Loading...
1989-0732392L NO $9n2CL AN ORDINANCE AUTHORIZING THE EXECUTION OF A CONTRACT BETWEEN THE CITY OF DENTON AND THE UNITED STATES ARMY CORPS OF ENGINEERS FOR ACCESS AND SITE ACTIVITIES ON THE HYDROPOWER PROJECT AT LAKE RAY ROBERTS, PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFORE, AND PROVIDING FOR AN EFFECTIVE DATE WHEREAS, the United States Corps of Engineers and the City of siteoa tivitiestoforttheihydropowereeprojectoatdLakeoRaycRobertsd NOW, THEREFORE THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS SECTION I That the City Council, hereby approves and author zes t e Mayor and City Secretary to execute and attest respectively, the agreement between the City of Denton and the site United States Corps of Engineers providing or access snd under activities for the hydropower project theattterms and ached her conditions being a part hereof in said agreement which SECTION II That the City Council authorizes the expenditure of fun s n t e manner and amount as specified in the Agreement SECTION III That this ordinance shall become effective imme ate y upon its passage and approval 1989 PASSED AND APPROVED this the ay of ' RAY S EP ENS, MAYOR ATTEST ?PROVED " TAR , CI S' ARY AS TO LEGAL FORM DEBRA ADAMI DRAYOVITCH, CITY ATTORNEY BY 266h 4 CORPS OF ENGINEERS MEMORANDUM OF AGREEMENT FOR TECHNICAL SUPPORT BY THE CORPS OF ENGINEERS AND FOR ESTABLISHING PROCEDURES FOR ACCESS AND SITE ACTIVITIES BY THE CITY OF DENTON PURSUANT TO FEDERAL ENERGY REGULATORY LICENSE FOR FERC PROJECT 3939 THIS AGREEMENT, entered into this 3_1.-t day of J'uc.~e , 1989, by and between the DEPARTMENT OF THE ARMY, Corps of Engineers (hereinafter referred to as the "Corps"), acting by and through the Southwestern Division Commander, and the City of Denton, Texas (hereinafter referred to as the "COD"), acting by and through its City Manager, WITNESSETH, THAT WHEREAS, the United States is the owner and operator of Ray Roberts Lake, the associated lands and appurtenant works located on the Elm Fork of the Trinity River, a navigable waterway of the United States in Denton County, Texas, and, WHEREAS, the Corps has constructed a low flow penstock in the Ray Roberts Lake Outlet Works Structures for use in development of future hydropower facilities, and WHEREAS, the COD has entered into a Contractual Agreement with the United States of America to use a portion of the Conservation storage space in Ray Roberts Lake In addition, the COD has a water appropriation permit from the State of Texas to t 5 impound and use water in the Conservation Storage space of the reservoir for beneficial purposes, and, WHEREAS, the Memorandum of Understanding (MOU) between the Department of the Army and the Federal Energy Regulatory Commission (FERC) requires that hydropower facilities that will be an integral part of, or that could affect the structural integrity or operation of a Corps' project shall be designed and constructed in consultation with, and subject to review and approval by the Corps, and, WHEREAS, the COD applied for and on March 20, 1985 was issued a Federal Energy Regulatory Commission Major License - Existing Project (hereinafter referred to as the "FERC License") to construct, operate and maintain a facility to develop and utilize the hydroelectric potential of the above mentioned Corps facilities, and, WHEREAS, Article 37 of the FERC License requires the COD to coordinate its plans with the Corps for access to and site activities on lands and property administered by the Corps so that the authorized purposes of the existing Ray Roberts Lake are protected, and, WHEREAS, Article 39 of the FERC License requires the COD to enter into and to execute a permanent Operating Agreement for the project approved by the Corps, prior to initiation of the Project operation, and, PAGE 2 a 4 WHEREAS, terms of the Agreement shall not affect or diminish in any way the obligation of the COD to meet the regulatory requirements of Section 404 of the Clean Water Act (Title 33 U S C Section 1344) NOW, THEREFORE, the parties agree as follows ARTICLE I - DEFINITIONS For purposes of the Agreement a The term "Project" shall mean the design, preparation of plans and specifications, and construction of a hydropower facility located downstream of the existing earthen embankment and adjacent to the existing stilling basin at the Ray Roberts Lake Construction will consist of tying into the existing five foot diameter low flow conduit and valve box, a powerhouse structure, powerhouse discharge channel, access roads, and transmission facilities b The term "period of construction" shall mean the time from the award of the first construction contract by COD for the Project, to the time of acceptance of the work by the Corps and COD c The term "low flow bypass system" shall mean the existing five (5) foot diameter low flow penstock and valve box located at the existing Ray Roberts Lake Outlet Works Structure constructed by the Corps PAGE 3 s 4 ARTICLE II - OBLIGATIONS