1987-0880923L AN ORDINANCh AUTHORIZING THE EXECUTION OF A CHANGE ORDER TO A CONTRACT BETWEEN THE CITY OF DENTON AND CALVERT PAVING COMPANY, AND PROVIDING AN EFFECTIVE DATE WHEREAS, on February 18, 1986, the City awarded a contract for the construction of certain improvements to the Yellowstone and Sheraton Drainage Project, and WHEREAS, the City Manager having recommended to the Council that a change order be authorized to amend such contract and sa~d change order being in compliance with the requirements of art 2368a, V A C S , NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF DENTON SECTION I That the change order to the contract between the ~ity and Calvert Paving Company in the amount of N~neteen fhousand Two Hundred and Seventy-eight Dollars ($19,278) is hereby approved and the expenditure of funds therefor ~s hereby authorized bBCTION II That this ordinance shall become effective immediately upon its passage and approval PASSED AND APPROVED this the 12th day of May, 1987 ATTEST APPROVED AS TO LEGAL FORM DEBRA ADAMI DRAYOVITCH, CITY ATTORNEY CITY OF DENTON, TEXAS BY CITY COUMCIL REPORT DATE May 12, 1987 TO Mayor and Members of the City Council FROM SUBJECT Lloyd V Harrell, City Manager BID# 9575 YELLOV/STONE SHERATON DRAINAGE P O tb 72432 CHANGE ORDER lb2 RECOI~IEItDATIOIt We recommend th,s change order be approved for $19,278 O0 to Calvert Paving, the Contractor for the pro)eot SUI~qARY The original cost o~ this project with Change Order #1-$14,495 00, was $681,381 42 When we add this Change Order for $19,278 00 the total pro)ect cost wall be $700,659 42 This Change Order is to cover the items explained on the at- tached memo ~rom David Salmon BACKGROUND,, Memorandum - David Salmon, Eng,neering Dept, PROGRAMS, DEPARTIqENTS OR GROUPS AFFECTED Street and Drainage Improvements FISCAL II,ACT Account # 432-002-0010-5118-9100 There is no additional impact on the General Fund Respectfully submitted Lloyd V Harrell City Manager Prepared by Marshall, Title Purchasing Agent Approved ~Name \~'~ot~n 3 Marshall, Title Purchasing Agent CITY of __ ITON / 215 E MGKInne¥ / Denton, Texss 76201 M~4ORANDUM DATE TO FROM May 6, 1987 Rick Svehla, Deputy City Manager David Salmon, E I T /C~v~l Engineer SUBJECT Sun Valley Flume The flume was originally constructed to allow trash veh, cle access in the rear of the subdivision Loads from the trash vehicles destroyed this flume so we added it to the contract to allow all the ma3or drainage systems in the basic vicinity to be upgraded ~ork started on the pro3ect several times but weather created problems When a few good days occurred in early April, the contractor hurried to get some work done In our haste, the contractor and City crews made combined surveying errors that compounded some basic design errors in a 582 foot section of the flume Our inspector did not catch the grade difference so the flume was poured much too high It was determined after significant evaluation, that the flume had to be removed and replaced We also decided to lower the 200 foot section that had been designed too high to guarantee that the flume would work to catch all water from ad3olnlng properties As part of the redesign, Kings Row had to be lowered with transitions back east and west to allow reasonable slopes to the low point Costs for the modifications follow Item quantity Remove Concrete Flume Install Concrete Flume Pumping ~ Liming Unit Price Total 711 sy $ 8 S0/sy 711 sy $18 00/sy Lump Sum 4,000 00 GRAND TOTAL $ 6,046 00 $12,804 00 $ 4,000 00 $2Z,850 00 Because both the City and the contractor were in error, it was decided to share the cost of removing and replacing the flume Calvert Paving agreed to deduct $9,500 00 from the price of removing and replacing the flume and to split the cost of pumplns,and liming which is $4,000 O0 ge 2 of 2 pages The cost of the original £1ngs Row design and the cost of the new design is as follows Irem Remove Concrete Pavement 70 sy $ 8 SO Remove Conc Curb ~ Gutter 40 1£ 2 SO Unclassified Excavation 60 cy 5 00 Trev~ra 130 sy 90 3 1/2" Asphalt 130 sy 7 50 1 1/2" Asphalt 130 sy 3 SO 8" Asphalt Valley Gutter 40 sy 14 00 Saw Cut Ex~st~ng Concrete 8 If 1 00 Concrete Curb ~ Gutter 40 If 10 00 quantity Unit Price Total $ 595 100 3OO O0 O0 O0 117 O0 975 O0 465 O0 560 O0 8 O0 400 O0 TOTAL $3,510 00 NEW DESIGN Remove Concrete Pavement 70 sy Remove Conc Curb ~ Gutter 240 if Remove Conc Driveway ~ 40 sy Sidewalk Unclassified Excavation 170 sy Trev~ra 500 sy 3 1/2" Asphalt 460 sy 1 1/2" Asphalt 460 sy 8" Asphalt Valley Gutter 40 sy Concrete Curb ~ Gutter 40 sy Concrete br~veway 40 sy Saw Cut Existing Concrete 8 If $ 8 SO $ 595 O0 2 50 600 00 8 SO 340 00 S O0 850 O0 90 450 O0 7 50 3,450 O0 3 50 1,610 O0 14 O0 560 O0 10 O0 1,900 O0 25 O0 1,000 00 1 00 8 00 IoTAL $11,563 The d~fference ~n price of the two designs ~s $7,853 O0 Th~s extra street work ~s necessary as part of a design change It would not be fair to ~mpose any of this on the contractor The total cost to the C~ty for the modifications on the Sun Valley Drainage Flume is $11,425 + $7,853 = $19,278 Excellent b~ds on the pro~ect from Calvert Paving provide enough funds from the original budgeted amount to cover these corrections and reworking of the K~ngs Row street section David Salmon 0464E