AN ORDINANCE ACCEPTING COMPETITIVE BIDS AND PROVIDING FOR THE AWARD
OF CONTRACTS FOR PUBLIC WORKS OR IMPROVEMENTS, PROVIDING FOR THE
EXPENDITURE OF FUNDS THEREFOR, AND PROVIDING FOR AN EFFECTIVE DATE
WHEREAS, the City has solicited, received and tabulated
competitive bids for the construction of public works or
improvements in accordance with the procedures of state law and
City ordinances, and
WHEREAS, the City Manager or a designated employee has received
and recommended that the herein described bids are the lowest
responsible bids for the construction of the public works or
improvements described in the bid invitation, bid proposals and
plans and specifications therefore, NOW, THEREFORE,
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS
SECTION I. That the following competitive bids for the
construction of public works or improvements, as described in the
"Bid Invitations", "Bid Proposals" or plans and specifications
attached hereto are hereby accepted and approved as being the
lowest responsible bids
BID NUMBER CONTRACTOR AMOUNT
9976 Cajun Contractors, Inc $ 148,800 00
1013 Sunmount Corporation $ 369,820 50
1020 Lupton Painting company $ 85,500 00
SECTION II. That the acceptance and approval of the above
competitive bids shall not constitute a contract between the City
and the person submitting the bid for construction of such public
works or improvements herein accepted and approved, until such
person shall comply with all requirements specified in the Notice
to Bidders including the timely execution of a written contract and
furnishing of performance and payment bonds, after notification of
the award of the bid
SECTION III, That the City Manager is hereby authorized to
execute all necessary written contracts for the performance of the
construction of the public works or improvements in accordance with
the bids accepted and approved herein, provided that such contracts
are made in accordance with the Notice to Bidders and Bid
Proposals, and documents relating thereto specifying the terms,
conditions, plans and specifications, standards, quantities and
specified sums contained therein
SECTION IV, That upon acceptance and approval of the above
competitive bids and the execution of contracts for the public
works and improvements as authorized herein, the City Council
hereby authorizes the expenditure of funds in the manner and in the
amount as specified in such approved bids and authorized contracts
executed pursuant thereto
SECTION V That this ordinance shall become effective
immediately upon its passage and approval
PASSED AND APPROVED this the 7th day of March, 1989
RAY S HEN , MAYOR
ATTEST
(2o"NAL "22222
NIFE WALTERS, CITY SECRETARY
APPROVED AS TO LEGAL FORM
DEBRA A DRAYOVITCH, CITY ATTORNEY
BY
Page 2
DATE NOVEMBER 7, 1989
CITY COUNCIL REPORT
TO Mayor and Members of the City Council
FROM Lloyd V Harrell, City Manager
SUBJECT BID #9976 - WATER WORKS IMPROVEMENTS, INSTALLATION
OF RAW WATER PUMP #3A, AND MISCELLANEOUS
REHABILITATIONS
RECOMMENDATION Item 1A - We recommend this bid be awarded to
Cajun Contractors, Inc of Baton Rouge, Louisiana, with offices in
Dallas, Texas, for the amount of $148,800 00 We also recommend
that Section B & C be rejected
SUMMARY This bid is for the installation of a recently bid and
purchased raw water pump and some other repairs and modifications
This bid has been reviewed and approved by the Utility Board on
October 24, 1989
BACKGROUND Public Utility Board Agenda, Public Utility Board
Minutes, and Bid Tabulation Sheet
PROGRAMS DEPARTMENTS OR GROUPS AFFECTED City of Denton Municipal
Utilities and the Citizens of Denton
FISCAL IMPACT: There is no additional impact on the City of Denton
General Fund
Respe ully,;ul;tnyttted
Lloyd Harrell
City Manager
Prepared by
Na a ohn J Marshall '
Tit s Purchasing Agent
Approved
n nil Marshall
itl Purchasing Agent
019 DOC
October 24, 1989 Q
PUBLIC UTILITIES BOARD
AGENDA ITEM
TO CHAIRMAN AND MEMBERS OF THE PUBLIC UTILITIES BOARD
FROM R E Nelson, Executive Director of Utilities
SUBJ CONSIDER BID OPENING #9976 TO CAJUN CONSTRUCTION COMPANY FOR PART
A, INSTALLATION OF RAW WATER PUMP #3A AND MISCELLANEOUS
REHABILITATION
RECOMMENDATION
Freese & Nichols, Consulting Engineers, and Staff, recommend award of
Part A, Installation of Raw Water Pump 3A and Miscellaneous
Rehabilitation, of Bid #9976 in the amount of_$148,000 to_ Ca,)uri
Construction Comp, and refection ofalf bids for Part B, Water
L ni e-Mean-ing, and Part C, Pipeline Cleaning
SUMMARY
Bids were opened October 12, 1989
summary attached
The results are shown on the bid
Miscell
on
Cajun r^gstruction Company, of Baton Rouge, Louisiana, (also a Dallas
office) is the lowest qualified bidder at $148,000 Their bid is
contingent upon receiving a contract extension time for late
switchgear delivery They have verbally indicated that they can meet
a June 1, 1990, deadline (approximately a 60 day contract extension
time), which is equivalent to the least amount of delay requested by
the other bidders
Part B - Water Line Cleaning Facilities
Red River Construction Company, of Dallas, Texas, is the lowest
qualified bidder at $215,000, which is contingent upon receiving a
contract extension time of approximately 60 days (April 15, 1990)
Otherwise, the bid is $225,000, and the lowest qualified bidder
becomes Montauk Services, Inc , with a bid proposal of $217,000
Montauk has verbally indicated that they are not interested in
reducing their bid, even with the same contract extension time
offered to them
Part C - Pipeline Cleaning
Montauk Services Inc , is the lowest qualified bidder, with a
proposal of $30,000 (no contingencies)
PUB Agenda Item
Page 2
BACKGROUND
The Water Utility has been in the process of increasing the capacity
of the Water Production facilities to 30 MGD from 24 MGD This
requires improvements to several facilities
1 Raw water pumps
2. Raw water transmission mains
3 Water treatment plant (completed)
4 Distribution pumps (completed)
High service pump #6 installation was completed last spring
Expansion of the water treatment plant was completed last fall The
contract for purchasing another raw water pump was approved last
spring This pump will be delivered by December 1989 Some
miscellaneous improvements to the raw water pump station and
transmission mains are yet to be accomplished
During design of the water treatment plant, and raw water pump
station improvements, Freese & Nichols reported that the internal
condition of the raw water transmission mains may inhibit their
capacity. Over time, silt, clamshells, and other lake debris tend to
settle on the pipe bottom and accumulate on the top and sides The
resulting buildup tends to reduce the cross sectional area and to
increase the pipe roughness The result is lowered capacity
Mechanical cleaning of the line, sometimes referred to as "pigging"
the line, will remove the debris and restore a significant amount of
the original capacity Field tests have indicated a roughness
coefficient (C value) of 90 New concrete has a C of 140 Pigging
should restore the pipe to a C of 120 This will increase the
capacity from 28 MGD to about 32 MGD The capacity over 30 MGD will
provide additional time before pigging will again be required
Based upon the 1990 Utility Department Planning Forecast, recent
operating conditions and the current growth rate, the current 28 MGD
raw water line capacity should suffice for two or three more years
The well system can be utilized if unusual conditions should
develop. Therefore, the installation of the cleaning facilities and
accomplishment of the cleaning can be postponed for a couple of years
PROGRAMS, DEPARTMENTS OR GROUPS AFFECTED
Citizens of Denton, Denton Municipal Utilities, Cajun Construction
Company, and Freese & Nichols, Inc
PUB Agenda Item
Page 3
FISCAL IMPACT
The total bid amount of $393,000, is greater than the amount budgeted
of $310,000 When consideration is given to the pump purchase
engineering fees, etc , then an additional amount of $233,000 is
needed. By not awarding parts B and C, the budgeted amount is
$11,200 greater than the amount required A detailed funding
analysis is provided on Exhibit III
ectfull su itted,
ResP,
l f! ti Q-~
e s n, Executive
Director of Utilities
Prepared by,
vz~
Lee son, Engineering
Administrator
Approved by,
i
am, rector o
Water/Wastewate W es
Exhibit I Bid Summary
II Letter of Recommendation
III Fund Analysis
Iv Project Location Maps
6529U 6-8
NOV-01-'89 WED 14 18 ib CITY OF DENTON UA TEL NO 817-566-8236 11783 P02
EXCERPT FROM MINUTES
PUBLIC UTILITIES BOARD
OCTOBER 24, 1989
7 CONSIDER SID OPENING #1013 TO SUNMOUNT CORPORATION FOR
OAR, FRY AND BRYAN SANITARY SEWER AND FRY WATER LINE.
Laney made a motion to approve Bid #1013 to Sunmount
Corporation Second by Thompson All ayes, no nays,
motion carried.
8. CONSIDER BID OPENING #9976 TO CA.7UN CONSTRUCTION COMPANY
FOR PART A, INSTALLATION OF RAW WATER PUMP #3A, AND
MISCELLANEOUS REHABILITATION.
Frady made a motion to approve Bid #9976 to Cajun
Construction Company Second by Thompson All ayes, no
nays, motion carried
9 CONSIDER BID OPENING #1020 FOR THE PAINTING AND REPAIR OF
THE HIGH SCHOOL ELEVATED STEEL STORAGE TANK.
Laney made a motion to approve Bid #1020 for the painting
and repair of the High School elevated steel storage
tank
The motion was seconded by Thompson All ayes, no nays,
motion carried
r
N
~
J IT G!1 J+ 4~ N
m
u
a
1
1
~M I
2
O a)
m
nn
m
mwmweo
i
n
m o
e)
1
o
s
ns
o r
iM
n
m
rrrrrrr
r
1
1
b
r
1~
r
S S Z~ s S
s
c
r
n
i
i
~
-1
-
~
1
i 1
r
0
n
~
n i
l
I
ml
A m
1
I
m
a i
n ui
r
1
1
1
m
0
x
R
ti
,y,
h
1
S 1
1
)
+
I
1 1 1 1 1 I 1
1
i
OI
n 5
N [m
+0
p.
~
~
® q
1
'A 1
-1 1
R1
1m !Y
i
i
UI rt'
01
w
so
-
I
I
W
N w
.Iyyyy
Iii
N N N N N
I
C I
T
u
m
1
n
u
i
~
~
gi
'
m
r
~
i
te
u
i
p
1
is
a s
as
~
1g
m a m z o s
~
o
w
1
1
a
Y
o
I
~ i
n H
~
T
I
® 1
1
1 1 I 1 1 1 1
.
I
G
C
S
N
ttllff
~
p.
~
I
T
I
I
1
~
®
~
~
1
1
1
1
1
1
4
N
w N
N
N N "N"w'
~
1
CI
Gl m
m
m
n
i v
i
v
~
~m
~
~
i
a
a
~
m
~
m
~
~
m
SmmS mE m
m
1
i
a
a
i
1
I
n
y~
N r
1~
i
cl
n~ m
w
m
N N
®
°
1.1
~
W N
rw
)
w
~
w
w
.
-`'.ol
i
I
ra -la
m
i
c
.
