AN ORDINANCE ACCEPTING COMPETITIVE PROPOSALS AND AWARDING A PUBLIC
WORKS CONTRACT FOR DRY AUGER BORING SERVICES FOR THE CITY OF DENTON;
PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFOR; AND PROVIDING AN
EFFECTIVE DATE (RFP 5419-AWARDED TO MABAK DIRECTIONAL DRILLING, INC. IN
THE NOT-TO-EXCEED AMOUNT OF $3,616,897).
WHEREAS, the City has solicited, received and tabulated competitive proposals for the
construction of public works or improvements in accordance with the procedures of State law and
City ordinances; and
WHEREAS, the City Manager or a designated employee has received and recommended that
the herein described proposal is the highest scored proposal for the construction of the public works
or improvements described in the Request for Proposal (RFP) document and plans and specifications
therein; NOW, THEREFORE,
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS:
SECTION 1. The following competitive proposal for the construction of public works or
improvements, as described in the "Request for Propasals" or plans and speciiications on file in the
Office of the City's Purchasing Agent filed according to the RFP number assigned hereto, are hereby
accepted and approved:
RFP
NUMBER CONTRACTOR AMOUNT
5419 Mabak Directional Drilling, Inc. $3,616,897
SECTION 2. The acceptance and approval of the above competitive proposals shall not
constitute a contract between the City and the person submitting the proposal for construction of
such public works or improvements herein accepted and approved, until such person shall comply
with all requirements specified in the Notice to Proposers including the timely execution of a written
contract and furnishing of performance and payment bonds, and insurance certificate after
notification of the award.
S! ;�'�C`ION 3. The City Manager is hereby authorized to execute all necessary written
contracts for the performance of the construction of the public works or improvements in accordance
with the proposals accepted and approved herein, provided that such contracts are made in
accordance with the Notice to Proposers and Request for Propasals, and documents relating thereto
specifying the terms, conditions, plans and specifications, standards, quantities and specified sums
Contained therein.
SECTION 4. The City Council of the City of Denton, Texas hereby expressly delegates the
authority to take any actions that may be required or permitted to be performed by the City of Denton
under RFP 5419 to the City Manager of the City of Denton, Texas, or his designee.
SECTION 5. Upon acceptance and approval of the above competitive proposals and the
execution of contracts for the public works and improvements as authorized herein, the City Council
hereby authorizes the expenditure of funds in the manner and in the amount as specified in such
approved proposals and authorized contracts executed pursuant thereto.
SECT�ON 6. This ordinance shall become effective immediately upon its passage and
approval.
PASSED AND APPROVED this the �.� `� °� day of �� �'�`.��'��`� �° , 2014.
r,
� ,.
� f �
�''� ��~ '' ��,.� �� ���
�
Cl � I� WATTS, I�E'�YOR�mm� µ��
ATTEST:
JENNIFER WALTERS, CITY SECRETARY
„ od,�
�
BY; �,�� � - ����_..
� .w
._
�,�
APPROVED AS TO LEGAL FORM:
ANITA BURGESS, CITY ATTORNEY
_� �
e- � ��
--. �
BY�� �-•�_�� �._ . ,� ��� � ° � ��
SPt�fE�)- �f' S419 W,�- ;�.w. ��,
CONTRACT BY AND BETWEEN
CITY OF DENTON, TEXAS AND MABAK DIRECTIONAL DRILLING, INC.
(RFP 5419)
�"��1�� �;�7�8���"��,�4��x"� �� r�����c ���c� ����a�r�� ��at� �lhis I?�'` day of �'uv��. 2014,
�� ���� ����.,;�,��G� �,,,�,p�,d,�, ��r>��N��' I'����',� � i���I1�f�i�IG a CORPORATION, whose address is
��4i G�c��.l�"��1��.r��� i�.�7�i� �e�'��ak���, u C���� �t��G�� i��;c°�un��lr�r r��:�rr��i ��y <�� ""�'cac�tr�rc;�����,""
�z�� tt�� �:1°1"�c" �'.�l^ L�I���J"I'�1�� °TE;���, � "�����:� l"���r��c�i��V �c���ar���i���� ��a�c� I#������-��a�l�° (��ty�a
hereinafter referred to as "City," to be effective u�t��� ����r�.�v�l tak' th� C��a�tt�rr �"Nty' ���a��r���l �x��
the subsequent execution of this Contract by t9�� ��r����r� �.�ut�r �������r c�r ��i� c1�1� ��atl��;�m�i����
designee.
For and in consideration of the covenants and agreements contained herein, and for the
mutual benefits to be obtained hereby, the parties agree as follows:
SCOPE OF SERVICES
Contractor shall provide construction services in accordance with the City's RFP #5419
������� ������°�.�,��°���' ��a7��� ��i�"'�' �,UGER BORING, a copy of which is on file at the office of
������,;����� ,���;���, ���� 4�c;���•�yc������1 ��erein for all purposes as `Bxhibit B". The Contract consists
��� ���� v��,,t,t�x� ��;r�.�r�e;��t ��r�d C�� I�llowing items which are attached hereto and incorporated
herein by reference:
(a) Special Terms and Conditions (Exhibit "A");
(b) City of Denton Request for Proposal # 5419 (Exhibit "B", on file at the Office
of the Purchasing Agent)
��� �Yi�y� ui V���tc��r �;t�r�cl��� "i`�,u�rn� �t�d Conditions (Exhibit "C");
�"��� Cp��a�u�.ru:t �t��i �'��r��rr��;ar��� E�c�m��.� (Exhibit ��D����
�c�� ]r�s�ar<���c: ��c����u���r�t� (I��c��i�aiut "E")�
���� k�°ca�°���� C°IC� - C����f�i�� c�f' 1t�t�����C �uestionnaire (Ezhibit ��F��),
(�;� �����ir�ctra�'� r�r��������V. (1+"�x���ut e�G����
These documents make up the Contract r��;����rt�c�n�� ��r�� �t��� a� �%������ l��` ���" ��X�� �k�^��� ��
�:� ��a��c�ira� �� i�" ����i�c� !"t��' !�� r�l�, [ii� t�'�a� �v��at ��` �xm ir�c�c�����i�rt�� c�r ��ar�t�dut it� �zn�' c�l t�t�
���v��i�r�u� ��i` t���� �"�-��°a��r;��:t �ca��r�����t�.�k w����: i���c����i������y c�r° c������i�� �➢x�9� �� r+���l�v+�c1 i��� �iv�ir���
�r��;�+�cr��;t� 9ir�� t�a ��t�� r�r�°iii�r� �����r�c�t, ��rt�4 tl�t�r�u 1� l}��. ��aq�tu��u� �c����a��a�°r�11;� irr ti�� �ut��it���ti�l
���,����. ��.� ,,�,����}� ��-�,�� ��� �a���,,� ��,������„ `��"i���� documents shall be referred to collectively as
"Contract Documents."
IN WITNESS WHEREOF, the parties of these presents have executed this agreement in
the year and day first above written.
�
MABAK DIRECTIONAL DRILLING, INC.
ATTEST:
B��.�.��� ����M�����:'.�" "�.4_�'...� �...... -�..
�
ATTEST:
JENNIFER WALTERS, CITY SECRETARY
:
��������,r'�_a�:.� ��"� TO LEGAL FORM:
ANIT� E3URGESS, CITY ATTORNEY
By. .„���"� � „,�. ��r�"� �^� �'��
,� "° � ,�" . � t— _ ,�,� �° .�^�
�,�" dG "
,�� � � ...
,� ��, ,�
By. �,.
� � I t i�� _ ._ w...._ _.....�
�1.��'��N� SIGNATURE
�.�ry
TYPED �'i��I :�:'�°� ��� �
� �"��� ���� ....._
"�'I"I"1 � ���..���'.�.���:�!��"� �"�.......��._..�_�...
� � � µ,_�_
� ��� �... �, � �
�
_ �, .
� �
�_.�.�_._....�..6_ ���..
PHONE NUMBER
�^ �aa. �- �� . �� c ��w.". � C � t.�ti
_ � �'m.� � �.�_. °�.....
__� _.._ ..
m mm E-MAIL ADDRESS
CITY OF DENTON, TEXAS
A Texas Municipal Corporation
�� �µ� ��
m.
m� .
By. �..m..wA,��,.._ � :,._ � �,.��m .��,�.._...
�p����. CAMPBELL
CITY MANAGER
EXHIBIT A
SPECIAL TERMS AND CONDITIONS
Contract Term
The contract term is for a one (1) year period. The City and the Contractor shall have the option to
renew this contract for an additional two (2) one-year periods.
The Contract shall commence upon the issuance of a Notice of Award by the City of Denton and
shall automatically renew each year, from the date of award by City Council, unless either party
notifies the other prior to the scheduled renewal date in accordance with the provision of the
section titled "price adjustments", or the section(s) titled "termination". At the sole option of the
City of Denton, the Contract may be further ex�ended as needed, not to exceed a total of six (6)
months.
Total Contract Value
The contact total for services shall not exceed $3,616,897. Pricing shall be per Exhibit G
attached.
Price Adjustments
Prices quoted for the commodities or services de��� i��d' �i�� tl�� l�-l� F' s���,��� b� Curr�� t«r =x f���r��'�� ��'f
r���� y�,�r �'ec��r�rd �,��i� ���'�a��t���t �r�v��•r�. �ra� ��.����;��;1�r ��r��� ���c���p��n� Mr�u�t: i�� k��r��� c�r� t���„
L7.� 1��:����°�r�c��n��� a��f° ��1����°„ ���,�r���� �1"L����s� �at��i;���i���„ ������aa���m� 1�'�•i�� 1����;� u��1��k'"��* �"��r �t��l�
{''�'i��.T d+���f)�73� sur��! tl�uc, �'�'l �'���° k�'� C�i���C �1��"�J,1 �l�rt.t.�°�,=!l����r�.�id�. ��.�rrl�n�������. ������} °�"1��
t��°i� �v�Vl k�� iia�r��sc� �r �iu������;c�ri ka���� ��c:�x� �1�� �������i }��r�������� �1���7�� rr� ti��; i'�'!� '�'l��
rrt���btt°t��r�� �;�t;�l�ii��r� �vva�l r���i. ��c��;;��1-� l- �"�rr,w f�ar ��r�� ixr�av�tiuu�l y���r. ..�.��� c���,�l�,�i��ra �rtld iaa�
determined annually at the renewal date. Shoulc� t:}�� �'I�i �1°��an�� �����t� ��������'��a��� ����"'������^�
value of+/-1%, then the stated eligible bid price�; �1��9V ��� =�c��t��t�c� �a� ����ar��r��c: r�"M�� �1�� �'�'1
change not to exceed the 8% limit per year. The supplier should provide documentation as
percentage of each cost associated with the unit �arices quoted for consideration.
Request must ��� �tak���u�k���' in wrii�r�,�'��'it1� ��rpporting evidence for need of such increase to the
Purchasing M�r����+��r �t� 1����t �"�� �ay� �ri�ar t:� contract expiration of each year. Respondent must
also provide s��r��rriir��, dcrr��������t���c�r1 �t:� j'���tification for the request.
Upon receipt of such request, the City of Denton reserves the right to either: accept the escalation
as competitive with the general market price at the time, and become effective upon the renewal
date of the contract award or reject the increases within 30 calendar davs after receipt of a
g�r�:����;�l�r ��a�ar���t��ci �������t. I�"a ��rr��e���� �uk�r��it��d �r��r���� �;� r�j����r�„ ��� �C°�r�t������r �����
r��!�u��t �c�r��;c�ll�ti���u ��f ��a�h i��ra�� fe��r�� ���a� +��"�ac������� b� �x�ir�� t:l�� C.'�i� �af"i�����a�r� ^�rri�t�n m��.ati�c.,
i�"a:����ik�ti�t��� �v�li r�c�t �c:,w intca �{t+��1 �'c�r md 5��_��rac9��.r �9�� �f��a' � c��.t.�r°rr�i����ti,a:�t� �aa� k����� u��;�.r��l,
Pre-price increase prices must be honored on ar�i��r� �,�w��:�i �u�� t.t� �he ����a��i�1 �M�t�', ���'���'����'��`���" �����
Denton approval and/or cancellation.
