1990-168~I DDl E OF
SNANCE NO• O ENDING GEytIESEgVICE
ORD TE 5r 2C D 2E
2Y TIVE A
OF pENE~DED SCYIEEFFEC
FOR
NCE OF BY ApOPIpR~ Ip,NG AN OR'DAINS• er-
AE OR RIC S iSq SE); ANp gEgEBY ctri
F cal din~3
ET ME O NSE Y OF 'DENSO s for aed by U5ae gen ate) e
TI 2
OF TgE CI e of g2 r to is a Tlene me of Yeferencalll TE1E COBNCTI' hat tine ance NG nera~-2SincorpOrated by ective
2 Ordl GS and m eff
'01 le SEC a50 as ptod Scheclla ea hereto I bec0 e
ltta0b ices. visioni i5 a di ante sha 1990
Of wh ch tylis or n
th c Py t
II tha a~j ay Of
herein • d
A
SEC2IOI3 j99() thy5
November 1r APPgOVEp
PA5SEp AND
~ENVI Eg WAL~Eg5r
B`L
APP "OV AD
DEBT
BI
tyre /
CITY SgCRE`~AgY
NJ ~,SGNL
ASgA O IT C'R r
D
2995L
SCHEDULE TGS
GENERAL SERVICE TIME OF USE (TGS)
Effective 11-01-90J
APPLICATION
Applicable to any commercial and industrial users for all
electric service supplied at one point of delivery and measured
through one meter who have peak electrical loads during off peak
hours.
Customers electing utilize the TGS rate may change to this
rate only during the month of June and must remain on this rate
for a minimum of twelve (12) continuous billing months.
Not applicable to resale service in any event, nor to
temporary, standby or supplementary service except in conjunction
with applicable rider.
NET MONTHLY RATE
(1) Customer Facility Charge
1 25.00/30 days Single Phase
30.00/30 days Three Phase
(2) On-Peak Demand Charge
(3) System Demand Charge
(4) Energy Charge
(5) Energy Cost Adjustment
MINIMUM BILLING
$12.50/KW of On-Peak
Demand
$ 4.00/KW of System
Demand
$ 0.01/KWH
Per Schedule ECA
The minimum monthly bill shall be the sum of the Customer
Facility Charge, the On-Peak Demand Charge, and the System Demand
charge but not less than 70% of the maximum monthly total demand
charge for any month during the preceeding months of May through
October.
TYPE OF SERVICE
Secondary service available to commercial and industrial
customers.
The City will supply single-phase service (or three-phase
service if available at the point of delivery) at sixty (60)
cycles and at any standard voltages available from the City's
distribution system through one standard transformation. Where
service of the type desired by the customer is not already available
at the point of service, special contract arrangements between the
City and the customer may be required prior to its being furnished.
DETERMINATION OF ON-PEAK DEMAND
The on-peak demand shall by the maximum KW demand supplied
during the fifteen (15) minute period of maximum use during the
on-peak hours as recorded by the City's demand meter and adjusted
for power factor, but not less than one hundred percent (100%) of
the maximum on-peak demand similarly determined during the previous
billing months of June through September in the twelve (12) months
ending with the current month.
DETERMINATION OF SYSTEM DEMAND
The system demand shall be the maximum KW demand supplied during
the fifteen (15) minute period of maximum use as recorded by the
City's demand meter and adjusted for power factor, but not less than
one hundred percent (100%) of the maximum system demand similarly
determined during the previous billing months of June through
September in the twelve (12) months ending with the current month.
POWER FACTOR PENALTY
The City reserves the right to determine the power factor of the
customer's installation served during periods of maximum demand or
by measurement of the average power factor for the monthl billing
period. If the power factor is below ninety percent (90ff on-peak
and average demand for the demand for billing purposes will be
determined by multiplying the unadjusted billing demand by ninety
percent (90%) and dividing by the determined power factor.
DEFINITION OF ON-PEAK HOURS
The City's on-peak hours, for the purpose of this rate schedule,
are designated as being from 1:00 P.M. to 8:00 P.M. each Monday
through Friday, starting on June 1 and continuing through September
30 each year. The City's on-peak hours may be changed from time to
time and the customer will be notified twelve (12) months prior to
such changes becoming effective.
DEFINITION OF OFF-PEAK HOURS
The City's off-peak hours, for the purpose of this rate
schedule, shall be all hours not designated as on-peak hours.
SUPPLEMENTAL POWER RIDER
Customers requesting standby or supplementary power shall be
allowed service under this rate schedule; however, the determination
of system demand shall be adjusted to read:
PAGE 2
The system demand shall be the sum of the maximum KW demand
supplied during the fifteen (15) minute period of maximum use as
recorded by the City's demand meter plus the KW nameplate rating(s)
of the customer's generator(s). In the event of the customer's
generator(s) is/are off-line at the time of the establishment of the
maximum system demand, the KW nameplate rating of the generator(s)
unavailable for service shall be removed from the determination of
the system demand. In no event shall the system demand be less than
seventy percent (70%) of the maximum system demand similarly
determined during the previous billing months of June through
September in the twelve (12) months ending with the current month.
SPECIAL FACILITIES
All services which require special facilities in order to meet
the customer's service requirements shall be provided subject to
special facilities rider.
PRORATION OF UTILITY BILLS
(a) Billing for the Facility Charge shall be based on 12
billings annually using the following formula:
Actual days in reading period x Customer Charge
(b) Billing for demand shall be calculated on a
30-day-per-month basis and pro rated for longer or shorter
billing periods using the following formula:
Actual days in reading period x KW Demand x Rate
ENERGY COST ADJUSTMENT
A charge per KWH of energy taken for fuel cost calculated in
accordance with Schedule E.C.A.
PAYMENT
Bills are due when rendered, and become past due if not paid
within 15 calendar days from date of issuance.
PAGE 3