Loading...
2012-3201lcodad\departmentsUegallour documentslordinances\12Vinda mcnatt animal center connolly architect amendment.doc ORDINANCE NO. 2012-32� AN ORDINANCE OF THE CITY OF DENTON, TEXAS AMENDING A PROFESSIONAL SERVICES AGREEMENT (PSA) WITH CONNOLLY ARCHITECTS AND CONSULTANTS FOR DESIGN SERVICES AND CONSTRUCTION OVERSIGHT FOR THE L1NDA MCNATT ANIMAL CARE AND ADOPTION FACILITY ENTERED INTO ON JANUARY 10, 2012; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, The City of Denton and Connolly Architects and Consultants have entered into an agreement for the provision of professional services excluding from the scope of services the provision of Leadership in Energy and Environmental Design (LEED) Certification Services; and WHEREAS, The City Council has determined that it is in the best interest of the City of Denton to amend the said agreement to include within the scope of services the provision of LEED services; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. The agreement described hereinabove is hereby amended to include in the scope of services the provision of LEED Certification Services as set forth in Attachment "A" hereto. SECTION 2. The City Manager, or his designee, is hereby authorized and directed to execute all documents required to accomplish the said amendment. SECTION 3. This ordinance shall become effective immediately upon its passage and approval. PASSED AND APPROVED this the ATTEST: JENNIFER WALTERS, CITY SECRETARY BY: APPROVED AS TO LEGAL FORM: ANITA BURGESS, CITY ATTORNEY n BY: � � Attachment A ��NNCJLLY ARCHI"1'H:C�I'S �c C(�NSUL"1'f1N'1'S L414 Exposition Boulevarcl, 5uile A-2 /austin,Texas' 78703 5 I 2.�180.961 I fax 5 I 2.480.9713 www.connollyaiacom ADDITIONAL SERVICES FOR LEED CERTIFIABLE DESIGNATION LINDA McNATT ANIMAL CARE & ADOPTION CENTER SCOPE OF SERVICES 1. Pursue LEED NC (New Const�.-uction) ceitification 2. Revise 100% completed Bidding Documents to comply with LEED ceitifiable standards 3. Piovide Contract Adtninistration foi revised Bidding Documents COMPENSATION At your request we have included in the Aichitectw�al/Engineering Fee Pioposal that is inclusive of the following: 1. Aichitectuial Design 2. Civil Engineering 3. Mechanical/ElectYical/Plumbing Engineering 4. Landscape Architecture 5. LEED consultant — Lee Gros 6. LEED coinmissioning agent — Facility Peiformance Associates Additional Fees $109,000 AYChitectuial $40,000 (spreadsheet attached) MEP Engineeiing $11,000 (includes Eneigy Model, EA1, CYedit 1) LEED Consultant $40,000 (pioposal attached) Conv.izissioning Agent $15,000 (includes enhanced com�s�issioiv.n� Estunatoi $3,000 (cost estimate of revised CD's) As Needed Services and Reimbursable Expenses $28,848 LEED Ciedit Allowances LEED Contingency LEED Consultant Travel Allowance Architect Txavel Allowance Total Lump Surn Fee HOURLY RATES The hourly charge will be as follows: Principal Project Aichitect Staff Architect $9,300 $5,540 $5,400 $8,608 $150.00 $100.00 $80.00 1 of 2 (identified in FPA proposal) for unforeseen scope additions Maximum fox travel and review fees duYing document ievisions and CA $137,848 November 7, 2012 Atchitectural Intein $60.00 BILLING AND PAYMENT Billing will be monthly based on the pexcentage of design completion �lus reimbursable expenses. Payment is due within 30 days of the invoice. LEED CERTIFICATION 1. The Architect agrees to endeavox to assist the City of Denton, subject to the scope of services, terins and piovisions of this Agreement, in obtainzng ceitification undei the U.S. Gieen Building Council's (CJSGBC) Leadership in Energy and Environmental Design (LEED) iating as indicated in the agxeement. The Aichitect cannot, however, guaiantee LEED certification oi the actual peifoimance of the building based on the Engineei's design diawings, specifications, oi resouice use oi consutnption modeling for the Project, nor can it gua�antee certain perforinance levels anticipated through the LEED ceYtification process. The City of Denton understands that the Pioject cannot achieve LEED certification until after substantial completion of construction and will be subject to certification piocesses and proceduies as detexmined by the authority that has juxisdiction. These pxoceduies aYe outside the control of the Architect, may not be unifoxmly implemented and may be subject to change at any time. The City of Denton agrees that submission foY LEED Certificarion foi the Project in no way shall constitute a waxranty or guarantee of such rating. Fuxthermore; the City of Denton agiees that LEED ratixig is subject to obtaining points or xattngs, which are outside the scope of the Aichitect's paxt of the Project, are subject to third paYty inteipietation, performance by third party con�iz�issioning agent, iequiie enfoxcement of mateiials and methods outside the design scope and contiol of the Architect, any of which may cause the Pioject to obtain a lessei iating than the City of Denton expected, oi may cause the Pioject to lose its abilit�� to obtain a iating. 2. Provide one (1) Trane Tiace building eneigy analysis (energy modeling) for baseline code minimuin building and actual building and systems. 3. The LEED teain will woik with the City of Denton to identify and pu�sue the available points that cost the least to iealize. 4. Should additional travel be necessary, a change to this contract will be iequired. 2 of 2 November 7, 2012