AN ORDINANCE OF THE CITY OF DENTON, TEXAS AMENDING THE SCHEDULE OF
RATES CONTAINED IN ORDINANCE NO. 2010-288 FOR ELECTRIC SERVICE;
DELETING INTERRUPTABLE POWER SUPPLY (SCHEDULE UPS); AlV�ND
COMMERCIAL RENEWABLE ENERGY SERVICE RIDER (SCHEDULE CGR) TO
INCREASE TERM OF AGREEMENT AND TO DEFINE PARTICII'ATION REQUIREMENT;
AMEND RESIDENTIAL RENEWABLE ENERGY SERVICE RIDER (SCHEDULE RG) TO
DEFINE PARTICIl'ATION REQUIREMENT; AMEND GENERAL SERVICE TIlVIE OF USE
(SCHEDLJLE TGS) TO DEFINE PARTICIPATION REQUIREMENT; AMEND ECONOMIC
GROWTH RIDER (SCHEDULE EGR) TO DEFINE PARTICIPATION REQUIREMENT;
AMEND GREENSENSE ENERGY EFFICIENCY REBATE PROGRAM (SCHEDULE GRP)
TO DEFINE PARTICIPATION REQUIIZEMENT; AMEND DISTRIBUTED GENERATION
FROM RENEWABLE SOURCES RIDER (SCHEDULE DGR) TO DEFINE PARTICIPATION
REQUIREMENT; PROVIDING FOR A REPEALER; PROVIDING FOR A SEVERABILITY
CLAUSE; AND PROVIDING FOR AN EFFECTIVE DATE.
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS:
SECTION 1. That the Schedule of Rates for electrical services as provided for in Chapter
26 of the City of Denton Code of Ordinances, is amended to read as follows:
RES
RG
GSS
GSM
GSL
TGS
G2
G1
�
AF
LS
LT
UFL
ULT
USC
LO
DD
DDL
DSL
T1
EGR
GRP
ECA
RCA
ELECTRIC RATE SCHEDULES
Residential Service
Residential Renewable Energy Service Rider
General Service Small
General Service Mediutn
General Service Large
General Service Time of Use
Local Government Sma11
Local Government
Weekend Service
Athletic Field
Street Lighting
Traffic Lighting
Unmetered School Zone/Crossing Flashers
Unmetered Traffic Lighting
Unmetered Security Camera
Other Lighting
Security Lighting
Decorative Downtown Lighting
Non Standard Street Lighting
Temporary Service
Economic Growth Rider
GreenSense Energy Efficiency Rebate Program
Energy Cost Adjustment
Renewable Cost Adjustment
1
PAGE
3
5
7
9
11
13
16
18
20
22
24
25
26
27
28
29
31
33
34
36
38
40
41
43
DGR
IWG
CGR
SFR
DFR
Distributed Generation From Renewable Sources Rider
Independent Wholesale Generator Rider
Commercial Renewable Energy Service Rider
Special Facilities Rider
Dark Fiber Rate
45
47
50
52
53
SCHEDULE RES
RESIDENTIAL SERVICE
(Effective 10/O l / 11)
APPLICATION
Applicable to any Customer for a11 electric service used for residential purposes in an individual
private dwelling ar an individually metered apartment, supplied at one point of delivery and
measured through one meter. This rate is not applicable to resale service in any event, or to
temporary, standby, or supplementary service.
NET MONTI II.,Y RATE
plus;
plus;
(1)
Facility Charge
Single-Phase
Three-Phase
WINTER
Billing months of
November through April
$ 8.25/bill
$16.SO/bill
(2) Energy Charge per billing period
First 600 kWh 5.70¢/kWh
Additional kWh 3.79¢/kWh
All kWh
(3) Energy Cost Adjustment Charge
See Schedule ECA
SUMMER
Billing months of
May through October
$ 8.25/bi11
$16.50/bill
5.70¢/kWh
See Schedule ECA
MINIMUM BILLING
Far each billing period, the Customer sha11 be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
Single-Phase Facility Charge
Three-Phase Facility Charge
3
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh in rate block x Rate per kWh in rate block
TYPE OF SERVICE
The City will supply single-phase service (or three-phase service if available at the point of
delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution
system through one standard transformation. Additional contractual arrangements between the City
and the Customer, subject to the Special Facilities Rider, may be required where service of the type
desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10)
business days after issuance.
�
SCHEDULE RG
RESIDENTIAL RENEWABLE ENERGY SERVICE RIDER
(Effective 10/O1/11)
APPLICATION
Applicable to any Customer for all electric service used for residential purposes in an individual
private dwelling or an individually metered apartment, supplied at one point of delivery and
measured through one meter. This rate is not applicable to resale service in any event, or to
temporary, standby, or supplementary service.
In light of additional costs associated with the Residential Renewable Energy Service Rider and to
mitigate potential risk to ratepayers, any participant in the Residential Renewable Energy Service
Rider rnust be, at the time this rider is applied for and continuing while such rider is in effect, a
customer in good standing of all Denton Municipal Utilities, including Solid Waste services.
Unless legal review procedures have been invoked in good faith regarding the obligation, a
customer in good standing for the purpose of this Rate Rider is defined as a customer not owing any
unpaid utility or solid waste debt obligation that is over forty-five (45) days past due to the City of
Denton, Texas during the previous 12 months.
NET MONTHLY RATE
plus;
plus;
(1) Facility Charge
Three-Phase
�r�+/��Ili�l:7
Billing Months of
November through April
$ 8.25lbill
$16.SO/bi11
(2) Energy Charge per billing period
First 600 kWh 5.70¢/kWh
All Additional kWh 3.79¢/kWh
All kWh
(3) Renewable Cost Adjustment Charge
See Schedule RCA
5
f•Y11►LI►�I�:�
Billing Months of
May through October
$ 8.25/bill
$16.50/bill
5.70¢/kWh
See Schedule RCA
TERM
Customers wishing to receive Renewable Energy Service must sign a Residential Renewable
Energy Agreement and commit to accept this service for a minimum term of 6 months. At the end
of each 6 month period, a customer's Renewable Energy Service will be extended for another 6
month period unless that customer provides a written request to terminate that service to the City of
Denton Customer Service Department 15 days prior to the end of the then-current 6-month
participation period.
ull► lul lu : 1► �
For each billing period, the Customer sha11 be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
Single-Phase
Three-Phase
ENERGY CHARGE
Facility Charge
Facility Charge
Billing for the energy charge sha11 be based on actual kWh consumption during the billing period.
Energy Charge = kWh in rate block x rate per kWh in rate block
TYPE OF SERVICE
The City will supply single-phase service (or three phase service if available at the point of delivery)
at sixty (60) cycles and at any standard voltages available from the City's distribution system
through one standard transformation. Additional contractual arrangements between the City and the
Customer, subject to the Special Facilities Rider, may be required where service of the type desired
by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
�Yi�-. i �11� �I �[e��
GENERAL SERVICE SMALL
(Effective 10/O1/11)
APPLICATION
The General Service Small (GSS) rate is applicable to any commercial or industrial customer
having a m�imum demand of less than 21.0 kW in each of the previous twelve (12) months for a11
electric service supplied at one point of delivery and measured through one meter. If the demand in
any month is equal to or exceeds 21.0 kW, billing will be made under the Rate Schedule GSM and
Customer must remain on the GSM rate for a minimum of twelve (12) billing periods. This rate is
not applicable to resale service in any event, or to temporary, standby, or supplementary service.
NET MONTHLY RATE
(1) Facility Charge
Single-Phase
Three-Phase
plus;
plus;
�2)
(3)
Energy Charge per billing period
First 2,500 kWh
Additional kWh
Energy Cost Adjustment Charge
MINIMLTM BILLING
$15.80/bill
$21.10/bill
7.02¢/kWh
3.67¢/kWh
See Schedule ECA
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
Single-Phase
Three-Phase
ENERGY CHARGE
Facility Charge
Facility Charge
Billing for the Energy Charge sha11 be based on actual kWh consumption during the billing period.
Energy Charge = kWh in rate block x Rate per kWh in rate block
7
TYPE OF SERVICE
The City will supply single-phase service (or three-phase service if available at the point of
delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution
system through one standard transformation. Additional contractual arrangements between the City
and the Customer, subject to the Special Facilities Rider, may be required where service of the type
desired by the Customer is not available at the point of service.
PAYIVIENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
:
SCHEDULE GSM
GENERAL SERVICE MEDIUM
(Effective 10/O1/11)
APPLICATION
The General Service Medium (GS1Vn rate is applicable to any commercial or industrial customer
having a maximum demand that meets or exceeds 21.0 kW in any one of the previous twelve (12)
months but less than 250 kVA in each of the previous twelve (12) months for all electric service
supplied at one point of delivery and measured through one meter. This rate is not applicable to
resale service in any event, or to temporary, standby, or supplementary service.
NET MONTHLY RATE
(1) Facility Charge
plus;
plus;
plus;
Single-Phase
Three-Phase
(2) Dernand Charge
(3) Energy Charge per billing period
First 6,000 kWh
Additional kWh
(4) Energy Cost Adjustment Charge
MINIMUM BILLING
$15.80/bill
$21.10/bill
$4.00/kW (all kVi�
4.43 ¢/kWh
3.66¢/kWh
See Schedule ECA
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
plus;
(1) The Facility Charge,
(2) The Demand Charge
�
DETERMINATION OF DEMAND
The demand used in calculating the Demand Charge for the billing period sha11 be the greater of: (1)
the actual monthly kW demand as measured during the fifteen (15) minute period of m�imum use
each month; or (2) seventy percent (70%) of the maximum monthly actual demand for any month
during the previous billing months of May through October in the twelve (12) months ending with
the current month.
ENERGY CHARGE
Billing for the Energy Charge sha11 be based on actual kWh consumption during the billing period.
Energy Charge = kWh in rate block x Rate per kWh in rate block
PRIMARY SERVICE DISCOUNT
Customers who receive service at secondary voltage (GM1) shall receive no Energy Charge
discount. Customers utilizing City owned and operated facilities and transformation equipment and
who are metered at primary voltage (GM2) shall receive an Energy Charge discount of 0.1 ¢/kWh.
Customers who own, operate, and maintain all facilities necessary to receive three-phase primary
voltage service and a11 transformation facilities required for conversion to utilization voltage (GM3)
shall receive an Energy Charge discount of 0.3¢/kWh. The City shall own, operate and maintain all
metering facilities, either at primary or secondary voltage.
TYPE OF SERVICE
The City will supply single-phase service (or three-phase service if available at the point of
delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution
system through one standard transformation. Additional contractual arrangements between the City
and the Customer, subject to the Special Facilities Rider, may be required where service of the type
desired by the Customer is not available at the point of service.
17_�`�ul�l►�1
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
10
SCHEDULE GSL
GENERAL SERVICE LARGE
(Effective 10/O1/11)
APPLICATION
The General Service Large (GSL) Rate is applicable to any commercial or industrial customer
having a minimum actual demand of 250 kVA for all electric service supplied at one point of
delivery and measured through one meter. Customers other than commercial and industrial may
be allowed service under this rate, subject to the minimum billing provision. Customers who
elect to discontinue service under this rate are ineligible for service under this rate for twelve
months. This rate is not applicable to resale service in any event, or to temporary, standby, or
supplementary service,
NET MONTHLY R.ATE
(1)
plus;
�2)
plus;
(3)
plus;
(4)
Facility Charge
Demand Charge
Energy Charge per billing period
First 200,000 kWh
Additional kWh
Energy Cost Adjustment Charge
u 1► lul lu : 1►I
$65.55/bill
$9.33/kVA (Minunum of 250 kVA
billed)
2.14¢/kWh
1.21 ¢/kWh
See Schedule ECA
For each billing period, the Customer sha11 be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
(1)
plus;
�2)
The Facility Charge,
The Demand Charge
11
DETERMINATION OF DEMAND
The demand used in calculating the Demand Charge for the billing period shall be the greater of (1)
the actual monthly kVA demand as measured during the fifteen (15) minute period of maximum use
each month; or (2) 250 kVA; or (3) seventy percent (70%) of the m�imum monthly kVA actual
demand for any month during the previous billing months of May through October in the twelve
(12) month period ending with the current month.
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh in rate block x Rate per kWh in rate block
PRIMARY SERVICE DISCOUNT
Customers who receive service at secondary voltage (GL1) sha11 receive no Energy Charge
discount. Customers utilizing City owned and operated facilities and transformation equipment and
who are metered at primary voltage (GL2) shall receive an Energy Charge discount of 0.1 ¢lkWh.
Customers who own, operate, and maintain all facilities necessary to receive three-phase primary
voltage service and all transformation facilities required for conversion to utilization voltage (GL3)
sha11 receive an Energy Charge discount of 0.3 ¢/kWh. The City shall own, operate and maintain all
metering facilities, either at primary or secondary voltage.
TYPE OF SERVICE
The City will supply single-phase service (or three-phase service if available at the point of
delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution
system through one standard transformation. Additional contractual arrangements between the City
and the Customer, subject to the Special Facilities Rider, may be required where service of the type
desired by the Customer is not available at the point of service.
I�_�•/�1�►1111
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
12
. i � �a��l�lCe��
GENERAL SERVICE TIME OF USE
(Effective 10/O1/11)
APPLICATION
Applicable to any customer having a minimum demand of 250 kVA for a11 electric service supplied
at one point of delivery and measured through one meter, with the City providing all facilities
necessary to receive primary voltage service. Customers electing this rate must remain on this rate
for a minimum of twelve (12) continuous billing months. This rate is not applicable to resale
service in any event, or to temporary, standby, ar supplementary service.
In light of additional costs associated with the General Service Time of Use rate and to xnitigate
potential risk to ratepayers, any participant in the General Service Time of Use rate must be, at the
time this rate is applied for and continuing while such rate is in effect, a customer in good standing
of all Denton Municipal Utilities, including Solid Waste services. Unless legal review procedures
have been invoked in good faith regarding the obligation, a customer in good standing for the
purpose of this Rate Rider is defined as a customer not owing any unpaid utility or solid waste debt
obligation that is over forty-five (45) days past due to the City of Denton, Texas during the previous
12 months.
NET MONTHI,Y RATE
(1)
plus;
i2)
plus;
(3)
plus;
(4)
plus;
(5)
Facility Charge
On-Peak Demand Charge
Off-Peak Demand Charge
Energy Charge per billing period
Energy Cost Adjustment Charge
13
$76.45/bill
$11.87/kVA
$2.34/kVA
0.71 ¢lkWh
See Schedule ECA
MTI ►11u1 u : I� i�
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
plus;
plus;
(1) The Facility Charge,
(2) The Off-Peak Demand Charge,
(3) The On-Peak Demand Charge
DEFINITION OF ON-PEAK HOURS
The City's on-peak hours, for the purpose of this rate schedule, are designated as being from 2:00
P.M. to 7:00 P.M. each Monday through Friday, for the months of June through September
excluding Independence Day and Labor Day. The City's on-peak hours may be changed from time
to time.
DEFINITION OF OFF-PEAK HOURS
The City's system (off-peak) hours, for the purpose of this rate schedule, shall be all hours not
designated as on-peak hours.
DETERMII�TATION OF ON-PEAK DEMAND
The demand used in calculating the On-Peak Demand Charge for the billing period shall be the
greater of: (1) the kVA actual demand supplied during the fifteen (15) minute period of maximum
use each month during on-peak hours as recorded by the City's demand meter, or (2) one hundred
percent (100%) of the actual maximum on-peak demand similarly deternuned during the billing
months of June through September in the twelve (12) months immediately preceding the current
month. The On Peak Demand Charge will be applied to each billing period.
DETERNIINATION OF OFF-PEAK DEMAND
The demand used in calculating the Off-Peak Demand Charge for the billing period shall be the
actual kVA demand supplied during the fifteen (15) minute period of maximurn use during off-peak
hours each month as recorded by the City's demand meter. The Off-Peak Demand Charge will be
applied to each billing period.
DETERMINATION OF DEMAND BILLING FOR CUSTOMERS WITH NO PEAK DEMAND
HISTORY DURING OFF-PEAK MONTHS
14
If the Customer is new or does not have a history of on-peak use for June through September, and
elects to accept service on the TGS rate, the Customer's billed demand shall be the off-peak demand
billed at the GSL demand rate. The off-peak demand will be billed every month at the GSL rate
until the customer establishes a separate on-peak and off-peak demand during an on-peak month.
