Loading...
1974-032AN ORDINANCE CHANGING CERTAIN PROVISIONS OF ARTICLE V OF ORDINANCE NO 74-12 PRIOR TO ITS EFFECTIVE DATE OF SEPTEMBER 1, 1974 WHEREAS, Ordznance No 74-12 was adopted by the City Council on March 19, 1974, to be effective September 1, 1974, and WHEREAS, subsequent to the date of zts adoptzon and prior to zts effectzve date several changes wzthzn Artzcle V have been recommended for approval to the Co~nczl by the Plumbing and Mechan- ical Code Board for adoptzon, NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON, TEXAS, HEREBY ORDAINS That the followzng Sectzons of Artzcle V of sazd Ordznance shall hereafter read as follows "Sec 203 Use of Copper Tubin8 (a) Copper tube for underground draznage and vent pipzng shall have a weight of not less than that of copper tube Type DWV sec 211 Use of PVC and ABS Plastic Pipe (a) Schedule 40 Poly (vinyl chlorzde)(PVC) meetzng the requzrements of ASTM D-2665 or Schedule 40 Acrylonztrile-Butadzene-Styrene (ABS) meetzng the requirements of ASTM D-2661-68 may be used under the followzng condztzons (1) Schedule 40 PVC or ABS may be used for drains, wastes and vents only zn resz- dentzal and apartment house construction when the buzlding does not exceed three (3) stories zn height Maxzmum hezght per story shall be 11 ft 6 zn (2) Schedule 40 PVC or ABS may be used under slabs in the occupanczes lzsted zn Section 211 (a) (1) when installed accordzng to ASTM D-2661-68, Appendzx 1 10 and ASTM D- 2665, Appendix 1 10 Ail PVC or ABS pzpe znstalled under a slab and all bedding materzal shall be znspected by the plumb- ing inspector before the pzpe zs covered (3) Schedule 40 PVC or ABS may be used for building sewers zn only the above lzsted oceupanczes when installed zn accordance with ASTM D-2321-72 Sec 410 Special Provzsions (a) No arms serving any other fixture shall be per- mztted for kztchen sznks, urznals, slop sznks, dishwashzng machznes or garbage grinder dzs- posals Each fixture shall waste into a verti- cal waste line z~dependent of all other fzxtures except, that garbage grznder dzsposals may be installed on two (2) compartment sznks through a one and one-half (1~~') znch P-trap, provzded, that the waste openzng zs of sufficzent hezght so that it will not submerge the garbage grinder dzsposal or the contznuous drazn of the other compartment Two (2) compartment sznks zn a residence may be connected together and may waste through a one and one-half (lb") inch P-trap Sec 503 Materzals (a) Vent pipe shall be cast zron, lead, copper, brass, Schedule 40 PVC or ABS (b) Vent fittings shall be cast zron, lead, copper, brass, Schedule 40 PVC or ABS (¢) Changes zn dzrectzon of vent pzpzng shall be made by the approprzate use of approved fzttzngs and no such pipe shall be strazned or bent Burred ends shall be reamed to the full bore of the pzpe (d) Schedule 40 PVC or ABS plastzc pzping may be used for vent pipzng provzded all of the followzng restrictzons are met (1) Plastzc pzpe may be used zn vent pzpzng only above the waste lzne (2) No plastzc pipe lnstallatzon shall be per- mzttad outside of a buzldzng, exposed to the weather, except where completely sheathed wzth an approved flashzng material (3) Plastic pzpe and fzttzngs shall be lzmited to PVC or ABS material not lighter than Schedule 40 with joints solvent-welded with materials recorm~ended by the pzpe manufacturer Manu- factured fztting adaptors shall be used in jozning plastzc pipe to cast zron or other approved materzals (4) Each length of pzpe and each fzttzng shall be clearly and permanently marked to certzfy compliance wzth one or more of the standards in Chapter 2 of thzs code Sec 702 Traps Protected by Vent Pzpes (e) Trap arms servzng lavatorzes or sznks shall be made of copper tubzng or other approved materzals Sec 909 Floor Drains and Shower Stalls (e) Precast receptors for built-up shower stalls shall be terrazzo, with zntegrally cast flange extendzng not less than one znch (1") above the shoulder Flange shall be constructed of bonderzzed, galvan- zzed steel, staznless steel, or copper, not less than 0299" thzck Receptor shoulder shall be not less than one znch (1") hzgh and not less than one and one-quarter inch (1¥") wzde Drazn shall