1987-2302114L
AN ORDINANCE ACCEPTING THE BID FOR THE CONSTRUCTION OF A TURBINE
WITH AUXILIARY EQUIPMENT FOR THE LAKE LEWISVILLE HYDROELECTRIC
PROJECT, AWARDING A CONTRACT TO DOMINION BRIDGE-SULZER, INC ,
AUTHORIZING THE EXPENDITURE OF FUNDS THEREFOR, AND PROVIDING AN
EFFECTIVE DATE
WHEREAS, the City Manager has advertised for bids for the
construction of a turbine with auxiliary equipment for the Lake
Lew~svllle Hydroelectric Project, and
WHEREAS, the City Manager having recommended to the City
Council that the lowest and best bid is that of Dominion
Brldge-Sulzer, Inc , NOW, THEREFORE,
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS
SECTION I That the bid of Dominion Brldge-Sulzer, Inc is
hereby, zn all things, accepted
SECTION II That the Mayor zs hereby authorized to execute
the contract with Domlnzon Brldge-Sulzer, Inc , a copy of which
is attached hereto arid incorporated herein
PASSED AND APPROVED thzs the~'/ day of~ 1987
RAY ST~H/ENS,~
ATTEST
APPROVED AS TO LEGAL FORM
DEBRA ADAMI DRAYOVITCH, CITY ATTORNEY
December 14, 1987 Mailed by Certifzed Nail
City of Denton, Texas B&V Project 10 566
Lewisville Hydroelectric Project B~V File 62 0200 O0
Turbine Generator 14 0400
Dominion Bridge-Sulzer, Inc Denton Bid #97 35
555 Notre Dame Street
Lachine, Quebec, 0anada HSB2B1
Attention Mr Thomas P Taylor
Gentlemen
Enclosed please find an executed copy of the above-referenced contract
document which was approved by the Denton City Council on December 8,
1987 Also enclosed are five copies of page (GC-17/18) which are to be
~nitialed by you where the changes are indicated Please initial (both
sides) three copies of this page, retaining one copy, sending one to Black
and Veatch and returning three copies to us for our records
We are looking forward to working with you on this project
Best,regards,
R E Nelsdn, Executive Director
Department of Utilities
gcr
cc Black & Veatch- copy of Letter plus one origmnal executed contract
Denton City Secretary- copy of letter plus one original executed
contract
Administration files- copy of letter plus one original executed
contract
Legal Department- copy of letter plus copy of revmsed page
Enclosure Specifications & Documents Cmty of Denton, Lewisville
Hydroelectric Project, Turbine Generator, B~d #9735,
Specification 10566 62 0200, Contract #10566 62 0200
5193U 3
DOMINION BRIDGE-EULZER INC.
C PIP 0 Box 555 Lachine OuGbec Canada HSS 4E7
T~l~phone (514) 634 3551 Telecop~er (5t4) 636-8588
January 6, 1988
C~ty of Denton
Department of Utilities
Denton, Texas
762O1 USA
Attention Mr R E Nelson
SUBJECT LEWISVILLE HYDROELECTRIC PROJECT
DB-S CONTRACT 720-110
DENTON BID #97 35
B&V PROJECT 10 566
Gentlemen,
We acknowledge receipt~ with thanks, of the executed
contract documents for the referenced project We enclose
three Initialed copies of page (GC-17/18) and are sending
one copy to Black & Veatch with a copy of this letter
We are pleased to advise you that Hr H (Hike) Lar~vl~re
has been appointed Contract Administrator for this proJect
Please direct all communications to DB-S to his attention
Hr H (Herb) Overbury has been appointed Project Engineer
Please feel free to contact him directly on matters of
a technical nature
We thank you again for your valued order and look forward to
a successful project
Yours sincerely,
T P Taylor, En~g
Hanager - Sales
Energy Division
TPT/rel
cc Black & Veatch
1500 Headow Lake Parkway .
Kansas City. Missouri 64~1~
Attn Mr David Guyot
SPECIFICATIONS
AND
DOCUMENTS
CITY OF DENTON, TEXAS
LEWISVILLE HYDROELECTRIC PROJECT
TURBINE GENERATOR
BID NUMBER 9735
SPECIFICATION 10566 62 0200
CONTRACT 10566 62 0200
CONTRACT ISSUE
DOMINION BRIDGE SULZER, INC
555 Notre Dine Street
Lachine, Quebec, Canada HSS 2B7
BLACK & VEATCH
Engineere-Architects
Kansas City, Missouri
1987
DgNTON,t
CTEIC ~ROJECT
02~0
~ ~ ~ ~o~ ~2~.o~oo
~ , OF~ CONT~T8 ~
~ ~ Pa~e~ thru
~ ~ ~ BC-1
GC-~ 0C-18~
J ~A-1 1A-Il
' Specifications lB-1 1B-28
,~ lC-1 lC-9'
~ ~ ~ ~ 1D-1 1D-2
~t 1DI-1 1D1-8
h 2A-1 2A-18
'~ ~ ~ 2~-1 2B-10~
1056~ TU~INE ~G~: 62.0200 ]
Pa~e t:h~ Page
2C-1 2C-3
:a=ton System 2E-~ 2E 16
gqu~pm~m~ 2F-1 2F-2
~e~r pocket) 2 sheets
~ B-1 B-7
D-1 D-30
TURBINE G~ 62 0200]
CONTRACT AGREEMENT
THIS CONTRACT AGREEMENT, made and entered into this 1st day of December,
1987, by and between the City of Denton, Texas, Party of the First Part
and hereinafter called the "Owner," and DOMINION BRIDGE-SULZER, INC , a
Canada corporation with its principal office in Lachine, Quebec Canada,
Party of the Second Part and hereinafter called the "Contractor,"
WIT~ESSETH
THAT WHEREAS, the Owner has caused to be prepared, in accordance with the
law, specifications, plans and other contract documents for the work as
herein specified, and
WHEREAS, the said Contractor has submitted to the Owner a Proposal in ac-
cordance with the terms of this Contract Agreement, and
WHEREAS, the Owner, in the manner prescribed by law, has determined and
deciared the aforesaid Contractor to be the lowest and best bidder for
the said work and has duly awarded to the said Contractor a contract
therefor, for the sum or sums named in the Contractor's Proposal, a copy
thereof being attached to and made a part of this Contract Agreement,
NOW, THEREFORE, in consideration of the compensation to be paid to the
Contractor and of the mutual agreements herein contained, the parties to
these presents have agreed and hereby agree, the Owner for itself and its
successors, and the Contractor for itself, himself, or themselves, or
its, hie or their successors and assigns, or its, his or their executors
and administrators, as follows
ARTICLE I That the Contractor shall furnish fob the Owner's Lewisville
Hydroelectric Project site the turbine generator and services complete as
specified and required in accordance with the provisions of the contract
documents, which are attached and made a part hereof, and shall execute
and complete all work included in and covered by the Owner's official
award of this Contract Agreement to the said Contractor
ARTICLE II That the Owner shall pay to the Contractor for the work and
mat~ri~l~-embraced in this Contract Agreement, and the Contractor will
accept as full compensation therefor, the sum (subject to adjustments as
provided by the contract) of ONE MILLION THREE HUNDRED FIFTY-EIGHT THOU-
SAND NINE HUNDRED SEVENTY AND NO/100 U S DOLLARS (U S $1,358,970 00) for
all work covered by and included in the contract award, designated in the
foregoing Article I, payment to be made in cash or its equivalent in the
manner provided in the specifications attached hereto
[DENTON 10566 TURBINE GEN 62 0200]
[ 111987 ]
CA-1
ARTICLE III That time of completion is a basic consideration of the
Cont~a~t-~reement, and that the Coatractor shall proceed with the spec-
ified work and shall confo~ to the specified schedule
IN WITleSS ~iEREO~, the parties hereto have executed this Contract Agree-
m-~nt~aa of the day and year [irst above ~ritten
CIT~ OF DENTON, TE~S
(S~L)
W R Strub, Executive V~ce-Presldent & General Manager
Attest
A~torney~ ~er
[DENTOIq 10566 TURBINE GEN 62 0200]
CA-2
r..'~o[, ALL ~ BY TF, ESE
That, DOMINION BRIDGE-SULZER INC /ENERGY OIVISlO~
(hessian=er c~lle~ ~he P~nc!pal), as PrOc!pat, an~ FEpERAL
INSURANCE COMPANY , a co~ora:=on or,an!zed
its pr~ct~ai o~f~cm ~n =ha Ci~ of WARREN, NEW JERSEY , (hermin-
af=er ~lled ~he Sure~), as Sura~, are bald and [~7 bound uncm
CO~C~ (he=~tar ~lled the Oh~ee), ~ the ~: uf ONE MILLION THREE HUNDRE[
FIFTY-EIGHT THOUSAND NINE HUNDREDSEVENTY~ S. DO~ (~ S $1,358,970 O~,
[c LE~ISVILLE HYDEOELECT~IC PEOJECT
SUPPLY ONLY OF TURBINE ~ITH AUXILIAEY E~UIPHENT
~ch coucracc ~s Earaby rafa~a~ co a~ ~da a parc baraoc as ~u~17
~o Chh s~a ~CanC as ~ cop~ad ac launch hara~
~kau shall he vo2~, a~Ba~e ~o ~ ~ ~u~ ~arcm and affect.
a~ancia~., a~d all 1.:Labi!:L~!as o~ ~:his bo~ sfla.Ll ba ~a~a~a~
amca ~i~ ~he p~ovisio~s of said A=:!~a ~o ~a s~e a~:a~ as if i: warm
co~iad a~ length ha~a~
a~d saaia~ ~hls ins~mam~ ~his 2N~h ~av ~ NOVEMBER ,
/ ~(Z~ Carpa~a~n) W R Strub, Executive Vice-President ~ General
Dominion Br~dge-Sulzer Inc (SEAL) Manager
FEDERAL INSURANCE COMPANY
This bond ~s void ~f the contract date above ~s later than December 15, 1987
[ o3o88~
PB-Z
STATUTORY P~Y~I~5~ BO\~D PURSUA~\"T IO
T~S ~V~$~ CIVI~ STATICS, ~N~ , ~T 5~60 NO 8113-22-81
(MC ~EGOR A~ --~L~LIC WO~S)
(Penal~% oz chis Bon~ zusc be [007 oz Cone:ac: Awar~)
K~NOW ALL I~'~ BY THESE
That, DOMINION BRIDGE-SULZER INC /ENERGY DIVISION
(hers!nafts~ called the Pr!n¢!pal), as ~r~nc!pal, en~ FEDERAL
INSURANCE COMPANY , a corporac!on
un,er =he laws of the S=a=e of NEW JERSEY , with
the City of WARREN, NEW JERSEY , (hereinafter calls4 the ~u=et~), as
~urm~, arm held an~ ~t~y beun~ unto CI~ OF D~ON, T~ AC~G
the Obll~me), In tbs a~un= uf ONE MILLION THREE HUNDRED F~FTY-EIGHT THOUSAND NINE
HUNDRED SEVENTY~ S DO~ (U.S $ 1,358,970 00 ), for =he ps.mn= whereof,
~P=~cipal an~ Su~a~ b~ ~ha~elves,
LEWISVILLE HYDROELECTRIC PROJECT
SUPPLY ONLY OF TURBINE WITH AUXILIARY
which cone:acc ts hereby ~efe~a~ Co an~ ~da a parc hereof as ~117 and
co the s~ extant as ~f cop~a~ ac lansCh
~OW, ~FO~, t~ CO~ZTION OF ~ OBLIVION IS SU~, chac
~f Che sai~ P:~ncipal shall pa7 all c!a~-ucs suppLT~S labs= and ~ca-
c~al CO h~ or a subcancracco= ~ ohm prosecution of ohm vock prov~a~
for ~ sa~ conCracC~ then, Chis obliSacion s~ll
=a~ ~ full fo=ce an~
[DID'TON 10566 T~INE GEN 62 0200]
[ 022786 ]
P%OVIDED, ~0%EVEK, that thzs bond is execu:ad pursuant to the
a~sn~e~, an~ a~ liabi~ic!es on this bo~d sha~l be deca~lned in ac-
Z~ ~Z~S~ ~E~EOF, the sa!~ P=incipal and Suracb have signed
an~ seale~ ~h~s lnsC~men~ chis ~ ~ay of N~v~ , [9~
(Zf Zn~ivi~l Fi~) BY (S~L)
(s~)
/ (Z~ Co~oa) Domln,on Brid~le-Sulzer Inc (S~&J.) Manager
P:iz~cipal
FEDERAL INSURANCE COMPANY
// YFNE PELLAND, Attorney-in-fact
Counters~j~/~ / ~
B R C~o'denough - Res%debt/gent
FRED/S JAMES & CO OF TENS, INC
~j~Tht$ bond is void ~f the contract date above ~s later than December 15, 1987
[D~r~ON 10566 TURnZNE GEN 62 02001
PYB-Z
POWER OF ATTORNEY
Know all Men by theeo Presents That the FEDERAL INSURANCE COMPANY 15 Mountmn View Road Warren New Jersey a New Jersey Corpora
{~on has conshtuted and appointed and does hereby constitute and appoint Pater Lemberg, Yvonne Pelland, Lisa Assaf and
Andre Lebrun of Hontraa]., Quebec, Canada .........................................................
each ~ts true and lawful Attorney in Fact to execute under such designation in its name and to affix its corporate seal to and deliver for end on its behalf as
surety thereon or otherwise bonds of any of the following classes to-wit
Bonds and Undertakings filed in any suit matter or preoeedlng in any Court or filed w~th any Shenff or Magistrate for the doing or not doing of anything
spembed ~n such Bohd or Undertaking
2 Surety bonds to the United States of America or any agency thereof including those required or permitted under the laws or regulabons relabng to Customs
or Internal Revenue iLIceneo and Permit. Bonds or other indemnity bonds under the laws ordinances or regulations of any Stele City Town Village
Board or other body Or organization public or private bonds to Transportation Companies Lost Instrument bonds Lease bonds Workers Compensa
hon bonds M;eosllar~eous Surety bonds and bonds on behalf of Notaries Public Sheriffs Deputy Sheriffs and s~mdar public ofhc~ale
3 Bonds on behalf of (~ontractors in connection with bids proposals or contracts
corpolate seallo be herald affixed this ]. J~t day ol Ja~tuar¥ ~9 87
ALICE LEONARD N°ta~"~ubhc
cEn'r~F~ca'hoe I~I'ARY PUDUC 0F flEW
STATS OF NEW JERSEY '~ as My ConlnlllllOff Expires .lunl 28
/
24th
November
C enundermyhandandlhesealolsaldCoh~parlyatWarren NJ this dayof
BASIS 0__F CONTRACT
BC 1 GENERAL This Basis of Contract covers certain designated stipula-
tionS agreed upon for the Turbine Generator from Dominion Bridge-Sulzer,
Inc , based on their Proposal dated April 1, 1987, including supplements
thereto, and Specification 10566 62 0200
Other negotiated stipulations have been incorporated into the text of
Conformed Contract 10566 62 0200, as appropriate, and identified as noted
herein under Contract Delineations
The Pricing and Proposal Data portions of the Contractor's Proposal are
bound in the Appendix of these Contract Documents Wherever in the Con-
tract Documents references to "Contractor's Proposal," "prices stated in
the Proposal," "info~mation included in the Proposal," or other similar
references are made, such references shall apply to the Contractor's
Proposal except as such Proposal has been modified or superseded by this
Basis of Contract
BC 1 1 Contract Delineations Wherever the wording in the Contract
Documents ia marked out by crosshatches, such wording does not apply but
has been deleted, modified or replaced by accepted items of the Contrac-
tor's Proposal exceptions including negotiated revisions
Wherever the wording in the Contract Documents is underscored with a
dashed line, such wording has been added to the text in accordance with
accepted items of the Contractor's Proposal exceptions including negoti-
ated revisions
The above changes have been identified by an asterisk (*) placed in the
left margin of the page and a corresponding footnote at the bottom of the
page
BC 2 SCHEDULE The Schedule for this Contract specified in Arti-
cle lA 6 4 shall be determined based on the Award of Contract date of
December 1, 1987
BC $ CONTRACT PRICE The Contract Price is a firm lump sum amount of
$1,358,970 O0 U S
BC 4 MATERIALS The Contractor's standard materials as stated in Pro-
posal Data Pages D-9 through D-30 may be used in lieu of those specified
[DENTON 10566 TURBINE GEN 62 0200]
[ 111987 ]
BC-1
"Day" or '*days,*' unless herein otherwise expressly de-
fined, shall mean a calendar day or days of 24 hours
each
**The work" shall mean the equipment, supplies, materi-
als, labor, and services to be furnished under the con-
trac~ and the carrying out of all obligations ~mposed
by the con~ract documents
"Drawings" or "plans" shall mean ell (a) drawings fur-
niched by the Owner aa e basis for proposals, (b) sup-
pleuentary drawl, nas furnished by the ~er co c~ar~fy
~d Co defoe ~n S~ea~e~ deca~ the ~n~enc of the con-
c~ac~ d~a~Ss and specifications, (c) d~a~nSs submit-
ced by the successfu~ b~dde~ ~h h~s proposal, provided
such d~a~n$s are acceptable ~o the ~er, (d) dra~ngs
run,shed by the ~er Co the Con~rac~or during chp
profTess of the work, and (e) engineer,sS dace and draw-
~nss submitted by ~he Conc~accor dur~ns ~he progress o~
~he work, provided such dra~n$s are acceptable co ~he
Eu~nee~
~enever in chase conCrac~ documents the words "as
ordered," "as directed," "as requited," etas pe~cced,"
"as all--d," o~d8 oF phrases of like i~or~ are
used, iC shall be ~de~scood cha~ the order, di~ec~ion,
Fequir~nC, pe~selon, or all--ce of ~he ~pr or
~sineer is incased on12 ~o the ex~enC of Judging c~-
plante ~h the Ceos of the conc~ac~, none o~ ~hese
Ce~ 8hX1 ~ly the ~r or ~he Engineer ha ~y
auchoric2 or respo~ibilicy for 8upe~lsiou of the Con-
CTa~o~e8 forces or consC~c~ion opera,ions, such super-
vision and the sole responsibilic7 therefor being strictly
resoled ~or the Contractor
Similarl7 ~he words "approved," "reasonable," "8ui~able,"
"acceptable," "proper," "saCisfac~orT," or words o~ like
e~ecC and i~or~, unless oChe~se par~icularl7 speci-
~ied herein, shll mean approved, reaso~ble, suitable,
acceptable, proper, or sacisfac~ow in the Jud~uc of
~he ~er or Engineer, co the exCen~ provided in (10)
above
~euever in ~hese contract doc~enCs the e~ression "i~
is understood and agreed" or an expression of like ~-
por~ is used, such e~ression means the ~cual under-
standing and agreeuen~ o~ the par~ies executing the
ConCrac~ Agreement,
10566 TURBIIqE Gglq 62 0200]
030885
GENERAL CONDITIONS
GC 1 CONTRACT DOCUIdL~S IC is understood and agreed chac the Adver-
cisamen~, Ins~rucCions co Bidders, Proposal, Proposal Dace, Contract
Agreement Performance and ?avmenc Bonds, General Conditions, Spacing-
cations, Drawings, Addenda, and Change Orders issued by the Owner or the
Engineer, and specifications and snginaerinB dace ~urnished by the Con-
tractor and accepted by the O~ner, are each included in chis Contract end
the work shall be done in accordance therewith
GC 2 DEFINITIONS Words, phrases, or ocher expressions used in chase
contract documents shall have meanings as
1 'Contract" or "contract doc~ncs" s~ll ~nclude the
~Cem embraced above under CON~ACT DO~TS
2 "~r" l~ll mean the City of Denton, Texas n~ed and
desi~aCed in the Contract A~re~mnc aa "Party o~
First ParC," acting through ica ~blic U~ili~les Board
and City Council and chair duly authorized asante Ail
noCicas~ letters, and ocher co~nicaCion directed co
the ~e~ shall be addressed and delivered co City of
Denton, Texas, Municipal Buildins, 215 Eaac ~Kinney,
DenC~, T~ 76201
3 "Concraccor" 8hll mean the co~oracion, c~an7,
par=ne~ship, fi~, o= individual ~ued and desis~ced
in ~he C~C=ac= Asree~n= as ~ha "Party of the Second
Parc," who has entered ~co chis Contract for the
perfomnce of the work c~eTed chereby, and i~s, his,
or chair duly auChorized representatives
"Subcontractor" shall mean and refer only =o a co~ora-
caen, partnership, o= individual havins a direct con-
crate with the Contractor for parleying work covered
by chess concrete dec.enOs
5 "Engineer" shall mean the fi~ of Black & Veacch,
Knglnee~s-~chiCec~s, 1500 Head~ Lab Par~ay, ~ilins
address P 0 Box 8~05, Kansas City, ~issouri 6~111, or
ica duly authorized a~enCs, such agents
the scope of the par~icula~ duties encysted
each case
6 "Dace of concrete," or equivalen~ words, shall
dace ~C=en in the first paragraph of the Coucrac~
Agree~nc
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
GC ~ LEGAL ADDP~SSES The business address of the Contractor listed in
the Proposal is hereby designated ss the place to which all notices,
rets, and other com,~unication to the Contractor w~ll be mailed or deliv-
ered The address ~f the Owner appearing on Page GC-1 is hereby designated
as the place to which all notices, letters, and other communication to
the Owner shall be mailed or delivered Either party may change his ad-
dress at any time by an instrument in writing delivered co the Engineer
and to the other party
GC S SCOPE A~D INTE"k~ OF CO~EACT DOCUMENTS The various parts of the
contract documents are in--tended to supplement but not necessarily dupli-
cate ~ach other Any work exhibited in one part and not in another shall
he executed as if it had been set forth in all parts, so that the work
will be performed according to the complete design as determined by the
Engineer
Should anything necessa~ for a clear understanding of the work be omit-
ted from the contract documents, or should the requirements appear to be
in conflict, the Contractor shall secure ~itteu instructions from the
Engineer before proceeding with the work affected thereby It is under-
stood and agreed that the work shall be performed according to the true
intent of the contract documents
GC 6 II~D~ENDENT COIT~ltACTOI[ The relationship of the Contractor to the
O~uer shall be that of an in~ependent contractor
~C 7 ASSXGI~t~E~T The Contractor shall not assign the work, or any part
thereof, without the previous w~itten consent of the O~aer, nor shall he
assign, by power of attorney or otherwise, any of the money payable under
this Cun~racX unless ~ritten consent of the O~msr has been obtained No
right un,er this Contract, nor claim for any money due or to become ~ue
hereunder shall be asserted against the O~aer, or persons acting for the
Owner, by reason of any so-called assignment of ~his Contract or any part
thereof, unless such assignment has been authorized by the written con-
sent of the O~ner In case the Contractor is permitted to assign moneys
due or to become due under this Contract, the instrument of assignment
shall' contain a clause subordinating the claim of the assigrae to all
prior liens for services rendered or materials supplied for the perform-
ance of the work
GC 8 O~AL gTATEHE~TS ~t is understood and agreed that the ~rritten
te~ms ~n"~-provisions of this agreeaent shall supersede all oral state-
mants of representatives of the ~er, and oral statements shall not be
effec,tive or be construed as being a part of this Contract
GC 9 EEI~E~CE STA~DAItDS Eeference to the standards of any technical
society, or$anisation, or association, or to codes of local or state
[DEITIO~ 10566 Tt,'RBZItE GE~I 62 0200]
[ o o 85 ]
13 "Official acceptance" shall mean the O~mer'e
acceptance of all work perfo=med under chis Contract.
based on the En$ineerts final inspection and issuance
of a final payment cercificaCe
"SCare-up" shall mean cbs time period required Co bring
the hydroelectric generacin$ unic from an inactive
condition, when consc=ucCion is essentially complece.
co the scats ready for commercial operacion The
sCare-up period shall include pre~iminat~/ ~nspecc~on
and checkout of equipment and supporting subsystems.
C~a~ ope~ac~on of supporting equ~pmenc and subsystem.
tn~c~ operation of Che complete hydroelectric
aC~n~ un~C. operation of the c~plece un~C co obCa~n
dace. pe~fo~ ca~b~ac~on and co~eccSve wo~k. and
shucdo~ ~nspecC~on and ad~uac~uC p~ior Co obCa~n~nS
cm~c~a~ operates status
"~n~c~ operation" sha~ mean the f~sC ~nCes~a~ op-
e~aC~on of che c~eCe hydroelectric ~ene~aC~n~ ~t
~ch subsysce~ a~ suppo~C~n~ e~p~nc ~n sa~ce
available fo~ se~ce
16 "C~c~ operation" aha~ mean che c~dLC~ou of op-
e~aC~on ~n~ch the c~eCe hyd~oeXecc~c ~ene~aC~ng
un~c ~s officially declared by the ~r Co be
available ~o~ continuous operaC~on ac variable loads up
co and ~nc~ud~n~ ~aced
17 ~P~o~ecc S~Cev~ o~ ~oba~ces~ s~ mean the o~Ce of che
~e~s Le~e Eyd~oe~ecc~c P~o~ecc and a~
ad~acenc che~eCo where any ~k ~a ~equ~ced Co be
perused ~n c~necC~on v~ch the c~sC~cC~on of such
p~o~ecC
GC 3 ~C~ON O~ CON.CT Fou~ cop~en of the conc~acC
be p~epa~ed by the Engineer A~ cop~es v~ be submitted co che Con-
c~accor ~nd the Couc~cco~ s~ execuCe the Couc~acc A~eemenc.
execuced c~es of the ~equ~ed bonds ~d po~ of aCCo~ey~ ~nd submit
· ~ cop~es co the ~e~ ~e dace of conC~acC on the c~c~acc and bond
dace on the p~er of aCco~e~ sha~ n~so be ~efc b~ank fo~ ~ng ~n by
~e ~e~ ~11 execute all copies, insert the dace o~ conc~acC om the
b~ds and p~e~ o~ aCco~ey, and ~eCu~ all copies Co the Engineer
review and distribution DiscribuCion of signed copies will be one copy
each co the ~er. Concracco~. Surety. ~d En~inee~
[DE~O~ 10566 TUrBinE GE~ 62 0200]
[ 030885 ]
GC-3
furnish c~! reasonable assistance required by the Engineer, or inspectors,
~or ~he proper inspection o£ the ~ork Should ~he Con~rac~or object
an~ interp~etation o~ the con,race by an inspector, ~he Contractor may
make tw~iccen appeal to the Enslneer ~or a decision
~nspectors shal~ have the authori~ ~o re~ecC work which is unsacis~ac-
torys faulty, or defective or does not confor~n to the requirements of the
contract documents Inspection shall not relieve the Contractor
obli~ation to cone~ruc~ the work strictly in accordance with the contract
documents and shall not be deemed co limi~ any rishcs or remedies of the
O~me~ or Ensinecr at law or in equity
6C l~ COITI'RACTOIt DEFAULT ~f the work to be done under this Co~tract is
abandoned by the Contractor, or if this Contract is assigned by
ou~ ~he ~Ceu consent of the ~er, or ~f the Contractor ~s adjudged
b~k~pc, or if a seneral assi~enC of his assets is ~de for the bane-
[i~ o~ his crediCors~ o~ if a receiver is appointed for ~he Contractor or
any of his proper~y, or if a~ any time ~he Engineer cer~i~i~s in ~i~ing
~o the ~er ~ha~ ~he per~o~nce of ~he work under ~his Con~rac~ is be-
ing unnecessarily delayed, ~ha~ the Contractor is viola~ins any of ~he
cond!Cions o~ ~his Contract, or ~haC he is executing the s~e in bad
faith or oche~se hOC in accordance wi~h cbs ~e~s of said con~rac~, or
if the work is no~ subs~aneially c~pleced within ~he c~ n~ed for i~s
c~ecion or ~chin the c~e co which such c~le~ion da~e ~ be ex-
tended, then c~ ~er ~ se~e ~ic~en no,ice upon ~he Con~rac~or and
his sure~y of ~he ~er's in~en~ion co ce~ina~e ~his Con~rac~ Unless
~h~ ~ days a~ar ~he se~in~ of such no,ice, s sa~is~ac~o~ a~anse-
men~ie ~ for cou~in~nce, chis C~racc shall Ca~i~Ce In ~he
even~ of such ~e~Ci~, the sure~y shall have ~he right ~o ~ake over
~d a~le~e the ~rk, provided C~c if the sure~y does no~ c~enca per-
fo~uce ~hin 30 days, the ~er ~y ~ake over and prosecute ~he work
~o c~lecion, by con~rac~ or oche~se ~e Con~rac~or and his surety
shall be liable Co the ~er for all excess cos~ sustained by the ~er
b2 reason of such prosecution and comple~ion ~e ~er ~v take posses-
sion of, a~d u~ilize in c~plecing ~he work, all ~terials, equipment,
~ools, and plan~ on ~he si~e o~ ~he work
CC 1~ HX~CES ~ DE~YS The Com~racCor expressly asrees ~hac
undercakins ~o c~e ~he work within ~he ~e specified, he ~s ~de
allow~ces for all hindrances and delays ~hich mish~ usually be e~ec~ed
~o occur in perfo~ns ~he ~rk No cla~ s~ll be ~de by ~he Contrac-
tor for such hindrances and delays
I~ ~he Contractor e~eriences hindrances and delays which, in his opinion,
are hoc usually ~o be e~ec~ed in ~he per[o~ce of ~he work and which
af~ee~ the perfo~nce o~ ~he work, he ~y reques~ a change In ~he con-
~rac~ Such hindrances and delays ~y include, buC no~ be limited ~o,
ac~s or failure ~o ac~ by ~he ~er or ocher contractors employed by the
[OElrfO~ 10566 TUItBZIfE GEN 62 0200]
[ o3o885 ]
GC-6
authorities, shall mean the latest standard, code, specification, or
tentative standard adopted and published ac the date of taking bids,
unless specifically stated otherwise
GC 10 SOURCE O.~F MATERIALS To the extent possible, materials and equip-
ment (including components thereof) furnished under these specifications
shall be produced, processed, manufactured, and assembled within the
United States of America Substitution of forei8n materials for domestic
materials will not be ps,mitred unless such substitution is clearly stated
in the Proposal and accepted by the Owner Should cbs Contractor's manu-
facturing facilities he located in s count~ other than the United States,
the Contractor can supply materials and equipment from these facilities
However, for auxiliar~ equipment purchased by the Contractor, the initial
provision of chis article shall apply
GC Il NO WAIVER OF RIGHTS Neither the inspection by the O~ner or En$i-
near or-~nyo-'~"~--~h~ro'~'~'~ials, employees, or asante, nor any order by
the Owner or En$ineer for payment of money, or any payment for. or accept-
ante of, the whole or any parc of the work by cha Owner or Engineer, nor
any extension of rime. nor any possession taken by the Owner or ica
ployee8, shall operate as a waiver of any provision of chis Contract. or
of any power h~rein reserved to the O~ner. or any rishc co damages herein
provided, nor shall any waiver of any breach in this Contract be held co
be a waiver of any ocher or subsequent breach
GO.12 AUTHORIT~ OF TI~ ~lqGIN~ To prevent delays and disputes, and to
discourage licisa~oa-'~'iC is agreed by the parries to chis Contract that
the Engineer slmll deCemine the quantities of work which are co be paid
for under the contract and shall decenn~.ne all questions Zn relation to
th work.
If in the opinion of the Contractor or the Owner a decision made by the
Engineer is not in accordance w~th the meanin$ and intent of the =ontract.
either party ~y file with the Engineer and the other par~v to the con-
tract, within 30 days a~ter receipt of the decision, a ~itter ob~ectio~
to the decision Failure to ~lle an ob~ection within the allotted time
will be considered acceptance of the En$1neer~s decision and ~he decisior
shell become final and conclusive
The Kngineert8 decision and the filing of the v~itcen ob~ecCion thereto
shell be a condition precedent to the rlSht to request arbitration or
start action in court
Ic is the intent of this agreement th~c there shall be no de,ay in the
execution o~ the vork and the decision of the Engineer as rendered shall
be promptly observed
GC 13 ELqC~h~ER~NG ~HSPECT~OH The O~mer may appoint (either directly or
through the En$ineer) such inspectors as the O~uer deems p~oper to inspect
the vork ~or compliince with the contract documents The Contractor shall
[D~rroN ~0566 T~RBZ~E GE~ 62 0200]
[ 022786 ]
GC 1811 Cancellation Charges Based on the Schedule of Cancellation
Cherses submitted with the Contractor's proposal and asrsed to by the
Owner~, the following terms and conditions shall apply in the event the
Owner exercises its right to cancel
In the event that cancellation occurs prior to the agreed lecest start
date for engineering, cancellation charges shall not apply and the O~ner
shall incur no liabilities
In the event that cancellation occurs after release for engineering, but
prior to the latest start dace for procurement of raw materials, cancel-
lacion charges shall nsc exceed the maximum charge quoted for engineer-
ing, provided the Contractor has submitted complete certified manufactur-
er's drawings and associated engineering data If such engineering work
and submittal of drawings are not complete at the tine of cancellation,
the maximum charge quoted will be prorated Co reflect the quantity of
such vork actually conplated
In the event chat cancellation occurs after release for procurement of
rav naterials, buc prior to the latest scare date for shop fabrication
and ~ssembly, cancellation charges shall not exceed the maximum charse
quoted for engineering or prorated aa specified in the previous para-
graph, plus a prorated ~unC for procurement of raw uterials nsc to
exceed the maximum charge quoted for such materials
In the event chac cancellation occurs after the latest dace for start of
shop ifabricetiou, cancellation charges shall not exceed the maximum
charges quoted for engineering and procurement of ray materials, plus a
prorated amount for shop fabrication based on the a~unc of shop fabri-
cation york eonpleted to the dace of cancellation
If cancellation ia exercised by the Owner, the Contractor shall take the
actions specified herei~hefore, and the final charges shall not exceed
the charses quoted in the Schedule of Cancellation CharBas stated in the
Contractor's proposal
GC 19 ~ODIFICATION$ The Contractor shall modify the work whenever so
ordered by the Owner and such modifications shall not affect the validity
of the contract ~odificaCions may involve chanBes in the amount of the
vorklto ba performed or changes in the contract time for which appropri-
ate changes co Cha contract will bs made
Contract changes due Co modifications shall be made in accordance with
the requirements of Article GC 20, CI~AI~GES TO THE COI~TRACT
GC 20 CIL~I~GE$ TO TItE COntRACT The contract may be changed only by duly
executed chan$e'~rders issued by the Owner
[DEI~'TOIq 10566 TIIR~INE GEI~I 62 0200]
[ 030885 ]
GC-8
Owner, fires, floods, labor disputes, epidemics, abnormal weather condi-
tions, or aces of God Claims by the Contractor for any chanss in the
contract due Co such hindrances and delays shall be made in accordance
with the requirements of Article GC 20, C~GES TO THE CONTRACT The
Contractor shall uss ell reasonable means co minimize the sxtsnc of the
delay
GC 16 SUSPENSION O_~FWOKK The O~mer reserves the rishc co suspend and
reinstate execution of the whole or any part of cbs work without invali-
dacinS cbs provisions of the contract
Suspension or rstnstatsmenC of the work will be by ~rriCten notice Co the
Contractor from the Owner
Suspension of ~ork shall not automatically entitle the Contractor Co ad-
ditional compensation or a chanse in ~ha contrac~ time, however, the
tractor rill be reimbursed for real and unavoidable direct costs incurred
by him as a result of such suspension and/or ~he contract will be sxCsndsd
as required co compensate for any delay due co such suspension Claims
by the Contractor for change of contract time or au adjustment of the con-
Crao~ price, due co ~ork suspensions ordered by ~hs O~nar shall be made
in accordance rich the requirements of Article GC ~0, CH~NGES TO THE
TRACT The Contractor shall usa all reasonable means to mini~zs the
consequsncs~ of such suspension
GC 17 DELAYED SHIPHEI~T The O~uer reserves the rish~ Co order the Con-
Crac~or co delay sh~pmen~ of squilmenC and materials herein contracted
[n ~he event such a delay is ordered by the O~ner in~r~in$, the O~ner
~ll pay the Contractor rmasonabla and proper extra charEss incurred by
the Contractor as a result of the delay Such ex~ra char~ss shall
clude storage charges, handl2n$ char~sa, insurance, lncares~ on invest-
~emt, and transportation charges to the storage
GC 18 CANCELLATION OF~ORK Tbs 0~ner reserves the right co cancel the
unshipped portion of the work by givens written not2ca co the Contractor
~n the evsnt of cancellation, the O~mer w~ll pay ~he Contractor cancella-
tion costs as specified in Article CC 18 ~
Cancellation of the york shall hoc const2cuce the basis for a claim for
d~gas or loss of anticipated profits
The Contractor shall, after consul~ation with the O~msr, take all reason-
able steps to min:f~izs the cos~a related ~o cancslla~iou The Contractor
shall provide the O~ner with an accounting of costs clawed, including
adequate suppor~lns information, and the Omlar may, aC les expanse, audio
the clawed costs and supportins in,or,melon
In no event shall cancellation charges plus the su~ of all previous pay-
manta exceed the contract price
[DENTON 10566 TURBINE C~N 62 0200]
[ 030885 ]
CC-7
applicable unic price Otherwise, such work shall be paid for as herein-
after provided
Contract price chanses /or modiflcaCions involvin$ extra york vii1 be
based on agreed lump sums or on asreed unit prices whenever the O~mer
and the Contractor agree upon such prices before the exCra work is
sCarced, ocher~lse~ pa~nents for extra work will be based on scCual
direct cost plus a percentage allowance The percencage allowance shall
includp the Contractor's extre profit and extra overhead, and unless och-
cruise esreed by the Contractor and the O~ner the percentase allowance
shall be 15 percent of the cocal direct cost
For the purpose of deteminin$ whe=her proposed extra work will be au-
thorized, or for de=e~lnins the pa~enc method for extra work, =he Con-
=rac~or s~ll subuiC Co ~he EnSinee~, upon request, a de~ailed cos~
esCi~Ce for proposed ex~ra wor~ ~e eaSts-Ce shall indicate itemized
quan~i~ies and c~rses for all elements of direc~ co8~ and a percen=a8e
· llowance co cover extra profit and ex=re overhead Unless oche~se
a~reed upon by the Con~racCor and the ~er the percentage allowance
ohll be 15 percen~ of =he total direc~ cost
GC 20 I 2 Decreased Price If a chanse in che cone=ac= price is re-
quired due ~o a ~difica~ion ~ich decreases che ~ounC of work, such
decrease shall no~ c~sCicuCe =ha basis for a clah for dmses or an-
~lcipa~ed profits on ~Tk if~ec~ed by such decrease ~ere the value of
~icced ~rk Lo usc covered by applic8ble vni~ prices, the Ensineer shall
de~e~ine on an equi~able basis ~he ~un~ of (a) credi~ due the ~er
for c~rac~ work as a reful~ of an authorized chn8e, (b)
~he Cone=actor for ~y accel loss incurred in con~ec~ion ~h ~he pur-
chase, deliver, and subsequent disposal of
quired for use on the ~rk as planned and which could nsc be used In any
par~ of the work ss locally built, and (c) any o~her ad]usCuen= of =he
conCrac= ~o~ where =he ~c~d co be used
no~ clearly defined in che conCrac= documen=s
GC 20 2 Con=fac= ~ime Chanses ~e contras= ~ime
work nodifica~ions~ hindrances and delays, and work suspensions over
which the ConC=ac~or has no control
GC 21 ~I~TI~ Before bring/nS any action tn court pertaining Co a
decision of ~h~ ln~in~er~ or cla~, dispute, or other ~Ccer in question
between the ~er ~nd C~CracCor arisins ouc of, or relating Co the Con-
trace DocmnCs or che breach thereof, the ob]ecCor (herei~fcer referred
Co as Percy A) shall first offer co arbitrate the question with Che ocher
percy Co the contract (hereinafter referred co as Percy B) by noClfying
h~ in ~iCins and seCCins forth in such notice the question co be arbi-
trated
10566 TURBINE G~I 62 02001
030885
GC-IO
Ii, in the opinion of the Owner or the Contractor, any event or action by
the ocher party Justifies a change in the contract, either party shall
initiate with the other party, within 5 days after such event or action,
a request for a change to the contract All documentation required to
substantiate the proposed change shall be submitted within a minimum rea-
sonable time after initiating the request for change Upon ~he parties
reaching agreement resarding the proposed change, the O~ner will issue a
written change order therefor
botwithstanding the foregoing provisions requiring duly authorized change
orders, in the evenC agreement has been reached between authorized repre-
sentatives of the parties regarding the change in the contract pandin$
processing of such change order, the Contractor shall proceed with the
work on the basis of written interim authorization from the Owner
If the Contractor claims that any instruction, request, drawing, speci-
fications or other directive or action of the Owner or the Engineer
constitutes a change in the contract, but has not been authorized as such
by a change order in writing by the Owner, the Contractor shall immedi-
ately request a written interim authorization and proceed without delay
to perform the work in accordance with such authorization The Contrac-
tor shall provide written notice of the claim or dispute to the Engineer
and the Owner within 5 days of the request for interim authorization
The Contractor's failure to give said written notice within the 5 day
period shall constitute a waiver and relinquislment of any such claim or
dispute The O~ner'e written interim authorization shall not constitute
approval of the claim for increased or decreased work, but shall be ·
condition precedent to the Contractor's right to receive payment for such
work and to the Contractor's right to prosecute or ~aintain any proceed-
ing to recover for such work
GC 20 1 Contract Price Chan~es The contract price msy be changed due
to modifications which involve extra work or decreased work, or due to
work suspensions, hindrances, and delays over which the Contractor has no
control Claims for changes in the contract price shall covform to the
requirements specified herein
GC 20 I i Increased Price If a change in the contract is required due
to work suspensions or hindrances and delays, the contract price will be
increased according to agreed lump sums, agreed acceleration costa, or
other demonstrable costa submitted by the Contractor and substantiated to
the satisfaction of the O~rner
If a change in the contract price is required due to a modification which
increases the amount of the work, and the added work or any part thereof
is of a type and character which can properly and fairly be classified
under one or more unit price items of the contract, then the contract
price will be increased according to the ,~ount actually done and at the
[DENTON 10566 TURBINE (~'~ 62 0200]
o3ogs$ ]
GC 25 ~L~TE~IALS ~ EqUZI~EHT Unless spscSficall! provided ocherS, se
· ~n each case, all uacer~a~s and equipment run,shed for pemnenc ~nsca~-
hC~on ~n the york sh~l confo~ co applicable scandard 8pec~f~caC~ons
8nd s~ be nev, unused, and undamped
co.orated ~n the work No such
the Contractor for any purpose ocher than chac ~ncended sT specified, up-
less such use ~s specifically auchor~zed by the ~er ~n each case
GC 26 ~ ~e Contractor guarantees C~C the york here~n con-
crested ~11 be as specified and ~1 be free frou defects in des~,
voT~neh~p, and uCe~ls If ~chin the ~aranCee per~od the vo~k
fa~is Co ~eC the prov~e~s of chis ~aranCee, the C~craccor
pr~pc~ correct any defects, ~nclud~nK nonconfomnce ~ch the contract
docents by ad~usCMnC, repair, or replacement of all defective parCs or
~e ~T~Cee pe~od oha~ bes~n on the dace o~ ~na~ pa~uc oz the dace
o~ ~n~c~a~ opeFaC~on, ~cheve~ ~s ~aceF, and sh~ end 12 ~nChs ~aceF
If n-~ufacCu~e~s f~e~d ~ep~esencac~ves a~e ~nc~uded ~n the contract,
such se~ces sha~l be fu~ished by the ConCracCoT v~chouc cost for the
cor~ecCLou of any defects
~is ~rancee oh1~ be extended co cover aL1 repairs and replac~encs
fu~Lehed ~d~r the ~raucee ~d the period of the ~r~Cee for each
such repaLr or replacmuC shL1 be o~ yea~ afCer ~nsca~1acton or c~-
~e C~craecor ~L~ be siren an opportunity co
che d~fecC ~C he ehL1 usc delay the correct,on ~e M~K such deter-
If v~Ch~n 10 days afCe~ the ~er has notified the ConCracCo~ of a defect,
fa~luTe~ or abno~cy ~n the york, the Contractor
uke the necessary repairs o~ ad~usCmenC~, the ~er ~s hereby authorized
co ~ke the repairs or ad~us~ncs or co order the york co be done by a
ch~rd percy, the cost of the ~rk Co be pa~d by the Contractor
In the ~euC of an e~rSency ~ere. ~n the ~ud~euc of oho ~e~, de,ay
~uLd cause serious Loss or dmse, r~pair8 or adJus~ncs uy be ~de by
the ~eT or a ch~rd percy chosen by the ~er ~ch~c advance noc~ce
the C~cTaccor a~ the coeC of the ~k sh~l be paid by the Contractor,
or by the oureCy
~C 27 IHS~CE ~cepc as oChe~se specif~ed ~n chis Contract, the
Contractor ~d h~s subcontractors of any cter ~ be required ac cheer
o~ e~ense Co u~nca~n in effect aC all C~es dur~ns
[DENTON 10566 TI,Vt~Z. NE GEN 62 0200]
[ o~oea5 ]
~-~2
Party B can elect arbitrate or not If Party t ~rees to arbitrate,
he shall so advise Party A in writing within 10 days after receipt of
Party A's notice Notice by Party B that he does not wish to arbitrate,
or failure of Party B to notify Party A within the I0 day period, will
give P~rty A the right to start action in court
If Party B agrees to arbitrate, the arbitration proceeding shall be gov-
erned by the Construction Industry Arbitration Rules or Commercial Arbi-
tration Rules of the American Arbitration Association as appropriate for
the matter to be arbitrated The award rendered by the arbitrators shall
be final, and Judgment may be entered upon it in any court having Juris-
diction
The Contractor shall not cause a delay of the work during any arbitration
proceedings, except by agreement with the Owner It is understood and
agreed by the parties to the contract that no requirement or statement
herein shall be interpreted as curtailing the power of the Engineer to
determine the amount, quality, and acceptability of work
GC 22 LAWS AND REGULATIONS The Contractor shall observe and comply
with all ordinances, laws, and regulations, and shall protect and indem-
nify the Owner and the Owner's officers and agents, including the Engi-
neer, against any claim or liability arising from or based on any viola-
tion of the same
*GC 23 TAXES, PEP. MITS, AND LICENSES
State and local taxes and fees for_p~rmfts or licenses will be for the
No State of Texas or loca~ taxes will be required on the equipment
furnished under these specifications
CC 2~ PATENTS Royalties and fees for patents covering materials,
articles, apparatus, devices, equipment, or processes used in the work,
shall be included in the contract amount The Contractor shall satfsf7
all demands that may he made at any time for such royalties or fees and
he shall be liable for any damages or claims for patent infringements
The Contractor shall, at his own cost and expense, defend all suits or
proceedings that may be instituted against the Owner for alleged infringe-
ment of any patents involved in the work and, in case of an award of dam-
ages, the Contractor shall pay such award Pinal patient to the Contrac-
tor by the 0~ner will not he made while any such suit or c~aim remains
unsettled
*Negotiated Revision
[DENTON 10566 TURBINE GEN 62 0200]
[ ~987 ]
GC-ll
Certificates of insurance coverins physical loss or damase to equipment
and ~atarials shell be sub~tted at least 30 days before the first ship-
merit of the equipment and materials A certificate for each of the other
insurance policies shall be submitted at least 30 days prior to the ex-
pected arrival of the Contractor's personnel at the site of installs=ion
CC 27 2 Additional Insureds All insurance coverages fur~ished under
this Contract shall include the O~ner, the En$ineer, and their officials,
partners, directors, officers, agents, and employees as additional insureds
with respect to the activities of the Contractor and his subcontractors
These policies shall contain a "cross liability" or "severability of in-
terest'' clause or endorsement Notwithstanding any other provision of
these policies, the insurance afforded shall apply separately to each
insured, named insured, or additional insured with respect to any claim,
suit, or Jud~nent made or brousht by or for any other insured, named
insured, or additional insured as chough a separate policy had been
issued to each, except the insurer's liability shall no~ be increased
beyond the amount or amounts for which the insurer would have been liable
had only one insured been nmued
The ~er or =he Ensineer shall hoc by reason of =heir inclusion under
chess policies incur liablllcy ~o =he insurance carrier for paten= of
premi~ for chess polic2es
CC 27 3 Waiver o~ Subro~aC~on ~e Concrac~or and his subcon=rac~ors
s~11 require ~heir insurance ca. Ears, with respect co all ~nsurance
policies, =o waive all ri~hcs of subrosacion asains= ~he ~er and che
~neer, chair perchers, dirsccors, officers, asante, and ~loyees and
a~ainsC ocher c~rac~ors a~ subconCraccors
~ 27 4 Wor~en~s C~ensa=~on an~ E~lo~er's Liabil2c[ ~is insurance
s~ll pro~ec= the ConCracCor and che additional insureds asains= all
claims under applicable s~a=e wor~en's compensa~ion laws ~e insureds
shall also be pro=ec~ed aSains= claims for injury, disease, or deaCh of
employees which, for any reason, ~y hOC fall wi=bin =he provisions of a
wor~en~s compensation law ~is policy shall include an "all states"
endors~enC
~e l~bElicy l~-~s s~ll no~ be less chan
Wor~en's c~ensa=ion Sca=uCo~
~ployer's liabil2~y $100,000 each occurrence
~ 27 5 Com~rehensive Au~obile ~ ~is insurance shell be
~iCCeu in c~prehensEve foTM and shall protect ~he Contractor and =he
additional insureds asainsC all claims for injuries =o members of
[DENTON 10565 TURBINE 6E~ 62 0200]
[ 030gSS
CC-I&
the work insurance coverages with limits not less than those set forth
below with insurers and under forms of policies satisfactory to the Own-
er It shall be the responsibility of the Contrac:or to maintain ade-
quate insurance coverage and to assure that subcontractors are adequately
insured ac all times Failure of the Contractor to maintain adequate
coverage shall no= relieve him of any contractual responsibility or obl!-
The requirements specified herein as to types, limits, and Owner's ap-
proval of insurance coverage to be maintained by the Contractor and his
subcontractors ars not intended to and shall not in any manner limit or
qualify the liabilities and obligations assumed by the Contractor and his
subcontractors under this Contract
Any insurance carried by the Owner or the Engineer which may be applica-
ble shall be deemed to be excess insurance and the Con~ractor's insurance
primary for all purposes despite any conflicting provision in the Con-
tractor's policies to cbs contrary
If the Contractor does hOC furnish onsita field services, the workmen's
compensation and employer's liability, comprehensive automobile liabili-
ty, comprahsusive Sahara1 liability, and umbrella liability insurance
specified herein may be omitted
For insurance purposes, the ti=la of ownership of equipment and materials
furnished under this Contract shall remain with the Contractor until the
Owner receives such equipment and materials at the Jobsi=a
GC 27 1 Carc~ficates of Insurance The Contractor and h~s subcontrac-
tors shall furnish the--Owner and the Engineer with cartif~cates of insur-
ance as evidence chat policies providins the required coverages and
lha~ts of insurance are in full forts and effect The cer~ificates shall
provide that any company issuing an insurance policy for the work under
this Contract shall provide not lees than 15 days advance notice in writ-
ing to the Owner and the Engineer prior to cancellation, termination, or
mater~al change of any policy of insurance In addition, the Contractor
shall immediately provide written notice =o the O~mer and Engineer upon
receipt of notice of cancellation of an insurance policy or a decision co
terminate or alter an insurance policy Ail certificates of insurance
shall clearly state thac all applicable requirements have been satisfied
Cartif~cates of insurance for Contractor- and subcontractor-furnished in-
surance and notices of any cancellations, tarminations~ or alterations of
such policies shall be mailed to the Owner and the Engineer at the ad-
dresses listed ~n Article GC 2
Each certificate shall quote the insuring agreement and all exclusions
and additions as they appear in the policy, or in lieu of certif~cates,
copies of the complete policy may be subm/tted
[DENTON 10566 TURBINE GEN 62 0200]
[ 030885 ]
Owner and Engineer and their officials, officers, directors, partners,
consultants, agents, and employees from and against all claims, damages,
losses, and expenses, direct, indirect, or consequential (including but
not limited to fees and charges of engineers, architects, attorneys, and
other professionals and court and arbitration costs) arising out of or
resulting from the performance of the work by the Contractor, any subcon-
tractor, any person or organization directly or indirectly en~loyed by
any of them to perform or furnish any of the work or anyone for whose
acts any of them may be liable, regardless of whether or not it is caused
in part by a party indemnified hereunder or arises by or is imposed by
law and regulations resardlase of the negligence of any such party
In any and all claims against the Owner, or the Engineer or any of their
officials, officers, directors, partners, consultants, agents, or employ-
ees by any employee of the Contractor, any subcontractor, any person or
organization directly or indirectly employed by any of them to perform or
furnish any of the work or anyone for whose acts any of them may be lia-
ble, this indemnification obligation shall not he limited in any way by
any limitation on the amount or type of damages, compensation, or bene-
fits payable by or for the Contractor or any such subcontractor or other
person or organization under workers~ or workmen's compensation acts,
disability benefit acts, or other employee benefit acts, nor shall this
indemnification obligation be limited in any way by any limitation on the
amount or type of insurance coverage provided by the Owner, the Contrac-
tor, or any of his subcontractors
GC 29 RELEASE OF LIABILITY Acceptance by the Contractor of the last
payment shall be a release to the Owner and every officer and agent
thereof, from all claims and liability hereunder for anything done or
furnished for, or relating to the work, or for any act or neglect of the
Owner or of any person relating to or affecting the work
GC 30 CLAIMS FOR LABOR AND MATERIALS The Contractor shall indemnify
and save harmless th-~--Owner from all claims for labor and materials fur-
nished under this Contract When requested by the Owner, the Contractor
shall submit satisfactory ~vidence that all persons, firms, or corpora-
tions who have done work or furnished materials under this Contract, for
which the Owner may become legally liable, have been fully paid or satis-
factorily secured In case such evidence is not furnished or is not
satisfactory, an amount will be retained from money due the Contractor
which in addition to any other sums that may be retained will be suffi-
cient, in the opinion of the Owner, to liquidate all such claims Such
sum will be retained until the claims as aforesaid are fully settled or
satisfactorily secured
*GC B1 PAYMENTS Payments, e~ressed in percentages of the total Con-
tract v~ll F. m~d~_~_o-the-C~n~r~c~o~ ~c~o~in~o-tKe-f~l~o~t~g
~c~e~u!e_o~ milestones
Event Payment
Submission of Certified 45 d~y 57
-
*Negotiated Revision
[DENTON 10566 TURBINE GEN 62 0200]
[ 111987 ]
GC-16
public and damage Co properry of ochers ariein$ from the use of motor ve-
hicles, and shall cover operation on or off the sics of ell motor vehicles
l~censed for highvay use, vhecher they are o~med, nonovued, or hired
The liability l~nics shall nsc be less than
Bodily injury and $500,000 combined single
property d~m-$e l~nic each occurrence
C,C 27 6 Coupreheueive General Liability This ~nsurance shall be
Can in comprehensive form and shall protect the Contractor end the
ciouaL ineureds against al1 claims arising from bodily injury, e~cknese,
dLsease, or danch of any person ocher Chart the Coucreocores employees or
dmmiSe co property of the O~mer or ochers sris~n$ ouC of any acc or
omission of the Contractor or h~s eaenCs, employees, or subcoucrncCors
This policy shal! also include protection asninsc cla~s~ insured by usual
personal inJur~ liabiL~y reverses, · #protective l~abiliCy" endorsement
co insure the contractual liab~licy assumed by the Contractor under the
article entitled ZNDE~IqZFICAT~ON, and "Completed Operacinus and Produces
L~ab~licy" coveraee (co remain in force for 2 years a£cer f~nal payaenc)
The l~ab~l~y lt~cs shall no~ bo less than.