OF THE PARTIES a COD shall design and prepare plans and specifications, for construction of the Project b COD shall be responsible for inspection during construction of all Project features to assure conformance with the plans and specifications c COD shall provide the Corps access to the construction site at all times and up-to-date construction schedules, including any modifications d The Corps shall review and approve the design, and plans and specifications prepared by COD prior to initiation of construction The Corps shall review and approve all construction modifications to features which could affect the structural integrity or operation of Ray Roberts Lake prior to the commencement of work e The Corps shall have the right, and intends to inspect the construction of those features which could affect the structural integrity or operation of Ray Roberts Lake to ensure compliance with the approved design, and plans and specifications, however, in no way shall this right relieve the COD of the full responsibility for inspection and compliance with the approved plans and specifications f The Corps retains the authority to stop construction in cases presenting an imminent danger, in the opinion the Corps, to PAGE 4 4 the structural integrity, operational adequacy or safety of Ray Roberts Lake g COD shall reimburse the Corps all costs for design, preparation of plans and specifications, and construction of the low flow bypass system located at the existing Ray Roberts Outlet Works Structure h COD shall reimburse the Corps directly for all reasonable costs associated with Corps' review and approval of the design and construction, plans and specifications, and the inspection of construction for the Project i COD shall prepare, and submit to the Corps for review and approval, a work area plan which defines the limits of construc- tion, work areas and storage areas for equipment and supplies When practical, work areas shall be determined such as to not obstruct public recreational access to fishing areas during the period of construction except during construction of access routes and other activities hazardous to the Public Alteration of recreational facilities, including provision for temporary parking and access during construction, will be at the expense of COD j The Corps shall furnish easements to the COD for construc- tion and operation of the Project k COD shall prepare and submit to the Corps for approval a plan for Care of Water during construction, prior to initiation of construction PAGE 5 1 The Corps will cooperate with COD to facilitate construction of the Project, including routing the releases through the Outlet Work gates, provided however, that such cooperation does not interfere with the authorized purposes of Ray Roberts Lake Flood conditions in the reservoir may require interruption of construction activities to evacuate flood waters from the reservoir m COD shall provide the Corps, at no charge, copies of all "record drawings" of the Project Such drawings shall be provided within 90 days after completion of construction of the Project Upon written request by the Corps, COD shall provide specific construction data, such as drilling logs or additional "record drawings" as may exist for the Project, within 30 days of said request n COD shall prepare a draft Operating Agreement as provided by Article 39 of the FERC License within 90 days of the date of execution of this Agreement, and to work diligently toward the execution of a final Operating Agreement for the Project The final Operating Agreement shall be executed before completion of construction of the Project ARTICLE III - LANDS AND FACILITIES a Title to all property interests, structures, and improvements (Outlet Works Structure and Conduit, Stilling Basin, Low Flow System, and Embankment) held by the United States shall PAGE 6 4 y not be affected by this Agreement b This Agreement provides consent and authorization to COD for access to and use of Federal Government land and easements for the Project as described in the FERC License and shown on Exhibit A of this Agreement c COD shall, subject to the FERC License requirements, possess title to all features and equipment installed by COD and associated with the construction of the Project, including but not limited to the following a powerhouse structure and its appurtenances, all turbines and associated facilities within the powerhouse structure, a switchyard and interconnection facility line to the future new Denton Water Plant d The Corps shall have access to the Project in accordance with and for the purposes set forth in Article 38 of the FERC License e In the event of a transfer of the FERC License, COD shall transfer all rights acquired from the United States for the Project, at the time of initial or subsequent executions, to the United States for re-execution with the new recipient of the FERC License for the Project In case of a surrender of the FERC License, not involving