At this time, both on-peak and off-peak demand will then begin billing at the TGS rate.
PRIMARY SERVICE DISCOUNT
Customers who receive service at secondary voltage (TGl) shall receive no Energy Charge
discount. Customers utilizing City owned and operated facilities and transformation equipment and
who are metered at primary voltage (TG2) sha11 receive an Energy Charge discount of 0.1 ¢/kWh.
Customers who own, operate and maintain all facilities necessary to receive three-phase primary
voltage service and all transformation facilities required for conversion to utilization voltage (TG3)
sha11 receive an Energy Charge discount of 0.3 ¢lkWh. The City shall own, operate and maintain all
metering facilities, either at primary or secondary voltage.
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh x kWh Rate
TYPE OF SERVICE
The City will supply single-phase service (or three-phase service if available at the point of
delivery) at s�ty (60) cycles and at any standard voltages available from the City's distribution
system through one standard transformation. Additional contractual arrangements between the City
and the Customer, subject to the Special Facilities Rider, may be required where service of the type
desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
15
SCHEDULE G2
LOCAL GOVERNMENT SERVICE SMALL
(Effective 10/01/11)
APPLICATION
Applicable to any local City, County or School District having a m�imum demand of less than
21 A kW in each of the previous twelve (12) months for a11 electric service supplied at one point of
delivery and measured through one meter. If the demand in any month equals or exceeds 21.0 kW,
billing will be made under the Rate Schedule Gl and Customer must remain on the G1 rate for a
minimum of twelve (12) billing periods. This rate is not applicable to resale service in any event,
or to temporary, standby or supplementary service.
NET MONTHLY RATE
(1) Facility Charge
Single-Phase
Three-Phase
plus;
(2) Energy Charge
plus;
(3) Energy Cost Adjustment Charge
MINIMUM BILLING
$15.80/bill
$21.10/bill
6.45¢/kWh
See Schedule ECA
For each billing period, the Customer shall be obligated to pay the following charges as a m;nimum,
whether or not any energy was actually used:
(1) Facility Charge,
ENERGY CHARGE
Billing for the Energy Charge sha11 be based on actual kWh consumption during the billing
period.
Energy Charge = kWh x kWh Rate
16
TYPE OF SERVICE
The City will supply single-phase service (or three-phase service if available at the point of
delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution
system through one standard transformation. Additional contractual arrangements between the
City and the Customer, subject to the Special Facilities Rider, may be required where service of the
type desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10)
business days after issuance.
17
SCHEDULE Gl
LOCAL GOVERNMENT SERVICE
(Effective 10/O1/11)
APPLICATION
The Local Government Service (Gl) rate is applicable to any local City, County, or School District
having a maximutn demand that equals or exceeds 21.0 kW in any one of the previous twelve (12)
months but less than 250 kVA in each of the previous twelve (12) months far all electric service
supplied at one point of delivery and measured through one meter. This rate is not applicable to
resale service in any event, or to temporary, standby, or supplementary service.
NET MONTHLY RATE
(1) Facility Charge
Single-Phase
Three-Phase
plus;
(2) Demand Charge
plus;
(3) Energy Charge
plus;
(4) Energy Cost Adjustment Charge
u I► ul u C ��►1
$15.80/bill
$21.10/bill
$6.81/kW
3.15¢/kWh
See Schedule ECA
For each billing period, the Customer sha11 be obligated to pay the following charges as a minunum,
whether or not any energy was actually used:
(1) Facility Charge,
plus;
(2) Demand Charge
:
DETERMINATION OF DEMAND
The demand used in calculating the Demand Charge for the billing period shall be the greater of:
(1) The actual kW demand supplied during the fifteen (15) minute period of maximum use
during the current month as determined by City's demand meter; or (2) not less than 50% of the
highest monthly actual demand determined during the billing months of May through October in
the twelve (12) months immediately preceding the current month.
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing
period.
Energy Charge = kWh x kWh Rate
TYPE OF SERVICE
The City will supply single-phase service (or three-phase service if available at the point of
delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution
system through one standard transformation. Additional contractual arrangements between the
City and the Customer, subject to the Special Facilities Rider, may be required where service of the
type desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10)
business days after issuance.
19
SCHEDULE WK
WEEKEND SERVICE
(Effective 10/O1/11)
APPLICATION
Applicable to any commercial and industrial user whose m�imum demand load occurs during the
period from Thursday at 12 midnight through Sunday at 12 midnight and does not experience a
demand load during the period from Sunday 12 midnight through Thursday 12 midnight that
exceeds 80% of the m�imum demand load. Customers who violate the 80% requirement more
than four (4) times during the month, or more than twice on the same day of the week, during the
months of June through September, are ineligible for service under this rate for twelve (12) months.
This rate is not applicable to resale service in any event, or to temporary, standby or supplementary
service except in conjunction with applicable rider.
NET MONTHLY RATE
(1) Facility Charge
Single-Phase
Three-Phase
plus;
(2) Demand Charge
plus;
plus;
(3)
(4)
Energy Charge per billing period
First 2,500 kWh
Ne� 3,500 kWh
Additional kWh
Energy Cost Adjustment Charge
MINIMUM BILLING
(1)
plus;
�2)
Facility Charge
Demand Charge
20
$20.86/bill
$26.08/bill
$6.72/kW (First 20 kW not billed)
7.02¢/kWh
3.67¢/kWh
2.70¢/kWh
See Schedule ECA
DETERNIIlVATION OF DEMAND
The demand used in calculating the Demand Charge for the billing period shall be the greater o£ (1)
the actual kW demand supplied during the fifteen (15) minute period of maximum use during the
current billing period as determined by the City's demand meter less 20 kW; or (2) zero (0).
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh in rate block x Rate per kWh in rate block
TYPE OF SERVICE
The City will supply single-phase service (or three-phase service if available at the point of
delivery) at sixty (60) cycles and at any standard voltages available from the City's distxibution
system through one standard transformation. Additional contractual arrangements between the City
and the Customer, subject to the Special Facilities Rider, may be required where service of the type
desired by the Customer is not available at the point of service.
I�_\•�►�I�l�Yll
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
21
SCHEDULE AF
ATHLETIC FIELD
(Effective 10/O1/11)
APPLICATION
Applicable to all electric service metered at one point for use to light specified areas for athletic
events. This rate is not applicable to resale service in any event, or to temporary, standby, or
supplementary service except in conjunction with applicable rider.
NET MONTHLY R.ATE
(1) Facility Charge
Single-Phase $21.07/bill
Three-Phase $31.60/bill
plus;
plus;
plus;
(2) Energy Charge per billing period
Billing months of June through September:
Peak (2:00 PM to 7:00 PM)
Off Peak (All Other Hours)
Billing months of October through May:
I:�if �Tii���
(3) Demand Charge
Billing months of June through September:
Peak (2:00 PM - 7:00 PIV�
Off Peak (All Other Hours)
Billing months of October through May:
All hours
(4) Energy Cost Adjustment Charge
22
7.96¢/kWh
3.98¢/kWh
3.98¢/kWh
$4.94/kW
$1.17/kW
$1.17/kW
See Schedule ECA
MIN]MUM BILLING
For each billing period, the Customer sha11 be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
Single-Phase
Three-Phase
DETERNII1�lATION OF DEMAND
Facility Charge
Facility Charge
The demand used in calculating the Demand Charge for the billing period shall be the actual kW
demand supplied during the fifteen (15) minute period of ma��imum use during the current billing
period as determined by the City's demand meter.
ENERGY CI IARGE
Billing for the Energy Charge shall be based on actual kWh consurnption during the billing period.
Energy Charge = kWh in rate block x Rate per kWh in rate block
TYPE OF SERVICE
The City will supply single-phase or three-phase service at sixty (60) cycles and at any standard
voltages available from the City's distribution system through one standard transformation.
Additional contractual arrangements between the City and the Customer, subject to the Special
Facilities Rider, may be required where service of the type desired by the Customer is not available
at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
23
SCHEDULE LS
STREET LIGHTING
(Effective 10/O1/11)
APPLICATION
Applicable to all street lighting owned and maintained by the City of Denton.