Personal injury and $~00,000 combined einele
property a~ee l~c each occurrence and
$500,000 aggra$aca
GC 27 7 Uubrella Ltabil~c~ Pol~c~ This insurance shall proCecc che
ConCraccor and the addicinna~ ~neureds aSninec all claque in excess of
the 3~cs provided under Che employer's l~ab~licy, comprehensive auCo-
uobile l~lbilicy, and comprehensive seueral liabiliry policies The
~ab~l~cy limtcs of the umbrella l~abll~cy policy shall nsc be Lees than
~C 27 8 Transportation ~nsurance Th~s insurance shall be of the "all
risks*' type end shall procure Che ConcracCor and the Ov~er from al1
~neurabLe risks of physical Lose or damage Co equipment and uaceriaLs in
transit Co che ~oha~Ce and until Cha Ovner receives the equ~puenc and
uaceriaLs aC cha Johaice The coverage amounc shall be nsc less than the
full anounc of Cha concracc
TransporCaCinn insurance shall provide for losses co be payable co the
ConCraccor and the Ovner ae their ~nCereoce nay appear.
GC 28 ~DD~qlFICAT~ON To the fullest exCenc peru~cced by Lave and res-
uLacione, the ConCracCor shall defend, indemnify, and hold haru~eee the
[DENTON 10566 T~BZIqE GEN 62 0200]
[ o30885 ]
CC-IS
· GC,32 LIlilTATIOH 0Y LIABZLIT~ l~either Contractor
~ incidental or consaquantSal da~aas~Or ~or claims b~
Fu :hemora, :he s~ of an and all liquidated da~Bee& aspr~idad for
* Event ,Payment
-dr--a -nSs !5!
D_e_liv_e~y_to_ o_it_e_of_ e_ub_ed_de_d
Rat-t!
Delivery of turbine stay
r"in-sTdi8 t-- "~b u-t o'-~-a 8-8 ~ab'=l 25_~
Dal:f,.vmr~ of tu~b:l.nm _ru_nnar
D_el_iv_et~_ _o_t sen_er_at_or !0~_
_ac£eitano_e !o!
_All Ea~__..ut_s_vi_l_l be in US dollars aud are net 30 days a£ter Presentation
_of_i_uv_oi_e 8_ ............................
After otiicial approval and acceptance o~ the ~ork by the 0~er, the
$inesr will be authorized to prepare a final certi~icate st the work dons
under this Contract The final certificate will be submitted to the 0~ner
within 10 days after its preparation has been authorized The Owner will,
within 30 days thereafter, pay the entiro sun found to be due 8~ter de-
ductin~ all amounts to be retained unde~ any p~ovision of this Contcact
If for a cause beyond the control st the Contractor the Owner does nsc
give official approval and acceptance of the work within 365 day8 after
shipment of equipment and uterials is completed, the final payment
be made aa stipulated above providing the equipment and materials are in
accordance with the contract documents aa ~ar as can be determined
GC 31 I Cost Breakdmm Prior to final palment, the Contracto~ shall
furnish ~h-'~-*O~ner a cost breakdown of the final contract price by retire-
mant units in accordance with the system of accounts ~urnished by the
0~mer The 0vner's syste~ of accounts has been designed in conformance
with the unifom aysteu of accounts prescribed by the Federal Energy ReS-
ulatory Co~m~ ~sion
eNegotiated Revision
10566 TURBINE GEl( 62 0200]
[ 111987 ]
GC- 17
lA 3 MISCELLANEOUS MATERIALS AND SERVICES Miscellaneous materials and
services not otherwise specifically called for shall be furnished by the
Contractor in accordance with the following
All nuts, bolts, gaskets, special fasteners, backing rings,
etc , between components and equipment furnished under these
specifications
All piping integral to or between any equipment furnished
under these specifications, except as otherwise specified
All necessary connections for the Owner's piping and instru-
Foundation anchor bolts, plates, and sleeves, including
design
Ail necessary instrument, power and control wiring and
raceways integral to any equipment furnished under these
specifications This shall include terminal blocks and in-
ternal wiring to these terminal blocks for equipment re-
quiring external connection
Coupling guards for all exposed shafts and couplings
Finish painting of all equipment
Leveling blocks, soleplates, thrust blocks, matching blocks,
and shims
Field office furnishings, supplies, telephone service, and
equipment for the manufacturer's technical service represen-
Erection drawings, prints, information, instructions, and
other data for use by the Owner's erection contractor
Detailed storage requirements and lubrication requirements
(including frequencies) for use by the Owner's erection con-
tractor
All special tools or lifting lugs for offloading
The use of all special tools required for erection of the
equipment, exclusive of the maintenance tools specified to
be furnished under Section ib Erection tools shall remain
the property of the Contractor and all shipping costs to and
from the Jobsite shall be at the Contractor's expense
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
lA-2
Section lA - GENERAL DESCRIPTION AND SCOPE OF THE WORK
lA 1 ~ENERAL This section covers the general description, scope of the
work, and supplementary requirements for equipment, materials, and serv-
ices included under these specifications
The equipment and materials covered by these specifications will be in-
corporated in the Lewisville Hydroelectric Project located at the outlet
works of Lewisville Reservoir near Lewisville, Texas The unit is sched-
uled for initial operation by October i, 1988 and commercial operation by
October 25, 1988
lA 2 WORK INCLUDED UNDER THESE SPECIFICATIONS The work under these
specifications shall include furnishing fob at the Lewisville Hydroelec-
tric Project site, the turbine generator and associated equipment and
providing miscellaneous materials and services complete as specified here-
in and in accordance with the contract documents defined in Article GC 1
of the GENERAL CONDITIONS
All equipment and materials required for a complete turbine generator unit
shall be furnished, except as specified otherwise in these specifications
The equipment and materials to be furnished shall include, but not neces-
sarily be limited to, the following major items
Turbine
Synchronous Bypass Valve
Controller
Speed Increaser
Generator
Excitation System
Neutral Grounding Equipment
Switchgear
Control System
The equipment will be tested by the Ovmer after erection to demonstrate
its ability to operate under the conditions and fulfill the guarantees as
set forth herein If the tests indicate that the equipment fails to meet
guaranteed performance, the Contractor shall make additional tests and
modifications in accordance with the procedures stated in the article en-
titled GUARANTEE of the GENERAL CONDITIONS and the requirements specified
in the article entitled PERFORMANCE TESTS in Section 2A
The Contractor shall provide drawings and other engineering data, manu-
facturer's field services, tools, instruction manuals, reco-.-anded spare
parts list, miscellaneous materials and services, and shall participate
in design conferences, all as specified herein
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
lA-!
The manufacturer's technical service representatives shall furnish writ-
ten certification to the Owner that the equipment has been inspected and
adjusted by them or under their direction and that it is ready for ser-
vice, all of which shall be done before initial operation of the equip-
mere
The duties of manufacturer's technical service representatives may in-
clude, but may not be limited to, the following
a Providin$ technical advice to assist the erection con-
tractor in installing the equipment
InspectinE and testing the equipment after installation
and directing any changes or adjustments required to
assure proper operation
Providin$ technical direction during startup and ini-
tial operation of the equipment
d Directing the correction of any design or manufacturin$
· InstructinE the Owner's personnel in the operation and
maintenance of the equipment
f Providin$ services required as a condition to providing
the warranties and guarantees specified
The lump sum prices stated in the Proposal shall include 60 days of ser-
vice and six round trips to the site for the field service represent-
ativee, to provide the services specified under Items (a), (b), (c),
and (f) above If the number of days of service and/or the number of
round trips actually required under Items (a), (b), (c), and (f) are more
or less than the specified quantities, the contract amount will be
creased or decreased in accordance with the adjustment prices for manu-
facturer's technical services stated in the Proposal
When, in the Judgment of the Engineer, field service representative's time
is required under Stem (d) above solely and expressly for the purpose of
correcting design or manufacturing errors, no payment will be made, nor
will the time spent at the site while correcting such errors apply coward
the days of service or round trips specified for Items (a), (b), (c),
and (f) above
When additional field service representative's time is required by the
Owner under Stem (e) above, the per diem rates for service time plus the
rate for each round trip will be paid in accordance with applicable ad-
Justment prices for manufacturer's technical services as stated in the
Proposal, unless covered by the Training Program
[DENTON 10566 TURBINE GEN 62 0200]
022786 ]
lA 4 WORK NOT INCLUDED UNDER THESE SPECIFICATIONS The following items
of work will be furnished by the Owner
Unloading and field erection of all equipment
Motor controls and starters not otherwise specified to be
furnished under these specifications
Foundations
Grouting materials and the placing thereof
Permanent electric wiring to connect equipment terminal boxes
to the plant electrical system
Lubricants for operation
Solvents and cleaning materials
Operating personnel for startup and tests
lA 5 CONTRACTOR'S SERVICES The services called for in WORK INCLUDED
UNDER THESE SPECIFICATIONS shall be in accordance with the following
lA 5 1 Submittal of Engineering Data Drawings and other engineering
data for the specified equipment and materials are essential to the design
and subsequent construction of the entire project
The Contractor will be required to submit drawings and engineering data
in accordance with the schedule and requirements specified herein to as-
sure compliance with the overall construction and operating schedule
The Contractor shall allow for a reasonable amount of time for mailing,
processing, and Engineer's review o£ drawings and data in his Engineering
Schedule and Procurement/Production/Shipping Schedule
lA 5 2 Manufacturer's Technical Services The Contractor shall furnish
the services of one or more manures technical service representa-
tives The service representatives shall be technically competent, fac-
tory trained, experienced in the installation and operation of the equip-
ment, and authorized by the manufacturer to perform the work stipulated
The Contractor shall also furnish the field services of direct represen-
tatives of the manufacturers of the switchgear, control switchboard, and
auxiliary equipment which has rotating parts, or which may require field
inspection and adjustment to assure proper operation
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
iA-3
lA 6 1 Activity Periods and Dates The time periods and dates listed in
the Schedule of Activities indicate the latest dates by which the listed
activities shall be completed Data, drawings, and lists for planning,
engineering and documentation may be submitted earlier than the indicated
dates at tile Contractor's option
lA 6 2 Engineering Schedule The Contractor shall submit a schedule for
engineering associated with the equipment being provided Such schedules
shall be updated and submitted by the first of each month until comple-
tionloi the engineering effort
lA 6.3 Procurement/Production/Shipping Schedule The Contractor shall
submit a detailed proourement/production~g schedule for the equip-
mentland materials not late~ than the date indicated, thereafter the
schedule shall be updated aa directed by the Engineer or Owner. but at
least every 30 days
lA 6 4 Schedule o_~fActivities
Days After
Activity Award of Contract
Plannin~, Engineering ~ Documentation
Contractor to deliver design
data and par£ormance curves
to Engineer
1 Performance curves and data
as specified in Article 2A 6 60
2 Turbine generator shaft
critical speed calculations 150
3 Final list of cooling and seal
water requirements including
flow and pressure drop 60
& Complete listing of all
accessory equipment
with instrument ranges
and reco-~.ended contact
set points 120
5 All control devices and/
or process set points,
ranges, and flow quanti-
ties 120
[DENTON 10566 TURBINE CEN 62 0200]
[ O22786 ]
lA-6
The per diem rates shall include all costs associated with the service
representative's work at the site, including local travel, local travel
time wages, and living expenses The round trip rate shall include all
expenses tot travel to and from the manufacturer's facilities and the
Owner's sits, including any salary costs for travel time The Owner will
not reimburse Contractor for air fare costs exceeding tourist class air
fare unless unusual circumstances exist The Contractor shall notify the
Owner of such circumstances
A day of service (per diem) is defined as 8 man-hours at the site The
total number of days of service shall be defined as the total regular
time man-hours at the site divided by eight
lA 5 3 Design Conference The Contractor's design engineer shall attend
a design conference at a time and place prescribed by the Engineer or
Owner to discuss matters relative to the execution of this Contract The
Contractor's design engineer shall attend additional design conferences
as required by the Engineer or Owner thereafter to expedite the work
lA 5 4 Instruction Manuals Instruction manuals shall be furnished in
accordance with the requirements stated in Section 1C of these specifi-
cations and as scheduled herein
IA 5 5 Recommended ~are Parts The bidder shell provide, in his
proposal, a listing of recommended spare parts with unit prices fob
Denton, Texas A complete listing of spars parts shall he provided not
later than the date listed in the Schedule of Activities The complete
listing shall include recommended quantities to be stocked, shall clas-
sify the rslative criticality cf parts based on the manufacturer's ex-
perience, and shall list the lead time required for manufacture and
delivery of each part Original equipment manufacturers' (OB}~) names and
part numbers shall be included in the listing
The Owner shall retain the option of purchasing any one or any combina-
tion of spare parts listed at the prices quoted until 6 months after the
date of commercial operation
lA 6 SCHEDULE The time of completion of the work is a basic considera-
tion of the contract This shall include the completion of various ac-
tivities in accordance with the milestone time periods and dates listed
in addition to the timely delivery of the equipment and materials
The Schedule of Activities included at the and of this article stipulates
the milestone time periods and dates for the work included in this Con-
tract It is necessary that the Contractor perform the activities shown
on or before the dates indicated to avoid delay of the entire project
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
iA-5
Days After
Activity - Award of Contract
Preliminary Certified
6 Switchgear and neutral ground-
ing cubicle outline drawing
showing equipment layout 60 90
7 Control switchboard outline
drawing showing equipment
layout 120 150
8 Excitation cubicle draw-
ings showing overall
dimensions and the loca-
tion and size of instru-
ments mounted in the
cubicle 90 150
9 Drawing and catalog data
on strainers, pumps, valves,
motors, instruments, and
other auxiliary equipment 90 210
l0 Lube oil diagrams 60 120
11 Controller fluid diagrams 60 120
12 Seal water diagrams 60 120
13 Cooling water diagrams 60 120
14 Turbine bypass valve, speed
increaser, controller, and
generator foundation design
data including equipment
loads 60 90
15 Details of foundation bolts,
pla:as, ~acks, grout plugs,
and piezometer taps 90 120
16 Cross section through
the turbine showing
details of design and
design clearances insofar
as practicable 90 150
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
lA-8
A ~ays After
Activity ward of Contract
6 Generator neutral ground-
ing equipment design cai-
eulations 90
Contractor to participate in
design conference 30
Contractor to deliver schedule
of engineering to the Engineer 30
Contractor to deliver drawings
to Engineer
Preliminar~ Certified
1 Turbine water passage
neat lines 30 90
2 General arrangement
plan and elevation
of turbine, speed in-
controller, and bypass
valve equipment and
ment, indicating
access, with outline
dimensions and criti-
cal elevations 30 90
3 Outline drawings of tur-
bine speed increaser, gen-
erator, and bypass valve
showing all connections 45 90
4 Controller hydraulic unit
showing overall dimensions
and the location and size
of instruments mounted on
the control panels 60 120
5 General arrangement plan
and elevation of excitation
equipment showing outline
dimensions of equipment and
arrangement 45 90
[DENTON 10566 TURBINE GEN 62 0200]
022786 ]
lA-7
Days After
Activity Award of Contract
Preliminary Certified
34 Storage instructions 180 210
35 Startup and commissioning
details and procedures 150 180
36 Erection drawings and manual,
including breakdown for
shipment 210 300
Days After
Activity Award of Contract
Contractor to deliver
completed Motor Information
Sheets to Engineer 90
Contractor to deliver initial
detailed procurement/production/
shipping schedule to Engineer
and Owner 30
Contractor to submit controlled
copy of Quality Assurance Manual 30
Contractor to submit shop inspec-
tion plan 60
Dates
Contractor to deliver
* "Proof Copy" of Instruc- July 18, 1988
tion Manuals to Engineer ~/~7~
Contractor to deliver
15 copies of accepted
Instruction Manuals as October 17, 1988
directed by the Engineer i~l/if7~ -
contractor to deliver complete
recommended spare parts list March 20, 1989
to owner
*Negotiated Revision
[DENTON 10566 TURBINE GEN 62 0200]
[ 111987 ]
lA-10
Days After
Activity Award of Contract
Preliminary Certified
17 Runner throat ring details 120 180
18 Runner details 120 180
19 Gate and runner servomotor
details 120 180
20 ~lcket gate details 120 180
21 Turbine main sha[t details 120 180
22 Gate operating mechanism
details 120 180
23 Guide bearing details 90 150
24 Thrust and guide bearing
with support details 90 150
25 Shaft seal details 90 150
26 Detailed pipe routing
drawings 90 2~0
27 Auxiliary equipment block
diagrams and panel layouts 90 120
28 Controller block diagram 30 90
29 Detail description of start-
stop sequences 90 120
30 Speed sensing device details 90 120
31 Electrical schematic
diagr~ 90 120
32 Electrical wiring inter-
connection diagrams 90 120
33 Electrical wiring internal
connection diagrams 150 210
[DE~TON 10566 I~JRBINE GEN 62 0200]
[ 031387 ]
IA-9
identified by printing on conductor identification sleeves A covductor
ide~tlfication sleeve shall he provided on each end of each internal con-
duc=or Each sleeve shall he marked with the opposite end destination
identification described in Section lC under WlRINC DIAGRAMS Conductor
identification sleeves shall he no= less than 1/2 inch ions and shall be
as ~anufactured by the Dura Mark Company, Port Washington, New York or
accgp=ahle equal Conductor identification shall be printed on the
sleeve with a Thomas & Be=ts Company Catalog No %rf163M-1 marking pen,
Panduit Corp Part No PX marking pen, or acceptable equal After in-
scription of =he conductor identification, the marking sleeve shall be
co~tad with clear acrylic spray coating, Krylon No 1303 as manufactured
by Borden, In= , or acceptable equal Conductor identification shall be
permanent, unaffected by heat, solvents, or steam, and no= easily dis-
!odsed Adhesive labels are not acceptable
The arrangement of connections on terminal blocks shall be acceptable to
the Engineer
Ill connections requiring disconnect plug and receptacle type devices
shall be provided with factory terminated conductors on each plug and
receptacle Plugs and receptacles shall he factory wired into Junction
boxes containing terminal blocks for external connections All conduc-
tors on the disconnect portion of plug-receptacle assemblies shall be in
a co~on Jacket
All temporary wiring installed in =he factory for equipment testing shall
be removed prior to shipment of =he equipment
lb 36 PIN AND SOCKET CONNECTORS Pin and socket connectors shall have
threaded couplings and crimp type con,acts and shall meet Military Speci-
fication MIL-C-5015 except for pin and socket plating Pin and socket
plating shall be a minimum of 0 000050 inch of gold over 0 000050 inch of
nickel Connectors shall be manufactured by Amphenol, Cannon, Pyle-
Na~ional, or acceptable equal If the Contractor is unable Co furnish
connectors as specified, he shall submit a sample of =he connector he
proposes to furnish accompanied by complete manufacturer's specification
data with the request for Owner acceptance
lb 37 TERMINAL BLOCKS Terminal blocks shall be furnished with white
marking strips and, where permitted by =he safety codes and standards,
shall be withou~ covers Spare unused terminals shall he furnished on
each terminal block for circuit modifications and for termination of
conductors in a multi-conductor control cable Not less than two spare
unused terminals shall bs furnished for every i0 terminals used
Fuses shall no= be mounted on terminal blocks Neither step type =ermi-
ne1 blocks nor angle mounting of terminal blocks will be acceptable
[DENTON 10566 TURBINE GEN 62 02003
[ 031387 ]
lB-19
All terminal blocky, except internal terminal blocks in factory prewired
electronic systems cabinets and terminal blocks for thermocouple exten-
sion wire, shall be rated 600 volts minimum and shall have strap screw
terminals Terminal blocks for 10 AWG and smaller 600 volt insulated
conductors shall be Marathon 1500 Series or acceptable equal Terminal
blocks for thermocouple extension wire shall be Buchanan Medium Duty with
thermocouple contacts, or Marathon 200 Series with Omega Engineering
Type TL terminal lugs for terminal blocks, or acceptable equal Terminal
blocks shall be appropriately sized for larger wire size as necessary
lB 38 FUSE BLOCKS Where fuse blocks rated 30 amperes, 250 volts are
required, they shall be modular type with bakelite frame and reinforced
retaining clips Blocks shall be Class H, 2-pole, Model No H25030-2SR
screw terminal fuse blocks as manufactured by Underwriters Safety Device
Co , 7300 West Wilson Avenue, Chicago, Illinois 60656 or acceptable
equal Blocks for other current and voltage ratings shall be similar in
construction and by the same manufacturer
lB 39 FUSES Where slow blow fuses are required for protection of
equipment, they shall be hussmann Type MI)L, or acceptable equal, with
ampere ratings of 1/4, 1/2, 1, or 2 Where fast acting fuses are
required for protection of equipment they shall be Bussmann Type NON, or
acceptable equal, with ampere ratings of 1, 3, 6, 10, 15, 20, or 30
lB 40 ELECTRICAL ACCESSORY DEVICES Electrical accessory devices shall
be furnished in accordance with the requirements stated herein unless
otherwise specified in the detailed specification sections
lB 40 i Electrical Instruments All indicating instruments for electri-
cal quantities shall be of the switchboard type with 1 percent accuracy
classification, shall be designed for flush mounting, and shall be ap-
proximately 4 inches square All analog instrument scales shall consist
of black markings on a white background Any instrument which is checked
in the field and found to be inaccurate in excess of 2 percent will be
returned to the Contractor for calibration or replacement without cost to
the Owner All ac instruments shall be designed for operation through
5 ampere current transformer secondaries and 120 volt potential trans-
former secondaries Analog instruments shall be General Electric (Yoka-
gawa) Type AB-40, Westinghouse Type 241, or acceptable equal Digital
instruments shall be Yokagawa ~eries 2350 or acceptable equal
iB 40 2 Control Relays General service auxiliary relays shall he Gould
Incorporated Type Jl-~, JllA, J13P, or acceptable equal Where current
carrying requirements exceed the capacity of the general service auxil-
iary relays, auxiliary relays shall be General Electric Type HFA or HGA,
Westinghouse Type MG-6, or acceptable equal
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
1B-20
All spars contacts on ail slectrical dsvices .xcept control switches and
lockout relays shall be wired out to accsssibls terminal blocks for
cure sxtsrnal corm.trion One spare normally open and one spare normally
closed contact on each control switch and lockout relay shall be wired
out to terminal blocks
All wiring 1saving an enclosure shall leave from terminal blocks and not
from other devices in the enclosure
Auxiliar7 equipment such ao terminal blocks, auxiliary relays, or contac-
tots shall he readily accessible Auxiliary equipment shall be located
in compartments, enclosures, or Junction boxes in such arrangement that a
serviceman will have direct access to the equipment without removal of
barriers, cover plates, or wiring
Terminal blocks for external connections shall be grouped in the instru-
ment and control compartment for easy accessibility unrestricted by in-
terference from structural members and instruments Sufficient space
shall be provided on each side of each terminal block to allow an orderly
arrangement of all leads to be terminated on the block Arrangement of
circuits on terminal blocks shall be such that ali connections for one
circuit plus any spare conductors shall be on adjacent terminals
Terminal blocks shall not he mounted in compartments containing cables or
buses operating at voltages above 600 volts
A shorting type terminal block shall be installed at an accessible loca-
tion for each set of current transformers supplied with the equipment
furnished under these specifications Tbs shorting terminal block shall
be the one nearest the current transformers No other shorting type ter-
minal blocks are required unless specified otherwise
Ail electrical cables shall be conservatively selected for the electrical
and environmental conditions of the installations and shall be of the
bast construction for the service where unusual service conditions are
encountersd Oil-resistant and proper temperature application cable
shall be used throughout Except where required to be otherwise to per-
form satisfactorily in the service, all electrical conductor shall be
Class B, stranded copper, 14 AWG or larger MI cable is not acceptable
Control panel and cabinet wiring shall be stranded copper conductor with
flame retardant cross-linked polyethylene insulation rated 600 volts and
shall meet the requirements of UL &4 for Type SIS The insulation shall
also meat the requirements of ICEA S-66-§24, Paragraph 7 8 3 1, and shall
be Rockbestoa Firewall SIS, General Electric Vulkene Type SIS, SI
No 57275, or acceptable equal
[DENTON 10566 TURBINE GFN 62 0200]
[ 031387 ]
1B-IT
General service power and control cables, integral to the equipment fur-
nished but not internal wiring of control cabinets or panels, shall be
rated for the maximum service voltage but not less than 600 volts Power
conductors and single conductor control cables shall have ethylene pro-
pvlene rubber insulation with a neoprene conductor Jacket, and multi-
conductor control cables shall have flame resistant cross-linked poly-
ethylene conductor insulation and an overall neoprene Jacket or acceptable
equal insulation systems, except NFC Type SF-2 silicone rubber insulated
cable with braided glass Jacket shall be used where ambient conditions
cause conductor operating temperatures to exceed the temperature ratings
of the general service cable insulation fur~ished
All thermocouple wire shall be solid conductor with twisted and shielded
conductor pairs Insulation shall be color coded in accordance with the
requirements of ANSI MC96 1 These requirements also apply to thermo-
couple extension wire which is furnished internal to Contractor-furnished
equipment The shield wire for each thsrmocouple furnished for external
connections shall be terminated on an ungrounded terminal
Control conductor terminal connectors shall be compression type connec-
tors properly sized for the conductor and the terminal The connectors
shall be constructed of copper and shall be tin plated The interior
surface of the connector wire barrel shall be serrated, and the exterior
surface of the connector wire barrel shall be furnished with crimp
~uides
Nonineulated terminal connectors are acceptable for conductors terminated
on devices equipped with individual fitted covers, such as General Elec-
tric Type SB-1 control switches and General Electric Typi HEA lockout re-
lays Preinsulatsd ring type terminal connectors shall be used on ali
current and potential transformer circuits All other terminal connec-
tors for conductors smaller than 8 AWG shall be pretnsulated ring type or
preinsulated spade type
Preinsulated terminal connectors shall include a vinyl sleeve, color
coded to indicate conductor size
Ring type connectors shall be manufactured by AMP, 3M, or acceptable
equal Spade type connectors shall be AM~ slotted spring spade or
3M Scotchlok Series 61 snap spade terminal connectors
Connectors for thermocouple extension wire shall be Omega Engineering
Inc Type SL, or acceptable equal
Each terminal block, terminal, conductor, relay, breaker, fuse block, and
other auxiliary device shall be permanently labeled to coincide with the
identification indicated on the drawings All terminals provided for
termination of external circuits shall be identified by inscribing cir-
cuit designations acceptable to the Engineer on the terminal block mark-
ing strips with black paint Ail other wiring terminations shall be
[DENTON 10566 TURBINE GEN 62 02001
[ 031387
lB-18
Insulated bushings with &nsulattng inserts in metal housings shall be
provided on all conduit not terminated in hubs and couplings Grounding
type bushings shall be provided on all conduit containing power circuitq
and on all conduit on equipment to be located iq hazardous areas Stand-
ard bushings shall be galvanized
All conduit shall be installed in exposed rune parallel or perpendicular
to dominant surfaces with right angle turns made of elnmnetrical bends or
fittings I run of conduit shall not contain more than the equivalent of
four quarter bends, including those i~mediately at outlets and fittings
Bends in conduit shall be made vithout reducing the internal diameter of
the conduit
All conduit runs shall be rigidly supported Each conduit shall be sup-
ported within I foot of Junction boxes and fittings Support spacing
along conduit runs shall be as follows
Conduit Size Maximum Distance Between Supports
1/2 inch through 1-1/4 inch 5 feet
1-1/2 inch and larger 10 feet
Conduit shall be supported by means of conduit clamps and clamp-backs
Moisture pockets shall be eliminated from conduits If water ca,not
drain to the natural opening in the conduit system, a hole shall be
drilled in the bottom of a pull box or a "C-type" conduit fitting pro-
vided in the low point of the conduit run
Conduit shall be securely fastened to all boxes and cabinets Threads on
metallic conduit shall project through the wall of the box to allow the
bushin$ to butt against the end of the conduit The locknuts both inside
and outside shall then be tightened sufficiently to bond the conduit se-
curely to the box
The raceway system provided for all interconnecting wiring shall be ac-
ceptable to the Engineer
IB 34 ELECTRICAL ENCLOSURES Unless indicated otherwise in these speci-
fications, electrical enclosures, except Junction boxes and pull boxes
4 inch trade size and smaller, shall be as follows
Location Enclosure Type
Indoor
Dry areas NEMA 12
[DENTON 10566 TI~BINE GEN 62 0200]
[ 031387 ]
lB-15
L~cation Enclosure T~pa
Areas where moisture
conditions are more
severe than those for
which NEMA 12 enclo-
sures are intended NEMA 4
Electrical enclosures, e¥cspt those of cast metal, shall be constructed
from steel plate reinforced as required to provide true surface and ade-
quate support for devices mounted thereon Thickness of the steel plate
shall conform to the requirements of UL Enclosures shall be of adequate
strength to support mounted components during shipment and to support a
concentrated load of 200 pounds on their top after erection
Free-standing enclosures shall be 90 inches high, not more than 20 feet
wide, and not more than 36 inches deep
All Junction boxe~ or pull boxes 4 inch trade size or smaller in any di-
mension shall be galvanized malleable iron or acceptable equal cast fer-
rous metal
Junction boxes and pull boxes shall be in accordance with the require-
ments of NEC, Article 370, Paragraphs 18, 19, 20, and 21 and shall be
without knockouts
Except as indicated otherwise in these specifications or on the drawings,
all Junction boxes and pull boxes larger than 4 inch trade size in all
dimensions for usa in indoor locations shall be sheet steal hot-dip gal-
vanized after fabrication and those for usa in outdoor or damp locations
shall be galvanized malleable iron or acceptable equal cast ferrous
metal, sheet steel hot-dip galvanized after fahricatlon, or sheet steel
epoxy coated inside and outside after fabrication The epoxy coating
shall consist of a 2 to 3 mil base coat of Z R C as manufactured by ZRC
Chemical Products Company, followed by two finish coats of epoxy Each
finish coat shall be a minimum of 2 mile thick
lB 35 WIRING In general, all devices furnished under these specifica-
tions and requiring electrical connections shall be designed for wiring
into electrical enclosures with terminal blocks Terminal blocks shall
be furnished for conductors requiring connection to circuits external to
the specified equipment, for internal circuits crossing shipping splits,
and where equipment parts replacement and maintenance will be facili-
tated
Splices will not be permitted in control wiring or instrument leads
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
lB-16
Thermocouples shall he single element, stainless steel sheathed, com-
pacted magnesium oxide insulated type, with ungrounded measuring Junc-
tions Thermocouples and extension wire shell meet the standard limits
of error specified in ANSI MC96 1
Temperature detectors shall be ISA Type T (copper-constantan) tbermocou-
plea with Type TX extension wire
Resistance temperature detectors for fluid system temperature measure-
ments shall be 100 ohm platinum, metal sheathed, ceramic packed, un-
Srpunded resistance temperature detectors
Temperature detectors for motor winding temperatures shall be as speci-
fipd in Section 1D
lB.30 10 Thermowella Fluid system temperature sensors shall be
equipped with thermowella Thermowells shall be one-piece solid bored
Type 316 stainless steel of stepless tapered design Maximum bored in-
ternal diameter shall be 0 387 inch The design of thermowells shall be
certified acceptable for the max/mum conditions of temperature, pressure,
and fluid velocity by methods described in ASME Performance Test
Code 19 3-1974, Chapter 1, Parasraphs 8 through 19 The acceptability of
each well shall be demonstrated to the Engineer
Thermowells aha11 be threaded and constructed to allow seal welding after
installation Thread sizes shall be as follows
Air duct wells 1 inch NPT
All others 3/4 inch NPT
Thermowell insertion length shall be as determined by the manufacturer,
un, ess otherwise specified in the Technical Requirements Thermowell
outside diameter at the beginning of the taper shall he approximately the
same as the root diameter of the threads Each thermowe11 shall be fur-
niched with a stainless steel extension nipple of the length determined
by the manufacturer, unless otherwise specified in the Technical Require-
merits
lB 31 CONTRO~ POldeR Electrical power for control and instrumentation
w~ll be a nominal 120 volt, single-phase, 60 hertz, alternating current,
or a nominal 42 volt direct current The Contractor shall provide any
devices required for proper operation and protection of the equipment
durin8 electrical power supply and ambient temperature fluctuations de-
scribed in the following paragraphs
A%l dc electrical control devices shall be designed for continuous opera-
C~on on an ungrounded station battery at any voltage from 34 to 48 volts
dc Electrical devices served from this supply shall not impose any
ground connections on it
[DENTON 10566 TURBINE GEN 62 02001
[ 031387 ]
lB-13
Ail ac electrical control devices shall, unless otherwise specified, be
designed for continuous operation at any voltage from 102 to 132 volts
alternating current The dropout voltage shall be lees than 75 volts for
relays and 90 volts for contactors and starters Alternating current
electrical control devices operating at nominal voltages other than I20
volts shall be designed for continuous operation over proportional volt-
age variations
All devices shall be guaranteed to operate satisfactorily under voltage
conditions specified in the above paragraphs and at a range of ambient
temperatures from 50 C to -30 C outdoors and from 50 C to 0 C indoors
lB 32 AUXILIARY POWER Auxiliary equipment, such as motors, transform-
ers, and rectifiers, requiring electrical power shall be designed to
operate from one of the nominal electrical power sources as follows
Volts Phase Hertz
480 3 60
120 1 60
42 dc -- (Emergency)
Alternating curren~ motor voltage ratings with relation to horsepower
shall be in accordance with the following
Horsepower Volts Phase
Below 3/4 115 1
3/4 thru 250 460 3
Emergency motors shall be designed to operate from a nominal 42 volt dc
supply Direct current motors shall be capable of continuous operation
at any terminal voltage from 34 to 48 volts dc
Variations from motor design voltages specified must be acceptable to the
Engineer
lB 33 RACEWAY Unless specified otherwise, all raceway interconnections
between devices, panels, boxes, and fittings shall conform to ANSI C80 1
and UL 6 All conduit connections shall be of the threaded type Unless
specified otherwise, all conduit shall be hot-dip galvanized rigid steel
Ail conduit entering outdoor enclosures shall enter through Efcor "Water-
Tire" malleable iron hubs or threaded openings
One exterior locknut and one interior locknut and one bushing shall be
provided at the termination of each conduit not terminated in a hub
Locknuts shall be designed to securely bond the conduit to the box or
cabinet when tightened Locknuts shall be so constructed that they will
not be loosened by vibration
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
lB-14
National Acme Company "Snaplock" Series EA-170-14100
(D2400X-ST) Switches shall have not less than two normally
open and two normally closed contacts
lB 30 2 Pressure Switches Pressure switches shall be selected as fol-
lows
General static pressure switches or differential pressure
switches for normal static pressure shall be Static "O"
Ring
Low differential pressure switches for low static pressure
ranges shall be manufactured by Dwyer Instruments, Inc
Low differential pressure switches for high static pressure
and applications requiring both indication and pressure
switch contacts shall be implemented with equipment manufac-
tured by ITT Barton, Process Instruments, Inc regardless of
the range
The acceptability of each pressure switch with respect to range, over-
pressure capability, repeatability, and deadband shall be demonstrated to
the Engineer
18030 3 T~mperaturs Switches Temperature switches shall be Allen-
Bradley Bulletin 837 with NEMA 4 enclosures Special length armored
capillary tubes shall be furnished where required Thermowells shall be
furnished ss required and shall be as specified in this Section 18 under
the article entitled Thermowells The acceptability of each temperature
switch with respect to range, repeatability, end deedband shall be demon-
stratsd to the Engineer
IB~30 4 Lave1 Switches Level switches shall be Magnetrol having float
and body construction appropriate to the service conditions of the sys-
tems to which they are connected Sw~tch elements shall be of the vibra-
tion resistant mercury bottle type magnetically coupled to the float
Two switch elements shall be available at each level point monitored
Eagh switch element shall be reversible for NC or NO operation or shall
beldouble-throw construction Switch housings shall be splashproof con-
struction, unless otherwise specified
lB 30 5 Solenoid Valves Solenoid valves shall be manufactured by Auto-
matic Switch Company Valves shall be selected to incorporate body con-
strnction, trim materials, and internal arrangements suitable to the
application and shall be acceptable to the Engineer Solenoid enclosures
shall be NEHA & unless othervise specified Solenoid coils shall be
Class H high temperature construction and shall be suitable for continu-
ous duty
[DENTON 10566 TURBINE GEN 62 0200]
[ 030885 ]
IB-11
lB 30 6 Valve Manifolds Each pressure switch and pressure gauge shall
be furnished with a manifold to provide shutoff ~nd calibration capabili-
ties Instrument* with one process connection shall be fitted with a two
valve manifold Instruments with two process connections shall be fitted
with a three valve manifold Valve manifolds shall be as specified be-
low
Two valve manifold Anderson, Greenwood & Company
assembly PTTMIiS, 316 stainless
steel body and trim, 1/2 inch
connections
Three valve manifold Anderson, Greenwood & Company
assembly MIHS, 316 stainless
steel body and trim, 1/2 inch
process and instrument connec-
tions, i/~ inch test ports
lB 30 7 Pressure Gau~es Gauges shall he 4-1/2 inch Aehcroft "Dura-
gauge" Dials shall be engraved with service legends, or separate name-
plates of engraved laminated phenolic shall be attached to the gauge
faces to identify the service Legends shall be as directed by the Engi-
neer Ail gauges shall have stainless steel movements and nylon bear-
ings Gauges for panel mounting shall be Type 1377 Gauges for separate
mountings shall he T3~e 1379 with I/2 inch NPT bottom connections Each
gauge except control air gauges shall be furnished with an Ashcroft
Type 1106S pulsation dampening valve of the same material as the Bourdon
tube
lB 30 8 Thermometers Thermometers for local mounting shall be Ashcroft
'~uratemp" 60OB, 4-i/2 inch dial "Every Angle" gas actuated thermometers
Thermometers for panel mounting shall be Ashcroft 4-1/2 inch dial 600A
gas actuated with Type 1377 case and stainless steel armored capillary
tubing of length required for the installation The dials shall be en-
graved with service legends, or separate nameplates of engraved laminated
phenolic shall be furnished attached to the dial faces to identify the
service Legends shall be as directed by the Engineer Thermowells
shall be furnished for all thermometers and shall be as specified in this
Section lB under the article entitled Thermowells
lB 30 9 Temperature Detectors Temperature detectors shall be thermo-
couples or resistance temperature detectors as required by the following
paragraphs and the detailed specifications
Temperature detectors equipped with thermowells shall be spring-loaded
and shall be furnished as complete assemblies, each including a well,
nipple, and weatherproof connection head Thermowells shall be as speci-
fied in this Section lB under the article entitled Thermowells
[DENTON 10566 TURBINE CEN 62 0200]
[ 030885 ]
1B-12
shafts by press fits and keys Couplings shall be of the all metal lu-
bricated gear flexible type, Koppers "Fast" or acceptable equal
Shaft couplings shall be sized to transmit the maximum brake horsepower
requirements of the driven equipment with a service factor o* not less
than 2
lB 27 EQUIPMENT BASES A cast iron or welded steel baseplate shall be
provided for all rotating equipment which is to be installed on a con-
crete base Each baseplate shall support the unit and its drive assembly
and shall be of a neat design with pads for anchoring the units Base-
plates for equipment subject to water or oil leakage shall be provided
with a raised lip all around and shall have a threaded drain connection
IB.28 PIPING Ail piping shall be in accordance with ANSI B31 1 - Power
Piping The following minimum requirements shall apply
Ail piping other than AST~ Al06 Grade B steel
control and instrument 2-1/2 inches and larger shall
piping be Schedule 40 minimum
2 inches and smaller shall
be Schedule 80 minimum
Fittings
2-1/2 inches and larger Butt weld type
2 inches and smaller Forged steel socket weld type
Valves
2-1/2 inches and larger Carbon steel, Class 150 mini-
mum, butt weld ends
2 inches and smaller Carbon steel. Class 600 mini-
mum, socket weld ends
