Loading...
1989-0222604L NO - AN ORDINANCE AUTHORIZING THE EXECUTION OF A CHANGE ORDER TO A CONTRACT BETWEEN THE CITY OF DENTON AND SUNMOUNT CORPORATION, PROVIDING FOR AN INCREASE IN THE CONTRACT PRICE, AND PROVIDING AN EFFECTIVE DATE WHEREAS, on September 6, 1988, the City awarded a contract for the construction of certain improvements to the Bolivar Street Project in the amount of $669,519 71, and WHEREAS, the City Manager having recommended to the Council that a change order be authorized to amend such contract with respect to the scope and price and said change order being in compliance with the requirements of Chapter 252 of the Local Government Code, NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF DENTON SECTION I That the change order to the contract between the City an unmount Corporation, a copy of which is attached hereto, in the amount of $109,420 00, is hereby approved and the expenditure of funds therefor is hereby authorized SECTION II That this ordinance shall become effective imme ate y upon it passage and approval PASSED AND APPROVED this day of , 1989 r RAYS PEN MAYOR ATTEST J FE ALTERS, CITY SECRETARY APPROVED AS TO LEGAL FORM DEBRA ADAMI DRAYOVITCH, CITY ATTORNEY BY CITY OF DENTON CHANGE ORDE 1 Division (Department) 2 Purchase Order No 3 Change Order No Public Works/Engineering 86137 1 4 Name of Project 5 Project Acct No 6 Date Prepared Bolivar Sewer 624-008-0471-9114 Feb 9 1989 7 Name and Address of Contractor Sunmount Corp - P 0 Box 1770 - Roanoke, Tx 76262 8 Description of Work Included in Contract - Complete rebuild Bolivar Street - University to Highway 77 9 Changes ordered and reason ordered List individual changes as A, B, C, D, etc Install 10 waterline - During street construction, line found to be shallow in depth and had a history of main breaks Upgrade waterline to Master Plan of City 10 Bid Original Contract Revised Negotiated Original Revised Contract Item Estimated Unit Estimated C 0 Unit Estimated Estimated Changes No Quantity Price Quantity Price Cost Cost A EXTRA 10 Waterline - See attached letter for -0- 109,420 B Cost Breakdown Total Total -0- 3109.420 Original Contract Price $ 669,519 71 Increase in Contract Price New Contract Price 778.939 71 Decrease in Contract Price 12 Contract time increased by 30 days New contract time 110 days THE AFOREMENTIONED CHANGE, AND WORK AFFECTED THEREBY, IS SUBJECT TO ALL CONTRACT STIPULATIONS AND COVENANTS 13 ISSUED FOR REASONS INDICATED ABOVE 14 ACCEPTED BY CITY ENGINEER 15 ACCEPTED BY CONTRACTOR %K'1"W-Q Z-9-89 upervisor Date Title D e 16 ASSISTANT CITY MANAGER DIRECTOR OF UTILITIES CONDITIONS OF APPROVAL Signature Title Date Signature Title Date 17 PURCHASING/FINANCE Signature Title Date COUNCIL APPROVAL (If needed) Date 0637E Awall, SUNMOUNT CORPORATION GENERAL CONTRACTORS P 0 BOX 1770 ROANOKE TEXAS 76262 817/648 2741 METRO 817/430 0552 February 8, 1989 Mr Jerry Clark, City Engineer City of Denton 215 E McKinney Denton, TX 76201 REFERENCE BOLIVAR STREET PROPOSED 10 INCH WATER LINE Dear Mr Clark In order that Sunmount and the City agree to the conditions of the new Sunmount quotation, we have included the following summary A Mainline includes 1 ± 3,200 10 inch DR 18 @ 900 pipe 2 6 each 10 inch MJ valves 3 Sand as required 4 6 inches 2 sack concrete cap 5 