1990-169ORDINANCE NO. D
AN ORDINANCE OF THE CITY OF DENTON, TEXAS, AMENDING THE SCHEDULE OF
ELECTRIC RATES BY DELETING SCHEDULE RW (RELIGIOUS WORSHIP) ; BY
ADOPTING A NEW SCHEDULE WK (WEEKEND RATE) ; AND PROVIDING FOR AN
EFFECTIVE DATE.
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS:
SECTION I. That the existing Schedule of Rates for electrical
services, as adopted by Ordinance No. 89-122 is amended by deleting
schedule RW (Religious Worship).
SECTION II. That the Schedule of Rates for electrical ser-
vices, as adopted by Ordinance No. 89-122, is amended by adopting
a new Schedule WK (Weekend Rate), a copy of which is attached
hereto and incorporated by reference herein.
SECTION III. That this ordinance shall become effective
November 1, 1990.
PASSED AND APPROVED this the""" day of OcAtO64-1990.
BOB CASTLEBERRY, MAYOR
ATTEST:
JENNIFER WALTERS, CITY SECRETARY
BY:
U
APPROVED AS TO LEGAL FORM:
DEBRA A. DRAYOVITCH, CITY ATTORNEY
BY: 4(Z1
2994L
SCHEDULE WK
WEEKEND RATE
APPLICATION
Applicable to any commercial and industrial user whose
maximum demand load occurs during the period from Friday at 12
midnight through Sunday at 12 midnight and does not experience a
demand load during the period from Sunday 12 midnight through
Friday 12 midnight that exceeds 50% of the maximum demand load.
Not applicable to resale service in any event, nor to
temporary, standby or supplementary service except in conjunction
with applicable rider.
NET MONTHLY RATE
(1) Customer Facility Charge
(2) Demand Charge
$25.00/30 days--Single
Phase
$30.00/30 days--Three
Phase
$ 4.25/KW (first 5 KW not
billed)
(3) Energy Charge
First 700 KWH
All over 700 KWH
(4) Energy Cost Adjustment
MINIMUM BILLING
7.50¢/KWH
2.92J/KWH
Per Schedule ECA
An amount equal to the demand charge as calculated below but
not less than fifty percent (50%) of the maximum monthly demand
charge for an month during the preceding months of May through
October plus 25/month for single phase service or $30/month for
three phase service, per 30 day billing.
TYPE OF SERVICE
The City will supply single-phase service (or three-phase
service if available at the point of delivery) at sixty (60) cycles
and at any standard voltages available from the City's distribution
system through one standard transformation. Where service of the
type desired by the customer is not already available at the point
of service, special contract arrangements between the City and the
customer may be required prior to its being furnished.
PAYMENT
Bills are due when rendered and become past due if not paid
within 15 calendar days from date of issuance.
DETERMINATION OF DEMAND
The demand shall be the KW supplied during the fifteen (15)
minute period of maximum use during the current month as determined
by the City's demand meter, but not less than 50% of the maximum
monthly KW similarly determined during the previous billing months
of May through October in the 12 months ending with the current
month. The first 5 KW demand shall be billed at $0.00/KW. The
adjusted KW demand will subsequently be used for billing for the
demand portion of the utility bill. In no case, shall billed demand
be less than 0 KW.
SPECIAL FACILITIES
All services which require
customer's service requirements
special facilities rider.
special facilities in order to meet
shall be provided subject to the
PRORATION OF UTILITY BILLS
Billing for consumption and demand shall be calculated on a
30-day basis and prorated for longer or shorter billing period.
(a) Billing for the Facility Charge shall be based on 12
billings annually.
Formula:
Actual days in reading period x customer charge
30
ENERGY COST ADJUSTMENT
A charge per KWH of energy taken for fuel cost calculated in
accordance with Schedule ECA.
PAGE 2