Joints shall be provided as required to facilitate assembly or disassem-
bly of equipment The Joints shall be forged steel unions with hardened
and ground stainless steel seats for piping 2 inches and smaller and
shall be flanged Joints for piping 2-1/2 inches and larger
lB 28 1 Instrument Piping Instrument piping shall be in accordance
with ANSI B31 1, and shall be 1/2 inch outside diameter stainless steel,
ASTM A213 TP316N
Fittings for tubing smaller than 1 inch shall be flareless bite type,
Swagelok or acceptable equal, brass for copper tubing, and stainless
steel for stainless steel tubing Tubing supports shall be furnished to
[DENTON 10566 TURBINE GEN 62 0200]
[ 030885 ]
lB-9
minimize vibration, and shall be copper or copper plated steel Tubing
Bends shall be made without reducing the internal diameter of the tub~
All tubing shall be blown clean with dry compressed air after routing but
prior to attachment to devices at either end
Piping within instrument enclosures shall be arranged to allow any devdce
to be ~erviced, disconnected, or removed from the enclosure without dis-
connecting piping to other devices Tubing for external connections
shall be terminated on bulkhead fittings in the bulkhead plate The Con-
tractor shall furnish 20 percent spare fittings on the bulkhead plate for
external connections
Each tubing termination shall be identified by a metal tag stamped with
the identification number furnished by the Engineer for the connected
device
In instrument enclosures, deflection plates of not less than 13 USS gauge
sheet steel shall he furnished above electrical devices and wiring lo-
cated under piping or instruments which contain liquid or which are cali-
brated or tested with liquid
Piping schematic, connection, and interconnection diagrams shall be sub-
mitted to the Engineer for acceptance
lB 29 EQUIPMENT COOLING WATER Plant cooling water will be taken from
the penstock, upstream of the guide vanes Design water temperature
shall be 90 F A complete listing of all equipment requiring cooling
water shall be submitted, including flows and pressure drops Equipment
utilizing cooling water shall have design pressure of 75 psig minimum
Cooling water pressure drop across any equipment shall not exceed 8 psi
lB 30 INSTRUMENTATION Instrumentation components furnished with the
equipment shall be in accordance with the following articles and shall be
constructed to withstand the temperatures encountered in the actual serv-
ice
lB 30 1 Limit Switches Limit switches, except those integrally mounted
on motor operated valves, shall be selected from the following alter-
nates
National Acme Company "Snaplock" Series EA-700-20000 (gL 3)
Switches shall have not less than two normally open and two
normally closed contacts
National Acme Company "Snaplock" Series EA-700-30000 (gL 4)
Switches shall have not less than three normally open and
three normally closed contacts
[DENTON 10566 TURBINE GEN 62 0200]
[ 031385
lB-10
shall be caped co seal aha interior o[ aha equipment Open ends of pip-
in~ cubing, and conduit shall ba sealed and caped
Returnable conCainars and special shippin$ devices shall be returned by
the manu£ac~urar's field representative at the Contractor's expense
[B ~19 TOOLS The Contractor shall furnish and ship with each piece of
equipment o~a set of all special cools required for dismantling and main-
cenance of aha equipment The cools shall be shipped in separate heavily
codeC~ucced wooden boxes provided with hinged covers and padlock hasps
Maintenance cools for each piece of equipment shall be boxed separately
and the boxes shall be ~arked with the large painted legend as follows
CIT~ OF DENTOn, TZXAS
LL~ISVILLE HYDROELECTRIC PROJECT
~AINT~qOE TOOLS FOR (~ome of Etuip~enC)
ERECTIO~ CONTRACTOR ~0 MOT OPE~ ~CEPT~FITR O~I~EI~'S
A veacherproofed i~euiaed linc of the contents shall also be attached cc
the outside of each box
The u~in~enanca cools shall include all special handling ri$8, bars,
elin~s, and cable A~lmainCenanca Cools shall be ~n nav and unused con-
diCiou and sh~l become she properC~ of the Ovner The bidder's proposal
shall include the lisa of ~aincenance cools which shall be furnished with
aha equtMaenC
In addition co aha cools for maintenance and dismanclin$, the Contractor
shall ~u~uieh the usa of all special cools required for erection of the
eq~ipmeng Erection cools shall remain aha property of aha Contractor
and all shippin$ costs co and from the Jobsite shall be ac aha Contrac-
tor's expense Erection cools for each piece of equipment shall be boxed
separately Erection cools shall hoc be boxed with maintenance cools
lB 20 ALIGIA~NT A~D BALANCE All rotating paros shall be true and
helically balanced Excessive noise or vibration, in the opinion of
Owner, will be su~ficienC cause for rejection of the equipment All ro-
cacin$ equip~enC shall be balanced at the factory
i~l rotating equipment, except electric motors, shall be factory balanced
Co a level such thac vibration displacement in mils peak-Co-peak is
mdre ch~ indicated under "~OOD" on IRD Mechana~yale, Ina Curve 305D,
"~eneral Hachinez~y Vibration Severity Chart," or as required for relia-
bility and lonseviCy, whichever requirement, as determined by the Engi-
neer, is the more acrinsenC Electric motors shall be balanced by the
manufacturer in accordance with NE}fA standards
10566 'I'UII.BII~ GEN 62 02001
03088S
lB-7
lB 21 NOISE LEVEL The equivalent "A" weighted sound level, measured at
5 feet elevation above floor level and 3 feet horizontally from the base
of any of the equipment furnished under these specifications, expressed
in decibels to a reference of 0 0002 microbar, shall not exceed 85 dBA
lB 22 DESIGN COORDINATION The Contractor shall he responsible for the
selection and design of all equxpment and materials which will provide
the best coordinated performance of the entire system Components of
rotating equipment shall be selected so that the natural frequency of the
complete unit is nsc at or critically near the operating range of the
uniC Where actual design characteristics of proposed components vary
from those quoted in the Proposal or specified, the Contractor shall take
Chase into account in the establishment of design criteria for related
co~ponencs
lB 23 LUBRICATION Equipment shall be lubricated by s2sCems designed
for continuous operation Lubrication systems shall hoc waste lubricants
and shall not require attention during startup and shutdown, or routine
inspection more frequently than once weakly
Oil lubricant level indicators shall be furnished and marked co indicate
proper levels under both standstill and operating conditions
lB 24 ENCLOSED ~,EAR DRIVE UNITS Enclosed gear drive unica furnished as
a part o~' the equipment specified shall be designed for continuous serv-
ice and shall be in accordance ~ith the latest AGMA standards for the
type of gear drive being furnished
Each gear drive unit shall be capable of withstanding the motor torques
developed during scare, acceleration, and deceleration if stalled
lB 2~ SAFETY GUARDS Guards shall he provided for protection of person-
nel from all exposed moving and/or rotating machine elements
Each guard shall be fabricated from ASTM A36 steel plate having a minimum
thickness of 3/16 inch and designed for easy installation and removal
Necessary supports and accessories shall be furnished with each guard
IB 25 i Horizontal Shaft E~uipmenc Safety Suarda for horizontal
ah&fca, shaft couplings, belt sheaves, eec , shall be of the inverted
"U" desisnwlch sides extending co the equipuenc base or baaeplate
lB 2~ 2 Vertical ~afc Equipment Safety ~uards for vertical shafts,
shaft couplings, etc , shall be of 360 degree consCrncCion with bolted
vertical Joints Hinged sections shall he provided for inspection of
couplings and glands
lB 26 SHAFT COUPLINGS Shaft couplings shall he used between all drives
and driven equipment Couplings shall he attached to driver and driven
[DENTON 10566 TURBINE GEN 62 0200]
[ 030885 ]
lB-8
Exposed surfaces sha~l be finished smooch, choroush~Y cleaned, and filled
as necessary co provide a smooch unifor~ base for
lB 17 1 ~ Shop coacin$ systems for steel equipmsnC and ocher
ferrous neCa~ surfaces shall be as specified on Che £ndfcaced Coacin$
STscsm Dace Sheets, included ac the end of chis section ~here specific
produces ars hoc listed, the coaCinS maCariaZs sha~ meet the criteria
indicated ~hers specific produces ars Zis~ad, coaCin$ macaria~s by
ocher ~anufaccurars ~a7 be acceptable In either case, information
the Proposa~
UuLo88 oche~se 8pec~[~ed, [~n2sh pa~nc co~ors ~1 be selected by the
Coatings sha~ uoc be applied ~hen the surface ce~eracure ~s ~ch~n ~
of the dev point AI~ appl~ca~on procedures 8ha~ be ~n accordance
the coat,nS ~nu[acCurer*s ~2cCeu 2nsC~cC~ons
~e Contractor 8ha~ [uru~sh su[f2c~enC couchup pa~nC ~or repa~r2ns
2~ percent of the area on a~l exterior [acco~ pa2nced surfaces Touchup
pa~nc8 sha2~ be of the s~e c~e8 and co,ors as the ~ac~ory applied
pa~nC8 and 8~1 be carefully packed co avoid d~ase dur~ns 8h~puenC
Co. Lace pa~nC~n~ ~sC~cC~on8 shal~ be [urn~shed
lB 17 1.I Elec~r2cal ~ E~ecCr~cal equ~p~nC, ~nc~ud~ns pane~s,
~cchsear, ~Cor control cancers, crausfo~rs, no,ors, ~d ocher s~m2-
~ar equtpmnC, sh~ be c~eaned, prepared, and coated ~n accordance
Coat,ns Sye~eu DaCe Sheet El
~B 17 I 2 Hec~cal Equ~p~uc Hechn~cal equipment, ~nc~ud~n8 pumps,
confessors, valves, valve operators, d~ers, da~er dr~ves,
sr~nd2ni apparatus, ex~e~a~ p2p~ns surfaces, convey~n8 ~ch~new, and
ocher s~m~ar equ~puen~ sha~ be c~eaned, prepared, and coa~ed ~n accord-
ance w~ch CoaC2n8 System Da~a Sheet El5
No pa~nC 8~ be applied co surfaces w2ch~n 3 ~nches o[ [~eld we2ded
connections
~B 17 1 3 SC~ccura1 Scoe~ and H~scel~aneous HeCa~s Sc~cCura~ s~ee~
~d ~sceLlaneou8 ueca~s ~nc~u~n8 a~l ~ceu ~abr2ca~ed o[ sC~ccura~ and
~sce~eous scee~ such as duc~8, hanser8, supports, and s~lar
cooed 8Cee~ ass~bl~es 8h~ be c~8aned, prepared, and coated ~n accord-
ance w~ch Coating System Dace Sheet Al
No pa~nC 8ha~ be applied Co surfaces w~ch~n 3 ~nches o~ [~e~d we~ded
connections
[DE~TON 10566 TURBINE GEg 62 0200]
[ 022786 ]
lB 17 2 Preservative Coatings Ferrous surfaces which should hOC be
painted and are subject to corrosion shall be coated with rust-preventive
compound, equivalent to Houghton "Rust Veto 3&4" or Rust-Oleum "R-9"
The manufacturer and manufacturer's designation of all preservative coat-
ings proposed to be used shall be submitted to the Engineer for accept-
ance prior to application
Machined surfaces of weld-end preparations shall be coated with consum-
able rust-preventive coating equivalent to "Deo~aluminita" manufactured
by Special Chemicals Corp , or "Bloxide" manufactured by Tempil Division
of Big Three Industries
lB 17 3 Galvanizin~ ~alvanlzing specified in the detailed specifica-
tions shall be in accordance with the folloving requirements
Structural steel members and steel assemblies shall be "pickled" after
all cutting, punching, reaming, drilling, tapping, and ocher fabrication
processes which would damage galvanizing have been completed The pick-
ling shall be done in accordance with the latest accepted practice and
shall continue until all scale, rust, grease, and other impurities have
been completely removed The steel shall then he hot-dip galvanized in
accordance with ASTAiA123
Where either member to be bolted is galvanized and where required by the
detailed specifications, erection and structural bolts shall be galva-
nized in accordance with AETNA153 and the applicable requirements of
A~T~ A325
lB 18 PROTECTION Ail equipment shell be boxed, crated, or otherwise
suitably protected during shipment, handling, and storage Equipment
having antifriction or sleeve bearings shall be protected by weathertight
enclosure8
Coated surfaces shall be protected against impact, abrasion, discolora-
tion, and other damages Surfaces which are damaged shall be repaired
Electrical equipment, controls, and insulations shall be protected
against moisture and water damage Ail external gasket surfaces and
flange faces, couplings, rotating equipment shafts, bearings, and like
items shall be thoroughly cleaned, coated with rust-preventive compound
aa specified above, and protected with suitable wood, metal, or other
substantial type covering to ensure their full protection All exposed
threaded parts shall be greased and protected with metallic or ocher sub-
8Cantial type protectors
All piping, tubing, and conduit connections on equipment and other equip-
ment openings shall be closed with rough usage covers or plugs Female
threaded openings shall be closed with forged steel plugs The closures
[Dmero~ ~0566 ~J~aZ~ ~ 62 02001
lB-6
Earliest Latest
Acceptable Acceptable
Delivery Date Delivery Date
Contractor deliver equipment
to Jobsite
Ail embedded parts, founda-
* tion bolts, and foundation December i, 1988 December 16, 1988
Switchgear channel sills December 1, 1988 December 16, 1988
Remainder of turbine and ~a_nu_arz~,_1989 ~a~uarZ 16, 1989
speed increaser $~/~/f~ - ~/~/~
Synchronous bypass valve January 1, 1989 January 16, 1989
7~7~71~ - 7¢I~7z7/¥~- -
Controller January 1, 1989 January 16, 1989
~R~7z~17~¢~ - ~¢1~7~7/7~¢- -
Generator and excitation ~a~u_arz~6~ 1989 February 1, 1989
Switchgear and neutral February 1~ 1989 February 16, 1989
grounding compartment 7¢I~7I~171~¢~ - I~¢~t717/~¢~¢- -
Control switchboard and all February 1, 1989 February 16, 1989
othsr equipment ~¢Y~7Z~7~¢~ - ~¢~¢;~7~7/7~¢- -
Date
Initial Operation Date April 19, 1989
Commercial Operation Date May 9, 1989
*Negotiated Revision
[DENTON 10566 TURBINE GEN 62 0200]
111987 ]
1A-II
shall provide for cha prevenCion and reedy deCeccion of discrepancies and
for timely and positive corrective action The ConCracCor shall make ob-
JecCive evidence of quality conformance readily available co the Owner
and the En$ineer ZnsCruccions and records for quality assurance shall
be concrolled A copy of che Quality Assurance Manual shall be aubmicced
Co 'the En$ineer
Based on the Quality Assurance Manual and code requiremenCs, cbs Contrac-
tor shall develop a shop inspection plan ~or che work covered under chase
specifications The shop inspection plan shall be submitted co the En-
iB 11 NI~BERI~G S¥STEH The En8ineer will establish an identification
ntuabering eyeCem co provide consistent numbering throughout the senerac-
inS uniC All elecCrical devices, control and instrumentation equipmenC.
valves, and ocher ice.s of similar uaCure shall he permanenCly identified
rich the idencificaCion ntmber supplied by the Engineer ExcepC as spec-
ified ochet~ise in chess specificaCione, che idencificaCion shall be em-
Staved on stainless accel or laminated phenolic cage or nameplates ac the
opCion of, and aa accepCahle co, the Engineer and permanently affixed co
the device The Engineer's identification numbers shall be included on
the manufacCurer's drawings
lB. 12 FACTORY ASSEIfBLY EquipmemC shall be shipped completely factory
assembled, except rhea the physical size, arranse~enc or configuration of
the eguipmanc, or ehippin$ and hamdlin8 li~icaCions ~ake che shipment of
completely assembled equip~enc impracticable, in vhich case che equipment
shall be assembled and shipped aa ecaced in the ConCracCor's proposal
~hen proposals are submicced vichouC eCacemenCe describin$ seccional
shipmentS, iC vill be undereCood chac no field assembly of the equipment
will be required and the ConCracCor shall be responsible for all costs
e~cOunCered in che field for assembly of sections, accessories, or appur-
cenances nsc lieced in the Proposal as requiring field assembly
All separately packaged accessory items and pares shall he shipped with
the equipmenc Containers for separately packaged items shall be marked
so chac chey are idencified rich che main equil~aemc An itemized packing
slip, indica~ing vhaC ia in chaC container only, shall be attached co the
outside of each container used for packaging A similar lisc shall be
inside of each conCainer A maecer packing slip, covering all accessory
iCe~ for a $iven piece of equipment vhich are shipped in separate con-
Cainere, shall be accached co one container
lB 13 CONSOLIDATED SR~P~T$ Except vhece auchorized by the O~mer in
writing, che Oviter will nsc accept direcC shipments of ConcracCor-furnished
materials and equipment from eubconcracCors The Contractor shall assem-
ble shipping unica co~poeed of chose icems of ~acerials and equipment
which he obCaine from eub~oncracCors Shipping uniC assembly shall be aC
one of the ConCracCor'e cegular business addresses Each item shall be
cagged rich ica individual identification used on che dravings for chis
[DE~TON ~0566 TURBi~E GEI~ 62 0200]
[ 022786 ]
lB-3
Contract and shipped as part of a shippinS unit to the construction site
All shipments from the Contractor's shippinS unit assembly location shall
be packaied and identified as indicated in this section The Contractor
shall stats in his proposal the minimum quantity of materials and equip-
mant he will assemble es a shipping unit, his proposed tagging system for
individual items of material and equipment included as part of a shipping
unit, and the assembly location for shipping units
iB 14 PACKAGING AND IDENTIFICATION O__F ~PARE PARTS Spare parts shall be
shipped in heavily constructed wooden boxes The boxes shall be designed
as permanent storaie enclosures Separate boxes shall be used for the
spare parts for each major piece of equipment ~;here applicable, boxes
shall be designed and constructed for return shipment of damasad or worn
components for repair
Spare parts shall be protected from damase due to moisture and dirt ac-
cumulation during an extended storase period by use of special coatings,
airtight membranes, bass of desiccant, or other means acceptable to the
Engineer
Each box shall be marked with the lares painted legend as follows
CITY OF DENTON, TEXAS
LEI~ISVILLE HYDROELECTRIC PROJECT
SPARE PARTS FOR (Name of
ERECTION CONTRACTOR DO NOT OPEN ~XCEPT WITH O~NERVS
PERNISSION
A weatherproofed itemized 1/st of the contents shall be attached to the
outside of each box. A similar list shall be Inside each box
lB 15 ~ECIAL SHIPPING REQUIREHE~TS ~here specified, the manufacturer
shall mount and ship impact recorders on each ratlcar transporting the
specified equipment The impact recorders shall be mounted at the fac-
tory to provide a permanent record of the magnitude of axial, transverse,
and vertical forces to which the equipment will be subjected while in
transit The custody of the impact recorders upon arrival at the plant
sits shall be the responsibility of the manufacturer's field rspresen~a-
tire ~he recorder impact charts shall be delivered to the Owner and
shall become parc of the furnished equipment
lB 16 ~ELDING If the manufacturer has special requirements relacing to
welding procedures for welds at the terminals of the equipment and if
such welding is to be performed under separate specifications, the re-
quirements shall be stated on the manufacturer's drawing of the affected
part
IB 17 S80P COATING All metallic surfaces subject to corrosion shall be
protected by suitable coa~lngs applied in the shop Surfaces which will
be inaccessible after assembly shall be protected for the life of the
equipment The surfaces shall be cleaned, prepared, and coated in the
shop
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
Section ~B - G~ERAL EQUIPHENT SPECIFICATIONS
lB 1 GENERAL These General Equipment Specifications apply in general
to all equipment and materials end are supplementary to the detailed
specifications If requirements specified herein are in conflict with
requirements specified in the detailed specifications, the detailed
specifications shall govern to the extent of such conflict
The Proposal shall be based upon the use of equipment and materials com-
plying fully with the requirements specified in this Section lB It is
recognized chaC the Contractor may have standardized on the use of c~er-
cain components, materials, processes, or procedures different than those
specified herein AlcernaCan in addition to the base proposal on the
basis of supplying the Contractor's standard co~ponents, materials, proc-
eases, or procedures will be considered The alternate proposal shall
clearly stipulate the alternate proposed, the specific exceptions to the
specifications, and the price change applicable fo~ supplyin$ such alter-
lB 2 REFERENCED STAI~DAIU>S Eefe~ence to the standards of an2 technical
society, organization, o~ association, o~ to the laws, ordinances, or
codes of governmental authorities shall mean the latest standard, code,
or specification adopted, published, and effective ac the dace of caking
bids unless specifically stated otherwise in chess specifications
The specificaCions~ codes, and standards referenced in these specifica-
tions (including addemia, a~endmenCs, and errata) shall govern in all
cases whe=e references thereto are made In case of con£1icc between the
re£erenced specifications, codes, or standards and chess specifications,
the lacca= shall govern Co the extent of such difference
iB.3 MATERIALS AND EqUIPMENT Unless specifically provided otherwise in
each case,'all materials and equipment furnished for permanent installa-
tion in the wo~k shall conform to applicable standard specifications and
shall be new, unused, and undamaged
Individual parts shall be manufactured to standard sizes and gauges so
chac repair parts, furnished ac any time, can be installed in the field
Like parts of duplicate unica shall be incerchanseable
lB & IDENTIFICATION All correspondence, shipping notices, specifics-
Clans. engineering dace. and other documents pertaining to the equipment
and materials furnished under these specifications shall be identified by
[DENTON 10566 TIT~INE GEN 62 0200]
[ 030885 ]
the O~mer's name, the project name, the specification number, end the
En$ineer~s project number as
Owner's Name City of Denton, Texas
Project Name Lewisville Hydroelectric ProJec~
Specification Number 62 0200
Engineer's Project Number 10566
lB 5 PRESHIPMENT INSPECTION The Owner reserves che righ~ Co inspec~
the equipment prior co shipment
The Contractor shall notify che Owner of al! shipments hoc lass than
15 days prior Co the dace of shipment co allow the Owner co lnepec~ the
equipment if so desired
lB 6 SHIPMENTS Shipments co the plane sics shall be consigned co the
following locacions
Truck Shipments City of Denton, Texas - Levisville Hydro-
electric Project Sics
Lawisville, Texas
The Contractor shall discuss rich the Ov~er che routing of shipments and
8hall roues the same as indicated by the Ovner provided freight races are
no greater chart by ocher routes
lB 7 ~IPPING NOTICE The Contractor 8hall subm'Lc Co the Owner
copies of shipping notices describ~n$ each shipment of material or equip-
mane The shippin$ notices shall be mailed Co arrive approximacel7
3 days ahead of the estimated shipment arrival The addressee for each
shippin$ noCice will be de~ermined later
lB 8 MATERIALS LIST The Contractor shall prepare and submit wich the
first shippins noCice cwo copies of an l~emized ma~erials list coverins
all material and equipment furnished under chess specifications The ma-
~erials ltsc shall be in su~ficienc detail Co permit an accurate determi-
nation of the completion of shipment
lB 9 CORRECTION O.~Y E~ROBS Equipment and materials shall be complete in
all respects vich~n the limits herein outlined A~l errors or omissions
required Co be corrected in che field shall be done by ~ha manufacCurar
or his duly authorized repreeenCaCive aC Che Contractor's expense
IB 10 ~UALITY aSSURANCE The ConCracCor shall maintain a quali~y assur-
ance program Chac provides Chac equipment, ma~erials, and services under
chess specificaCions whether manufactured or performed vi~hin the Con-
tractor's plane or ac any ocher source shall be controlled ac all poincs
necessary co assure conformance Co contractual requirements The PrOSram
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
lB-2
lB 41 WEATHFRPROOPINC All outdoor electrical equipment and all appur-
tenamces shall be designed for satisfactory operation dnring 60 mile par
hour wind and driving rain Ail exposed unpainted parts shall be fabri-
cated of corrosion-resisting metal Ail ventilating openings shall be
louverad on outdoor electrical equipment to prevent entrance of rain
under weather conditions described above Ail ventilating openings on
outdoor electrical equipment shall be equipped with fine mesh filters and
stainless steel bug screens
lB 42 FACTORY PREWIRED ELECTRONIC SYSTEMS CABINETS Internal wiring in
fact6ry praw£re~e-~ec~onic systems cabinets may be installed according
to the Contractor's standard aa to wire size, insulation, and method of
termination on internal equipment except that insulation for all wiring
(including circuit board wiring, back plane wiring, and power supply
wiring) shall meet the V~/-1 (vertical wire) flame test requirements of
UL 4~ Interconnecting cables between devices shall meet the flame test
requirements of IEEE Standard 383 (ANSI Ndl 10) using a gas burner flame
source The individual conductors of the interconnecting cables shall
meet the flame resisting test requirements of ICEA S-19-S1, Paragraph
6 19 6 Identification of conductors may be done by insulation color
coding identified on drawings or by printed wiring lists Terminal
blocks for connection of external circuits into factory prewired elec-
tronic systems cabinets shall meet all the requirements of the article
TEP~INAL BLOCKS in this section
lB 43 SOLID-STATE LOGIC SYSTEMS Ail electrical equipment containing
solid-state logic' systems shall be tested for a minimum of 120 hours
under power prior to shipment from the factory For the lest 48 hours of
testing, the ambient temperature shall be elevated to 120 F and the
equipment shall be interconnected with devices which will cause it to
repeatedly perform all operations it will be expected to perform in serv-
ice with loads on the various components equivalent to those which wilt
be experienced in actual service
The 48 hour elevated temperature test period shall be continuous but
shall be divided into four 12 bout segments Input voltage during each
12 hour segment shall be nominal rated voltage for 11 hours, followed by
110 percent of nominal rated voltage for B0 minutes, followed by 90 per-
cent of nominal rated voltage for 30 minutes
In the event that a component fails during the first, second, or third
segment of the 48 hour elevated temperature test, system testing follow-
inS component replacement shall resume at the beginning of the 12 bout
segment during which the failure occurred In the event that a component
fails during the last segment of the 48 hour elevated temperature test,
system testing following component replacement shall include two complete
12 hour elevated temperature test segmemts
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
1B-22
Timing relays where the dsla% period is 3 minutes or less shall be Gould
Incorporated Type T12A or acceptable equal Timing relays where the de-
lay period may exceed 3 minutes shall be Agastat Series 7000 or accepta-
ble equal
Gould Incorporated relays shall be purchased directly from the Gould In-
corporated relay manufacturing plant and oot from any warehouse or assem-
bly center
lb 40 3 Control Switches Control switches shall be 600 volt, 20 am-
pere, multistage, rotary type with a minimum of l0 contacts Switches
shall have black, fixed, modern, pistol grip type handles and engraved
black plastic escutcheon plates with targets Switches shall be Westing-
house Type W, General Electric Type SB-1, General Electric Type SB-10,
Electro Switch Type 20K, or acceptable equal
lb 40 4 Push Buttons and Selector Switches Push buttons and selector
switches shall be heaw-duty oiltight, Honeywell Micro Switch Type PT,
Square D Class 9001 Type K, or acceptable equal Toggle switches shall
be Honeywell Micro Switch Type TL or acceptable equal
lb 40 5 Indicattn~ Lights Status indtcatin~ lights shall be Foneywsll
Micro Switch Type PTW, push to test, with Type 387 lamps, plastic lenses,
and appropriately sized resistors
Engraved indicating lights shall be Master Specialties 2100 or I00 series
with Type 387 lamps
Indicating light lens colors shall be coordinated with indicated condi-
tions as specified in the following table Indicating lights shall be
energized when the condition exists and shall be de-energized when the
copdttion does not exist
Lens Color Condition
Red Equipment energized, such as
motor running, valve open, or
breaker closed
Green Equipment de-energized, such
as motor stopped, valve
closed, or breaker open
White Equipment abnormality, such as
motor trip or breaker trip
IB 40 6 Alarm ~ontacts Alarm contacts for remote annunciation shall be
suitable ~or operation at 125 volts dc Alarm contacts shall be ~ormally
open contacts which close on alarm condition
[DENTON 10566 TURBINE GEN 62 0200]
031387
lb-21
lB 45 CONTRACTOR-FURNISREp D__C MOTOR STARTERS Magnetic starters for dc
service shall be suitable ~or starting 42 volt dc motors
Each dc starter shall be complete with 42 volt dc operating coils, con-
tactors, six electrically separate auxillary relay contacts (three nor-
mally open and three normally closed), one overload relay, and a 36 point
terminal block Ail auxiliary and overload contacts shall be w~red to
terminal blocks for external use
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
1B-24
In addition to the 48 hour elevated temperatur, testa, the solid-state
logic systems shall ha teated for surge withstand capability in accord-
ance with the requir.mants of ANSI C37 90a
Solid-state logic systems shall be teated as complete assemblies Test-
ing of individual components or modules will not be acceptable as systsm
teats
Copies of the teat procedures and reports shall be submitted to the Engi-
neer as required in Section iC
lB 44 CONTRACTOR-FURNISHED AC MOTOR STARTERS The ac motor starters
furnished with the equipment shall be'provided in accordance with the Typ-
ical Schematics for Combination Starters following this section and in
addition shall conform to the requirements which follow
Fotor starters for 480 volt ac service shall include 480 volt, 3-phase,
60 hertz contactors with three manua~ reset thermal overload relays,
120 volt ac operating coils, and 480 to 120 volt dry type control trans-
formers complete with one secondary lead fused and the other secondary
lead grounded
Large size starters which require line voltage to energize the operating
coils shall he equipped with auxiliary contactors for use in the oper-
ating coil circuit These contactors shall be operated from the 120 volt
circuit of the control transformers
Two speed starters and reversing starters, where required, shall be me-
chanically and electrically interlocked ao that only one set of contacts
can be closed at any one time
Auxiliary contacts shall he mechanically operated By the starter contac-
tot The quantity of contacts shall be as required, but not less than
the quantity indicated on the Typical Schematics for Combination Start-
ers Terminal blocks shall be furnished as indicated on the Typical
Schematics for Combination Starters
Control transformers shall have 60 hertz ac ratings permitting operation
at a primary voltage from 440 to 480 volta at a voltage ratio of 4/1
Assuming a 440 volt primary, each control transformer shall maintain a
potential of not less than 105 volts at its secondary terminals during
starter coil inrush while simultaneously serving a 100 VA load in ad-
dition to the coil load
Starters for 120 volt ac service shall be similar to 480 volt starters
except control transformers will not be required
[DENTON 10566 TURBINE GFN 62 0200]
031387 ]
IB-23
SYSTEM
DESCRIPTION
Steel - Normal, Coastal, end Hoderate Corrosion and Abrasion A/
Exposure ....
SURFACE SSPC-SP6 Commercial Blast Cleanin8
PREPARATION Prof:[le depth 1 to 2 5 ails as recommended by
paint ~nufaaturer
DRY FILM SPECIAL NOTES
COATING THICKNE~
FIRSTCOAT 3 u~ls ~o component Inorganic zinc ~ch a minimum
3 m~ls ~san~c z~nc or modified epoxy
TO~ UP Power tool c~ean damased surfaces only (shop or
f~eld
$~CONOCOAT ~-6 ~ls Epoxy t~e coa~
Apulv by m~st coat-full coa~ technique
THIRD.AT 1 ~-2 A~pha~c pol~rethane ~opcoa~
TOTAL ~Y~EM 8 5-[ ~
~ATING PRODU~ IDENTIFI~TION
MANUFA~RER FIR~ COAT TOUCH UP SECOND COAT THIRD COAT
A~toa D~aetcote 9 ~ ~co~t 68A ~e:coat 383HS ~etcoat
Catboltne Catbo Zinc 12 658 o: tgO ~ ~34
Catbo~sttc 15
Glidden 5536/5537 ~526/27/28 55~5/5556 6[00 Series
Kop~egs ~701 ~santc Zinc R/-Gard 1~22
Eobtl Hobtl~ac 11 ~at-~ak 13-~1, 89 Series ~0 Set/es
~orter Ztac-[ock 312 Zt~c-~ock 308 ~3 Efgh Sutld ~600 Series
~e~- S6~[/S69D2 ~59A~5 S62 Series/ ~63 Sec/es
W/ll/~ B60V70
Tnemc )0E-75 9~93 Ser~es 66 Series 72
1B-25
SYSTEM NO
)E?aCRIPTION
Equ,pment - Electrf. cat. Noraal Ex[~osure E1
SURFACE SSPC-S~I Sotvent Cleantn8 plus
SSPC-SP3 Po~er Tool C[eantn~ or ~SPC-SP7 Brush-DEl
P~PANATION
BLast C~eantng
I
DRY FILM SPECIAL NOTES
:DATING THiCKN~S~
FIRSTCOAT 2 ails Rust Lnhtbtttve alkyd
aO per cent solids b~ volume
TOUCM UP
SECONOCOAT I 5 mlls Htsh gloss alkyd enaaet ~tth a atntaum &O per cent
so[ids by votume Indoor ANSI 61t Outdoor ANSI 70~
rHIROCOAT 1 5 ails Htsh Stoas alkyd enamel ~tth a minimum ~0 pet cent
solids by votume Indoor ANS[ 6It Outdoor ANSI 70
TOTALSY~EM ~5 m~[s Interior surfaces o[ pane[s, svLtchgear~ and motor
control canters shat[ be ~loss vhtte enamel
COATING PNOOUCT IDENTIFICATION
MANUFACTURER FIRST COAT TOUCH UP $ECONO COAT THIR0 COAT
B~CK & VEATCH COATING SYSTEM DATA SHEET 10t58t
co.sUL .
~B-26
SYSTEM NO
DESCRIPTION
Equipment- Mechan,csl, Normal Expo,ute []6
SURFACE ;SPC-SPI Solvent Cleaning plus
;SPC-SP3 Power Tool CLeanins plus SSPC-SP?
PREPARATION Brush-off Blast ClesninS
DRY FILM SPECIAL NOTES
COATING THiCKNES,~
FIRST COAT 2-3 u:Llf Alkyd Primer
2-3 u lo Alkyd
TOUCH UP
1,$-2 Gloss Alkyd
;ECOND COAT
1.5-2 Gloss ~kyd
THIRD COAT utZs
5-7 mile
TOTAL
PRODU~ tDENTIFJ~TION
COATING
MANUFA~RER FIR~ COAT TOUCH UP SECOND COAT THIRD COAT
~eron 5105 5105 540
Carbol~e GP-18 Rust.nd 8~
Glidden 5210 5210 4550 4550
;eeZer & ~us 6040 6040 B-1 Series B-1 Se;tes
Koppers 622 622 50 ~ 501
~btl 13-R-28 13-R-28 12 Series I2 Serles
Por~er 297 ~ 297 FD
~e~- BSOH2 BSON2 B54 Series B54 Set/es
Tn~ec ,1~99 10-99 Series 2H Series 2H
OATE PREPAREDBY
B CK VEUCH SYST
~B-27
(NTR) ~ FOURTH OVERLOAD ~EL R OV O ~LAR~ ~HEN SPECIFIED
~ OTHERVlSE, I~ & I~ ARE SPARE ~ERHINAL$
NIRING DIAGRAH C~BINATION FULL VOLTAGE NON-REVERSING STARTER
NOTE. THI~ DOES NOT APPLY TO SIZE S AND ~RGER
~20 V ~2~ L~2F 6 ~ 10
~IRiNG DI~GR~ ~MBINATION FULL VOLT~GE REVERSING STARTER
CONIUL~NO llIlli~ sPEc~ 62 0200
TYPICAL SCHE~TICS
FOR COMBINATION STARTERS
1B-28
lC 4 PER¥O~O-NCE CURVES Ten copies of the performance curves specified
in Section 2A under the article entitled PERFORMANCE CURVES AND DATA
shall be submitted as scheduled in Section iA
lC 5 DESIGN DATA Ten copies of design data shall be submit=ed as spec-
lfied and scheduled in Sec=ion iA
lC 6 TEST AND INSPECTION DATA Certified copies of test and inspection
reporC~-~a~-he provided by the Contractor for all =eats and inspections
conducted on the specified equipment Ten copies of each report shall be
eubm/CCed Co the En$ineer w~chin 2 weeks after completion of each test or
~nspecCion
lC ? MOTO~ INFOItMATION A Mocor In~ormaCion Sheet is included at the
end of chis section A copy of chis sheet shall be completed for each
motor ful.'t~ished under chess specifications Copies of the completed
sheets shall be submitted as specified in this section and as scheduled
in Section lA The number of copies submitted shall be the same as for
ocher manufacturer's drawin$s
lC 8 DRAWINGS Draw~n$s shall be in sufficient detail to indicate ~he
kind, size. arransamant, weishte of each component, Breakdown for ship-
mane, end operation of component materials and devices, the external con-
necCions, anchorasee, and supports required, the dhnensions needed for
installation and correlation with ocher materials and equipment, and the
infor~cion specifically requested in the drawin$ submittal schedule
specified in Section lA
Certi~ied drawinSe only shall be subu~.tced unless a submittal date for
prell/nary drawings is specifically stated in the drawin$
schedule Such requirement shall hOC preclude the Contractor from sub-
mitcin$ certified drawin$s on the schedule specified for submittal of
prel~minary draw~n$s
"Prel/minary" drawin$s shall mean drawinss hOC fully completed or ap-
proved by the Contractor, however, they shall be reasonably complete and
suitable for the En$1neer's use in escablishinS basic plant arransements
and des~$n requir~meuCs Preliminary drawinse shall be clearly scamped
"Prel~nary" Prel/~nary draw~n$s will not be reviewed by the
near, however, the En$1neer w~11 advise the Contractor of any discrepan-
cies ~r conflicts which he may discover in his reference to the drawin$s
"Certified" drawings shall mean drawin$s fully completed and certified by
the Contractor aa Co the co~pliance of the information contained =hereon
with the requirements of these specifications Certified drawin$s shall
be clearly stmnpad "Certified" or shall have title block entries clearly
lnd~caCin$ the draw~n8 is certified Certified drawinss will be reviewed
by the En$inaer and processed as specified in this Section lC
[DENTON ~0566 T~T,.~INE G~N 62 0200]
[ 030885
Section lC - ENGINEERING DATA
lC 1 GENERAL This section stipulates the requirements for engineering
data which the Contractor shall submit for design information and review
Compliance with the specified schedule for engineering dace submittal is
essential ~o ~he scheduled progress and complecion of the proJecc and is
of che essence of chis Contract
All engineering dace shall be identified with the equipmenC or structure
it represents By use of the nomenclature established by the contract doc-
umente Equipment drawings shall have the Engineer's equip~ant name and
number clearly displayed Material drawings shall have che Engineer's
structure name and structure number (when applicable) clearly displayed
lC 2 CO,R~ESPONDENCE Correspondence fo~arding engineering data shall
be addressed :o the Ensineer as follows
Original and one ([) copy co
Black & Veacch, Englneers-ArchlCeccs
P 0 Box 8405
Kansas City, Missouri
Ac~en~ion Mr D F Guyot
Let=ers of ~ran~i~al shall acc~pany all sub~2~als of en~ineerin~ da:a
and s~ll include a lisC of ~he da~a included in =he =ran~i~cal L~s=s
shall include ~nufac~urer's dra~n~ n~bers lden~ifimd w~h che corre-
spo~ proJec~ equipmen= or sc~cCure n~nclature as applicable All
correspondence shall be iden=ified w~ch the project ~me (City of Denton,
Texas, Lewi~ille Hydroelectric Project), Specification Numar 62 0200,
B&V Project N~ber 10566, and ~nufac:urer's order number
[C 3 REVI~ O~ ~GINEBRING DATA ~e Ensineer's review of ensineering
dace will cover only seneral confomicy of the data to the specifications
and dot.ants, exce~al connections, interfaces w~=h equipment and ma~e-
rials furnished u~der separate specifics=ions, and d~ensions which af-
fect plant arrangements ~e Ens~neer's review does no~ indicate a thor-
ouch review of all d~mnsions, quanCi=ies, and details of che equipment,
~:erial, device, or item i~dica~ed or the accuracy of ~he
submit=ed, nor shall review by =he E~gineer be construed as relievin8 the
Contractor fr~any respons~blll:y for errors or deviations
quiremencs of the con=ract doc~enCs
All en~ineerin~ data subml=:ed, after final procmssin~ by
and acceptance by the ~er, shall bec~e a part of the concrac: docu-
ments and the work indicated or described ~hereby shall
confo~icy therewith, unless o~he~se required by the
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
IC-1
~o ~ork shall be performed in connection ~ith the fabrication or manufac-
ture of equipment and ~aterials until the drawinss and data therefor have
been reviewed by the Ensineer except aC the Contrectorts own risk and re-
sponsibility Work may proceed on equipment and materials when the draw-
inss end data therefor have been returned marked NO EXCEPTIONS NOTED or
RECEIVED FOE DISTRIBUTION, and when drawinss have been returned marked
EXCEPTIONS NOTED, provided the work is performed £n accordance with the
En$ineerts notations
If chanses are made ac the project site co the equipment to correct for
manufacCurin$ errors, due To design chanses, or due co wiring revisions,
revised drawings indicaCin$ the chan~as made shall be prepared by The
Contractor and submitted co The Fn$ineer
lC 8 $ Final Dravin~e Upon receipt from ~he Ensineer of dravinSs
~rkad NO ~C~PTIONS ~OT~ or ~CEI~ ~OR DIS~IB~ION, ~he Contractor
shall transit ~lve additional prince of each drains ~o the Engineer for
fill distribution ~ovever, if durins the submittal process, the Con-
cracC0r ~akes further chanses ~o dra~nss c~ have been reviavad by ~he
Ensineer, ~he chanses sha~ be clearly ~rked on ~he dravinss and ~he
submittal p~ocess shall be repea~ed
lC 8 l Reproducib~es One reproducible prin~ o~ each final elec~rical
virin~ and e~n~a~ diasr~ lot equip~n~ shall be ~uruished The re-
producible s~ll be right readins on 0 003 inch chick Du Pon~
mylar a~ s~l~ hOC exceed 3~ ~chaa by il inches in size Diazo sepias,
b~ack line my~, or au~o-poaiCive reproducib~es ~11 no~ be
Such drain,s sha~l be subleted Co ~he Engineer In rolls and hOC folded
lC 9 ~G D~ Connection and in~erconnecCion ~rin~ disarms
fu~is~~rac~or shall be as indica~ed in ~SI YI~ 1~a-1971,
Section 15-I1~ Article 15-~i 3,2 1 and ~lsure ll-i excep~ ~hac f~cCion
infom~ion and ~re ~ code are not required Each device connec~ion
shall have near each ce~inacion, indica~ed in breaks, conductor iden~i-
[ica~ion consisCins o~ ~he opposite end des~inaC!on ~e ~trins diasr~s
shall be dra~ vi~h all devices indicated in chair relative physical lo-
ca~ions and shall rep~esen~ ~he equipmen~ and ce~ina~s arransed as ~hey
vould appear co a person ~irin~ ~he equipment
~irins d~r~s shall be prepared on sheets approx~ely 30 inches by
12 inches ~ere in~erconnec~in~ ~rins [r~ ditferen~ i~ams of equip-
· eu~ or sec~i~al vi~in~ d~r~s off ~he s~e i~ of equip~n~ appear on
di~iarenc virins dia~r~ shee~s, all inCerconneccions shall be clearly
iden~ified ~ere sec~ional virinS diasr~s are required for a
i~em of equipmen~, such as a ~e~ay panel or control panel, cha~ section
of ~he panel vhich is represented by each individ~l virins diasr~ shee~
shall be keyed on cha~ shee~ in a ~nner acceptable co ~he
[DENTON 10566 TURBINE GEN 62 0200]
[ 0~0885 ]
lC-4
Each drawing submitted shall be clearly marked with she name of the proj-
ect, the unit designation, the spec/f/cation title, the specification
number, the project equipment or structure nomenclature, and the Contrac-
tor's nme Catalog pages ars not acceptable If standard drawings are
submitted, the applicable equipment and devices furnished shall be clearly
marked
Dravfngs shall be submitted in accordance rich the schedule specified in
Section IA
lC 8 1 Dravin~ Submittal Eight prince of each draying shall be submit-
ted Prints shall be black line on whirs background (preferred) or blue
line on white background Print size shall not exceed 34 inches by
44 inches unless due to the size of the equipment larger drawings are
necessary Drawings shall be folded to 8-1/2 inches by 11 inches
producible prints shall be submitted rolled
~ha Engineer viii use a 35 n microfilm system in processing drawings
All drawings shall be suitable for microfilming Drawing and lettering
practices shall be in general accordance with the requirements of U S
Department of Defense, Military Standard - Engineering Drawing Practices,
DOD-STD-100C Drawings submitted which ars not suitable for microfilming
will not be accepted
IC 8 2 OraWin~ Frocsssin~ A copy of each drawing reviewed will be
returned to the Contractor as stipulated herein Copies of drawings
returned to the Contractor will be in the form of a print with the
hearts marking, a print made from a microfilm of ~ha marked up drawing,
or a marked reproducible print for drawings larger than 34 inches by
44 inches in size, at the option of the Engineer
~hsn drawings and data are returned marked EXCEPTIONS NOTED. the chan~as
shall be made as noted thereon, and sight corrected copies shall be sub-
mitred co the Engineer
~han the drawings and data are returned marked RETURNED FOR CORRFCTION,
the corrections shall be made as norad thereon and as lnst:ucted by the
Engineer, and eight corrected copies shall be submitted
~han a drawing is revised and resubmitted, the Contractor shall include
an issue number and revision d~ecription in the drawing revision block
Ail revisions pertaining to t~at particular drawing issue shall be back-
circled or otherwise clearly noted on Cna drawing.