1
N N
q
1
1
y
p
~
®
H
y
m
m®
2 3 5
®
mi
110
9C
®
m m
u
~1
®
so y a z z m
1
a
c
e
I
I
"ii'i
i
sl ~
a
o
~
N N
'
~ 1
1
I I 1 I 1 I 1
i
O I
y
r
9 R'] m
~q
IID
li
1
~ 1
1 -1 T
-
m
I
I
A' T
m
~
m
I
1
I
I
~ Y
W
C
x
A
N
V N i ~W N
y
y
CO
1
Ti
a91 'nA
t y,
m m
N~
1
1
M+
~
1
Cf 1
~
n Cf L
Si
m
Siiffl
mmi"
IA
I
1
DATE NOVEMBER 7, 1989
CITY COUNCIL REPORT
TO Mayor and Members of the City Council
FROM: Lloyd V Harrell, City Manager
SUBJECT BID #1013 - OAK, BRYAN, AND FRY STREETS SANITARY
SEWER AND WATER LINES REPLACEMENT
RECOMMENDATION We recommend this bid be awarded to the low
overall bidder, Sunmount Corporation, for the amount of
$369,820 50
SUMMARY This bid was advertised and a bid invitation was sent to
the large group of prospective vendors for this type project We
received four bids as shown on the attached tabulation sheet The
Public Utility Board has reviewed this bid with the recommendation
of award to the low bidder, Sunmount Corporation
BACKGROUND Tabulation Sheet, Public Utility Board Agenda and
Minutes
PROGRAMS, DEPARTMENTS_ OR GROUPS AFFECTED City of Denton
Utilities, Public Works, and the Citizens of Denton
FISCAL IMPACT: There is no additional impact on the General Fund
Res tfuullly su itted
v
L1 yd Harrell
City Manager
Prepared by
15'e or J Marshall
Tit s Puchasing Agent
Approved
r ~
me 'o n J Marshall
T e Purchasing Agent
019 DOC
PUBLIC UTILITIES BOARD
AGENDA ITEM
October 24, 1989 1
TO CHAIRMAN AND MEMBERS OF THE PUBLIC UTILITIES BOARD
FROM R E Nelson, Executive Director of Utilities
SUBJ CONSIDER BID OPENING #1013 TO SUNMOUNT CORPORATION FOR OAK, FRY
AND BRYAN SANITARY SEWER AND FRY WATER LINE
RECOMMENDATION
The Department of Public Works Engineering and the Water and
Wastewater Engineering Divisions recommend award of Bid #1013 to
Sunmount Corporation in the amount of $369,820 50
SUMMARY
Bids were opened September 19, 1989 The results are shown on the
bid summary attached Sunmount Corporation, of Roanoke, Texas, was
the overall lowest qualified bidder Although Sunmount was the
second lowest bidder for the water line, the contract was structured
to be awarded to one contractor to avoid confusion during
construction
BACKGROUND
Oak, Fry and Bryan Streets are part of a Public Works Paving and
Drainage Capital Improvements Protect Approximately 5,900 linear
feet of 8" and 10" sewer main, along Oak from Bonnie Brae to Fry,
along Fry from Hickory to Scripture, and along Bryan from Oak to
Scripture are proposed to replace deteriorated and to capacity clay
tile 6" pipes Approximately 1,000 linear feet of 8" water main
along Fry from Oak to Scripture is proposed to replace the existing
old cast iron 4" pipe In order to accommodate the Public Works CIP,
these lines need to be replaced prior to the commencement of the
paving and drainage work
PROGRAMS, DEPARTMENTS OR GROUPS AFFECTED
Citizens of Denton, Denton Municipal Utilities, Public Works, and
Sunmount Corporation
FISCAL IMPACT,
Oak, Fry and Bryan sanitary sewer and water line replacements were
originally part of the fiscal year 1987 Utility CIP under the
"Replace Miscellaneous Street Program" Due to Public Works'
delaying of the street work, Utilities also elected to delay line
replacements so that funds are not expended prematurely
PUB Agenda Item
Page 2
The bids for the work were $58,500 for water line replacement, and
$311,500 for sanitary sewer line replacement The department has
$175,000 budgeted for replacing water lines, in conjunction with the
Public Works street programs, and $100,000 budgeted for replacing
sewer lines In order to fund the project $245,000, it must be used
from the fund for replacing miscellaneous sewer lines This fund has
a budgeted amount of $379,000, of which $170,000 was designated for
unspecified lines About $45,000 of the specified linework will be
delayed until FY 1991
A detailed funding analysis is included in Exhibit III
Respectfully ub tted,
so xeccuve
Director of Utilities
Prepared by,
%~-l
ee son, Engine er
Administrator
Approved by,
David am, rector
Water/Wastewater Util
Exhibit I Bid Summary
II Letter of Recommendation - City Engineering
III Fund Analysis
IV Project Location Maps
6529U 4-5
N
A
W
N
+
I w
I ~ ~
i
1+
Izrn
Tw
r
O
ti
~
y
O C
D
1 T~
C
N
~
222
T
1
T
(
q/~
S K
I
l 119
TTC
1
1z
O Z
Zp
x
1
I
-1 y
1 T
>
~O-1
m 2
T
ti
T yZZZ
1
o
m
~
I
9
\
m
V
I
x
i
H
x
1
I
1
i
1
i
i
w
ti
w
V
N
O
w
r
«
N
I
T
d
e
O
=
A
I r
>
t
N
y
ti
m
y
1
1~~II
I m
'A
O
O
V
N
W
O
O
O
N
O
I
1
I
I
I p
I >
N
N
P
41
IT
I N
I
I
1
N
b
Y
N
A
I ~
Q
8
8
S
S
I+ m
I m
S
S
S
S
S
~
1
1
1
1
~
G
W°
1fN~ p>
I I=TI~O
A
b
)c
1 a
W
~
O
O
w
ti m
I Z~ K K
8
S
~
S
S
IH ~
1
1
N
N
(W~1
IW11
N
1 W
1
I
1
1
~
M
M
N
~
I r p Dp
CI
N
m
y
N
N
W
1 HO
I
T rl
O
O
N
O
p
N
yO11
y
1 N 2 H
1
O
O
$
O
O
O
O
D<
1 HT
o
S
o
0
0
I m
1
0
0
0
0
~
i
1
M
N
N
N
N
I
~
N
A
W
W
1
N
M
O
N
10
1 pl O
b
b
N
N
1 H ti
1 O>
OI
O
W
+
O
W
O
T
N
O
1 r
1
O
O
N
N
N
O
O
N
O
1
I
I
I Z
I > M
Iw.l
Q
P
Y
W
I
m S O
N
N
m
N
0
b
W
O
N
I
O
i
O
+
W
O
OI
O
-m H O
I T~
_
N <0
O
O
N
N
O
O
T
1
KN
A
A
I
1
1
I
N
VI
N
N
N
1 O
OZ
T yTy
K >K
m w O
N
~ O M
r~
A t
m
K
rm to
t
-1
i =
O
m K
ZZT N
N =
A
m w
0 o
m O
w m
A I=-1
+ w
b
R
+ O
b +
~ W
CONTRACT AGREEMENT
STATE OF TEXAS
COUNTY OF DENTON )
THIS AGREEMENT, made and entered into this 8th_ day of NOVrmnFR _
A.D., 19gg_, by and between THE CTTV nF ppNTO t mFVac
of the County of DE.NTON and State of Texas, acting through r.r.OVD
V- HARRELL thereunto duly authorized so to do,
Party of the First Part, hereinafter termed the OWNER, and S jNM[~ OuNT
of the City of ROANOKE , County of DENTON
and state of TEXAS Party of the Second Part, hereinafter
termed CONTRACTOR.
WITNESSETH: That for and in consideration of the payments and
agreements here inafter'mentioned, to be made and performed by the Party of the
First part (OWNER), and under the conditions expressed in the bonds bearing
even date herewith, the said Party of the Second Part (CONTRACTOR) hereby
agrees with the said Party of the First Part (OWNER) to commence and complete
the construction of certain improvements described as follows:
BID #1013 P O #93720 OAK BRYAN AND FRY STREETS SANITARY SEWER/
WATER IMPROVEMENTS 4 a cl,820 So
and all extra work in connection therewith, under the terms as stated in the
General Conditions of the agreement; and at his (or their) own proper cost and
expense to furnish all materials, supplies, machinery, equipment, tools,
superintendence, labor, insurance, and other accessories and services
necessary to complete the said construction, in accordance with the conditions
and prices stated in the Proposal attached hereto, and in accordance with all
the General Conditions of the Agreement, the Special Conditions, the Notice to
Bidders (Advertisement for Bids), Instructions to Bidders, and the Performance
and Payment Bonds, all attached hereto, and in accordance with the plans,
which includes all maps, plats, blueprints, and other drawings and printed or
CA-1
0044b
written explanatory matter thereof, and the Specifications therefore, as
prepared by CTTV OF pF.NTON FNCTNF.F.RTNC+ 1)7?pARTMENT
, all of which are made a part hereof and collectively evidence and
constitute the entire contract.
The CONTRACTOR hereby agrees to commence work on or after the date
established for the start of work as set forth in written notice to commence
work and complete all work within the time stated in the Proposal, subject to
such extensions of time as are provided by the General and Special Conditions.
The OWNER agrees to pay the CONTRACTOR in current funds the price or
prices shown in the Proposal, which forms a part of this contract, such
payments to be subject to the General and Special Conditions of the Contract.
IN WITNESS WHEREOF, the parties of these presents have executed this
agreement in the year and day first above written.
ATTEST:
LLOYD V. HARRELL, CITY MANAGER
(SEAL)
ATTEST:
~s erg r.
SUNMOUNT CORPORATION
Party of the Second Part, CONTRACTOR
BY
Title Secretary-Treasurer
(SEAL)
APPRO ED TO FORM:
City Attorney
CA-2
0044b
PERFOR11ANCE BOND
STATE OF TEXAS
COUNTY OF DENTON
KNOW ALL MEN BY THESE PRESENTS: That SUNMOUNT CORPORATION
, of the City of ROANOKE
County of DENTON , and State of TEXAS
as PRINCIPAL, and SEABOARD SURETY COMPANY
, as SURETY, authorized under the laws of
the State of Texas to act as surety on bonds for principals, are held and firmly
bound unto the CITY OF DENTON TEXAS
as OWNER, in the penal sum of THREE HUNDRED SIXTY NINE THOUSAND, EIGHT HUNDRED
TWENTY AND 50/100 Dollars ($?rq ugn rn ) for the payment whereof, the said
Principal and Surety bind themselves and their heirs, administrators, executors,
successors and assigns, jointly and severally, by these presents:
WHEREAS, the Principal has entered into a certain written contract
with the OWNER, dated the $LjL .day of NOVF.MRF.R , 19$x, for the construction of
OAK BRYAN AND FRY STREETS SANITARY SEWER/WATER IMPROVEMENTS
which contract is hereby referred to and made a dpart hereof as fully and to the
same extent as if copied at length herein.
NOW, THEREFORE, the condition of this obligation is such, that if the
said principal shall faithfully perform said Contract and shall in all respects,
conditions and agreements in and by said contract agreed and covenanted by the
Principal to be observed and performed, and according to the true intent and
meaning of said Contract and the Plans and Specifications hereto annexed, then this
obligation shall be void: otherwise to remain in full force and effect;
PB-1
PROVIDED, HOWEVER, that this bond is executed pursuant to the
provisions of Article 5160 of the Revised Civil Statutes of Texas as amended by
acts of the 56th Legislature, Regular Session, 1959, and all liabilities on this
bond shall be determined in accordance with the provisions of said Article to the
same extent as if it were copied at length herein.
PROVIDED FURTHER, that if any legal action be filed upon this bond,
venue shall lie in County, State of Texas.
Surety, for value received, stipulates and agrees that no change,
extension of time, alteration or addition to the terms of the contract, or to the
work performed thereunder, or the plans, specifications, or drawings accompanying
the same, shall in anywise affect its obligation on this bond, and it does hereby
waive notice of any such change, extension of time, alteration or addition to the
terms of the contract, or to the work to be performed thereunder.
IN WITNESS WHEREOF, the said Principal and Surety have signed and
sealed this instrument this 8TH day of NOVEMBER 19 89,
911NMOUNT CORPORATION
Principal
SEABOARD SURETY COMPANY
Surety
By
C'kUvf~
R. A. Brown
Title Secretary-Treasurer
Address P. 0. Box 1770
Roanoke, TX 76262
Title LINDA COUEY ATTY-IN-FA(
Address P.O. BOX 2125
AUSTIN, TEXAS 78768
(SEAL) (SEAL)
The name and address of the Resident Agent of Surety is:
FRANK SIDDONS INSURANCE
P.O. BOX 2125 - AUSTIN, TEXAS 78768
NOTE: Date of Bond must not be prior to date of Contract.
PB-2
0091b
For verification of the authenticity of this Power of Attorney you may call, collect, 201-658-3500 and ask for the Power of Attorney clerk. Please refer to the Power
PAYMENT BOND
STATE OF TEXAS
COUNTY OF DENTON
KNOW ALL MEN BY THESE PRESENTS: That SUNMOUNT CORPORATION
of the City of ROANOKE ,
County of DENTON and State of TEXAS , as principal, and
SEABOARD SURETY COMPANY
authorized under the laws of the State of Texas to act as surety on bonds for
principals, are held and firmly bound unto THE CTTV OF DENTON TEXAS
OWNER, in the penal sum of TH$F:F. HIINDRF.D RTXTY NTNF.
THOUSAND EIGHT HUNDRED TWENTY AND 50/100 Dollars (1369 R20.50 )
for the payment whereof, the said Principal and Surety bind themselves and their
heirs, administrators, executors, successors and assigns, jointly and severally, by
thes presents:
WHEREAS, the Principal has entered into a certain written contract
with the Owner, dated the 8th . day of NOVEMBER , 19 89
BID# 1013 - OAK, BRYAN AND FRY STREETS SANITARY SEWER/WATER
IMPROVEMENTS
to which contract is hereby referred to and made a part hereof as fully and to the
same extent as if copied at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the
said Principal shall pay all claimants supplying labor and material to him or a
subcontractor in the prosectiou of the work provided for in said contract, then
this obligation shall be void, otherwise to remain in full force and effect;
PROVIDED, HOWEVER, that this bond is executed pursuant to the
provisions of Article 5160 of the revised Civil Statutes of Texas as amended by the
acts of the 56th Legislature, Regular Session, 1959, and all liabilities on this
bond shall be determined in accordance with the provisions of said Article to the
same extent as if it were copied at length herein.
PB-3
Surety, for value received, stipulates and agrees that no change,
extension of time, alteration or addition to the terms of the contract, or to the
work performed thereunder, or the plans, specifications or drawings accompanying
the same, shall in anywise affect its obligation on this bond, and it does hereby
waive notice of any such change, extension of time, alteration or addition to the
terms of the contract, or to the work to be performed thereunder.