NET MONTHLY RATE
(1) Facility Charge
Rate
LSA
LSB
LSC
plus;
Luminaire Tvpe
100 W Sodium Vapor
250 W Sodium Vapar
400 W Sodium Vapor
(2) Energy Cost Adjustment Charge
Rate
Bulb Wattage Factor
LSA
LSB
LSC
TYPE OF SERVICE
100 W Sodium Vapor
250 W Sodium Vapor
400 W Sodium Vapor
Facility Charge
$5.15/bill
$7.30/bill
$919/bill
(Current ECA per Schedule ECA) x
(Bulb Wattage Factor where the
following Bulb Wattage Factors
apply);
Luminaire Tvt�e
48 kWh
105 kWh
159 kWh
The City will supply single-phase, sixty (60) cycle service at 120, 240, or 480 volts from the City's
distribution system through one standard transformation. Additional contractual arrangements
between the City and the customer, subject to the Special Facilities Rider, may be required where
service of the type desired by the customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
24
SCHEDULE LT
TRAFFIC LIGHTING
(Effective 10/Ol/11)
APPLICATION
Applicable to State and Local Government agencies that operate and maintain their own traffic
signals.
NET MONTHLY RATE
plus;
(1) Energy Charge per billing period 5.62¢/kWh
(2) Energy Cost Adjustment Charge See Schedule ECA
ENERGY CHARGE
Billing for the energy charge sha11 be based on actual kWh consumption during the billing period.
Energy Charge = kWh x kWh Rate
TYPE OF SERVICE
The City will supply single-phase, sixty (60) cycle service at 120 or 240 volts from the City's
distribution system through one standard transformation. Additional contractual arrangements
between the City and the Customer, subject to the Special Facilities Rider, may be required where
service of the type desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
25
SCHEDULE UFL
UNMETERED SCHOOL ZONE/CROSSING FLASHERS
(Effective 10/O1/11)
APPLICATION
Applicable to Loca1 Government agencies that operate and maintain their owY unmetered school
zone/crossing flashers.
M� I �II:� 1►1i�_\ �7_11 � �!
plus;
(1) Energy Charge per billing period 5.62¢/kWh
(2) Energy Cost Adjustment Charge See Schedule ECA
ENERGY CHARGE
Billing for the energy charge shall be based on historical recorded annual kWh consurnption. The
total billed usage divided by number of school zone/crossing flashers will determine the average
kWh usage. This average consumption will be billed for each school zone/crossing flasher once
every twelve (12) months at the end of the fiscal yeara Any accounts that are added during the year
will be billed on prorated consumption.
Energy Charge = kWh x kWh Rate
Aiulual Usage = 48 kWh per account
TYPE OF SERVICE
The City will supply single-phase, sixty (60) cycle service at 120 or 240 volts from the City's
distribution system through one standard transformation. Additional contractual arrangements
between the City and the Customer, subject to the Special Facilities Rider, may be required where
service of the type desired by the Customer is not available at the point of service.
I'7_�•�u1��M�
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
. ^,
SCHEDULE ULT
UNMETERED TRAFFIC LIGHTING
(Effective 10/Ol/11)
APPLICATION
Applicable to Local Government agencies that operate and maintain their owY unmetered traffic
signals.
NET ANNUAL RATE
plus;
(1) Energy Charge per billing period 5.62¢/kWh
(2) Energy Cost Adjustment Charge See Schedule ECA
ENERGY CHARGE
Billing for the energy charge shall be based on historical recorded annual kWh consumption. The
total billed usage divided by number of lighted intersections will determine the average kWh usage.
This average consumption will be billed for each lighted intersection once every twelve (12) months
at the end of the fiscal year. Any accounts that are added during the year will be billed on prorated
consumption.
Energy Charge = kWh x kWh Rate
Annual Usage = 904 kWh per account
TYPE OF SERVICE
The City will supply single-phase, si��ty (60) cycle service at 120 or 240 volts from the City's
distribution system through one standard transformation. Additional contractual arrangements
between the City and the Customer, subject to the Special Facilities Rider, may be required where
service of the type desired by the Customer is not available at the point of service.
PAYIV�NT
The due date for the payment of the bill for utility services sha11 not be less than ten (10) business
days after issuance.
27
�Y�: i ��ia ��II.YiJ
UNMETERED SECURITY CAMERA
(Effective 10/01/11)
APPLICATION
Applicable to Local Government agencies that operate and maintain their own unmetered security
cameras.
NET ANN UAL RATE
(1) Facility Charge $15.80
plus;
(2) Energy Charge 5.62¢/kWh
plus;
(4) Energy Cost Adjustment Charge See Schedule ECA
ENERGY CHARGE
Billing for the energy charge shall be based on technical information of installed equipment. This
calculated consumption will be billed for each camera once every twelve (12) months at the end of
the fiscal year. Any accounts that are added during the year will be billed on prorated consumption.
Energy Charge = annual kWh per camera x kWh Rate
Annual Usage = 300 kWh per camera per account
TYPE OF SERVICE
The City will supply single-phase, sixty (60) cycle service at 120 or 240 volts from the City's
distribution system through one standard tra.nsformation. Additional contractual arrangements
between the City and the Customer, subject to the Special Facilities Rider, may be required where
service of the type desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
:
SCHEDULE LO
OTHER LIGHTING
(Effective 10/O1/11)
APPLICATION
Applicable to Texas Department of Transportation unmetered and metered safety lighting systems
and continuous lighting systems as those terms are defined in Texas Administrative Code, Title 43,
Part 1, Chapter 25, Subchapter A, Rule §25.1 l.
DEFINITION
The following definitions apply to this Schedule LO:
Hours of Operation Per Billing Period = 333 hours
Bulb Wattage is the rated wattage of the lumuiaire bulb
NET MONTHLY R.ATE LOA (Unxnetered Li h�)
plus;
(1)
�2)
Energy Charge per billing period
Energy Cost Adjustment Charge
ENERGY CHARGE LOA (LTnmetered Li h� tin�)
5.62¢/kWh
(Current ECA per Schedule ECA) x
(Bulb Wattage/1000) x (Hours of
Operation Per Billing Period)
Billing for the Energy Charge shall be based on estimated kWh consumption during the
billing period.
Energy Charge =(kWh Rate x Bulb Wattage/1000) x(Hours of Operation Per Billing
Period)
NET MONTHLY RATE LOB (Metered Li ht� in�)
plus;
(1) Energy Charge per billing period
(2) Energy Cost Adjustment Charge
�.
5.62¢/kWh
See Schedule ECA
ENERGY CHARGE LOB (Metered Li�htin�)
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh x kWh Rate
TYPE OF SERVICE
The City will supply single-phase, s�ty (60) cycle service at 120 or 240 volts from the City's
distribution system through one standard transformation. Additional contractual arrangements
between the City and the Customer, subject to the Special Facilities Rider, may be required where
service of the type desired by the Customer is not available at the point of service.
I�_�'/ul�l�IIII
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
�
SCHEDULE DD
SECURITY LIGHTING
(Effective 10/O 1/11)
APPLICATION
Applicable to any customer within the area served by the City's electric distribution system for
outdoor area lighting when such lighting facilities are operated as an extension of the City's
distribution system.
NET MONTHLY RATE
(1) Facility Charge
Rate
DSA
DSB
DSC
DHA
DHB
plus;
�2)
Luminaire Type
100 W Sodium Vapor
250 W Sodium Vapor
400 W Sodium Vapor
250 W Meta1 Halide
400 W Metal Halide
Energy Cost Adjustment Charge
Facili � Charge
$ 8.14/bill
$10.76/bill
$12.97/bi11
$12.65/bi11
$15.07/bi11
(Current ECA per Schedule ECA) x(Monthly Bulb Wattage Factor where the following
Bulb Wattage Factors apply);
Rate
DSA
DSB
DSC
DHA
DHB
Lwnuiaire Tvpe
100 W Sodium Vapor
250 W Sodium Vapor
400 W Sodium Vapar
250 W Metal Halide
400 W Metal Halide
31
Bulb Watta�e Factor
48 kWh
145 kWh
159 kWh
105 kWh
159 kWh
TYPE OF SERVICE
The City shall fiunish, install, maintain and deliver electric service to automatically controlled, metal
halide or sodium vapor lighting fixtures conforming to the City's standards and subject to its
published rules and regulations.