When the drawings are returned marked NO EXCEPTIONS NOTED or RECEIVED FOE
DISTRIBUTION. the Contractor snell submit drawings for final distribution
se specified hereinafter under Final Drawings Drawings marked RECEIVED
FOR DISTRIBUTION have been filed, but have nsc been reviewed
[DEI~rI'ON 10566 TURBINE GEI~ 62 0200]
lC-3
List of recommended spare parts
List of maintenance tools furnished with the equipment
The above listed requirements are minimum, however, requi~ements which
are clearly not applicable to the equipment may be deleted Additional
information which is necessary for proper operation and care of the
equipment shall also be included
lC 10 2 BindinS Each copy of the manuals shall be assembled and bcund
in a special binder in accordance with the followin$
Manufacturer McBes Loose Leaf Binders
&i& North Cedarbrook Avenue
Sprinsfisld, Missouri 65802
417-866-0822
Binder t~pe Tslescopins Post C536~ with
concealed backbone rivets
Construction Stiff binder board
Coverin$ Supported vinyl crush pa~tern,
kivar liner
Color Later
~print~ns Foil stamp in accordance with
drawin$ bound at end of this
section Color of imprincinS
to be gold
Capacities available 1 inch through 3 inches in
1/2 inch increments
Binder capacities shall not exceed 3 inches, nor shall material included
exceed the desisned binder capacity If material to be bound exceeds
capacity rating, multiple volumes shall be furnished Binder capacity
should not be more than approximately 1/2 inch greater than the thickness
of the material w~thin the binder
lC 10 3 Submittal One complete copy of the proposed manual shall be
submitted to the En$ineer for review The En$ineer's review w~ll be for
seneral conformity to specified requirements and ia not intended to con-
stitute detailed review or approval of content
The copy submitted for review shall be complete with binder, however, to
expedite the manufacture and shipment of the binders, the binder supplier
may contact the Engineer directly to secure acceptance of the binder and
[DENTON 10566 TURBINE GEN 62 0200]
[ 030885 ]
IC-6
Information indicated on the Contractor's drawin$s shall include wiring
of the individual panel items as they actually will appear in ch~ panel,
contact arrangements of switches, wire type, wire size, and internal
wiring of relays and instruments
Elementary diasrams shall be cross-referenced to terminal markings on the
connection and interconnection diagrams, but need not indicate complete
details of circuits external to the panels Each item o[ panel mounted
equipment indicated on the diasrsms shall be identified by item number
and name
Sufficient space shall be left on the Owner's side of outgoing terminal
blocks for adding cable color codes and circuit numbers The Contractor
shall be responsible for adding the color codas and circuit numbers co
his drawings a£tar they are assigned by the Engineer
lC 10 INSTRUCTION MANUALS Instruction manuals for the unloading, stor-
age, installation, operation, and maintenance of the equipment shall be
furnished The number of manuals and their required time of delivery are
specified in the Schedule of Activities in Section lA
lC l0 ~ Content ~anuals shall include the following information spe-
cific to the furnished equipment
Table of Contents and index tabs
Specifications, test data, and curves
Description of the equipment
Instructions in the methods of receiving, inspection, star-
asa, and handlin$ prior to installation
Installation instrucnlons
Operating instructions
Maintenance instructions
Assembly drawings
Parts lists
List of acceptable lubricants
Nameplate information and shop order numbers for each item
of equipment and component part thereof
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
lC-5
its lmprintin$ on the basis of the suppliar's layout drawing This will '
enable manufacturer to proceed without requiring the submittal of a
binder proof copy
Upon acceptance of the manual by the Engineer, the remaining copies shall
be san= to =ha addresses daeig~ated by the Engineer
[DENTON 10566 TURBINE G~N 62 0200]
[ 030885 ]
1C-7
SPEC 62~Q200
MOTOR PRO,~ECT _ ~,0 ~ ~
MOTOR DATA TO BE SUBMITTED
HOOEI.
i, MNUi~ACTOR~.R --
P#A~E, NIrRTZ -
HR ,,VS',T8 __
EEiIVI~ FAGTOR NB4A 0ESIEN LETTER FUU. LOAC SPEED ,,. NPH
ENCI0SUII~' ~PE . FRA~tr SIZE
I#SULATIQfl 8YSTEN CLA88 _ ,, ETA#0ARO SEAl. ES ., ,ANS TENP ,. C
TB4P RI$~r C BY NIEIrrANcE AT SERVICE IrAc4'OR OF J. 0 ~, US
PULL LOAO CURIIrdlT .AHP8, LOGKEI)-MOTOS CURRENT AHPS
8PAC~Ir HEATER (IF PURIIISUED) NUI4BER OF UNIT8 ,. UNIT RATING IdA'TTS
VOLTS PHASE
~AEIN~8 TYPE AFBI4A k.tO RATING LIFE NOT LEG# THAN ,.flN~
LuERiOATiOE: ,r,yplr ,, 8YST~4
SOU#t)
ROUES P(~EE LEVfL OVERALL #F.,AN NO-kOAO GNUN0 PRESSURE t. EVEl.
lie ~.0'~'2 vA~r8 dRA K 20 NICROP&SCALS (0 000° NICRORAR) R~*,FERENC;E OISTANCE
FKIr FIgJ,.O OF I NET~R 2 NETEGN dBA IrRK FIF. J.D
TOTAL NOTOR vr I.GN
FOg NULTISPIr~O HOTOSU
VARIABI.E TOI~UE GOlISTANT TOIi~UE CONSTANT #O#SEFO~IER
NOTOR TLqHINAI. CCU#ECTIOIL DIAGEAH NO (ATTACU GOPY OF SIAGILA~)
FOR MOUIIO ROTOR HOTORS
GNC~ VOLT~ SE(: AHPS SEC RF..~ 0104S N-N AT 25 C
FOR HOTOSS IN HAZAEDQUS lOCATIONS:
MOTOR ENCLO~BURE SURFACE ~rdlA*'IURE C AT SERVICE FACTOR OF I 0 ,1 I,~
rILL MOTOR EDNTAIN A 8URFA~ TB4PERATOK CONTROL THERMOSTAT REQUIRING GONNECTICU INTO THE MOTOR
8TACTER C:0NTROL C:IRCUIT YES , NO
FOR SUET IGNITION-PROOF MOTOGN MOTOR ENCLOSURE SURFACE TDdPERA1URE RISE UNOER ANY ASUORNAi.
OPERATING GQ#OITION INCLUDING OVERI.OAO, SINQI.E-PHASING, ETS , ASSU#ING ENCLOSURE SURFACE
TTHP~EA1UK OF ~0 C ~41EN ABROF~4AL ¢0NOITIQfl DEVELOPS
NININUI4 TINg TO IIRACU 268 ¢ .Er. cs
NAXIHUH RAT~ OF RISE C IN S SF.~S
& YEATCH
ENGI#EEIW
~OTOR ].¢-8
I NFORkL4T ION SHG£T
CITY OF DENTON, TEXAS
NAME
OF
EQUIPMENT LEWISVILLE HYDROELECTRIC PROJECT
INSTRUCTION BOOK
CITY OF
DENTON F O R
TEXAS NAME OF EQUIPMENT
VOLUME NUMBER*
L,EWIBVILLE
HYDROELECTRI(
PROJECT
MANUFACTURER'S NAME
MANUFACTURER'S ADDRESS
VOLUME SLACK & VEATCH
ENGINEERS. ARCHITECTS
NUMBER* KANSAS CITY MISSOURI
(Cover)
NOTES
I All imprinting shell be "Deppa" style font
2 All backbone ,mprinting shell be 14 point
3 Cover imprinting shell be point sizes indtoeted tn column to r,ght of cover tllustret,on
4 *Volume number required only if instruotions ere oonteincd in more then one volume
~! TYPICAL INSTRUCTION BOOK COVER
ENGIN EEI~-ARCHITECTe
--~ ~ CITY OF DENTON, TEXAS
10566 LEWISVILLE HYDROELECTRIC PROJECT
1C-9
110 per ce~c raced voltase or the scarCin$ coudicions indicated on the
Motor Speci~icaCion and Data Sheets shall be as required Co accelerate
the inertia loads o[ the motor and driven equipment co lull speed vichouC
damage ,Co the motor or the equipment
[DEIqTO~ I0566 TURBZ~E GElq 62 0200]
[ 030885 ]
1D-2
Section 1D - KI.,ECT~IC ~OTOP~S
1D i GENEP~L These rotor specifications are applicable to all electric
motors furnished under these specifications Motor Specification and Data
Sheets have been included in this section as required Any motors for
which Motor Specification and Data Sheets have not been included, but
which are required for operation of the equipment, shall ba furnished
The bidder shall l=st in his proposal all motors bein$ furnished
In case of conflict between the requirements of the various parts of
these specifications, the requirements of the different parts shall
govern to the extent of such conflict in the following sequence manda-
tor~ governmental resulation8, codes, and standards, Motor Specification
and Data Sheets (when included), individual equipment technical sections,
this motor section, the referenced industr~ codes and standards
1D 2 CODES AND STANDARDS All motors shall conform to applicable stand-
ards of ANSI, IEEE, HEI~A, and AFBMA, except where modified or supplemented
by these specifications In case of conflict between any of the industry
standards relative to manufacturin$ requirements covered in these speci-
fications only by reference to the standards, the requirements of
shall govern All equipment and materials shall be ~n accordance with
the applicable requirements of the Federal "Occupational Safety and Health
Standards"
ID.3 SUBSECTION The following subsection contains technical require-
ment8 applicable to motors furnished under these specifications
Subsection [DI &60 VOLT INTEGlt~ HORSEPOWK~ MOTORS
Special requirements for individual motors and specifications for special
application motors are included in the individual specification technical
sections as required
iD & RATING The ~otor nameplate horsepower multiplied by the motor
nameplate service factor shall be at least ~5 per cent greater than the
driven equipment operating ranse max/mum brake horsepower
Motors shall be designed for full voltage startins and frequent startin$
where required, and shall be suitable for continuous duty in the speci-
fied ambient Intern~Lttent dut~ motors may be furnished where recognized
and defined as standard b~ the equipment codes and standards and accepta-
ble to the En$ineer Motors shall be sized ~or the altitude at which the
equipment w~ll be installed
ID 5 TOR~UB CHARACTERISTICS Except as specified otherwise in the
dividual subsections or technical sections, the torque characteristics of
all induction motors at any voltage from 90 per cent rated voltage to
[DE~fO~ L0566 TUP4SDII~ GE~ 62 0200]
[ 030885 ]
ID-1
External cooling fans for fan cooled motors shall be fabricated of brass,
bronze, aluminum alloy containing not more than 0 2 per cent copper, mal-
leable iron, or plastic All plastic fans shall be fabricated of · re/n-
forced thermosetCin$ plastic and shall be approved by Underwriters, Labs-
racoriss, Inc
iD! ! a Insulation a_~nd ~ All insulated windings shall have
Class B nonhysroscoplc insulation systems rated for temperature rise and
ambient temperature in accordance w/th NEHA MG 1 Standards for the insu-
latlon class specified
~here mOtors w/th Class B insulation are not available, motors may be
furnishsd with Class F lnsulaeton provided ~he tempera=ute rise is in ac-
cordance with N~ MG 1 vales for Class B ~nsulaclon and provided all
ocher requlre~n=s are as specified, tncludtns bear/nS llfe and sealed
lnsula~ion
A~I Insulated wtnd~nS conductors shall be copper
~ere a sealed insulac~on sysc~ Is specified, ~o addl=to~l dips and
bakes of epo~ vanish or vacuum-pressure imprecation shal~ be included
Co provide a Premium lnsulacton for random wtndlnss Sealed insulation
for foxed coi~ w~dlnss shall be ~n accordance w/ch =he requirements of
~M~ 1 sC~dards
~e lns~ciou resis~ance corrected Co ~0 C s~ be nsc less C~n ms,oF
=a~ed kV+l ~So~s for ell windinss
IDI.I ~ ~a~ure Rise ~ obse~ab~e Ce~eraCuFe rise ~asured by
resiscanc~~
~cors ~vins a semite fac=or greater than 1 O, ~en
°pera=in$ a~ the semite ~acCor load, shall no= exceed Char rise which
applies f~r ~Co~s ~vinS a semite fac=or of A.O
~en a~ienc temperatures greater c~n 40 C are specified, the observable
=e~eracure rise s~ll be reduced in accordance with N~ MG 1 s~andards
IDI 1 6
Zrame series or
Space heaCe=a shall be =ace~ 120 volcs, sin~le-p~se. ~0 he=cz
~e heacers s~ll be provided inside the ~Cor enclosure in a location
suitable for easy re.vel and replacement Heaters sell be located and
insulated as they do nsc d~se ~Cor c~ponencs or finish
Space heaters shall be sized as required co ~incaln che motor ince~al
temperature above the dew point ~en the motor la idle ~e space
[DZ o zu Rz z 0200]
[ o3o ss
1DI-2
Subsection iD1 - 460 VOLT INTEGRAL HORSEPOWER MOTORS
1Df ! DESIGN AND CONSTRUCTION Design end construction of each 460 volt
lncsEral horsepower motor shall be coordinated with the driven equipment
requirements and shall be as specified herein and on the Motor Specifi-
cation and Data Sheets
1Di I 1 Nameplates Ail motor nameplate data shall conform Co NEHA MG 1
requirements The following additional nameplate dace shall be included
SCartin$ limitations, if any
Direction of rotation and vol=age sequence as specified
later
AFBHA bearing identification number for motors furnished
with rolling element bearings
All ~otor nameplates and attachment pine shall be corrosion resistant
~etal
IDi.1 2 Service Fac=or For all motors furnished wi~h a service factor
grea~er t~-~-~-~, the service factor shall be in accordance with N~14A
~C 1-12 47
ID1 I 3 Enclosures Ail motors shall be self-ventilated unless speci-
fied ocherviee
Enclosure parrs for all ~ocore (e g , frames, bearing brackets, terminal
housings, external fan covers) shall be made of teac iron, caeC steel,
sheer steel, or steel places Al--tnum enclosure parrs are hOC accept-
able
All self-ventilated open type ~oCors, including those with dripproof,
splashproof, and weather protected enclosures, and the fan covers of
totally enclosed fan cooled motors shall maec N~I~A MG 1 requirements for
a fully guarded machine
ID11 3 1 Tocall7 Enclosed Motors Totally enclosed ~oCore shall be
furnished wiC-'~-~i~o-"~-and rotating shaft seals Drain holes shall
be provided with Crouee-Rlude Type EtD "Universal" combination water
drain-breather plugs or acceptable equal
TotAlly enclosed ~ococs shall have caeC iron fremas, bearing brackets,
and term/ual housings
[v~trro~ ~0566 TU~n~E G= 62 0200]
[ 030895 ]
1Df-1
shall be permanently marked in accordance with the requirements of NEMA
MG 1, Parc 2 Each lead marking shall be visible after taping of the
=erminals
Ail motors raced ~00 horsepower and larger, all motors furnished with
unidirectional blowers, and all ver=ical mo=ors shall have =he direc=ion
of ro~ation marked by an arrow mounted visibly on =he sCa=or frame near
the =erminal housing or on the nameplate and =he leads marked =or phase
sequence T1, T2, T3, Co correspond to the direction of rotation and sup-
ply voltage sequence
Leads for dual volCase raced or for mulcispeed motors shall be easily
conneccad or reconnected in the terminal housing for the operating volt-
age or for the specified speeds Permanent inaCrucCions for making these
connecCions shall be furnished inside the corm/hal housing or on the mo-
Cot fFama or uameplaCe
IDi 1 9 Term/hals Cable C~pe leads shall be provided with compression
type =srm/~"~--~'~ecCors Connector type shall be coordinated with in-
coming power supply cable size and macerial as listed in the table fol-
lowing Incoming power supply cable size and ma=erial will be furnished
later Terminal connectors shall be as follows or accepcable equal
Burnd~ Terminal Connector
Power Suppl7 Cable Size Cop~er Ab,~num
8 AWG and smaller YAV
6 AWG thru &/O AWG YA YA-A-TN
ID1 1.~0 Ground Conmectors Each motor shall be furnished with a
grounding connootor aC~ached co the motor frame ~nside the moCor power
lead term/ne1 housing The grounding connector may be a lug or ter~/net
or other acceptable ground~n8 connector Grounding connec=or size shall
be coordina=ed with motor full load amperes as follows
Full Load Ground Connec=or
Motor Amperes ~an~e~ A~G
0 thru 21 II Chrn ~0
22 thru 40 10 thru 8
&l thru 65 8 thru ~
1D1 ~ ~1 gearings The type of bearing furnished shall be as specified
on ~he Motor Specification and Da~a Sheet
ID1 1 ~1 1 AntifricCion ~ Grease or oil lubricated antifric=ion
radial and ~hrust bearings shall be designed and fabricated in accordance
wi=h AFBMA standards to have a minimum L-10 ra~ing life of not less =hen
[DE:ITl'ON 10566 T'u'~BDIE GEN 62 0200]
o3o88
ID ~-~
heaters shall not cause winding temperatures co exceed raced limiting
values nor cause thermal protective device "over temperature" ~ndication
vhen ~he motor Ks not energized
Space heater leads shall be stranded copper cable rich 600 volt insu-
lation and shall include terminal connectors
Space heater sheaths shall be of a corrosion resistant,
material and shall have a chick, ness not less than 0 025 ~nch
1D11 ? Terminal Housings A single terminal housinS for ms,or ps.er
leads and accessory leads shall be furnished on all motors
All terminal housings shall be ex~ernally mounted on the motor frame en-
closure
Terminal housings [or ~otally enclosed motors shall be cast iron Ter-
minal housings ~or a~l other motors shal~ be cast iron, pressed steel, or
fabricated steel Housings shall be diagonally or longitudinally split
vtth a gasket between the split halves of the housing Each housing
shall have a threaded opening co provide a ~atertight rigid connection
with the conduit, and shall be designed for rotation in ~0 degree incre-
ments, or have pro~ielons included otherwise, to receive coudu~t ~rom any
of ~our directions Nonconducting motor lead posit~oners end gaskets
shall be furnished between the housins and the motor fr-~ All motor
leads located in the housing shall have terminals and shall be permanent-
ly numbered ~or ease of identification
All motor pover lead terminal housings shall be aC least one size larger
than normally furnished as standard Zn addition, Cardinal housing ~tni-
mum volume, mtni~tm cover opening dimension, and minimum siae o~ conduit
entrance opening shall be in accordance rich the ~ollovtng cable
Haximum Terminal ~ousins Minimum ae~uirements
Rated Motor ~ominal
Full Load Useable Cover Conduit
Current, Volume, Dimension, Opening,
amperes ~bic inches inches inches
3 ~ 12 ~-3/& 3/~
7 6 16 2 3/~
l~ 0 33 2-7/8
2! 0 ~& 3
&0 0 72 3-5/8 1-1/2
65 0 100 3-5/8 2
1DI I 8 Leads l~otor po~er leeds aad specs haeter lsads shall be ~rsd
into the motor tsr~inal housing All motor lseds a~d their tsr~inals
[DI~qTON 10566 TURBII~ Gllq 62 0200]
[ 030885 ]
101-3
1D1 i 1~ Torque Characteristics Unless specified otherwise, motors
shall have torques and locked-rotor current in accordance with NEMA MC
Parc 12 for the specified design classification
1Df ! 15 Critical Speeds Motors shall be designed to keep torsional
and roca~i~ural frequencies of vibration aC leas~ 25 per cent
above the motor raced speed ranges co avoid resonant vibration over the
operating speed range of the equipment-motor unit
1Di 1 16 Sound Level The motor sound level shall be selected by the
Contractor cb' cono'~-~ with ~he overall motor driven equipment assembly
sound level requirements which are included elsewhere in these specifi-
cations, buc in uo case shall the average no-load sound pressure level,
re 0 '0002 dyne/cma, produced by the motor exceed 90 dBA free field
3 fee~
Sound reduction ba£~les, mufflers, and materials shall he contained
in the motor enclosure excep~ external fan mufflers may be furnished on
totally enclosed fan cooled motors
1DI 2 QUALIT~ CONTROL TESTS AND ~NSPECTIONS Each motor shall be
and lnspec'ecc-~a~ the manu-~urer's factory co determine tha~ it is free
from elec~rical or ~echanical defects and Co provide assurance
meets the re~ui~emencs of chase specifications Teac procedures shall he
in accordance wi~h ~EEE No ll2A Tes~ Procedure for Polyphase Induction
Motors and ~enera~ors
and
1D! 2.1 Tes~s --.--. ~nopec~ions Routine tests as lis~ed in
12 ~Z shal-T'~perfo~ued on each mocor
The ~ollowin~ additional ce8~8 and inspections shall be performed on mo-
nors 50 horsepower and larse~
Measurement of winding resistance
Inspection of bearings and bearing lubrication system
Five copies o~ reports of ~he ~ests and inspections for each motor 50 horse-
power and larger shall be submi~ed Co the Engineer prior
~he ~o~or from ~he manufacturer's
iD1 3 DRA~INGS AND ENGINKERINC DATA Motor dimensional drawinss shall
include rocor weigh~ and motor total weigh~ in addition ~o the require-
merits listed hereinbefore and in Section lC
[DEterOg t0~66 T~ms~gg ¢~ 62 0200]
[ 030885 ]
1DI-6
130,000 hours under the load, speed, and thrust requirements for direct
coupled service and hOC less than 42,500 hours for belt or chain con-
netted service Grease lubricated radial bearinSs shall be double-
shielded
Motors furnished with rollinS element bearinss shall have the AFB~L~ bear-
ins identification number indicated on a nameplate attached Co the motor
~rama
1D1 ~ 11 2 Miscellaneous Bsarin~ Re~uiramencs All bearins mounCinss
shall be desisned to prevent cha entrance of lubricant into the motor
enclosure or dirt into the baarinss and shall be provided with pipes and
drain plusa
Fittinse for sreasa lubricated bearinss shall be arranssd for safe, easy
relubrication from the outside of the motor while the motor is in serv-
ice
Insulation shall be provided when required ~o prevent circulation of
shaft current on bearinss, on baarinS temperature detector connections,
or on oil pipins connections
Searinse and bearins houeinSs shall be deelsned to permit disassembly in
the field for inspection of the bearinss or re~oval of the rocor
Baarin$ lubricants shall contain a corrosion inhibitor The ~ypa and
8rads of lubricant shall be indicated on a nameplate aC~achad ~o the
motor frame or end shield adjacent to the lubricant fillin$ device The
Contractor shall furnish all lubrication infor~aciou required to assure
proper equipment stare-up and subsequent bearin$ ~aintanance
iD1 1 12 Rotors All induction motors shall have squirrel-cage rotors
Rotors ehall'~-b'~-eadequately sized co avoid overheating during acceleration
of the motor and driven equipment Rotors not of ~ncesral dis-cast con-
sCruccion shall be furnished with copper or copper alloy casa material
All motor rotating components shall be dynamically balanced after mount-
ins on the shaft Hotor vibration shall uoc exceed cha peak-co-peak
plitude values given in MEHANG 1 standards when measured in accordance
wi~h chose standards In addition, cbs ma~nicuda of vibration values for
twice-the-line frequency vibrations shall not exceed 0 5 mil
1D1 1 13 Shafts ~ars shipment permits, motor output shafts shall be
complete with motor half couplins mounted, connected co the driven equip-
menc, and adjusted ready for operation ~ere ~otor size prevents ship-
menc with motor connected co driven equipment, the motor half couplin$
shall be factory mounted for field connection to the driven equipment
[DENTON 10566 TURBII~E GEM 62 0200]
[ 030885 ]
1D1-5
1DI 4 ,~L~UFACTURERS Ail motors shall be as manufactured by one or more
of the ~ollowins o~ 'acceptable equal
Baldor Electric, Model "Dirty
General Electric, Model "Severe Duty" - Cast Iron
Louis Allis, Modal "Chemical"
Reliance, Model "$XT" or "XT"
$iemens-Allis, Model "Chemical Duty/Severe Duty"
U S Motors, ~odel "Corro-Out2"
Wes~inshouse, Model "Mill and Chemical (MAC) Life-Line
All motors shall he ~urnishad in complete accordance with the require-
man~s of these specifications
[DENTO~ 10566 TI~B~IE GEN 62 0200]
[ 030885 ]
ID1-7
Each motor shall be designed and constructed in accordance with the fol-
lowing requirements
Type Squirrel-cage induction
Voltage 460 volts, 3 phase, 60 hertz
NEMA design letter Design B
Service Indoor
Mounting Horizontal
Ambient temperature range 0 C minimum, 50 ¢ max/mum
Enclosure type Totally enclosed fan cooled, with N~MA
waterproof features
I~sulation Sealed
Bearing type Ancifrfctton
Bearing lubrication syscom Grease
Shaft Solid
The shaft shall be furnished with corrosion resis-
tant treatment or shall be of a corrosion resis-
BLACK & VEATCH ,~L 460 VOLT INTEGI~L PROJECT ~0566
NOESEPOWER MOTORS SPEC 62 0200
ENGINEIH$ ARCHITECTS
MOTOR SPECIFICATION
AND DATA SHEET 1DI-8
L
2A-~
and S~an~a~d~
2A 2
L and Data
ees 2A-
2A-
2B-
2B.
Wa~er S~stem 2~
Valve
fdn 20. ,1
Uni~ 20~1
~ 2C~2
~em 2C42
DELETED FO ~CON~OT
[~I~NTON~ 105~6~T~~ , G~N 62 0200]
Sect t~AI~lp~EXOI~TATIO)I SYSTEM 2E-1 th~ 2E-16
~Sys~ ' 2E~ 0
~Data S~eet 2E- L6
2F-1 th~ 2F-2
2F-
~nd Data Shee~s 26-12 ~ru 2G-17
~,60V~ F~gdex Circui~
2~ 18
Sec 2~-1 th~ 2E-fl
II ~d~ 10566 TU~I~E G~ 62 0200]
Alternate codes, standards, or procedures not identified in the Proposal
will,not be accepted
The proper stamps shall be affixed to denote conformance to the appropri-
ate codes
Data reports rsquired by the ASME Boiler and Pressure Vessel Code shall
be submitted to the En$ineer in triplicate
2A 3 TYPE The hydraulic turbine senerator unit shall consist of a hor-
izontal Kaplan turbine connected to a synchronous senerator A speed
increaser may be provided between the turbine and senerator if its inclu-
sion results in a sisnificant capital cost reduction An electrohydrau-
lic controller shall be provided for turbine control
2A 4 GENERAL ARRANGEHENT The equipment furnished under this Contract
shall be based on installation and operation in the saneral powerhouse
arransements indicated on the followin$ drawings included as part of
these specifications
Drawing No Revision Title
10566-DS-1001 0 PROJECT GENERAL
ARRANGEMENT
10566-DH-1001 0 POW~RIiOUSE ARRANGF~[ENT -
HORIZONTAL
The dimensions of the hydraulic passages and the turbine setting shall be
established by the Contractor as required to meet the performance and
cavitation Suarantees This information shall be submitted with the Pro-
posal
2A 5 DESIGN CRITERIA The turbine generator unit shall be designed to
operate under the conditions specified herein
2A 5 1 Project Site Conditions The site specific conditions for design
shall be as follows
Maximum lake level 532'-0" msl
Minimum lake level 481'-0" ms1
Minimum tailwater level 446'-0"
Maximum tailwater level 463'-0" msl
Tailwater level at 470 cfs 448'-5" msl
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2A-2
Section 2A - DESIGN AND PERFORMANCE
2A i GENERAL This section covers the major design and performance cri-
teria for the turbine, controller, speed increaser, generator, excitation
system, and auxiliary equipment
The specifications for various items of equipment are intended to outline
minimum acceptable standards of quality and performance and to describe
the scope of work involved These specifications are not to be considered
exhaustive "bills of materials" nor are they intended to restrict proper
design and application of system components
Consideration will be given to a unit which varies from these specifica-
tions in order to conform to the manufacturer's standards, provided that
the equipment satisfies the performance and operation requirements spec-
ified herein
The maximum capability of the unit shall be established by the bidder
based on consideration of the annual generation model in Section D and
capacity credits Maximum capability greater than rated conditions is
desired
2A 2 CODES AND STANDARDS All materials, equipment, and fabrication
procedures and tests shall be in accordance with the latest applicable
requirements of the ASME Boiler and Pressure Vessel Code, ANSI, ASTM,
NFPA, NEC, NEHA, IEC, IEEE, ISO, and ~he laws of the State of Texas, all
local ordinances, the applicable requirements of ~he Federal "Occupational
Safety and Health Standards," and other codes and standards as specified
Other national standards of the manufacturer's country may be acceptable
to control the actual performance of ~he work Such standards shall be
clearly identified in the Proposal Data section The bidder shall demon-
strata in his Proposal the conformance of these standards to the minimum
requirements specified The acceptability of these standards will be de-
termined by the Ensineer during the detail design
Two copies each of the proposed alternate codes, standards, and proce-
dures shall be available at no cost to the Engineer on request The
copies shall be in the English language Alternate codes, standards, and
procedures which do not satisfy the minimum requirements specified, may
be made acceptable by the addition of supplemental written procedures and
instructions Such supplemental procedures and instructions shall be
subject Co the review and acceptance of the Engineer These supplemental
procedures and instructions shall also be available, on request, to the
Ensineer If accepted by the Engineer, ~he proposed alternate codes, in
conjunction with the supplements, shall con2rol the actual performance of
the work
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2A-1
The ambient air emperature ran8e is -3 to 113 F
The site seismic conditions shall be as defined for ANSI ASS
Seismic Zone 1
2A 5 2 Turbine The general design parameters of the turbine shall be
as follows
Number of u~i=s
Pa=ad flow 470 cfa
Nominal ratted net head 60 feet
Net head op~ratin8 range 76 to 25 feet
Minimum con::lnuous operatin$
flow at 76 :!est net head 150 cfa or less
Range of cl,~sin$ time for
synchronous bypass valve 20 to 60 seconds
Maximum all, mble transient
pressure in ~enstock 101 feet
Maximum ova ~aad on full
load reJect Lon at 76 feet
net head 160 percent
The nat head spa:iliad above shall be the head available (static head
plus velocity he id) at the inlet pressure taps, as indicated on the draw-
lngs, lass tailw~ter level and draft tube velocity head Pressure drop
from the upatrea point of equipment supply under these specifications
through discharg of the draft tube is not included in the net head and
shall be include in the turbine efficiency (pressure drop)
2A 5 3 Controll The general design parameters of the controller
shall be aa follows
Type Electrohydraulic
~aximum oil pressure 900 psi
Wicket gate closing time range 4 to I0 seconds
Wicket gate opening time ran8· 20 to 40 seconds
Servomotor ~ead time Less than or equal to
0 2 second
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2A-4
The following flow duration data, and flow-tailwater level data, shall be
used
Percent of Time
Equaled or Exceeded Flow Tailwatsr Level
cfs msl
20 510 448'-?"
40 330 447'-11"
60 250 447'-7"
80 210 447'-4"
90 190 447'-3"
River water temperature ranges from 40 to 90 F A typical water quality
analysis is as follows
Parameter Value (m~/1 as such)
Calcium 80
Magnesium 6 5
Sodium 70
Bicarbonate 270
Sulfate
Chloride 79
Fluoride 0 3
Nitrate 1
Phosphate 0 5
Dissolved Oxygen 9
BOD 1 9
pR 7 7
River water from the reservoir is screened through trash racks with open-
ings of 4 inch by 40 inch size
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2A-3
2A 5 6 Operatin~ Requirements The Lewisville Hydroelectric Project
will be a remote controlled facility Reservoir releases and therefore
unit load will be controlled by the U $ Army Corps of Engineers
The turbine generator unit shall be designed for continuous, reliable,
and safe operation under the following conditions for a period of
50 years
Over the entire load from guaranteed maximum output to mini-
mum stable load
Over the entire net head range
Ail equipment furnished shall be free from adverse vibrations, pulsa-
tions, and torsional resonances The critical speed of the combined ro-
tating parts shall be at least 25 percent greater than the maximum run-
away Speed All components shall be designed and constructed to with-
stand safely the stresses resulting from operation at the maximum runaway
speed as well as those stresses resulting from normal operation modes
The system and equipment shall be designed for any underspeed or over-
speed condition of duration expected with equipment furnished during any
operating mode The unit rotating parts shall be designed for the maxi-
mum speed resulting from the turbine maximum runaway, including speed
increaser, and shall safely withstand such operation for a period of not
less than 60 minutes, the unit bearings shall safely withstand the tem-
peratures and wear caused by such operation
System equipment shall be designed to protect equipment and accomplish
appropriate response in event of power outage This shall include a full
automatic shutdown of the unit on loss of offeite power to the unit
2A 5 7 Materials Materials of all component~ furnished by the Contrac-
tor shall be new and of first-class quality, suitable for the purpose,
free from defects and imperfections and of the classes and types listed
in Section II of the ASME "Boiler and Pressure Vessel Code" or the equfv-
alent ASTM materials Unless otherwise specified, structural steel com-
ponents and supports shall be manufactured from steal conforming to
ASTHA36 Should the bidder propose other materials, complete details
and specifications shall be submitted with the Proposal A listing of
all materials for the major components shall be included with the Pro-
posal
All materials or parts used in the equipment shall be tested in confor-
mance with the applicable specifications and purchased with certified me-
chanical and chemical properties Stocked materials may be used provided
tbs material when purchased required certification Copies of all certi-
fications shall he supplied if requested by the Engineer
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2A-6
Servomotor deadband Less than or equal to
0 05 percent
Time constant of damping
device 0 to 10 seconds
2A 5 ~ Generator The general design parameters of the generator shall
be as follows
Rated output Equal to or greater than
the larger of the follow-
2,877 kVA at 0 9 power
factor
or
Turbine maximum out-
put over nat head
operating range in
kW aC 1 0 power factor
Synchronous speed, rpm Not greater than 720
Runaway speed, rpm As required by turbine
runaway speed
All other requirem~nts shall be in accordance with Section 2E
2A 5 5 Excitation System The general design parameters of the excita-
tion system shall be as follows
Nominal band of regulated ±0 5 percent of the rated
voltage generator voltage
Rate of correct behavior Within 85 percent to
of the exciting system and 150 percent of the rated
AVR equipment during speed/ speed
frequency variation
AVR sensing circuit 2 PTs, 4,200/120 volt
ANSI Accuracy, Class 0 3
W~ X~ y
Excitation system voltage
response ratio Higher than 1 0
Excitation nominal ceiling
voltage Higher than 150 percent
[DENTON 10566 TURBINE GEN 62 0200]
[ O31387 ]
2A-5
Transition surfaces between concrete and air or concrete and water shell
be coated at least 6 inches into the concrete in accordance with Coating
System Data Sheet A52
2A 6 PERFORFUtNCE CURVES AND DATA Full characteristic curves and per-
formance data on the turbine, generator, controller, speed increaser, and
excitation systems shall be submitted as requested herein and as scheduled
in Section lA
Turbine
Prototype turbine curves based on previous model test data
for the operating conditions of minimum continuous output to
maximum continuous output from net heads of 25 feet to 76 feet
with efficiency, allowable sigma value, wicket gate opening,
and runner blade angle
Prototype turbine cavitation diagram of critical siena
(sigma value where efficiency starts to drop) and plant
sigma versus turbine discharge for net heads of 76, 66, 60,
49, and 2S feet
Turbine performance curves of the model for various gate and
runner blade openings for the full range of specified heads
The results shall include the head for maximum turbine effi-
ciency, even if this point should occur outside the normal
operating range
Siena break curves for maximum and rated discharge at maxi-
mum and rated head
Necessary curve for not less than six gate and runner blade
openings selected for advantageous coverage of the con-
di=ions necessary to perform hydraulic transient calcu-
lations
Characteristic curves for model and prototype turbine run-
away speed and corresponding discharge for turbine on-cam
and off-cam
Flow, torque, and head loss curves for synchronous bypass
valve
Speed increaser
Efficiency curve
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2A-8
2A 5 7 1 Working Stresses The Contractor shall be responsible for
using adequate factors of safety throughout the design of the equipment
specified herein Under the most severe conditions of loading expected
under normal operation, including maximum generator output under 76 feet
net head, tensile or compressive stresses in the materials shall not ex-
ceed the lesser of 1/2 of yield strength or 1/4 ultimate strength Shear
stress shall be limited to 1/2 the allowable value specified above for
tensile or compressive stress Under emergency loadings such as runaway
speed, the stresses shall not exceed 1 33 times the allowable value for
normal operation
2A 5 7 2 Welded Construction and Welding Weld-fabricated pressure
parts shall be designed, fabricated, inspected, and teated, unless other-
wise specified, in accordance with Section VIII, Division 1, of the ASTM
"Boiler and Pressure Vessel Code" and shall be stress relieved when re-
quiring by Section VIII Division 1 as a unit prior to final machining
The qualification of welding procedures, welders, and welding operators
for all welding of pressure components, including repair welding, shall
conform to Section IX of the ASME "Boiler and Pressure Vessel Code" The
qualifications for welding of other parts shall conform to either ASME
Section IX or AWS D1 I "Structural Welding Code"
2A 5 7 3 Shop Coating The following shop coating requirements shall
apply in addition to those specified in Section lb
2A 5 7 3 1 Surfaces i__n Contact With Water Components fabricated of
carbon steel and having carbon steel surfaces in contact with water such
as wicket gates, bulb, draft tube liner, att , shall be shop coated in
accordance with Coating System Data Sheet A$2 included at the end of this
section Contractor shall supply touchup paint adequate to repair 25 per-
cent of the area coated
Critical surfaces such as mating surfaces, bearing surfaces, and stain-
less steel surfaces shall be protected by masking or other suitable means
to ensure that damage during the blasting will not occur
No paint shall be applied to surfaces within 3 inches of field welded
connections or to mating carbon steel surfaces
2A 5 7 3 2 Surfaces in Contact With Concrete Surfaces in contact with
concrete such as d-~f~ tube liner, embedded anchorages, att , shall be
cleaned but not painted unless otherwise indicated Surfaces of these
components shall be prepared by mechanical cleaning in accordance with
the requirements of SSPC-SP-2 or SP-3 and as otherwise required to pro-
vide a clean, dry, oil free surface
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2A-7
2A 7 pERFOlhVd~CE GUARANTEES The turbine generator and auxiliary equip-
ment shall be guaranteed to operat~ satisfactorily without pitting, ex-
cessive cavitation~ excessive vihration~ or excessive noise when operat-
ing at design conditions, when being started up or shut down, and at
runaway speed
The following shall be guaranteed to be as stated in the Proposal Data
Rated turbine/speed increaser/generator output with turbine
flow conditions of 470 cfs at net head of 60 feet and a
0 9 senerator power factor
Maximum continuous turbine/speed increaser/generator output
for a net head of 60 feet and 0 9 power factor
Minimum stable turbine operation for net heads of 76 to
49 feet
Average annual net energy generation by the turbine/speed
increaser/generator based on flow and head model in Proposal
Data
Turbine efficiency and output at flows from minimum stable
operation to maximum with net heads of 76, 60, and 49 feet
Speed increaser efficiency over the entire output tense
Generator efficiency versus power output for power factors
of 0 9 and 1 0
Excitation system performance
Critical speed of all rotating parts greater than 125 per-
cant of maximum runaway speed
Overspeed and pressure rise on load rejection
Maximum runaway speed
Flywheel effect
Maximum sound pressure level of combined turbine/speed
increaser/generator
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2A-10
Generator
Generator capability diagram for rated conditions
Generator open-circuit and short-circuit characteristics
Generator zero and rated power factor saturation curves
Generator v-curves
Generator individual losses and diagram of their segregation
from test
Generator efficiency curves versus output at power fac-
tors 0 9 and 1 0
Excitation system
Ail generator, exciter, and regulator data required to com-
plete a mathematical model study of system stability
A block diagram of sisnificant transfer functions represent-
ing the generator, exciter, and regulator, satisfactory for
computer studies
Current transformers
Transformer secondary excitation characteristics curve
Ratio correction factor curve
Thermal rating
ANSI metering relaying accuracy class
Current transformer secondary resistance at 25 C
Phase angle correction factor curves
Transformer correction factor curves
Combined turbine-generator-speed increaser
Generator output with 0 90 power factor for operatin8 con-
ditions of m~nimum continuous output to maximum continuous
output with net beads of 76, 66, 60, 49, and 25 feet
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2A-9
2A 8. STAETUP AND COMMISSIONING After all the component and subsystem
tests and adjustments have been made to ensure their satisfactory oper-
ation, the equipment furnished under Chess specifications shall be pre-
pared for startup and commissioning under the direction of the Contrac-
tor's representatives
The Contractor shall perfom the startup tests indicated below, perform
commissioning of the units, and prepare a 8tartup and commissioning re-
port a8 specified herein Performance Casts will be conducted by the
Con,ratter with the Owner's assistance as specified elsewhere in these
specifications The Owner will provide operating personnel to assist in
the startup, co--.~saioning, and testing
The preparation for startup and commissioning will include cleanup.
