Loading...
2010-199ORDINANCE NO. 2010-199 AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NUMBER FIVE TO THE CONTRACT BETWEEN THE CITY OF DENTON AND TERRA- SOLVE, INC. FOR DESIGN SERVICES RELATED TO THE CONSTRUCTION OF A FLEET FUELING FACILITY LOCATED AT 1251 SOUTH MAYHILL ROAD; PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFOR; AND PROVIDING AN EFFECTIVE DATE (FILE 4124-CHANGE ORDER NUMBER FIVE IN THE AMOUNT OF $6,438 FOR A TOTAL CONTRACT AMOUNT OF $104,075.97). WHEREAS, on July 22, 2008, the City awarded a professional services contract to Terra- Solve Inc., in the amount of $48,900 for the engineering design services for a fleet fueling facility to be located at 1251 South Mayhill Road; and WHEREAS, the Staff having recommended, and the City Manager having recommended to the Council that a change order be authorized to amend such contract agreement with respect to the scope of work and an increase in the payment amount, and said change order fees under the proposed contract are fair and reasonable and are consistent with and not higher than the recommended practices and fees published by the professional associations applicable to the Provider's profession and such fees do not exceed the maximum provided by law; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. The Change Order No. Five, increasing the amount of the professional services agreement between the City and Terra-Solve Inc., which is on file in the office of the Purchasing Agent, in the amount of Six Thousand Four Hundred Thirty Eight and 0/100 ($6,438) Dollars, is hereby approved and the expenditure of funds therefor is hereby authorized in accordance with said change order. The total purchase order including previously approved change orders one through four in the amount of $48,737.97 increases to $104,075.97. SECTION 2. This ordinance shall become effective immediately upon its passage and approval. PASSED AND APPROVED this the !/c day of 4/JY/7r'J7N~l % . 2010. ATTEST: JENNIFER WALTERS, CITY SECRETARY BY: 191v) in. ja APPROVED AS TO LEGAL FORM: ANITA BURGESS, CITY ATTORNEY BY: 5-O ile 4124 Change Order 5 TERM • SOLVE E N V I R 0 N M E N T A L C O N S U L T A N T S 3216 COMMANDER DRIVE. SUITE 1 03 • CARROLLTON, TExAs 75006-2518 • (972) 267-1900 • FAx (972) 267-1902 W W W.TERRA-SOLVE.COM August 23, 2010 Mr. Herman Lawson City of Denton Facilities Management 869 South Woodrow Lane Denton, Texas 76205 RE: ENGINEERING & CONSULTING SERVICES: FLEET FUELING AND TRUCK WASH FACILITY CITY OF DENTON 1251 SOUTH MAYHILL ROAD DENTON, TEXAS TERRA-SOLVE PROPOSAL NO. 080902-2 TERRA-SOLVE PROJECT NO. 08665 FUEL SYSTEM Mr. Lawson: Terra-Solve, Inc., (Terra-Solve) is pleased to present this proposal for the engineering services associated with the Fleet Fueling and Truck Wash construction at the above-referenced location. The following presentation represents Terra-Solve's understanding of the scope of services, the schedule required to do the work, and the estimated costs for providing these construction phase services. SCOPE OF SERVICES Terra-Solve will provide the following engineering services: Proposed change of 60 KVA diesel Generator to 25 KVA natural gas generator: Project Manager, P.E. 30 hours @120.00 per hour 3,600.00 Outside Services, Electrical Engineer 2,580.00 Total Reimbursable Expenses 2,580.00 Markup 10.00% 258.00 Total $6,438.00 The budget will not be exceeded without the City of Denton written authorization. Terra-Solve appreciates the opportunity to present this proposal and looks forward to being of service to you. We Mr. Herman Lawson August 23, 2010 Page 2 will initiate the project upon your written authorization to proceed. Please contact Terra-Solve at (972) 267-1900 if you have any questions about this proposal. Respectfully submitted, Terra-Solve, Inc. (t- Perry W. Evans, P.E., P.G. Charles R. Robertson, P.G. President / Soil Scientist / Civil Engineer Vice President / Geologist