The request can be sent by e-mail to: purchasing(a)cityofdenton.com
Or mail to:
City of Denton
Attn: Purchasing Manager
RFP # 5241
901 B Texas Street
Denton, Texas 76209
Or call:
City of Denton Purchasing
(940) 349-7100
The City of Denton reserves the right to accept, reject, or negotiate the proposed price changes,
Bonds
The Contractor will be required to sign original contract and submit a blanket performance and
payment bond for $150,000. Bonds shall be in accordance with the V.T.C.A Government Code
Section 2253.021, as amended.
The contractor shall obtain an independent payment and performance bonds for 100 % of the
project value for any single project in excess of $150,000. Any single project in excess of
$150,000 will require the following before a purchase order or notice to proceed is issued:
• Formal proposal of the project cost from the Contractor
• City Council approval
• Separate payment and performance bonds for 100% of the estimated project cost
• Retainage of 5% of the contract value
EXHIBIT C
CITY OF DENTON STANDARD TERMS AND CONDITIONS
ARTICLE 1 GENERAL PROVISIONS
GENERAL DEFIIVITIONS
1.1 The following definitions apply throughout these General Conditions and to the other
Contract Documents:
a) THE CONTRACT DOCUMENTS
The Contract Documents consist of the formal Building Construction Services
Agreement between the Owner and the Contractor, these General Conditions and other
supplementary conditions included by special provisions or addenda, drawings,
specifications, addenda issued prior to execution of the Contract, other documents listed
in the Contract, and Amendments issued after execution of the Contract. For purposes of
these General Conditions, an Amendment is:
(1) a written Supplemental Agreement to the Contract signed by authorized
representatives of both parties;
(2) a Change Order, including Change Orders signed only by the Owner as described in
Subparagraph 7.1(b) and Subparagraph 7.1(e); or
(3) a written order for a minor change in the Work issued by the Architect/Engineer as
described in Paragraph 7.3.
The Contract Documents also include bid documents such as the Owner's Instructions to
Bid�����,,� ;����rn��l� f�r��n���� t���� Contractor's Bid Proposal and portions of addenda relating to
any c��' t1���c� �,�c�'t�t���:�at�, �nd any other documents, exhibits or attachments specifically
enuc���a��t�� i�� t��+� ����u1��►�g Construction Services Agreement, but specifically exclude
geotechnical and subsurface reports that the Owner may have provided to the Contractor.
b) THE CONTRACT
The Contract Documents, as defined in Paragraph 1.1, are expressly incorporated into
and made a part of the formal Building Construction Services Agreement between the
Owner and the Contractor by reference in this Paragraph and Paragraph 1.1 (which
documents are sometimes also referred to collectively in these General Conditions as the
���~,������,�����„ `��y� ,�����,�����;;�, �„�ca�z����o�t� ���ar'+�'sent the entire and integrated agreement
�������� ��� ��,���� ����� �),�� �;�"crr��r�r�t:�ar` and supersede all prior negotiations,
�����,��;��,������N����� t�r ��;��•�;�r���;��u�s„ �u�k��r �rdt���� or oral. The terms and conditions of the
,�ro,�,����.��� ��,�����,��y�� �y�� �� �}���N���;;� �-��gyy by an Amendment. The Contract Documents
shall not be construed to create a contractual relationship of any kind:
(1) between the ArchitectlEngineer and Contractor;
(2) between the Owner and a Subcontractor or Sub-subcontractor; or
(3) between any persons or entities other than the Owner and Contractor.
The ArchitecdEngineer shall, however, be entitled to performance and enforcement of
obligations under the Contract Documents intended to facilitate performance of the
Architect/Engineer's duties.
c) THE WORK
The term "Work" means the construction and services required by the Contract
Documents, whether completed or partially completed, and includes all labor, materials,
equipment, and ���vi��� �����i��s� ��ar to be provided by the Contractor, or any
Subcontractors, Su�-�t�k��tam�tr�c~lc��`�, ����t�arial suppliers, or any other entity for whom the
Contractor is resp�n;�ubl�„ t�� 9"aa1[�I� �1�� �"��ntractor's obligations. The Work may constitute
the whole or a part of the Project.
d) THE PROJECT
The Project is the total construction ����.�c°� �K�r�-��+�raCar�� �:�����i��� �� ���� �����V'�����
Construction Services Agreement, of w��c� t:l°d�. 'i�l<"�r� ����'��°�'��� �������" ��$� �����'��`���
Documents may be the whole or a part of t�� i�r���c��� ����� '+�'�u�h ����" a��"����'� ����������°��m����
by the Owner or by separate contractors. A1� ����r�r��t�� i�� �k���c� �������""�� ���'������������ ��� ���"
concerning the Work or the site of the Work will use the term "Project," notwithstanding
that the Work may only be a part of the Project.
e) THE DRAWINGS
The Drawings (also known as the "Plans") are the graphic and pictorial portions of the
Contract Documents, wherever located and whenever issued, showing the design,
location and dimensions of the Work, generally including plans, elevations, sections,
details, schedules, and diagrams.
fl THE SPECIFICATIONS
The Specifications
requirements for
workmanship for
requirements.
are that portion of the Contract Documents consisting of the written
materials, equipment, construction systems, standards, and
the Work, performance of related services, and other technical
g) THE PROJECT MANUAL
The Project Manual is the volume or volumes which contain the bidding requirements,
sample forms, General Conditions for Building Construction, special provisions, and
Specifications. The Project Manual may be modified by written addendums issued by the
Owner during bidding, in which case the written addendums become a part of the Project
Manual upon their issuance, unless otherwise indicated by the Owner in writing.
h) ALTERNATE
An Alternate is a variation in the Work on which the Owner requires a price separate
from the City Building General Conditions Base Bid. If an Alternate is accepted by the
Owner, the variation will become a part of the Contract through the execution of a change
order or amendment to the Contract and the Base Bid will be adjusted to include the
amount quoted. If an alternate is accepted by the Owner, and later deleted prior to any
Work under the alternate being performed or materials delivered to the Project site, the
Owner will be entitled to a credit in the full value of the alternate as priced in the
Contractor's Bid.
i) BASE BID
The Base Bid is the price quoted for the Work before Alternates are considered.
j) HAZARDOUS SUBSTANCE
The term Hazardous Substance is defined to include the following:
(1) any asbestos or any material which contains any hydrated mineral silicate, including
chrysolite, amosite, crocidolite, tremolite, anthophylite or actinolite, whether friable
or non-friable;
(2) any polychlorinated biphenyls ("PCBs"), or PCB-containing materials, or fluids;
(3) radon;
(4) any other hazardous, radioactive, toxic or noxious substance, material, pollutant, or
solid, liquid or gaseous waste;
(5) any pollutant or contaminant (inclu�irt� k�ui ��ca� �r�r�rt��� t�� ����'���'���'��� �'�����������
hydrocarbons, petroleum products, cr�a�l� �a3�' �.��' ��a�� fi����ti�ar�� t���'�+����, �����' �>�� "��a ��`"
exploration or production waste, any n�t��r��l �a��, �y��.t#��t�� �,a� ��r' �x��' r��r��+��"� ����"'��-��a�
lead, or other toxic metals) which in u�� �ca�u�l����ar�� ��a�.��r�tr��i�a�� ��r �a��re;� a�` �r�l�������
could have a significant effect on human health, the environment, or natural
resources;
(6) any substance that, whether by its nature or its use, is subject to regulation or requires
environmental investigation, monitoring, or remediation under any federal, state, or
local environmental laws, rules, or regulations;
(7) any underground storage tanks, as defined in 42 U.S.C. Section 6991(1)(A)(I)
(including those defined by Section 9001(1) of the 1984 Hazardous and Solid Waste
Amendments to the Resource Conservation and Recovery Act, 42 U.S.C. Section
6901 et seq.; the Texas Water Code Annotated Section 26.344; and Title 30 of the
Texas Administrative Code Sections 334.3 and 334.4), whether empty, filled or
partially filled with any substance; and
(8) any other hazardous material, hazardous waste, hazardous substance, solid waste,
and toxic substance as those or similar te.rms are defined under any federal, state, or
local environmental laws, rules, or regulations.
k) OTHER DEFINITIONS
As used in the Contract Documents, the following additional terms have the following
meanings:
(1) "provide" means to furnish, install, fabricate, deliver and erect, including all services,
materials, appurtenances and other expenses to complete in place, ready for operation
or use;
(2) "shall" means the action of the party to which reference is being made is mandatory;
(3) "as required" means as prescribed in the Contract Documents; and
(4) "as necessary" means all action essential or needed to complete the work in
accordance with the Contract Do�cuments and applicable laws, ordinances,
construction codes, and regulations.
1.2 EXECUTION, CORRELATION AND INTENT
(a) The Building Construction Services Agreement shall be signed by duly authorized
representatives of the Owner and Contractor as provided in the Agreement.
(b) Execution of the Building Construction Services Agreement by the Contractor is a
representation that the Contractor has visited the site, become familiar with local
conditions, including but not limited to subsurface conditions, under which the Work is to
be performed and correlated personal observations with requirements of the Contract
Documents.
(c) The intent of the Contract Documents i� �c� dr��l�ci� �til �t�c��� ����������� �'�� ���� T��"��'�`�"
execution and completion of the Work b� �I�� �:��r�ta'�'�����r�°• "C"ha� ���a��tr�c��i 1:����t����nt� ���+�
complementary, and ^�^h�t i� �r�q�ir�t� ��? ��� �}z�l� �� �`� ��t���mr�� �� u6` r�e�uir�� �a� ��lq;
performance by the �:;"����k.r������'���° ����Il 1��� �c�������°��� c���w�� t�� t��.�� �;�������� �.a�r���i��c:r�t v�ri�i� ����
Contract Documents ��n� r�:���ac���1� it��+�r.�l�l� ��c���� ii��r�� �� I,��i��� r����:���:r°y t�� q�rc�c1.�,����
the intended results.
(d) Organization of the ���+��..i���������.� zr�t�� d����lca��:�, ��������`'� ���� ��'licles, and arrangement
of Drawings shall nc:��: �ar���°c;�l i�� �":c�r��ractor ir� �iwitiit�� t��� '�Vc.�r� among Subcontractors
or in establishing tha� �x���� a��" ""+��:�r1� t�� be p�rt�rr���cl ��y ;��� tr��i��.
(e) Unless otherwise stated in the Contract Documents, words which have well-known
technical or construction industry meanirwgs are used in the Contract Documents in
accordance with such recognized meanings.
(� The Drawings ar�c� ��a�:ei�ic�tac�a��; ��� intended to agree with one another, and Work called
for by Drawin�;� ���cl nr�� r���7�1%������� in Specifications, or vice versa, shall be furnished as
if set forth by �ca�h, ����iti��tia��:� �hall govern materials, methods and quality of work.
In the event of a conflict on the Drawings between scale and dimension, figured
dimensions shall govern over scale dimensions and large scale drawings shall govern
over small scale drawings. Conflict between two or more dimensions applying to a
common point shall be refened to the Architect/Engineer/Engineer for final adjustment.