Where necessary far proper illuinination or where existing poles are inadequate, the City will install
or cause to be installed, one (1) wood pole with the necessary lighting hardware and overhead
conductor for each installed light, at a distance not to exceed eighty (80') feet from existing lines, at
no charge to the Customer. Additional contractual arrangements between the City and the customer,
subject to the Special Facilities Rider, may be required where the eighty (80') feet distance limit is
exceeded ar service of the type desired by the Customer is otherwise not available at the point of
service.
TERM OF CONTRACT
A two (2) year contract sha11 be agreed to and signed by each Customer desiring Security Lighting
Service authorizing fixed monthly charges, which may be reviewed annually, and to be applied to the
Customer's monthly municipal utilities bill. In the event that a Customer requests the removal of the
unit or discontinuance of the service prior to completion of two (2) years, the remainder of the
contract period shall become due and payable. After the end of the initial two (2) year contract,
service shall continue on a month-to-month basis and may be canceled bp either party upon thirty
(30) days notice.
PAYNIENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
32
SCHEDULE DDL
DOWNTOWN DECORATIVE LIGHTING
(Effective 10/O1/11)
APPLICATION
Applicable to any Customer requesting service on the perimeter of the historic County Courthouse
Square located in downtown Denton and served by the City's existing electric distribution system
for outdoor area lighting at said location.
NET MONTHLY RATE
plus;
(1) Facility Charge $4.04/bill
(2) Energy Cost Adjustment (Current ECA per Schedule ECA) x
(350 kWh per Customer)
TYPE OF SERVICE
The City shall furnish, install, maintain and deliver electric service to automatically controlled
lighting f�tures conforming to the City's standards and subject to its published rules and
regulations. The service is provided between dusk and midnight. Additional contractual
arrangements between the City and the Customer, subject to the Special Facilities Rider, may be
required where service of the type desired by the Customer is not available at the point of service.
':/UI\
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
FACILITY CHARGE
The Facility Charge shall be assessed on each bill rendered.
33
SCHEDULE DSL
NON-STANDARD STREET LIGHTING
(Effective 10/01/11)
APPLICATION
Applicable to street lighting owned and maintained by the Customer. Availability of this service is
contingent on the existence of an executed Special Facilities Rider between the legally responsible
party and the City under which the legally responsible party accepts all responsibilities, both legal
and financial, related to operation and maintenance of the subject lights, including but not limited to
payment of a11 applicable energy charges.
NET MONTHLY RATE
(1)
plus;
i2)
plus;
(3)
Facility Charge
Energy Charge
$8.14/bi11
5.62¢/kWh
Energy Charge =(kWh Ra.te) x(Bulb Wattage Factor)
Energy Cost Adjustment Charge
(Current ECA per Schedule ECA) x(Monthly Bulb Wattage Factor where the following
Bulb Wattage Factors apply);
Rate Luminaire Tvt�e
DLSA 100 W Sodium Vapor
DLSB 250 W Sodium Vapor
DLSC 400 W Sodium Vapor
DLHA 250 W Metal Halide
DLHB 400 W Metal Halide
Bulb Watta�e Factor
48 kWh
105 kWh
159 kWh
105 kWh
159 kWh
Other — For any lamp types installed by owner that are not included in the list above, a
Bulb Wattage Factor will be deternuned for each unique type.
TYPE OF SERVICE
The City shall deliver single-phase, sixty (60) cycle service at 120 or 240 volts to the site for non-
standard streetlight fixtures supplied by the customer, and installed by the City in accordance with
Municipal Code requirements. Additional contractual arrangements between the City and the
customer, subject to the Special Facilities Rider, may be required where service of the type desired
by the Customer is not available at the point of service.
34
ADDITIONAL SERVICE CHARGES
If the City is required to maintain the privately owned lights to ensure public safety, the owner of
the lights may be subject to additional service charges. The additional service charges sha11 be the
actual cost of performing any work required to perfortn the necessary maintenance including but not
limited to:
Labor Regular time or overtime labor hourly rates in effect at the time the work is
performed for all personnel performing the work. Labor charges shall be
based on a one (1) hour minimum with all additional time above the
minimum to be measured to the nearest one-quarter hour.
Transportation To be billed by hours or miles, as applicable, according to the estimated cost
of operating the required equipment.
Material Any material needed to repair and/or maintain facilities will be billed at City
of Denton Warehouse cost plus 25%.
Administrative Fee 10% of the total labor, transportation, and material costs.
17_\•/►�1�►11M
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
35
SCHEDULE Tl
TEMPORARY SERVICE
(Effective 10/01/11)
APPLICATION
Applicable when a Customer requests electric service on a short term or temporary basis where a
customer has received a permit from the City Building Inspections Department. This rate is not
applicable after the certificate of occupancy or building final inspection has been issued.
NET MONTHLY RATE
(1) Facility Charge
Single-Phase
Three-Phase
plus;
i2)
plus;
(3)
MINIMUM BILLING
Energy Charge per billing period
Energy Cost Adjustment Charge
$15.80/bill
$21.10/bill
7.11 ¢/kWh
See Schedule ECA
For each billing period, the Customer sha11 be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
Single-Phase
Three-Phase
ENERGY CHARGE
Facility Charge
Facility Charge
Billing for the Energy Charge shall be based on actual kWh consurnption during the billing period.
Energy Charge = kWh x kWh Rate
TYPE OF SERVICE
The City will supply single-phase service at sixty (60) cycles at a standard secondary voltage
available at the site. Additional contractual arrangements between the City and the Customer,
subject to the Special Facilities Rider, may be required where service of the type desired by the
Customer is not available at the point of service.
�
ADDITIONAL TEMPORARY SERVICE CHARGES
Labor Regular time or overtime labor hourly rates in effect at the time the
work is performed for all personnel performing the work. Labor
charges shall be based on a one (1) hour minimum with all additional
time above the minimum to be measured to the nearest one-quarter
hour.
Transportation To be billed by hours or miles, as applicable, according to the
estimated cost of operating the required equipment.
Material Material that cannot be salvaged sha11 be billed at City of Denton
Warehouse cost plus 25%, plus applicable sales t�. At the time a
temporary service is removed or converted, any loss of the installed
material due to negligence or willful action by the Customer will be
billed separately to the Customer at replacement cost plus 25%, plus
applicable sales tax.
Administrative Fee 10% of the total labor, transportation, and material costs.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
37
SCHEDULE EGR
ECONOMIC GROWTH RIDER
(Effective 10/O1/11)
PURPOSE
The purpose of this rider is to facilitate local economic growth and expand the ad valorem t� base
of the City of Denton.
AVAILABILITY
This rider is available to the Customers who:
(1) Receive service from Rate Schedules GSL or TGS; and
(2) Pay City of Denton ad valorem t�; and
(3) Receive no electric service discounts other than those specifically defined in the
GSL or TGS rate schedules.
APPLICATION
This rider is available to electric service supplied at any one location. It is for firrn electric service
applicable to new and existing Customers as described below, over a five (5) year period. This rider
is available to the following classes of Customers:
(1) New customers whose electric service represents demand not previously served by
the City at any location in the City's service area in the last twelve (12) months,
where such metered demand will be in excess of 1,000 kVA, as estimated and
mutually agreed upon by the DME General Manager and the customer.
(2) Existing customers served under Rate Schedules GSL or TGS who increase their
prior existing metered demand by 1,OOOkVA. This increase shall be verified by sub-
metering (at the Customers expense) the additional load. If sub-metering is not
possible, at the discretion of the General Manager, the increase may be verified by
comparing a three-month rolling average of the new level of demand to the prior
demand averaged for corresponding months. During periods in which this
verification method cannot be applied, the General Manager and the Customer may
develop a rnutually agreed-upon formula to estimate the base and additional demand
levels.
In light of additional costs associated with the Economic Growth Rider and to mitigate potential
risk to ratepayers, any participant in the Economic Growth Rider must be, at the time this rider is
applied for and continuing while such rider is in effect, a customer in good standing of all Denton
Municipal Utilities, including Solid Waste services. Unless legal review procedures have been
invoked in good faith regarding the obligation, a customer in good standing for the purpose of tlus
Rate Rider is defined as a customer not owing any unpaid utility or solid waste debt obligation that
is over forty-five (45) days past due to the City of Denton, Texas during the previous 12 months.