IN WITHNESS WHEREOF, the said Principal and Surety have signed and
sealed this instrument this 8THday of NOVEMBER , 1989
S NMO 1NT CORPORATION
Principal
By
R. A. Brown
Title SPrrPtary-TrPaourar
Address P. 0. Box 1770
Roanoke, TX 76262
SEABOARD SURETY COMPANY
Surety
Title LINDA COUEY
ATTY-IN-FACT
Address P.O. BOX 2125
AUSTIN, TEXAS 78768
(SEAL) (SEAL)
The name and address of the Resident Agent of Surety is:
FRANK SIDDONS INSURANCE
P.O. BOX 2125 - AUSTIN, TEXAS 78768
PB-4
0092b
For verification of the authenticity of this Power of Attorney you may call, collect, 201-658-3500 and ask for the Power of Attorney clerk. Please refer to the Power
MAINTENANCE BOND
STATE OF TEXAS )C
COUNTY OF DENTON
KNOW ALL MEN BY THESE PRESENTS: THAT Sunmount Corporation
as Principal, and SEABOARD SURETY COMPANY
a Corporation authorized to do business in the State of
Texas, as Surety, do hereby acknowledge themselves to be held and bound to pay unto
the City of Denton, A Municipal Corporation of the State of Texas, its successors
and assigns, at Denton, Denton County, Texas the sum of THIRTY SIX THOUSAND NINE
HUNDRED EIGHTY TWO AND N01100 Dollars 36.982.00 , l0. of
the total amount of the contract for the payment of which sum said principal and
surety do hereby bind themselves, their successors and asssigns, jointly and
severally.
This obligation is conditioned, however, that:
WHEREAS, said SUNMOUNT CORPORATION
has this day entered into a written contract with the said City of Denton to build
and construct BID 41013 - P.C. #93720 OAK BRYAN AND FRY STREETS SANITARY
SEWER/WATER IMPROVEMENTS
which contract and the plans and specifications therein mentioned, adopted by the
City of Denton, are filed with the City Secretary of said City and are hereby
expressly incorporatd herein by reference and made a part hereof as though the same
were written and set out in full herein, and:
WHEREAS, under the said plans, specifications, and
contract, it is provided that the Contractor will maintain and keep in good repair
the work therein contracted to be done and performed for a period of one (1) year
from the date of acceptance thereof and do all necessary backfilling that may
become necessary in connection therewith and do all necessary work toward the
repair of any defective condition growing out of or arising from the improper
construction of the improvements contemplated by said contractor on constructing
the same or on account of improper excavation or backfilling, it being understood
that the purpose of this section is to cover all defective conditions arising by
reason of defective materials, work, or labor performed by said Contractor, and in
case the said Contractor shall fail to repair, reconstruct or maintain said
improvements it is agreed that the City may do said work in accordance with said
contract and supply such materials and charge the same against the said Contractor
and its surety on this obligation, and said Contractor and surety shall be subject
to the damages in said contract for each day's failure on the part of said
Contractor to comply with the terms and provisions of said contract and this bond.
MB-1
0093b
NOW, THEREFORE, if the said Contractor shall perform its
agreement to maintain said construction and keep same in repair for the maintenance
period of one (1) year, as herein and said contract provided, then these presents
shall be null and void and have no further effect; otherwise, to remain in full
force and effect.
It is further agreed that this obligation shall be a
continuing one against the Principal and Surety and that successive recoveries may
be had hereon for successive breaches of the conditions herein provided until the
full amount of this bond shall have been exhausted, and it is further understood
that the obligation to maintain said work shall continue throughout said
maintenance period, and the same shall not be changed, diminished, or in any manner
affected from any cause during said time.
IN WITNESS WHEREOF the said Sunmount Corporation
as Contractor and Principal, has caused
these presents to be executed by R. A. Brown, Secretary-Treasurer
and the said SEABOARD SURETY COMPANY
as surety, has caused these presents to be executed by its Attorney-in-Fact
LINDA COUEY and the said Attorney-in-Fact has hereunto set his hand
this 8TH day of NOVEMBER , 19 89 .
SURETY:
COMPANY
BY:
LINDA COLEY
Attorney-in-Fact
PRINCIPAL:
R1INMCIRNT CCnRPORATTnN
R. A. Brown
Secretary-Treasurer
MB-2
0093b
For verification of the authenticity of this Power of Attorney you may call, collect, 201-658-3500 and ask for the Power of Attorney clerk. Please refer to the Power
INSURANCE
The Contractor is fully responsible for all losses pertaining to, resulting
from, or connected with the completion of this contract. The owners
acceptance of a Certificate of Insurance, that does not comply with the bid
or contract documents, does not release the contractor or the insurance
company from any liability, conditions or other requirements within the
scope of this contract documents.
It is the responsibility of the Contractor to send this complete insurance
package to his insurance provider. This will enable the policies and the
Certificate to include all requirements as they apply to the Contract
documents. The Insurance Certificates must be returned to the City of
Denton with the Contract documents for approval and execution.
All Contract documents must be returned to the CITY OF DENTON, JOHN MARSHALL,
PURCHASING AGENT, 901-B 'T'EXAS STREET, DENTON, TEXAS 76201.
CI-0
INSURANCE
The Contractor is fully responsible for all losses pertaining to, resulting
from, or connected with the completion of this contract. The owners
acceptance of a Certificate of Insurance, that does not comply with the bid
or contract documents, does not release the contractor or the insurance
company from any liability, conditions or other requirements within the
scope of this contract documents.
It is the responsibility of the Contractor to send this complete insurance
package to his insurance provider. This will enable the policies and the
Certificate to include all requirements as they apply to the Contract
documents. The Insurance Certificates must be returned to the City of
Denton with the Contract documents for approval and execution.
All Contract documents must be returned to the CITY OF DENTON, JOAN MARSHALL,
PURCHASING AGENT, 901-B TEXAS STREET, DENTON, TEXAS 76201.
CI-0
CITY OF DENTON
MINIMUM INSURANCE REQUIREMENTS
INSURANCE:
Without limiting any of the other obligations or liabilities of the
Contractor, the Contractor shall provide and maintain until the contracted
work and/or material has been completed/delivered and accepted by the City of
Denton, Owner, the minimum insurance coverage as indicated hereinafter.
Satisfactory certificate(s) of insurance shall be filed with the Purchasing
Department prior to starting any construction work or activities to deliver
material on this Contract. The certificate(s) shall state that thirty (30)
days advance written notice will be given to the Owner before any policy
covered thereby is changed or cancelled. The bid number and title of the
project should be indicated, and the City of Denton should also be listed on
all policies as an additional named insured. To avoid any undue delays, it is
worth reiterating that:
o Thirty (30) days advance written notice of material change or
cancellation shall be given;
o The City of Denton shall be an additional named insured on all
policies.
1. Workmen's Compensation and Employer's Liability. This insurance shall
protect the Contractor against all claims under applicable state
workmen's compensation laws. The Contractor shall also be protected
against claims for injury, disease, or death of employees which, for
any reason, may not fall within the provisions of a workmen's
compensation law.
The liability limits. shall not be less than:
o Workmen's Compensation - Statutory
o Employer's Liability - Statutory
II. Comprehensive Automobile Liability. This insurance shall be written in
comprehensive form and shall protect the Contractor against all claims
for injuries to members of the public and damage to property of others
arising from the use of motor vehicles licensed for highway use,
whether they are owned, nonowned, or hired.
The liability limits shall not be less than:
o A combined single limit of 8500,000
III. Comprehensive General Liability. This insurance shall be written in
comprehensive form and shall protect the Contractor against all claims
arising from injuries to members of the public or damage to property of
others arising out of any act or omission of the Contractor or his
agents, employees or subcontractors.
CI-1
Insurance Requirements
page two
To the extent that the Contractor's work, or work under his direction,
may require blasting, explosive conditions, or underground operations,
the comprehensive general liability coverage shall contain no exclusion
relative to blasting, explosion, collapse of buildings, or damage to
underground property.
The liability limits shall not be less than:
o A combined single limit of $500,000
IV. Owner's Protective Liability Insurance Policy. This insurance shall
provide coverage for the Owner and its employees, in the name of the
City of Denton, for liability that may be imposed arising out of the
work being performed by the Contractor. This also includes liability
arising out of the omissions or supervisory acts of the Owner.
Although this insurance is strictly for the benefit of the Owner, the
Contractor is responsible for obtaining it at his expense.
The liability limits shall not be less than:
o A combined single limit of $500,000
INSURANCE SUMMARY:
The Contract shall provide insurance to cover operating hazards during the
period of placing the facility in operation and during testing, and until such
time as the facilities are completed and accepted for operation by the Owner
and written notice of that fact has been issued by the Owner. Approval of the
insurance by the Owner shall not in any way relieve or decrease the liability
of the Contractor hereunder. It is expressly understood that the Owner does
not in any way represent that the specified limits of liability or coverage or
policy forms are sufficient or adequate to protect the interest or liabilities
of the Contactor.
Again, the Owner shall be given a certificate of insurance indicating that all
of the above policies and the appropriate limits are indeed enforced. The
certificate shall also indicate that the Owner will be given at least thirty
(30) days written notice of cancellation, non-renewal, or material change of
the required insurance coverage. All responsibility for payment of any sums
resulting from any deductible provisions, corridor or self-insured retention
conditions of the policy or policies shall remain with the Contractor. The
rnnrrarrnr shalt not heain anv work until the Owner has reviewed and approved
writing. Any notice to proceed that is issued shall be subject to such
approval by the Owner.
CI-2
01/13/87
" Certificate of Insurance
BhS,CErtnrICATF IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO IIIGHrS UPON YOU THE CERTIFICATE HOLDER THIS CERTIFICATE IS NOT AN INSURANCE
POLICY AND DOES NOT AMEND. EXTEND, OR ALTER THE COVERAGE AFFORDED BY TI IE POUCIES LISTED BELOW
BID #1013 OAK, BRYAN AND FRY STREETS SANITARY SEWER/WATER IMPROVEMENTS -
This is to Certify that LIBERTY
SUNMOUNT CORPORATION MUTUAL
P.O. BOX 1770 n Name and
address of
ROANOKE, TX 76262 Insured.
L -1
is, at the issue date of this certificate, insured by the Company under the pollcyhes) listed below. The insurance afforded by the listed policyhes) is subject
to all their terms, exclusions and conditions and is not altered by any requirement, term or condition of any contract or other document with respect to which
this certificate may be issued
TYPE
CERT. EXP. DATE'
LIMIT
OF
❑CONTINUOUS
POLICY
OF
POLICY
[JExTENDED
NUMBER
LIABILITY
X]POLIOV TERM
COVERAGE AFFORDED UNDER WC
EMPLOYFI I S II hi It I IY
LAW OF THE FOLLOWING STATES:
Bodily bixny H, armdom
500,000 Ea As.
WORKERS'
scan; Imury By Ul.,.ie
COMPENSATION
5/30/90
WC2-611-004030-099
ALL STATES EXCEPT
500,000 _ _Us POrson
Rods, Injury By DDn-.ism j
WC1-611-004030-089
ME
500,000 PolL t
General Aggregate-Other than Products/Completed Operations
5/30/90
RG1-611-004030-109
2,000,000
Products/Completed Operations Aggregate
r
2,000,000
dily Injury id Property Damage Llatuhly
Bo
2 , 000 , 000 Per ocwrrence
❑ CLAIMS MADE
Personal and Advertlsmg Injury
per person/
<
nEmOONE
organization
Q
JJ
Other CONTRACTUAL LIABILITY, RCU, INDEPENDENT ~
(]OCCURRENCE
CONTRACTORS/CONTRACTORS PROTECTIVE, 331t=y
0
FORM PROPERTY DAMAGE
SPECIAL/EXCL
ENDORSEMENTS
rPgp~'
2,000,000 EACH ACCIDENT-SINGLE LIMIT-BI AND PD. COMBINED
>
p~
~m
uOWNED
g
OWNED
U NON
5/30/90
AS1-611-004030-119
EACH PERSON
Q
-
AS1-611-004030-139
EACH ACCIDENT
EACH ACCIDENT
J
A HIRED
OR OCCURRENCE
$ OR OCCURRENCE
W
THE CITY OF DENTON IS ADDITIONALLY INSURED
0
LOCA310N(S) OF OPERATIONS & JOB a (if Applicable)
DESCRIPTION OF OPERATIONS.
COVERS ALL WORK PERFORMED BY THE NAMED INSURED
IN THE CONTINENTAL UNITED STATES
'If the certificate expiration date is continuous or extended term, you will be notified if coverage is terminated or reduced before the certificate expiration care However,
you will not be notified annually of the continuation of coverage
liberty Mutual
NOTICE OF CANCELLATION: THE COMPANY WILL NOT TERMINATE OR REDUCE
THE INSURANCE AFFORDED UNDER THE ABOVE POLICIES UNLESS 30 DAYS
NOTICE OF SUCH TERMINATION OR REDUCTION HAS BEEN MAILED TO'
The City of Denton
901-B Texas Street
PIRATE
HOLDER TE Denton, TX 76201
~ J
Insurance Group
..,~nnn~y MmITAI Ur-,I RMCE Cr(' IP,c- _c=,u hlr,-'rnae us"Ah, u..- -...e 135772 R2
11-28-89 WALLINGFORD, CT 06492
DAI E ISSUED OFFICE
CONDITIONS
ALDMORAL. MM D: The City of Denton, its elected and appointed dr al c, officers
ad employees. (This dos not apply to Worker's Cc pmsaticn. )
N= OF CANCFIlMM: Prior to any material chaff or cacel7at4 the city or
Dental will be gives_10~advanoe written notice mailed to the stated address aP the
Certificate Holder, City of Denim.
i • CCN1RACl RAL OWNWE: (Liability assuiwd by contract or Ott, and World
not otherwise exist). The contractual liability requirement stun an the
reuses side of this Certificate of Insu ronce under CaVreisasive Corral
Liability, must include a definition of cove- I I eomugs to provide
o7ve4p for cbligatio s assumed by the contractor in the referenced contract.