a transfer, COD shall also transfer such agreement to the United States ARTICLE IV - METHOD OF PAYMENT a Prior to initiation of work by the Corps, COD shall PAGE 7 provide funds presently estimated to be $35,000 for the Corps' review of the plans and specifications prepared by COD for the Project Prior to the term of construction, COD shall provide additional funds presently estimated to be $45,000 for the Corps' inspection of construction of the Project COD shall provide the requisite amount to the Corps by delivering a check payable to "FINANCE AND ACCOUNTING OFFICER, FORT WORTH DISTRICT" b If any time during the Corps' review of the plans and specifications or inspection of construction of the Project, the Corps determines that additional funds will be needed from the COD to meet its costs, the Corps shall so notify the COD, and the COD, within 60 days from receipt of notice, shall make the necessary funds available through the funding mechanism specified in paragraph a above c Upon completion of the Project, the Corps shall compute the total costs for its review and inspection of the Project In the event the COD has provided funds in excess of the Corps costs, the Corps shall within 90 days of the final accounting return said excess to the COD d The COD shall repay to the Corps the amounts listed below, which consists of the construction and design of the low flow by- pass system and the Interest During Construction computed through September 1989 The interest is charged at a rate of nine (9) percent, as determined by the Secretary of the Treasury The COD shall repay PAGE 8 CONSTRUCTION AND DESIGN COST $ 675,239 20 INTEREST DURING CONSTRUCTION 398,011 45 THROUGH SEPTEMBER 1989 TOTAL INVESTMENT COST ALLOCATED TO HYDROPOWER FROM THE RAY ROBERTS LAKE PROJECT $ 1,073,250 65 e Prior to the construction of the Project, COD shall repay the Total Investment Cost Allocated to Hydropower above, payable to "FINANCE AND ACCOUNTING OFFICER, FORT WORTH DISTRICT" The actual interest charged during construction shall be determined at the time the COD repays the total investment cost allocated to the hydro power and COD shall be given a pro rata reduction in interest payments for every day prior to September 30, 1989 that payment is remitted f In the event that the construction does not begin by the end of October 1989, additional Interest During Construction will be charged accordingly ARTICLE V - DISPUTES Before any party to this Agreement may bring suit in any court concerning an issue relating to this Agreement, such party must first seek in good faith to resolve the issue through negotiation or other forms of nonbinding alternative dispute resolution as stated in the FERC License of the Project ARTICLE VI - LIABILITY a The COD shall hold and save the Corps free from all damages arising from the construction, operation and maintenance PAGE 9 s 4 of the Project, except for damages due to the fault or negligence of the Corps or its contractors b For the purposes of fulfilling its obligation under this Article, COD shall procure and maintain or require the general contractor to procure and maintain during the term of this Agreement and any extensions thereof, liability insurance of at least $500,000 per occurrence for bodily injury and property damage and an excess liability policy in the amount of at least $6,000,000 The named insured parties under the policy shall be COD and the United States of America Each policy or certificate evidencing the insurance shall contain an endorsement which provides that the insurance company will notify the Corps and COD 30 days prior to the effective date of any cancellation or termination of the policy or certificate or any modification of the policy or certificate which adversely affects the interest of the United States Government in such insurance The notice shall be sent by registered mail and shall identify this Agreement, the name and address of COD, the policy, and the insured Within 30 days of execution of this Agreement or prior to commencement of construction, which ever occurs first, COD shall furnish the Corps with acceptable evidence showing that the insurance coverage described in this Article has been obtained ARTICLE VII - RELATIONSHIP OF PARTIES The parties to this Agreement act in an independent capacity PAGE 10 4 ' in the performance of their respective functions under this Agreement, and neither party is to be considered the officer, agent, or employee of the other ARTICLE VIII - OFFICIALS NOT TO BENEFIT No member of or delegate to the Congress, or resident commissioner, shall be admitted to any share or part of this Agreement, or to any benefit that may arise therefrom ARTICLE IX - NOTICES a All notices, requests, demands, and other communications required or permitted to be given under this Agreement shall be deemed to have been duly given if in writing and delivered personally, given by prepaid telegram, or mailed by first-class (postage-paid), registered, or