:
NET MONTHLY RATE
The Customer sha11 be charged under the appropriate applicable rate schedules with the exception
that the monthly billing demand (for GSL) or system demand and on-peak demand (for TGS) will
be adjusted in accordance with the following table:
Time Period
First Year
Second Year
Third Year
Fourth Year
Fifth Year
CONTR.ACT PERIOD
Reduction to Billin� Demand
50%
40%
30%
20%
10%
The term of the contract will be for five (5) years.
39
SCHEDULE GRP
GREENSENSE ENERGY EFFICIENCY REBATE PROGRAM
(Effective 10/O l / 11)
PROGRAM SUMMARY
The objective of the GreenSense Energy Efficiency Rebate Program ("Program") is to reduce
energy demand and consumption by promoting energy conservation, thereby reducing the utility
bills of Denton Municipal Electric (DME) customers, reducing the peak load of the DME's electric
system, reducing emissions in the state, and promoting energy conservation. The Program ofFers
incentives, in the form of rebates on the electric service bills of DME retail customers and cash
incentives to builders. Cash incentives may be paid to residential retail customers for the
installation of photovoltaic applications.
In light of additional costs associated with the GreenSense Energy Efficiency Rebate Program and
to mitigate potential risk to ratepayers, any participant in the GreenSense Energy Efficiency Rebate
Program must be, at the time this program is applied for and continuing while such program is in
effect, a customer in good standing of a11 Denton Municipal Utilities, including Solid Waste
services. Unless legal review procedures have been invoked in good faith regarding the obligation,
a customer in good standing for the purpose of this Rate Rider is defined as a customer not owing
any unpaid utility or solid waste debt obligation that is over forty-five (45) days past due to the City
of Denton, Texas during the previous 12 months.
Program applicants will be able to qualify for multiple incentives simultaneously. A separate
application may be necessary for each incentive. The Program will be in effect each fiscal year
begiiuuiig on October 1, until the allotted funding is depleted or until cancellation of the program by
DME. At the time the funds are depleted, no additional applications for participation will be
accepted until the next fiscal year.
Qualifying applicants must receive electric service from DME. The Program guidelines and
payments are subject to change by DME without prior notice. DME may, at any time,
discontinue the Program without prior notice. The current program guidelines may be found in
the GreenSense Energy Efficiency Rebate Program Manual located at www.dmepower.com.
��
SCHEDULE ECA
ENERGY COST ADNSTMENT
(Effective 10/O1/11)
The Energy Cost Adjustment (ECA) rate shall be set by the Public Utilities Board (PUB). The ECA
rate sha11 be reviewed on a monthly basis and adjusted as defined below to recover the variable cost
of energy delivered to customers. Variable energy cost includes the variable cost of Texas Municipal
Power Agency (TMPA) energy (excluding the portion of TMPA's energy charge associated with
fixed costs), the variable cost of purchased energy (excluding demand payments or fees for services),
and fuel costs.
ENERGY COST ADJUSTMENT BALANCING ACCOUNT CALCULATION
The ECA Balancing Account shall be calculated using the following formula:
Where:
ECA Balancing Account =(Actual plus Projected ECA revenue) —(Projected Energy Cost)
Projected Energy Cost =(Actual plus Projected cumulative cost of fuel) +(Actual plus
Projected cumulative variable cost of TNIl'A energy) +(Actual plus
Projected cumulative variable purchased energy cost).
The General Manager, Denton Municipal Electric (DNIE) or his/her designee shall calculate the ECA
Balancing Account balance monthly. In the event that the ECA Balancing Account balance
calculated during the last month of each fiscal quarter (December, March, June, and September) is
greater than or less than zero dollars ($0) by $5,000,000 or more during the next quarter, the General
Manager, DME or his/her designee shall recommend to the PUB an ECA rate adjustment sufficient to
recover/return any under/over collection, and maintain DME in a fmancially sound position. The
PUB shall consider that recommendation and may adjust the ECA rate far the quarter immediately
following as necessary to maintain DME in a financially sound position.
ENERGY COST ADJUSTMENT CALCULATION
ECA =[(Projected Energy Cost) +(ECA Balancing Account)] /(Projected kWh sales)
ENERGY COST ADJU5TMENT CHARGE
The Energy Cost Adjustment Charge shall be based on actual kWh consumption during the billing
period.
Energy Cost Adjustment Charge = kWh x ECA rate
!��
EXTRAORDINARY CIRCUMSTANCE ECA RATE ADJUSTMENT
In the event that the ECA Balancing Account balance calculated for any month is greater than or
less than zero dollars ($0) by $10,000,000 or more during the next month, the General Manager,
DME or his/her designee shall recommend to the PUB an ECA rate adjustment sufficient to
recover/return any under/over collection, and maintain DME in a financially sound position. The
PUB shall consider that recommendation and may adjust the ECA rate for the month irrunediately
following as necessary to maintain DME in a financially sound position.
42
SCHEDULE RCA
RENEWABLE COST ADJUSTMENT
(Effective 10/O1/1)
The Renewable Cost Adjustment (RCA) rate shall be set by the Public Utilities Board. The RCA rate
sha11 be reviewed on a quarterly basis and adjusted as defined below to recover the cost of renewable
energy delivered to customers. Renewable energy cost includes the Energy Cost Adjustment Charge
(see Schedule ECA) plus the cost of Renewable Energy Credits (REC) purchased.
RENEWABLE COST ADJUSTMENT BALANCING ACCOUNT CALCULATION
The RCA Balancing Account shall be calculated using the following formula:
Where:
RCA Balancing Account =(Actual plus Projected RCA revenue) —(Projected Renewable
Energy Cost)
Projected Renewable Energy Cost =(Actual plus Projected cumulative ECA cost) +(Actual
plus Projected REC cost)
During the last month of each fiscal year quarter (December, March, June, and September), the DME
General Manager or his/her designee shall calculate the RCA Balancing Account balance. In the
event that the RCA Balancing Account balance calculated during the last month of each fiscal quarter
is greater than zero dollars ($0) by $100,000 or more during the next quarter, the General Manager or
his/her designee sha11 recommend to the Public Utilities Board an RCA rate adjustment sufficient to
recover/return any under/over collection, and maintain DME in a financially sound position. The
Public Utilities Board shall consider that recommendation and may adjust the RCA rate far the
quarter immediately following.
RENEWABLE COST ADJUSTMENT CALCULATION
Where:
RCA = ECA +[(Projected Renewable Energy Cost) /(Projected kWh sales)]
Projected Renewable Energy Cost = Actual + Projected REC cost
RENEWABLE COST ADJUSTMENT CHARGE
The Renewable Cost Adjustment Charge shall be based on actual kWh consumption during the
billing period.
Renewable Cost Adjustment Charge = kWh x RCA rate
43
EXTR.AORDINARY CIRCUMSTANCE RCA RATE ADJUSTMENT
In the event that an Extraordinary Circumstance ECA Rate Adjustment is made (see Schedule ECA)
the RCA shall be adjusted concurrently with the Extraordinaty Circumstance ECA Rate Adjustment
by substituting the new ECA rate in the Renewable Cost Adjustment Calculation formula above.
„
SCHEDULE DGR
DISTRIBUTED GENERATION FROM RENEWABLE SOURCES RIDER
(Effective 10/O1/ll)
APPLICATION
This Rider is available to any retail customer receiving electric service under a DME electric rate
schedule who owns and operates an on-site generating system powered by a renewable resource
capable of producing power, and who interconnects with the DME electric system. Renewable
energy technology is any technology that exclusively relies on an energy source that is naturally
regenerated over a short time and derived directly or indirectly from the sun or wind. A
renewable energy technology does not rely on energy resources derived from fossil fuels, waste
products from fossil fuels, or waste products from inorganic sources. This Rider applies to a
Customer-owned generating system that primarily offsets part or all of the Customer's electric
service provided by DME. If the Customer-owned generating system larger than SOkW or if the
system's primary purpose is to sell energy to the grid and not offset the Customer's consumption,
special arrangements and contract may be necessary.
