1991-093e thermsto oJune 6 1991
ORDINANCE NO 9/-0q3
AN ORDINANCE OF THE CITY OF DENTON, TEXAS, AMENDING THE SCHEDULE OF
ELECTRIC RATES BY ADOPTING AN AMENDED SCHEDULE TS (THERMAL STORAGE
INCENTIVE RATE), AND PROVIDING FOR AN EFFECTIVE DATE
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS
SECTION I That the Schedule of Rates for electrical ser-
vices, as adopted by Ordinance No 89-122, is amended by amending
the provisions of Schedule TS (Thermal Storage Incentive Rate), a
copy of which is attached hereto and incorporated by reference
herein
SECTION II That this ordinance shall become effective
immediately upon its passage and approval
PASSED AND APPROVED this the/day of loc~ 1991
ATTEST
JENNIFER WALTERS, CITY SECRETARY
BY
APPROV AS TO LEGAL FORM
DEBRA A DRAYOVITCH, CITY ATTORNEY
BY
SCHEDULE TS
THERMAL STORAGE INCENTIVE
APPLICATION
Applicable to any customer who agrees to be on Time-of-Use rate
for five (5) years and who has a thermal storage facility of a
minimum storage capacity of 840,000 BTU The General Service Time
of Use Rate (TGS) shall apply, except that the system demand charge
shall be increased by $2 50/KW of system demand
THERMAL STORAGE INCENTIVE PAYMENTS
First 500 KW shifted $250/KW
to off-peak hours
Additional KW shifted $125/KW
to off-peak hours
Thermal storage incentive payments shall be made to qualifying
customers based on the following method
A design shall be submitted to the Director of Electric
Utilities for approval The thermal storage equipment shall be
checked for input electric demand (KW) and output capacity (BTU)
The system shall be limited for incentive payment to a maximum of
12,000 BTU per 500 square feet for the conditioned area of the
facility to be served
upon completion, the input-output of the thermal storage units
will be measured by the City of Denton The customer may observe
and verify all information and calculations for the actual size of
the facility Auxiliary equipment used to circulate fluid or air
handlers which would operate under normal peak periods will not be
included in calculating the KW load for incentive payments