If discrepancies or conflicts occur within or between the Drawings and Specifications
regarding the Work, or within or betweerm ��tl�e�r �'��t�t�Gr�t ���r�u�����t�, tl�� �;�a�r�t�°���c��' shall
not perform such Work without ���r�i���„ �aw��ai���� ��1�ri����w����� ��"���� the
Architect/Engineer and resolution by t.i�� ��w�er "i`1�� C:����r"� �����ic�r� �� ��a the
���,�x����ar���i�,� ��;���rl�t��tion of a conflict or discr�r��r�c� �;�x�ll ���: ��r������ �l�c���l� tl°w� ��r�,an���r���s or
t��� ��a�i��miu�r�� disagree within themselw��:� �r� �itl� +�r���� r��:ta�w�, tl�� ������� [3ic1 wpill be
����„��� ��� �I�� ca�a��t expensive combination of quality and quantity of Work indicated.
(g) Deviations from Contract Documents shall be made only after written approval is
obtained from Architect/Engineer and (iwner, as provided in Article 7.
(h) The intention of the Contract Documents is to include all materials, labor, tools,
equipment, utilities, appliances, accessories, services, transportation, and supervision
required to completely perform the fabrication, erection and execution of the Work in
its final position.
(i) The most recently issued Drawing or Specification takes precedence over previous
issues of the same Drawing or Specification. In the event of a conflict, the order of
precedence of interpretation of the Contract Documents is as follows:
(1) Amendments (see Paragraph 7.2 for order of precedence between Amendments);
(2) the Building Construction Services Agreement;
(3) addenda, with those addenda of later date having precedence over those of an
earlier date;
(4) the Supplementary General Conditions and Special Provisions, if any;
(5) the General Conditions for Building Construction;
(6) the Specifications and Drawings.
1.3 OWNERSHIP AND USE OF ARCHITECT/ENGINEER'S DRAWINGS,
SPECIFICATIONS AND OTHER DOCUMENTS
All Drawings, Specifications, and copies thereof furnished by the Architect/Engineer are and
shall remain the property of the Owner and �ire, with the exception of the Contract set for
each party, to be returned to the Owner upon request at the completion of the Work.
1.4 CAPITALIZATION
Terms capitalized in these General Conditions include those which are:
(1) specifically defined in these General Conditions (except the terms defined in
Subparagraph 1.1(j), which terms are of common grammatical usage and are not
normally capitalized);
(2) the titles of numbered articles and identified references to Paragraphs, Subparagraphs,
and Clauses;
(3) the titles of other documents published or used by the Owner as manuals or official
policy statements; or
(4) proper nouns or other words required under standard grammatical rules to be capitalized.
ARTICLE 2 THE OWNER
2.1 DEFINITION OF OWNER
The Owner is the City of Denton, a Texas municipal corporation, and is identified as such in
the Building Construction Services Agreement, and is referred to throughout the Contract
Documents as if singular in number. The term "Owner" means the Owner or the Owner's
authorized representatives.
2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER
(a) The Owner shall furnish the most recent survey describing the physical characteristics,
legal limits, utility locations, and a permanent benchmark for the site of the Project. The
Owner shall also furnish any environmental site assessments that may have been given to
the Owner or conducted for the property upon which the Project is to be constructed.
THIS INFORMATION IS FURNISHED TO THE CONTRACTOR ONLY IN ORDER
TO MAKE DISCLOSURE OF THIS MATERIAL AND FOR NO OTHER PURPOSE.
BY FURNISHING THIS MATERIAL, THE OWNER DOES NOT REPRESENT,
WARRANT, OR GUARANTEE ITS ACCURACY EITHER iN WHOLE, IN PART,
IMPLICITLY OR EXPLICITLY, OR 1N ANY OTHER WAY, AND THE OWNER
SHALL HAVE NO LIABILITY FOR THIS MATERIAL.
(b) Except for permits and fees which are provided for in Subparagraph 3.7(a), the Owner
shall secure and pay for necessary approvals, easements, assessments, and charges
required for construction, use, or occupancy of permanent structures or for permanent
changes in existing facilities.
(c) Information or services under the Owner's control shall be furnished by the Owner with
reasonable promptness to avoid delay in the orderly progress of the Work. It is incumbent
upon the Contractor to identify, establish, and maintain a current schedule of latest dates
for submittal and approval, as required in Paragraph 3.10, including when such
information or services must be delivered. If Owner delivers the information or services
to the Contractor as scheduled and Contractor is not prepared to accept or act on such
information or services, then Contractor shall reimburse Owner for all extra costs
incurred of holding, storage, or retention, including redeliveries by the Owner to comply
with the current schedule.
(d) Unless otherwise provided in the Contract Documents, the Contractor will be furnished
electronic copies of the Drawings and Specifications for bid purposes and one hard copy
approved by Building Inspections upon execution of the Contract. Contractor may obtain
additional copies by paying the cost of additional printing or reproduction.
(e) The obligations described above are in acidition to other duties and responsibilities of the
Owner enumerated in the Contract Documents and especially those in respect to Article 6
(Construction by Owner or by Separate Contractors), Article 9(Payments and
Completion), and Article 11 (Insurance and Bonds).
(� The Owner shall forward all instructions to the Contractor through the
ArchitecdEngineer, except for the Owner's Notice to Proceed and the Owner's decision
to carry out Work as described in Paragraph 2.4.
(g) The Owner's employees, agents, and consultants may be present at the Project site
during performance of the Work to assist the ArchitecdEngineer in the performance of
t�� �wr������t;t,l� �a��;ir���r's duties and to verify the Contractor's record of the number of
w��ricrr��� c��ti�1����+� r,�n the Work, their occupational classification, the time each is
c�g�=���d i� ��� �c�r�, the equipment used in the performance of the Work, and for
purpose of verification of Contractor's Applications for Payment.
2.3 OWNER'S RIGHT TO STOP THE WORK
If the Contractor fails to correct any portion of the Work which is not in accordance with the
requirements of the Contract Documents as reyuired by Paragraph 12.2 or refuses or fails to
carry out all or any part of the Work in accordance with the Contract Documents, the Owner,
by written order, may order the Contractor �t� ����� ���� ��r�:, ��' ����y ��+��I�i�a�r ���I� ti���:� �"'�°��e��
until the cause for the order has been eliminatc��. "�"��� s�i�;l�t �,l" tk�� ��e�,�t��r� h���v�r�v�:r, i�a s���� t�u�
Work shall not create or imply a duty on th� ���t r�'C �h�: ���r��t' �e� ��c+�r�it�� i1��:� ri�l'�� �"c.��' ����
benefit of the Contractor or any other persoar ��r ���it�. '����� �`��1�t� �f't��c� ��wc�ur ����r���" tl°�G'�
Paragraph 2.3 shall be in addition to, and ra��� iot r�;�ta���ti�� ����", t��� C�;�'^�r�c�r��� ri���t�� u������'
Paragraph 12.2.
2.4 OWNER'S RIGHT TO CARRY OUT THE WORK
If the Contractor fails or refuses to cany out the Work or perform any of the terms,
covenants, or obligations of the Contract Documents, and fails or refuses to correct any
failure or refusal with diligence and prompfiess within fourteen (14) days after receipt of
notice from the Owner, the Owner may correct the Contractor's failure or refusal or cause
such failure or refusal to be corrected, without affecting, superseding, or waiving any other
contractual, legal, or equitable remedies the Owner has, including but not limited to the
Owner's termination rights under Article 13. In that case, an appropriate Change Order will
be issued deducting the Owner's cost of correction, including Architect/Engineer's
compensation for additional services and expenses made necessary by the failure or refusal
of the Contractor from payments then or thereafter due to the Contractor. The cost of
correction is subject to verification (but not approval) by the Architect/Engineer. If payments
then or thereafter due the Contractor are not sufficient to cover the cost of correction, the
Contractor shall pay the difference to the Owner.
2.5 NOTICE TO PROCEED
�ft�r �iu��� �;��uc�utic�r� t�i" tN°�� �f��r�:����,e�t a��c� r���i�,t �t��� �����av�,� ��' thc� �'��pa�ir�� �a�rl`'�ar������
�n�l ����r�a��� ���a�cl� ���� �v����r��� �� �c�����r�..�� i;���ar�����c� �I�� +�'�r�vr���r �riN� is�u� �, ��rr�t��r� ���t�+��
�� �rc:,�,�t��e� r�ikl� tl�u W�'c��•�, a���l������� t�i� d�����t����i C�'caai�r��t "l ac�n� �°ik���in w�l����� ',5��asi�r��aad
Cm�r�n����ti��n c��" ih� �'c�r� rmrou�l k�� a�l�i���I. �I" �1�� �3r?����r �a��r�,�������i�l�r ci�a�4�� i��������� ��f` <�
��•ittua� ��cat;i�:� t�rr �ar���:,��.� t��r�!��„I� a�ra t'����� �f tb�� �fc��t��;�r��c�c�, t�� (:;:u����•��tca� �l��ell l�au ��tit���i
only to an equitable adjustment of the +�."�������r���,t "����"��r���.a �9" ��'������`��" ���������� C�����""��������� ��� �°�"�
requirements of Paragraph 4.3; but the �'c���air�c.t�r�� �1;7��11 r��t k�� �;��tm���� ��a ��n�r ���u��rc���� t� tl°t�
Contract Sum whatsoever for this reason.
ARTICLE 3 THE CONTRACTOR
3.1 DEFINITION OF CONTRACTOR
The Contractor is the person or business entity identified as such in the Building
Construction Services Agreement, and is referred to throughout the Contract Documents as if
singular in number. The term "Contractor" means the Contractor or the Contractor's
authorized employees or representatives.
3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY
CONTRACTOR
(a) The Contractor shall carefully check, ���r�y, ���1 �;��r�p��xr� ��r� ��c��uts`��:t �c���r�����ui'.� "�"���
each other and shall at once report to th� !"t.r+�I�itc��;�fN.����i���s�r i�, r�'r��i-t��; an� ir,a�c����,�t�,t����
ambiguity, enor, omission, conflict, or cli���a,�sa���.y t��,� �'o���r���tc�r ����Y �is�c�v�� ��'1�'�
Contractor shall also verify all dimensi�r��, C�c;l� t�°����twre;r���:��t�, �rx�� fi��� c�����di�ic�r�:�
before laying out the Work. The Contractor will be held responsible for any subsequent
error, omission, conflict, or discrepancy which might have be�rr ��vr�i�9�r� k��r t1�c� �b��ve-
described check, study, comparison, and reporting. In the evenl t#�� �:'�a�tr��;i��a• �����ir�t�es
to work on an item where an inconsistency, ambiguity, en�rr� u�u��;ic:ar�, �c�r�f���t, or
discrepancy exists without obtainin�; s����� �I�ri�+���ia��� c�� r����l�utuc�� ��a� �c�rr�m�w���� an
item of the Work without giving �rrit,��r� ��a�i�� �f� <�� ��'�'c��'� ������'����x�� ���r������� or
discrepancy that might have been avoidc� ��� t.��� �h�c�l�, ;�t���y„ ����� ���r�q���������� ���8���red
above, it shall be deemed that the Co���r���t��' ��i�.l ���� G���������� '��� �'�.������� ����' ���ore
stringent, higher quality, or state of the art requirement, or accepted the condition as is in
the Contract Documents, without any increase to the Contract Sum or Contract Time. The
Contractor shall also be responsible to correct any failure of component parts to
coordinate or fit properly into final position as a result of Contractor's failure to give
notice of and obtain a clarification or resolution of any error, omission, conflict, or
discrepancy, without any right to any increase to the Contract Sum or Contract Time.
(b) The Contractor shall perform the Work in accordance with the Contract Documents and
submittals approved pursuant to Paragraph 3.12.