In light of additional costs associated with the Distributed Generation From Renewable Sources
Rider and to mitigate potential risk to ratepayers, any participant in the Distributed Generation
From Renewable Sources Rider must be, at the time this rider is applied for and continuing while
such rider is in effect, a customer in good standing of all Denton Municipal Utilities, including Solid
Waste services. Unless legal review procedures have been invoked in good faith regarding the
obligation, a customer in good standing for the purpose of this Rate Rider is defined as a customer
not owing any unpaid utility or solid waste debt obligation that is over forty-five (45) days past due
to the City of Denton, Texas during the previous 12 months.
CONDITIONS OF SERVICE
All charges, character of service, and terms and conditions of the electric rate schedule under
which the Customer receives service shall apply except as expressly altered by this Rider.
The Customer shall comply with the current DME technical requirements for distributed
generation interconnection. The Customer sha11 obtain approval from DME before the Customer
energizes the customer's on-site generating system or interconnects it with the DME electric
system. The Customer shall submit to DME a completed interconnection application form and
signed Standard Agreement for Interconnection and Parallel Operation of Distributed Generation
Agreement. The minimum term of an Agreement under this Rider is one year, extended
automatically unless terminated by either party with sixty days advance written notice
The Customer is responsible for the costs of interconnecting with the DME electric system,
including transformers, service lines, ar other equipment determined necessary by DME for safe
installation and operation of the Customer's equipment with the City's system. The Customer is
responsible for any costs associated with required inspections and permits.
45
METERING
Metering under this Rider shall be performed by a single meter capable of registering the flow of
electricity in two directions (delivered and received) to determine the Customer's net energy
flow.
RATE
Beginning in a billing period after a Customer receives approval to interconnect the Customer's
on-site generating system from the City of Denton, all energy generated by the Customer's
system and delivered to the DME electric system will be considered renewable energy. The
Customer shall be billed for all energy delivered by DME to the Customer under the approved
residential rates.
For any generation delivered by the Customer's system to the DME system up to the amount of
energy delivered by DME to the Customer, the City shall credit the Customer's account for the
energy generated as follows:
Generation Credit =[(kWh delivered from the Customer's approved system)
x(Customer's base electric service rate)] +[(kWh delivered from the
Customer's approved system) x(RCA rate)]
For all energy delivered by the Customer's system to the DME system that exceeds the amount
of energy delivered by DME to the Customer, the City shall credit the Customer's account for
the energy generated as follows:
Excess Generation Credit =(kWh delivered from the Customer's system)
x RCA rate (see Schedule RCA).
Any Billing Period Credit shall be applied to the utiliTy charges due from the Custorner to the
City of Denton for the billing period.
1NDEMNIFICATION
The Customer operating the renewable distributed generation system indemnifies DME and
holds DME harmless for all damages and injuries to DME, the Customer, or others arising out of
Customer's use, ownership or operation of Customer's distributed generation facilities in parallel
with DME's system. Customer is solely responsible for providing adequate protection for
operating in parallel with DME's system in such a manner that faults or other disturbances on the
DME system do not cause damage to the Customer's distributed generation equipment.
,,
SCHEDULE IWG
INDEPENDENT WHOLESALE GENERATOR
(Effective 10/1/11)
APPLICATION
The Independent Wholesale Generator (IWG) rate is applicable to non-renewable generating
installations of ten (10) MW or less interconnected to and operating in parallel with DME's
distribution system, for the sole purpose of delivering the net output (gross output minus
auxiliary load and step up transformer loses) of said generating installation to the Electric
Reliability Council of Texas (ERCOT) transmission grid for sale in the ERCOT wholesale power
market. DME will interconnect the IWG pursuant to the terms of the DME standard Agreement
for Interconnection and Para11e1 Operation of Independent Wholesale Generation. Other services
or special requirements for interconnection of a specific generating facility not included in the
DME standard Agreement for Interconnection and Parallel Operation of Independent Wholesale
Generation, requested by the IWG Customer, or required by DME may be provided pursuant to
negotiation and agreement by both the IWG Customer and DME. The provision of said
additional services or requirements shall be recorded in the form of an addendurn to the DME
standard Agreement for Interconnection and Parallel Operation of Independent Wholesale
Generation.
TERMS AND CONDITIONS OF SERVICE
At a minimum, the IWG Customer shall comply with the current DME technical requirements
for independent wholesale generation interconnection specified in the DME standard Agreement
for Interconnection and Parallel Operation of Distributed Generation. The IWG Customer may
not begin construction of its facilities until an Agreement for Interconnection and Parallel
Operation of Distributed Generation has been signed by both the IWG Customer and the City of
Denton. The IWG Customer sha11 obtain approval from DME before the IWG Customer begins
operation of its generating system or interconnects it with the DME electric system. The IWG
Customer is responsible for any costs associated with required City of Denton and/or DME
inspections and permits.
PRE-INTERCONNECTION STUDIES
DME may, at its sole discretion perform pre-interconnection studies DME or the City of Denton
deems appropriate, which may include, but are not restricted to, a service study, coordination
study, emissions impact study, and utility system impact study. In instances where such studies
are deemed necessary, the scope of such studies shall be based on the characteristics of the
particular IWG generation system to be interconnected, DME's distribution system at the
specified proposed location(s), and environmental characteristics of the Denton County area.
Such studies will also determine whether the electric interconnection can be made consistent
with safe and reliable operation of DME's distribution system. The cost of such analysis will be
the responsibility of the IWG Customer. A cost estimate will be provided and agreed to by the
IWG Customer prior to DME or the City performing the studies.
47
SYSTEM MODIFICATIONS
The IWG Customer will be required to install, operate, and rnaintain in good order and repair,
and without cost to DME, all facilities required by DME for the safe operation of the IWG
system in parallel with DME's electric system. The IWG Customer's IWG system shall be
installed, operated, and maintained by the IWG Customer at all times in conformity with good
electrical practice and shall comply with the National Electric Code, the National Electric Safety
Code, any applicable local codes and any applicable DME service standards included in the
DME Agreement for Interconnection and Parallel Operation of Independent Wholesale
Generation
Any modifications or additions to DME's electrical system caused by the addition of the
Customer's IWG system will be solely at the IWG Customer's expense. However, the IWG
Customer will not acquire any ownership in these facilities. The modifications and additions
may include, but are not restricted to, the upgrading of transformer insulation levels and
lightening arrester ratings, the replacement of circuit breakers due to increased fault current
levels, additional protective relaying and any additional metering. Further, DME may require
that a communications channel(s) be installed at the IWG Customer's expense as part of the
relay protection, remote control, remote metering, SCADA telemetry, and/or direct voice contact
between DME and the IWG Customer.
.
..
The IWG Customer shall be subject to special contract arrangements and the rates charges to the
Customer may consist of a minimum monthly Facility Charge plus a monthly distribution charge
plus a monthly distribution line loss charge. These charges shall be calculated as follows:
Monthly Facility Charge:
The IWG Customer shall pay DME a monthly facility charge sufficient to
compensate DME for its investment in special facilities dedicated exclusively to
providing the IWG Customer service and/or that are necessary to ensure that the
quality of service provided to other customers is not adversely affected pursuant
to the requirements of the SYSTEM MODIFICATION provisions set forth above.
The minimum monthly facility charge shall be $65.55.
Distribution Delivery Charge:
The IWG Customer shall pay DME a monthly distribution delivery charge equal
to $2.06 times the IWG Customer's delivery demand. The IWG Customer's
delivery demand shall be the greatest of the IWG Customer's maximum 15
minute net capacity output as measured at the IWG Customer's IWG site, the
minimum billing kW shall be as established in the DME Agreement for
Interconnection and Parallel Operation of Independent Wholesale Generation, or
1,500 kW.
�-
Distribution Line Loss Charge:
The IWG Customer shall pay DME a monthly distribution line loss charge equal to
the applicable monthly Energy Cost Adjustment (ECA) charge (see schedule ECA)
times monthly energy losses. Monthly energy losses sha11 be calculated as the
metered monthly kilowatt-hour output of the IWG Customer's IWG generating
unit(s) as measured at the IWG Customer's IWG site times five (5.0) percent.
Generator Auxiliary Load Standby Charge:
The IWG Customer shall pay the DME General Service Large rate for any electric
service used by the IWG Customer to serve generator auxiliary load as a result of
demand and energy requirements placed upon DME resulting from planned or
forced outage of the IWG Customer's IWG generation unit(s).
