1989-083NOOK
SCHEDUL
AN ORDINANCE OF THE CITY OF
OF RATES FOR ELECTRICAL SERVICES BYIADD TEXAS NG~SCHEDULESG T RE(RESIDENE
T
TIAL TIME-OF-USE), TGS (GENERAL SERVICE - TIME-OF-USE), TGP IME-OF TIMEEOFLUSE), ANDPPRO IDINGTFOR AN EFFECTIVE DATE(~RGE PRIMARY -
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS
S&CTTON I. That the Schedule of Rates for electrical services
is amended by adding Schedules T-RT(RRe ident 11 Time -of-Use), TGS
Primary -
Se , and TLPi(Large Primary - Time-of-Use) , attached here-
Time--oofal -use)
to and incorporated herein by reference
SX9MR-1 That a copy of this ordinance shall be attached
to the current Schedule of Rates for electrical services to show
the amendments herein approved
SECTION TII. That this ordinance shall become effective
immediately upon its passage and approval
day of 44"- , 1989
PASSED AND APPROVED this the
RAY E HENS, MAYOR
hATTEST
JE dI ALTERS, CITY SECRETARY
A ROVED AS TO LEGAL FORM
DEBRA ADAMI DRAYOVITCH, CITY ATTORNEY
BY A~i~ A- kA&f~lzb-L
89-333
SCHEDULE T-R
RESIDENTIAL - TIME-OF-USE
APPLICATION
Applicable for any customer for all electric service used for
residential purposes in an individual private dwelling or an
individually metered apartment, supplied at one point of delivery
and measured through one meter Customers applying for the T-R
rate must remain on this rate for twelve (12) continuous billing
periods Not applicable to resale service in any event, nor to
temporary, standby or supplementary service, except in conjunction
with the applicable riders
NET MONTHLY RATE
(1) Customer Facility Charge
Single-Phase $15
Three-Phase $20
(2) Energy Charge
On-Peak Hours $ 0
Off-Peak Hours $ 0
(3) Energy Cost Adjustment Per
00/30 days
00/30 days
260/kWh
023/kWh
Schedule E C A
MINIMUM BILLING
The minimum monthly bill shall be the Customer- Facility
Charge
TYPE OF SERVICE
Single-phase or three-phase at sixty (60) cycles at secondary
distribution voltage Whera service of the type desired by the
customer is not already available at the point of service, special
contract arrangements between the City and the customer may be
required prior to its being furnished
DEFINITION OF ON-PEAK HOURS
The City's on-peak hours, for the purpose of this rate
schedule, are designated as being from 1 00 PM to 8 00 PM each
Monday through Friday, starting on June 1 and continuing through
September 30 each year The City's on-peak hours may be changed
from time to time and the customer will be notified twelve (12)
months prior to such changes becoming effective
SCHEDULE T-R
RESIDENTIAL - TIME-OF-USE
(Continued)
DEFINITION OF OFF-PEAK HOURS
The City's off-peak hours, for the purpose of this rate
schedule, shall be all hours not designated as on-peak hours
SPECIAL FACILITIES
All services which require special facilities in order to
meet customer's service requirements shall be provided subject to
the special facilities rider
PRORATION OF UTILITY BILLS
Billing for the Facility Charge shall be based on 12 billings
annually using the following formula
Actual days in reading period x Customer Charge
30
ENERGY COST ADJUSTMENT
A charge per kWh of energy taken for fuel cost calculated in
accordance with Schedule E C A
PAYMENT
Bills are due when rendered, and become past due if not paid
within fifteen (15) calendar days from date of issuance
SCHEDULE TGS
GENERAL SERVICE - TIME-OF-USE
APPLICATION
Applicable to any commercial or industrial customer for all
electric service supplied at one point of delivery and measured
through one meter Supplementary service subject to the
applicable rider Not applicable to resale or temporary service
Customers electing this rate must remain on this rate for a
minimum of twelve (12) continuous billing months
NET MONTHLY RATE
(1) Customer Facility Charge
(2) On-Peak Demand Charge
(3) System Demand Charge
(4) Energy Charge
(5) Energy Cost Adjustment
MINIMUM BILLING
$25 00/30 days
$ 9 o0/kW of on-Peak Demand
$ 6 70/kW of System Demand
$ 0 0040/kWh
Per Schedule E C A
The minimum monthly bill shall be the sum of the Customer
Facility Charge, the On-Peak Demand Charge, and the System Demand
Charge, but not less than $693 00
TYPE OF SERVICE
Single-phase or three-phase at sixty (60) cycles at available
secondary distribution voltage
DETERMINATION OF ON-PEAK DEMAND
The on-peak demand shall be the maximum kW demand supplied
during the fifteen (15) minute period of maximum use during the
on-peak hours as recorded by the City's demand meter and adjusted
