1990-091AN ORDINANCE AUTHORIZING THE MAYOR TO EXECUTE AMENDMENT NO. 2 TO THE AGREEMENT OF FEBRUARY 16, 1988 BETWEEN THE CITY OF DENTON AND FREESE AND NICHOLS, INC. RELATING TO PROFESSIONAL ENGINEERING SERVICES FOR THE DESIGN OF THE LAKE RAY ROBERTS WATER TREATMENT PLANT; AUTHORIZING THE EXPENDITURE OF FUNDS THEREFORE; AND PROVIDING AN EFFECTIVE DATE. THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION I. That the Mayor is authorized to execute Amendment No. 2 to the agreement between the City of Denton and Freese and Nichols, Inc. relating to the design of the Lake Ray Roberts Water Treatment Plant under the terms and conditions contained within said amendment, a copy of which is attached hereto and made a part hereof. SECTION II. That the city Council hereby authorizes the ex- penditure of funds not to exceed Two Hundred Fifty-Three Thousand Five Hundred Thirty-Five ($253,535) Dollars for the services required pursuant to Amendment No. 1 and No. 2 of the Agreement. SECTION III. That this ordinance shall become effective immediately upon its passage and a~. ~ PASSED AND APPROVED this the /~ay of __, 1990. JENNIFER WALTERS, CITY SECRETARY APPROVED AS TO LEGAL FORM: DEBRA A. DRAYOVITCH, CITY ATTORNEY 5906~ ./'"- - ' AMENDMENT NUMBER 2 TO THE AGREEMENT FOR ENGINEERING SERVICES BETWEEN THE CITY OF DENTON AND FREESE AND NICHOLS, INC., FOR LAKE RAY ROBERTS OFFSITE WATER TRANSMISSION FACILITIES The Agreement for Engineering Services entered into on the 16th day of February 1988 and as amended on the 7th day of November 1989, by and between the City of Denton (OWNER) and Freese and Nichols, Inc., (ENGINEER) shall be amended as set forth below. The said Agreement and Amendment No. I are attached and are hereby amended as follows: That portion of Amendment No. i within Section I which describes Phase II is hereby amended by the addition of the following language after the first paragraph of Section I on Page i of Amendment No. 1. Prepare the design of a booster pump station and ground storage tank, that includes the following: 1. Two (2) preliminary site layouts with two (2) proposed pump station building floor plan and elevation alternatives. 2. Pump station building to enclose three (3) vertical turbine pumps with space for three (3) vertical turbine pumps to be added in the future. Building is to have appearance of a high quality modern residential home. 3. One partially buried rectangular cast-in-place concrete storage tank with a capacity of approximately three million (3,000,000) gallons. 4. Emergency chlorine scrubber system with audible, visual and remote alarms. 5. Temporary off-site crushed stone access drive from Sherman Drive to the pump station site. 6. Attend six (6) project coordination meetings. II. That paragraph within Section VI, Subsection B, on Page 14 of the Agreement which obligates the Engineer to submit a maximum fee to the Owner for Phase II Detailed Design Phase and Phase III Construction Phase Services is hereby amended by the addition of the following language: The ENGINEER shall be pai~ for the increased scope of work under Phase II- Detailed Design Phase, described above in Amendment No. 2, and for the adOitional scope of work under Phase III - Construction Phase Booster Pump Station and Ground Storage Tank, described in the Prime Agreement, as set forth in Exhibit "A" of the original Agreement, Schedule of Charges, with the total additional fee not to exceed the amount listed below (Phase III is based on a twelve (12) month construction period in lieu of nine (9) months): Additional Fee Booster Pump Station and Ground Storage Not to Exceed Amendment No. 1 Phase II & III $147,850 Amendment No. 2 Phase II & III $105,685 lotal Estimated Phase II & III $253,535 Partial payments to the Engineer will be made on the basis of monthly statements rendered to and approved by the Owner; however, under no circumstances shall any monthly statements exceed the value of work performed at the time a statement is rendered. III. All other provisions, terms, conditions and obligations of the Agreement between Owner and Engineer and Amendment Number 1 to the Agreement which are not expressly amended here shall remain in full force and effect. Said Agreement Amendment and this Amendment shall be construed together as a single contractual agreement. Th~sJAmendme~Number 2 is executed in two counterparts, on this the/_~y of ~ , 1990. CITY OF DENTON, TEXAS, OWNER BY:BO ATTEST JENNi~ ~WALTERS,.C1TY SECRETARY BY: ~ APPROVED AS FOR LEGAL FORM: DEBRA AD/~I DRAYOVITCH, CITY ATTORNEY BY: AND NICHOLS, INC., ENGINEER ROBERT L. NICHOLS, PRESIDENT ATTEST: JAMES R. NICHOLS, P.E. ROI~RT L. NICHOLS, P.E. AND ROBERT S. GOOCH, P.E. ROBERT A. THOMPSON III, T. ANTHONY REID, P.E. , INC. GARY N. ~E~V~S, P.E. ROBERT F, PENCE, P.E. CONSULTING ENGINEERS THOMAS C. GOOCH, P.E. RONNIE M. LEMONS, P.E. MICHAEL L. NICHOLS, P.E. GARRY H. GREGORY, P.E. Hay 18, 1990 IERRYL. FLeMInG, P.