1989-0972651L-10/3689 NO 9q 092_ AN ORDINANCE AUTHORIZING THE hXECUTION OF A CHANGE ORDER TO A CONTRACT BETWEEN THE CITY OF DENTON AND LANDMARK COMPANY, FOR A REDUCTION IN THE CONTRACf PRICE, AND PROVIDING AN EFFLCTIVE DATE WHEREAS, on May 16, 1989, the City awarded a contract for the construction of certain improvements to the Senior Center Addition Project, and WHEREAS, the City Manager having recommended to the Council that a change order be authorized to amend such contract and said change order being in compliance with the requirements of Article 2368a, V A C S , NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF DENTON SECTION I That the change order reducing the amount of the contract between the City and Landmark Company, in the amount of Sixteen Thousand Two Hundred Eighty Seven and No/100 ($16,287 00), a copy of which is attached hereto, is hereby approved SECTION II That this ordinance shall become effective imme ate y upon it passage and approval PASSED AND APPROVED this Of day of 1989 RAY ST PrI ENS , AYOR ATTEST 4 r S APPROVED AS TO LEGAL FORM DEBRA ADAMI DRAYOVITCH, CITY ATTORNEY BY ALCI ~ '%:HANGE ORDER A1A DOCUMENT G701 OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ 1 FIELD ❑ OTHER ❑ PROJECT Senior Center Addition (name address) City of Denton, TX (P O #91019) TO CONTRACTOR Landmark Company (name address) 2016 W University Drive Denton, TX 76201 The Contract is changed as follows CHANGE ORDER NUMBER One (1) DATE July 13, 1989 ARCHITECTS PROJECT NO N PH 8812 CONTRACT DATE May 16, 1989 CONTRACT FOR General Construction See attached change order Number 1, it was dated July 13, 1989 V Not valid until signed by the Owner, Architect and Contractor The original (Contract Sum) was s 717,872 00 Net change by previously authorized Change Orders s 0 00 The (Contract Sum) (G*Wlfi1WX ffX4" prior to this Change order was t 717,872 00 The (Contract Sum) (4Vfi tflfiWMi*ffi il4ltl(ff*wr0 be rMINd500) (decreased) ( fi by this Change Order in the amount of $ <16,287,00> The new (Contract Sum) (tl(fld6lii614f11fffi1E8H(f~1tP4tdi) including this Change Order will be i 701,585 00 The Contract Time will be 0WR6lf MWA1SK (unchanged) by (-0- ) dat s The date of Substantial Completion as of the date of this Change Order therefore is 250 calendar days of date of Owner's written "Notice to Proceed" NOTE This summary does not reflect changes in the Contract Sum Contract Time or Guaranteed Maximum Price which have been authorized bN Construction Change Directive ~Landmark Company CONTRACTOR 0 --%2016 W. University Dr ,_QAMjjk 75 r^y Denton TX 76201 BY BY t ~ DATE ' ATE /tip Dp(; r ORDER • 1987 EDITION • AI KO • ®1987 • THE AMERICAN INSTITUTE HIT8CT5 1735 NEW YORK AVE N W WASHINGTON D C 20006 of r)Antnn oWNE 215 E Mc Kinney Address D n TX 1 BY DATE Z o G1701-1987 Architecture Hp Planning j LI lr'Ch1 cd,) Interiors July 13 1989 CHANGE ORDER NUMBER 1 Project Senior Center Addition City of Denton Texas (P O Box #91019) Contractor Landmark Company 2016 W University Drive Denton, TX 76201 Arch Prot # NPH 8812 The following list of items are to be added to or deducted from the cont ract sum for the project No Description Add/Deduct Amount 1 Substitute Alternate Lighting Control System (same operations as specified) DEDUCT <$500 00> 2 Substitute Standard Grade Oak for quarter cut Oak DEDUCT <$1 400 00> 3 Delete Durock and substitute moisture-resistant Gyp Board behind areas to receive ceramic the DEDUCT <$300 00> 4 Delete ceding board (type ll) Armstrong #573-A San Serra 24"x24"x3/4" regular lay-in and substitute 24"x24"x3/4" acoustical tile to match new ceiling tile system as specified DEDUCT <$900 00> 5 Delete 2 1/2" Sound Attenuation Batts and substitute 2" noise carrier batt by Owens Corning DEDUCT <$300 00> 6 Delete Dust vent Collector System entirely DEDUCT <$13,000 00> 7 Change the duct liner from 3 lb density to 1 1/2 lb density DEDUCT 8 For standard low pressure ductwork, use Snap Lock standard galvanized ductwork in lieu of spiral DEDUCT 9 Substitute red oxide for the grey oxide specified DEDUCT <$650 00> <$450 00> <$200 00> Norman P Hatfield Jr AIA 16479 Dallas Parkway Suite 710 Dallas Texas 75248 (214) 250 3399 Senior Center Addition Change Order No 1 July 13, 1989 10 Add ceiling mounted smoke detectors with wiring to enunciator board at the reception desk in the following areas 1 @ Corridor 118 1 @ Game Room 209 1 @ Vending Room 114 1 @ Men's Rest Room 111 1 @ Women's Rest Room 110 - - - - - 5 Total required ADD $2,16300 11 Add one layer 5/8" Fire Code Gyp Board to each side of the walls at Wood Shop 122 and Finish Room 125 Gyp Board shall extend to roof deck to achieve a 2 hour rated wall separation Change Door 124 to a 2 hour rated door assemble ADD $3,65000 12 Reduce the construction contingency from $10,000 00 as specified to $98500 (Note $985 00 still remains in the construction contingency amount ) DEDUCT <$9,015 00> 13 Add Alternate Number 1 (painting) ADD $1,58500 14 Add Da Lite Boardroom Electrical electrically operated projection screen in ceiling of Stage 129 ADD $3 030 00 15 TOTAL Change Order #1 DEDUCT <$16,287 00> Landmark Company City of Denton, Texas V