3.3 SUPERVISION AND CONSTRUCTION PROCEDURES
(a) The Contractor shall supervise and direct t.h�'w�!��rk, ���irz� ���� Cr���titi�°�����'� �'�`�� ���d� ^���"�
attention. The Contractor shall be sol�}�r ��c�:��r�a��i�k� �'ctia° �r�ci ��v� ������"�>� �����"
construction means, methods, techniques, ;�c������r����� ��a�� ��r'�rc��'�a��� ��� �'��' �<���`���'�����'��
all portions of the Work, unless the Co���-��:� ������rr�c����� ��� ����"��� ����°��� p°��'��"��������"
concerning these matters.
(b) The Contractor shall be responsible to the Owner for the acts and omissions of the
Contractor's employees, Subcontractors, Sub-subcontractors, and their respective agents
and employees, and any other per�»c��� ��+��'�a��`������„ V��}������ ���� ���� ����� '����"� �
subcontract with the Contractor or wi�t� �m�y �u����rn��'������", ���� ��'�� �������` ���`����" ���
entities for which the Contractor is legal'l� t��������i����X�• ���� �����-��" "������ ��� �'�'����������`� ����
mechanics that are trained and skilled un� t���i�' �����ct�v� t����l�s• �i��'r��'�'�� �� "+�''�'�`�
required throughout shall be of a quality �����u�t w���l ��ar��� t:�u�tl� �ir��t r������ r`�'������ �'��������u�`�
whose work is unsatisfactory, or who arr.� �����ic���r�c� c�a��°c.�����, �w�r������a�t�;t����,, !u���k�il���� ��
othcr+�ri�� �������tuc�a��:ble shall be dismissed promptly from the Work and immediately
repl�c�c+� �it� +�t��r�c�tent, skilled personnel. Any part of the Work adversely affected by
the ��t� �e t�?rtai���ca��� of incompetent, unskilled, careless, or objectionable personnel shall
be immediately corrected by the Contractor.
(c) The Contractor shall not be relieved of its obligation to perform the Work in accordance
with the Contract Documents either by activities or duties of the Architect/Engineer in
the Architect/Engineer's administration of the Contract, or by tests, inspections, or
approvals required or performed by persons other than the Contractor.
(d) The Contractor shall be responsible for �ra������;�ti����t ��i"p��:��'t��y��� �.�� "+���1� ���"����" ����"����"p��'�'�
under this Contract to determine that suc��� �c��°iat���� '�r� ��'� 1��"��i���" �'��z'�v���'�� ��� �'�^�'�d"�'�
subsequent Work. The Contractor's �•����c��a��k�i1�'��+ ��r�r���' �.��is ����"�4���M���'�� "'�aq� ����� ��� `���
way eliminate the Architect/Engir��c��'r� �e�����r����,����Y �� ���;, ��"�'�r��;r �°�c1c;r. tt�e
Architect/Engineer/Owner Agreement.
(e) Any Contractor, Subcontractor, S�Mb-�u��.s��tt•����c�c`„ <.�r�` ������`��� �������'�'���?�' '4�'�'��
commences Work over, in, or under r�t�y ����'�"��%� q��'�,���'��' ���Y '���� '��'"�`°����' ���� ���" °������" {����"�
contractor, subcontractor, sub-subcontra���ar c�r �e��<a�•�i�: �c�a�utr�ctc��" �'Nt��►��.N't t��� �"����'��s�<-'�"
having given written notice to the Ar�:�it��.�,�I�P���w�����' �� ��+� '��i����'�� '��� ����� ���"���"
surface or condition in the surface that ��rc�v�r�tti ��hi�vit�p� t��+� c��a��d�ty t�f �`c�r�r���.ra�h��
specified by the Contract Documents ���� ������aui 1�,��r��� ��l�i���i����� ��� ��"���" �����'�r�l c�l"
the Architect/Engineer and the Owner tca ��rc�c:a���� u� c���r��a� tc� 1���� ����'I���� ���� ��������
or condition in the surface as satisfact��� �t ��� ���'��a����"��"���� ��� "��"'��� �����" ''����
unsatisfactory Work subsequently resultdd�� ��°��a�� �uc��� � t��l�y ��r���� �r �����c������r� �� ���
surface that was not pre-approved by the ArchitecdEngineer or the Owner after notice as
provided above may be rejected and replacement required, without any increase to the
Contract Sum or Contract Time.
(� All grades, lines, levels, and benchmarks shall be established and maintained on an
ongoing basis by the Contractor. The Contractor is solely responsible for any errors made
in establishing or maintaining proper �r�r���, 1i���:�, I�va���, �ar k��a���tin���'��. ��:�����
Contractor for his own Work shall verif� �N� �������, I������ l�vc���, ��r�� �'��-��.��Ga�x�� ���
indicated on Drawings. He shall report �n� +���c�c�, ��r����i�r��, �����i`�ic;���, ��r r���x�������t����
to ArchitecdEngineer before commenc��� �a�� "�`r�s�� �����t��i �a�' �1���� �������������
Contractor shall establish and safeguar�� }�����c6�.������r1�� ��� ����� ������► t",�'�� '�'��c�y ���,���o������^�
places and, as Work progresses, establish benchmarks at each level and lay out partitions
on rough floor in exact locations as guides to all trades. The Contractor shall, from the
permanent benchmark provided by the Owner, establish and maintain adequate horizontal
and vertical control.
3.4 LABOR AND MATERIALS
(a) Except as is otherwise specifically provided in the Contract Documents as being the
responsibility of the Owner, the Contractor shall provide and pay for labor, materials,
equipment, tools, construction equipment and machinery, water, heat, utilities,
transportation, and other facilities and services necessary for proper execution and
completion of the Work, whether temporary or permanent and whether or not
incorporated or to be incorporated in the W ork.
(b) The Contractor shall enforce strict discipline and good order among the Contractor's
employees and other persons carrying orat the Contract. The Contractor shall not permit
employment of unft persons or persons not skilled in tasks assigned to them.
(c) The Contractor shall give preference, when qualified labor is available to perform the
Work to which the employment relates, to all labor hired for the Project in the following
order:
(1) to bona fide residents of the City of Denton, Texas;
(2) to bona fide residents of the County of Denton, Texas;
(3) to bona fide residents of the State of Texas;
(4) to bona fide residents of the United States.
3.5 WARRANTY
(a) General Warranty. The �'���i�`���;tr��° w�rc��rtt� t�:� d6�e t`�w�r��r�e° tk��.k �ll "�"�"carit ,�$���i �,��
accomplished in a good �.��� ��c�rk���.����l�i�� A�u������r w���� t1�u��� �u�� r������ri���� ���.��� w������t�a��►��t
furnished under the Con�r��;t ��itl k�� �ai" �;car��l c:a�.��i6it�, �a�r� �G,mx��c,�� c;�t���arv�a�s� ��������i;),
and free from faults or defects, and�that th� �v'`��'��: '����� ������""+�'���� ^����������"r�"� ��� ������ �-�'�������'���
Documents. Work not confortning to these requirements, including substitutions not
properly approved and authorized, will be considered defective or nonconforming. The
Contractor's warranty excludes any remedy for damage or defect caused by abuse,
modifications not executed by the Contractor, improper or insufficient maintenance,
improper operation, or normal wear and tear under normal usage. If required by the
Architect/Engineer, the Contractor shall furnish satisfactory evidence as to the kind and
quality of materials and equipment. The commencement date, duration, and other
conditions related to the scope of this general warranty are established in Subparagraphs
9.9 (a) and 12.2(b) of these General Conditions. THE GENERAL WARRANTY
PROVIDED IN THIS SUBPARAGRAPH IS IN ADDITION TO AND DOES NOT
LIMIT OR DISCLAIM ANY OTHER WARRANTY OR REMEDY REQUIRED OR
PROVIDED BY LAW OR THE CONTRACT DOCUMENTS AND SUCH
WARRANTY SHALL REQUIRE THE CONTRACTOR TO REPLACE DEFECTIVE
MATERIALS AND RE-EXECUTE DEFECTIVE WORK THAT IS DISCLOSED BY
THE OWNER TO THE CONTRACTOR WITHIN A PERIOD OF ONE (1) YEAR
AFTER SUBSTANTIAL COMPLETION OF THE ENTIRE WORK OR, IF A LATENT
DEFECT, WITHIN ONE (1) YEAR AFTER DISCOVERY BY THE OWNER OF THE
LATENT DEFECT.
(b) Special Warranties. The Contractor shall assign to the Owner in writing, as a condition
precedent to final payment, the terms anw3 conditions of all special warranties required
under the Contract Documents.
3.6 TAXES
The Owner yualifies for exemption from state and local sales and use taxes, pursuant to the
provisions of Section 151.309 of the Texas `�'�� ��'�c�c�, �� ���z�������• W����'��°�=����"�� ���'� ��'`����
shall not be liable for, or pay the Contractor'�� c:�a�t ���� �����'� ������ �x��� ���* ������ "��`��°��' ''�'��'�����
otherwise be payable in connection with the ����•�1���� ��1' ��'a��i�l� ��r������Y �r��>�S�r"t� �"���r������f
and incorporated into the real property being ��cro��cxv�c� �����i�r i�t� t��r��r�c�t ������'��'�����' ���" ��u�
�a��r����� �� ���t�ri�ls„ �m���?Vi�� ��r�� �����ra��• t����i.hdu �ac:,ar��r���� prc�F��rty, ��i���� th�� ��-���;k�i�a�;�•y ���.
���Gi�ta��r�t �:r�� it� �m�c���e��•�c� ����r� �°���d�' �zs�� r��V����x�e�t ����t�s� ����,����r� �r�� �,���a����l �i,�r
p��:rfi�s�°pt��r��� �'r�" iw��: �°rr��tra�t ^�vh���i� �� tc� �� ��`��r��l�t�;tl� �:�r����ur��,�� �t tk�� ,ptair sit�:. "C'��
���a����������� �;������ ������ ar� ����rrm��;i�r� ���r%i�����e in lieu ofthe tax on such purchases.
3.7 PERMITS, FEES AND NOTICES
(a) The ArchitecdEngineer will apply and ��'�r�,�� ��`�ar �h�.� ��s������� ��" ���� '��������" ��� ��'�°�������
Building Permit. The Contractor and ����r:���t��'������'� +�v��1 ��a��ly �u��d ��t`�'ar��� ������" ����
issuance of all other required permits, anc� vviN� ����t h�: ��c:��ir'+�� tt� �a��y" ����' ���� ����Y "� �t."r' �>�'
Denton permits required for the Projec�, °�"���� +��'+�'�����. '�'��� ����" ��� �����"�'�� '������`�����"�
charges, including tap fees, assessed by the Water Utilities Department.
(b) The Contractor shall comply with and give notices required by laws, ordinances, rules,
regulations, and lawful orders of governmental entities or agencies applying to
performance of the Work.
(c) Except as provided in Subparagraph (d) below, it is not the Contractor's responsibility to
ascertain that the Contract Document;s are in accordance with applicable laws,
ordinances, construction codes, and rules and regulations. However, if the Contractor
observes that portions of the Contract D�xuments are at variance with applicable laws,
ordinances, construction codes, rules or regulations, the Contractor shall promptly notify
the ArchitectlEngineer and the Owner in writing, and necessary changes shall be
accomplished by appropriate Amendment.
(d) If the Contractor performs Work kn�w�r�� a� tc� �� ���r����r� ��� la�+�w��� �a���i���r����„
construction codes, or rules and regulatira��� vvi��'��'�art r���t��y�r�� thc� ��`�ka�����'�����������' ����
the Owner, the Contractor shall assume f"uGl �°����c�r��il�mlit� �car tk�t� �cark ��u�i �i��11 k����r i��r�
attributable costs of the correction of the "�"�r6� �t'a�! ���� c���re��° '�"c�rl� i�� ������ ������ °�°���" ��'�
adversely affected by the corrective work.