lubrication, and tagging of equipment as necessary for startup tests
Also. in preparation for the testa, the Contractor shall submit to the
Engineer. for review and comments, a proposed Startup and Commissioning
Man, al to be followed during the tests The Contractor shall revise the
man, al to incorporate the Engineer's comments The Startup and Commis-
sioning Manual shall detail the following
Checking. lubrication, and tagging of equipment in prepara-
tion for the tests
The step-by-step procedure for various tests, including the
following items
~ listing of the inspections to be made on each
item of equipment such as lubrication, clearances.
vibration readings, calibrations, alignment checks.
insulation testa, and rotation
A listing of all auxiliary devices such as pres-
sure switches, temperature switches, level switches.
limit switches, and indicators with the function
of device, the method of testing, the required
setting for the device, and the actual setting
recorded at site
A listing of all the sequential steps which must
be observed to demonstrate that the equipment as a
whole functions aa intended This demonstration
shall include starting and stopping of auxiliary
equipment by means of push-button stations, if ap-
plicable, plus automatic starting and stopping of
equipment, if applicable. Ail intermediate events
such as auxiliary device operation, auxiliary
equipment start/stop, and alarm action shall be
listed for verification in the proper sequence
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2A-12
The Suaranteed efficiency of the turbine shall be determined from the ef-
ficiency of a previousl~ tested model corrected for scale effect by the
Hutton formula in which
prototype loss ~Rem~1/5
model loss = 0 3 + 0
~ere Re = i:urbine Relmolds' number Re = D ~
o n
Subscrip~ p denotes prototype
Subscript m denotes model
H - head in
n
D = runner dive,er in
~ ~ kinematic vfscosi~y of fluid in square fea~ per second
The correction shall be applied ~o ~he poin~ of ~ ef~iciency o~ the
· odel The e~ficiincy o~ the ~urbine ac ocher points shall be the model
e~ficiancy increased by the same amoun~ as for ~he poin~ o~ ~im~
ciency Th~ ~urbine po~er ou~pu~ shall be scaled up by applyins
ra~io o~ the prototype efficiency co the model e~iciency
Piccins due co cavi~aCion resulcinS in ~Cal loss o~ ~he runnar~ ~nner
chroa~ tins, or dra~ ~ube shall be sua~an~eed hoc Co exceed cbs
ins ~or a period o~ 8,000 operacinS hours
He,al loss a~ a race o~ 0 10Da/8,000 pounds per opera,tnS
hour, vhera D is ~he runner dia~csr in
~al loss ~o a depth o~ 3/16 inch resardless o~ the area o~
loss
Should either o~ ~he above criteria no~ be ~C, ~ha Con~rac~or shall
pair ~he d~a~ed area by veldinS and srindin~ ~o the orisinal or improved
runner pro~iles In cas~ o~ local cavi~aCion da~se caused or assravaCed
by any contour e~rors, the Con~rac~or shall ~ka ~h~ modi~ica~ions neces-
sa~ Co ~he runne~ pro,lie or ocher par~s ~o prevent i~s reoccurrence
Upon comple~ton o~ ~he repairs, ~he suaranCee period shall be reneved ~or
· n additional 8,000 hours
~e ~urbine capacity and e~iciency shal1 be based on previous laboratory
model cesc results The bidder shall submit vi~h his proposal su~ficlenc
suppor~inS da~a and calculations from applicable ~del ~ascs conducted
accordance vi~h a ~eco~nized per~o~nce ~es~ code ~o demonacrace the
validity of ~he ~aranCeed ouCpu~ efficiency, and seCCins ~ch relation
Co CailvaCar for ~he operaCinS speed
[DENTON 10566 TURBINE GEN 62 0200]
031387 ]
Unit speed ~
Generator power output, volcase, and current
Temperatures of the tuide and thrust bearinss, oil
reservoirs, and heat exchanser inlet and outlet
Los of startup and connnissionin8 events
The Contractor shall provide a listing of the required
instruments=ion for the testing program to obtain record of
the test dace All required instrumentation shall be pro-
vided by the Contractor and shall remain the property of the
Contractor The Contractor shall make the necessary pro-
visions in the desisn of the equipment for proper mounting
and proper functioning o[ the test instruments All instru-
mentation, racordins, alarm, and indicating devices furnished
as a part of the equipment supplied under this Contract shall
be available for the test purposes
The proposed orsanization of the Startup and Commissioning
Tests shall be included The Engineer will appoint a test
ensinaer who will provide technical and schedulins liaison
between the Owner, the Contractor, and ocher contractors
The Snsinaarfs representative, in addition to witnessing the
~eeCs, will rule on acceptability of =est data or whether
adjustments and modliicacione should be made before proceed-
inS with fur=her tests. The Ensineerfs representative will
also coordinate operations of watering and unwaterins of the
unit, placement of unit on-line, and loadfns and load rejec-
tion operations with the 0wnerts operations personnel
The Startup and C~iesioning Test program will be conducted in accord-
ance with the revised test program which shall be bound and distributed
to the Ensineers and specified in Section iC
Any defecCs or inadequacies uncovered as a result of the Startup and
Commissioning Tests or the performance tests shall be corrected, and the
tea~s continued until ~he entire testing prosram is completed and the
equipment found satisfactory by cha Owner All defects and inadequacies
found durins the testins program shall be corrected by the Contractor at
no cos~ to the Owner, provided such defects are within the Contractor's
responsibilicy as defined herein
A StarCup and Commissionins Test Report shall be prepared by the Contrac-
tor and shall include copies of sisnificant sections of the recorded
traces, su~naries of recorded data from all equipment, as well as docu-
mentation of revised sectins of various equipment and revised performance
[DENTON 10566 TURBINE GEN 62 02001
[ 031387 ]
2A-14
The Startup and Commissioning Schedule including time .
durations for each test
The scope of the testing program, which shall include the
following as a minimum
Dynamic balancing of the coupled turbine, speed
increaser, and generator rotating parts
Recording of pertinent data for mechanical rota-
tion and monitoring of the unwatered unit
Initial watering and pressurizing of the water
passages with unit stationary
Initial hydraulic rotation and speed checks of the
unit and operation at speed no-load
Synchronization and placement of the unit on-line
Loading operations until stable conditions are ob-
tained for 10 percent increments of rated capac-
ity. and load rejection for load increments of 25.
50. 75. and 100 percent of rated capacity and for
maximum capability
Index tests in accordance w/thASHE Power Test Code
Hydraulic Prime Hovers PTC 18
Test data to be observed and recorded during the startup and
commissioning, which shall include the follow~ng
Shaft runouts
Axial movement of the shaft
Thrust bearing support deflection
Runner blade position
Water pressure at intake area and in the draft
tube section
Oil pressures in the opening and closing sides of
servomotors, and in the pressure tank
Total and effective opening and closing times of
wicket gates and runner blades measured with unit
unwatered and again with the unit watered
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2A-13
output at rated conditions, $2,800 per kW for each kW below guaranteed
maximum continuous operation output, and $420 for each }~h below the
guaranteed average annual energy production Payment will not be made to
the Contractor for kW output and ~ production in excess of the guaran-
teed
2A 9 1 Capacit~ and Index Testa Unit capacity and index tests of the
turbine-generator unit shall be 'perfot~ned by the Contractor at the option
of the Owner to verify that the power output, shape of the efficiency curves.
and average annual energy generation guarantees have been fulfilled Net
head shall be determined by subtracting the tailvater elevation staff gauge
reading frma the upstream penstock preaaure tap pressure plus the velocity
head~rlthin the penstock less the calculated velocity head at the draft
cube outlet for the flow condition At the Owner's option, draft cube
pressure tap pressure measurement may be used instead of tailvater eleva-
tion The capacity tests will be conducted at a net head near the spec-
iliad net head~ however, should the nec head condition not exist aC the
time of the test, the generator output shall be adlusted by the ratio of
the net heada to the 3/2 power to decer~ine whether the guaranteed outputs
have been achieved The unit capacity will be determined from electrical
measurements of genarator output The power output of the generator will be
measured with the use of calibrated electrical test instru~ents furnished
by the Contractor Flow measurement shall be by ultrasonic measurement
or another method mutually agreed upon by the Owner and Contractor The
manufacturer's field service representative shall perform any subsequent
adjustments as may prove necessary or desirable to secure optimum perfor-
mance Test results shall verify that total installed system will deliver
~uaranteed output at dee~gu head flow and speed without high temperature
buildup on any component and without undue vibration or torsional reso-
nances
2A 9 2 Turbine Runawa~ Speed Test During the starCup and test period,
the Contractor, at the opCiono-r~he O~ner, shall perform a runaway speed
test on the unit to determine whether the guarantee, with respect co run-
away speed has been fulfilled The test will be perfot~ned at the highest
head available at the time of the test with no load on the generator
The test vlll be of not more than 3 minutes duration from the time
maximum speed has been attained
2A.9 3 Turbine Efficienc~ Test Within the guarantee period the Con-
tractor, a~"~'~-~ option of the Owner, shall perform an efficiency cast of
the turbine to verify that the turbine efficiency guarantees have been
fulfilled In the avant that the turbine efficiency teats are performed,
they will be conducted in accordance with the provisions of IEC41, "Inter-
national Code for Field Acceptance Teats of Hydraulic Turbines," except
as modified herein Flow measurement upstream of the turbine shall be
made by the ultrasonic flow measurement method or another method mutually
agreed upon by the Contractor and Owner Nec head shall be measured as
specified under Capacity Tests
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2A-16
data as obtained during the startup tests The Startup and Co~issioning
Test Report will be subject to review by the Engineer, and the Contractor
shall revise or expand the report as may be requested by the Engineer
Copies of the revised Startup and Commissioning Test Report shall be
furnished to the Engineer as specified in Section iC
2A 9 PERFORMANCE TESTS After the turbine-generator set has been in-
stalled and placed in operation, it will be tested at the option of the
Owner by the Contractor for the price listed in this Contract to deter-
mine if equipment furnished performs as specified and as guaranteed The
Contractor shall be responsible for furnishing and installing all test
connections required on the equipment furnished under this Contract If
the Owner exercises the option to have the Contractor performs test, the
Contractor shall provide all instrumentation required to perform the test
The instrumentation shall remain the property of the Owner
No tests shall be conducted on equipment or materials for which manufac-
turer's field service is specified unless the manufacturer's field rep-
resentative is present and declares in writing that the equipment and ms-
tarsals are ready for such test
Performance tests shall be conducted in accordance with applicable IEC
and/or ASME Standard Test Codes except as modified herein The Contrac-
tor shall supply input regarding type and location of monitoring devices
which should be incorporated into station construction to obtain neces-
sary teat data
If the equipment operation is unsatisfactory due to any deficiency in the
Contractor's work, the Contractor shall make repairs and correct defects
in his work to obtain satisfactory performance of the equipment If any
supplementary tests are required as a result of such deficiency, the Con-
tractor shall provide all additional testing equipment an~ instruments,
furnish testing personnel, and incur all expenses connected with such
supplementary tests
In case any of the equipment furnished under this Contract fails to oper-
ate aa required, or in case of failure to meet any of the guarantees pro-
vided for in this Contract, the Owner shall have the right to operate the
equipment until such defects have been remedied, and guarantees fulfilled
without cost to the Owner Repair or removal of rejected equipment shall
be scheduled to the satiafactiou of the Owner In the event that serious
defects necessitate the rejection of equipment, the Owner shall have the
right to operate the equipment until such time aa new equipment is pro-
vided to replace the rejected equipment
Should the Contractor be unable to modify the turbine generator to meet
the guaranteed output and average annual energy production, the Contrac-
tor shall pay the O~ner $2,800 per kW for each kW below the guaranteed
[DENTON 10566 TURBINE GEN 62 0200]
( 031387 ]
2A-IS
2A 9 4 Generator Efficisnc~ Tests In order to check the efficiency
values 8uatanteed by the Contractor, efficiency measurements by means of
approved methods shall be performed by the Contractor at the option of
the Owner
A detailed program of the field efficiency tests shall he prepared by the
Contractor and approved by the Owner
The followin$ tests and measurements shall be mede
Measurement of senerator load losses for load points of
50 percent, 75 percent, and 100 percent of continuous output
Precision measurement of reactive and active power sen-
stated, measured with precision class 0 2 equipment, w/Ch
conditions maintained as close as possible to rated values
Excitation losses as determined from voltage and current
2A 10 SHOP ASSEMBLY The turbine, senerator, speed Zncreaser, and con-
troller shall be individually assembled in the shop to the extent practi-
cable They shall he properly maccBm~rked and dowelled to ensure correct
assembly and allsnmant of parts in the field except chat, where necessary,
suitable dowels shall be furnished for insertion after field assembly and
drilling Assemblies shall also be made of all control panels and cabi-
Coolins coils, pressure vessels, servomotors, and pressured oil circuits
shall be shop tested at 1 § C~nes their design pressure for 1 hour with-
out leakase, damage, or failure
Oil sump assemblies shall be Casted with a full oil level without leak-
age
All normal operating cycles, such as wicket sate operation, servomotor
operation, runninS blade operation, and swiCchgear operation, shall he
perfo~ned in the shop durin$ the assembly tests
Interferences, errors in dimensions, and inaccurate workmanship dis-
covered during shop assembly shall be corrected
A record shall be made of shop measurements of all critical dimensions,
diameters, concentricities, runouts, clearances, att , of the moving and
stationary parts, which may affect the field installation and alignment
or the operation of the unit These records shall be forwarded to the
Engineer for reference during field erection and for record purposes
[DENTON 10566 TUEBINE GEN 62 0200]
[ 031387 ]
2A-17
)ESCRtPTION SYSTEM
PREPARATION Profile depth 2 to 6 mils as recommended by coating
COATING DRY F~LM ~C~AL NOTES
THICKNE$~
FIRSTCOAT 2-8 ~ A~ ~eco~ended b7
TOUCH UP
, ,
SECOND COAT 8-16 ~ reco~ended by ~nu[acturer
mt]s
THIRD COAT 8 m~s I~ =equated by ~nu[acturer
TOTA[$Y~EM 18-26 ~ teco~nded by ~nufacturar
~ATING PRODU~ IDENTIFI~TION
MANUFA~RER FIRST COAT TOUCH UP SECONO COAT THIRD COAT
~e~on ~etcoat 71 H/A ~ercoat 78HB Hot requ~red
Po~ya~de ~ured ~ne cured
~poxy Primer Coat Tar Epoxy
~tbol~ne ~rbo~sttc 3 N/A Carbo~st~c 16 ~rbomast~c [4
Coal Tar Epoxy Coal Tar Epoxy Coal Tar Epoxy
PrL~r
V~TC~ COATING SYSTEM DATA SHEET 090181 IRH/C~F
N ENOINEERS
* Inlet anchor ring Steel plate, ASTM A516
Grade 55 or cast steel,
ASTM A27 Grade 70-40
Draft tube Steel plate, ASTM A516
Grade 55
Stay column Cast steel, ASTM A27
Grade 70-40 or steel
plate, ASTM A516 Grade 55
Wicket gates Cast steel, ASTM A27
Grade 70-40 or steel
plate, ASTM A516 Grade 55
2B 4 RUNNER The runner shall be of Kaplan type, consisting of the hub,
the blade regulating mechanism with servomotor, and the adjustable
blades
The number, size, and profile of the runner blades shall be established
by the turbine manufacturer based on previous model tests to provide op-
timum performance throughout the design range of operating conditions
The runner hub shall have a flange for bolted connection to the turbine
shaft
Ail surfaces of the runner exposed to the flow of water shall be finished
to a surface finish of 125 microinch or better by grinding and shall be
free from hollows or projections
The runner shall be stress relieved before final machining
The completed runner shall be statically balanced in the turbine manufac-
turer's shop
2B 5 SHAFT The main shaft shall be of hollow shaft type with forged
couplings and suitably welded and properly heat treated The shaft shall
be of ample size to operate at any speed up to the maximum runaway speed
without detrimental vibration or distortion The shaft shall be designed
with an ample margin of safety against failure by fatigue Design and
manufacture shall be such as to avoid or reduce stress concentrations to
a safe minimum by providing fillets ~here there are discontinuities of
the shaft section
The shaft shall be accurately machined and finished, and shall have weld-
ed and forged flanges conforming to ANSI Standard B49 1, with tapped
holes for Jacking screws in the flange on the runner end for breaking the
Joints The shaft shall be machined as necessary to properly connect
*Refer to Basis of Contract
[DENTON 10566 TURBINE GEN 62 0200]
111987 ]
2B-2
Section 2B - TURBINE AND AUXILIARY EQUIPMENT
2B 1 GENERAL This section covers the technical requirements of the
turbine and associated auxiliary equipment
2B 2 GENERAL DESCRIPTION The turbine shall be of the horizontal axis,
tubular---w~ type with Kaplan type runner Both wicket gates and runner
blades shall be adjustable The turbine shall be directly connected to
the 84 inch diameter pipe carrying the water from the reservoir The
turbine shall include concrete embedded inlet anchor ring, wicket gate
operating mechanism with oil hydraulic servomotor and counterweight, run-
ner throat ring, bulb casing, draft tube, the runner operating mechanism,
and turbine bearing The runner throat ring shall be split horizontally
in the shaft axis plane to facilitate runner inspections The turbine
shaft shall be connected to the runner and shall lead to the outside
through the draft tube liner The runner shaft shall be supported at its
downstream end by a combined thrust and guide bearing located on a con-
crete foundation The turbine draft tube shall be of welded design with
the downstream end formed by concrete formwork in accordance with the
manufacturer's hydraulic design
Direction of rotation shall be selected by the turbine manufacturer, co-
ordinated with gearbox and generator, and stated in the Proposal Data
sheets
The turbine shall be provided with Winter-Kennedy or Peck taps for
continuous flow monitoring
*2B 3 MATERIALS Turbine materials shall be equivalent to, or exceed,
the strength and corrosion-erosion resistance of the following listed ma-
terials
Runner Stainless steel castings,
ASTM A743 Grade CA-6 NM
Nub Cast steel, ASTM A27
Grade 70-40
Shaft Forged steel, ASTM A668
Class D
Bulb Steel plate, ASTM A516
Grade 55
Runner throat Steel plate, ASTM A516
Grade 55 or cast steel,
ASTM A27 Grade 70-40
*Refer to Basis of Contract
[DENTON 10566 TURBINE tEN 62 0200]
111987 ]
2B-I
correct operation for 15 minutes without cooling water circulation, if
provided, starting from nomal service temperature Each bearing shall
be provided with a RTD or thermocouple for temperature monitoring and
alarm, and a temperature switch for trip Level switches on all sumps
shall also be provided for alarm and trip
2B 7 DISTRIBUTOR The outer bearings and seals for the wicket gates
shall be incorporated in the outer casing Tbs wicket gate bearings
shall be the self-lubricating type Inner bearings and seals for the
wicket gates shall be incorporated in the inner casing
Ail wicket gates shall be interchangeable and independently adjustable
The gate mechanism shall have ample strength to withstand maximum load
imposed by most severe transient operating conditions
Suitable protection devices shall be incorporated in the wicket gate ad-
Justing mechanism to prevent damage in the event o£ wicket gate blockage
These shall include a shear pin or breaking link for every gate
The gates shall be designed to drift towards closed position in event of
loss of controller oil pressure A reliable mechanism with counterweight
shall be provided to ensure safe closing under any conditions
The wicket gates shall be of cast steel or fabricated of steel plates
with internal steel stems A bushing of the self-lubricating type or
grease lubricated shall be provided for all parts having contact when in
motion Stops shall be provided to prevent a free wicket gate from
Stay colv~--~s shall be provided for flow distribution and bulb support
Stay columns and wicket gates shall be accurately machined smooth, free
of waviness, projections, depressions, or other surface irregularities
2B 8 FABEICATED STRUCTURES The following fabricated steel plate con-
struction shall be provided and shall have suitable reinforcing and an-
choring ribs for concrete grouting where applicable and shall be complete
with all flange connections and lifting lugs as required
Bulb nose casing
Eunner throat casing, in two halves
Inlet anchor ring
Draft tube
Support ribs shall be incorporated for transmitting all axial, radial,
and torsional £orces from the turbine to the concrete structures and
foundations The minimum steel plate thickness shall be 3/8 inch
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
2E-4
with the coupling provided on the low speed shaft of the speed increaser
or the senera=or shaft Before installation, the shaft shall be cleaned,
prepared, and coated in accordance with Coating System Dace Sheet A52,
included at the end of Section ZA
A packing box shall be provided where the shaft passes through the draft
Cube The packing box shall be designed in two halves and the packing
material shall be of high grade hydraulic type or carbon Lubrication by
water or grease shall be in accordance with manufacturer's standard Lu-
brication water will be supplied from the penstock A RTD or chermo-
couple shell be provided to monitor and alarm temperature, and a tempera-
ture switch shell be provided for unit trip
The shaft shell have r~movable and renewable sleeves where iC passes
through the bearings and the packing box The sleeves shall be made of
corrosion-resisting steel and shall be accurately machined, polished on
the outside, and securely fastened to the shaft
RunouC shall be checked by rotating the finished shaft in a lathe or
aligning device in the manufacturer's shop and shall not exceed toler-
ances reco~anded for turbine shafts in the NE}iA Publication MG 5 1-3 04/1
2B 6 BEARINGS A guide bearing shall be provided and incorporated in
the bulb nose casing and a thrust and guide bearing shall be provided on
the shaft outside the draft cube and supported on the concrete structure
The combined thrust and guide bearing shell be of latest improved design,
of ample capacity to support axial thrust and counter-thrust in both di-
rections parallel to shaft axis under the most unfavorable operating con-
diCions
The ~utde bearing shall be a sacCionalized bearing shell lined with white
The turbine guide bearing shall be of the immersed self-lubricated type
and shall be located as near the runner as possible
The combined thrust and guide bearing shall be provided with a tempera-
ture detector for alarm and shutdo~m
All bearing housings and shells shall be split conveniently to facilitate
dismantling and maintenance
The bearings shall be capable of operating continuously without injury at
any speed from 50 percent Co 110 percent of the raced speed and for an
hour aC any speed from 100 percent of the raced speed to the maximum run-
away speed specified Furthermore, the bearings shall be guaranteed for
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2B-3
cooling water flow during unit startup, and automatically stop flow dur-
ing unit shutdown Manual control shall also be provided from the con-
trol switchboard
2B 11 SYNCHRONOUS BYPASS VALVE This article covers the desisn and con-
struction requirements for the synchronous bypass valve and operator to
be furnished under these specifications
In order to prevent water hair in the penstock during load rejection, a
synchronous bypass valve shall be provided The valve shall open syn-
chronously with the wicket gate closure
In the event of a turbine closure following a load rejection, the valve
shall open in a manner that the flow rate in the penstock remains un-
changed The valve shall be designed to remain open or automatically
close depending on the mode selected The valve closing time shall be
adjustable within the given adjusting range The closing time shall not
be influenced by the ambient temperature variation Water pressure dur-
ing valve closure shall not exceed the maximum permitted pressure in the
penstock
At the upstream side, the valve shall be directly flanged and bolted to
the turbine bypass pipe At the discharge side, the valve shall be bolt-
ed to a coupling provided [or dismantling and aligrmaent
Thelvalva shall operate through a mechanical linkage which is connected
to the turbine wicket gate operating ring The valve shall be of butter-
fly type A ires discharge valve shall be proposed as an option if throt-
tling of water flow ia later datemined to be required Minimum size
shall be ~8 inches
All elements subject to appreciable wear by water erosion shall be re-
placeable without removal of the disk
Complete valve and fitting elements shall be provided, including dif-
fusers, flanges, fitting pieces, foundation plates, and all necessary ac-
cessories for proper and safe synchronous bypass operation, such as dash
pot, retraction spring, and linkage
The butterfly valve shall he menu£actured by Allis-Chalmers, Xeyetone,
Ecolaire, Henry Pratt, or EIF-6eneral Signal
2B ll 1 Code Re~uiremants The butterfly valve shall be designed and
co~structed in accordance with AWWA C§0~-A~A Standard for Rubber-Seated
Eutterfly Valves, except where modified or supplemented by these speci-
fications, and in accordance with the applicable requirements of the
Federal "Occupational Safety and Health Standards" If the bidder's
valve design deviates from the requirements of AWWA C50~ other than those
specified herein, the bidder shall clearly state such deviation in the
proposal
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2B-6
The runner throat ring shall be stainless steel lined The stainless
steel shall be of a type that may be readily welded using only local pre-
heat and postweld heat treatments without danger of crackinS
The inlet anchor ring upstream end shall be shop prepared for butt weld
to the 84 inch penstock
The steel draft tube shall extend for a sufficient length into the struc-
ture to prevent leakage and to minimize erosion of concrete due to high
water velocities The draft tube shall be provided with a manhole
2B 9 OVERSPEED DEVICE An overspeed device shall be mounted on the tur-
bine shaft for the shutdown of the turbine-generator unit in case of ex-
cessive overspeed This device shall have hydraulic action on the con-
troller oil pressure system, initiating the closing of the turbine wicket
sate The device shall be complete with necessary electrical control
equipment
The device shall be adjustable within a certain range above the theoret-
ical maximum load rejection speed and shall be equipped with the neces-
sary oil pipes and isolatinB valves for connection to the governor oil
system
2B 10 COOLING AND LUBRICATION WATER SYSTEM Coolin$ and lubricating wa-
ter for bearing oil, shaft seal, and other required services shall be
provided from the upstream penstock and shall be discharged, to the maxi-
mum extent possible, to the tailrace or draft tuba All piping, valves,
strainers, instruments, controls, and other components required for a
complete system shall he furnished Pum~inS of water should be avoided
Strainers provided shall be of the dual basket, automatic, backflushinS
type with stainless steel basket System design shall consider multiple
strainers in series to preclude frequent strainer plusginB due to large
straining size reductions in any one strainer set Each strainer set
shall be provided with differential pressure gauge and two switches to
automatically backflush on hish differential pressure and alarm on higher
differential pressure BackflushinS valves shall be solenoid operated
Each strainer set shall be provided w~th isolation valves and a bypass
line and valve
Pipin$ shall be designed for easy removal where required for maintenance
access to the turbine Piping to each service shall be provided with a
globe throttling valve, sight flow indicator, pressure gauge, and pres-
sure switch A RTD or thermocouple shall be provided to monitor and
alarm temperature, and a temperature switch shall he provided for unit
trip Valving and controls shall he provided to automatically start
[DENTON 10566 TURBINE 6EN 62 0200]
[ 022786 ]
2B-5
The valve body shall be capable of withstanding a hydrostatic teac pres-
sure of two times the design pressure and shall be capable of withstand-
ing momentary shock loads of ~hree times the design pressure
2B 11 5 Valve Disk The valve disk shall rotate approximately 90 de-
srees from-"~ull Open Co tisht shutoff position
2B 17 S Valve Seats Rubber seaC rings shall be either clamped
valve die~'~-camp~'~-~d to the valve body with retaining rings or segments
and bolted fasteners The seat rinse shall be adjustable and replaceable
w~chout reuoviuS cha body from the line The retaining rings or sequents
shall be of corrosion-resistant material Fasteners shall be as speci-
fied herein under MA~!AT~S
A valve with disk mounted rubber seats shall have a hardened, Sround, and
polished body seaC ring, as specified under MATEP~T-ALS, secured to the
valve body
A valve with body mounted rubber seats shall have ground and polished
seating surfaces on the edge of the disks Disk seating surfaces shall
be of the material specified above
2B iI 7 Valve Shaft The valve shaft shall be designed for the torques
and forces encountered in opening and closing the valve in service The
shaft dasisn torque shall be determined in accordance with Appendix A of
AI~/A
A~l disk-co-shaft eecurin$ fasteners shall be as specified herein under
MATERIALS
2B 11 8 Sh~f~ Seals Shaft seals shall be of the split '~*' type or of
the squ~re--~ iimprsgn&ted Teflon packing with adjustable bronze packing
glands The packing shall be adjustable and replaceable without removing
the operator from the valve body
2B 11 9 Valve ~ The valve operators shall be in accordance
with AW~/AC"~ The valve operators shall be selected Co meeC the maxi-
mum torque requirements due to the design differential pressure specified
herein and with flow correspondin$ to ruuaway speed or m~x~mam continuous
output, wh~ohaver is greater The valve shall be provided with a ~nual
operator and a mechanical operator as required to open w~th wicket gate
closure, and then automatically close or remain open, depending on mode
selected
The valve operator torque requirements shall be the max~num
countered in not~l operation of the valve as calculated in accordance
wi~h Appendix A of AI~'WA C$0~, and shall include a factor of safeW
of 2 0
[DENTON L0566 TU1L~NE GEN 62 0200]
[ 022786 ]
2B-8
2B 11 2 Design The valve shall be of heavy-duty construction and shall
provide bubblstight shutoff with a differential pressure of 40 psi
The valve shall have a design pressure of 50 psi
The valve shall be designed for modulating service with the valve disk in
any position from fully closed to fully open
The valve shall be designed to accommodate the weight of the operator
without allowing deflection in the valve shaft when the shaft orientation
is vertical or otherwise
*2B 11 3 Materials The butterfly valve materials shall be equivalent
to, or shall exceed, the strength and corrosion-erosion resistance of the
following listed materiels
Valve body Ductile iron, ASTM A536
Grade 65-45-12
Cast iron, ASTM A48
Class 40 or ASTM A126
Class B
Disk Ductile iron, ASTM A536
Grade 65-45-12
Shaft Stainless steel, ASTM A276
Type 304 or A276 Type 316
Soft seat Buna N
Neoprene
Hard seat Stainless steel Type 304
or 316
Fasteners 18-8 stainless steel
Valve sleeve bearings Self-lubricated bronze or ac-
ceptable corrosion-resistant
nonlubricated material
2B 11 4 Valve Body The butterfly valve body shall be Class 75, with
Class 125 flat faced flanged ends, faced and drilled in accordance with
ANSI B16 1 Face-to-face dimensions of valve shall conform to AW-WA C504
for short body valves
*Refer to Basis of Contract
[DENTON 10566 TURBINE GEN 62 0200]
111987 ]
2B-7
* Center Support Flange Steel plate, ASTM A285 Grade B
or C
Lantern Ring and Gland Bronze
Operating Rods and Nuts Bronze
The valve shall be provided complete with all hydraulic equipment, con-
trol panels, and accumulator as required to assure operation on unit trip
and loss of ac power to the unit Limit switches to indicate when the
valva is open, closed, or in any intermediate position shall be provided
Limit switchee shall be in accordance with Section lB
The valve shall be provided with discharge end steel supports as re-
quired
*Refer to Basis of Contract
[DENTON 10566 TURBINE GEN 62 0200]
[ 111987 ]
2B-lO
The valve manual operator shall be a worm gear reducer manual operator
The operator shall be suitable for operation in any position without loss
of lubricant
The operator shall be provided with a position indicator and locking de-
vice The locking device shall be arranged to lock the valve with the
disk in any position from fully closed to fully open The operator shall
be furnished with a handwheel Lsvers or cranks will not be acceptable
In addition, the operator shall be provided with a 1-1/2 inch hexagonal
nut for use with a portable air wrench drive
2B 11 10 Limit Switches The valve shall be provided with limit switch-
es to indicate when the valve is open, closed, or in any intermediate po-
sition Limit switches shall be in accordance with Section lB
2B 11 11 Tests The valve shall be given witnessed factory tests in ac-
cordance with tests listed in AWWA C504
2B 11 12 Optional Free Discharge Valve The free discharge valve shall
be as manufactured by Allis-Chalmers (Howell-Bunger Valve), Kubota, or
acceptable equal The valve will be installed in a pit in the powerhouse
floor and discharge into a tunnel under the powerhouse and parallel to
the turbine discharge Both ends of the valve shall be provided with
Class 125 flat faced flanges
The valve shall be hydraulic operated and mechanically linked to the
turbine wicket gates as for the butterfly valve option A manual worm
gear operator shall also be provided
The valve shall have a design pressure at 50 psi The body shall be
capable of withstanding a hydrostatic test pressure of two times the
design pressure and three times that pressure for shock
*Valve materials shall be as follows
Body Steel plate, ASTM A285,
Grade B or C with stsinless
steel facings, ASTM A167,
Type 304
Body Sleeve Stainless steel, ASTM A167,
18-8 or ASTMA176, Type 405
Gate Steel plate, ASTM A285,
Grade B or C with stainlsss
steel seals, ASTM A167
Type 304
*Refer to Basis of Contract
[DENTON 10566 TURBINE GEN 62 0200]
111987 ]
2B-9
2C 4 SPEED SENSING DEVICE The speed sensing device shall be of the
electronic type, consisting of a toothed disk mounted on the end of the
turbine shaft and of two electronic compact pickups for speed detection
Speed signal from the first pickup shall be to the electronic control
unit while the speed signal from the second compact pickup shall be used
for the actuation of switches and/or relays for unit control and for a
speed signal to the remote supervisory system
2C 5 OIL ~YDRAULIC SYSTEM The hydraulic system shall consist of the
foll6wing main elements which shall be combined into a unit
Actuator cabinet, containing electrohydraulic transducers,
main distributing valve and all operation control valves and
elements and valves for automatic shutdown at normal rate of
closure and smsrsency shutdown
Oil pressure set, consisting of two pumps with 3-phase,
460 volt ac motors, oil reservoir of adequate capacity,
auto~atic pressure control system, unloader valve, safety
valve, filters, hand pump, and all necessary appurtenances
Control panel with all relays, control switches, indicating
lights, motor starters, and devices required for complete
control of the pumping set
Each pump shall be capable of delivering oil at maximum pressure at a rate
per minute not less than three times the active servomotor volume of both
servomotors and shall be designed to run continuously The pressure rs-
lief valve shall maintain pressures at a level required to operate the
power amplifier system of the controller The sump tank shall be sized
to keep the oil temperature at a suitably low level Upon power loss to
the oil pumping units, the precharged accumulator shall supply pres-
surized oil to the servomotors for unit shutdown
An oil piping system shall be provided for the entire oil hydraulic system
including connections to the turbine servomotors All necessary valves,
solenoid valves, gauges, relief valves, check valves, instruments, and
strainers shall be provided, as well as all material necessary for in-
stallation
The control system shall be designed for local manual control and for
automatic control from the unit control The local pump selector
switches shall be "HAND-OFF-AUTO" type, and a "LEAD-LAG" selector switch
shall be provided When in "AUTO," the lead pump shall run as required
*Negotiated Revision
[DENTON 10566 TURBINE GEN 62 0200]
[ 111987 ]
2C-2
Section 2C - CONTROLLER
2C 1 GENERAL This section covers the technical requirements of the
controller and associated auxiliar~ equipment
2C 2 GENERAL DESCRIPTION An elecCrohydraulic standard controller for a
double resulaced tubular Kaplan type turbine shall be provided Main
components shall consist of the electronic control unit, speed sansins
device, and the complete hydraulic system The controller shall include
a speed controller for synchronizin8, and a flow controller for loadin$
Flow control shall be by comparins a flow sec point co actual flow and
operating the controller co el~minaCa any error between chess ~wo values
The Contractor shall furnish the necessary equipment Co allow the flow
sac point co be sec locally or by a remote supervisory sisnal consisCinE
of raise-lower pulses The Contractor shall provide an output siEnal,
from the controller Co the remote supervisory aquip~enC, which indicates
the actual set point Actual flow shall be decar~ined by a differential
pressure ~eaaure~enc method (Winter-Kennedy or Peck) The Contractor
shall provids all transmitters, receivin8 equi~aenC indicators, and de-
vices necessary to measure flow A 8aCe limiCin$ device shall be provid-
ed and shall be adjustable by remote supervisory or local control The
controller shall be of adequate capacity Co control the turbine under all
conditions, co rssulace ic co be frae from huncins or sursin$, and shall
cause the unit Co operate sacisfacCor~ly w~h the interconnected system
2C 3 ELECTRONIC CONTROL UI~IT The ~overnor electronic control unic sha~l
be a modular uniC desk,ned for installa~ion in the uniC control swatch-
board The electronic control unic shall be lnCesraCed into the overall
plane control specified in Section 2H
The control uniC power supply will be ~8 voles dc
Power supply moniCorin8 shall be incorporated in cbs electronic Sovernor
control uniC In case of interruption or failure of the power supply, a
monitorin~ relay shall be actuated for omer8sncy shucdo~m of the unic and
alar~ indication on the control switchboard
Correlation of runner blades and w~ckac sates shall be lnCe~raCad in an
electronic module and shall be adjustable
The controller shall allow for swicchinE over fro~ automatic control to
manual control and vice versa at any load without rapid load chansas
A complete combined mechanical electric or electronic feedback system
$ivimj suitable stsnals to the electronic controller supplied shall be
provided
[DEb'TON 10566 I"UR3ZNE GEg 62 0200]
[ 031387 ]
2C-!
by the unit control system, and the las pump shall start automatically
upon failure of the lead pump or system low pressure Motor starters
shall be provided in accordance with Section lB
Two oil pressure operated, double acting, hydraulic cylinder type servo-
motors shall be furnished for operating the wicket gates and runner
blades Oil for operating the servomotors shall be supplied under pres-
sure from the oil pressure system The servomotor components shall be
desisned for the maximum controller oil operating pressure The servo-
motors shall have a combined capacity, at minimum oil operating pressure,
sufficient to operate sates or runner blades under all conditions of head
and load, through the full servomotor opening and closing stroke in the
specified time Suitable drain valves and pipins shall be furnished for
draining oil from each end of the servomotor cylinders and for bleeding
entrapped air An adjustable slow closins device for retarding the rate
of closins travel between the approximate speed-no-load position for rated
head and the closed position, shall be provided A manually adjustable
stroke limiting device shall be provided which can be locked to positively
limit the sate or runner blade position if desired A scale affixed to
the mechanism shall show the limit for which this device is set Actual
sa~e opening shall be accurately indicated on a scale with pointer af-
fixed to a servomotor or to the sate operatins tins
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
2C-3
2E 2 3 2 Enclosure and Coolin~ The generator shall be self-ventilated
and shall include outlet air ducting to interface with Owner-furnished
ductwork The outlet air ducting shall be arranged to interface above
the generator with a single connection to the Owner's duct The Owner's
duct will be designed so that maximum pressure at the interface will be
1/2 inch water gauge The Contractor shall provide all fans required to
self-ventilate the generator
Enclosure parts (e g , frames, bearing brackets, terminal housings, ex-
ternal fan covers) shall he made of cast iron, cast steel, sheet steel,
or steal plates Aluminum enclosure parts are not acceptable
Bolts, nuts, screws, and other hardware items shall be corrosion resis-
tant or heavy cadmium plated metal
2E 2 3 3 Insulation and~ All insulated windings shall have
Class F nonhysroscopic insulation systems Stator insulation systems
shall ba form wound utilizing vacuum-pressure impregnated epoxy and shall
be sealed in accordance with the requirements of NEMA MG 1-20
All insulated winding conductors shall be copper
2E 2 3 4 Temperature Rise The temperature rise when operating at the
rated load and 50 C ambient shall not exceed 70 C when measured by resis-
tance or 75 C when measured by embedded detector (RTD)
The temperature rise requirements shall apply to all the generator in-
sulated windings including armature, main field, exciter armature, and
exciter field
2E 2 3 $ Space Heaters The generator shall have space heaters Space
heaters operating at 1200 watts and lees shall be suitable for operation
on 120 volts, single-phase, 60 hertz power circuit Heaters operating
above 1200 watts shall be arranged for operation on 208 volts, 3 phase,
60 hartz power circuit
Space heaters shall be rated for 240 volt operation, but shall be
utilized at 120 volts ac
The heaters shall be provided inside the generator enclosure in a loca-
tion suitable for easy removal and replacement Heaters shall be located
and insulated so they do not damage generator components or finish
Space heaters shall be sized as required to maintain the generator in-
ternal temperature above the dew point when the generator is idle The
internal temperature shall not cause winding temperatures to exceed rated
limiting values nor cause thermal protective device "over temperature"
indication when the generator is not energized
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2E-2
Section 2E - GENERATOR AND EXCITATION SYSTE/4
2E 1 GENERAL The generator and excitation system shall be furnished in
accordance with the requirements of this section
2E 2 GENERATOR In case of conflict between the requirements of the
various parts of these specifications, the requirements of the different
parts shall govern to the extent of such conflict in the followin8 se-
quence mandatory governmental tabulations, codes, and standards, Gener-
ator Specification and Data Sheets included at the end of this section,
the other technical sections, this section, the referenced industry codes
and standards
2E 2 1 ~odes and Standards The generator shall conform to applicable
standards of ANSI, IEEE, and NEMA, except where modified or supplemented
by these specificat~ons In case of conflict between any of the industry
standards relative to manufacturin8 requirements covered in these speci-
fications only by reference to the standards, the requirements of NEMA
shall govern Ail equipment and materials shall be in accordance with
the applicable requirements of the Federal "Occupational Safety and
Health Standards"
2E 2 2 Ratings The generator power input ratin$ shall be not less than
the maximum expected power output of the turbine The generator power
output rating shall not he less than specified in Article 2A 5 &
2E 2 3 Design and Construction The Senerator shall be a horizontal
salient pole synchronous machine designed for coupling to the turbine or
a speed increaser The 8enarator shall be coordinated with the overall
design of the hydroelectric system and shall be as specified herein and
on the Generator Specification and Data Sheets
2E 2 3 ! ~ameplates All generator nameplate data shall conform to NEMA
MC 1-21 61 requirements The following additional nameplate data shall
he included
Frame size number
Insulation system class designation
Oil pressure required for pressure lubricated bearinss
Complete nameplate data shall be included on the generator dimensional
drawing submitted for final review
All generator nameplates and attachment pins shall be corrosion resistant
metal
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2E-I
as listed in the table following Incoming power supply cable size and
materiel will be furnished later Terminal connectors shall be as fol-
lows or acceptable equal
8urndy Terminal Connector
Power Supply Cable Size Cop~er Aluminum
8 AWG and smaller YAV
6 AWG thru 4/0 AWG YA YA-A-TN
250 Mcm and larger YA-2N YA-A-2NTN
The nnucral leads connection shall be arranged for easy accessability and
disconnecCion for removal of the current transformers
2E 2 3 9 Ground Connectors The generator shall be furnished with a
grounding connector attached to the generator frame inside the power lead
terminal housing The grounding connector may be a lug or terminal or
other acceptable grounding connector
Two additional grounding connectors shall be permanently attached to the
frame The grounding connectors may be corrosion resistant metal pads,
containing two N~MA spaced and sized threaded holes, welded or brazed to
the frame, terminal connectors attached to the frame, or other acceptable
frame groundin~ method The grounding points shall be on the sides of
the frame
2E 2 3 10 Bearings The type of bearing furnished shall be as specified
on the Generator Specification and Data Sheet
2E 2 3 10 1 Slidin~ Type ~ Sleeve bearings shall be oil ring
lubrica2ed type The oil ring shall be one-piece construction, split
type construction will not be acceptable The bearings, end belle, and
bearing housings shall be split type when available Air gap measurement
holes or other acceptable means shall be provided in each end enclosure
for checking air gap
Sleeve bearings shall be designed and located centrally, with respect to
running magnetic center, to prevent the rotor axial thrust from being con-
tinuously applied against either end of the bearing The generator shall
be Capable of withstanding without damage the axial thrusts that are de-
veloped when it is energized
2E 2 3 I0 2 BearinS Lubrication System Lubrication for oil lubricated
bearings shall be furnished by an internal lubricant recirculation sys-
tem, Oil reservoir capacity and ventilation of the bearing housing and
oil reservoir shall be as required to adequately maintain proper cooling
of the oil and bearings
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
2E-4
Space heater leads shall he stranded copper cable with 600 volt insula-
tion and shall include terminal connectors
Space heater sheaths shall be of a corrosion resistant, nonoxidizing ma-
terial and shall have a thickness not less than 0 025 inch
2E 2 3 6 Surge Protection Rotating machine surge protection arrestors
and surge capacitors shall be provided These items shall be located in
the main power lead terminal box
2E 2 3 ? Terminal Housin~ A terminal housing for power leads and a
separate accessory terminal housing for accessory leads shall be fur-
nished Leads insulated for different voltage classes shall not occupy
or terminate in the same housing under any conditions If required, a
neutral lead and neutral current trans£ormer terminal housing may be
provided
All terminal housings shall be externally mounted on the frame enclosure
Terminal housings shall be pressed steel or fabricated steel Housings
shall be diagonally or longitudinally split with a gasket between the
split halves of the housing Each housing shall have a threaded opening
to provide a water~isht rigid connection with the conduit, and shall be
designed for rotation in 90 degree increments, or have provisions included
o~herwise, to receive conduit from any of four directions Nonconducting
lead positioners and gaskets shall be furnished between the housings and
chi frame All leads located in the housings shall have terminals and
shall be permanently numbered for ease of identification
Separate accessory terminal housings provided for current transformer
leads, temperature detector leads, space heater leads, alarm devtce leads,
speed switch leads, and other similar accessory equipment leads shall be
complete with screw type terminal blocks in accordance with the require-
ments of Section lB for termination of such leads Terminal blocks for
current transformer leads shall be shorting type Each terminal in the
blocks shall be identified and marked for its respective leads Accesso-
ry terminal housings shall be accessible from outside the generator
All power lead terminal housings aha11 be large enough to provide working
space for the field fabrication of stress cones within the housing and to
contain the stress cones after fabrication Surge capacitors and attesters
shall be mounted at the terminals inside an oversized housing
Location and dimensions of terminal housings shall be acceptable to the
Engineer
2E 2 3 8 Terminals Cable type leads shall be provided with compression
type terminal connectors Connector type shall be coordinated with in-
coming power supply cable and neutral groundin8 cable size and material
[DERTON 10566 TURBINE GEN 62 0200]
031387
2E-3
fhe;lb~slanced
z 'erforman~r assembly ~L
'ezghts -_ =~ be d~ ~ &enera=o. _ ~eVels ~
'"Creaser "~usta
The OUtput s
:he gener-- haft ahal~ ~
at rate~ =cot ~agne.~- oe Clrc~
~ ~ue~tl~ -r~g h- ~ refer~ wae~ le,. ,
'~able = uusl~ =ncc ~ -e~
2B 2 3 [3 SOle la ~or USe ~, ~°r shaf~ _~an~ shaT~ ~" rt
bol ~.all be '"nec~l°~ d co. ~he co~~e and loc~i~ ~°lepla~
~' waShe~ fu~ished ..~e~ails a~ --e~e founa '~aou of ~-'e dra~_
-'' a~d ~z,* ~i~ aac~ ' ProCedu- ---a:lo~ ~.~ -.,e
anChOr
bolts sh_~op d=llle~V: :he ~e~erh~al area
l~ waah'~l be loca.~a.d be or__~c°r mounts5'~i not be -
COmPla._T~s and nu.~''u Under t~ "csized 1/4 ~"8 bol~a ~ ~eas than
eo/ep/~'~Jy grout'~J. Shall cl~_generator znch la di..~Chor bo/~ ~e.