This Certificate of Insurance is provided as required by the g7ve:ning
oontract.
2. CU1 M MILE F= FURL- Regiilred period cf aNe-qp will be detmmned by the
following famIIa: Crntinnis cove-a- for the life of the contract, plus one
year (to provide coveap for the war alty period), and a extended discovery
period for a mirdmm of 5 yeas Which shall begin at the end CC the warxmty
period.
3. FIM LEML. LIALiILTn: (Required in all contracts that involve the occupancy,
construction or alteration of Citg-awned or leased facilities). Insurance is
to cover buildings, contents (Wtiae applilah] ) and pemaneotly bulled
egwdlmmt with respect to pnape ty damt~ to structures or portions of
structures if such daat~ is cased by the peril of fire and due to the
operations aP the contractor. Lind of liability is to be a minimm of
(600,000.
Q-4
NOTICE TO BIDDERS
Sealed bid proposals addressed to the City of Denton, Purchasing
Department, 901-B Texas Street, Denton, Texas, 76201 will be
received at the office of the Purchasing Agent until
2:00 p.m. September 19, 1989
BID # 1013 - OAK ST., BRYAN ST., FRY ST., SANITARY SEWER LINE,
FRY ST. WATERLINE.
The bids will be publicly opened and read, bids received later thar
the specified time and date will be returned to the bidder unopened
The bids will then be officially reviewed and awarded by the Ci'
Council as soon thereafter as possible.
All bid proposals must be made on the printed document form=
included in the specifications. The submitted bid shall not be
altered, withdrawn, or resubmitted within 60 days from and after the
date of the bid opening.
Each bid must be accompanied by a cashier's check, certified check
or acceptable bidders bond payable without recourse to the City of
Denton, Texas in amount not less than five (5%) percent of the bid
submitted as a guarantee that the bidder will enter into a contract
and execute a performance bond, payment bond, and the required
insurance certificate and owner's protection policy within fifteen
(15) days after the notification of the award of the contract to the
bidder.
Qualified prospective bidders may obtain copies of the bid
invitation with information to bidders, bid proposals, plans and/or
specifications at the office of the Purchasing Agent, located at
901-B Texas Street, Denton, Texas at the Service Center Complex, on
deposit of twenty five ($25.00) dollars per set. Deposit will be
refunded provided the documents are returned to the City of Denton
Purchasing Office within fifteen (15) days after the bids ar,.
opened.
No officer or employee of the City of Denton shall have a financial
interest, direct or indirect in any contract with the City of
Denton.
The City of Denton, Texas reserves the right to reject any and all
bids and to waive defects in bids.
Minority and small business vendors or contractors are encouraged to
bid on any and all City of Denton projects.
CITY OF DENTON, TEXAS
John J. Marshall, C.P.M.
Purchasing Agent
This advertisement to run August 31 and September 7, 1989.
009.DOC
REV.7/6/89
PURCHASING DEPARTMENT
City, of Denton
901,13 Texas St.
Denton, Texas 76201
BID INVITATION
CITY OF DENTON, TEXAS
Sunmount Corporation
P.O. Box 1770 41
Roanoke, TX 76262
Date 7111y/~/
BID NUMBER 1O15
BID TITLE rdl~ . f
Q U 2 ti Z -e o yit P rt r J e yvl Pita1~S
Sealed bid proposals will be received until 2:00 p.m.
FJ 1"L, /9 t //eil/_at the office of the
Purchasing Agent, 901-B Texas St., Denton, Texas 76201
For additional information contact
JOHN J. MARSHALL, C.P.M. Tom D. SHAW, C.P.M.
PURCHASING AGENT ASSIST. PURCHASING AGENT
Office
817-566-8311
DIFW Metro
817.267-0042
INSTRUCTIONS TO BIDDERS
1. Sealed bid proposals must be received in duplicate, on this form, prior to opening date and time to be considered. Late
proposals will be returned unopened.
2. Bids shall be plainly marked as to the bid number, name of the bid, and bid opening date on the outside of completely
sealed envelope, and mailed or delivered to the Purchasing Department, City of Denton, 901-B Texas St., Denton, TX
76201.
3. Any submitted article deviating from the specifications must be identified and have full descriptive data accompanying
same, or it will not be considered.
4. All materials are to be quoted FOB Denton, Texas, delivered to the floor of the warehouse, or as otherwise indicated.
5. The City of Denton, Texas reserves the right to accept separate Items in a bid unless this right is denied by the bidder.
6. In case of default after bid acceptance, the City of Denton, Texas may at its option hold the accepted bidder or contractor
liable for any and all resultant increased costs as a penalty for such default.
7. The City of Denton reserves the right to reject any and all bids, to waive all informalities and require that submitted bids
remain in force for a sixty (60) day period after opening or until award is made; whichever comes first.
8. The quantities shown maybe approximate and could vary according to the requirements of the City of Denton
throughout the contract period.
9. The items are to be priced each net. (Packaging or shipping quantities will be considered.)
10. The Purchasing Department assumes responsibility for the correctness and clarity of this bid, and all information and/or
questions pertaining to this bid shall be directed to the City of Denton Purchasing Agent.
11. Any attempt to negotiate or give information on the contents of this bid with the City of Denton or its representatives
prior to award shall be gounds for disqualifications.
12. The conditions and terms of this bid will be considered when evaluating for award.
13. The City of Denton is exempt from all sales and excise taxes. (Article 20.04-B)
BID #
PROPOSAL
TO
THE CITY OF DENTON, TEXAS
FOR THE CONSTRUCTION OF
OAK, FRY, BRYAN STREETS SANITARY SEWER
AND FRY STREET WATER LINE
IN
DENTON, TEXAS
The undersigned, as bidder, declares that the only person or
parties interested in this proposal as principals are those
named herein, that this proposal is made without collusion with
any other person, firm or corporation; that he has carefully
examined the form of contract, Notice to Bidders, specifications
and the plans therein referred to, and has carefully examined
the locations, conditions, and classes of materials of the
proposed work and agrees that he will provide all the necessary
labor, machinery, tools, apparatus, and other items incidental
to construction, and will do all the work and furnish all the
materials called for in the contract and specifications in the
manner prescribed herein and according to the requirements of
the City as therein set forth.
It is understood that the following quantities of work to be
done at unit prices are approximate only, and are intended
principally to serve as a guide in evaluating bids.
It is agreed that the quantities of work to be done at unit
prices and material to be furnished may be increased or
diminished as may be considered necessary, in the opinion
of the City, to complete the work fully as planned and
contemplated, and that all quantities of work whether increased
or decreased are to be performed at the unit prices set forth
below except as provided for in the specifications.
It is further agreed that lump sum prices may be increased to
cover additional work ordered by the City, but not shown on the
plans or required by the specifications, in accordance with the
provisions to the General Conditions. Similarly, they may be
decreased to cover deletion of work so ordered.
It is understood and agreed that the work is to be completed in
full within the number of work days shown on the bid tabulation
sheet.
P - 1
Accompanying this proposal is a certified or cashier's check or
Bid Bond, payable to the Owner, in the amount of five percent of
the total bid.
It is understood that the bid security accompanying this
proposal shall be returned to the bidder, unless in case of the
acceptance of the proposal, the bidder shall fail to execute a
contract and file a performance bond and a payment bond within
fifteen days after its acceptance, in which case the bid
security shall become the property of the Owner, and shall be
considered as a payment for damages due to delay and other
inconveniences suffered by the Owner on account of such failure
of the bidder. Owner reserves the right to reject any and all
bids. Owner may investigate the prior performance of bidder on
other contracts, either public or private, in evaluating bid
proposals. Should bidder alter, change, or qualify any
specification of the bid, Owner may automatically disqualify
bidder.
The undersigned hereby proposes and agrees, to perform all work
of whatever nature required, in strict accordance with the plans
and specifications, for the following sum or prices, to wit:
P - 2
Fry Street Water Line
BID TABULATION SHEET
WORK DAYS' 15
BID NO.
PO NO.
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
I Contractor's Warranties I I I ao I s
7.71 1 ~nA 17,,l crcnnc I I T.C I t' Irv,., /T.C I .t' ZnM V
1
8" C-900 Class 150
I 1 I
1
2.12.20-BI
PVC Water Main
I 1,071 1 LF I $
c
ZZ° /LF
1 $
09750
24
7
I
2.12.8 1
Cast Iron Fittings
I I I
I 500 1 LB I $
/LB
I
I $
S6 c
I
2.13-A 1
6" Gate Valve
i I I
I 2 I EA I $
_?00 %EA
I
I $
6pa o_e
EA
e a
I I 1 I eo I e.
2.14 1 Fire Hydrant 1 2 1 EA I $ 740 /EA I $ lila&
1 I I I ez~ I 6c
2_lfi-A 1 3/4" water Service I 9 1 EA 1 $ -7550./EA 1 $ 3l•SO."
~'/EA I $ /750 6a
2.16-C
I I
1 2" Water Service I
I
17 1 EA
I
I $
6e
~'b0• /EA
I
I $
e,
660
I Remove Concrete I
I
I
o
o
I
o0
3-B
I Curb and Gutter I
6 1 LF
I $
/0. %
LF
I $
6 O• -
3-C
I I
I Remove Walks and Drives I
1
2 I SY
I
I $
o"
~Q /BY
I
I $
Za e o
6.7.3
I I
1 Bullhead 1
1
3 1 EA
I
I $
os
1400. -/EA
I
I $
-?60a,ee
I Barricades, Warning I
I
I
I
6e.
Oe
°-/T.F i a 6a.eO
SP-10 I Rock Excavation I 50 1 CY I $ Z(f)~"/CY I $ /Y160.
I I I I •a 1 e.o
SP-37 IEVCavatinn Protection I LS I LS 1 $ 2-600.7LS 1
I I I 1 0e I c.
SP-39 1Prolect Signs 1 2 1 EA I $ Z$O. /EA I $ 5'00,-
1 I I I .s I c~
~
SP-40 (Water Line Abandonment I 2 1 EA I $ 50o/EA I $ /60
I I I I I y^o
I TOTAL PROJECT I I I I$ 4:39-7.
I I I I I
P - 3
Oak, Fry and Bryan Streets Sanitary Sewer
BID TABULATION SHEET
ITEM DESCRIPTION QUANTITY UNIT
BID NO.
PO NO.
UNIT PRICE TOTAL
Contractor's Warranties
1.21
and Understandings
LS
`GYX)~/LS
Opo ~
2.12.14-A
6" PVC Sanitary Sewer
20
LF
'-/LF
3po
2.12.14-B
8" PVC Sanitary Sewer
-314-5-7
LF
31 /LF
0$ $ S
2.12.14-C
10" PVC Sanitary Sewer
2,455
LF
z(, `~/LF
~S d S
6" C-900 Class 150
2.12.20-A
PVC Water Main
16
LF
Z5,°p/LF
Ooh -
8" C-900 Class 150
2.12.20-B
PVC Water Main
496
LF
Z6~=/LF
z OO,~
10" C-900 Class 150
2.12.20-C
PVC Water Main
50
LF
O~~/LF
15006-4
Remove Concrete
3-B
Curb and Gutter
6
LF
/0 c e /LF
(~O eo
5.7-B
Asphalt Patch (Type D)
100
TON
157-/TON
$006
7.4
Concrete Encasement
16
CY
2bo-/CY
1 ZSo
7.6
4' Concrete Manhole
20
EA
Z~pp,''yEA
e
O•
Barricades, Warning
o0
00
8.1
and Detour Signs
LS
7600, /LS
OOO.
8.2
Concrete Curb and Gutter
6
LF
o-
/Jr /LF
00
96,
"
3307
v
$
WS-11
4
Sanitary Sewer Service
118
EA
/EA
Q
SP-2
Concrete Saw Cut
10
LF
Y~'/LF
50''
Break into Existing
'
e,
SP-6
Manhole
3
EA
/EA
75e
ZZ50-
SP-8
Abandon Manhole
11
EA
lb0a%EA
00
SP-10
Rock Excavation
50
CY
Oo
ZO, /CY
Oe
/COa.
Abandon Existing
0a
a
SP-23
Sanitary Sewer
19
EA
7EA
706,
ao,-
SP-37
Excavation Protection
LS
c°
/SOabTLS
e
/,SOao,
SP-39
Pro ject Signs
2
EA
66
Z %EA
eo
$00.
