Loading...
2018-074 Wastewater Budget InformationDate: 6/15/2018 Report No. 2018-074 INFORMAL STAFF REPORT TO MAYOR AND CITY COUNCIL SUBJECT: Provide information in response to questions about year to year variations in dollar amounts for “Group Assignment Category 036 – Replace Lines” during the June 5, 2018 Wastewater Departmental presentation. DISCUSSION: The Wastewater Budget and Departmental presentation was provided to the City Council on June 5, 2018. During this presentation, Councilman Ryan asked for details concerning the large year to year variations that existed within “Group Assignment 036 – Replace Lines” Category. Group Assignment (GA) 036 is typically associated with small assessments of private sewer lateral lines using smoke testing and camera data, and repairs if warranted. These repairs are typically simple and low cost, and are usually completed by City staff. GA 020 – Field Service Replace”, however, reflects larger replacement projects that are conducted by City personnel based on asset management analyses and coordination with streets projects. Staff uses expenditure information for all costs incurred within GA 020 to benchmark the costs of using City staff and equipment against costs for similar services obtained from outside contractors. The large expenditures for GA 036 for 2019 and 2020 reflects the “bundling” projects that are being conducted as a part of some Streets projects that also involve Wastewater. These projects were added to this GA to simply facilitate easier cost tracking. Without these projects included, GA 036 is funded at $25,000 annually to cover the repairs listed above. Details sheets for all projects within each GA will be included in the Capital Improvement Plan section of the full budget document. The large projects in GA 036 are summarized in the following table: Year Project total Note Bonnie Brae I-35 to Scripture FY19 $360,000 Replace sanitary sewer lines along Bonnie Brae from I-35 to Scripture Pavement replace Scripture FY19 $346,000 1870 feet of 8” paved Pavement replace Windsor Easte FY19 $246,000 1330 feet of 8” paved Bonnie Brae to Windsor FY20 $85,000 Replace sanitary sewer line along Bonnie Brae from Hwy 380 to Windsor Bonnie Brae Scripture to 380 FY20 $240,000 Replace sanitary sewer lines along Bonnie Brae from Scripture to 380 TOTAL FY19 $952,000 Date: 6/15/2018 Report No. 2018-074 TOTAL FY20 $325,000 CONCLUSION: Staff will be glad to provide any additional information upon request. ATTACHMENT(S): None STAFF CONTACT: Kenneth Banks. General Manager of Utilities (940) 349-7165 Kenneth.Banks@cityofdenton.com