~al S
and ~ ~da ~ Stilled -' Portion
ceaE above atlo~ a~d tapped~ o~ each
~he The generator s
SPeed range of ~avay sp~tUral freque hall be
applicable -= ~urn~d~
darda requirements and lasts., earing an~ °Petering
, ag~ HG 1.o~C°rdanCe w~e detec_
-u, and IEeE '~g the
All
to te~l- _ Ute
ground~_nal bloc~ ~-cors sha~ .
with ~__~-ur lead . or aac~ t-- the ~CCe d wl~h d
-~"uulet ~j~ a co~e ~roundln~ .-~r Shal~ ~lngs
-uts Shal1~i~ard ~ '=ceCtors _~ -~vab/e --a~ box
* va ~on~_~-.,araC:e.. snell b- - '
D~ON 10566 ~ ~ 62 0200]
0~1387
2E-6 ]
2E 2 3 10 3 Miscellaneous gearin~ Requirements Ail bearing mountings
shall be designed to prevent the entrance of lubricant into the generator
enclosure or dirt into the bearings, and shall be provided with pipes and
drain plugs
Filler caps for oil lubricated bearings shall be arranged for safe, easy
addition of lubricant from the outside of the generator while the generator
is in service
Ail oil lubricated bearings shall be provided with oil level sight glasses
marked for required oil level at generator running and standstill Plastic
sight windows or bottles shall be of a material not adversely affected by
continuous exposure to sunlight Sight glasses shall be Gits Style FG or
BW-20, Tedeco P/NS, or acceptable equal Stationary labyrinth seals shall
be bronze material
Insulation shall be provided to prevent circulation of shaft current on
bearings, on bearing temperature detector connections, or on oil piping
connections
Bearings and bearing housings shall be designed to sustain the additional
load due to flywheel weight and co permit disassembly in the field for
inspection of the hearings or removal of the rocor
Bearing lubricants shall contain a corrosion inhibitor The type and
grade of lubricant shall be indicated on a nameplate attached co the
generator frame or end shield adjacent to the lubricant filling device
The Contractor shall furnish all lubrication information required to as-
sure proper equipment start-up and subsequent bearing maintenance
A vibration switch as manufactured by Robert Shaw shall be provided to
monitor vibration and trip the unit on high vibration
2E 2 3 11 Rotors The rotor shall be of laminated salient pole design
with noninterconnecced damper windings The poles shall be fastened to
the rotor by "tee" tails or dovetails The rotor, including poles and
windings, shall be capable of withstanding all continuous and transient
forces caused by maximum runaway speed or a sudden 3 phase short circuit
at the generator terminals without damage or deformation to any component
A flywheel shall be mounted between the generator bearings and shall be
incorporated into the generator overall design in order to meet the moment
of inertia (WR2) minimum requirement to limit ovarspead on load rejection
All rotating components shall be dynamically balanced after mounting on
the shaft Generator vibration shall not exceed the peak-to-peak ampli-
tude values 8ivan in NEMAMG 1 standards when measured in accordance with
those standards In addition, the masnitude of vibration values for twice
the line frequency vibrations shall not exceed 0 5 mil
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2E-5
2E 2 6 Manufacturer The generator shall be as manufactured by one of
the following
Electric Machinery
General Electric (Canada)
Louis Allie
2E 3 EXCITATION SYSTEM The excitation system shall be brushless, con-
sistin$ of an electronic dual channel PI or FID type automatic voltage
regulator (AVR), a rotatin$ armature type alternating current main exciter
machine (multiple of 60 hertz frequency) and an unregulated rotating rec-
tifier bridge with silicone diodes
Field excitation energy for the ac main exciter machine shall be derived
from the excitation power transformer, connected directly to the genera-
tot buebar Thle power shall be fed to the exciter machine field winding
in regulated mode through the thyristorized auxiliary excitation rectifier,
controlled by sate control from the electronic type AVR
If the generator remanent voltage is insufficient for voltage buildup, an
additional 120 volt ac plant auxiliary source will be provided for
initial excitation power
The equipment offered shall correspond to the basic layout as outlined in
IEEE 421 The bidder may offer equipment which deviates from that stand-
ard only to a limited extent
2E 3 1 O~erational Requirements In addition to the requirements of
Article 2A S 5, the following requirements apply During "automatic"
operation, and within the area of the capability diagram, the terminal
voltage of the generator shall be kept stable, without hunting, within
the '~ominal Band of Regulated Voltage" (as defined by IEEE 421-1972)
specified at the prevailing set point
During transient or abnormal operating conditions, including failures of
the turbine, governor, generator, exciter or grid, the terminal voltage
of the generator shall be kept within safe limits by the AVR, and such
conditione shall be guarded by the control, limiting, or protective de-
vices provided in order to sustain operation of safety as long as feas-
ible
The system shall be designed for "manual" and "automatic" voltage
control
On co-..-nd "exciter on" provided from the control system or manually, the
excitation system shall provide excitation current to the generator field
as required for voltage buildup under AVR control with the set point "au-
tomatic" prevailing, which is normally 95 percent UN at no load
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 l
2E-10
accuracy and stability, and be insensitive to vibration and strain Each
detector shall be furnished with three leads
Thermocouple type temperature detectors shall be as specified in Sec-
tion lB Thermocouple extension wire shall he solid 18 AWG or larger
2E 2 3 15 1 Bearin~ Temperature De=actors Bearing temperature detec-
tors, complete with detector head and holder assemblies as required,
shall be furnished when specified on the Generator Specification and Data
Sheets The detector temperature-sensitive tip shall be hermetically
sealed and held in intimate contact with the outside diameter of the
hearing babbitt not over 1/8 inch from shaft surface of bearing babbitt
for sleeve bearings The Contractor shall submit drawings to the Engi-
neer indicating the detector location and mounting
2E 2 3 15 2 ~ Temperature Detectors Winding temperature detec-
tors shall be furnished, installed and wired complete when specified on
the generator Specification and Data Sheets
Ail resistance type detectors shall be noninductively wound, annealed
after winding to ensure accuracy and stability, and be insensitive to
vibration and strain At least two detectors per phase, evenly spaced
around the stator, shall be embedded between the coils in the stator
slots Leads shall be furnished with ring type terminals
Temperature detector and detector lead insulation class shall be ~he same
as ~he 8~ator coil insulation class Detector leads external to the slot
shall be provided with protective brass interlocked spiral armor The
armor shall be Anaconda Type gL, Penflex Type gQ, or acceptable equal
metallic type
Ail temperature detectors shall be tested at 1500 volts to ground and
checked for accuracy i""-ediately prior to performing the final winding
dielectric tests Accuracy shall be checked by measurement of the detec-
tor resistance or by checking the temperature reading obtained with a
temperature detector meter when the windinss are at room temperature
2E 2 3 16 Differential Protection The generator shall be furnished
with three bushing type relaying accuracy current transformers, one on
each neutral lead Current transformers shall be provided with e~randed
cable type leads and shall be removable without disassembly of the gener-
The current transformers shall be mounted in the main power lead terminal
housing or a current transformer housin$ located on the side of the
generator frame Current transformer secondary leads shall be wired to
shorting type ~erminal blocks mounted ia ~he separate accessory terminal
housing
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2E-7
The neutral leads shall be wired to the CT primaries The wye connection
shall be completed at the factory, leaving only four leads TI, T2, T3,
and neutral for field connection in the ps,er lead terminal housing
2E 2 3 17 Sound Level The sound level shall be selected by the Con-
tractor to confo~---~h the overall equipment assembly sound level re-
quirements which are included elsewhere in these specifications, but in
no case shall the average ne-load sound pressure level, re 0 0002 dyne/tm2,
produced by the generator exceed 90 dBA free field at 2 meters
Noise level tests shall be in accordance with the requirements of IEEE
85
In addition to the specified overall sound pressure level, single fre-
quency noise, regardless of cause or source, shall not exceed levels
which are irritating or which can produce damage to the human ear
Sound reduction baffles, mufflers, and materials shall be contained with-
in the enclosure
2E 2 4 quality Control Tests and Inspections The generator shall be
tested and inspected at the manufacturer's factory to determine that it
is free from elec~rlcal or mechanical defects and to provide assurance
thac it muets the requirements of these specifications Test procedures
shall be in accordance w~th IEEE No 115 Test Procedure for Synchronous
gachine8
Five copies of reports of the quality control tests and inspections for
the generator shall be submitted to the Engineer prior to shipment of the
senerator from the manufacturer's factory
The routine tests listed in NEMA MG I shall be performed The following
add~tional tests and inspections shall be performed
Mechanical balance
Current balance check, no-load
Armature winding polarization index test
Airborne sound pressure level measurement
Air Sap muasurements
Winding temperature detector dielectric and
accuracy tests
The polarization index specified above shall be determined from an insu-
lation resistance-time curve corrected to 40 Co and shall be taken imme-
di~tely prior to perfo~ming the final high potential ground test Each
starer phase shall he casted separately to ground with other phases
grounded Phase windings shall he tested at not less than 5000 volts dc
The ambient temperature, winding temperature, and relative humidity
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2E-8
accuracy and stability, and be ineensitive to vibration and strain Each
detector shall be furnished with three leads
Thermocouple type temperature detectors shall be as specified in Sec-
tion lB Thermocouple extension wire shall be solid 18 AWG or larger
2E 2 3 15 1 Bearing Temperature DeCectore Bearing temperature detec-
tore, complete with detector head and holder assemblies as required,
shall be furnished when specified on the Generator Specification and Data
Sheete The detector temperature-sensitive tip shall be hermetically
sealed and held in intimate contact with the outside diameter of the
bearing babbitt hOC over 1/8 inch from shaft surface of bearing babbitt
for sleeve bearings The Contractor shall submit drawings Co the Engi-
neer indicating the detector location and mounting
2E 2 3 15 2 Winding Temperature Detectors Winding temperature detec-
tors shall be furnished, installed and wired complete when specified on
the Generator Specification and DaCe Sheets
Ail resistance type detectors shall be noninducCively wound, annealed
after winding Co ensure accuracy and stability, and be insensitive to
vibration and strain At least Cwo detectors per phase, evenly spaced
around the sector, shall be embedded between the coils in the eCacor
slots Leads shall be furnished with ring type terminals
Temperature detector and detector lead insulation class shall be the same
as the sCacor coil insulation class Detector leads external Co the slot
shall be provided with protective brass interlocked spiral armor The
armor shall be Anaconda Type gL, Penflex Type gQ, or acceptable equal
metallic type
Ail temperature detectors shall be tested aC 1500 volCe Co ground and
checked for accuracy immediately prior to performing the final winding
dielectric casts Accuracy shall be checked by measurement of the detec-
tor resistance or by checking the temperature reading obtained with a
temperature detector meter when the windings are ac room temperature
2E 2 3 16 Differential Protection The generator shall be furnished
with three bushing type relaying accuracy current Cransfonaere, one on
each neutral lead Current transformers shall be provided with stranded
cable type leads and shall be removable without dieassembly of the gener-
ator
The current transformers shall be mounted in the main power lead terminal
housing or a currant transformer housing located on the side of the
generator frame Current transformer secondary leads shall be wired Co
shorting type terminal blocks mounted in the separate accessory terminal
housing
[DENTON 10566 TURBINE GEN 62 0200]
031387
2E-7
The AVl{ shall provide safe and continuing operation upon oc-
currence of inadmissible operating conditions (excessive set
point, internal failure, external disturbances, excessive
load angle, overexcitation, underexcttation, etc ) by the
limiting action of the limiting devices provided
The AVE and the excitation system shall have the following additional
compensating limiting and protective functions
In case of disturbances in the AVE, the voltage sensing cir-
cuit, or the gate control unit, a follow-up device shall be
provided for the "manual" set point, which shall automatically
be set Co the prevailing set point of the reference value
for automatic voltage regulation, in order to permit automatic
changeover (trip) to manual without sudden change of reactive
power
Reactive current dependent droop £or reactive load sharing
with adjustment range of 10 percent
Maximum field current limiter function for inductive (over-
excited) load region
Load angle limiter function or a limit of stability limiter
function for capacitive (underexcited) load region
Frequency compensation limiter function (U/F = const) with
adjustable time delayed action
The following disturbances shall be indicated separately at the AVE's
failure indicating panel and shall initiate an unenergized contact
closure for a common alarm signal "excitation system trouble" to the
station annunciator
AVE internal failure
Failure off automatic gate control unit
Actuation of one of the protective or limiting devices of
the AVE
Failure of chyristor aC auxiliary excitation rectifier
Failure of diode (fuses) at rotating main excitation recti-
fier
Loss of AVE sensing voltage signal
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
2E-12
The excitation system shall provide a positive sisnal "exciter ready for
operation" and a lockout signal "exciter trouble" to the startup sequence
controllers
Startup and shutdown of the excitation system, selection of mods of oper-
ation (manual/automatic) and adjustment of set points for "automatic" and
"manual" voltage control shall he possible from the AVR panel In addi-
tion, the Contractor shall provide a power factor controller This con-
troller may be included as a part of the AVR, or as part of the unit con-
trol system specified in Section 2H
Excitation rectifiers (controlled thyristorized in AVR and rotatins diode
rectifier in exciter field circuit) shall have a repetitive peak reverse
(inverse) (URRM) and forward (UDRM) blocking voltage of not less than 3 5
times excitation ceiling voltage Further, the excitation rectifiers
shall be capable of delivering for 10 seconds, maximum excitation current
(i · , the current driven across the fields by the ceilin$ voltage) with-
out exceeding permissible temperatures with maximum ambient air tempera-
ture conditions A minimum redundancy of n + 1 shall be provided with
respect to number of bridges or bridge arms in parallel for unlimited
operation
Special attention shall be paid to an effective natural convection cool-
in8 of all electronic devices In no circumstances shall their tempera-
ture ratinss be exceeded Maximum temperature rise of such equipment
shall be limited to 20 C above ambient air temperature of 50 C within
cubicles Separate electric forced air coolin8 fans ~lll not be accept-
able in the system
2E 3 2 Automatic ~oltase Regulator The automatic voltage regulator
(AVR) shall be mounted in the unit control panel The AVR shall have
terminal voltase and excitation current regulation systems The former
shall be for automatic control, and the latter shall be utilized for
manual control The system shall be identical and redundant During
manual control, all protective and limiting devices shall remain in
service and shall initiate alarm and shutdown signals if necessary The
AVR panel shall be provided with an exciter field ammeter and voltmeter
The AVR shall have the followin$ performance in addition to chat speci-
fied previously
The automatic voltage control action shall be within an AVR
set point tense of 90 percent (at no load) to 110 percent
(at full load) of generator rated voltage, upon any devia-
tion from the set point The manual voltage control shall
be vithin a set point range of 5 percent terminal voltage
(at no load) up to 110 percent (at full load)
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2E-ll
Nominal exciter output voltage shall correspond to the gen-
erator field circuit requirements, taking into account the
voltage drop across the rotating main excitation rectifier
Nominal exciter output shall be according to generator field
circuit requirements The maximum excitation power demand
shall be delivered from the ac main exciter without exceed-
ing any component thermal or mechanical ratings
AC main exciter maximum output voltage (excitation ceiling
voltage) shall be not less than 1 5 times nominal exciter
output voltage
Exciter field leads shall be wired to a dedicated auxiliary
terminal box
2E 3 6 Rotatin~ Main Excitation Rectifier The rotating 3 phase recti-
fier bridge shall be mounted on or inside the exciter rotor on a carrier
ring The rectifier shall be directly connected to the exciter armature
winding terminals on the ac side and directly connected to generator
field leads on the dc side
Diodes shall be silicone power diodes
Diodes shall be mounted in heat sinks and shall not exceed 80 C tempera-
*tuts ~i~s on the diode stud under maximum load ~ o_ve_r 50 C cooling air
temperature
The number of diodes in parallel connection in each branch of the 3 phase
bridge connected rotating main excitation rectifier shall be such that in
case of failure of 20 percent of the diodes in any branch, 100 percent
peak excitation current is still delivered without exceeding 80 percent
of any diode current rating
Quick-acting fuses of respective rating shall be provided in series con-
nection with each diode path for selectively switching off any failed
diode
Fuses shall have a bouncing pin failure indicator and shall be mounted
equally spaced at the same level on the rectifier support ring, in order
to permit checking of fuses during operation by means of a frequency-
adjustable battery operated stroboscopic lamp through an inspection door
Adequate surge protection capacitors with damping resistors or metal
oxide varistors shall be provided for every diode in order to avoid
voltage surges due to commutation (carrier storage effect)
*Negotiated Revision
[DENTON 10566 TURBINE GEN 62 0200]
[ 111987 ]
2E-14
A signal initiating unit shutdown, a de-energized contact closure for
common alarm signal of "excitation system failure" to the station an-
nunciator, and a lockout s~gnal to the master sequence Controller shall
occur upon the following
Failure of an unacceptable high number of thyristors,
diodes, or fuses at auxiliary/main excitation rectifier
Actuation of loss of excitation power protection relay
Loss of AVR and/or excitation system supply voltage
Failure of manual gate ignition unit
2E 3 3 Excitation Power Transformer The excitation power transformer
shall be provided in accordance with Section 2G
2E 3 4 Auxiliary Excitation Rectifier The auxiliary excitation recti-
fier shall be rack mounted with the AVR panel The rectifier shall be
designsd for natural convection cooling and shall have the following
characteristics
Power output As required for ac exciter nominal
field exoitation plus 10 second
maximum current/csiling voltage
short-time rating
Connection Three-phase bridge, gate controlled
Rectifier thyristors shall be silicone controlled rectifier
Surge capacitors and damping resistors for each thryristor shall be
provided
Quick-acting fuse with failure indicator pin in series connection with
each thyristor shall be provided A fuse in series with the entire thy-
ristor bridge will be acceptable only if a redundant thyristor bridge is
provided
The temperature rise of each thyristor (at base of cooling fin connection
*to heat sink) shall be ~ ~0 C or less ~/~ o_v~r an ambient air tem-
perature of 50 C
2E 3 5 Alternatin~ Current Main Exciter Machine An alternating current
main exciter machine of rotating armature winding type shall be provided
on the generator The machine shall consist of the following items and
have the following characteristics
AC main exciter field circuit requirements (power, voltage,
current) shall match the respective figures of the auxiliary
excitation system as derived from the AVR
*Negotiated Revision
[DENTON 10566 TURBINE GEN 62 0200]
111987
2E-13
2E 3 7 Field Circuit Breaker A field circuit breaker and field dis-
charie resistor shall be furnished and mounted in the unit control panel
The circuit breaker shall an electrically operated 2 pole 8enerator field
breaker The field breaker shall be capable of successfully interrupting
field current durin8 maximum transient conditions It shall have at least
three "a" and three "b" auxiliary contacts for indicatin8 llihts and inter-
locks As an alternate to the field circuit breaker, free wheelin$
diodes may be provided to dissipate the enersy durin8 transients
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2E-15
The generator shell be designed and constructed in accordance with the
following require~ents
Type Salient pole synchronous
Voltage 4160Y/2400 volts (6 terminals), 3 phase
Power factor 0 9, over excited
Frequency 60 hertz, +2 percent, -3 percent
Duty Continuous
Excitation system Brushless rotating rectifier
Service Indoor
Mounting Horizontal
Ambient temperature range -18 C minimum, 50 C maximum
Enclosure type Dripproof
Bearing type Split sleeve
Bearing lubrication system Oil rings, self-cooled
Shaft Solid
Coupling to speed increaser Preferably tooth type coupling
The generator shall be furnished with soleplates
The generator shall be furnished with the following temperature
detectors
Bearings Thermocouples or resistance temperature de-
tectors for temperature monitoring, tempera-
Cure switches for tripping
Armature windings Resistance temperature detectors
The generator shall be furnished with three current trans-
iomers for differential protection, 600 5 ampere ratio,
C100 accuracy class, and three current transformers for use
with the power factor controller, 600 5 ampere ratio, ANSI
metering accuracy Class 0 3, E 1-1 0
The generator rotor and flywheel total inertia (WRl) shall be a
minimum of 42,200 lb-it1 (referenced to 720 rpm)
BLA K & VEAT :PRO*ECT
SPEC 62 0200
ENGINEERS ARCHITECTS
GENERATOR SPECIFICATION
AND DATA SHEET 2E-16
mesh screened ventllatin$ louvers shall be provided to dissipate heat
generated by the enclosed equipment under rated operacin8 conditions
Internal barriers shall be provided to isolate the various items of
equipment within the enclosure
All interconnections between components within the neutral 8rounding
equipment enclosure shall be with solid copper bus or with stranded
copper cables
2F ~ TIGI~G OF CONNECTIONS The Contractor shall include on his
erection and aSse~'~17 drm~inSs complete in~o~mation for tightening of all
elect~ical connections secured with bolts or s~uds. The info.scion ~u~-
nished shall incl~e totoue ~ench se~tin8s or c~lete details o~ other
cighceuin8 procedures rec~ended for bus Joints and co~ectot attach-
[D~O~ 10566 ~ll;E OH 62 0200]
[ 030885 ]
27-2
Section 2F
2F I GENERAL This section covers furnishin$ neutral grounding equip-
ment, mate~ials, and accessories ~xcept as ocher~ise specified in this
section, the neutral Sroundin$ equipment, m~terials, and accessories
shall be s8 specified in Sectiou lB
iF 2 CODES A}ID STANDARDS All equipment furnished under these speci-
f~caCions shall ~o applicable standards of ~SI, N~, and ~EEE
~ ~ter~a~s and devices sha~l be ~n accordance w$ch the applicable
qu%~e~ncs of the F~de~a~ "OccupaCio~ Safety and Hea~th S~andards"
2Y 3 E~UIP~ R~UIR~TS NeuCra~ groundins equipment dasisned for
use vi~h the ~sn~racor described in $~cCion 21 shall be furnished
~e Equipment shall Include one ~ndoor ~eneracor neutral ~roundi~g ~qutp-
menC enclosure wl~h the follovinl items fu~ishad, mounted, and connected
within the enclosure
1 - GroundinS transpolar sinsle-phasa, cast resin, 4160-~20/240 volts
1 - Resistor raced for 1 minute, cast ~rid type, connected
co shunt the 240 volt secomda~ windin~ o~ the
fomr Connections shall be provided fr~ the
siecor co au easily accessible ~mi~l block fo~
re~ce relayin~
1 - ~ouad bus with p~isious fo~ aCCac~aC o~ a ~/0
Co 300 Mcm sc~auded coppe~ cable Ail equi~emc
quirins S~ouuding shall be co~ecCed Co ~his bus
~ - Te~inal block, connected Co the S~oumding
seconda~ ~or extension ~o ~he p~ocec~ive ~elav
~e C~ans~o~ and ~esis~oz kVA and kW racings shall be as requi~ed
l~i~ the $~ound fault current Co a value ~z ~esulcs in the resistor
duria~ a ~nd faul~ Co be equal co the aoml sysC~ line-Co-sround
capacitive kVA. buc. in no case shall the Sround fault cu~en~ be less
chaa 5 ~e~es ~e Contractor shall ~u~nish. ~o~ the Ensinae~'s ~evie~.
calculaci~s used co data.ne the S~oundin~ system capacity
~e enclosure s~ll be ~ab~icacad ~om leveled steel sheets hoc less than
~1 USS sauge. ~e~n~orced wich we~ded steel ~e~ers Co ~om a rigid ~ree-
standing sc~cCure Doo~s wi~h concealed hinses and ~h~ee-poim~ latches
s~ll be p~ovided ou the ~oaC and ~ea~ o~ the enclosure ~o~ equipment
access Latch asse~ly shall include lock type handles ~e-fou~h inch
[DENTON 10566 TUREINE G]~ 62 0200]
[ 022786 ]
2~-1
2G 4 1 Maintenance and ~~, and Spare Parts Tbs
ewitchgear shall be furnished with the following maintenance and operat-
ing equipment
1 - Test cabinet with test Jumper for testing breakers out of housing
1 - Breaker transfer truck, if required to move the circuit
breakers into and out of the breaker housings
I - Maintenance closing lever for closing the circuit breakers
1 - Manual operating lever for moving the breaker elements into and out of the operating position
~ 1 - Set of test plugs suitable for testing the relays
The switchgear shall be furnished with the following spare parts
100 per cent replacement of fuses
i00 per cent replacement of color caps
100 per cent replacement of lamps for indicating lights
The bidder shall include with his proposal a complete list of other spare
parts or special tools which will be furnished with the equipment and are
included in the lump sum price stated i~ the Proposal
2G 4 2 Switch,ear Enclosures The switchgear shall be furnished with
NEMA 1 gaeketed enclosures Ail ventilation openings shall be filtered
and have rodent proof screens
Switchgear equipment shall be mounted in vertical sections fabricated of
steel and assembled to provide rigid self-supporting structures The
breakers shall be removable from the front Grounded removable steel
barriers shall be provided between the instrument panels and the power
cable and current transformer compartments
Where 8crew type fasteners are indicated in these specifications to be an
acceptable type fastener for securing removable panels in place, it is
preferred that the screws fit into threaded openings in the enclosure
framework The framework shall provide three full threads to receive the
screw type fasteners In the event that the framework is too thin to
provide for three full threads, the framework shall be reinforced or
shall be furnished with nuts welded at the screw holes to provide the
[DENTON 10566 TUI~INE GEN 62 0200]
[ 031187 ]
2G-2
Section 2G - METAL-CLAD SWITCHGEAR -
2G I G~NERAL This section covers furnishing of 5,000 volt metal-clad
switchgear equipment, materials, and accessories as specified herein and
on the Switchgsar Unit Specification and Data Sheets included as a part
of this section Except as otherwise specified in this section, metal-
clad switchgsar equipment, materials, and accessories shall be as spec-
ified in Section lB
The 5,000 volt switchgear shall be designed and constructed for use on a
4,160 volt, 3 phase, 60 hertz, 3 wire, ungrounded system
Except as specified otherwise herein or on the Switchgear Unit Specifica-
tion and Data Sheets, all equipment shall be designed for service at sea
level at an ambient temperature of 50 C
2G 2 CODES AND STANDARDS Ail equipment furnished under these speci-
fications shal-'-~ conform to applicable standards of IEEE, NE~A, and ANSI
Ail materials and devices shall be in accordance with the applicable re-
quirements of the Federal "Occupational Safety and Health Standards"
In case of conflict between the requirements of the various parts of
these specifications, the requirements of the different parts shall gov-
ern to the extent of such conflict in the following sequence mandatory
governmental regulations, codes, and standards, Switchgear Unit Speci-
fication and Data Sheets, this metal-clad switchgear section, and the
referenced industry codes and standards
2G 3 ARRANGEMENT The switchgear shall be arranged as indicated on the
Switchgear Unit Specification and Data Sheets
This arrangement is preliminary In the event that rearrangement is re-
quired due to the Engineer's request, or the Contractor's proposal, a new
arrangement shall be furnished to the Engineer The Contractor shall
proceed with design and issuance of certified shop drawings only after
receipt of the Engineer's acceptance
The switchgear units shall be numbered from left to right facing the op-
erating (drawout) side of the switchgear
2G 4 DESIGN AND CONSTRUCTION Design and construction of metal-clad
switchgear shall he in accordance with the requirements of the articles
which follow
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
2G-1
Voltage normally applied to the space heaters will be 120 volts Space
heater'voltase rating shall be 240 volts
The bmr will furnish a 120 volt ac, single-phase, 60 hertz feeder to
the Switchgear assembly for switchgear space heaters The Contractor
shall furnish all space heater wiring integral to the switcbgear and
suitable branch circuit protection
2G 4 2 4 Nameplates Engraved nameplates shall be furnished for the
front and rear of each switchgear unit and for equipment and devices
within each unit Nameplate inscriptions will be furnished by the Engi-
neer, at a later date
2G 4 3 Power Circuit Breakers The switchgear shall be furnished with
high' voltage power circuit breakers of standard drawout design
The breakers shall not be forced cooled
Removable breaker units of the same type and ampere capacity shall be
wired alike and shall be mechanically and electrically interchangeable
Terminal desisnacions shall be as indicated on the Typical Schematic for
4160V Feeder Circuit Breakers included at the end of this section
2G 4 3 1 Rating Power circuit breakers furnished under these specifi-
cations shall be provided with the following ratings
4160 V
Breakers
Rated maximum voltage, kV tms 4 76
Rated voltage range factor, K 1 24
Rated low frequency withstand
voltage, kV ms 19
Rated full wave impulse with-
stand voltage, kV peak 60
Rated short circuit currant,
amperes rms 29,000
Related required capa-
bilities
Maximum sy~metrical
interrupting capability,
amperes rms 36,000
[DENTON 10566 TURBINE GEE 62 0200]
[ 030885 ]
2G-4
necessary thickness The Contractor shall furnish 100 per cent replace-
ment screw type fasteners if they are of a noncaptive type and 50 per
cent replacement screw type fasteners if they are of a captive type
If the manufacturer's standard fasteners for removable panels consist of
screw type fasteners which are inserted in captive nuts held in place by
nut retainer clips, they will be acceptable, but the Contractor shall
furnish 100 per cent replacement nuts and nut retainer clips as switch-
gear spare parts The quantity of replacement screw type fasteners shall
be as specified in the previous paragraph
The rear panels shall be removable
26 4 2 1 Front Doors Each switchgear unit shall be furnished with a
hinged front door to allow removal of the circuit breaker, and a separate
hinged front door to provide access to the secondary or control compart-
ment of the unit, and for mounting instruments, meters, relays, switches,
indicating lights, and other specified devices
Doors shall be furnished with turned-back edges and additional bracing as
required for rigidity No hinge shall be visible from the outside when
the doors are closed Stops and latches shall be provided for control of
each door in the opec and closed positions Latches for the closed posi-
tion of each door shall be one of the following or acceptable equal
One three-point single handle operated latch
Multiple single-point latches consisting of captive knurled
handle quarter-turn cam fasteners or threaded screw retain-
ing Bolts Doors which are 36 inches or less in height
shall have a mis/mum of two single-point latches, doors
which are greater than 36 inches in height shall have three
single-point latches
2G 4 2 2 Channel Sills Channel sills shall be furnished for instal-
lation in the switchgear foundation and shall be arranged for tack
welding to the switchgear base from inside the units The channel sills
shall be shipped separate from the switchgear as scheduled in Section lA
2G 4 2 3 Switch,ear Space Heaters Each unit of outdoor ewitchgear
shall be furnished with space heaters to prevent condensation of moisture
within the switchgear The heaters shall be located and thermally in-
sulated such that no painted surface will be d-m~ged or discolored
Space heater capacity shall be as required to maintain the compartment
and unit internal temperature above the dew point
[DENTON 10566 TURBINE Ol~l 62 02001
[ 031187 ]
2G-3
Each breaker shall be furnished with not less than two "a" and two "b"
electrically separate auxiliary contacts mounted on the breaker for re-
mote interlocking service Each switchgear unit containing a circuit
breaker shall be furnished with not less than eight "a" and eisht "b"
electrically separate breaker mechanism operated auxiliary switch con-
tecta mounted in the switchgear unit enclosure for remote interlocking
service These auxiliary contacts and auxiliary switch contacts shall he
in addition to those specified in the preceding paragraph
Breaker mechanism operated auxiliary switches shall operate only when the
breaker is in the connected position
All additional auxiliary contacts shall ha wired to terminal blocks for
external connection
2G 4 3 & Breaker Control Devices Each breaker shall be furnished with
a local control'switch and breaker position switch arranged to provide
the following control of breaker operation
Breaker Breaker Operation
Drawout Remote Contro,~, Local Control Switch
Position Close Trip Close Trip
Connected X X ....
Teat __ -- X X
Disconnected ........