TOTAL PROJECT
/
3) 14 Z3.°
ALTERNATE
/
5-7-B
Asphalt Patch (T a D)
300
TON
#sf~ITON
13 $00
S°
a
D
00
P - 4
BID SUMMARY
TOTAL BID PRICE IN
/ZC 6
4P
C-A
In the event of the award of a contract to the undersigned, the
undersigned will furnish a performance bond and a payment bond
for the full amount of the contract, to secure proper
compliance with the terms and provisions of the contract, to
insure and guarantee the work until final completion and
acceptance, and to guarantee payment for all lawful claims for
labor performed and materials furnished in the fulfillment of
the contract.
It is understood that the work proposed to be done shall be
accepted, when fully completed and finished in accordance with
the plans and specifications, to the satisfaction of the
Engineer.
The undersigned certifies that the bid prices contained in this
proposal have been carefully checked and are submitted as
correct and final.
Unit and lump-sum prices as shown for each item listed in this
proposal, shall control over extensions.
S n,nscec~l eryo.r~:~.✓
CONTRACTOR
BY Ile CSC wig
Street Address
~ou.c10%~- ~fc~-9 1L Z6 Z--
City and State
Seal 6r Authorization
(If_a corporation) g!7-9(S6-osSS-
- _ Telephone
P - 5
CITY of DENTON, TEXAS
MUNICIPAL BUILDING / DENTON TEXAS 76201 / TELEPHONE (817) 566 8
MEMORANDUM
DATE September 29, 1989
TO Renee Baker, Engineering Associate I
FROM Jerry Clark, City Engineer
SUBJECT Bid 1013 Oak, Fry, and Sewer
We reviewed the bids received on
are aware, the low bid is $50,0
estimate was based on pipe prices
prices seem to be rising for all
our recent storm sewer bids We
are high
September 19, 1989 As you
00 over our estimate That
for the 1988 CIP Material
pipe projects including all
agree the water line prices
The 3 low bids are $40,000 apart which is a 11% variation based
on the lowest submittal The other bid is obviously a company
not really interested in the work
Oak, Hickory, and Fry Paving and Drainage has been delayed over
a year due to political considerations We need the project to
be constructed now to avoid further postponements
Finally, the design life of this project will be 20 years
before any major subgrade work would be anticipated When you
evaluate the waterline for length of service that period should
be considered The prices for sewer and water are higher in
part because of the cement stabilized backfill now required for
trench replacement
We recommend that you accept the bids as submitted Sunmount
is an excellent company who does the best job possible of
supervising their subcontractors
Je ty ar c
xc Charlie McKenna
0751E
NOU-01-'89 WED 14 18 ID CITY OF DENTON UR TEL NO 817-566-8236 #783 P02
EXCERPT FROM MINUTES
PUBLIC UTILITIES BOARD
OCTOBER 24, 1989
7. CONSIDER BID OPENING #1013 TO SUNMOUNT CORPORATION FOR
OAK, FRY AND BRYAN SANITARY SEWER AND FRY WATER LINE.
Laney made a motion to approve Bid #1013 to Sunmount
Corporation Second by Thompson All ayes, no nays,
motion carried
8. CONSIDER BID OPENING #9976 TO CAJUN CONSTRUCTION COMPANY
FOR PART A, INSTALLATION OF RAW WATER PUMP #3A, AND
MISCELLANEOUS REHABILITATION.
Frady made a motion to approve Bid #9976 to Cajun
construction company Second by Thompson All ayes, no
nays, motion carried
9. CONSIDER BID OPENING #1020 FOR THE PAINTING AND REPAIR OF
THE HIGH SCHOOL ELEVATED STEEL STORAGE TANK.
Laney made a motion to approve Bid #1020 for the painting
and repair of the High School elevated steel storage
tank
The motion was seconded by Thompson All ayes, no nays,
motion carried
C7
H
H
'H'
H
~C
~
~ii
L'i
U7
r
;v
H
7
y
cn
Cn
H
H
po
~
n
+9
t
ttil
o
H
H
O
H
tR
-V~
ul
Va
Ln
yr
w
w
H
to
-l
-l
00
W
tO
O]
U1
~
-4
In
Ln
W
C O
Li
O
Ul
N
o
w
o
-3
H
O
lP
O
--l
ul
O
-
o
o
Ul
VT
V?
W
V?
w
N
-l
N
N
In
Ul
tC
N
N
O
--1
F,
H
Ut
~
to
H
0
0
C)
o
rn
m
o
0
o
m
0
0
0
0
0
0
0
o
O
C)
N
VT
P.
N
w
yr
N
N
P
LI
4
FC
o
r
r
~
m
t~
In
o
J
0
J
O
O
m
O
N
w
o
rn
o
v
Ul
O
N
O
W
Ul
O
Ul
O
O
N
W
L?
W
La
0)
H
1.
VR
Ul
1-4
~O
W
H
P
00
Vj
O
Ul
w
Ul
w
N
O
N
O
-O
O
O
W
O
J
Ul
O
O
O
Ul
O
0
O
O
0
O
w
w
o
z
=H:
to
c
C
zz
H
N
O
~
-
xt
o
C)
H
o
w
ro
W
H
z
z
[=i
R,
r
~
U
i
3
n
b~
H
e
H
ro
ro
~
H
H
h
i
H
O
z
H
U]
O
r
H
n
O
nz
OH
~
[tl
0
H n
z
zH
K
n H
O
z
KD
b
t
r
C
t
r
H'w>
Hrog0H
nj F3 N
H Pj En
O
n
O
n
0
zu
n (n H
OHn
~zx
yzro M
0 0
y
C
ooz
z
n
room
0 Q
H
z
DATE NOVEMBER 7, 1989
CITY COUNCIL REPORT
TO Mayor and Members of the City Council
FROM Lloyd V Harrell, City Manager
SUBJECT BID # 1020 - PAINTING & REPAIR OF THE HIGH SCHOOL
ELEVATED STEEL STORAGE TANK
RECOMMENDATION We recommend this bid be awarded to the low
bidder, Lupton Painting Company, for items 1, 2, and 4, for the
total amount of $85,500 00
SUMMARY This bid was advertised and sent to several known vendors
that are equipped to complete this bid project We received only
three bids Lupton Painting Company was by far the lowest bid
received This Company has bid on prior projects for the City
They have a satisfactory work record of like projects in both
Oklahoma and Texas They are a larger company than the company
that did our last painting project
BACKGROUND: Public Utility Board and Minutes and Bid Tabulation
Sheet
PROGRAMS DEPARTMENTS OR GROUPS AFFECTED The City of Denton
Utilities, Maintenance, The Vendor, and The Citizens of Denton
FISCAL IMPACT There is no additional impact on the General Fund
Respec ully 'submitted
City Manager
Prepared by
a o n J Marshall
itT Purchasing Agent
Approved
01
a e o nhall
Tit Purchasing Agent
019.DOC
X
October 24, 1989
PUBLIC UTILITIES BOARD
AGENDA ITEM
TO CHAIRMAN AND MEMBERS OF THE PUBLIC UTILITIES BOARD
FROM R E Nelson, Executive Director of Utilities
SUBJ CONSIDER BID OPENING #1020 FOR THE PAINTING AND REPAIR OF THE
HIGH SCHOOL ELEVATED STEEL STORAGE TANK
RECOMMENDATION
The Staff recommends approval of the subject bid and awarding the
following bid items to Lupton Painting Company, of Shawnee, Oklahoma,
for a total amount of $85,500
Bid
Item
Description
Bid Price
No
1
Blast & Paint Inside of Tank
$75,000
No
2
Repair or Replace Damaged Steel
4,500
Members
No
4
Install Safety Climb Devices
6,000
No
6
Additive Item for Deleting
-0-
Outside Tank Painting from
Contract
Total $85,500
SUMMARY
Bids were received and opened October 19, 1989 The results are
shown on the bid summary t see Exhibit I) The bid included a total
of 6 bid items, which were described as follows
Bid Item Description
No 1 Blast and Paint Inside of Tank
No 2 Repair or Replace Damaged Steel Members
No 3 Blast and Paint Exterior of Tank
No 4 Install Safety Climb Devices
No 5 Alternate Outside Paint System
No 6 Additive Item for Deleting Ouside Tank Painting from
Contract
Lupton Painting Company was the lowest qualified bidder for the base
bid, as well as for each individual bid item The bid was structured
to include an alternative exterior paint system, bid item 5 (with a
lower degree of surface preparation), and an option to delete
painting the outside of the tank, bid item 6
PUB Agenda Item
Page 2
The Staff had proposed that both the interior and exterior of the
tank be painted in 1990 Exteriors of tanks should be painted
approximately every 10 years The estimated cost was $157,000
Since the bids came in at $230,400, the Staff is recommending only to
paint the interior this year and wait until next year to paint the
exterior
The Utility Department Staff investigated, and is satisfied with the
qualifications, experience record, and bid prices submitted by Lupton
Painting Company However, due to limited available budget funds,
Staff only recommends awarding the contract to paint the inside of
the tank, repair the structural steel, and install the safety climb
system (bid items 1, 2 and 4) It should be noted that Lupton
Painting Company did not assign an additional cost (bid item 6) for
deleting the exterior painting of the tank from the contract
BACKGROUND
The High School tank is a 2 million gallon tank, which was
constructed in 1968 by the Pittsburg-Des Moines Steel Company The
exterior of the tank was repainted in 1979 At that time, the
interior of the tank received some minor spot repair work
Otherwise, no other work has been done on the interior since the tank
was built Recent inspection of the tank indicates that the interior
paint system has reached the end of its usable life and some limited
steel corrosion has occurred inside the tank bowl The outside paint
system is also at the end of its usable life, and the colors are
significantly faded and chalked However, there is no evidence of
corrosion on the outside of the tank except on the roof of the vent
During the budgetary process, the Utilities Staff contacted the
painting contractor who had repainted the interior of the Peach
Street Tank for assistance in preparing cost estimates for the High
School tank project This resulted in the following cost estimates
which were incorporated into the FY 89-90 operating budget
Account #620-081-0460-8301 - Maintenance on Water Storage Reservoir
Interior Paint System
Exterior Paint System
$ 76,800
80,600
Total
$157,400
Account #620-081-0460-9101 - Safety Climb Systems for Elevated Tanks
Total $ 5,000
PUB Agenda Item
Page 3
After the bidding process, the Utility Staff met with the low bidder
and checked his previous job experience references Lupton Painting
Company has successfully completed repainting numerous elevated steel
storage tanks in the 500,000 to 2 5 million gallon size range in both
Oklahoma and Texas The company is a large, stable and bondable
company for a project of this size and has proper equipment and
personnel to perform the work
PROGRAMS, DEPARTMENTS OR GROUPS AFFECTED
Citizens of Denton, Denton Municipal Utilities, and Lupton Painting
Company
FISCAL IMPACT
Funds 620-081-0460-8301
620-081-0460-9101
Total
Bid Proposal (Items 1, 2 and 4)
Amount Over/(Under) Budget
Bid Proposal (Items 1, 2, 3 and 4)
Amount Over/(Under) Budget
W ed b .
Lee Allison, n r ng
Administrator
$157,400
5,000
$162,400
$ 85,500
(76,900)
230,500
68,100
ResRes eclubmi ted,
' Nelson, -Executive
Director of Util` s
Apd by,
S
Exhibit I Bid Summary
II Project Location
am, rector
Water/Wastewater Uti
6529U 9-11
NOV-01- 89 WED 14 18 ID CITY OF DENTON UR TEL NO 817-566-8236 #783 P02
EXCERPT FROM MINUTES
PUBLIC UTILITIES BOARD
OCTOBER 24, 1989
7 CONSIDER BID OPENING #1013 TO SUN14OUNT CORPORATION FOR
OAK, FRY AND BRYAN SANITARY SEWER AND FRY WATER LINE.
Laney made a motion to approve Baal #1013 to Sunmount
Corporation Second by Thompson All ayes, no nays,
motion carried.
8. CONSIDER BID OPENING #9976 TO CAJUN CONSTRUCTION COMPANY
FOR PART A, INSTALLATION OF RAW WATER PUMP #3A, AND
MISCELLANEOUS REHABILITATION.
Frady made a motion to approve Baal #9976 to Cajun
Construction Company Second by Thompson All ayes, no
nays, motion carried
9 CONSIDER BID OPENING #1020 FOR THE PAINTING AND REPAIR OF
THE HIGH SCHOOL ELEVATED STEEL STORAGE TANK
Laney made a motion to approve Bid #1020 for the painting
and repair of the High School elevated steel storage
tank
The motion was seconded by Thompson All ayes, no nays,
motion carried
~j
1
U1
IN
w
N
-
b
- - - - - -
- -
-
- - -
- -
- -
- -
- -
- - -
H
o
9
~
ro
ro
ro
ro
ro
~
x
H
C
y
qq
~
fi
U1
w
n
H
w
d
H
w
>
O
En
H
z
0
l7
w
H
0
N
i/!
i/Y
H
N
i?
H
a
LT
00
N
N
a
w
~D
-1
w ~O
lD
N
m
41
W
%
J
l0
H
%D
U1
ko
W
U1
O
OJ
O
O
In
Ol
O
N
O
N
O
W
H
0
O
O
0
0
0
0
- - - - - -
0
- -
0
- -
0
- -
0
- -
0
- -
o
- -
O
- - -
lu~ K
H H in N
H V! ~P is ~1 N
tC Ln rn Ln A. ~n
cn o O O in o CD
0 o O o 0 0
0 0 0 0 0 0
O O O o O o
O O O O o 0
ar Va to In yr
H H N H W
w w yr o vy H H
w o o koo lp-o tp-
w .