3.8 ALLOWANCES
(a) The Contractor shall include in the Contract ��ym �l� �Il�r���:r���� :�t�t�.c� ir� �N�� ��car�tr��t
Documents. Items covered by allowances sha1N �� ��o���'��� ���� ���" ����������� �������y'���� �r'
the Contract and by persons or entities as the �)^����r ����y ��r���, �i��t ��1� �'�c�t�`��°��'�" `�1��z��
not be required to employ persons or entitw�� ����i���t �rM'�ic�� t��� +C�'��w�������;t,�r� ������:�:�'
reasonable objection.
(b) Unless otherwise provided in the Contract Documents:
(1) materials and equipment under an allowance shall be selected promptly by the Owner
to avoid delay in the Work;
(2) the amount of each allowance shall cover the cost to the Contractor of materials and
eyuipment delivered at the site less all exempted taxes and applicable trade discounts;
(3) the amount of each allowance includes the Contractor's costs for unloading and
handling at the site, labor, installation costs, overhead, profit, and other expenses
contemplated for stated allowance Work;
(4) whenever costs are more than or less than allowances, the Contract Sum shall be
adjusted accordingly by Change Order. The amount of the Change Order shall reflect:
(i) the difference between actual costs and the allowances under Clause (b) (2); and
(ii) changes in Contractor's costs under Clause (b) (3);
(5) the Owner retains the right to review and approve Subcontractors selected by the
Contractor to perform work activities covered by allowances.
3.9 SUPERINTENDENT
The Contractor shall employ a competent superintendent and necessary assistants who shall
be in attendance at the Project site during performance of the Work. The superintendent shall
represent the Contractor, and communications given to the superintendent shall be as binding
as if given to the Contractor. Important communications shall be confirmed in writing. Other
communications shall be similarly confirmed on written request in each case. The Owner
reserves the right to request that the Contractor replace its superintendent at any time and the
Contractor will replace said superintendent at the Owner's direction.
3.10 CONTRACTOR'S CONSTRUCTION SCHEDULES
(a) The Contractor shall, immediately after award of the Contract and before submittal of the
first Application for Payment, prepare and submit the construction schedule for the
ArchitecdEngineer's and Owner's information, review, and approval in accordance with
the following provisions:
(1) Unless otherwise approved in writing by the Owner, the construction schedule shall
not exceed the Contract Time limits currently in effect under the Contract Documents
and shall provide for expeditious and practicable execution of the Work.
(2) The construction schedule shall include all shop drawing and submittal data
requirements, indicating for each:
(i) the latest date to be submitted by the Contractor; and
(ii) the latest date for approval by the Architect/Engineer.
(3) The construction schedule shall be in the form of a critical path management
schedule, and shall indicate each critical task (the "predecessor") of all the major
construction activities of the Work in a logical and sequential order (the "project
network") which reyuires completion prior to commencement of the task next
following (the "successor"). Each task shall be identified with:
(i) actual work time, exclusive of slack time, for accomplishment;
(ii) the latest start date;
(iii) the latest finish date;
(iv) the amount of float associated with each task;
(v) the amount of labor, material, and equipment associated with each task; and
(vi) the percentage of completion as of the date of the current schedule.
(4) The construction schedule shall be revised and updated monthly to reflect the actual
status of the Work and shall be submitted with each Application for Payment.
(5) On or before the first day of each month, following the date of commencement of the
Work as stated in the notice to proceed, the Contractor shall prepare and submit to the
Architect/Engineer and the Owner an up-to-date status report of the progress of the
various construction phases of the Work in the form of an updated construction
schedule. This status report shall consist of a time scale drawing indicating actual
progress of the various phases of the Work and the percentage of completion of the
entire Work. The original construction schedule shall be updated or changed to
indicate any adjustments to the Cor�t�a�� '�"it�t� �r��r�t�c� b� the Owner. The updated
schedule must be submitted with t��� �`c:yr�lo°��t+��°'s ,����lication for Payment. No
application will be certified without a�aii�i'��:tc����^ ���a���� �r� the construction schedule.
(6) The construction schedule will also be revised to show the effect of change orders and
other events on Contract Time. No request for an increase in Contract Time will be
considered unless it is accompanied by a schedule revision demonstrating the amount
of time related to the cause of the request. If the Contractor's status schedules reflect
that the Contractor has fallen behind the pace required to complete the Work within
the Contract Time, through no fault of the Owner, the Contractor shall prepare a
recovery schedule demonstrating how it intends to bring its progress back within the
Contract Time. This recovery schedule shall be in a form acceptable to the Owner.
(7) Costs incurred by the Contractor in preparing �nt� M��u����������i��� ��a� �°��qt��red
construction schedule, any updated schedule, and an� r�c�ca�r��� ���������� �"����a�"�� by
the Owner will not be paid as an additional or extra ���� ��r�� �;��<��1 �� ir��u4��"�c�ti i'�� the
Contract Sum.
(8) The Contract Sum is deemed to be based upon a construction schedule requiring the
full Contract Time. NO CLAIM FOR ADDITIONAL COMPENSATION SHALL
BE ALLOWED AS A RESULT OF THE CONTRACTOR BASING HIS BID ON
AN EARLY COMPLETION SCHEDULE, OR AS A RESULT OF DELAYS AND
COSTS ATTRIBUTABLE TO COMPLETION LATER THAN THE PLANNED
EARLY COMPLETION DATE.
(b) The Contractor shall also prepare and keep cunent, for the Architect/Engineer's
approval, a schedule of submittals which is coordinated with the Contractor's
construction schedule and allows the Architect/Engineer reasonable time to
review submittals.
(c) The Contractor shall conform to the most recent schedules approved as to form by
the ArchitecdEngineer and the Owner. Any subsequent revisions made by the
Contractor to schedules in effect shall conform to the provisions of Subparagraph
3.10(a)
(d) If the Work falls behind the approved construction schedule, the Contractor shall
take such steps as may be necf,s�a�w� t�� is�u�arta�� I��� ��r��„r���� _���� ���'
Architect/Engineer and the Owner ���y c'�c�r���� ��it'�� tc� ����"���� ��'� ���'����' ���
shifts, overtime operations, days of ^�a�r��, c�r t�a� t�r�t�����i cr�"�.c�r���.�"���ic�7� �1����t, ����
to submit for approval revised sche��.�l�;s i�� th�� �`��`r��� �"��+ai-r��,� �k���'a �� ��"���" ���
demonstrate the manner in which the agreed rate of progress will be regained, all
without additional cost to the Owner.
3.11 DOCUMENTS AND SAMPLES AT THE PROJECT SITE
The Contractor shall maintain at the Project site for the Owner one record copy of the
�wr��w����s� �����if �+��t�c��x:�, �,c������, �M�c� �����r��n����� ��� ��:�c�c� �rc���• R�a�rd rria����� ���r�°������ ���
�'��c�r�1 ��a��ro�e��; �t�r�c�l ��;1����t��s t�t�c�� �l���i��„ �c�r��ta•�tt�ti�a��� ��.n�9 ir� �a�c�itut�as� ��<�tY u����ir�tmd�� �t
tY�r�. G'r�aj�.c�t, s��� ���arc���� ����a� ��•�,�wic��,�, 1�r�d���;x t����, ��r��a��:�� �.�r� ��►a����� ��cc��ir�c�'
s������r:t�.���. "I:"l��s�: ���a�1 �� �v�il��a�� �ca �h� �r��hit��d�"�r��iar���r° ��4�� �h�l� �� c����v�,r�� t�� �;i��
ArchitecbEngineer for submittal to the Owner upon completion of the Work.
3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
(a) Shop Drawings are drawings, diagrams, schedules, and other data specially prepared for
the Work by the Contractor or a Subcontractor, Sub-subcontractor, manufacturer,
�����li��; ���r �i��t��a�br,u����- k�� ��la���r�at� ��rro�� �ortion of the Work.
��� ���.������� ���� �,�� iigt,t��r��a�t��, s��ra�N�rc� schedules, performance charts, instructions,
���������;�� �p��������u�,, �d �t,�d�r i����'�am-�a�����ion furnished by the Contractor to illustrate
r��&��ar��ls� �"�tl� ���u�r���ptt� fi��r ����� p����.i�� �a�"�t��e Work.
��,� ������q,�� ���„ ������p��], ���a�������; u�hi�;�� ull���trate materials, equipment, or workmanship
�n� ��t��1���w�1� ;�����r��a'�i�� I�� w�����h ���� �'cark will be judged.
(d) Shop Drawings, Product Data, Samples, and similar submittals are not Contract
Documents. The purpose of their submittal is to demonstrate for those portions of the
Work for which submittals are required tt�� r,��� ��� �:r�xatr��t��r" ��r�a���^��;:� tt� ����u�:�ar'r� tt�
the information given and the design �t��a���t �.�p�e���cc� "r� �1�� �'����r���� ��'�����'�������`
Review by the Architect/Engineer is subj��� t�� t��usa lir�u��ti��ro� t��" �'��'��,���� °� ��
(e) The Contractor shall review, appr��^�� �rt��l ����a�"r�ii t<� Cl�� �r�M"��-����`��������� `���'�
Drawings, Product Data, Samples, <�r�� �s��r1�r �r,i�n�stt���� �e���ffi'�''�� �Y ���� �-j��������
Documents with reasonable promptness <�ruak �r� ����1� ��c�t�c����� �� ��� �%������% ��� ��'�����' ��7 ��'�
Work or in the activities of the Owner oe �:�f" s������� �����������"�� �x��`�����'����� �°����° ��' ����"
Contractor which are not required by th� ("��r���'�a�t �����aa"����� �����' �'� ������'���'� "'�'"���'���
action.
(� The Contractor shall perform no r�c���ic��� cal �k�� °Vwr"cac� r�c��ax�-i�� sa���r��i����V a���i rc:vi�.+� ���°
Shop Drawings, Product Data, �a��ta�rg�k�, �a sir��r�l€��r ��u�r���itt�l� ��ur�til ����� �����p����i"��
submittal has been approved by ��� r'�r��a��+��,t,������iz���r. 'VVc�r� r�c�r�ir'm��,� �:w��� ������t�:�.l.
and review shall be in accordance with �����r�a��� ��l�r����'t��1� ����� �r��^ �cic�z��y�°�� ����J�����°��
noted by the ArchitecdEngineer.