Each circuit breaker local control switch shall have a trip-close es-
cutaheon, shall have a center normal position, shall be spring return to
normal from close and trip, shall have red and green targets to indicate
the~latest operation of the switch, and shall be furnished with red and
green indicating lights
The,breaker poaition switch shall be furnished with four stages Two
breaker position switch contacts shall close only when the breaker is in
the co.netted position, the remaining two contacts shall close only when
the breaker is in the test position
2G & ~ Power and Control Conductors Switchgear power and control con-
duc~ors shall be f~d in accordance with the requirements of the ar-
ticles which follow Provisions shall be made for bus expansion, to pre-
vent undesirable or destructive mechanical strains in the bus supports
and connections, through a full ambient temperature range from -30 C to
+50 C Expansion Joints shall be furnished where required
[DENTON 10566 TURBINB GEN 62 0200]
030885 ]
2G-6
4160 V
Breakers
Short time (3 second)
current carrying capa-
bility, amperes rms 36,000
Closing and latching
capability, amperes rms 58,000
Rated interrupttn$ time
(60 hertz basis), cycles 5
Rated permissible tripping
delay, Y, seconds 2
Nominal control voltage Close, 120 volt
ac, trip, ~8 volt
dc
Breaker continuous current ratings shall be as specified on the Switch-
Esar Unit Specification and Data Sheets
2G 4 3 2 ~Mechanism Each po~ar circuit breaker shall be a
3 pole sinBle throw unit, complete with operating mechanism and other
required devices, mounted on a drawout type carriage
The operating mechanism shall be of the stored energy type with a closing
coil and a shunt trip coil The closing devices, tripping devices, and
charging motor shall be desisned and rated for operation on the nominal
control voltage specified
The operatin$ mechanism shall be trip-free in any position and shall be
antipump The breaker main contacts shall not touch or arc across into a
faulted circuit when a breaker close signal is received while a trip sig-
nal is being applied
Each breaker shall be furnished with a manual trip push button which me-
chanically trips the breaker The manual trip push button and its asso-
ciated breaker trip linkage shall have no common comRonents with the
electrical trip mechanism, except the final breaker release device
Each breaker shall be furnished with an operations counter which shall be
readable from the front of the switchgear unit with the breaker in the
connected position
26 4 3 3 Auxtltar~ Contacts Each breaker shall be furnished with a
sufficient number of auxiliary contacts and auxiliary switch contacts to
provide all necessary interlocks for operation of the breaker
[DENTON 10566 TURBINE GEN 62 0200]
030885 ]
2G-5
2G 4 5 1 Entrance Adequate openings shall be furnished for all conduc-
tors enterin$ the switchgear Cable entrance to the switchgsar will be
as follows
Power and control cable entrance shall be from the top
2G 4 5 2 Terminal Connectors Terminal connectors for power cable and
ground cable entering the switchgear shall be furnished and shall be as
listed in the following table or acceptable equal, solder type terminals
are not acceptable
Burndy Terminal Connector
for Copper Conductors
Cable Size, AWG Bolted Clamp Type Compression Type
8 and smaller YAV
6 thru 1/0 VA-2 YA-2N
2/0 and larger W~A-2N YA-2N
Cable sizes will be furnished by the Engineer at a later date
2G 4 5 3 Stress Cones Where the Switchgear Unit Specification and Data
Sheets indicate that the power conductors entering a switchgear unit will
be cable, adequate space and facilities shall be furnished for flaring of
power cables, for field installation of stress cones, and for support of
tbs cabla
The distance from the cable terminals to the window type current trans-
former or the cable entrance location in each switchgear unit shall be
not lsss than 38 inches
2G 4 5 4 Ground Bus Ground cable connectors shall be furnished for the
attechmentof-~-4-~O-~G stranded copper cable to the ground bus for exter-
nal connection to the station grounding system One connector shall be
furnished at each end of the swttchgear assembly ground bus In addi-
tion, each switchgear unit containing external power circuit terminals
shall have provisions for attachment of power cable shields
2G & 6 Control Power The Owner will furnish a 2 wire dc feeder to the
switohsser assembly for breaker tripping control power and a 120 volt ac
circuit for breaker closing power
The Contractor shall furnish all internal switchgear wiring required to
distribute control power to each switchgear unit
Each breaker shall be furnished with a 2 pole control power disconnecting
and protective device in the closing circuit, and shall be furnished with
[DENTON 10566 TURBINE GEN 62 0200]
[ 030885 ]
2G-8
2G 4 4 1 Main Bus The switchgear main bus shall be copper bar, de-
signed to carry continuously the current specified on the gwitchgear Unit
Specification and Data Sheets without exceeding temperature rise require-
ments specified in IEEE and NEMA standards
The bus shall be installed with rigid, aontracking, £ire-resistant, and
nonhygroscopic insulating supports capable of withstanding the mechanical
forces imposed by short circuit currants equal to the momentary current
rating of the circuit breakers
The bus shall be supplied in unit lensths which will permit rearrangement
of the units in the field
All load current carrying connections shall be flat bar or acceptable
equal All power current carrying connections shall be completed by
bolting together flat bar All Joints shall have silver-to-silver
contact surfaces with minimum contact resistance
Instrument transformer primary connections shell be designed to permit
removal and replacement of the transformers without damage to the con-
nections
Except at bolted terminations and connection points, all buses which are
specified to be insulated shall be coated with epoxy type insulating ma-
terial or acceptable equal molded around and bonded to the bus All
bolted Joints, expansion Joints, bus connections, factory or field, and
all terminals, cable connectors, or bus connectors for attachment of con-
ductors of instrument transformer circuits and external circuits shall be
insulated with removable boots Removable boots shall be designed to
overlap permanent bus or cable insulation a minimum of one inch upon each
conductor in the connection insulated by the boot The insulation rating
of bus, Joint, connection, and termination insulation shall be not less
than the voltage rating of the equipment
The Contractor shall furnish all material required for field connections
and insulation of switchgear bus and terminals
2G 4 4 2 Ground Bu._~s An uninsulatad copper ground bus with a momentary
rating at least equal to the momentary ratin$ of the circuit breakers
shall be furnished through the entire length of the switchgear All
switchgear equipment requiring grounding shall be connected to this
ground bus
2G 4 5 External Connections Facilities for the entrance, support, ter-
mination, and connection of power and control conductors shall be fur-
nished in accordance with the requirements of the following articles
[DENTON 10566 TUREINE GEN 62 02001
[ o3o885 ]
20-7
lettered or marked in accordance with =he Contractor's connection dia-
grams Extra flexible wire shall be furnished at hinge points
Switchgear units that are split for shipment shall be furnished with all
wiring required to interconnect the switchgear units
The minimum sizes of wire used in =he switchgear for control and instru-
mentation shall he in accordance with the following table
Minimum Wire
Service $ize~ AWG
Power supplies 12
Current transformer
circuits 12
lndicating lights and
annunciator circuits 16
All other wiring
2G § 2 Dia~rama Wiring diagrams shall be in accordance with the re-
quirements of Section lC and aa specified herein Switchgear schema=it,
connection, and interconnection diagrams shall be furnished by the Con-
tractor for review by the Engineer
The complete connection diagram of each switchgear unit shall be on an
individual sheet Information on each connection diagram sheet shall in-
clude poin~-to-point wiring of the entire unit aa it would appear =o a
perSon wiring the switchgear unit, including wiring on the breaker
self Elementary diagrams of control and instrument circuits, contact
arrangemen~ of switches, and internal wiring of relays and instruments
for each switchgear unit shall be on additional sheets aa required In-
terconuection diagrams shall be on separate sheets Ail sheets shall be
the same size
Each item of switchgear mounted equipmen~ indicated on the diagrams shall
be identified by item number and name
Sen =he Contractor's s~andard terminal designations differ from those
marked on the ConCrac~or's connection drawings submitted for acceptance
and' returned by the Engineer, the Contractor shall revise terminal desi$-
nations in accordance with the Engineer's requirements on both the Con-
tractor's drawings and the retinal blocks
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
2G-10
a 2 pole control power disconnecting and protective device in the trip-
ping circuit The disconnecting and protective devices shall be molded
case circuit breakers or enclosed fused pullouts
2G 4 7 Instrument Transformers, Instruments, and Associated Devices
Instrument transformers, instruments, and associated devices shall be
furnished as specified on the Switchgear Unit Specification and Data
Sheets and in the articles which follow Ail instrument transformer sec-
ondary leads shall be wired out to terminal blocks
2G 4 7 I Current Transformers Currant transformer mechanical and that-
mai limitss--'~be coordinated with the momentary and short timo ratings
of the circuit breakers with which they are used All current transform-
ers shall be multiratio type unless otherwise specified
2G 4 7 2 Potential Transformers Unless otherwise specified, potential
transformers shall have a rating of not less than 400 volt-amperes on a
thermal basis, a capability of withstanding a secondary short circuit for
not less than one second, and accuracy rating in accordance with the fol-
lowing table
Potential Transformer Accuracy Ratin~*
Voltage Rating, volts W X M Y Z
4,200 0 3 0 3 0 3 0 6 1 2
*Accuracy classification 0 3, 0 6, and 1 2, and burdens W, X,
¥, and Z shall be as defined in ANSI C57 13-1968, burden M
shall be as defined in ANSI C12 11 Burdens shall be based
on a secondary voltage of 120 volts
Each transformer shall be provided with current limiting primary fuses
and secondary fuses, and shall be mounted with primary fuses on a drawout
type removable unit designed to isolate and ground the potential circuits
when the unit is in the fully vithdra~m position
2G 4 7 3 Protective Relays Protective relays shall be flush mounted,
equipped with built-in teat switches and operation indicators
2G 5 WIRING A~D WIRING DIAGRAMS The Contractor shall furnish internal
ewitchgear wirt--~g, connections, and diagrams in accordance with the re-
quirements of the following articles
2G 5 1 Control and Instrument Wtrin~ Ail low voltage control and in-
strument wiring s-~ll be installed and tasted at the factory
All interior wiring shall be neatly and carefully installed in wiring
gutters or conduit and shall be terminated at terminal blocks plainly
[DENTON 10566 TW.B~NA G~N 62 0200]
022786
2¢-9
ufficient space shall be left on the "customer's" side of outgoing ret-
inal blocks for adding cable color codes and circuit numbers The Con-
tractor will be furnished this information later, which he shall then in-
clude on his drawings
At the time the Contractor's connection drawings are submitted for re-
view, the Engineer will mark thereon all external circuit and wire des-
ignations required, and such designations shall be added to the con-
nacCion drawings by the Contractor Except as marked on the drawings
submitted by ~ha Contractor and returned to him By the En$ineer, no
external circui~ and wire designations shall be indicated on the ConCrac-
torts drawings
2G 6 FACTOH¥ TESTS After the switchgear has been completely fabricated
it shall be subjected Co and shall meet all requirements of the produc-
tion tests listed in NEMA and ANSI standards
2G.7 TIGHTENING OF CONNECTIONS The Contractor shall include on his
erection and aase~ly drawings complete information for tightening of all
electrical connections secured with bolts or studs The information fur-
nished shall include torque wrench settings or complete details of other
tishtanin$ procedures recommended for bus Joints, connector attachments,
and con=act attachments
2G.8 MANUFACTU~RS The metal-clad switchgear shell be manufactured By
one of ~ha followin$
Brown Boveri Co~poration
General Electric Company
Siemens
Wastinshouae Electric Corporation
2G 9 SPECIAL SHIPPING HEqUIHEMENTS The metal-clad switch,ear equipment
shall ha shipped By dedicated truck to prevent shipping damage
[DENTON 10566 TURBINE GEN 62 0200]
[ 031187 ]
26--11
The Type ~ switchsear unit shall include the e~uipmen= in the followins
lists
The followins equipment shall he furnished, mounted, and connected within
=he swi=chgear unit compartments
1 - Set of insulated main bus rated 1,200 amperes continu-
ous
1 - Sat of ground bus with terminal connectors for attach-
mant of power circuit ground cable
1 - Sat of provisions for termination of power cables
1 - Station auxiliary power transformer, rated 45 kVA,
&160 - &80 volts, 3 phase. 60 hertz The primary of
the power transformer shall be connected to the
¢o~%n$ line by fuses The primary fuses shall be
mounted on a drawout type unit designed to isolate and
ground the potsncial circuits when the unit is fully
withdrawn The secondary of the transformer shall be
co--sctad to a 3 phase. 600 volt molded case circuit
breaker which is interlocked with the primary fuse unit
so that the breaker must be "off" to withdraw the
fuses
2 - Currant transformers, bus sida~ single ratio. 600 5 am-
pare ratio. ANSI metering accuracy Class 0 3, B 1-1 0
! - Compartment arranged for drawout of potential trans-
formers to the front of the unit The compartment
shall contain two drawout type po~antial transformers,
connected to the ewitchgear main bus. ~200 120 vol~
ratio
I - Potential transformer compartment for the main bus
ground detection schema, mounted at the top of the
unit~ located toward the rear of =he switchgaar unit
and not to protrude above the Contractorts standard
height switohgsar unit The compartment shall contain
three drawout type potential transformers, connected to
the switchgear main bus, ~200 ~20 volt ratio
1 - Damping resistor for connection to the ground detector
schema secondary open delta
BLACK & VEATCH
ENGINEERS ARCHITECT~ T~PE 1 SWITC~GEAR UNIT SPEC 62 0200
SWITCHGEARUNIT
SPECIFICATION AND DATA SHEET 2G-12
The followin$ equipment shall be furnished, mounted, and connected on the
switchgear unit front instrument panel
1 - Bus protection relay (810, 81U, 27, 59, 47, 60), Beck-
with Type Pride M-0296
I - Synchronizing check relay (25), Beckwith M-0388
I - Bus ground detection relay (59B), General Electric
Type IAV
1 - Generator transformer ground current detection relay
(51NGT), General Electric Type IAC
3 - Generator transformer differential relays (87GT), Gen-
eral Electric Type BDD
1 - Generator transformer lockout relay (86GT), Electro-
switch Type LOR with ember "reset" indicating light
o
O
BLACK & VEATCH: p. OJECT 10566
ENGINEERS ARCHITECTS ~i~PE 1SWITCHGEAR UNIT SPEC 62 0200
SWITCHGEAR UNIT
SPECIFICATION AND DATA SHEET 2G-13
The Type 2 switchgear unit shall include the equipment in the following
lists
The following equipment shall be furnished, mounted, and connected within
the switchsear unit compartments
! - Drawout power circuit breaker element, rated 1,200 am-
peres continuous
1 - Set of insulated main bus rated 1,200 amperes continu-
ous
1 - Set of ground bus with terminal connectors for attach-
ment of power circuit ground cable
! - Set of provisions for termination of one power cable
per phase
3 - Current transformers, bus side, single ratio, 600 5 am-
pere ratio, ANSI relay Class C100
9 - Currant transformars~ generator side, single ratio,
600 § ampere ratio~ three ANSI relay Class CIO0, six
ANSI metering accuracy Class 0 3, E 1-1 0
1 - Compartment arranged for drawout of potential trane-
formers to the front of the unit Compartment shall
contain two drawout t~pe potential transformers, con-
nectad to the sanerator bus 4200 120 volt ratio
The following equipment shall be furnished, mounted, and connected on the
switchsear unit front instrument panel
1 - Circuit breaker local control switch with lights
1 - Generator lockout relay for electrical trip (86G),
Electros%fitch Type LOP with amber "reset" light
[ - Generator lockout relay for mechanical trip (86M),
Electroswitch Type LOB with amber "reset" light
1 - Generator differential relay (87G), General Electric
Type CFD
1 - Generator nasative sequence current relay (46G), Gener-
al Electric Type INC
8 CK & V TCH oJEcT
SWITCHGEAR UNIT
SPECIFICATION AND DATA SHEET 2G-~4
[ - Generator loss of excitation relay (40G), General Elec-
tr$c Type CEIl
3 - Generator voltage restrained overcurrent relays (51V),
General Electric Type IGCV
1 - Generator reverse power relay (32G), General Electric
Type
i - Generator ~round £ault det~ction relay (59G), Gensral
Eleotria Type IAV
BLACK & VEATCH ~O:E~T ~o~
EN61NEER$ A~CHITECT9 "~"~E ~ S~ITCHGF--,,A-1~ UNIT SPEC ~2
SWITCHGEARUNIT
SPECIFICATION AND DATA SHEET 2G-15
The Type 3 switchgear unit shall include the equipment in the following
The following equipmeut shall be furnished, mounted, and connected within
the switchgear unit compartments
1 - Generator excitation power transformer rated as required
by the generator excitation system performance spec-
ified in Section 2E The transformer primary shall be
connected to the generator bus by fuses The primary
fuses shall be mounted on a drawout type unit designed
to isolate and ground the potential circuits when the
unit is fully withdrawn The secondary of the trans-
former shall be connected to a 3 phase, 600 volt molded
case circuit breaker which is interlocked with the pri-
mary fuses so that the breaker must be off to withdraw
the fuses
1 - Compartment arranged for drawout of potential trans-
formers to the front of the unit The compartment
shall contain the necessary potential transformers as
required by the Contractor's automatic voltage resulator
specified in Section 2E
0
0
0
81 CK & VEATgH P,oJEcT os66
ENGINEERS ARCHITECTS TYPE 3 SWITCHGEAR UNIT SPEC 62 0200
SPECIFICATION AND DATA SHEET 2G-16
The swicchgear units shall be furnished with vent±laCed, indoor general
purpose enclosures
The switchsear units shall be provided in ~he followinS unit gvpes
UNIT UNIT
NUMBER UNIT NAM~ TYPE
1 INCOMING LINE AND STATION 1
POT~R
2 GENEI~.TOR 2
3 EXCITATION POWER TRANSFORMER 3
BLACK & VEATCH PRo:EcT
ENGINEERS ARCHITECTS UNITS FOR SWITCHGEAR SPEC 62 0200
SPECIFICATION AND DATA SHEET 2G-17
Upon loss of station auxiliary power or the disconnection from the trans-
mission line, the system shall safely shut down the unit Upon restora-
tion of power, the system shall automatically reset so that a remote
start can be made without local operator intervention
Tbs unit control system shall provide for a manually controlled uniC
startup sequence or automatically controlled unit startup sequences The
manual or automatic startups shall require the operator to place all aux-
iliaries into operation manually or to place all auxiliaries into "AUTO"
to allow the unit sequencing control to place them into operation
With the unit control in manual mode, the operator shall have control
over each sequence of startup including master startup relay reset, ini-
tial wicket gate opening~ excitation system on, speed and voltage match-
ing for synchronizing and generator breaker closing After synchroniza-
tion~ the unit shall load to a preset minimum flow rate which shall then
be &d]uatabla by local operation of the turbine controller Unit excita-
tion shall then be controlled by excitation current control, voltage con-
trol~ or power factor control es selected by the operator
With the unit control in local automatic mode, the operator shall place
the unit into operation by actuation of a single device After synchro-
nisation~ unit loading and excitation control shall be the same as for
manual control
With the unit in remote automatic mode~ the unit shall be placed into op-
eration by a sin$1e co~mand from the Owner's SCADA system After syn-
chronization~ the unit shall load to a prsset minimum flow rate which
shall then be adjustable by raise-lower pulses from the Ownsrts SCADA
system to the turbine controller Unit excitation shall then be con-
trolled by voltage control or power factor control as selected end
adjusted by the Owner's SCADA system
In all modes~ the power factor control set point shall be automatically
set to a preset value prior to unit startup
The unit control system shall provide for a normal shutdown by a manually
controlled sequencer or automatically by operator actuation of a single
device or by a single co~mand from the Owner's SCADA system The method
of shutdown shall be determined by the control mode selection
The unit control system shall also provide for three automatic protective
shutdown sequences
One sequence shall be an emergency shutdown with lockout and shall be ac-
tuated by any protective device which senses a condition that is immedi-
ately detrimental to the turbine ienarator or its auxiliaries The de-
vices shall consist of electrical protective relays and other devices
required by the Contractor*s design to provide complete pro~ection This
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
2H-2
Section 2N - CONTROL SYSTEM
2H I GENERAL The Contractor shall furnish a complete control system
for all equipment furnished under this specification and as required by
the Engineer for auxiliary equipment not furnished under this specifica-
tion The control system shall consist of one dual control switchboard,
control logic, software, equipment, materials, and accessories as spec-
ified herein Except as otherwise specified in this section, switchboard
equipment, materials, and accessories shall be as specified in Section lb
2H 2 OPERATIONAL REqUIREmeNTS Due to variances in turbine generator
equipment and auxiliaries, the following articles specify general oper-
ational requirements for the control system The Contractor shall fur-
nish all logic, devices, and materials necessary for a complete system in
accordance with the intent of these requirements and as directed by the
Engineer
The Contractor shall furnish a general block diasram of the system start-
up, normal shutdown, normal shutdown with lockout, emergency shutdown with
lockout, emergency shutdown without lockout, flow control logic, and exci-
tation control logic for the En$ineerts review and acceptance prior to
detailed logic and schematic submittal
2H 2 1 Control Modes The control system shall be desisned for local
manual control, local automatic control, and remote automatic control
Local manual control shall allow step-by-step manual startup Local
automatic control shall provide complete unit startup by manual operation
of a single control device Remote automatic control shall provide com-
plete unit 8tartup by tom,mhd from the Owner's SCADA system
Mode selection shall he made only at the control switchboard
2H 2 2 Unit Control S[stem The Contractor shall provide a complete
unit control system for operation and protection of the turbine generator
and auxiliaries in any of the control modes The unit control system
shall be /mplemented by a progrsm-ble controller or hard-wired relay
logic, protective relays, sensors, transducers, devices, and materials as
required for safe startup, shutdown, and continuous operation of the unit
and as specified in this section The equipment, materials, and devices
specified in this specification shall be considered as the minimum to
meet this requirement
All protective devices and interlocks shall be in service during any mode
of operation and shall override any control commands as required to pro-
tect the unit F~ergency protective devices shall trip the generator
breaker either directly or through lockout relays
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
eH-1
The Contractor's system shall incorporate a failure detection system so
that upon failure of the actual flow rate signal, flow rate set point
signal, or other turbine controller internal failure, the system will
alarm and hold last gate position or trip the unit
2H ~ 4 Excitation Control The Contractor shall furnish a generator ex-
citation control system The system logic shall be included as a part of
the unit control system or incorporated in the excitation system specified
in Section 2E
A power factor controller shall be provided to regulate the generator
power fac=or to an adjustable set point value The set point shall be
adjustable by opera=or action at the control switchboard when the unit is
in local automatic mode or by raise-lower pulses from the Owner's SCADA
system when in remote-auto mode The power factor set point shall be
dice=ad at the control swicchboard, and the signal shall be conditioned
as required for connection ~o the Owner's SCADA system The Contractor's
system shall incorpora~e a failure detection system The scheme shall be
such that upon failure of the actual power factor signal or other power
factor controller internal failure, the system will alarm and hold the
last sst point, revert to manual (excitation current regulation), or trip
the unit
The excitation control shall also provide for control of the excitation
system manual (excitation current regulation) mode and automatic (voltage
regulation) mods by tales-lower pulses from the Owner's SCADA system
Sels~ction of the excitation systsm control mode, power factor, manual or
automatic, a~all be at the unit control switchboard when the unit control
is in local, or shall be by pulse signals from the O~nsr~s SCADA system
when ~hs unit control is in remote
2H 2 5 B}~ass Ga__Ce ~0n=rol The Contractor's control system shall
cate bypass gate full open, full close, or intermediate position by indi-
cating lights at the unit control panel In addition, a failure-to-
operate alarm shall be provided which actuates when the turbine generator
is started or shut down and the bypass gate fails to reach full close or
sst open position
The bypass sate position indication and travel failure alarm shall be
available for connection to the 0vner's SCADA system
2H 2.6 Substation OCB Control The Contractor shall provide all logic
and devices required to operate the 0vner's substation oil circuit breaker
(OCB) The logic shall consist of hard-wired relays and shall be separate
from the unit controI system, except for trip signals originating from
the unit control system The control shall include provisions for closed
and trip signals from the Om~er~s SCADA system
[DENTON I0566 TURBINE GEN 62 0200]
[ 022786 ]
2H-4
shutdown shall trip the generator breaker and unit control system without
any time delay and bring the unit to a complete stop as soon as possible
The generator and generator transformer lockout relays. 86G and 86GT.
shall be used for the tripping and lockout functions of this sequence
The second sequence shall he a normal shutdown with lockout and shall be
actuated by any protective device which senses a condition that is detri-
mental to further operation of the unit, but that does not require an
emersency shutdown The devices shall consist of temperature switches,
pressure switches, vibration detectors, and other devices required by the
Contractor's design to provide complete protection This shutdown shall
trip the unit control system and shut the unit down in a normal sequence
The turbine lockout relay, 86M, shall be used for the tripping and lock-
out functions of this sequence
The third sequence shall be an emergency shutdown without lockout and
shall be actuated by any abnormal condition external to the turbine gen-
erator, generator transformer, or unit auxiliaries that requires
ate disconnection of the unit from the transmission line The abnormal
conditions will be sensed by the line electrical protective relays, or
w~ll consist of transfer trip signals from the Owner's SCADA system
This shutdown shall trip the generator breaker and unit control system
w~thout any time delay A nonlockout tripping relay shall he provided
for the tripping function of this sequence
Any shutdown shall cause flow sst points, gate limit, and excitation set
points to return to preselected m~nimums
The Contractor shall p~ovide indicating lights as required to indicate
the complete step-by-step sequencing of the unit control system during
startup, shutdown, or tripping of the unit
All sequences shall be monitored to ensure completion of any sequence
In the event an incomplete sequence is established, alarms and indication
of incomplete sequence failure and incomplete sequence cause shall be ac-
tuated, and the unit shall shut down by an emergency trip
2H 2 3 Flow Control The Contractor shall furnish a turbine generator
loading control system which shall control water flow rate The control
system's logic shall be included within the turbine electronic controller
specified in Section lC
The actual flow rate and the set point shall be indicated at the control
switchboard and both signals shall have conditioning as required for con-
nection to the Owner*e SCADA system ~en the control system is in local,
the actual flow rate shall be adjustable by operator ac=ion of a raise-
lower device located on the control switchboard ~hen the control system
is in remote, the flow rate set point shall be set by raise-lower pulses
from the Owner's SCADA system
[DENTON 10566 TU~INE GEN 62 0200]
[ 022786 ]
2H-3
be free of waves, bellies, and other imperfections Exterior panel sur-
faces shall be sandblasted, ground smooch, filled, primed, and enamel
finished Interior surfaces shall be sandblasted, primed, and finished
with gloss white enamel
The panel shall have solid back panels The back of the switchboard will
not be accessible after installation
Panel space not utilized by equipment shall remain clear for addition of
possible future equipment
A receptacle, Hubbell 5362 or acceptable equal, shall be furnished,
mounted, and wired in a convenient location near the hinged door of each
switchboard section The receptacle is for portable cools and drop lights
and will be supplied from a 120 volt, sinEle-phase ac source furnished by
the Owner Internal panel wiring and circuit protection shall be furnished
by the Contractor
The interior of each switchboard shall be illuminated with a light,
mounted inside the top of each switchboard section and controlled from a
Hubbell 1221 switch mounted inside the door
Space heaters shall be provided and shall be thermostatically controlled
to prevent condensation Heaters shall be raced 240 volts ac buC will be
enerEised from a 120 volt ac source provided by the Owner
2H 3 2 Nameplates Engraved nameplates shell be furnished Nameplate
inscriptions will be furnished by the Engineer at a later date
2H 3 3 Buses Control, potential, and alarm buses of 12 AWG or larger
switchboard wire shall be furnished and installed as required
2H 3 4 Ground Bu_.~s A continuous 1/4 inch by 1 inch cross-section bare
copper ground bus, with compression or clamp type connectors at each end,
shall be provided in the switchboard The end connectors for connection
to the Owner's stran.[ed copper ground cable shall be Burndy YA-L or WA
or acceptable equal All switchboard equipment requiring Eroundin$ shall
be connected to this ground bus with Burndy Type YAV or acceptable equal
connactors
2H 3 5 Power Su_u_~_~_~Disconnects Each panel mounted device requiring ac
supply s~-havs in its supply circuit a panel mounted fuse or discon-
necting link connectld to isolate the device from the power supply in the
tripped or open condition Disconnecting links shall be sliding link
terminal blocks S~at, ls Company Type NT or acceptable equal
[D~NTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2H-6
2H 2 7 Alarms The Contractor's control system shall include a complete
system of alarms and alarm indication Alarms shall be initiated for all
unic and auxiliary trip and out-of-normal conditions Ail alarms shall
have local indication consisting of white lights or mechanical indicators
which shall "sec" on alarm and require local manual "reset" action co
clear =he alarm indication In addition Co the local indication, each
alarm shall have an output which will be grouped with ocher similar
alarms and wired co the control switchboard annunciator where the ~larm
group will be indicated The control switchboard annunciator shall be
provided with undivided point alarm output contacts which close on alarm
and are available for connection co the Owner's SCADA system
Alarms shall be designed so chat when auxiliaries or the uniC is shuC
down normally, there will be no false or nuisance alarms indicated
Alarm grouping will be determined by the Engineer based on the Contrac-
tor's design and recommendations
2H 2 8 Optional CO._~EValve Control The Contractor shall provide an op-
tion Co include control logic for operation of the Cwo existing Corps of
Engineers outlet valves on unit trip and unit shutdown during low flow
The logic shall provide a signal co position the valves Co match the flow
setpoinC Valve positioning shall be based on split range control with
valve position feedback provided by Owner-furnished position potenCio-
meter transmitter and full closed and full open limit switch contacts
The Contractor shall provide redundant power supplies for the position
transmitters Valve failure to operate shall also be included in the
logic
The Contractor shall also provide control switches, one per valve, co
allow manual operation of the valves from the control switchboard
Switches shall be "CLOSE-AUTO-OPEN," AUTO being under the control of the
flow control system
2H 3 EqUIPMENT ANDMATERIALS The switchboard structure, equipment, ma-
terials, and accessories shall include the features specified in the
lowing articles
2H 3 1 Switchboard Structure The switchboard structure shall be com-
pletely enclosed ac Cha front, rear, Cop, and both sides Standard dual
switchboard construction shall be used, having the front panel hinged
with concealed hinges that are nsc visible from the outside of the panel
Leveled 11 USS gauge steel sheets and formed steel members shall be weld-
ed together co form a rigid self-supporting structure Equipment cutouts,
mounting studs, and brackets shall be accurately located Welds on ex-
posed surfaces of the structure shall be ground smooch Switchboard
nominal panel size shall be 28 inches wide, 90 inches high, and 30 inches
deep Overall length shall be as required Finished panel surfaces shall
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2H-5
2 - Generator bearings
2 - Speed increaser bearings
1 - Building temperature
2 - Turbine bearing
1 - Turbine seal
1 - Cooling water temperature
4 - Spares
Annunciator complete with test and acknowledge push
buttons, Rochester Instrument Systems Model AN3100, Se-
quence A, Suffix FOD, with one Federal No 450-N horn
A manually adjustable time delay relay shall be incor-
porated in the horn circuit to cause automatic silent-
inS of the horns after a time delay Each point shall
have an electrically isolated output follower contact
which shall close or open in accordance with the point
input alarm contact Each follower contact shall be
wired to terminal blocks for connection to the Owner's
SC.iDA system The annunciator shall have a number of
points equal to that required by the Contractor's con-
trol system plus 10 spares In no case shall there be
lees than 32 points
Three position selector switch, "LOCAL AUTO-LOCAL
Local unit auto start control switch, "STOP-START,"
pull to lock in trip, with green and red indicating
liihts actuated from speed switches
Set of bypass gate position indicating lights to indi-
cate full open, intermediate, full close, or failure to
operate
Automatic voltage regulator panel with control switches
SynchronizinS panel with sync scope, sync switch and
lights
Auto-synchronizer system consisting of Beckwith
Sychrodoser M-0193 and Beckwith Generator Control
Unit M-0194 The system shall include protective
covers, operator window option for manual synchroniz-
ing, and preoperational voltage and speed control
phases for automatic synchronizing
Turbine controller control panel with control switches
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2H-8
2H 3 6 Watt-Hour Meters Meters shall be flush, 2-1/2 element, drawout
type with built-in test devices The coils, rated 2-1/2 amperes,
120 volts, 60 hertz, shall be designed for use with current transformers
Fhase shifters shall be furnished for each measurement The meters shall
be complete with a potential indicating lamp for each coil and with dials
having multipliers of 10 or a multiple of 10 Contact making devices
unit shall be furnished
2H 3 7 Front Fanel g~uipment The following equipment shall be fur-
nished ~ounted in the front panels of the control switchboard Unless
otherwise indicated, all meter scales shall be selected by the Contrac-
tor, subject to acceptance by the Engineer
1 - Digital generator wattmeter
1 - 6enerator kilowatt-hour meter with contact making de- vice
1 - Line kilowatt-hour in meter with contact making device
1 - Line kilowatt-hour out meter with contac~ making device
1 - Digital generator frequency mater
I - Digital generator power factor mater
1 - Digital bus frequency meter
1 - Digital generator varmater
I - Digital kilovolt-ampere (kVA) meter
1 - Analog generator tachometer
1 - Genera=or breaker control switch, "TRIF-CLOSE," pull to
lock in trip with green, white, and red indicating
lights (green-open, red-closed, white-tripped)
I - Recorder for monitoring flow and multiple ETD and thar-
mocouplea, and alarming when any one or more are above
or below the field adjustable set points The recorder
shall be a ¥okogawa 4081 Hybrid Recorder with four
point alarm output (AK-04) and remote on-off control
(RE}i) As a minimum, the following points shall be
provided All alarms provided shall be wired to termi-
nal blocks for connection of O~uer field wiring
I - Flow
3 - Genera2or a=ator
[DENTON 10566 TUI~II~ GEN 62 0200]
[ 031387 ]
2H-7
controller system hardware and software shall be per-
formed by the Contractor at the factory in the presence
of the Engineer The Contractor shall Be responsible
for providing all simulation hardware and for all sys-
tem hookup and operation required to accomplish this
functional checkout
Generator automatic voltage regulator equipment ~nclud-
ing controller, auxiliary excitation rectifier, power
factor controller and field circuit breaker
Turbine controller electronic control equipment as re-
quired
Generator kilovolt-ampere (kVA) transducer
Generator watts transducer
Generator var transducer
Generator volts transducer
Generator amps transducer
Generator frequency transducer
Bus voltage transducer
Generator power factor transducer
Generator rpm transducer
Penstock flow transducer
Lot of breakers, fuses, and disconnects as required to
distribute 120 volt ac and 48 volt dc power
Manual transfer switch to switch the programmable con-
troller from inverter power to house power
Lot of terminal blocks and wiring to allow for connec-
tion to the Owner's SCADA system This will include
all transducer outputs, watt-hour meter pulse outputs,
flow set point raise, flow set point lower, power fac-
tor control, plant auto-start, plant auto-stop, all an-
nunciator point follower contact output, and oil cir-
cuit breaker trip and close
[DENTON 10566 TURBINE GEN 62 0200]
[ 111987 ]
2H-10
1 - Digital penstock flowmeter
3 - Analog indicating ac ammeters, generator amps
1 - Analog indicating ac voltmeter, generator voltage
1 - Substation oil circuit breaker (OCB) control switch,
"TRIP-NORMAL-CLOSE" with green, white, and red indicat-
ing lights
1 - Generator voltmeter transfer switch, 3-phase, "AB"-
"BC"-"CA"-"OFF"
1 - Analog indicating ac voltmeter, bus voltage
1 - Bus voltmeter transfer switch, 3-phase, "AB"-"BC"-"CA"-
"OFF"
2H 3 8 Internal Equipment The following equipment shall be mounted
within the control switchboard
1 - Lot terminal blocks, hardware, wiring, and accessories
to obtain a complete functional operating system
* 1 - Programmable controller, Gould Modicon or General Elec-
tric Series 6 with all necessary I/O and inverter power
supply for 48 volts dc to 120 volts ac CMOS memory
with battery backup shall be provided The memory
shall be nonvolatile with respect to power disturb-
ances Individual status lights shall be provided for
each input and each output on an I/O card A program-
ming device shall be furnished capable of entering,
altering, and monitoring programs in the programmable
controller The programming device shall also be cap-
able of forcing on or off all inputs and outputs Use
of the programming device shall be possible either
on-line, in real time, or off-line The progr-mmtng
device shall provide immediate and long term storage of
programm~ed system software with a magnetic cassette
tape loader recorder or floppy disk The programming
device shall be capable of providing hard copy documen-
tation by driving a printer The printer shall be fur-
nished with the system Ail cables, software, and ac-
cessories required for the programming device to in-
terface with the programmable controller shall be fur-
nished A full functional test of the programmable
*Negotiated Revision
[DENTON 10566 TURBINE GEN 62 0200]
[ 111987 ]
2H-9
2H 4 SPARE PARTS Each switchboard shall be provided with the following
spare parts ·
1 - Lot of fuses, lamps for indicating lights, and color caps as follows
100 percent replacement of fuses
100 percent replacement of lamps for indicating
lights and annunciator
I00 percent replacement of color caps
10 percent annunciator windows
10 percent programmable controller input/output
cards
10 recorder ribbons
6 recorder charts
2R.$ FACTORY TESTS After the switchboard has been fabricated and all
parts assembled, the complete gear, including instruments and devices,
shall bm factory tested Factory tests shall include the following
Tests required to verify correctness of assembly and opera-
tion
High potential tests
Applicable NEIiA and IEEE standard tests
Functional testing of unit control systems
2H 6 SPECIAL SHIPPING REQUIREMENTS The control switchboard shall be
shipped by dedicated truck to prevent shipping damage
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
2H-11
Qualified prospective bidders ma7 obtain five copies of the specifica-
tions from the En$ineer (mailin$ address - Black & Veatch, P 0 Box 8405,
KanSas City, ~iseouri 64114, Attention ~r D F Guyot)
All bids must be made on printed contract document iotas included in the
specifications
~hen filed with the Purchaein$ Asent, each bid shall be accompanied
either by an acceptable bidder's bond, a certified check, or a cashier~s
check on any solvent bank, the amount of which shall be not less than
5 percent of the amount of the bid The bid security shall be made pay-
able to ~he City of Denton, Texas Bid security of the successful bid-
ders will be reEu~ned when their contracts have been sisned, filed with,
and approved by the City Bid security of unsuccessful bidders will be
~eturued on award of contract or relecTion of bids
~o bid may be altered, withdrawn, or resubmitted within 120 days [rom and
a~Ter The dace set for The openin$ of bide
The City of Denton, Texas reserves the riSht to reject any and all bids
and to waive defects in bids
CITY O~ DENTOn, TEXAS
John J ~arshall
Purchasin$ Asent
[DEItTOI~ 10566 TURBINE GEN 62 0200]
[ 022786 ]
A-2
ADVERTISEMENT
TURBINE GENERATOR
FOR
CITY OF DENTON, TEXAS
LEHISVILLE HYDROELECTRIC PROJECT
BID NUF~ER 9735
Sealed bids will be received by the City of Denton, Texas, at the office
of the Purchasing Agent, 901-B Texas Street, Denton, Texas, prior to
2 00 p m , April 2, 1987, Central Standard Time, then publicly opened for
furnishing
TURBINE GENERATOR
Prospective bidders may examine copies of the specifications at the
office of Black & Veatch, Engineers-Architects~ 11401 Lamer, Overland
Park, Kansas
Specifications will be issued only to those bidders who have been de-
termined by the City of Denton, Texas to he qualified to bid Determi-
nation of a prospective bidder's qualifications will be based entirely on
written evidence submitted by the bidder in duplicate to the City and the
Engineer not later than 10 days before the time set for opening the bids
Each prospective bidder shall submit evidence that he
Has adequate plant equipment available to do the work prop-
erly and expeditiously
Has an adequate financial statue to meet financial oblisa-
clone incident to this work
Has adequate technical knowledge and practical experience
Has no Just or proper claims pending against him on other
similar work
Has field service facilities in the United States, or a
contract with a firm that has field service facilities in
the United States
Bidders who were qualified for Bid Number 9610 do not have to resubmit
the qualification information
The equipment offered by the bidder shall be of the same design as equip-
ment manufactured by him which has been in successful commercial opera-
tion for 3 or more years in similar applications The prospective bidder
shall submit a list of such equipment in service 3 years or longer The
list shall indicate the owner's name, location, date of initial opera-
tion, brief system description, operatin$ conditions, and type
[DENTON 10566 TURBINE GEN 62 0200]
[ 031487
A-].
B 4 2 Exceptions Each bidder shall list in the space provided on the
proposal form all exceptions or conflicts baL~eeen his proposal and the
specif$cacione and documents If more space is required for chis list-
ing, additional pages may be added If the bidder takes no exceptions,
ha shall ~lCe "None" in the space provided Proposals chat do not com-
ply with chis requirement will ba considered irregular and may be
ed at the discretion of the Owner In case of conflicts not stated as
directed, the requirements of the specifications and documents shall
srn
If Cha bidder Cakes exception, than all such exceptions shall ba specific
in nature and carefully referenced co =ha applicable page number, article
number, and article title of the specifications and documents If the
bidder proposes deletion of specification languase and substitution of
revised lansuage, =hen such deletion and substitution shall be carefully
presented by typing coupla~a paragraphs or articles of the original spec-
lficaCion langu&ge and incorporating cbs eubecituts lansuass Identify
proposed deletions by parenthesis and proposed substitute languass by
underlining For example "(Contractor) Owner shall be responsible
for " Exceptions ChaC are general, ~haC make reference Co the bid-
dar's standard terms and conditions, or Chat make reference to the bid-
der'e descriptive information as a whole will not be acceptable Pro-
posals cha~ do nsc comply wi~h these requirements for the presentation of
exceptions will nsc be acceptable and may be re]ec=ed
If a proposal includes ~prsss or ~plied exceptions chac are nsc 1laCed
as required, ~he raquirnance of the specifications and documents shall
govern The bidder shall usc al~er any parc of ~he specifications and
docmnce in any way, except by stating hie exceptions
B & 3 Si~nacuraa Each bidder shall sign the proposal with his usual
signa~ura and shall give his full business address The bidder's name
stated on the proposal shall be the exact legal name of the firm. The
names of all persons signing should also be typed or printed below the
signature
Proposals by partnerships shall be signed with the partnership name fsi-
loved by the signature and designation of one of the partners or ocher
authorized represeu~aCiva A complete list of the par~ners shall be in-
cluded vich the propoea~
Proposals by a corporation shall be signed in the official corporate name
of the corporation, followed by Cha signature and designation of the
president, secretary, or ocher person authorized co bind the corporation
A proposal by a parson~o af£~xae co his signature the word "president,'
"secretary," "agent," or ocher designation, without disclosin$ his prin-
cipal, will be rejected Satisfactory evidence of the authority of the
officer 8ignin$ in behalf of the corporation shall be furnished Bidding
10566 'i'uaBINE GiN 62 0200]
030885
8-2
INSTRUCTIONS TO BIDDERS
B 1 GENERAL These ins=ructions apply to =he preparation of proposals
for equipment, materials, end related work for =ha City of Den=on, Texas
acting through ice Public Utilities Board and City Council, hereinafter
~aferred co as =ha "Owner" Ail proposals shall be prepared and submit-
ced in accordance with =he Advertisement, chase lnscruccions~ and =ha
la=tar transmitting chase specifics=inns and documents
B 2 GENERAL PROJECT DESCRIPTION The specified equipment ~nd materials
will ba incorporated in the Owner's Lewiavilla Hydroelectric Pro]sc= lo-
ca=ad aC =he outlet works of =ha Lewisville Reservoir near Lawievilla,
Texas
Section lA of the specifics=lens defines the scope of work to be included
in the proposal
B 3 DOCUI~NTS FO___RRBIDDING Prospective bidders may obtain copies of the
specifications aa seated in =he Advertisement
Addicion&l copies will not be available
B 4 PROPOSALS Proposals shall be prepared in accordance with =he re-
quirements of chess Ins=ructions to Bidders Proposals that ara nec pre-
pared in accordanoe with such inst~uctione will imply thac the bidder
does not intend Co comply with 811 of =he proposed contract conditions
and such proposals will be considered lrreSular
Four copies of each proposal shall be prepared and 8ub~Ltted, each copy
con=aining a complete bound copy of these specifications and documents
B & 1 Preparation Each proposal shall be carefully prepared using =he
proposal and proposal date forms included as · parc of =he biddin$ docu-
ments Eh=rise on =he proposal and proposal data forms shall be typed,
using dark black ribbon, or legiblywriC=an in black ink All prices
shall be sCa=ed in words and flSures except where =he forms provide for
figures only
The bidder shall acknowledge, in =he space provided in =he proposal form,
receipt of each addendum issued for =he specifications and documents dur-
ing =he biddin$ period
The bidder shall assemble cll drawings, catalog da=a, and other supple-
uentary information necessary =o =horoushly describe materials and equip-
mant covered by =he proposal, and shall ac=ach such supplemental infom-
=ion to =ha copies of =he specifications and documents submitted
[DENTON 10566 T'u"RBII~ CEN 62 0200]
030885
B-1
bidder and e surety company authorized to do business in the state of
Texas
The proposal guarantee shall be made payable without condition to the
City of Denton. Texas. and the amount thereof may be reteined by said
City if the bidder's proposal is accepted and the bidder fails to enter
into contract in the form prescribed, with legally responsible surety.