Labor, equipment and traffic control for the above work Price 3,200 1 f @ $27 29 1 f = $87,328 00 B Hydrant installation includes 1 Mainline 10" x 10" x 6" T 2 6 inch pipe as needed 3 Thrust blocks and gravel as required 4 Labor to install * Note City to furnish hydrant, valve and valve box Price 7 each @ $690 00 each = $4,830 00 C Stubs include 1 Mainline T 10" x 10" x 101', 8" or 6" (as required) 2 Labor to make the connections * Note City to furnish valve, valve box, and miscellaneous fittings as required to make the connections Price 6 each @ $700 00 each = $4,200 00 Awk D Services include BOLIVAR STREET PAGE TWO i Saddles, 1" copper pipe, corp & curb stop 2 Labor to stub services into the meter box * Note City to accomplish the final tie ins Sunmount has 18 each services to be paid yet under the original paving and drainage contract This leaves 42 each to be paid here Price 42 each @ $311 00 = $ 13,062 00 Estimated Total $109,420 00 Sunmount requires 30 working days to accomplish this water line We would abandon any claim we may have for delays or idle equipment time that can be attributed to this particular situation if this matter can be settled promptly Please call if you have any questions concerning the above summary Your expedience in this matter will be appreciated Sincerely yours, SUNMOUNT CORPORATION Thomas R Barber Plant Manager TRB/cs cc SLM 10" WATER LINE COST COMPARISON DESCRIPTION Contractors Warranties and Understandings 10" PVC Water Line 10' D I Water Line Cast Iran Fittings 6' sate Valve It, sate Valve 3/4' Niter Service 1' Water Service Asphalt Patch Barricades Saw Cut Existing Cancre 18' Bore and Casing Fire Hydrant Installatt Excavation Protection PROJECT TOTALS EQUIVALENT PROJECT COST 3/LF Hasty Fowler Const CO Sunmount Corporation Bolivar 10" WL Bolivar 10' WL Univ to Ross Ross to HWV77 UNIT QUANITY UNIT UNIT PRICE TOTAL QUANTITIES UNIT PRICE TOTAL - - - 1 00 LS 3888 BB 3,008 Be f I 860 08 LF 14 00 12,848 80 f 1 3,288 88 LF 27 29 $87,328 08 238 88 LF 16 08 3,888 08 I N/A 1,227 88 LS 5 Be 6,135 08 f 2 81 EA 375 88 758 08 f I 4 88 EA 775 08 3,100 I BB e I 13 00 EA 265 00 3,445 08 f I 2 00 EA 298 88 588 08 f I 8 88 TON 35 Be 8 88 I 1 88 L8 3000 80 3,080 88 I 42 88 LF 3 08 126 00 I 230 88 LF 180,88 23,000 08 2 88 EA 1,835 80 2,878 08 f I 2,616 00 SF 1 08 2,616 00 , $63,678 88 I $36 19 I 1,650 88 N/A le BB N/A 42 88 N/A N/A N/A N/A 7 88 N/A f These items only are considered in determining the EQUIVALENT PROJECT COST for Bolivar 18' Water Line from University to Ross These costs reflect actual installed items ff Unit Price cost of gate valves is included in the Unit Price cost of 10' PVC Water Line fff EQUIVALENT PROJECT COST 311.F comparison equates projects on an equal basis That is, no Excavation Projection, Barricades, Saw Cut, Bores, etc are considered because these items are not necessary for the completion of the 10 WL installation from Ross to HNY 77 LB 2 55 4,287 58 EA ff 8 88 EA 311 08 13,862 88 EA 698 00 4,838 88 $189,427 58 $34 28 - - - - - - - - - - - - - - - - - - - 9 CO iN u 1 e • f~ P I ~ s !1 ! E ~ C 1 I ! "I RPQ 1 "A 1 7 4 ` - A P `J PROJECT LOCATION, r.s I ' I tl dC sfwti .91 ~ 11111 '111{ M \ • lp 1 8" SANITARY SEWER Jm- yy y WIWI% ~ I Sony OM • • pY an ~ ~ : w f EXHIBIT 18 JID, r CI FY C PITON I_EGAIL ()F