�g) BY aPProving and submitting Shop ��r��v+�ir��s, f'rc��c��a�:� [,����, �S�z�a��e� �r�c& ��r�arl���'
submittals, the Contractor represents tN�w�t th� +C'c�s�drtt���t��" k��� ��t�'r'������ ���� �'�°�4�"�"�
materials, field measurements, and rel���l�c� �i����� �c�������������� ��"���`�"��'_ '��" �'"^""°�� ��� ���� �°�'��
has checked and coordinated the in1:��r��������� �c����������-� �`������ �����''������" �""���� ���
requirements of the Work and of the �"�c�tr���t �3c���������� �1`�� �-������'����°��`�� ^����'''������' �`�
directed to Paragraph 3.2 of these Ge���c'�� C'+���c�i'�i�ar�� ���� ���� r����i�'�������� "������� u�� �����
��"������r���l�,
��.�� �����, ���������,�,��� ����,7, ����� j�, rr�l%�v�r� �;�f responsibility for deviations, substitutions,
��.�������;w �����'������� ��������',�,��� �aa• ����a���ic�c�� from requirements of the Contract Documents
�� ���� �y.,��,a�,��,���,���r�����;� ���������1 ��f" Shop Drawings, Product Data, Samples, or
similar submittals unless the Contractor has specifically informed the Architect/Engineer
in writing of such substitutions, changes, additions, deletions, omissions, or deviations
involved in the submittal at the time of subtt�ittal and the ArchitecdEngineer, subject to a
formal Change Order signed by the Owner, �r�l����t�c��f���r��������r' �►r��� �s����'��������� ���� ��"����
written approval to the specific substitution�, �k��;�r����, �i��9iti��r�s, a�+�9c��ac���', c�r�ati�i����;�, �.��'
deviations. The Contractor shall not be reli���ci r��t' x����a�c��r���ihil��� f'����° ��'�'�,��"� �r c���'�i��i�q���
in Shop Drawings, Product Data, �a�����1��, �a�' ���������' ��������x��� ���" ���
Architect/Engineer's approval thereof. Ft�rti��r, nat�+'�������r������� ��'��" �l�i��"���`�� ���TM �
submittal by the ArchitectJEngineer, tt�� �"��r�t������' �����1 ��� �"��P������a��� ���� ��� �'�����������
Project costs, including costs of �:��a�clar��Yi+�r�'�, rt�t�c�i�"i�;�tic>r��, �ar ���a��t�, tid-''��i c��.
indirect, resulting from any and all �t��a��i���������� ���������a ���������i�a °���'�������ry ���"��'"�"���'�'
or deviations, whether or not specifica�ly i+��nti�i�c! Y�� ��'�� ^��am���������" ��� ����
ArchitecdEngineer at the time of the abo���-r�ac����ii��r��r� ;�r��irr►t��t�,�s, ��������►c����� ��1������.����
consulting fees, if any, in any and all accommodations associated with such substitutions,
changes, additions, deletions, omissions, or deviations to the requirements of the Contract
Documents.
(i) The Contractor shall direct specific attention, in writing or on resubmitted Shop
Drawings, Product Data, Samples, or similar submittals, to additional revisions other than
those requested by the Architect/Engineer on previous submittals. In the absence of such
written notice, the ArchitecdEngineer's approval of a resubmission shall not apply to the
additional revisions not requested.
��� ��������.�������,����� ����������,���, ������ �}���,�� i��� Architect/Engineer is not expected to take
,������,���;��� ������� �����r ��� ��a p��ntpl���i aa� �.k�e Contract Documents.
��� y������ ���.���,��;��,��,�� ����� N�������a�,��� �~�� ���r9"��rmance criteria of materials, systems, or
�,�������,���� �;� �������,�� ��r t��� �;�r��t�r�c't �)ocuments, the ArchitecdEngineer shall be
entitled to rely upon the accuracy and completeness of such calculations and
certifications.
3.13 USE OF THE PROJECT SITE
The Contractor shall confine operations at the Project site to areas permitted by law,
ordinances, permits, and the Contract Documents and shall not unreasonably encumber the
Project site with materials or equipment.
3.14 CUTTING AND PATCHING
(a) The Contractor shall be responsible for cutting, fitting or patching required to complete
the Work or to make its parts fit togethf,r properly.
� x.C�r�a�l;���t�c r� �+� �c���� �� ��� �� �� �.��r����3�ro�a� por����r� �`t�� �.��c�r� �� ����r fully or
� � � r�tar��ctr��T:� %� cutting,
� �' N � ,
���t�:l����t�, �a�° c>�k��r°u�r��� u�1t�r���� th'a� �c�rr�t�'�a���c���, �r by ��c����ir��,. '� ��e� �'t�M�tr,��tor shall
u�t�� ��t c�r ��th��°e�vm�� �6���° tl�� �car��Cr�as�tion by the Owner or ���;�a�r��ia� �c�nir���,Cor except
with the written consent of the Owner and of the separate �����t'������; c�'��'��+�r��. shall not
be unreasonably withheld. The Contractor shall not unre��t���x��l;� '+�'i�l��c���i from the
Owner or a separate contractor the Contractor's consent to cutting or otherwise altering
the Work.
(c) A Hot Work Permit must be obtained from the City of Denton's Facilities Management
Department, 869 S. Woodrow Lane, Denton, Texas (940 349-7200) for any temporary
operation involving open flames or producing heat and/or sparks. This includes, but is
not limited to: Brazing, Cutting, Grinding, Soldering, Torch Applied Roofing and
Welding.
3.15 CLEANING UP
(a) The Contractor shall keep the Project site and surrounding area free from accumulation
of waste materials or rubbish caused by operations under the Contract. Upon the
completion of the Work the Contractor shall remove from and about the Project site all
waste materials, and rubbish, and all of the Contractor's tools, construction equipment,
machinery, and surplus materials.
(b) If the Contractor fails to clean up as provided in the Contract Documents, the Owner
may clean up and the Owner's cost of cleaning up shall be charged to the Contractor.
3.16 ACCESS TO WORK
The Contractor shall provide the Owner and the Architect/Engineer access to the Work in
preparation and progress wherever located during the course of construction.
3.17 TESTS AND INSPECTIONS
(�) `�'��t�„ w����a��tuc��r�, ���c� ����r�au��� ���" �a�a���i�-�ra� of the Work ��c���r��.a� ��� tl�w� f�'��rr�tr,��c�i
C�ca���������� �ar i�y� ��vvs�, ��wcii��t���-����� r•������ r���.�lations, or order� c�t" ��:�������,r�����a��l� ����rt���
�ar ���r�ci�:� h��^i���;.p�,r.ri��l�����:�� c���.�• t��� W�ar6� �hall be made at ��i��rc��ar��►t� ��rr��:�. �.��C����
��th�m-�i�;� �a�c�v�icl�c�, t�c, ����r,irac��c��° ;����a��� t��kc� �rra�r�����c���wt� f�� �t,i�l� �s�st�, r�����ct��r���„
��e6 a��rc��v��l� v���l� �r� r��ei���m���r�t t�st���� l;ak�c�r�rt��r� �c e���ii�^ ��c���tai��� t� t1�� �)����r �:r�•
vvit�� t�r� �����c��ari��ut� �;�a��rnr�ti�t�t�I ����it�r ��• �������:y, �a��f tka� (.��arr�r�c�c�a�� sk���1 N���zr a1�
r��;;�t��& ��a��� �,�i t�st�a ir�w���:�iic�r��, �r�c�' ����ar°���G�V�. '�"h�. Cµ°�ar��r���t�r �h�11 �r�v� th�.
Architect/Engineer timely notice of when ��ci �'t��ru t��is ��rt� �r�sp���+������ ���'� �� �"� ��7���
so the Architect/Engineer may observe su�1� �r�ac��c����s� "�'��� ^��'�`��'��' ����� ��'�'~�� ����'�� ���
tests, inspections, or approvals which be�c�nn�: r�c�r.��a°�c�a��C� ����r ���� ��� ��a"��<����`' �°Y'�
received.
(b) If the ArchitecdEngineer, the Owner or ot��c��� �u���i� ���r�h�rd�i�:� i��vrr��, .1��`���x������� ���"��°
the Work determine that portions of the "�r�'c��°1�. �'����a��� ������������� �"���i'��� ����"�'��'������ �'�
approval not included under Subpara�ra�p��� ��.1"�{a), �h�: �.r�����'���`�-���"r����` w'�l ��i���
written authorization from the Owner, ���truc�t �:k�� ^��c�����"���"���' ��� m����� ����'�"��°'��`����' ����
such additional testing, inspection or appr�a�u��� ��r� ��� �����ty �+�������� ��� ����� '�"�`'�'�� � "���"�
the Contractor shall give timely notice to t�a� �.��k�it��tiJT�r��i����," ����'�^"���� ��� °�'��'��'� �����
and inspections are to be made so t���t t��� �1r�1�����tl�r�������" �����" ��k��^���"� ������
procedures. The Owner shall bear such c���t� ���f��r� �� ��'��'������ �� `�����1������"������ -�°� ����'
(c) If procedures for testing, inspection, or approval under Subparagraphs 3.17(a) and
3.17(b) reveal deficiencies or nonconformities in the Work, the Contractor shall bear all
costs made necessary to correct the defici��ncies or nonconformities, including those of
repeated procedures and compensation for the Architect/Engineer's services and
expenses, if any. The Contractor shall bear the costs of any subsequent testing,
inspection, or approval of the corrected Work.
(d) Required certificates of testing, inspection or approval shall, unless otherwise required by
the Contract Documents, be secured by the Contractor and promptly delivered to the
ArchitecdEngineer.
(e) If the Architect/Engineer is to observe tests, inspections or approvals required by the
Contract Documents, the Architect/Engineer will do so promptly and, where practicable,
at the normal place of testing or inspection.
( fl Tests or inspections conducted pursuant to the Contract Documents shall be made
promptly to avoid unreasonable delay in the Work.
3.18 ROYALTIES AND PATENTS
The Contractor shall pay all royalties and license fees. CONTRACTOR SHALL
COMPLETELY DEFEND, 1NDEMNIFY AND HOLD OWNER AND
ARCHITECT/ENGINEER HARMLESS FROM ANY AND ALL SUITS OR CLAIMS
FOR INFRINGEMENT OF PATENT RIGHTS, REGARDLESS OF WHETHER OR NOT
THE OWNER OR THE ARCHITECT/ENGINEER SPECIFIED A PARTICULAR
DESIGN, PROCESS OR PRODUCT 1N THE CONTRACT DOCUMENTS THAT MAY
BE THE SUBJECT OF A PATENT 1NFRINGEMENT OR OTHERWISE ACTIVELY
INDUCED OR CONTRIBUTED TO THE INFRINGEMENT. In the event the Contractor
has reason to believe that a particular design, process or product specified infringes a
patent, the Contractor shall immediately notify the Owner and the Architect/Engineer of
same.
3.19 INDEMNIFICATION
(a) THE CONTRACTOR AGREES TO DEFEND, INDEMNIFY AND HOLD THE
OWNER, ITS OFFICERS, AGENTS AND EMPLOYEES, AND THE
ARCHITECT/ENGINEER, HARMLESS AGAINST ANY AND ALL CLAIMS,
LAWSUITS, JUDGMENTS, FINES, PENALTIES, COSTS AND EXPENSES FOR
PERSONAL INJURY (INCLUDING DEATH), PROPERTY DAMAGE OR OTHER
HARM OR VIOLATIONS FOR WHICH RECOVERY OF DAMAGES, FINES, OR
PENALTIES IS SOUGHT, SUFFERED BY ANY PERSON OR PERSONS, THAT
MAY ARISE OUT OF OR BE OCCASIONED BY CONTRACTOR'S BREACH OF
ANY OF THE TERMS OR PROVISIONS OF THIS CONTRACT, VIOLATIONS OF
LAW, OR BY ANY NEGLIGENT, GROSSLY NEGLIGENT, INTENTIONAL, OR
STRICTLY LIABLE ACT OR OMISSION OF THE CONTRACTOR, ITS OFFICERS,
AGENTS, EMPLOYEES, SUBCONTRACTORS, OR SUB-SUBCONTRACTORS
AND THEIR RESPECTIVE OFFICERS, AGENTS, OR REPRESENTATIVES, OR
ANY OTHER PERSONS OR ENTITIES FOR WHICH THE CONTRACTOR IS
LEGALLY RESPONSIBLE IN THE PERFORMANCE OF THIS CONTRACT;
EXCEPT THAT THE INDEMNITY PROVIDED FOR IN THIS PARAGRAPH SHALL
NOT APPLY TO ANY LIABILITY RESULTING FROM THE SOLE NEGLIGENCE
OR FAULT OF THE OWNER, ITS OFFICERS, AGENTS, EMPLOYEES OR
SEPARATE CONTRACTORS, OR OF THE ARCHITECT/ENGINEER, AND iN THE
EVENT OF JOINT AND CONCURRENT NEGLIGENCE OR FAULT OF THE
CONTRACTOR, THE OWNER, AND THE ARCHITECT/ENGINEER,
RESPONSIBILITY AND INDEMNITY, IF ANY, SHALL BE APPORTIONED IN
ACCORDANCE WITH THE LAW OF THE STATE OF TEXAS, WITHOUT,
HOWEVER, WAIVING ANY GOVERNMENTAL IMMUNITY AVAILABLE TO
THE OWNER UNDER TEXAS LAW AND WITHOUT WAIVING ANY DEFENSES
OF THE PARTIES UNDER TEXAS LAW. THE PROVISIONS OF THIS
PARAGRAPH ARE SOLELY FOR THE BENEFIT OF THE PARTIES HERETO AND
ARE NOT 1NTENDED TO CREATE OR GRANT ANY RIGHTS, CONTRACTUAL
OR OTHERWISE, TO ANY OTHER PERSON OR ENTITY.
