1989-005ORDINANCE NO Y l AN ORDINANCE AUTHORIZING THE EXECUTION OF CHANGE ORDER NO 2 TO A CONTRACT BETWEEN THE CITY OF DENTON AND SUNMOUNT CORPORATION, PROVIDING FOR AN INCREASE IN THE CONTRACT PRICE, AND PROVIDING AN EFFECTIVE DATE WHEREAS, on October 18, 1988, the City awarded a contract for the construction of certain improvements to Woodrow Lane's Fifteen Inch Sewer Line Replacement in the amount of $1,513,097 49 Dollars, and WHEREAS, the City Manager having recommended to the Council that a change order be authorized to amend such contract with respect to the scope and price and said change order being in compliance with the requirements of Chapter 252 of the Local Government Code, NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF DENTON SECTION I. That Change Order No 2 to the contract between the City and Sunmount Corporation, a copy of which is attached hereto, in the amount of Sixteen Thousand Seven Hundred Fifty Dollars ($16,750 00), is hereby approved and the expenditure of funds therefor is hereby authorized SECTION II. That this ordinance shall become effective immediately upon its passage and approval PASSED AND APPROVED this the 10th day of January, 1989 ATTEST I A TERS, 'CITY SECRETARY PPROVED AS TO LEGAL FORM DEBRA A DRAYOVITCH, CITY ATTORNEY BY DATE JANUARY 10, 1989 CITY COUNCIL REPORT TO Mayor and Members of the City Council FROM Lloyd V Harrell, City Manager SUBJECT BID CONTRACT# 9893 - PURCHASE ORDER N's 87271 and 87728 CRANGF ORDER WOODROW LANE AND BURNING TREE RECOMMENDATION We recommend this Change Order be approved for $16,750 00 to replace and relocate 15" sever line on Woodrow rane SUMMARY This project was bid and awarded in October, 1988 The project is well underway and it was determined that after damaping the shallow sewer line several times, the sewer line should be replaced This is the Change Order to allow Sunmount to replace the line and still continue the other construction without adding anymore construction time The amount shown on the Change Order is only for the utilities portion The original total contract amount was $1,513,097 49 BACKGROUNp Change Order and Memo PROGRAMS DEPARTMENT OR GROUPS AFFECTED_ Utility Department and the stability of roadbed on Woodrow Lane affecting the City and the Citizens of Denton FISCAL IMPACT There is no additional impact on the General Fund Respe tfuullllyy submitted v yd V Harrell L 0o City Manager Prepared by Title PURCHASING AGENT Approved ama V J M SSn I J tl PURCHASING AGENT CIEX OLD DENION CHANGE ORDER 1 Division (Department 2 Purchase der No 3 Change Order No Public Works (Engineer-LP) rl-87728 871 2 4 Name of,Project 5. Project Acct No 6 Date Prepared Sec 5 Woodrow & Burning Tree 624-008-0471-9138 anuar 3 1989 7 Name an Address of Contractor Sunmount Corporation P 0 Box 1770 Roanoke, Texas 76262 8 Description of Work Included in Contract Relocate 15" Sewer Line - Woodrow Lane 9 Changes ordered and reason ordered (List individual changes as A, B, C, D, etc A Relocate and Replace 15" Sewer Line on Woodrow Lane (See Back-up Attached) 10 Bid Original Contract Revised Negotiated Original Revised Contract Item Estimated Unit Estimated C 0 Unit Estimated Estimated Changes No. Quantity Price Quantity Price Cost Cost A Additio al Work See backu informatio e attache for contr act price from C Sunmoun Corporati on D $71,543 1 $88.293 Total Total 11. Original Contract Price $71,543 Increase in Contract Price $1 6.750 New Contract Price §88.293 Decrease in Contract Price 12 Contract time increased/decreased by -0- days. New contract time days THE AFOREMENTIONED CHANGE, AND WORK AFFECTED THEREBY, IS SUBJECT TO ALL CONTRACT STIPULATIONS AND COVENANTS 13 ISSUED FOR REASONS INDICATED ABOVE: /--3 91 Date 14. ACCEPTED BY CITY ENGINEER: C Q - 11 .1 lag Sign tule Title Date 15. ACCEPTED BY CONTRACTOR: Signature Title Date 16 ASSISTANT CITY MANAGER Z" gi na ore Title D2 DIRECTOR OF UTILITIES: Signature Title Date CONDITIONS OF APPROVAL: 17 PURCHASING/FINANCE Signature Title Date COUNCIL APPROVAL (If needed) Data n444R CITY of DENTON, TEXAS MUNICIPAL BUILDING / DENTON TEXAS 76201 / TELEPHONE (817) 566 820 MEMORANDUM DATE December 30, 1988 TO Rick Svehla, Deputy City Manager FROM David Salmon, Engineering Associate II SUBJECT Change Order for Sewer Relocation on Woodrow Lane Due to an extremely irregular horizontal and vertical alignment, the existing 15" sewer line along Woodrow Lane unexpectedly turned up to be under the proposed pavement at a shallow depth The main has already been damaged several times during the construction process due to its age and shallow cover It has been deemed necessary by the Water/Wastewater Division of the Utilities Department and the Engineering Division of Public Works to replace the 15" sewer main We have prepared a change order in the amount of $16,750 00 for your consideration The $16,750 00 will include installing 646 feet of 15" PVC sewer main, removing the old main, installing a 36" x 24' wye connection and modifying two existing manholes Construction in the immediate area of the sewer line can not resume until either the existing clay the sewer line is replaced, or a very expensive concrete cap is placed over the line The latter would leave both the street and the sewer line with questionable structural integrity Please contact me if you need further information avi a mon Engineering Associate II 0613E FILE REFERENCE FORM 89-006 X Additional File Exists Additional File Contains Records Not Public, According to the Public Records Act Other FILES Date Initials Assignment of Airport Lease Agreement - Ordinance No. 2009-197 09/01/09 JR