0 o Ui O n o o
O o O O C) 0 O
0 0 0 0 0 0 0
0 0 0 0 0 o O
o O O o o O O
z~
C7
O
n
0
w
n
w
d
d
o
czi
z
~
H
H
N
LT7
O
C
N
C3
ti
o
C)
C
ro
~
~
d
O
D~
H
L
O
ad
w
pd
;U
H
O
H
O
G)
w
H
0
y
00
b
~
7zC
H zH
F113 6~y 11
fpn HC
"rd H
H U7
H
z
n
ro
0HHq
roZH
>H0
z4zz
t~
0
rd
n
0
z ~
H~-7 !n '*J
nnvzid
y
O
z
c
W
0
STATE OF TEXAS
COUNTY OF DENTON ) (
CONTRACT AGREEMENT
THIS AGREEMENT, made and entered into this Rth day of NOVEMBER _
A.D., 1989, by and between THE CITY OF DENTON
qnt-R TEXAS STREET - DENTON. TEXAS 76201
of the County of DENTON and State of Texas, acting through
I.T.OYD V. HARRELL thereunto duly authorized so to do,
Party of the First Part, hereinafter termed the OWNER, and LUPTON PAINTING,_
COMPANY 1210 GORDON COOPER- SHAWNEE, OKLAHOMA (405) 273-7142
of the City of SHAWNEE , County of
and state of OKLAHOMA Party of the Second Part, hereinafter
termed CONTRACTOR.
WITNESSETH: That for and in consideration of the, payments and
agreements hereinafter mentioned, to be made and performed by the Party of the
First part (OWNER), and under the conditions expressed in the bonds bearing
even date herewith, the said Party of the Second Part (CONTRACTOR). hereby
agrees with the said Party of the First Part (OWNER) to commence and complete
the construction of certain improvements described as follows:
BID# 1020 - JR. HIGH SCHOOL ELEVATED STORAGE TANK PAINTING AND
REPAIR- P.C. #93718 - $85,500.00
and all extra work in connection therewith, under the terms as stated in the
General Conditions of the agreement; and at his (or their) own proper cost and
expense to furnish all materials, supplies, machinery, equipment, tools,
superintendence, labor, insurance, and other accessories and services
necessary to complete the said construction, in accordance with the conditions
and prices stated in the Proposal attached hereto, and in accordance with all
the General Conditions of the Agreement, the Special Conditions, the Notice to
Bidders (Advertisement for Bids), Instructions to Bidders, and the Performance
and Payment Bonds, all attached hereto, and in accordance with the plans,
which includes all maps, plats, blueprints, and other drawings and printed or
CA-1
0044b
--written explanatory matter thereof, and the Specifications therefore, as
prepared by CITY OF DENTON ELECTRICAL ENGINEERING/WATER PRODUCTION
DEPARTMENTS ,
all of which are made a. part hereof and collectively evidence and
constitute the entire contract..
The CONTRACTOR hereby agrees to commence work on or after the date
established for the start of work as set forth in written notice to commence
work and complete all work within the time stated in the Proposal, subject to
such extensions of time as are provided by the General and Special Conditions.
The OWNER agrees to pay the CONTRACTOR in current funds the price or
prices shown in the Proposal, which forms a part of this contract, such
payments to be subject to the General and Special Conditions of the Contract.
IN WITNESS WHEREOF, the parties of these presents have executed this
agreement in the year and day first above written.
ATTEST:
\t tl .
(SEAL)
ATTEST:
ZcL
LUPTON PAINTING COMPANY
Party o e Seed Part, CONTRACTOR
By / 41\ L AS
Title
(SEAL)
APP rTO FORM:
i/
C ty Attorney j
CA-2
0044b
LLOYD V_ HARRELL, CITY MANAGER
BOND PREMIUM BASED ON
FINAL CONTRACT PRICE
BOND EXECUTED IN FOUR ORIGINALS
STATE OF TEXAS
s
COUNTY OF.COLLIN
PREMIUM CHARGED
ON ANNUAL BASIS
BOND #841034-89
PERFORPIANCE BOND
KNOW ALL MEN BY THESE PRESENTS: That L jjpTGN PAINTING COMPANY
, of the City of SHAWNEE
County of Pottawatomie , and State of OKLAHOMA
as PRINCIPAL, and International Fidelity Insurance Company
as SURETY, authorized under the laws of
the State of Texas to act as surety on bonds for principals, are held and firmly
bound unto the CITY OF DENTON TEXAS
as OWNER, in the penal sum of EIGHTY FIVE THOUSAND FIVE HUNDRED AND N01100
----------------------Dollars 385,500.00 ) for the payment whereof, the said
Principal and Surety bind themselves and their heirs, administrators, executors,
successors and. assigns, jointly and, severally, by these presents:
WHEREAS, the Principal has entered into a certain written contract
with the OWNER, dated the R+h day of NOVEMxFR , 19gcL, for the construction of
BTD# 102n TR HTCH SCHOOL ELEVATED STORAGE TANK PAINTING AND
which contract is hereby referred to and made a dpart hereof as fully and to the
same extent as if copied at length herein.
NOW, THEREFORE, the condition 'of this obligation is such, that if the
said principal shall faithfully perform said Contract and shall in all respects,.
conditions and agreements in and by said contract agreed and covenanted by the
Principal to be observed and performed, and according to the true intent and
meaning of said Contract and the Plans and Specifications hereto annexed, then this
obligation shall be void: otherwise to remain in full force and effect;
PB-1
PROVIDED, HOWEVER, that this bond is executed pursuant to the
provisions of Article 5160 of the Revised Civil Statutes of Texas as amended by
acts of the 56th Legislature, Regular Session, 1959, and all liabilities on this
bond shall be determined in accordance with the provisions of said Article to the,
same extent as if it were copied at length herein.
PROVIDED FURTHER, that if any legal action be filed upon this bond,.
venue shall lie in nFNTON County, State of Texas.
Surety, for value received, stipulates and agrees that no change,
extension of time, alteration or addition to the terms of the contract, or to the
work performed thereunder, or the plans, specifications, or drawings accompanying
the same, shall in anywise affect its obligation on this bond, and it does hereby'
waive notice of any such change, extension of time, alteration or addition to the
terms of the contract, or to the work to be performed thereunder.
IN WITNESS WHEREOF, the said. Principal and Surety have signed and
sealed this instrument this 21st day of November , 1989 .
LUPTON PAINTING COMPANY International F i de l i ty ins. uo. n ,
~L
Principal Surety
K~
-7 1
BM 'I Vim/( L 7J r ~YF
C ryl L. Humphrey
Title l~I~zCLQ(w Title Attorney-in-Fact
Address Address 24 Commerce Street
A4 . Newark New Jersey 07102
(SEAL) (SEAL)
The name and address of the Resident Agent of Surety is:
V.R. Damiano, Jr.
101 E. Park Blvd., Suite 1021, Plano, Texas 75074
NOTE: - Date of Bond must not be prior to date of Contract.
PB-2
OM
BOND PREMIUM BASED ON
FINAL CONTRACT PRICE
BOND EXECUTED IN FOUR ORIGINALS
STATE OF TEXAS
PREMIUM CHARGED
ON ANNUALBASIS
BOND #841034-89
PAYt1ENT BOND
COUNTY OF COLLIN
KNOW ALL MEN BY THESE PRESENTS: That nrNmrAlr rnr~n ANY
County of Pottawatomie
of the City of SHAWNEE '
and State of OKLAHOMA , as principal, and
international Fidelity Insurance Company
authorized under the laws of the State of Texas to act as surety on bonds for
principals, are held and firmly hound unto. THE CITY OF DENTON TEXAS
OWNER, in the penal sum of EIGHTY FIVE THOUSAND
)
FIVE HUNDRED AND NO/1 00 -----------------------------Dollars (t85,500.00
for the payment whereof, the said Principal and Surety bind themselves and their
heirs, administrators, executors, successors and assigns, jointly and severally, by .
thes presents: .
WHEREAS, the Principal has entered into a certain written contract
with the Owner, dated the 8th : day of NOVEMBER 19 g~•
RTD* 1090 TRr HIGu ScHOOT FLFVAT ORAGE TANK PA7NTTNG AND REPAIR
to which contract is hereby referred to and made a part hereof as fully and to the
same extent as if copied at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the a'
said Principal shall pay all claimants supplying labor and material to him or a
subcontractor in the prosection of the work provided for in said contract, then,
this obligation shall be void, otherwise to remain in full force and effect;
PROVIDED, HOWEVER, that this bond is executed pursuant to the.
provisions of Article 5160 of the revised Civil Statutes of Texas as amended by the
acts of the 56th Legislature, Regular Session, 1959, and all liabilities on this
bond shall be determined in accordance with the provisions of said Article to the
same extent as if it were copied at length herein.
PB-3
Surety, for value received, stipulates and agrees that no change,
extension of time, alteration or addition to the terms of the contract, or to the
work performed thereunder, or the plans, specifications or drawings accompanying
the same, shall in anywise affect its obligation on this bond, and it does hereby .
waive notice of any such change, extension of time, alteration or addition to the
terms of the contract, or to the work to be performed thereunder.
IN WITHNESS WHEREOF, the said Principal and Surety have signed and
sealed this instrument this 21st day of November 1989
LUPTON PAINTING COMPANY
Principal
By h
Surety
Ch&41 L. Humphr
Title Attorney- in-Fact
^r
R J '
Title
Address
.
4210
~ oo
(SEAL)
Address 24 Commerce Street
Newark New Jersey 07102
(SEAL)
The name and address of the Resident Agent of Surety is:
V.R. Damiano, Jr.
101 E. Park Blvd., Suite 1021, Plano Texas 75074
PB-4
0092b
BOND EXECUTED IN FOUR ORIGINALS BOND #841034-89
mAINTENANCE BOND
STATE OF TEXAS
COUNTY OF COLLIN
KNOW ALL MEN BY THESE PRESENTS: THAT LUPTON PAINTING
as Principal, and International Fidelity Insurance Compare
1 ~~nrw~V
a Corporation authorized to no business in the State o
Texas, as Surety,. do hereby acknowledge themselves to be held and bound to pay unto
the City of Denton, A Municipal Corporation of the State of Texas, its successors
and assigns, at Denton, Denton County, Texas the sum of T' D FI lOX of .
Dollars u 550.00
the total amount of the contract. for the payment of which sum m said Principal and
surety do hereby bind themselves,, their successors and asssigns, .jointly..and .
severally.
This obligation is conditioned, however, that:
WHEREAS, said PTON PAINTING COMPANY
has this day entered into a written contract with the said City of Denton toXdludlC7d
aXAX9PRRJER9G*X PAINT AND REPAIR AN ELEVATED STORAGE TANK
which contract -and plans and:.specifications therein menLiuu=u,. -.r---
City of .Denton, are filed with the City Secretary of said City and-are hereby
expressly incorporatd herein by reference arid made a part hereof as though the same
were written and set out in full herein, and:
WHEREAS, under the said plans, specifications, and
contract, it is provided that the Contractor will maintain and keep in good repair
the work therein contracted to be done and performed for a period of one (1) year
from the date of acceptance thereof and do all necessary backfilling that may
become necessary in connection therewith and do all necessary work toward the
repair of any defective condition growing out of or arising from the improper
construction of the improvements contemplated by said contractor on constructing
the same or on account of improper excavation or backfilling, being unders
that the purpose of this section work, or labor perfor performed by said Contractor, and in
reason of defective materials, , reconstruct or maintain said
case the said Contractor shall fail to repair,
work in accordance with said
improvements it is agreed that the City may
contract and supply such materials and charge the same against the said Contractor
and its surety on this obligation, and said Contractor and surety shall be subject
to the es in said Contractormto comply with the terms and provisions ' offsaid rcontra thandathisobond.
MB-1
0093b
NOW, THEREFORE, if the said Contractor
agreement to maintain said construction and keep same in repair
period of one (1) year, as herein and said contract provided,
shall be. null and void and have no further effect; otherwise,
force and effect.
shall perform its
for the maintenance
then these presents
to remain in full
it is further agreed that this obligation shall be a
continuing one against the Principal and Surety and that successive recoveries may
be had hereon for successive breaches of the conditions herein provided until the
full amount of this bond shall have been exhausted, and it is further understood
that the obligation to maintain said work shall continue throughout said
maintenance period, and the same shall not be changed, diminished, or in any manner
affected from any cause during said time.