within l0 calendar days after the presentation of the contract document
for signatura
The proposal guarantee of each unsuccessful bidder will be returned The
proposal guarantee of the bidder to whom the contract is awarded will be
fulfilled when said bidder executes the Contract Agreement and files a
satiefactoz7 Performance and Pa~ent Bonds. as required The proposal
guarantee of the second evaluated bidder may be retained for a period not
to exceed 120 days pending the execution of the Contract Agreement and
Performance and Payment Bonds by the successful bidder
B 6 TAXEg. PEI~iITS. AND LICENSES The bidder's attention is directed co
the G~-'"RAL CONDITIONS'~-regarding taxes, permits, and licenses
It shall be the bidder's responsibility to determine the applicable tax-
es. per,its, and licenses If the bidder is in doubt as to whether or
not a tax. permit, or license is applicable, he shall state in his pro-
poaal'whether this item has been included in his bid price and the amount
of the applicable tax. per,it, or license in question
B 7 INFOI~ATXON TO BE SUBMITTED WITH PROPOSAL Each bidder shall submit
with his proposal-~h~"nameo~nu"~tura~ the type or model of each
principal item of equipment or material he proposes to furmish He shall
also 'submit four copies of separately bound booklets containing drawings
and descriptive matter indicating general dimensions, principle of opera-
tion. and the materials from which the parts are made Any proposal not
having sufficient descriptive matter to describe accurately the equipment
or materials proposed may be rejected as irregular The drawings and de-
scriptive matter submitted by the successful bidder will be retained by
the Owner Any material departure from chase drawings and descriptive
matter as submitted will not be permitted without written permission from
the Owner
Verbal statements made by the bidder at any time regarding quality, quan-
tity. or arrangement of equipment will not be considered
If alternate equipment or materials are indicated in the proposal, it
shall be understood that the Owner will have the option of selecting any
one of the alternates so indicated and such selection shall not be a
cause for extra compensation or extension of time
[DENTON 10566 TURBINE tEN 62 0200]
[ 022786 ]
B-&
corporations shall designate the scats in which they are ~ncorporaced and
the address of chair principal office
B 4 i guba~Lccal The original proposal {and les accompanying copies)
shall be Crane~iCced Co arrive ac the designated address not later than
the date and time stipulated in the Advertisement
Submit the original proposal and three signed copies of the proposal to
City of Denton Purchasing
901-g Texas Street
Denton, Texas 76201
Attention Mr John J Marshall
Purchasing Agent
Proposals shall be submitted in a sealed envelope or package The enve-
lope shall be plainly ~arkad in the upper or lower la,c-hand corner rich
the na~e and address of the bidder and the yards "Proposal for," followed
by cha name o£ the proposed york and the epeci£icacion number as stipu-
lated in cha Advertisement The proposal guarantee shall be enclosed
v/ch the original proposal in the envelope or package mailed Co the O~m-
ar
i single proprietary interest shall nsc submit ~ulcipla proposals for the
same york even though the individual proposals are submitted under dif-
ferent names The O~ner reserves the right Co rslscC all proposals so
submitted
E 4 5 Wichdraval Proposals may be vichdrava, altered, and resubmitted
ac any c/me before the cima sec for receipt oK proposals Proposals may
nsc be vichdra~nt, altered, or reauba~LCced viChin 120 days a£cer the time
sec for receipt
B i 6 Acceptance and Re~eccion o_~EProposals The O~mer reserves the
right to accept the proposal which, in ica ~udgmenc, is the best respon-
sive proposal, co relecc any and all proposals~ and to waive irregulari-
ties and informalities in any proposal chaC is submitted
Proposals received after the time specified for receipt of proposals will
nsc be considered
· ll proposals shall become the property of the Ovner
B 5 PROPOSAL GUARAntEE Each proposal shall be acco~panied by a pro-
poaal guarantee in an amount nsc less than 5 percent st ~he coral pro-
posal price The guarantee shall be a cer~lfied check or cashier's check
dra~nt on any solvent bank, or an acceptable bidder's bond executed by the
[DEI~TON 10566 TURBINE GE~ 62 0200]
[ O22786 ]
sufficient sureties which the Contrnctor shall furnish to the satisfac-
tion of the Owner within 10 days after notice co do so In default
thereof~ the contract may ha suspended and all payments on moneys due to
the Contractor withheld
The Performance Bond shall guarantee the faithful performance of all cov-
enants, stipulations, and conditions of the contract The Pa~nent Bond
shall guarantee the falChful payment of all obligations vh$ch may arise
under the contract
The cost of the bonds shall be included in the lump sum proposal prices
B 12 PROPOSAL PRICinG Bidders shall submit firm price proposals thnt
are nsc subject co escalation All prices shall be in United States
Dollars
B 13 ~RAI~qlNG P~OGRAH Each bidder shall include pith his proposal a
complete detailed description of available training programs and training
aids applicable to the equipment Such programs and aids should be suf-
ficient to familiarize the Om3erVs personnel pith equipment aaaenbly and
dieaeaembly~ operating procedures, performance analysis, and maintenance
instructions
Aa a miniuum ~equtrement. the succassful bidder shall provide coupecent
instructors to conduct neceasat~ training of the Sugar's operating and
maintenance personnel Videotapes of training programs shall be sup-
plied
The lump sun prices for providing the bidder's recmeuded training pro-
gr-=- shall be stated in the Proposal The ~rainin$ program proposal
shall include an i~euizatio~ of all coots for providing the above serv-
ices, any available alte~ates, and the bidder's recounendations regard-
lng training The breakdown of such lump sum prices and costs for avail-
able alternate services shall be stated in the Proposal Data section
B 1~ SPARE PARTS OPTION The bidder shall state a lump sum price in the
PropoSal for those spare parts he lists for the Owner's consideration in
the P~oposal Data. The O~ner shall retain the option of purchasing the
spare parts for the lump sum price stated in Section C. or the unit
prices stated in Section D, until 6 months after the start of commercial
opera~ion
B 15 ~UAL~T~ ASSUlh~qCE The bidder's attention is directed to Sec-
tion I$ regarding provisions for quality assurance manuals and shop in-
spection plans
B 16 SCHEDULE OF CAnCELLATiON CHARGES In the Proposal section, ~he
bidder shall pro'~ide a schedule of charges for termination by the Owner
as specified in the CANCELLATXON OF ~O1~ article of the General Condi-
tions
[DENTON 10566 TURB~I~ GEI~ 62 0200]
[ 022786 ]
E-6
B 8 T~ME SCHEDULE The time schedule for delivering the specified
equip~enC and materials, and the timely delivery of the specified draw-
ings and engineerin$ dace for the equipment and materials, will be a
basic contract consideration The proposal shall be based upon submittal
of drawings and engineering data and delivery of equipment and materials
in accordance with the specified schedule
B 9 LOCAL CONDITIONS If the work includes ~urnishing field services,
each bidder shall thoroughly infom himself of all conditions and factors
which would affect the execution of such services
Ic muse be understood and agreed thac all such factors have been properly
investigated and considered in the preparation of ever~ proposal submit-
ted No claims for financial adjustment to any contract awarded for the
work will be peraiCced by the Owner which are based on the lack of such
prior information or its effect on the cost of the work
B l0 INTEEPRETATION If any prospective bidder is in doubt as co the
true meaning of any parc of the proposed contract documents, he may sub-
mic co the Engineer a written request for an interpretation The person
submitting the request will be responsible for ice prompt delivery, end
all requaecs ~usc be received by the Engineer aC least l0 ~orking days
before the rime specified for receipt of proposals Any interpretation
of the proposed documents will be mede only by addendum transmitted
each parry receiving a sec of such doctmencs The O~er will hoc be
spouaible for any ocher explanations or interpretations of the proposed
documents
IC shall be the bidder's responsibility co advise the Engineer, before
the rime specified for receipt of proposals, of conflicting requirements
or o~lssions of inforaacion which require clarification Those questions
moc resolved by addenda shall he listed in the space provided on the pro-
posal fo~, together with statement of the basis upon which the proposal
is made as affected by each question
B II PERFOI~V~ANCE AND PAYMENT BONDS Coincident with the execution
the Contract Agreement, the Contractor shall furnish good and sufficient
Performance and Payment Bonds co the City of Deacon, Texas on the forms
bound herewith, each in au amount equal co ~00 percent of the contract
amsunC Ail provisions of the bonds shall be co.plaCe and in full ac-
cordance with statutory requirements The bonds shall he executed with
the proper surety through a company licensed and qualified Co operate in
the scare of Texas and acceptable Co the 0~mer The bonds shall be
signed by an agent resident in the stare of Texas and the dace of the
bonds shall be the dace of execution of the Contract Agreement The
bonds shall be accompanied by a power-of-aero.ney document certified co
include the dace of the policy
If ac any rime during the continuance of the contract, the surety becomes
irresponsible, the O~mer shall have the riBhc co require additional and
[DENTON 10566 TUItBINE (~E~ 62 0200]
022786 ]
Such charses shall be associated with the milestone daces specified in
SecCion lA and shall be based upon caeca anticipated Co be incurred and
progress made coward completion of contract raquiremencs ac such time as
optional termination ma7 be exercised
Charsee shall be proposed for the followin$ milestone daces as a minimum
Scare of enstneerin$ - latest sCarC dace for which en-
$ineerin$ muse be$in in order co meeC the contract re-
quirements
2 SCare of maCer~al procurement - latest scare dace for
order~ns of ~aCerials or commiCmenC of shop space,
whichever occurs first in order co meeC Che contract
requirements
3 Scare of shop fabrication and esseubly - latest scare
dace for which fabrication and assembly muse basin Co
meec the contract requirements
The bidder may propose additional termination criteria
B 17 F,INAHC~qL PROPOSAL Proposals are requested Co provide financin$
for the equipment furnished under Chess specifications Financin8
proposals are specified in Section FD
B 18 DOHESTiCHATERiALS The bidder's aCCenCion is directed co the
SOURCE OF ~ATER~ALS article of the General Conditions resardins
requirements for use of domestic maeerials
B 19 PI~KFERKNCE LAM Proposal evaluation will cake inca consideration
the Preference Laws of the Statutes of Texas
[DE~O~ ].0566 T'~Z~ GE~ 62 0200]
02278~ ]
PROPOSAL
To C%TY OF DENTON PURCI{ASING
901-B TEXAS STREET
DENTON, TEXAS 76201
ATTENT~0N Mr John J Marshall
Purchaein~ Asent
pROPOSAL FOR TURBINE GENERATOR
LEWTSVTLLE HTDROELECT~IC PROJECT
Gentlemen
The undersigned bidcter havens read and examined the specifications and
associated contract documents for =he ~bove ~es~a=ad equipman~ which
w~ll be tnco~oraCed ~n Law~a~lle Hydroelectric ProJec= does hereby pro-
pose =o furnish ~he equip~nc and pr~de =ha se~tces se= forth ~n chis
Propoeal All prices s=aced hara~n are fi~ and shall
escalation p=~dad =h~s Proposal is accep=ed
official op~n~n~ o~ proposals
~e u~srsi~ned hereby ~eclares chaC the follow,ns lis~ states any an~
all v~rtactons from ~d ~copC~s co the requi:emenCs of the concrac=
~oc~enCa and chac~ oChe~se~ ~C ts the ~ncenc of
work v~11 be pe=~o~ in sc=~cc acco=dance wtCh the cone=acC documents
1 DB-S has mncluded all mmport duties ~n the prices offered
but has not included any state or local taxes nor fees for
permits or l~cences Any such a~unts would be charqed~ with-
out mark-up to the customer's acc9unt
2 DB-S )s plannin~ to use ~ts standardmzed se)ect~on of
materials in the constructmon of the turbmnes These
are l~sted ~n the b(d data sheets
~ In order to meet the de)[very dates stated mn Sectmon lA 6
the Cmt~ of Denton must award th~s contract on oK before
May 15~ 1987 If award ~s delayed beyond th~s date the del*very
dates must be extended by an equal number of days (A~ a~t~onal pa~es as require6)
[DU~TON ~0566 ~INE G~ 62 02001
[ 022786
DOMINION BRIOGE-IUI.,ZER INC~
Generator Page 2E-14 Para 2E 3 6
4 Requirement 30°C temperature rmse over 50 ambient
Standard E M (and mndustry) des,gn is 80°C r~se over
ambient Larger d~odes to reduce tamp r~se would physically
not f~t on the rotetmng rectifier assembly Also larger
non-standard diodes would require special fuses whmch may
not protect the d~odes
5 Aux excitation rect~fmer (Basler) page 2E-13, para 2E 3 4
Requirement Thyrmstor tamp r~se 30°C over 50°C ambient
This is similar to gan above and was discussed during
the ~et~ng of September 11, 1986 ~n Kansas C~ty Baster
stated :hat this was not practical and that tamp r~se was
h~gher To my knowledge th~s was never solved Take excep:[om
C I LUP.~ SUM PRICE The undersisned bidder hereby proposes to furnish
fob the O~'~r's Ls~fsville Rydroelectric Project site the turbine ~enera-
tot and ser'~ices complete in accordance with the contract documents de-
fined in General Conditions, Article GC l, for the lump sum price of
One million three hundred & f~ft¥-e~qht thousand
n~ne hundred & seventy U $ Dollars (U S $ 1,358 970
(Pries in Words)
¢ I 1 Turbine Portion of the Item ¢ 1 lum~ sum price for turbine and
euxiliar~ ep~ipm~nt as s~ecifis4 in Sectio~ ~B
Seven hundred & ~wenty-f~ve thousand
U S Dollars (U S $ 725,000
~ I ~ Ce~t~oller Portio~ of the Item C 1 lu~ sum ~rice for controller
as speci~ied ~n Section 2C
N,nety- thousand
U S Dollars (~ S $ 90,000
(~r~c~ ~n Words)
C ~ 3 S~eed ~ucreaser Portion of the ~cem C 1 lu~ s~price f~r speed
incre~ec ~d a~il~ equip~nc as specified in Section ~
U S Dollars (U S $ N/A
(Price in Words)
C ~ 4 Generator ~d gxci~a~ion Sys~ Portion of ~he I~em C [ lump sum
price fo~ ~eneraCor~ excitation system, and a~iliary equi~en~ as spec-
Twn hu~H~d a ~lnhtv-~nur thnu~nd F~v~
hunHred U S Dollars (U S $ 284 500
(Price in Words)
[DE,TON 10566 TU~INE GE~ 62 0200]
[ 022786
¢-2
C 1 5 Neutral Groundin~ Equipment Portion or the Item C 1 lump sum price
for furnishing ths neutral grounding equipment as specified in Section 2F
Included ,n C 1 4
g S Dollars (b S $ ~ncluded
(Price in Words)
C ~ 6 Switch~ea~ Portion of the I~em C 1 lump sum price for the metal-
clad switchgear as specified in Section 2G
E~ghty-f~ve thousand
U S Dollars (U S
(Price in Words)
C 1 7 Control System Portion of the Item C 1 lump sum price for ~he
control system as specified in Section 2R
One hundred & thirty-thousand
U $ Dollars (U 8 $ )
(Price in Words) 130,000
C 1 8 Ptald Services Portion of the Item C ~ lump sum price for mann-
facture~ield services as specified in Section IA
Forty-two thousand
U $ Dollars (U S $ · )
(Price in Words) 42,000
C 1 9 Psrformamcs and P_9}~mnt Bonds Portion of the Item C I lump sum
price for furnishing Performance and Payment Bonds, each covering
100 percent of the contract price
Two thousand four hundred & seventy-
U S Dollars (U S $ )
(Price in Words) 2,470
C I i0 Optional Performance Tests Lump sum price additions for perform-
ing the perfor,a-nca tests as specified in Section ZA Owner shall have
the right to exercise these options for the prices listed until 6 months
after Co~aercial Operatin$ Date
Capacity and Index Test U S $
Turbine Runaway Speed Teat U S $ 3,200
Turbine Efficiency Test U $ $
Generator Efficiency Test U S $ 4,100
[DENTON 10566 TUI~BINE GEN 62 02001
[ 031387 ]
¢-3
C [ [1 Synchronous Bypass Valve (Butterfly) Lump sum price deduction
to delete the butterfly synchronous bypass valve specified in Section 25
from scope of supply Ow:er shall haue the right to delete the valve for
the price listed until 6 months after contract award
Nineteen thousand f~ve humdred
U S Dollars (U S $ 19,500 )
(Price in Words)
C 1 12 Optional S~uchromous B~assValve (Free-Dischar~e) rump sum
price addition to furnish a free-discharge synchronous bypass valve ss
specified in Section 2B Owner shall have the right to exercise chis
option for the price listed until 6 months after contract award
One hundred & f~fty-two thousand
O S Dollars (U $ $ 152,000 )
(Price in Words)
C I 13 Optional Control o_~ C0E Valves Lump sum price addition to
furnish controls to operate the Corps of En$ineers valves durin$ unit
trip as specified in Section 2H Owner shall have the riSht to exercise
this option for the price listed until 6 months after contract award
Six thousand, f~ve hundred
O S Dollars (O S $ 6,500 )
(Price in Words)
C 2 ADJUS~tl~NT FEIC~$ ~OItNA~UPAC~I~EE'S TECRNICAL SELVZCE~ The fol-
lowiu$ prices will be used to adjust the contract amount for additions to
or deductions from the mamufacturer's service representative's time spec-
ified in gection IA
Weekend
Ee~ular Time Overtime Weekends Overtime
Par diem at
pro~ect site U S $ 650 U S $ 975 U S $ 975 U S $ ~300
Per round trip
to a~ from
the project
site U S $ 1200
[DENTO~ 10566 TURBINE GE~ 62 0200]
[ 031387 ]
C-~
¢ 3 SCHEDULE OF CANCELLATION ¢~GE,S The undersigned hereby proposes
the following i'~formation regarding dates and cancellation charges in ac-
cordance with the requirements of the Instructions to Bidders article en-
titled SCHEDULE OF CANCELLATION CHARGES All dated quoted are based on
meetin$ the dates specified in Section IA
C 3 I En~inaerin~
Latest start date for engi-
ueerin$ (days before
scheduled delivery) 380
Haximun amount for
en$~neerin$ U S $ 120,000
C.3.2 Procurement
Latest start date for pro-
or reae~vatiou of mhop
space (days before sched-
uled delivery) 365
14aximum amount for pro-
curement of raw materials U S $ 375~000
C 3 3 Shop Fabricatiom
Latest start date fo~ shop
fabrication (days before
scheduled delivery) 300
Hax~au~amount for shop
fabrication U S $ ?00,000
C 3 4 Other Cancellation Criteria In addition to the requirements
listed ao-~, the unde~eigne---~oses the following cancellation cfi-
(D~qTOH 10566 TUItBIlqE GEN 62 0200]
[ 031387 ]
C 4 TRAI~NG PROGRAM OPTION Lump sum prica option for providing ~razn-
ins program as described in the Proposal Data section
Twelve thousand f~ve hundred
U S Dollars (U S $ 12 500 )
(Price in Words)
C 5 SPAR~ PA~T$ Lump sum pric. option for furnishin$ fob the Owner's
facility in Denton, Texas, including all costs associated therewith and
the bidder in Section D
qtxr¥-~v~n ~hn,,~nd ~hr
and twenty- U S Dollars (U S $ 67,820 )
(Price in Words)
C 6 ADDEIqDA The undersized bidder acknowledges receip~ of ~he follow-
~ni ~whtch have been considered in preparing chis Proposal
Da~ed
Dated
Dated
Da~ed
C 7 DEC~O~S ~ SI~A~ES Enclosed herewith is the requized Pro-
posal Gua~aa~ae l~e a~un~ o~ five (5) percen~ of the co~al of
lu~ s~ price(s) bid,
5~ o~ 8~d P~,ce U S Dollars (U S $ )
(A~ in Wo~ds)
which ~he unde~sl~ne~ bidder a~rees is ~o be forfeited ~o and become the
p~oper:y o~ ~he City of De~, Texas, should ~his Proposal be accepted
a~d a con~rac~ be awarded ~o h~ and should he fail co em~er in~o a con-
~a~ tn ~he fo~ prescribed ~d co iuznish ~he required bonds, bu~
o~he~ise ~he a~oresaid Proposal Guarantee will be retumed upon his
siin~ ~he Con,rat: A~re~en~ and deliverin~ ~he approved bonds
~e undersi~ned bidder fur:he~ agrees cha:, in case of defaul~ in execu-
~ion of suah Come,ac: A~ree~n~ wi~h necessary b~d, ~he check or bond
acc~a~yin~ ~his Proposal and ~he money payable thereon (a) shall cover
the cos~s associa~ad ~h such default, (b) shall cover a portion of
costs associated wi~h such defaul~ and ~he bidder shall be liable for the
balance, or (c) ~he ~esidual obligation of such sure~y, af~ar deduc~ing
~he cos:s associated wi~h such default, shall be released Co the bidder
[DEIqTOII 10566 TUt~BI~E GEN 62 02001
[ 031387 l
C-6
The undersigned hereby declares Ghat only the persons or firms interested
in the Proposal as principal or principals are named herein, and that no
other persons or firms than herein mentioned have any interest ~n thLs
Proposal or in the contract to be entered into, that this ?roposal is
made without connection with any other person, company, or parties like-
wise submitting a bid or proposal, and that it is in all respects for and
in good faith, without collusion or fraud
If this Proposal is accepted, the undersigned bidder agrees to submit
drawings an4 engineering data in accordance with Section 1C and co tom-
place delivery of equipment and materials in accordance with the speci-
fied schedule The undersigned fully understands chat the time of draw-
ings and data submittal and equipment and materials delivery is vital to
the completion of design, construction, and operation of the Lewisville
Hydroelectric Project at the Lawisville ReserVoir near Lewisville, Texas
and is a basic consideration of the contract
If writ:eh notice of the acceptance of this Proposal is delivered to the
undersigned within 120 Says after the time set for receipt of proposals,
or any time thereafter before this Proposal is withdrawn by the bidder,
the undersisned will, within i0 days after presentation of the document
[DENTON 10566 TUE~INE GEN 62 0200]
[ 031387
for siSnature, execute and deliver to the City of Den:on, Texas a con-
tra¢: in the form of :he Con:tact Asreement attached, co. lets with ac-
oep:able Performance and Payment Bonds
Dated a: Lach~ne this let day of April [987
Bidder Dom,n,on 8rldge-Su]zer In:
, (SgAL)
By
W R Strub
Title Executive V~¢e-Pres~den~ & General
Manager, Energy D~vis~on
Business Address of Bidder 555 Notre Dame Street
Cach~ne) quebec, CANADA HSs 287
Stats o~ ~ncorpo~a~lou CANADA
Add, eSs of ~r~nc~pa~ Of~ce 555 Notre Dame Street
S~er of Person :o Con~act
~e~ardin~ this Proposal T P Taylor
555 Notre Dame Streett Lach~net ~u~bec
H8S 287 CANADA
TELEPHONE (514) 634-355]
[DENTON ~0566 TUP. BINE GEN 62 0200]
pPOPOSAL DATA
D 1 GENERAL Each bidder shall submit complete and definitive ln:or~a-
tion on his offering in sufficient detail to permit a complete anal szs
of the bid The requirements stated in tbs Instructions to Bidders rela-
tive to information submittal shall be followed
The requirements for information contained in this section are basic re-
quirements Additional information shall be provided as requested by the
Owner or Engineer
The blank data sheets included in this section shall be completely filled
in The data listed therein shall not relieve the Contractor of his re-
sponsibility for masting the requirements of the detailed specifications
The bidder shall not alter the original Proposal Data section page num-
bers If it becomes necessary to add pages, at other than the end of the
section, a suffix such aa a, b, or c, etc , shall be added to the original
number to designate the added page number Pages added at the end of the
section shall be numbered sequentially by continuation of originally es-
tablished numbering
If the bidder finds it necessary to reproduce any of the Proposal Data
pages, methods of reproduction shall not appreciably reduce or enlarge
the reproduced pages In the process of preparing the bid evaluation,
the right-hand portion of Proposal Data pages which have a trim line will
be trimmed off and ~atched with corresponding pages received from other
bidders It is'therefore desirable that these pages match as nearly as
practicable with the original left-hand portion of the page when placed
aide by aide The bidder shall make no changes to the left of the trim
line
~here alternates are indicated in the Proposal or Proposal Data, the bid-
der shall provide complete information for each alternate
Write entries boldly with black ink or type entries using carbon black
ribbon Do not use ball point pens or blue ink
D 2 PERFORi~AN~E CURVES The following performance curves shall be fur-
nished with the Proposal as specified in Part 2 of the specifications
Turbine hill diagram with efficiencies, allowable sigma
limits, wicket gate opening, and runner blade angle for net
heads between 76 and 25 feet, with upper and lower limits
for continuous operation
Generator efficiency curves
[DENTON [0566 TURBZNZ GEN 62 02001
022786
D-1
Speed increaser efficiency curve ,0' REQL[RE3)
Combined turbine - speed increaser - generator output as a
function of turbine discharge for net heads of 76, 60 and
49 feet, with upper ~nd lower limit for continuous ~nd
temporary operation
Sigma break curves at maximum and rated discharge for
maximum and rated head
Characteristic curves of model and prototype turbine runaway
speed and discharge
Flow, head loss, and torque curves for the synchronous
bypass valve
D 3 DRAWINGS Drawings shall be submitted indicating the following in-
formation Ail drawings shall be in sufficient detail to permit prelimi-
nary arrangement studies to be made
Individual general outline drawings of major equipment com-
ponents with cutaways showing basic dimensions and construc-
tion details and features
General outline and arrangement drawings of the assembled
system in plan and elevation showin$ approximate overall and
governing dimensions, locations, elevations, and order of
arrangement of major components, and locations and sizes of
required building openings, floor plates, hatches, turbine
wa:ar passages, bypass valve, ccc Also, show general ac-
cess and clearance requirements for erection, operation, and
disassembly of system components Include sufficient infor-
mation to determine overhead clearances AIl dimensions
shall be in feet and inches
Shaft seal arrangement
Turbine control block diagram
gxcitation system functional diagram
Foundation and powerhouse loads and associated performance
criteria including but not limited to stiffness and preload-
ing requirement for anchorages
[D£NTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
D-2
D ; SUPPLEMENTARY [NFOI~TYON The £ollowing supplementary in£o~at~on
shall be submitted with the Proposal as provided for in the Instructions
tO Bidders
Approximate total power requiremen~s for equipment furnished
noting approximate portions required by major components
Manufacturer's descriptive data for all major individual
components including, but not limited to
Generator
Speed increaser (NOT REQUIRED)
Turbine
Synchronous bypass valve
Controller
Excitation system
Control system
Swicchgeer
Neutral grounding compartment
Water strainers
Transient calculations of speed and pressure rise at normal
and emergency shutdo~m
List of instruments for each major component
Brief description of
Erection procedures
Turbine guide and thrust bearings
Turbine shaft seal
Couplin8s between turbine-speed increaser and
speed increaser-generator
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
D-3
DOMINION BRIDGE-SULZER INC
(Bid~e~'s Name)
D 5 TILAININ~ PROOl~a~4 The bidder The tralnln~ programme consists of
sha~ provide a complete deec~ipc~on
' o~ CraSh,nS p~o~ram, an ~CemLzaC~on f~ve eight hour days combining both
o~ co,Cs ~nc~uded ~n the ~ump sum
proposal p~ce ~o~ C~a~n~n$~ avaiL- theoretical instruction and practical
able a~Ce~na~ae, and the bidder's
recommendation 'hands-on"operating experience w~th
all the equipment supplied under th~s
contract The programme ~s broken
· down as follows
- Control schematics theory and opera-
ting / maintenance instruction for
instrumentation
- Theory and operating / maintenance
instruction for motor control center,
· programmable controller and alarm systen
· - Operation and maintenance of power
plant, practice
- Electronic governor-theory and opera
· ting / maintenance instruction
- Electronic governor adjustment and
operation, practice
~i The course will be given by one full t~
instructor supplemented by two days
with a governor specialist In add~t
we encourage the operators to take an
active part in the commissioning proce
in order to gain experience w~th the
· equipment
[DEB'~ON 10566 '~URI)I~E GEN 62 0200]
030SSS ]
COST BREAKDOWN D-~
7 MAN DAYS X S600/D~Y S42C~
2 RETURN TRIPS S2400
D 6 qUALITY ASSURANCE The following quality assurance information
shall be submitted with the proposal
D 6 I quality Assurance Manual Bidders shall submit their Cualzty As-
surance Manuals with th~ proposa]s for a quality assurance evaluation
Ths Manuals shsll contain procedures that the bidder will follow during
design, procurement, and fabrication of the equipment to be furnzshed un-
der this Contract The Manual should contain procedures that apply on!v
to the equipment being supplisd for this Contract, and should contain
implsmenta~ion exhibits that will be used
[DENTON 10566 TURBINE GEN 62 0200]
[ 022786 ]
D-5
D 7 CODES AND STANDARDS Bidders sha]I provide a complete listing of
codes and standards which are proposed to be substituted for the codes
and standards specified in these specifications
Specif, ied Code/~t~ndard Proposed Code/Standard
[DENTON 10566 TURBINE CEN 62 02001
[ 022786 l
D-6
D 8 WORK LOCATION AND SUBCONTRACTING Bidders shall list the SsoRraphic
locations wher~ major elements of the work will be performed Bidders
shall also list the major elements of work co be subcontracted, names of
proposed subcontrac=ors, and locations where such work will be performed
Subcon=rac=or
Component ~If Applicable) Location of Work
T~rb~ns Stationary 08-S M~r~l~ 0uebe¢
Parts
Turbine Rota~n§ Bell Enqlneer~nq Kr~ens~ Switzerland
Parts
Generator Electric Mach~ners M~nneapol~s~ M~nn
Switch,ear?Controls PACS Ind Inc Mt Vernon Ohio
D 9 SPA~E PA~TS The bidder shall provide a complete lis=ins of recom-
mended spare parrs =o be fu~nished for =he Spare Parrs Option price
8~aCed in she Proposal (Sec=ion C) The lis=ins shall include quantities
to be furlt~shed, descr~p=ion, and unit prices should =he Owner decide co
purchase only selected spare parrs
Deecrip~ion ~ua~Cic~ Unit Price~ $ Total Price, $
Please see attacged Spare Parts L~st
{DENTON ~.0566 TURBINE GEN 62 0200]
[ 022786 ]
D-7
DOMINION ORIOGE-~II.ZER IN ~
NECESSARY SPARE PARTS FOR S-TURBINES
SET/qUANTITY DESCRIPTION USS
I Runner blade seals complete 550
1 Servopiston sliding ring seals 580
1 Bestobell seal ring, Including 0 rings 8,160
1 Psds to one thrust bearing 3,680
1 Floating seal to guide bearing 1 250
1 Buckling links 1,410
1 Gear pump for bearing oil supply ---
I Special seals, gaskets, packings 675
10 Filter elements for governor oil 845
10 Filter elements for lub oil 600
1 Solenoid for emergency shutdown valve
1 Solenoid for stop valve
1 Pressure gau~e for govenor oil 235
1 Pressure gauge for lub oil 235
1 Oil Pump without motor 4,015
1 Lub oil p~t~p without motor 525
1 Servo Valve for runner 6,000
1 Servo Valve for wicket gates 5,300
I Guide Bearing Sleeve 1,845
1 Floatin~ seal to thrust bearing 1,055
1 otl inlet head 4,025
1 Shaft protecttn~ sleeve 4,895
1 Outer and inner bearing to guide vanes 2,195
1 O-rings and rubber seals 575
2 Flow-svitch (indicator) for oll supply 1,445
1 Thermostat for pump unit 525
1 Gaskets and packing seals for governor oil pump 190
1 T~o-~ay valve for overspeed pendulum 520
1 Limit switch 55
I Fuses for governor 65
1 Ansle Converter (runner) 1,495
1 Angle Converter (distributor) 1,440
1 Overepeed Switch 1,945
1 Loose Wear Rtn~ to Bestobell 2,210
1 Generator bearing sleeve 8,200
3 Generator fuses 700
TOTAL 67,820
Description Quantity Unit Price, $ Total Price
D 10 EQUIPMENT DATA The information required on the following pages is
to assist the Engineer in evaluating the Technical Proposal
The data listed herein is stated for definitive purposes and for the con-
venience of the O%mer
[DENTON 10566 TUKBINE GEN 62 02001
[ 022786 ]
D-8
(Bidder's lame)
D 10 I Turbine
}lanufacturer DOrllNION BRIDGE-$HLTER/BELL ErlGR G
Inlet diameter, inches 90, 94
bl~imum outside dimensions, £nchas 106, 93
360
Turbine design speed, rpm
Direction of rotation vieved
CLOCYWISE
~rom upstream
~aiihcs, pounds
Total 55000 lbs
Heaviest piece handled
durin$ erection STAY RII~ & DISTPIBUTOR ASll ( 240C0 lbs
Heaviest piece handled
durinB main:anance hEAPING & RU~INE~ AS~ ( 12000 lbs)
Type ADJUSTABLE BLAnF TYPE
V~a,=srtal (by AStl4 Noo) AS'IH 743 GRADE CA 6I~1
Outside diameter, inches 64 96"
5
Number off bledes
Runner hub diameter, inches 28, 58"
Total vsishc, pounds llNO0 lbsl~
~aximum hydraulio ~hrus~ at
~ LATER
normal opera~ion~ pounds
~laximum hydraulic thrust
durini emergency shucdo~'n,
~ LATE~
pounds
AS~I A 106 Ga C DP A 202 GP
NaCectal (by AS~i No )
[D£NTON ~0S66 TtRBI;E GE' 62 0200]
[ 022786 ]
D.~
1 WEIGHT OF RJNNER INCLbDF. S E'AR G
(Bidder's
(shai~ bod~) inches 8
(couplinss), inches U/$ 25 31 /
Overall len$ch o: one piece,
inches 172, 52
Weisht, pounds 3000 lbs
Packing bo~
Type PACYI~IG SltJFFING BOX
Sealing water
flow/pressure 6 gpm/ 22 psi
Guide bearing
Type BABBITT - METAL LIIIED
Diameter, inches 8, 86" {ID)
Einer material BABBITT - ~IETAL
Quantity of oil, gallons FORCED LUBRICATIOn) O, 26 gpm
Thrust and guide bearing
Type DOUBLE ACTIIIG/TILTH'G BEARII'G SEG'EI TS
Outer diameter, inches 20, 00'
Inner diameter, inches 7,
LATER
Design thrue:, pounds
Design ¢ounterthruet, pounds ~ LATEP
Liner material ~ BABBITT - )
Cooling oil re~uiremente,
flov/preeenre l~ 30 gpm/ 12 psi
quantity of oil, gallons FORCED LUBRICATIOII SYSTE~'
[DENTON 10566 TLPBIN£ GE~' 62 0200]
[ 022'86 ]
D-10
D~-S
Runner throat casin$
Alsteri~l (h~ AqTM ko ; ASlt~ g o40 TYPE ~ I
D~meCer inches 64, 96
Weight pounds
Turbine casing
?~,
DISCHAPGE Maximum diameter, ~nches
RI~IG 64, 2O
~n~mum dismete~, ~n:hes
Thickness, inohes 5/8"
~ength, inches (TOTAL) 65, 38
Me:e~i~ ~b~ A$?M No ) AS1U A 2R5 GI~ C
~e~gbt, pounds (TOTAL) 5500 lbs
Bulb casing
Outside d~ametet, inches ~, 77"
Thickness, %riches 3~4"
Mater~a~ (by ASTH No ) AS~,i A 36
~e~ght, pounds
Start tube
AS~4 A 285 GR C
~aceti&~ (bT AST)4 ho )
~ensth, ~nchss
~ 3/8
Thickness, ~nches
Outlet dtmens%ono, vtdth x
height, inches
Weight, pounds lO 000
[D£I~"rON 10566 TLPJI~£ G~\ 62 0200]
[ 022786 1
D-il
OB-S,
(Bidde~'s
Distributor
¥sCerial of stay column A$~I A 36
(by ASTI.! No )
Nu~be~ o~ s~ay columns
4], 34"
8Csy column hsiBh:, inches
Materiel of ~icke~ Sates ASTM A 27 GR 65-35
(by &$Tlt No )
~unbar of wicket sates 13
Wicket Sacs heishc, inches 23t 09
Type of Sacs seals PARKER 'POLYPAK' SEALS
Type of lubrica:ion of
bearinBs FIBERGLIDE BUSNINGS
LeakaSe rats for new wicket
Sates, all closed, runner
dewatered, Spn 2249
~aterial o~ operaCin$ ring
(by AST~ So ) A$~i A 27 GR 70-36
Total veishC o£ conplece dis- 24000 ~
Cributor assembly, pounds
Recommended maximum river water
4" × 4'
object size, inch x inch
Water strainers
Nu~er
~anutacturer
~ M3~2L OR EQUAL
~odel
~esh 25 MICRON
2 INCLUDING STAY RING ASM
[DEt,,'TO~ 10566 TU~BX~E GE~ 62 0200]
[ 022786 ]
D-12
DB-S,
(B~ddert8 Name)
D.10.2 $Tnchronoue Bypass Valve.
DuCCer£1y
HanufacCurer and model 1 OF THE SUPPLIERS IN CONTRACT SPEC
' BUTTERFLY VALVE
D~sk Cype
Nominal diameter, incites
Design pressure, psi 50 PSI
108416
Cv aC ~00 percent open
Weight of each valve,
piece, pounds 6 000 lbs
Shaft diameCer, inches
Disk thickness, inches LATER~
Face-Co-~ace dimension, LATER(~)
incites
Disk clearance dimension, LATE~
incites
Disk axis posicion LAT£R(~
Haximum required shaft
torque wich operacing cycles
and design flows specAfied, ~ 000 ~-~b$
Angle aC which maximum torque
occurs, degrees £rom closed : 35~
Flan~e thickness aC boar
circle, incites
Deotgu pressure, psis ~: 75
~laxtmum eight shutoff pres- ·
· LATER(~)
sure, psis ·
IDENTON 10566 1URBIrl£ C£~ 62 0200]
[ 031387
3 INFO TO BE PROVIDED UPON RECEIPT OF CONTRACT & VALVE DESIGN COMPLETION
(B~dde~'e Hame)
~erial8 (by ASTM Ho )
Body ASTM A-48 CL 40 W
Diek . ASTM A-536 GR 65-45-12
Shaft ASTM A-276 TY 304
Rubber sea= ' BUNA N
Gear reducer
Manufacturer i LATER~'~
Size or claes : LATER~
Maximum required force =o
operate handwheel while
unseating :he valve with
design di~£erenCial pres- LATER~__
sure, pounds
Free diecha£$e
Manu£acCurer and model Allts-Chalmers Hydro In=
· 48"
Nominal diems=er, incites ·
Weigh=, pounds 9000 lbs
Type of opera=or i Two (2) Double Actlnq H,¥d C~llnders
Face-to-~aee dimeneAone, ·
inches 7' - 5"
Design pressure, pe~g : 50 PSIG
Materials
Body ~' AS1M A-516 GR 60
Body sleeve ~ Staine§) }tell 304
Gate ASTM A-516 GR 60 c/~ Bronze Seat
Opera=lng mechanism ASTM A-36
[DENTON 10566 TURBINE G~N 62 0200]
9-14
information to be provided upon receipt of contract
and valve design completion
OB-S,
(B£dde~'s Name)
Sea~ I)-£1lP HY£AR
Can=er suppor: flange ASTM A-516 GR 60
Lan:am ~im~ and Blend Bronze Alloy 936
requirements
Square, len$ch x width,
inches 8' - 8" Square
Roumd, d~ams:sr, ~nchss 10'- 0" Die
D 10 3 Con:roller
Manu£acCure~ ~ul~er-Escher W~ss
Type or mode~ [T~ 21 (ElectroDlc head)
Daadband, psrcsn: IAT~
Dead :~me, seconds LATER
Time cons:an= of damp~n~ ~
device, seconds 1 to 60 seconds, settable
Runner ferule:ins torque, ~ATER(~%/
Minimum runner c~os~n$ :ims,
seconds 40 seconds
Wicket Sacs rsSU~a:in$ :orqus,
lb-f: LATER(l)
Minimum wicket Sa:S closin$
~- lO seconds
Maximum w~¢ket gate open,ms ~
:Sma, seconds ~ 40 seconds
Wicke~ same 8ervomo:or volume, LA~E~-
sa~lons
Information to be provlded upon receipt [DENTO~ 10566 TURBINE G£N 62 0200]
of contract [ 031387 ]
D-IS
DB-S,
(B~dder~s Name)
Runner blade set. omo=or
volume, gallons LATER(~)
Ope~ac~n$ o~ pressure, ps~ 900
~n~mum o~ pressure for sa~e
reSul~CLon, ps~ 400
Coo~ng of controller ~equ~red,
yes/no NO
Zf yes, coo~ng ~acer requirement
· c 90 F, flow/pressure N/R gpm/ N/R psi
Motor driven o~l pumps
Manufacturer LATER
Model or Cype LATER
· 1800
Speed, rpm
Capacity ac raced pressure, LATER
gpu *
O~l pressure cank *
· NOT APPLICABLE
Type
Manufacturer
Volume, gallons
Diamecec, ~nchee
Height, ~nchea
Operating pressure, ps~
Power supply for electronic
control un~C
Znd~caCe preferred power
STATION BATTERIES
(DE~TOH 10566 TURBINE GEN 62 0200]
03~3g?
D-~6
DB-S,
(Bidder's Name)
Indicate current s~stem, ac DC
Voltase ~ 24 V
MaxLmum current, r~ POW[R CONSUHPTION APPROX 50 VA
Controller elactrLc control
unit, langch x widch ~ haLghc,
inches 12 DEEP x 19 WIDE x 16 HIGH
Controller hTdraulL¢ cubicla,
length x w%dth x ha~ght, felt 40" x 35,43" x 65"
Oil pump motors HYDR /LUBE
tianufacturer GE, WESTINGHOUSE OR EOUAL
Type SQUIRREL CAGE INDUCTION
$~za, horeapo~ar HYDR APPROX 15HP, LUBE APPROX 3 HP
Voltage/phase ' 460 / 3,
Speedm rpm LATER
Full load current, amperes LATER
Locked-rotor current, amperes LATER
D 10.~ Speed Increaser
Manufacturer NOT R[QUIREO
Type or moda~ .-,.
Service factor ~
Maximum horsepower ratin$ ~
Gears .
Material (by ASTI~ No )
[DENTON 10566 TURBINE tEN 62 0200)
[ 022786 ]
D-17
Relisb~li~v fac=or
Life factor
Direction of ro=a=ion viewed
from upstream
Driven shaft (turbine end)
Driving shaft (generator
end)
Bearings
Type
Radial
Thrust
Quan=i~y
Radial
Overall dimensions, width x
dep=h x heish=, inches
Elevation ac base (NGVD), fee= ,
Weight, pounds
Gear
Low-Speed Shaft Hi,h-Speed Shaft
Coupling type
Shaft spacing, inches
[DE~TO~ 1056~ TURBinE ~ 6~ 0200]
03~387
D-18
DB-S
· (Bidder's
Coo~in$ waker raqu£ramen~
PLo~ required a~ 90 F
inle~ temperature, gpm
Pressure drop on coolin$
water side, psi
Speed increaser service factor/ '
life, hour
Speed increaser ~hrusC bearing :.
racing, pounds
Speed increaser torque rating,
Type, make, and desisnation
of monitoring services
Xigh and low oil level ·
seneor8
Temperature monitors ·
Vibration transducers
Oil flow monitoring device
Waker £1ow monitoring device
~aximal compensation o£ sha£t .
uisalignment
Angular, degrees
Radial, inches
D I0 5 Generator
Nanu~acturer ~ Electric Machinery
~'' 3000
kVA rating ·
kw rating at gO percent power 2700
[DENTON 10566 TUR$INE GEN 6l 0200)
[ O3X387 ]
D-~9
DB-S
(Bidder's Name)
Temperature rise, when oper-
atin$ ac rated kVA, 0 9 powar
factor and 50 C ambient, mea-
sured by resistance in
desrees C
Sta~or-- 70
~ain field 70
Exciter arms=ute 70
Exc2ter [ield 70
Temperature rise, when oper-
atin$ at rated kVA, 0 9 power
factor and 50 C ambient, mea-
sured by RTD in desreee C
Stator 75
Exciter a~mature
Exciter f~eld
Service factor
Design speed, rpm 360
Max/mum runaway speed, rpm ]]60
Overall dimensions, inches ]]9W × ]03H x ]50[
Elevat2on at base (NGVD), feet Less tha~ 3 300 fee~
Shaft d~ameter, inches · 12
~ Self ventllateU
Generator cooI~n$ system type
aequ~red seneraCor coolins a~r
volume at sea level, scfm
For 50 C (122 F) ambient ]] 000
For -17 C (0 F) ambient ]0 500
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
D-20
~5-S
(Bidder's Name)
Weight of ro~a~in~ paros of
genera=or including flywheel, 25,000
pounde
Weigh= of compls=e Sonora=or, 52 000
pounds
Genera=or =o~al inertia (WR2), 75,000
In case of shot= ciroui=,
maximum torque =o =he founda-
=ion, lb-f~ 317,000
Main =erminal box dimensions,
wid=h x depth x haish=, inches law x 400 x 72H
Genera=or ehor=-circui= fa=lo,
sa=urn=ad hishar chan 0 9
Synchronous reactance, 1
unsaCura=ed (Xd)
Tranoion= reactance, . 35
unsa~ura~ad (I"d)
Power diasram No
Volcase ~eacs
$~a~or, V/mia 9320
Eo~or, V/mia 2~00
Ea~ed axci=a~ion require-
msnce
Vol~ase, dc ~ 2~0
~ BRUSHLESS
~anufa¢~u~e~ LATER IF REQUIRED
[DENTON 10566 TUPBINE GEN 62 0200]
031387 ]
9-21
TO BE DETERMINED AT TIME OF TRANSIENT
CALCULATIONS
OB-$
Inertia (WA=), lb-ft= LATER
Ou~si~e d~ame~e~, fee~ LATER
Thickness, inches LATER
WeiSh=, pounds LATER
D 10 6 Neutral Groundinj Equipment
Grounding transformer
Manufac=urar GE OR EQUAL
Oatmlo) ~o or TTps LATER
Groundin$ resistor
Manufacturer CH OR EQUAL
Catalog No or ~ype ' LATER
Overall dimensions and total ·
veight of neutral grounding
equipment
Height, inches 36
~idth, inches 36
Depth, inches 18
Total veisht, pounds LATER
D 10 7 Svitch~ear
~anufac~urer ~ PAC$ INDUSTRIES INC
Circuit breakers
Catalog No '~ $IE~ENS-ALLIS ~A-250
Type AIR ~AGNETIC
[DENTON 10566 TURBINE GEN 62 0200]
031387 ]
9-22
~-$
(Bidder*s Name)
Operating mechanism
CacaloR No
Type STORED ENERGY
C~os~n$ current
8
125 voles ac, amperes
T~ms co close, cycles 4
Tr~pp~n$ curren= ac 8
&8 voles dc, amperes
T~me Co =r~p, cycles ] 8
PeCan,s and capab~licies
Current recesS, amperes ]200
Vol~ase recesS, vol~s
Nominal 3 phase 14VA 250
Maximum ey~e~r~cal '
~ncerrupc~nS capacity
ka rms aC (1aCer) kV 36
3 second shore
ra:~nS, ka rms 36
Cloein~ and la:ch2n~
58
capab~liey, ka
Insc~mencs and devices Hanufac:urer T~e
Current :ransfomers
S~nsle rac~o ~ INS~UMENT, TRANSFORMER LATER
~ul:~ra:~o ~ INS~UMENT YRANSFORMER LAYER
Pocen:2al :ransfo~ers ~ GE LATER
Control sw~cchee ~ SBI
[DENTON 10566 TURBINE GEN 62 0200]
[ 03~387 ]
D-23
OB-$
(Bidder's Name)
Manufacturer TTpe
Indicatin$ lights
Relays
Auxiliary GE HFA
Timing AGASTAT 7000
Lockout, manual reset GE OR FIF£TROSWITCH ~FA OR
Phase ovsrcurrent~
voltage restrained
(sir) GE I~CV
Ground overcurrznt GE IFC
()INGT)
Ground dztsction ($9G)
Ground detection (59B) GE IAV
Bus protection (g10/21,
27, 59, &?, 60) BECKWIT~ PRIDE M-0296
A/arm GE HPA
Synchronizing vzri~i-
cation (25) BECKWITH M-0388
Negative sequencz (&6) GE INC
Trans~ormsr di~£erentiel
(g?GT) GE BDD
Generator dif~erential
~ GE CFD
(gTC)
Loss o[ excitation (40)
GF
Zeverse power (32) ~ ~[ GGP
Type and size of wire used in
small wiring SIS ~ 14
[DENTON 10588 TURBINE GEN 62 0200]
[ 031387 ]
D-2&
D8-S
(Bidde~'s Name)
Type of bum insu)ation LEXAN SLEEVE
Type of bus supports POLYESTER
Type of insulation on connections 800TS
Size of completely assembled
~wttchssar, inches
Halsht 90
Depth 94
Lensth
7000
Total weisht of switchsssr, pounds
Shtpptn$ pieces
Numbor AS REQUIRED
Weight of largest shipping LATER
group, pounds
D 10.8 Control Switchboard
Manufacturer PACS INDUSTRIES tNC
Outlino dimensions each section,
width x depth x height, lnchos 36 x 30 x 90
WelSht saoh section, pounds 1000
Weight of hssviest component to
be delivered, pounds 2000
Dimensions of largest componants
to bs moved chroush powerhouse
hatch ~ 72 x 30 x gO
~ Manufacturer T~pe
Instruments and devices
Relays
Auxiliary GE HFA
[DENTON 10)66 TURBINE GEN 62 0200)
[ 031387 )
D-25
DB-S
(Bldder'm Hame)
Manufacturer Type
Timing AGASTAT 7000
Lockout, manual reset GE HEA
KtZowatt-hour ms=ers GE SWITCHBOARD TYPE
Anglos meters CROMPTON SWITCHBOARD TYPE
CROMPTON 262
DtStta! meters
Control switches GE SBI
Recorders : YOKAGAWA MULTIPOINT
Annunciators PANALARM SERIES 90
Transducsrs ~ LATER
Au=oua=tc vol=eSe reSulacor : BASLER SRBA
Power fac=or controller
Auto sTachroatzer BECKWITH M-Olg3 & M-0194
ProsrmbLe coa=ro~er · GE SERIES SIX
D 10.~ Equipment Perfo~uamee
The performance dace %nde=aCed
below sha~1 be suaranceed
Generator output of curbLne-speed
~ncreaser-senerator unit ac Fated
nec head of 60 ~eeC, ~70 cfa
2128
and 0 9 power £actor, k~ ·
· urb~ns ef~c~snc~as at 470 cfa
flor and ne= heed o£
49 ~eeC 91 2% (turb)
[DENTON 10566 TURBINE CEN 62 0200]
[ 031387 ]
D-26
DB-S,
(B£dder'$ ~lamc)
Turbine efficiency at 3~0 els
and nec head of
76 feeC
~0 feeC 91
--~ fae~ . 90 4% (turb)
Turbine effic~enc7 ac 200 cfs ,
and nec head of
76 feeC
60 feet · ~7
~ feet ' 86
Hax~mum continuous unLc
~nB cond~Cion for · net head of *
60 feet and 0 9 po~er fflcCor
Turb&ne £~o~, cfa
Turbine e£f~c~encr, per-
* 90 5% (Curb)
cent
Turbine po~er output, kW ~B92 KW
Speed ~ncreaser eff~c~encr, *
percent N R
Oeneracor efficiency,
percent
Generator output, kg
HLnLmum continuous ·cabLe
turbine operaC~n$ flo~e for
nec heads of ~ *
7~ £eeC ~ 15~ cfa
60 ~ee~ 14~ c~s
49 f~eC 130 cfm
[DE~TO~ L0566 TURnXN£ O~N 62 0200]
~-27
Load rejection overspeed and
maximum pressure ri~e in turbine
inlet
Maximum output. 76 feet
net head
Maximum output. 60 feet
net head
With 470 cfs. 60 feet
net head
Highest allowable turbine shaft
center line elevation (NGVD).
feet
Turbine oft-earn runawav condi-
tion with 76 feet net head
Speed. rpm
Flow. cfs
Minimum time to rsach
runaway speed from rated
speed. seconds
Turbine on-cam runaway condi-
tion with 76 feet net head
Speed. rpm
Flow. cfs
Minimum time to reach
runaway speed from rated
speed. seconds
Flywheel effect (wail) of all
rotating parts of hydro-
generator system. including
flywheel (rsferred to generator
speed). lb-ftil
1 To be determl ned @ the t, me of trans, ent
calculatlon
DB-S.
(Bidder's Name)
Wicket Gate Speed
Closing Time. Rise.
Seconds ~
LATER <D LATE~
CD LATE~
LATER
LATER cr
LATERJ;
44283 FT
Pre~sure
Rise. psi
LATER (f\
CD
LATER
LA TER T
1159
pnn
, LATER (j)
860
870
,...
01'
oS
,.
!
~
..,
LATER CD
LATER Cì'
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]
D-28
Generator efficiency (75 F),
percent
At 75 percent rated kVA
At 100 percent rated kVA
At 115 percent rated kVA
Speed increaser efficiency,
percent
At full load
At 50 percent load
First critical speed of the
rotatinl parts, rpm
Maximum overall sound pressure
level of entire turbine/speed
increaser/generator assembly at
any location 5 feet above the
floor at a distance of 3 feet
from a reference perimeter
which contains the equipment
Location
Overa1l sound pressure level.
dB to a reference of 0,0002
microbar
"A" scale
"c" scale
Average Annual Generation Hodel Qj'
oS
Avail- Tail- ,.
able Net Head water Hours of!
Flow. to Tur- Ele- Opera- "
...st!- bins, it ~ tion t.
180 64 1 447'-2" 2,290
DB-S.
(Bidder's Name)
l...Q....£!
972
97 3
Q...i..Ef.
96 8
96 8
97 1
966
N/R
N/R
LATER <D
Generator/Hydraulic Pump1ng Un1t
85
LATER
Flow Generator
Through Output Power
Turbine. @ 0 9 pf, Generated.
cfs kW kWh
180 779 7 1 785.426
[DENTON 10566 TURBINE GEN 67 0200J
[ 031387 ]
D-29
DB-S
(Biclder's Name)
Avail- Tail- Flow Generator
able Net Head water Hours of Through Output Power
Flow, to Tur- Ele- Opera- Turbine, @ 0 9 pf, Genereted,
...ili- bine, ft ~ don cfs kW kWh
240 63 8 447'-6" 890 240 1109 1 987091
320 645 447'-10" 1,520 320 1536 3 2.335.212
360 63 1 448'-0" 765 360 1702.0 1.302.066
400 61 4 448'-2" 765 400 1847 3 1.413,160
440 595 448'-4" 890 440 1971 2 1.754,397
530 59.8 448'-8" 275 530 2383 1 655,358
600 60 3 448'-10" 350 600 26976 944.174
650 605 448'-11" 275 623 3 2801 6 770.429
700 + 57 7 449'-1" 275 620 8 2654 9 730.088
Guarangeed averale annualsen-
eration (based on above model). I 12,677.402
kWh
Qj'
oS
,.
!
..
'"
..,
[DENTON 10566 TURBINE GEN 62 0200]
[ 031387 ]