for power factor, but not less than one hundred percent (100%) of
of similarly induring
the gtwelthe
ve
months demand
the previous maximum billing on-peak
(12) months ending with the current month
SCHEDULE TGS
GENERAL SERVICE - TIME-OF-USE
(Continued)
DETERMINATION OF SYSTEM DEMAND
The system demand shall be the maximum kW demand supplied
during the fifteen (15) minute period of maximum use as recorded
by the City's demand meter and adjusted for power factor, but not
less than seventy percent (708) of the maximum system demand
similarly determined during the previous billing months of June
through September in the twelve (12) months ending with the
current month
POWER FACTOR PENALTY
The City reserves the right to determine the power factor of
the customer's installation served during periods of maximum
demand or by measurement of the average power factor for the
monthly billing period If the power factor is below ninety
percent (908) on-peak and average demand for the demand for
billing purposes will be determined by multiplying the unadjusted
billing demand by ninety percent (908) and dividing by the
determined power factor
DEFINITION OF ON-PEAK HOURS
The City's on-peak hours, for the purpose of this rate
schedule, are designated as being from 1 00 PM to 8 00 PM each
Monday through Friday, starting on June 1 and continuing through
September 30 each year The City's on-peak hours may be changed
from time to time and the customer will be notified twelve (12)
months prior to such changes becoming effective
DEFINITION OF OFF-PEAK HOURS
The City's off-peak hours, for the purpose of this rate
schedule, shall be all hours not designated as on-peak hours
SUPPLEMENTAL POWER RIDER
Customers requesting standby or supplementary power shall be
allowed service under this rate schedule, however, the
determination of system demand shall be adjusted to read
SCHEDULE TGS
GENERAL SERVICE - TIME-OF-USE
(Continued)
SUPPLEMENTAL POWER RIDER (Continued)
The system demand shall be the sum of the maximum
kW demand supplied during the fifteen (15) minute period
of maximum use as recorded by the City's demand meter
plus the kW nameplate rating(s) of the customer's
generator(s) In the event the customer's generator(s)
is/are off-line at the time of the establishment of the
maximum system demand, the kW nameplate rating of the
generator(s) unavailable for service shall be removed
from the determination of the system demand In no
event shall the system demand be less than seventy
percent (703) of the maximum system demand similarly
determined during the previous billing months of June
through September in the twelve (12) months ending with
the current month
SPECIAL FACILITIES
All services which require special facilities in order to
meet customer's service requirements shall be provided subject to
the special facilities rider
PRORATION OF UTILITY BILLS
(a) Billing for the Facility Charge shall be based on 12 billings
annually using the following formula
Actual days in reading Period x Customer Charge
30
(b) Billing for demand shall be calculated on a 3o-day-per-month
basis and prorated for longer or shorter billing periods
using the following formula
Actual days in readlna Period x kw demand x Rate
30
ENERGY COST ADJUSTMENT
A charge per kWh of energy taken for fuel cost calculated in
accordance with Schedule E C A
PAYMENT
past f not paid
Bills due w calendar rendered, days from become date ol issuance
within fifteen (15) cal
SCHEDULE TGP
GENERAL SERVICE PRIMARY - TIME-OF-USE
APPLICATION
Applicable to any customer having a minimum demand of 750 kW
for all electric service supplied at one point of delivery and
measured through one meter, with the City providing all facilities
necessary to receive primary voltage service Supplementary
service will be available subject to the applicable rider Not
applicable to resale or temporary service Customers electing
this rate must remain on this rate for a minimum of twelve (12)
continuous billing months
NET MONTHLY RATE
(1) Customer Facility Charge $60 00/30 days
(2) On-Peak Demand Charge $ S 90/kW of On-Peak Demand
(3) System Demand Charge $ 5 50/kW of System Demand
(4) Energy Charge $ 0 0035/kWh
(5) Energy Cost Adjustment Per Schedule E C A
MINIMUM BILLING
The minimum monthly bill shall be the sum of the Customer
Facility Charge, the On-Peak Demand Charge, and the System Demand
Charge, but not less than $4,155 00
TYPE OF SERVICE
Three-phase at sixty (60) cycles at available primary
distribution voltage.
