Loading...
1986-1581522L NO % AN ORDINANCE APPROVING AN AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF DENTON AND FREESE & NICHOLS FOR ENGINEERING SERVICES IN REGARD TO THE RAW WATER DISCHARGE/PUMP STATION STRUCTURE FOR RAY ROBERTS RESERVOIR, AND PROVIDING FOR AN EFFECTIVE DATE NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS SECTION I That the Mayor and City Secretary are hereby authorized and directed to execute and attest, respectively, Amendment No 1 to the agreement between the City of Denton, and Freese $ Nichols, Consulting Engineers, providing for professional services comprising of engineering services for the raw water discharge/ pump station structure for Ray Roberts Reservoir under the terms and conditions being contained in said agreement which is attached hereto and made a part hereof SECTION II The expenditure of funds is hereby authorized in an amount not to exceed $26,000 SECTION III That this ordnance shall become effective immediately upon its passage and approval PASSED AND APPROVED this the day of 1986 RAY ST EN , MAYOR CITY F DENTON, TEXAS ATTEST CHARLOTTE ALLEN, CI EC R CITY OF DENTON, TEXAS APPROVED AS TO LEGAL FORM DEBRA ADAMI DRAYOVITCH, CITY ATTORNEY CITY OF DENTON, TEXAS BY AMENDMENT NO 1 TO CONTRACT FOR ENGINEERING SERVICES The Contract for Engineering Services entered into on the 2nd day of October 1984 by and between the City of Denton, Texas, and Freese and Nichols, Inc shall be amended as set forth hereinunder The said Con- tract is attached as Exhibit A 1 That Section II - Character and Extent of Services is hereby amended to include the following to wit CHARACTER AND EXTENT OF SERVICES The Engineer shall perform professional services comprising engineering studies, including a cost effective analysis of available sites for construction of a municipal water treatment plant near Lake Ray Roberts, and available sites for construc- tion of a booster pump station and ground storage facility on the northeast section of the City The Engineer shall also perform an analysis for either connecting to the intake struc- ture which is to serve a future Hydroelectric Facility or construction of a separate intake structure for supply of raw water to the water treatment plant at Lake Ray Roberts That Section III - Scope of Services is hereby amended to include the following to wit III SCOPE OF SERVICES The selection and evaluation of sites for the treatment plant near Lake Ray Roberts and for the booster pump station near the Northeast edge of the City will be conducted concurrently and will consist of the following scope of work 1) Locate potential sites with suitable topography and area for the water treatment plant and booster pump station 2) Conduct field inspection of the possible sites and reduce the number to those which have the best potential 3) Select for each of the water booster pump station sites a water line, high service line tion system and to potential disposal requirements, access and pumping requirements treatment plant and the tentative routing for raw connection to the distribu- customer cities, sludge road, electrical services, 4) Prepare a tentative plant layout for each water treatment plant and booster pump station site with consideration given to future expansions Prepare estimates of probable construction and operation cost for comparison between the sites 5) Coordinate with a soils laboratory for drilling at least two (2) test holes on each site selected for final con- sideration to determine soil classification and to eval- uate foundation requirements 6) Prepare a draft report summarizing the basic data obtained in the study and presenting recommendations and compara- tive estimates of construction and operations cost 7) Following approval of the draft report twenty-five (25) bound copies of the final report shall be presented to the Owner The scope of work for the analysis of the raw water intake structure will include the following 1) Analysis of connecting to the intake structure for the Hydroelectric Facility or construction of a new intake structure for the supply of raw water to the water treat- ment plant For each alternative Engineer will develop estimates of probable construction costs, conduct an impact analysis on the operation of the lake and the Hydroelectric Facility, and prepare recommendations con- cerning the raw water intake structure 2) Prepare a letter report summarizing the results of the analysis and present recommendations That Section IV - Time of Completion is hereby amended as follows to wit IV TIME OF COMPLETION The letter report on the analysis of the raw water intake structure shall be delivered to the owner within forty-five (45) calendar days following authorization to proceed The draft report on the water treatment plant and booster pump station shall be delivered to the Owner within ninety (90) calendar days following authorization to proceed The final report shall be delivered to the Owner within fifteen (15) calendar following review and approval of the draft report Execution of this Amendment 1 shall be considered as authori- zaztion to proceed 4 That Section V - Payment is hereby amended as follows to wit V PAYMENT Method of payment for engineering services shall be in accor- dance with Section V Payment of Agreement dated October 2, 1984 The maximum fee for this additional scope of work shall be $26,000 and the revised maximum fee shall be $48,000 The Contract Amendment No 1 is executed in two counterparts IN TESTIMONY HEREOF, they have executed this Agreement, this f day of 1986 ATTES CITY OF DENTON Owner By yor WITNESS -7 Q~h 4 FREESE AND NICHOLS, INC Engineer ges c io s, res ed ni-