Loading...
1990-169ORDINANCE NO. D AN ORDINANCE OF THE CITY OF DENTON, TEXAS, AMENDING THE SCHEDULE OF ELECTRIC RATES BY DELETING SCHEDULE RW (RELIGIOUS WORSHIP) ; BY ADOPTING A NEW SCHEDULE WK (WEEKEND RATE) ; AND PROVIDING FOR AN EFFECTIVE DATE. THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION I. That the existing Schedule of Rates for electrical services, as adopted by Ordinance No. 89-122 is amended by deleting schedule RW (Religious Worship). SECTION II. That the Schedule of Rates for electrical ser- vices, as adopted by Ordinance No. 89-122, is amended by adopting a new Schedule WK (Weekend Rate), a copy of which is attached hereto and incorporated by reference herein. SECTION III. That this ordinance shall become effective November 1, 1990. PASSED AND APPROVED this the""" day of OcAtO64-1990. BOB CASTLEBERRY, MAYOR ATTEST: JENNIFER WALTERS, CITY SECRETARY BY: U APPROVED AS TO LEGAL FORM: DEBRA A. DRAYOVITCH, CITY ATTORNEY BY: 4(Z1 2994L SCHEDULE WK WEEKEND RATE APPLICATION Applicable to any commercial and industrial user whose maximum demand load occurs during the period from Friday at 12 midnight through Sunday at 12 midnight and does not experience a demand load during the period from Sunday 12 midnight through Friday 12 midnight that exceeds 50% of the maximum demand load. Not applicable to resale service in any event, nor to temporary, standby or supplementary service except in conjunction with applicable rider. NET MONTHLY RATE (1) Customer Facility Charge (2) Demand Charge $25.00/30 days--Single Phase $30.00/30 days--Three Phase $ 4.25/KW (first 5 KW not billed) (3) Energy Charge First 700 KWH All over 700 KWH (4) Energy Cost Adjustment MINIMUM BILLING 7.50¢/KWH 2.92J/KWH Per Schedule ECA An amount equal to the demand charge as calculated below but not less than fifty percent (50%) of the maximum monthly demand charge for an month during the preceding months of May through October plus 25/month for single phase service or $30/month for three phase service, per 30 day billing. TYPE OF SERVICE The City will supply single-phase service (or three-phase service if available at the point of delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution system through one standard transformation. Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may be required prior to its being furnished. PAYMENT Bills are due when rendered and become past due if not paid within 15 calendar days from date of issuance. DETERMINATION OF DEMAND The demand shall be the KW supplied during the fifteen (15) minute period of maximum use during the current month as determined by the City's demand meter, but not less than 50% of the maximum monthly KW similarly determined during the previous billing months of May through October in the 12 months ending with the current month. The first 5 KW demand shall be billed at $0.00/KW. The adjusted KW demand will subsequently be used for billing for the demand portion of the utility bill. In no case, shall billed demand be less than 0 KW. SPECIAL FACILITIES All services which require customer's service requirements special facilities rider. special facilities in order to meet shall be provided subject to the PRORATION OF UTILITY BILLS Billing for consumption and demand shall be calculated on a 30-day basis and prorated for longer or shorter billing period. (a) Billing for the Facility Charge shall be based on 12 billings annually. Formula: Actual days in reading period x customer charge 30 ENERGY COST ADJUSTMENT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. PAGE 2