be zn conformance wzth Sectzon 909 (a), shall be in- tegrally cast znto the receptor, and shall provzde for a caulked lead connectzon not less than one (1") znch deep to a two (2") znch pzpe Receptors shall be water tested before acceptance Where pre-cast terrazzo receptors are not used zn built-up stalls, the base of the shower stall shall be lzued wzth sheet lead wezghing not less than four (4) pounds to the square foot or other materzals lzsted in the Uniform PlumblngeCOdeL ad DtrectozTo~f Research Recommendations shower pans sha~l be protected on both upper and lower sides by coatlnF with asphalt and application of thirty (30) pounds asphalt felt over such coatzng on both sides of pan The sheet lead shall be turned up on all sides to a hezght of not less than slx (6) znches Lead shower pans may be omitted mn built-up shower stalls, provided the following condltzons are met Sec 1005 Valves (d) A control valve shall be installed immediately ahead of each water supplied appliance and immedz- ately ahead of each slzp 3oint or nonmetallic supply or appliance supply Control valves shall be installed in supply lznes to all fixtures ex- cept tubs and showers Sec 1010 Size of Potable Water Pzplng in Residential and Small Commercial Installations (a) The size of water service lines to buildings in this category shall conform to Table 10-3 The water service line shall extend undzminlshed in size from the water meter to the water heater or if no water heater exists to the first opening Sec 1106 Grade, Support and Protection of Bulldzn8 Sewers (b) In the constructzon of building sewers of cast zron or soil pipe, the trench shall be excavated to a depth below the bottom of the bell of the pipe suffzcient to permit the barrels of the pipe to rest on the bottom of the trench, except where the bottom of the trench is zn rock Where the bottom of the trench is in rock, such rock shall be removed to a depth of at least three (3) inches below the bottom of the barrel of the pipe and a uniform cushion composed of not less than three (3) inches of "sandy gravel material" as herein specified shall be provided After the trench has been appropriately prepared, pipe shall be lazd and 3oints made in accordance with the manufacturer's lnstructzons and with the speclfz- cations herein contained After the laying of the pipe and cushion, if any, the work shall be left exposed until after it has been znspected, tested, and approved by the Plumbzng Inspector In all cases, after the building operation has been completed, the trench shall be backfzlled No rock larger than three inches in zts greatest diameter, no organic matter and no large lumps of clay shall be permztted in the backfill Where the trench excavation zs zn rock and the material re- moved from such excavatzon zs not acceptable for backfill, it shall be hauled away and the trench shall be backfzlled to ground surface or subgrade wzth sandy gravel materzal Sec 1206 Inspectzons (c) The Administrative Authority shall make the follow- mng inspections and shall emther approve that por- tmon of the work as completed, or shall notmfy the permmt holder wheremn the same fazls to comply wmth this code (2) Final Pipmng Inspectmon Thms inspection shall include an amr pressure test, at which tmme the gas servmce pipmng shall stand a pressure of not less than nznety (90) pounds per square mnch amr pressure for a length of tmme satmsfactory to the Adminmstra- tlve Authormty, but zn no case less than thmrty (30) minutes wzth no perceptible drop mn pres- sure The gas pmpmng system from the regulator outlet shall stand a pressure of ten (10) pounds per square znch amr pressure for a length of time satmsfactory to the Administrative Auth- ority, but in no case less than fzfteen (15) minutes The 90-pound test shall be made by usmng a 100-pound gauge and the 10-pound test shall be made by uszng a 30-pound gauge Sec 1311 Access and Workmng Space Water heater locations shall be provzded wmth an electrmc light at or near the water heater" PASSED AND APPROVED thzs the 20th day of August, A D 1974 CITY OF DENTON, TEXAS ATTE S T BROOKS~OL~ ~ CITY OF DENTON, TEXAS APPROVED AS T.O--LEGAL FORM W 'RALPH MANN, ~C~TY 'ATTORNEY CITY OF DENTON ,'TEXAS