��� ��� �,����z� �,���vg�,�i £���� ��r��:�c� �ar ��t��� indemnified under this Paragraph 3.19 by an
�����,��,�� ��{� g��� ��,�y��;�����, �����;����r��+�tor, anyone directly or indirectly employed by
���;��� ��� ����`��� ��� �v�,c��� ��t� t)��� t�rt�y be liable, the indemnification obligation under
ti���� }������������ ��, ��� �t�;��l r���t 6�a 1i����i���d by a limitation on amount or type of damages,
compensation or benefits payable by or for the Contractor or a Subcontractor under
workers compensation acts, disability benefit acts or other employee benefit acts.
(c) Indemnification under this Paragraph 3.19 shall include, but is not limited to, liability
which could result to or be created for the Owner, its officers, agents, or employees, or
the ArchitecdEngineer pursuant to State or Federal laws or regulations relating to
pollution of the environment ���t� �t��� �:�� �'����'�M ��"�'� ��" �"��'������������ �������°�� ��� �d��"
occupational safety and health �f ���I���'.�, !'��� C."����C'�����" ������M��Ii�+ ��„�'��� t�� ���F��Y
with the above-mentioned law� ����� r'��r�:�ati��s��t� i�� ���� �����w�����ti����r��� ���` th� W'rar� ta� ���
Contractor and that the obligations of the i�w����',� i�� �af�u��"�, ��„����°�� �u��� �"���i��'��`�'��r �°�"�
the Architect/Engineer under the above-������icar��c� 1��s ����i r���.�1��tt�a��� s��'� ����'�����" �'�
those of the Contractor.
ARTICLE 4 CONTRACT ADMINISTRATION
4.1 THE DESIGN PROFESSIONAL (ARCHITECT/ENGINEER)
(a) The design �r�a[�s��c�a��d i� t�c� ���r���a� �'��fi�pN� li�ensed to �ar���i�c; arcb��t�;�t�Gr� as�,
engineering r�� �� �"�r��u c�r �ik��r k���%w���� ur�t:i�y l��wful�� practicin� ���°��it�°��tarud����;;����r���
identified as ���t��� �ea t}�� 1�r��a�1 f��i9�i�� �"'c���tru�ti�a�� Services 11�r�����ca�i �n� �� r��`�rr��
to throughout the Contract Docum�ni� ��; rf �d�i�;�1��� i1� ��urr��r�a° �"1�u� ����►
"Architect/Engineer" means the Ar�.�����.�.��'������r���r ��r t1�c� �r�l�►'luc���f�x��,„r��c��.r��
�uty����ri:e�,�.� r����es�r�t�wt:iv�, �C�l�� ��v��r ���, ��t �t� t�������z, cir�s��a���t� � ��m��lif�t�c� ��wr���r
r���'���a�i�tiv� ��a ��:r^�c ��� l.q�� �w rc1�M1��1�"�,A���a����;r ��rr� �h� �'rr�}�:�1 ���tst.�;�c� s��" ��t� ���.a�tsM��; t�r���
e�r° �t�r�t:�a�. �r� ����}� �a��r�t, t9�� re:���°e:t�c���; ira ��c�� ����Za��°�l i��t�Y��Viti��rt� thw�i �����r ��� i�"M�
��-�g����;,������a,���,�,� ������ ����I� t�� the Owner-designated Architect/Engineer
representative and the Owner-designated Architect/Engineer representative shall be
accorded that same status by the Contractor.
(b) In the event the ArchitecdEngineer is an outside person or firm and the
Architect/Engineer's employment is terminated, the Owner may, at its option, contract
with a new outside Architect/Engineer to replace the former, or may designate a qualified
Owner representative to serve as the Architect/Engineer. The replacement
Architect/Engineer, whether an Owner representative, an independent ArchitecdEngineer
or any other qualified person or entity, shall be regarded as the Architect/Engineer for all
purposes under the Contract Documents and shall be accorded that same status by the
Contractor. Any dispute in connection with such appointment shall be reviewed and
settled by the Owner, whose decision shall be final and binding.
(c) Owner r����v+�� �1�� �i���t �c� a�a�point a representative empowered to act for the Owner
during tht; �:"��t���rt�ciir�n P����e� and to supersede the Architect/Engineer's Construction
Phase r��pr�����'�ii�t�. �i►�i1�rrl�r, from time to time the Owner may expand or reduce the
Owner's delegation of powers to the �r°���at�c�l���ir���r„ �°ith i��r� �.��w'r�c��" ����71�'i��6 ����
Contractor of any such changes. The Arcl�it��td�'���i���r �ha�l r��t �� ���*������' �`� ���'���
party beneficiary to the Contract and can ���u r��a� �w��� ���j�+�� t�� ����y ��.����������°��� ���' �������������
of powers as set forth in this Subpara�c��h (a��, p�� �'��� ��"����z ��^�"������ `�k��ti� ��� ���""����
have control over charge of, or be x��:���r��i��l� �"�r�r, �;��r�����'���������� r������������ a���������
techniques, sequences, or procedures, or �'err� :���'�iy' ���°��R�����+��� ��" 1��`����"����� �� ��'�����i�����
with the Work since these are solely the ��.�ntr�+��C���c'� r���c�r���i�r�u���w "T'k��."� ����'r'�"t���' ''�"�N� �����
be responsible for the Contractor's failu�� t+� �:t��"c'� r�ut �}�c� ����'� ��� ���<��'������ "'���� ���°
Contract Documents. The Owner will not k��v� ���r�tr�l �ar��r ta�° �har�� ca1` �r�� v�^��1 r��� ka�
responsible for acts or omissions of Contractor, Subcontractors, or their agents or
employees, or of any other persons performing portions of the Work.
4.2 ARCHITECT/ENGINEER'S RESPONSIBILITIES DURING CONSTRUCTION
(a) The Architect/Engineer will administer the Contract as described in the Contract
Documents and in accordance with the terms of the ArchitecUEngineer's agreement with
the Owner, where applicable, subject to the direction and approval of the Owner. If
requested by the Contractor, the provisions of the Owner/Architect/Engineer Agreement
will be made available to the Contractor.
(b) The Architect/Engir���r ������ �area+wi�V�, �w��'i��� ��r[i�a�r�������� ���' the Work, adequate and
competent periodic c�r����kc. �c�r����ru�t�c�r� a�l���:rr��tic�r�, ���"i�c�i���ly visiting the Project site
to the extent necess�r�r ��r ��a°���a�1�y^ f����il'i�rGZ� t�ct����av�� "�'��h the progress and quality
of the Work, and to determine if the Woa�l�: i:� �a���c���c�rn� in ���c�rc��x�c�� r�'���� ��a� ^��c���t�"a��
Documents. The Architect/Engineer sha�� ���t, ��t.a���a��-, ��� �+��E��e�'��I t�� ����� �����i��4�cx!���
on-site inspections to check the Work. Fic�l� r������t� �:f` ����};a �b�ri ��'�.��11 �� �a�����r�t� ka� i���
Architect/Engineer and submitted to the ��r��r�. �i"1�� ������t��t,�l;���������� ����G� �������+��" ���
reasonable measures to safeguard the Owner against defects and nonconformities in the
Work. The Architect/Engineer shall not be responsible for the construction means,
methods, techniques, sequences of procedures, nor for the safety precautions and
programs employed in connection with the Work. The Architect/Engineer wil1, however,
immediately inform the Owner whenever defects or nonconformities in the Work are
observed, or when any observed actions or omissions are undertaken by the Contractor or
any Subcontractor which are not in the best interests of the Owner or the Project.
��� °�T��� ���}y���,������������ �rr� ����� ��^+�t��r ^�r��11 not have control over or charge of and will
a��+��� l�e r����c������r���� ��r ��a��ic�.�������� ���c��n;��� �����k������� i�,����7i������, ��c���d��;�s���, ���
�aar�:���cl�ar��;, c�r �'�ar �;�f��� ��r��a�mtit�c�� �a�� �r�,�r�rn�►�; i�� �c���d�+���iu�u �rotd� th� °'+��r�, �ir���
t����� ����; ��aY�9y ��� �c�r��r���c�6"� r��������sil��lity �� �r�a���.i��i �rr 6��,r��r�r��a}� �.�. "�"h�
Architect/Engineer and the Owner will ra�t L�� ������t��ibic� �`���° t��a ����w�ir"��tc��'� %�i��°� �c">
carry out the Work in accordance with t�l�� C�"��t�tr���ti T����a.�rr�r�'�r��t�� "I"�� .��'��°�����'"°����������"
and the Owner will not have control ovur` t�a �I��r�� of and will not be responsible for acts
or omissions of the Contractor, Subcontra��:�a��, �ub-subcontractors, or their respective
agents or employees, or of any other perso►�� �aar�vrming portions of the Work for which
the Contractor is responsible.
�,�� �;��,,��� �� ��������,��� ���,������t i� �h� �<.���a��ct Documents or when direct communications
����,�, ����a�.� ��,��x���� ,�������u���� t��� �����r �nd Contractor shall endeavor to communicate
�h.r�c��,t� t�� �r�;��t�����^�x�������r, �"���������y�ic�ti�x�� ��r �r�c� �rit.� t���; �r�;��itec��'����ir��c���'�
r�����������w�a� ��a�,�l �a� tl�rca���;�� t�� �ra��i���tl�ar��;ir�eer. �,"n�r�rnut��+��t�a���� t�� �r��i r��t��
Subcontractors and material suppliers shal� k�c �hr°cwt���'� t���. ��'��t°��r�t�tc��°k ����x����'��������r�����
by and with separate contractors will be th:�•�at��;l� ����� +����r� '1�'����. �����8:r������` ���"��p ����'���'r��'�
written confirmation of communication� rm���c9� ��i�-�c�ti��^ w�"i�i� t�c ��"�"���'�" �z�� ��'������
copies of such confirmation to the Architect/Engineer.
(e) Based on �}�� �r���%���tl����,ir�a�ca°'� observations and evaluations of the Contractor's
Applicatio���� ��r� �'z�y���t, �"��'�� �a��������'ect/Engineer will review and certify the amounts due
the Contra��tc�r �ar�ci wf�l� ����a� (�'����'z�ates for Payment in such amounts.