DETERMINATION OF ON-PEAK DEMAND
The on-peak demand shall be the maximum kW demand supplied
during the fifteen (15) minute period of maximum use during the
on-peak hours as recorded by the City's demand meter and ad3usted
for power factor, but not less than one hundred percent (10o%) of
the maximum on-peak demand similarly determined during the
previous billing months of June through September in the twelve
(12) months ending with the current month
SCHEDULE TGP
GENERAL SERVICE PRIMARY - TIME-OF-USE
(Continued)
DETERMINATION OF SYSTEM DEMAND
The system demand shall be the maximum kW demand supplied
during the fifteen (15) minute period of maximum use as recorded
by the City's demand meter and adjusted for power factor, but not
less than seventy percent (703) of the maximum system demand
similarly determined during the previous billing months of June
through September in the twelve (12) months ending with the
current month
POWER FACTOR PENALTY
The City reserves the right to determine the power factor of
the customer's installation served during periods of maximum
demand or by measurement of the average power factor for the
purposeninety
billingbelow
and aIf the power verage demand factor
monthly percent b(903),lgon-peak period
will be determined by multiplying the unadjusted billing demand by
ninety percent (903) and dividing by the determined power factor
DEFINITION OF ON-PEAK HOURS
The City's on-peak hours, for the purpose of this rate
schedule, are designated as being from 1 00 PM to 8 00 PM each
Monday through Friday, starting on June 1 and continuing through
September 30 each year The City's on-peak hours may be changed
from time to time and the customer will be notified twelve (12)
months prior to such changes becoming effective
DEFINITION OF OFF-PEAK HOURS
The City's off-peak hours, for the purpose of this rate
schedule, shall be all hours not designated as on-peak hours
SUPPLEMENTAL POWER RIDER
Customers requesting supplementary power shall be allowed
service under this rate schedule, however, the determination of
system demand shall be adjusted to read
SCHEDULE TGP
GENERAL SERVICE PRIMARY - TIME-OF-USE
(Continued)
SUPPLEMENTAL POWER RIDER (Continued)
The system demand shall be the sum of the maximum
kW demand supplied during the fifteen (15) minute period
of maximum use as recorded by the City's demand meter
plus the kW nameplate rating(s) of the customer's
generator(s) In the event the customer's generator(s)
is/are off-line at the time of the establishment of the
maximum system demand, the kW nameplate rating of the
generator(s) unavailable for service shall be removed
from the determination of the system demand In no
event shall the system demand be less than seventy
percent (708) of the maximum system demand similarly
determined during the previous billing months of June
through September in the twelve (12) months ending with
the current month
SPECIAL FACILITIES
All services which require special facilities in order to
meet customer's service requirements shall be provided subject to
the special facilities rider
PRORATION OF UTILITY BILLS
(a) Billing for the Facility Charge shall be based on 12 billings
annually using the following formula
Actual days in reading period x Customer Charge
30
(b) Billing for demand shall be calculated on a 30-day-per-month
basis and prorated for longer or shorter billing periods
using the following formula
Actual days in reading period x kW demand x Rate
30
ENEBG-Y COST ADJUSTMENT
A charge per kWh of energy taken for fuel cost calculated in
accordance with Schedule E C A
PAYMENT
Bills are due when rendered, and become past due if not paid
within fifteen (15) calendar days from date of issuance
SCHEDULE TLP
LARGE PRIMARY - TIME-OF-USE
APPLICATION
Applicable to any customer having a minimum demand of 750 kw
for all electric service supplied at one point of delivery and
measured through one meter, with the customer providing all
facilities necessary to receive primary voltage service
supplementary service subject to the applicable rider Not
applicable to resale or temporary service Customers electing
this rate must remain on this rate for a minimum of twelve (12)
