1989-0972651L-10/3689
NO 9q 092_
AN ORDINANCE AUTHORIZING THE hXECUTION OF A CHANGE ORDER TO A
CONTRACT BETWEEN THE CITY OF DENTON AND LANDMARK COMPANY, FOR A
REDUCTION IN THE CONTRACf PRICE, AND PROVIDING AN EFFLCTIVE DATE
WHEREAS, on May 16, 1989, the City awarded a contract for the
construction of certain improvements to the Senior Center Addition
Project, and
WHEREAS, the City Manager having recommended to the Council
that a change order be authorized to amend such contract and said
change order being in compliance with the requirements of Article
2368a, V A C S , NOW, THEREFORE,
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF DENTON
SECTION I That the change order reducing the amount of the
contract between the City and Landmark Company, in the amount of
Sixteen Thousand Two Hundred Eighty Seven and No/100 ($16,287 00),
a copy of which is attached hereto, is hereby approved
SECTION II That this ordinance shall become effective
imme ate y upon it passage and approval
PASSED AND APPROVED this Of day of 1989
RAY ST PrI ENS , AYOR
ATTEST
4
r
S
APPROVED AS TO LEGAL FORM
DEBRA ADAMI DRAYOVITCH, CITY ATTORNEY
BY ALCI
~
'%:HANGE
ORDER
A1A DOCUMENT G701
OWNER
❑
ARCHITECT
❑
CONTRACTOR
❑ 1
FIELD
❑
OTHER
❑
PROJECT Senior Center Addition
(name address) City of Denton, TX
(P O #91019)
TO CONTRACTOR Landmark Company
(name address) 2016 W University Drive
Denton, TX 76201
The Contract is changed as follows
CHANGE ORDER NUMBER One (1)
DATE July 13, 1989
ARCHITECTS PROJECT NO N PH 8812
CONTRACT DATE May 16, 1989
CONTRACT FOR General Construction
See attached change order Number 1, it was dated July 13, 1989
V
Not valid until signed by the Owner, Architect and Contractor
The original (Contract Sum) was s 717,872 00
Net change by previously authorized Change Orders s 0 00
The (Contract Sum) (G*Wlfi1WX ffX4" prior to this Change order was t 717,872 00
The (Contract Sum) (4Vfi tflfiWMi*ffi il4ltl(ff*wr0 be rMINd500) (decreased)
( fi by this Change Order in the amount of $ <16,287,00>
The new (Contract Sum) (tl(fld6lii614f11fffi1E8H(f~1tP4tdi) including this Change Order will be i 701,585 00
The Contract Time will be 0WR6lf MWA1SK (unchanged) by (-0- ) dat s
The date of Substantial Completion as of the date of this Change Order therefore is 250 calendar days of date of
Owner's written "Notice to Proceed"
NOTE This summary does not reflect changes in the Contract Sum Contract Time or Guaranteed Maximum Price which have been authorized bN
Construction Change Directive
~Landmark Company
CONTRACTOR
0 --%2016 W. University Dr
,_QAMjjk 75
r^y
Denton
TX 76201
BY
BY
t
~
DATE
'
ATE
/tip Dp(; r
ORDER •
1987 EDITION
• AI KO • ®1987 • THE
AMERICAN INSTITUTE
HIT8CT5 1735 NEW YORK AVE N W WASHINGTON D C 20006 of r)Antnn
oWNE
215 E Mc Kinney
Address
D n TX 1
BY DATE Z o
G1701-1987
Architecture
Hp Planning
j LI lr'Ch1 cd,) Interiors
July 13 1989
CHANGE ORDER NUMBER 1
Project Senior Center Addition
City of Denton Texas
(P O Box #91019)
Contractor Landmark Company
2016 W University Drive
Denton, TX 76201
Arch Prot # NPH 8812
The following list of items are to be added to or deducted from the cont
ract sum for
the project
No Description Add/Deduct
Amount
1 Substitute Alternate Lighting Control System
(same operations as specified) DEDUCT
<$500 00>
2 Substitute Standard Grade Oak for quarter cut Oak DEDUCT
<$1 400 00>
3 Delete Durock and substitute moisture-resistant
Gyp Board behind areas to receive ceramic the DEDUCT
<$300 00>
4 Delete ceding board (type ll) Armstrong #573-A
San Serra 24"x24"x3/4" regular lay-in and
substitute 24"x24"x3/4" acoustical tile to
match new ceiling tile system as specified DEDUCT
<$900 00>
5 Delete 2 1/2" Sound Attenuation Batts and substitute
2" noise carrier batt by Owens Corning DEDUCT
<$300 00>
6 Delete Dust vent Collector System entirely DEDUCT <$13,000 00>
7 Change the duct liner from 3 lb density to
1 1/2 lb density DEDUCT
8 For standard low pressure ductwork, use Snap
Lock standard galvanized ductwork in lieu of spiral DEDUCT
9 Substitute red oxide for the grey oxide specified DEDUCT
<$650 00>
<$450 00>
<$200 00>
Norman P Hatfield Jr AIA 16479 Dallas Parkway Suite 710 Dallas Texas 75248 (214) 250 3399
Senior Center Addition
Change Order No 1
July 13, 1989
10 Add ceiling mounted smoke detectors with wiring to enunciator
board at the reception desk in the following areas
1 @ Corridor 118
1 @ Game Room 209
1 @ Vending Room 114
1 @ Men's Rest Room 111
1 @ Women's Rest Room 110
- - - - -
5 Total required ADD $2,16300
11 Add one layer 5/8" Fire Code Gyp Board to each side
of the walls at Wood Shop 122 and Finish Room 125
Gyp Board shall extend to roof deck to achieve a 2 hour
rated wall separation Change Door 124 to a 2 hour
rated door assemble ADD $3,65000
12 Reduce the construction contingency from $10,000 00 as
specified to $98500 (Note $985 00 still remains in the
construction contingency amount ) DEDUCT <$9,015 00>
13 Add Alternate Number 1 (painting) ADD $1,58500
14 Add Da Lite Boardroom Electrical electrically
operated projection screen in ceiling of Stage 129 ADD $3 030 00
15 TOTAL Change Order #1
DEDUCT <$16,287 00>
Landmark Company City of Denton, Texas