IN WITNESS WHEREOF the said Lupton Painting Company
as Contractor and Principal, has caused
these presents to-be executed by Mr. Robert Lupton
and the said International Fidelity Insurance Company
as surety, has caused these presents to be executed by its Attorney-in-Fact
Cheryl L. Humphrey and the said Attorney-in-Fact has hereunto set his hand
this St day of ovem er , 1989
PRINCIPAL:
Lu ton Paintin Com an
/To6erf 1e oak - vhaoroGe~
MB-2
0093b
SURETY:
=TEL, (201) 624-7200._ POWER OF-- ATTORNEY -
-INTERNATIONAL FIDELITY INSURANCE COMPANY-
_ HOME OFFICE 24 CO04ERCE"STREET
NEWARK tNEW JEEY 07Q02- BOND NO '~.84~ 034-89
RS
KNOW ALL MEN BY THESE PRESENTS: That,INTERNATIONAL FIDELITY INSURANCE COMPANY, a corporation organized and existing , . -
under the laws of the State of New Jersey, and having its principal office in the City of Newark; New Jersey, does hereby constitute and appoint
V.R. OAMIANO,.JR-., BE TTY J. DAMIANO, CHERYL L. HUMPHREY', SHANE<ALLEN HUMPHREY.-:'
PLANO, TEXAS: _ 6 89~
its true and lawful attorney(s)-m foci to execute, seal and'deliverfor and on its behalf as surety. any and allbo"nds and undertakings contractsofmdemnity and -
otherwritings obligatory in the nature thereof, which are or may be allowed, required or permitted by law, statute, rule, regulanon; contract or otherwise; and the, _
execution of such instrument(s) in pursuance of these presents, shall be as binding upon the said INTERNATIONAL FIDELITY INSURANCE COMPANY;:-
asfully and amply, to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at its principal office.
This Power of Attorney is executed, and maybe certified to and maybe revoked. pursuant to and by authority . ofArticle2,-Section 3, of the By Laws adopted
by the Board of Directors of INTERNATIONAL FIDELITYINSURANCE COMPANY ata meeting called and held on the 23rd day of December, 1968.
-
The President,-or any Vice President, Executive Vice --:Pressident; SecretaryorAssistant'Secretary„shall have power and authority
(I) To appoint Attorneys m fact; and io authonze'them to execute on behelLof the Company and attach the Seal'oEihe Company thereto'borids and -
undeertakings, contracts:of indemnityand other writings .obligatoryto [he nature.thereof and -
(2) To remove, at any time, any such Attorney-in-fact and revoke the authority given.- _ - ,
Further, this Power of Attorney is signed and sealed by facsimile pursuant to resolutionofthe Board of Directors of said Company adopted at a meeting duly
called and held on the 4th day of February, 1975 of which the following is a true excerpt: _
Now therefore the signatures of such officers and the seal of the Company maybe affixed to any such power of attorney or any certificate relating thereto by
facsimile, and any such power of attorney or certificate hearing such facsimile signatures or facsimile seal shall be_valid and binding upon the Company,and'
any such power so executedand certified -by faesimile'signaatures and facsimile seal shall be valid and bindmgupon the Coinpanv urthe-future with`resp9d to :
any bond or undertaking to which it is attached - - g _
IN TESTIMONY WHEREOF. INTERNATIONAL FIDELITY INSURANCE COMPANY has caused this instrument to
- be signed and its corporate seal to be affixed by its authorized officer, this I st day of May, A.D. 1986: _
INTERNATIONAL FIDELITY INSURANCE COMPANY
S~m
1 off STATE NEW JERSEY -
County of of Essex
rh: - - -Executive Vice President
On this lstday of May 1986: before me came the individual who executed the preceding instrument, tome personally known, and, being by me duly sworn, - _
said that he is the therein described and authorized officer of the INTERNATIONAL FIDELITY INSURANCE COMPANY; that the seal. affixed to said
instrument is the Corporate Seal of said Company; that the said Corporate Seal and his signature were duly affixed by order of the Board of Directors of said
Company.
IN1y~
IN Re. INTESTIMONY WHEREOF, Lhave hereunto set my hand and affixed my Official Seal,
w_ at the City of Newark. New Jersey the day and year, first above written.
~ M OTA R y~~ , e J
PV`8L f A NOTARY PUBLIC OF NEW JERSEY
'If.S My Commission Expires April 28, 1992
1L.~- w x
~~7.JE! Sxif' - - 6FKT F1~GrAAyT~IIONc-. -
I, the undersigned officer of INTERNATIONAL FIDELITY I IIRrLYVCE COM$AN,do hereby certify that I have compared the foregoing copy of the
Power of Attomey and affidavit. and the copy of the Section of the,~;RS1s'spfsaid Companyas set forth in said Power of Attorney, with the ORIGINALS ON
`FILE INTHF HOME OFFICE OF SAID COMPANY and that thesame are coorrecttranscripss thereof. and of the whole ofthe said originals, and that the said
Power of Attorney has not been revoked and is now in full farceand effect
IN TESTIMONY WHEREOF,"I-have hereunto set my hand[h~~ler l9"89
R
a
{s - _ =r..- w Assistant=Secretary
TO'A -lyA01
LaGere & Walkingstick Insurance
Agency, Inc.
P.O. Drawer 409
Chandler, Oklahoma 74834
►~t~'~~;~h`1\rCnl 11-30-89 pml
THIS CERTIFICATE IS ISSUED AS A MA'I I ER OF INFORMATION ONLY `
AND CONFERS NO RIOH 15 UHOIN 1'HF. C.FR T IFIC.ATE HOLDER. THIS
CCRTIFICATE DOES NOT AMENO, F.XTF;NO OR ALTER THE COVER-
ACE AFFORDED BY THE POLICIES BELOW. _
COMPANIES AFFORDING COVERAGE
COMPANY A
LETTER Employers Casualty
COMPANY g
INSURED LETTER
Lupton Painting Company COMPANY C
1210 Gordon Cooper Dr. LETTER
Shawnee, Oklahoma 74801 COMPANY
LETTER D
COMPANY
ER E
LETT
li-ld
THIS IS TO CERYIVY THAT POLICIES Of INSURANCE LIS I ELI BELOW IIAVF. 8LF_N 155ULD TO r1 N: iPL;UH(:0 NARII:.I, A(AOVC FOR TI IF POLICY
PERIOD INDICATED. No rWI r HSI' ANUINO ANY RF.OIIIRFM6NT, TERM OR CONOITIi)N OF ANY CON) RACT UH OTHER UOCUMeNT WITH
RE5PI 1' TO WHICH TI ITS CERTIFICATE MAY BE ISSUED OR MAY PER LAIN. I'HE INSURANCE Al-VORDLD By I'1 IF POLICIES DF.SCRIBFO
HEREIN 15 SUBJECT TO ALL THE TERMS, EXCLUSIONS, AND CONOIFIONS Of' SUCH POLICIES.
CO POLICYETFeCTIVE POLICY EXPIRATION LIq BTLI IV LIM ITS IN THOUSANDS'
TYPE OF INSURANCE POLICY NUMBER Ion n Ia+MARD!vv1 LIA IE IMM!I111!Y!I _
POOPEDATE .
.TR
M, IJARFNCE
GENERAL LIABILITY COOav _
PIJURY
CfIMPRFNEN9IVE FORM -
IIYI
HAZAl10
NOENTCONTRACTORS
FORM PROPERTY OAMAGtt
AUTOMOBILE LIABILITY
I1 - ANYAVrU
xx ALL OWNEO AUrO&
183110
RED AVTOS
LIAHILI rY
EXCESS LIABILITY
UMBRELLA FORM
OTHER THAN UMBRELLA FORM
WORKERS' COMPENSATION
AND
EMPLOYERS' LIABILITY
PFRSONAL INJURY
' _ HrJUIL VNJURY
1 -
PER
3-23789 3-23-90 TRIMLY
IN.ILI XY
(PER + 1 l IF
ACCIDENT) iy
Mq NFDI yrooo
& VU
I.:' f.:
(EACH ACCIDENT)
(DISEASE-EACH
....._..L....
DESCRIPTION OF OPERATIONS/COCA (ION S/V CHICLES(SPCCIAL ITEMS
Additional Insured: City of Denton
Bid #1020 - Title, Painting and repair of high school elevated steel storage.
- ,
tank....__
City of Denton, Texas
Purchasing Agent
901-5 Texas St.
Denton, Texas 76201
Attn: John Marshall
cam., 01'7-7a7-dti97
SHOULD ANY OF THE ABOVE L)C5CRUIED Pt)1_117165 BE CANCELLED
BI FORT, IIiE EXPIIIATION DArE '1'l IERBOF, 11 HE ISSUING COMPANY
WI1,1_ rNnFAVOR TO MAIL Q UAYS WHI ITEN NOTICE TO
nw in:R'rIFICATri IIOI.DI:R NA 11, (u TIIF 1 FFI, BUT FAILURE TO
MAIL'iUCH NOTICE 5HALL IM1105E NO OBLIGATION OR LIABILITY OF
ANY VtINU UPS1N T COMPANY, ITS Au ENT!) Oil RLFINESENTATIVES.
AUI'HORILfiU IIF PHE
LA'I
TO'd 7di01
:at: int. CERTIFICATE OF INSURANCE
PRODUCER
LaGere & Walkingstick Insurance
Agency, Inc.
P.O. Drawer 409
Chandler, Oklahoma 74834
CODE
sue CODE
INSURED
Lupton Painting Company
1210 Gordon Cooper Dr.
Shawnee, Oklahoma 74801
ISSUE DATE (MM/OWYY)
11-29-89 F
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS
NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMENI
EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW
COMPANIES AFFORDING COVERAGE
COMPANY
LETTER
A
Employers Casualty
COMPANY
LETTER
B
COMPANY
LETTER
C
COMPANY
LETTER
D
COMPANY
LETTER
E
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD'
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS .I
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, l
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
POLICY EFFECTIVE POLICY EXPIRATION .I 1'[
TR TYPE OF INSUAANCS - POLICY NUMBER DATE (MMIDO/YY) DATE (MM/ODIYY) ALL LIMITS IN tHOUSAND9
ii
GENERAL LIABILITY
COMMERCIAL GENERAL LIABILITY
CLAIMS MADE X OCCUR. v
X OWNER'S E CONTRACTOR'S PROT. 183277
AUTOMOBILE LIABILITY
ANY AUTO
ALL OWNED AUTOS
SCNEOULED AUTOS
HIROO AUTOS
NON-OWNED AUTOS
GARAGE LIABILITY
EXCESS LIABILITY
OTHER THAN UMBRELLAFORM -
WORKER'S COMPENSATION
AND
EMPLOYERS' UASILITY
GYMS
DESCRIPTION OF OPERATIONSILOCATIONSIVEHICLES/AE9TRICTIONB/SPECIAL ITEMS
Additional Insured: City of Denton, Texas
HOLDER
City of Denton, Texas
Purchasing Agent
901-B Texas St.
Denton, Texas 76201
Attn: John Marshall
FAx 917-3ga
AcnRn aR.A (A/AA%
GENERAL AGGREGATE 01,00
PRODUCTS•COMP/OPS AGGREGATE $1,00
PERSONAL A ADVERTISING INJURY $1,00
12-2-89 12-2-90 EACH occurintrice 11,00
FIRE DAMAGE (Any one fire) S 5
MEDICAL EXPENSE (My one person) f
COMBINED
SINGLE S
LIMIT
BODILY
INJURY S
(Per peraon)
BODILY
INJURY S
(Pa ecclam)
PROPERTY
DAMAGE i ~II I
EACH AOOREOATE11I
OCCURRENCE 333 I
S 3 l!
f7 x{':
STATUTORY
If (EACH ACCIDENT) 'I)
1 (00EAS0--P0LI6 U011
f (DISEASE-`EN]H ltl.'""}, c..
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR
MAIL-10-DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO
LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION
LIABILITY OF ANY KIND UPON THE.COMPANY, ITS AGENTS OR REPRESENTATIV
AUTHOAIYED REPRESENTATIVE
~~„~,r,E.t,sfti ~COR~ORP., ONTB80
CITY OF DENTON
is and Address of Agency
STATE INSURANCE FUND
P 0 BOX 53505
OKLA. CITY, OK 7315 Phone (405) 232-7663
City of Denton Reference:
Project Nero:
Project Not
Project locations
to and Address of Insureds
Maneging Dept:
Companies Affording Coverages
A STATE INSURANCE FUND
1210 GORDON COOPER DRIVE
SHAWNEE. OK 74801 Phons
a
C
This is to certify that policies of insurance listed below have been Issued and are In force at this time.
any Expiration Limits of Liability
W Tvna of Insure Pnl Irv hanker ne+M In Thouarvla MWI
slue Gesmal Liability
en«
- rrance
- CI• Made (see f2-reversy
Bodily Injury
$
Broad Fore to ludes
Property Damage
$
- Premises/Opera I
- Independent Contr
- Products/Completed ons
Bodll njury and Property
- Personal Injury
U Combined
$
- Contractual Liability (see fl )
- Explosion and Collapse Hazsrd
- Underground Hazard
- Liquor Liability Coverage
- Fire Legal Liability (see f3-reverse)
- Broad Form Property Oanage
- Professional Errors/Omissions
- occurrence
- claims made (see 02-ceverse)
Caw, shensive
Bodily In Person
S
Liability
Bodily Injury TA ident
f
- OWnwd/ Automobiles
Property Damage
$
- Hon Automobiles
Automobiles
Bodily Injury/Property
Damage Combined
S
- Workers' Compensation and
Statuto Amount
ry
Employers' Liability
00245654
2-1-90
1 000
000
each occl n
Other Insurance
eription of Operations/Locations/Vehicles. The City of Denton Is an additional insured as its interest may
ear as defined on the reverse side.
and address of Certificate Holder.