continuous billing months
NET MONTHLY RATE
(1) Customer Facility Charge $60 00/30 days
(2) On-Peak Demand Charge $ 9 30/kW of on-Peak Demand
(3) System Demand Charge $ 4 80/kW of System Demand
(4) Energy Charge $ 0 0035/kWh
(5) Energy Cost Adjustment Per Schedule E C A
MINIMUM BILLING
The minimum monthly bill shall be the sum of the Customer
Facility Charge, the On-Peak Demand Charge, and the System Demand
Charge, but not less than $3,637 50
TYPE OF SERVICE
Three-phase at sixty (60) cycles at available primary
distribution voltage
DETERMINATION OF ON-PEAK DEMAND
The on-peak demand shall be the maximum kW demand supplied
during the fifteen (15) minute period of maximum use during the
on-peak hours as recorded by the City's demand meter and adjusted
for power factor, but not less than one hundred percent (1008) of
the maximum on-peak demand similarly determined during the
previous billing months of June through September in the twelve
(12) months ending with the current month
SCHEDULE TLP
LARGE PRIMARY - TIME-OF-USE
(Continued)
DETERMINATION OF SYSTEM DEMAND
The system demand shall be the maximum kW demand supplied
during the fifteen (15) minute period of maximum use as recorded
by the City's demand meter and adjusted for power factor, but not
less than seventy percent (703) of the maximum system demand
similarly determined during the previous billing months of June
through September in the twelve (12) months ending with the
current month
POWER FACTOR PENALTY
The city reserves the right to determine the power factor of
the customer's installation served during periods of maximum
demand or by measurement of the average power factor for the
monthly billing period If the power factor is below ninety
percent (903), on-peak and average demand for billing purposes
will be determined by multiplying the unadjusted billing demand by
ninety percent (903) and dividing by the determined power factor
DEFINITION OF ON-PEAK HOURS
The city's on-peak hours, for the purpose of this rate
schedule, are designated as being from 1 00 PM to 8 n0 PM each
Monday through Friday, starting on June 1 and continuing through
September 30 each year The City's on-peak hours may be changed
from time to time and the customer will be notified twelve (12)
months prior to such changes becoming effective
DEFINITION OF OFF-PEAK HOURS
The city's off-peak hours, for the purpose of this rate
schedule, shall be all hours not designated as on-peak hours
SUPPLEMENTAL POWER RIDER
customers requesting supplementary power shall be allowed
service under this rate schedule, however, the determination of
system demand shall be adjusted to read
SCHEDULE TLP
LARGE PRIMARY - TIME-OF-USE
(Continued)
SUPPLEMENTAL POWER RIDER (Continued)
The system demand shall be the sum of the maximum
kW demand supplied during the fifteen (15) minute period
of maximum use as recorded by the City's demand meter
plus the kW nameplate rating(s) of the customer's
generator(s) In the event the customer's generator(s)
is/are off-line at the time of the establishment of the
maximum system demand, the kW nameplate rating of the
generator(s) unavailable for service shall be removed
from the determination of the system demand In no
event shall the system demand be less than seventy
percent (70%) of the maximum system demand similarly
determined during the previous billing months of June
through September in the twelve (12) months ending with
the current month
SPECIAL FACILITIES
All services which require special facilities in order to
meet customer's service requirements shall be provided subject to
the special facilities rider
PRORATION OF UTILITY BILLS
(a) Billing for the Facility Charge shall be based on 12 billings
annually using the following formula
Actual days in reading period x Customer Charge
30
(b) Billing for demand shall be calculated on a 30-day-per-month
basis and prorated for longer or shorter billing periods
using the following formula
Actual days in reading period x kW demand x Rate
30
ENERGY COST ADJUSTMENT
A charge per kWh of energy taken for fuel cost calculated in
accordance with Schedule E C A
PAYMENT
if not paid
Bills when issuance
within fifteen (15) calendar days from date