£. m~cn^EL c. morr,~n, P.e. Mr. c. David Ham, D~rector of ~ater and ~aste~ater ~ti]~t~es Service Center/~arehouse 901-~ lexas Street Benton, lexas 76201 Re: Proposed Amendment No. 2 Lake Ray Roberts Off-Site Facilities Phase II & III DTN 89844-3.10 Dear Mr. Ham: As per your request, we are pleased to submit a proposal for the increased scope of Engineering Services for Phase II (Detailed Design) and Phase III (Construction Phase) of the Lake Ray Roberts Off-Site Facilities. In general, this will include a 3 MG underground concrete reservoir and a building to enclose the high service pumps in lieu of an above ground welded steel tank with exposed high service pumps. The services to be provided are as indicated in the original contract for Engineering Services- Lake Ray Roberts Off-Site Water Transmission Facilities Section III, Phase II and Phase III dated February 16, 1988, Amendment No. 1, dated November 7, 1989 and the attached Amendment No.2. Freese and Nichols proposes that this project be bid under one construction contract and a revised estimate of the sheets required for the plans is as follows: 1. Cover Sheet 2 Index/Notes/Vicinity Map 3 Site Layout 4 Site Grading Plan 5 Pump Station - Mechanical 6 Misc. Mechanical Details 7 Pump Station Foundation Structural 8. Pump Station Structural Details 9. Ground Storage Tank Layout 10. Ground Storage Tank Plan and Sections * 11. Ground Storage Tank Structural Details * 12. Ground Storage Tank Structural Details * 13. Ground Storage Tank Roof Structural Details'* 14. Ground Storage Tank Roof Structural Details * 15. Ground Storage Underdrain Collection System Plan and Details * 16. Pump Station Building Floor Plan/Finish Schedules/Door Schedules * 17. Pump Station Building Sections and Details * 18. Pump Station Building Elevations and Details * TELEPHONE 817 336-7161 811 LA. MAR STREET FORT WORTH, TEXAS 76102-36~3 METRO 817 429-1900 FAX 817 877-4267 Mr. David Ham, P.E. May 18, 1990 Page 2 19. Pump Station Foundation Plan and Details 20. Pump Station Roof Framing Plan and Details * 21. Chemical Room Plans and Details 22. Chemical System Piping Plan and Details 23. Emergency Chlorine Scrubber System Plan, Elevations and Details * 24. Scrubber System Enclosures and Details * 25. Flow Tube Vault 26. Holding Tanks 27. Access Road Plan and Profile 28. Access Road Plan and Profile 29. Access Road and Drainage Details 30. Pipeline - On-Site Layout 31. Pipeline - Plan and Profile 32. Pipeline - Plan and Profile 33. Pipeline Details 34. Sprinkler System Layout and Details 35. Electrical Site Plan 36. Electrical Schematics 37. Electrical Pump Station Building Plan * 38. Misc. Electrical Details * 39. Misc. Electrical Details 40. Supervisory Control and Instrumentation · Denotes Additional Drawing Required for Increased Scope of Work. See Attachment i for manhours per drawing breakdown. Below is an estimate of the additional manhours and cost (based upon the multipliers in the existing contract) for the increased scope of work: Additional Additional PHASE II {Amendment No. 2) Manhours Raw Salary Cost Principal-in-Charge 10 $ 360 Project Manager 145 3,915 Project Design Engineer 164 3,444 Structural Engineer 288 5,188 Architectural Designer 126 2,520 Electrical Engineer 112 2,016 Technician 468 7,956 Clerical 36 324 Subtotals 1,349 $25,719 Mr. David Ham, P.E. May 18, 1990 Page 3 Total Raw Salary w/ multiplier of 1.4136 x 2.3 $83,620 Expenses w/ multiplier of 1.0 $ 3,230 Estimated Increase in Engineering Fee - Phase II $86,850 Additional Additional PHASE III (Amendment No. 2) Manhours Raw Salary Cost Principal-in-Charge 5 $ 175 Project Manager 39 1,005 Construction Engineer 102 2,193 Design Engineer 42 924 Construction Technician 67 1,139 Technician 0 0 Clerical 20 180 Subtotals 275 $5,564 Total Raw Salary w/ multiplier of 1.4136 × 2.3 $18,090 Expenses w/ multiplier of 1.0 $ 745 Estimated Increase in Engineering Fee - Phase III $18,835 Estimated Total Increase (Phase II & III) $105,685 Freese and Nichols proposes to perform the services for Phase II and Phase III on the basis of salary cost times a multiplier of 2.3 plus direct expenses times a multiplier of 1.0 with a maximum ceiling not-to-exceed $105,685 without written authorization by the Owner. (Salary cost is equal to 1.4136 times payroll.) Freese and Nichols will be available to provide resident representation during the Construction Phase (III) in accordance with Section IV.I of the prime engineering contract, if requested by the City. Since the number of meetings with the City and the local neighborhood residents are unable to be determined, we propose that services for these meetings be compensated as Additional Services under the prime engineering agreement. Mr. David Ham, P.E. May 18, 1990 Page 4 We appreciate this opportunity to submit this proposal to the City of Denton. If you have any questions or require additional information, please call. Yours very truly, FREESE AND NICHQLS, INC. Robert L. Nichols, P.E. President Enclosure xc: Lee Allison Bob Nelson Renee Baker Mike Nichols