NOVFMRFR 21 q$
C= CF OMM, MW
PUICR4SRE AGM
901-8 MW Sr
LEIM, T)C 76201 gg >rMEE CIS G2CUM= CN > C1-4 )t>9!®.
CT-1
STATE INSURANCE FUND
P.O. BOX 53505
OKLAHOMA CITY, OKLAHOMA 73152,
(405) 232-7663.
CERTIFICATE OF INSURANCE
THIS IS TO CERTIFY THAT POLICY NUMBER 00245654 89 1 ISSUED IN THE NAME OF:
LUPTON PAINTING COMPANY OTHER BUSINESSES COVERED:
1210 GORDON COOPER DRIVE
SHAWNEE .OK 74801
IS IN FORCE ON THE DATE HEREOF, AS FOLLOWS:
LOCATION OF OPERATIONS TO WHICH THIS CERTIFICATE OF INSURANCE APPLIES:
STATE OF OKLAHOMA AND EXTRA TERRITORIAL JURISDICTION.
KIND OF INSURANCE: WORKERS COMPENSATION AND EMPLOYERS LIABILITY
POLICY PERIOD: EFFECTIVE: 02 01 89 AT 12:01 A.M.
EXPIRES: 02-01 90 AT 12:01 A.M.
THIS CERTIFICATE OF INSURANCE NEITHER AFFIRMATIVELY NOR NEGATIVELY AMENDS
EXTENDS OR ALTERS THE COVERAGE AFFORDED IN THE POLICY DESCRIBED HEREIN.
LIMITS OF LIABILITY:
WORKERS COMPENSATION INSURANCE: FULLY COMPLIES WITH THE REQUIREMENTSIOF
THE STATE LAWS OF OKLAHOMA.
EMPLOYERS LIABILITY INSURANCE:.
BODILY INJURY BY ACCIDENT 1,000,000 EACH ACCIDENT
BODILY INJURY BY DISEASE 1,000,000 EACH EMPLOYEE
BODILY INJURY BY DISEASE 1,000,000 POLICY LIMIT
THE DESCRIBED POLICY IS A STANDARD OKLAHOMA' WORKERS COMPENSATION AND EMPLOYERS
LIABILITY POLICY APPROVED BY THE STATE PROPERTY AND CASUALTY RATE BOARD. IN
THE EVENT OF ANY MATERIAL CHANGE IN, OR CANCELLATION OF SAID POLICY THE
UNDERSIGNED COMPANY WILL GIVE 30 DAY WRITTEN NOTICE TO THE PARTY TO WHOM THIS
CERTIFICATE IS ISSUED, BUT FAILURE TO GIVE SUCH NOTICE SHALL IMPOSE NO
OBLIGATION NOR LIABILITY UPON THE COMPANY.
CERTIFICATE ISSUED TO: OKLAHOMA STATE INSURANCE FUND
UNDERWRITER -
CITY OF DENTON, TEXAS
ATTN: PURCHASING AGENT
901-B TEXAS STREET
DENTON TX 76201
SIGNED 11-21-89 AT ITS OKLAHOMA CITY OKLAHOMA OFFICE. SR
3[ALe 'tne.iitnnca Funci P.O. R653505 OvIahnma City. C!;
NOTICE TO BIDDERS
Sealed bid proposals addressed to the City of Denton,
Purchasing Department, 901-B Texas Street, Denton, Texas, 76201
will be received at the office of the'Purchasing Agent until
2:00 p.m. October 10, 1989
Bid #1020 High School Elevated Steel Storage Tank Painting
and Repair
The bids will be publicly opened and read, bids received later
than the specified time and date will be returned to the bidder
unopened. The bids will then be officially reviewed and
awarded by the City Council as soon thereafter as possible.
All bid proposals must be made on the printed document forms
included in the specifications. The submitted bid shall not be
altered, withdrawn, or resubmitted within 60 days from and
after the date of the bid opening.
Each bid must be accompanied by a cashier's check, certified
check or acceptable bidders bond payable without recourse to
the City of Denton, Texas in an amount not less than five (58)
percent of the bid submitted as a guarantee that the bidder
will enter into a contract and execute a performance bond,
payment bond, and the required insurance certificate and
owner's protection policy within fifteen (15) days after the
notification of the award of the contract to the bidder..
Qualified prospective -bidders may obtain copies of the bid
invitation with information to bidders, bid proposals, plans
and/or specifications at the office of the Purchasing Agent,
located at 901-B Texas Street, Denton, Texas in the
Purchasing/Warehouse portion of the Service Center Complex, at
a non-refundable cost of $ l0.00 (ten) dollars per set.
The City of Denton, Texas reserves the right to reject any and
all bids and to waive defects in bids.
No officer or employee of the City of Denton shall have a
financial interest, direct or indirect, in any contract with
the City of Denton.
Minority and small business vendors or contractors are
encouraged to bid on any' and all City of Denton, Texas
projects.
CITY OF DENTON, TEXAS
John J. Marshall, C.P.M.
Purchasing Agent
This advertisement to run September 19, 1989 & September 26, 1989.
009.DOC
Rev. 7/6/89 2
PAGE
CITY OF DENTON }
PURCHASING DEPARTMENT "
is
DATE: October 10, 1989 BID NUMBER: 1020
BID TITLE: High School Elevated Steel Storage Tank Painting
and Repair. W
Sealed Bid Proposals will be received until 2:00 p.m. October 10, 1989
at the Office of thelPurchasing nnAgent 901-B Texas Street, Denton, Texas 76201-42N.-
BIDDER NAME: v/r~dti' ol'111ri' lea John J. Marshall, C.P.M.
I { Purchasing Agent
ADDRESS: ~tU n 'u ~f (817) 566-8311
INSTRUCTIONS TO BIDDERS
1. Sealed bid proposals must be received in duplicate. on this forth, prior to opening dale and time to be considered. Late
proposals will be returned unopened..
2 Bids shall be plainly marked as to the bid number: name of the bid. and bid opening date on the outside of completely
sealed envelops. and mailed or delivered-to the Purchasing Department. City of Denton. 901 •B Texas St., Denton, TX
76201.
1 Any submitted article dirviating from the specifications must be identified and have full descriptive data accompanying
same, or it will not be considered. - - "
L 4, All materials are to be quoted FOB Denton, Texas, delivered to the floor of the warehouse, or as otherwise indicated.
5. The City of Denton, Texas reserves the right to accept separate items in a bid unless this right is denied by the bidder. - i
8. In case of defaut attar bid acceptance, the City of Denton. Texas may at its option hold the accepted bidder or contractor
liable for any and all resultant increased costs as a penalty for suctr default.
The City of Denton reserves the right to (elect any and all bids, to waive all informalities and require that submitted bids
remain in force for a sixty (BM day period after opening or until award is made: whichever comes first. -
& The quantities shown maybe approximate and could vary according to the recuirements of the City of Denton
throughout the contract period. -
9. The Items are to be priced each not. (Packaging or shipping quantities will Do considered.) ,
10. The Purchasing Department assumes responsibility for the correctness and clarity of this bid. and all information and/or
questions pertaining to this bid shall be directed to the City of Denton Purchasing Agent.
11. Any attempt to negotiate or give information on the contents of this bid with the City of Denton or its representatives
prior to award shall be gounda for disqualifications.
12. The conditions and terns of this bid will be considered when evaluating for award.
19. The City of Denton is exempt from all sales and excise taxes. (Article 20.04-8) .
PAGE
7
PROPOSAL OF
BID
PROPOSAL
Ic-
ocl /U 1951
(70 C, e I I
A Corporation organized and existing under the laws of the State of
a partnership consisting of I r (An .~H(Li i
the business name of an individual.
TO: City of Denton, Texas
PROPOSAL FOR: IiTGR SCHOOL ELEVATED STEEL STORAGE TANK PAINTING
APED REPAIR
Bid Nuiuber: I0ab
The undersigned Bidder, pursuant to the foregoing Invitation for Bids, has
carefully examined the Instructions to Bidders, this Proposal, the
Supplemental Conditions, the form of Contract Agreement and Bonds, the
General Conditions for the'Agreement, the Specifications, the Plans, and
also the site of the_work, and will provide all necessary labor,
superintendence, machinery, equipment, tools, materials, services and other
facilities to complete fully all the work as provided in the Contract
Documents; and binds himself upon formal acceptance of his Proposal to
execute a contract and bonds, according to the prescribed forms, for the
following prices to-with:
2TF008.DOC P-1
i
I
`t
+i
j
r
?i'
• 1
4
t.
Item Quantity Description. Unit Extended
No.
Price Amount
1 L.S. For furnishing all materials,
tools, equipment, labor,
supervision, and incidentals
as required to clean out the,
tank, prepare the surface
(including all spot repairs)
and seam sealing), and
place paintings on the
interior surfaces of the
tank bowl, wet riser column,
and access drywell as
specified herein, conplete
in place for the lump sum
amount of:
Vji- l 4uuSIIIJ DOLLARS
AND OX, CENTS $
5 UUd S ~S,CG'd
per luny sum
2 100 HR For furnishing all materials,
tools, equipment, labor,
supervision and incidentals
as required and as directed by
the owners' engineer for the
replacement and repair of
structural steel members,
ladders, platforms, safety
railings and other appurtenances
within the interior of the tank
bowl as specified herein,
for the sum
of:
p
ld i l.CvL') DOLLARS
00
CENTS $
/ Oaf
$
per.hour..
2TF008.DOC P-2
Item
No.
3
Quantity Description Unit Extended
Price Amount
L.S. Ebr furnishing all materials,
tools, equipment, labor
equipment, labor supervision
and incidentals as required
to.prepare the surfaces and
install Exterior Paint System
Dumber one to the exterior
surfaces of the tank including
the tank bawl, legs, braces,
and central column skirt (the
exterior surfaces of the tank
within the central column
sk triare not included in
this contract) as specified
herein, complete in place
for the lump sum amount of:
o~o_~u~a~s-r~,►c.~-u~~`R~aDOIS.ARS
AND CENTS $ y5J~ d0"'/rs $ I4SO~o'~
per lump sum
ALTERNATE BID ITEMS
4 Total Base Bid for Bid Items 1, 2, &3) a`I05O6u,
L.S. Ebr furnishing all materials,
tools, equipment, labor
supervision and incidentals
as required to install a
permanent fall prevention
system on all existing ladders
in accordance with OSHA
requirements as specified
herein, complete in place
for the lump sum amount of:
DOLLARS
AND ~w CENTS $ r U bU $
per luup sum
0
2TFOO8.DOC
P-3
°i
r
i•
Item
Quantity
Description Unit
Extended
No,
Price
Amount
5
L.S.
Delete Bid Item NLmiber 3
and replace it with the same
description except for the
substitution of Exterior
Paint System Number Two
4
instead of Exterior Paint ,
System Number One for the
lump sum total amount of:
DOLLARS
~ . .
AND CENIS $ ,S J. $ 05'm
per lump sum
Item
Quantity
Description Unit
Extended
No,
Price
Amount
6
L.S.
Additive Item
(See'Special Conditions)
In the event the Owner elects
to Delete the painting of the
exterior of the tank (Bid Item
Number 3 or Alternate Bid Item
Number 5) due to the availability
of sufficient funds, this Bid
Item shall cover the additional
overhead expenses (if any) such
as mobilization, start-up,
insurance, etc., to be applied
to the total contract bid price
as a result of deleting the
painting of the exterior of
the tank from the scope of the
project for the lump sum of:
Z1-~ DOLLARS
7e ,U crams
AND
per lug sun
2TFOO8.DOC P-4
within fifteen (15) days after formal acceptance of this Proposal by a
Notice of Award of contract, the undersigned will execute the Contract
Agreement and will furnish approved surety bonds and such other bonds as
required by the Contract Documents for the faithful performance of the
Contract. In the event the Contract Agreement and bonds are not executed "
within the time above set forth, the attached bid security in the amount of
is to become the property of the Owner as liquidated damages for the delay
and additional work caused thereby.
The undersigned agrees to substantially complete all work covered by these
Contract Documents within 60 consecutive working days from the date of
written Notice to Proceed.
If the Owner elects to delete bid item number 3 (for painting the exterior
surfaces of the tank) the undersigned agrees to substantially complete all
work covered by these Contract Documents within 45 consecutive working days
from the date of written Notice to Proceed.
Receipt is acknowledged of the following addenda:
Addendum No. 1
Addendum No. 2
Addendwn No. 3
Addendum No. 4
Addendum No. 5
Attested By:
ret-ary W-HN>s
Respectfully Sul~Ynitted,
By /N~
r
(Print Name andl Title) V
url 1q„ l I/ l u+n - /9
Address
Telephone
(jjS --)i 112-
(SEAL) If Bidder is a Corporation
NOTE: Do not detach bid forms from other papers. Fill in with ink and
submit complete with attached papers.
2TF008.DOC
P-5
I
Y
1
i
3
i
i
ii
I
i
it l
tl
i
i
I
i
i
i
i
E
Y
s
s
r
r
Y
t
c
a
t
a
1
i
I Y ~ ~
i
II i
, E
I Y
1 i
i i
1 ! Y
It zjl
4F
1 i
i
~ Y