certified mail, as follows If to COD Executive Director of Utilities City of Denton 215 E McKinney Street Denton, Texas 76201 If to the Corps District Engineer U S Army Corps of Engineers P 0 Box 17300 Fort Worth, Texas 76102-0300 b A party may change the address to which such communications are to be directed by giving written notice to the other in the manner provided in this Article c Any notice, request, demand, or other communication made PAGE 11 Y pursuant to this Article shall be deemed to have been received by the addressee at such time as it is personally delivered or on the third business day after it is mailed, as the case may be ARTICLE X - TERM OF AGREEMENT This Agreement shall become effective on the day of execution by the Corps and shall terminate upon the final accounting of all costs and payment after completion of construction ARTICLE XI - ASSIGNMENT The benefits and obligations of the Agreement may be assigned by either party This Agreement shall be binding upon any assigns or successors to COD approved by FERC ARTICLE XII - MODIFICATIONS The provisions of this Agreement may be modified or added by written mutual agreement of the parties IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first above written UNITED STATES DEPARTMENT OF THE ARMY BY Ro ert ee Brigadier General, U S A Division Engineer CITY OF DENTON BY 40ya &T-- City Manager City of Denton, Texas APPROVED AS TO LEGAL FORM DEBRA A DRAYOVITCH, CITY ATTORNEY BY "LZAL/ILLI~ PAGE 12 Exhibit A Parcel A A permanent easement for the purpose of creating a right-of-way to access the Ray Roberts Hydroelectric Project and its related facilities with right to improve, operate, and maintain the facilities an right-of-way, located in Tracts 210 and 213 of the Corps of Engineers Trinity River Basin, Texas-Aubrey Lake real estate plot in Denton County, Texas, consisting of 1 63 acres, and described in Attachment 1 Parcel B A temporary easement for the purpose of access to construct the Ray Roberts Hydroelectric Project and its related facilities, located in Tracts 210 and 213 of the Corps of Engineers Trinity River Basin, Texas-Aubrey Lake real estate plot in Denton County, Texas, consisting of 3 27 acres, and described in Attachment 2 Parcel C A temporary easement for the purpose of spoil of excess construction excavation and temporary stockpiling of construction material, to be located as specified and required by the Corps of Engineers PAGE 13 Attachment 1 Y Ray Roberts Hydroelectric Project Parcel A A tract consisting of 1 63 acres, located in Denton County, Texas, on the property of the United States Army Corps of Engineers Beginning at a point on the northern edge of the boundary which is a distance of 406 23 feet along a line of N 15° 43' 53" W from the center line of Ray Roberts Dam at STA 93+00 00, the intersection of the dam center line and the outlet works Thence, along the eastern boundary in succession S 17° 06' 10" E - 13 6 feet S 71° 33' 54" W - 12 65 feet S 17° 48' 09" E - 716 30 feet S 2° 41' 39" W - 85 09 feet S 16° 38' 20" E - 90 80 feet S 31° 25' 46" E - 21 10 feet S 17° 49' 55" E - 150 22 feet N 65° 10' 14" W - 73 82 feet S 21° 12' 10" w - 373 27 feet Thence, along the southern boundary N 59° 37' 15" W - 67 23 feet PAGE 14 4 Attachment 1 (Continued) Thence, along the western boundary in succession N 15° 40' 05" W - 255 49 feet N 4° 06' 49" W - 292 75 feet N 48° 07' 20" W - 77 90 feet N 72° 01' 07" E - 119 85 feet S 28° 24' 46" W - 69 35 feet S 3° 06' 54" E - 294 44 feet S 64° 08' 40" E - 144 46 feet N 23° 38' 56" E - 167 03 feet N 15° 25' 20" E - 90 25 feet N 17° 31' 32" W - 39 85 feet N 15° 56' 43" E - 29 12 feet N 18° 26' 06" W - 15 81 feet N 11° 11' 36" E - 86 68 feet N 17° 54' 12" W - 715 65 feet S 72° 53' 50" W - 1 3 6 feet N 15° 56' 43" W - 14 56 feet Thence, along the northern boundary N 72° 45' 31" E - 30 36 feet to the origination point 4 PAGE 15 4 Attachment 2 Ray Roberts Hydroelectric Project Parcel B A tract consisting of 3 27 acres, located in Denton County, Texas, on the property of the United States Army Corps of Engineers Beginning at a point on the north edge of the boundary which is a distance of 626 99 feet along a line of S 17° 53' 03" E from the center line of Ray Roberts Dam at STA 93+00 00, the inter- section of the dam center line and the outlet works Thence, along the eastern boundary S 17° 53' 03" E - 320 feet Thence, along the southern boundary S 72° 06' 57" W - 450 feet Thence, along the western boundary N 17° 53' 03" W - 370 feet Thence, along N 72° 06' N 4° 06' N 48° 07' N 72° 01' S 28° 24' S 3° 06' N 72° 06' N 9° 23' N 72° 06' S 17° 53' S 72° 06' S 21° 53' N 72° 06' to the origir the northern boundary in succession 57" E - 106 27 feet 49" W - 269 38 feet 20" W - 77.90 feet 07" E - 119 85 feet 46" W - 69 35 feet 54" E - 290 83 feet 57" E - 193 26 feet 33" E - 180 00 feet 57" E - 30 00 feet 03" E - 20 00 feet 57" W - 15 00 feet 42" E - 190 72 feet 57" E - 20 00 feet ation point PAGE 16