Electric Service to Shuctures and Other Facilities Other than Generator A�iliary Load:
All charges, character of service, and terms and conditions of the applicable City of
Denton electric rate schedule(s) under which the IWG Customer receives DME
electric service for structures or other facilities not specifically supplying a�iliary
service directly to its generating unit(s) shall apply except as expressly altered by this
Rider.
49
SCHEDULE CGR
COMMERCIAL RENEWABLE ENERGY SERVICE RIDER
(Effective 10/O1/11)
This Rider defines the manner by which commercial customers may purchase predetermined
1000 kWh blocks of energy or 100% of actual energy consumption from renewable resources by
substituting the Renewable Cost Adjustment Charge (see Schedule RCA) in lieu of the Energy
Cost Adjustment (see Schedule ECA) specified in their applicable rate Schedule.
APPLICATION
This Rider is applicable to any non-residential Customer receiving service under rate schedules
GSS, GSM, GSL, G1, TGS, or WK at one point of delivery and measured through one meter.
This Rider is not applicable to resale service in any event, or to temporary, standby, or
supplementary service.
In light of additional costs associated with the Commercial Renewable Energy Service Rider and
to mitigate potential risk to ratepayers, any participant in the Distributed Commercial Renewable
Energy Service Rider must be, at the time this rider is applied for and continuing while such rider is
in effect, a customer in good standing of all Denton Municipal Utilities, including Solid Waste
services. Unless legal review procedures have been invoked in good faith regarding the obligation,
a customer in good standing for the purpose of this Rate Rider is defined as a customer not owing
any unpaid utility or solid waste debt obligation that is over forly-five (45) days past due to the City
of Denton, Texas during the previous 12 months.
NET MONTHLY RATE
A customer eligible for service under this Rider may elect to purchase renewable energy at the
Renewable Cost Adjustment Charge, determined in accordance with Schedule RCA. Said customer
may elect to purchase 1000 kWh blocks of energy at the RCA rate, with the remainder of the
customer's energy use charged at the ECA rate or to purchase all energy used at the RCA rate. All
other charges contained in the customer's applicable rate Schedule sha11 continue to apply, as
specified in said Schedule. Said customer's energy charge shall be calculated as follows.
Either:
Tota1 Energy Charge =[(Y x 1000 kWh) x RCA] +{[(Total Energy Used) -(Y x 1000 kWh)] x
ECA}
Where:
Or:
Customer has elected to purchase a portion of its energy consumption at the RCA and:
Y= Number of 1000 kWh RCA blocks elected by said customer
50
Total Energy Charge = Total Energy Used x RCA
Where:
Customer has elected to purchase its entire energy consutnption at the RCA
TERMS OF SERVICE
To exercise the energy supply choice made available by this Rider, an eligible customer must enter
into a separate written agreement with Denton Municipal Electric that specifies either a specific
number of 1000 kWh energy blocks to be purchased at the Renewable Cost Adjustment Charge or
specifies that 100% of said customer's monthly energy consumption is to be purchased at the
Renewable Cost Adjustment Charge. The minimum term for a Schedule CGR agreement shall be
12 months.
This Rider replaces the Energy Cost Adjustrnent Charge for participating customers.
51
SCHEDULE SFR
SPECIAL FACILITIES RIDER
(Effective 10/O1/11)
(1) All service shall be offered from available facilities. If a customer service characteristic
requires facilities and devices not normally and readily available at the location which the
customer requests service, the total cost incurred by DME for all facilities installed, buried,
relocated andlor removed shall be the responsibility of the Customer and subject to a special
contract entered into between DME and the Customer. This contract shall be signed by both
parties prior to the DME providing service to the Customer.
(2) Billing for services beyond the delivery of electricity, utilized by the Customer, may be
subject to a special contract entered into between DME and the Customer. This contract
shall be signed by both parties prior to DME providing service to Customer.
52
SCHEDULE DFR
DARK FIBER
(Effective 10/O1/11)
APPLICATION
Service is available to any customer to the e�ent there is any excess capacity respecting Denton
Municipal Electric's fiber optic cable facilities, within the area served by Denton Municipal
Electric's ("DME") distribution system, for the purpose of point-to-point dark fiber optic cable
connectivity intended for the transport of high-speed data.
MONTHLY RATE
(1)
�2)
Fiber Mileage Charge
Building Presence Charge
Total Fiber Rate
RATE GUIDELINES
$400 per fiber pair/mile, per month; and
$180 per location, per month
$580 per fiber pair/mile, per month, per location
(1) The minimum quantity of fiber to be leased shall be one (1) fiber pair. All fiber pairs
furnished to the customer sha11 consist of two (2) fibers.
(2) The minimum Fiber Mileage Charge is for one (1) fiber pair/mile.
(3) After the first mile, Fiber Mileage Charge will be charged in increments of the nearest
one-tenth (0.1) mile.
(4) All costs associated with ingress to a customer's location from the DME right-of-way
shall be billed directly to the customer, and are not included in the Fiber Mileage
Charge and the Building Presence Charge and shall be paid to Denton Municipal
Electric within fifteen (15) calendar days from the date of issuance of the bill.
(5) The Fiber Mileage Charge calculation is based upon the actual fiber pair distance
along the DME distribution system rights-of-way. The Fiber Mileage Charge is not
based upon any other method of calculation. The Fiber Mileage Charge is not based
upon any distance determination, such as the distance the crow flies, or from point-to-
point.
(6) The Fiber Mileage Charge distance shall be capped at two (2) times the direct point-to-
point distance.
DISCOUNTS
Special discounts will be applied for fiber pairs to the same location, and for fiber pairs for long-
term contracts in the amounts as shown in the table below. The discount applicable to a customer
shall not be a cumulative total of a11 the discounts offered. The discount any customer is entitled to
shall be the largest single discount applicable to that customer's service.
53
Discount Type Discount Discount Type Discount
Term of Lease % Number of Fibers %
5-7 Years 30% 1-2 Fibers /Mileage Charge 0%
8-10 Years 45% 3-6 Fibers/ Mileage 9.7%
Charge
7-12 Fibers/Mileage Charge 19%
12 or more Fibers/Mileage 28.7%
Charge
TYPE OF SERVICE
The City shall fiunish, install, maintain, and deliver only point-to-point dark fiber connectivity for
the purpose of transporting high-speed data with a m�imum loss of no more than 9.0 dB.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
TERM OF LEASE CONTRACT
All dark fiber lease contracts shall be for a nununum term of five (5) years.
54
SECTION 2. That the Assistant City Manager for Utilities is hereby authorized to
expend funds to issue rebates to electric utility customers in the form and type set forth in
Schedule GRP, as the installation of energy efficient is in the best interest of the City of Denton,
Texas, as such will reduce energy demand and consumption, reduce the peak load of the DME's
electric system, reduce emissions in the state, and promote energy conservation, which are public
purposes of the City.
SECTION 3. That all ordinances or parts of ordinances in force when the provisions of
this ordinance became effective which are inconsistent, or in conflict with the terms or provisions
contained in this ordinance are hereby repealed to the extent of any such conflict.
SECTION 4. That if any section, subsection, paragraph, sentence, clause, phrase or ward in
this ordinance, or application thereof to any person or circumstances is held invalid by any court of
competent jurisdiction, such holding sha11 not affect the validity of the remaining portions of this
ordinance, and the City Council of the City of Denton, Texas, hereby declares it would have enacted
such remaining portions despite any such invalidity.
SECTION 5. That this ordinance and the rates herein adopted sha11 become effective,
charged, and applied to a11 electric services rendered by Denton Municipal Electric, and a11 energy
usage by customers of Denton Murucipal Electric effective with the first billing issued on and after
October 1, 2011; and a copy of said rates shall be maintained on file in the Office of the City
Secretary of the City of Denton, Texas.
PASSED AND APPROVED this the �� �� day of � , 2011.
ATTEST:
JENNIFER WALTERS, CITY SECRETARY
By:
APPROVED AS TO LEGAL FORM:
ANITA BURGESS, CITY ATTORNEY
By: , ��'
55
�
G
L �/ /
A. B OU ; S, MAYOR