(� The Architect/Engineer and the Owner will each have authority to reject Work which
does not conform to the Contract Documents. Whenever the Architect/Engineer considers
it necessary or advisable for implementati�,��� ��f �k�� iu����t� ��E" t6��, C.:������~��� [����������"�� the
Architect/Engineer will have authority to t��c}���a°r� �a�s�ii�c°�m��l �t��p������r� ���" ��`���r�� 4��' the
Work in accordance with Subparagraphs �.6 ����� �7��� �"�. � ����� '������^��" ���' ���� ���"���' ''�'�ork
is fabricated, installed or completed. ���t�w��'�t', �tt�i�l���" t��u� ���������'��� ���� the
,����x�i����tl"L�n���t�er nor a decision made in good faith either to exercise or not to exercise
�;�uuy� �t�tl��r�1�r sl;�all give rise to any duty or responsibility of the Architect/Engineer to the
!�:;'�a�tm•�c�t�;�z•� ��iN��ontractors, material and equipment suppliers, their agents or employees,
or other persons performing portions of the Work.
(g) The ArchitecdEngineer will review and approve or take other appropriate action upon the
Contractor's submittals such as Shop Drawings, Product Data, and Samples, but only for
the limited purpose of checking for conformance with information given and the design
concept expressed in the Contract Documents. The ArchitecdEngineer's action will be
taken with such reasonable promptness as to not delay the Work or the activities of the
Owner, Contractor, or separate contractors. Review of such submittals is not conducted
for the purpose of determining the accuracy and completeness of other details such as
dimensions and quantities, or for substantiating instructions for installation or
performance of equipment or systems, all of which remain the responsibility of the
Contractor as required by the Contract Documents. The Architect/Engineer's review of
the Contractor's submittals shall not relieve the Contractor of any obligations under
����°������ka� �3.�„ �,5, and 3.12. The ArchitectlEngineer's review shall not constitute
����•��^��b' ��" ���`�.ty ��recautions or, unless otherwise specifically stated in writing by the
�,��1�i(�c„1/���i����r,, of any construction means, methods, techniques, sequences, or
procedures. The Architect/Engineer's approval of a specific item shall not indicate
approval of an assembly of which the item is a component.
(h) The Architect/Engineer will prepare Change Orders and may authorize minor changes in
the Work as provided in Paragraph 7.3.
(i) The Architect/Engineer will conduct inspe�ti�w��� ti�a� �i�t��t��ir�c t�z� date or dates of
Substantial Completion and the date of final ��a��a���e�dcy��„ �+ra�l r���iv� and forward to the
Owner for the Owner's review and records �^r��t��� vYr�rd`«�t�ti�� �a��i related documents
required by the Contract and assembled by the Contractor, and will issue a final
Certificate for Payment upon compliance with the requirements of the Contract
Documents.
(j) If the Owner and Architect/Engineer agree, the Architect/Engineer will provide one or
more Project representatives to assist in carrying out the Architect/Engineer's
responsibilities at the site. The duties, responsibilities, and limitations of authority of such
Project representatives shall be as set forth in an exhibit to be incorporated into the
Contract Documents.
(k) The Architect/Engineer will interpret an� r��<�I�� x�c�a�rr�a.ra�u�rur���ia�rns to the Owner
concerning performance under and requirem���:t� c�l` tl°�� �'��ttr��� ��c.r�a�ments upon written
�°�=:��ty�;�t c�d` �it���r t��� �^w�����' c�r �"c�r�ir��cfl;or. r�"6�e r�t°�:l��l�c:�l:^;r���r����r's response to such
���������� ���p� �,� �����,�� ,,�y��,� ��;�����;�L��� �romptness and within any time limits agreed
����„p� ����,� ��µ�;��;���.���r��„it���r� �»�'��ql s�;��rrc� the Owner's written approval before issuing
���,;��.�����������;� z�������,���;��rn�, ��r ��u��„��c.ra��s to the Contractor which change the scope of
the Work or which modify or change the terms and conditions of any of the Contract
Documents.
(1) Interpretations and decisions of the ArchitecdEngineer will be consistent with the intent
of and reasonably inferable from the Contract Documents and will be in writing or in the
form of Drawings. When making such interpretations and decisions, the
Architect/Engineer will endeavor to secure faithful performance by the Contractor.
(m)The Architect/Engineer's decisions on matters relating to aesthetic effect will be final if
consistent with the intent expressed in the Contract Documents provided that the
ArchitecdEngineer has prior written approval of the Owner.
4.3 CLAIMS AND DISPUTES
(a) Definition; General Notice of Claim Procedure. As used in these General Conditions, a
"Claim" means a demand or assertion by one of the parties to the Contract seeking an
adjustment of the terms of the Contract Documents, of the Contract Sum, of the Contract
Time, or some other relief in respect to the terms of the Contract Documents. The term
also includes all other disputes between the Owner and the Contractor arising out of or
relating to the Project or the Contract Documents, including but not limited to claims that
work was outside the scope of the Contract Documents. The responsibility to substantiate
the Claim and the burden of demonstrating compliance with this provision shall rest with
the party making the Claim. Except where otherwise provided in the Contract
Documents, a Claim by the Contractor, whether for additional compensation, additional
time, or other relief, including but not limited to claims arising from concealed
conditions, MUST BE MADE BY WRITTEN NOTICE TO THE
ARCHITECT/ENGINEER AND THE OWNER WITHIN FOURTEEN (14) DAYS
AFTER OCCURRENCE OF THE EVENT OR EVENTS GIVING RISE TO THE
PARTICULAR CLAIM. Every Claim of the Contractor, whether for additional
compensation, additional time, or other relief, including but not limited to claims arising
from concealed conditions, shall be signe;d and sworn to by an authorized corporate
officer (if not a corporation, then an official of the company authorized to bind the
Contractor by his signature) of the Contractor, verifying the truth and accuracy of the
Claim. THE CONTRACTOR SHALL BE DEEMED TO HAVE WANED ANY
CLAIM NOT MADE STRICTLY IN ACCORDANCE WITH THE PROCEDURE AND
TIME LIMITS SET OUT IN THIS PARAGRAPH.
(b) Referral to the ArchitecdEngineer. Claims, disputes, and other matters in question
between the Contractor and the Owner relating to the progress or execution of the Work
or the interpretation of the Contract Documents shall be referred to the
ArchitecdEngineer for recommendation to the Owner, which recommendation the
r���1�u�c��.tJ�;���i.n���,r �ri�l furnish in writing within a����ean��l� turr��� F�rc�rra��ed proper and
�e��c��a�i� �u�a�t��:r�t��,�iaa�� has been received. Failure ��8" ���� �'�e�t:r�m�tc��° t� �G���mit the Claim
����� t1�� ��r�hik�a�t��ru�i�reer for rendering of a r�;��rr�������a�c�t�t���� ���� t.���.� Owner shall
constitute a waiver of the Claim.
(c) Contit�a�ir�� ��cso��G'�+�t ���a'�"caa�r���c�� Pending final resolution of a claim the Contractor
shall ��w°�a�ut�� ���i��r��ly °�it� ��rt��.�rmance of the Work and the Owner shall continue to
make �a�����u�r�t� ua� ;��.c��r°ci�r��� °w��� the Contract Documents.
(d) Claims for Concealed or Unknown Conditions. No adjustment in the Contract Sum or
Time associated with concealed or unknown conditions will normally be considered or
allowed; provided, however, that the Contract Sum or Time may be adjusted by the
Owner in such circumstances only if:
(1) a concealed subsurface condition is encountered in the course of performance of the
W ork;
(2) a concealed or unknown condition in an existing structure is at variance with
conditions indicated by the Contract Documents; or
(3) an unknown physical condition is encountered below the surface of the ground or in
an existing structure which is of an unusual nature and materially different from those
ordinarily encountered and generally recognized as inherent in the character of the
Work; and
(4) a notice of claim with proper and adequate substantiation is presented pursuant to
Subparagraph 4.3(a) of these General Conditions; and
(5) the Owner and the Architect/Engineer determine that:
(i) prior to submitting its bid for the Work, the Contractor used reasonable diligence
to fully inspect the portion of the Project site where the condition was discovered; and
(ii) the work caused or required by the concealed or unknown condition at issue can
be considered extra work to the extent that additional new Drawings must be prepared
and issued and new construction bey��nd the scope of the Contract Documents is
required.
(e) Disclaimer of Wananties as to Reports, Drawings, and Specifications. PROJECT SITE
INFORMATION AND REPORTS (1NCLUDING BUT NOT LIMITED TO SOILS
TESTING REPORTS, GEOTECHNICAL REPORTS, OR ENVIRONMENTAL SITE
ASSESSMENTS) PROVIDED BY THE OWNER AND THE
ARCHITECT/ENGINEER IN THE PROJECT MANUAL OR BY OTHER MEANS
SHALL BE UTILIZED BY THE CONTRACTOR AT THE CONTRACTOR'S OWN
RISK. THE OWNER AND THE ARCHITECT/ENGINEER DO NOT GUARANTEE
OR WARRANT ANY INFORMATION SHOWN IN THE PROJECT SITE
INFORMATION AND REPORTS.
(� Claims for Additional Cost. If the Contractor wishes to make a claim for an increase in
the Contract Sum, written notice as provided in this Paragraph 4.3 shall be given before
proceeding to execute t�� '�"'�rk, �"cic�� r��ti�� is not required for claims relating to an
emergency endangering I��� c�r p�c��a���:�Gy ��a'i;�ir�g under Paragraph 10.3. In addition, the
Contractor's request for �r� ����c���� uM� t.�� �_�",��'��ract Sum for any reason (other than work
performed under emergency conditions) shall be made far enough in advance of required
work to allow the Owner and the Architect/Engineer a sufficient amount of time, without
adversely affecting the construction schedule, to review the request, prepare and
distribute such ����iti�����al �a����r�����ts �� �r���� be necessary to obtain suitable estimates or
proposals and t� r���„��t�s�t�, e�����u�c �,►�ci �l���t�ribute a Change Order for the required work if
the Contractor k.�a��i�v�;� ����� ������iti'i�r��V �t�st is involved for reasons including but not
limited to:
(1) a written interpretation from the Architect/Engineer;
(2) a written order for a minor change in the Work issued by the Architect/Engineer;
(3) failure of payment by the Owner;
(4) termination of the Contract by the Owner;
(5) the Owner's temporary suspension of all or any portion of the Work where the
Contractor was not at fault; or
(6) other reasonable grounds.
(g) Injury or Damage to Person or Property. If tye ���������1��� ��a�i��'s ,r�j��"�" ��" ��������� ��
person or property because of an act or omissio�� caL° t�a� �.Dwvr���`, �r �al` ��y� a.��' �hw� f.�"+�"r���'"�
officers, employees or agents, written, sworn-to r���ti�;� ��'���� �1�a���� t`��r ��x������� ���"'��a��"�'
shall be given as provided in Subparagraph 4.�(���. ���� ��caxi�� ��y�i� q��'�^���� ����w�������
detail to enable the Architect/Engineer and the Owner to investigate the matter.
(h) Subcontractor Pass-Through Claims. In the event that any Subcontractor of the
Contractor asserts a claim to the Contractor that the Contractor seeks to pass through to
the Owner under the Contract Documents, any entitlement of the Contractor to submit
and assert the claim against the Owner shall be subject to:
(1) the requirements of Paragraph 4.3 of these General Conditions; and
(2) the following additional three requirements listed below, all three of which additional
requirements shall be conditions precedent to the entitlement of the Contractor to seek
and assert such claim against the Owner:
(ii) The Contractor shall either (A) have direct legal liability as a matter of contract,
common law, or statutory law to the Subcontractor for the claim that the
Subcontractor is asserting or (B) the Contractor shall have entered into a written
liquidating agreement with the Subcontractor, under which agreement the Contractor
has agreed to be legally responsible to the Subcontractor for pursing the assertion of
such claim against the Owner under the Contract and for paying to the Subcontractor
any amount that may be recovered, less Contractor's included markup (subject to the
limits in the Contract Documents for any markup). The liability or responsibilities
shall be identified in writing by the Contractor to the Owner at the time such claim is
submitted to Owner, and a copy of any liquidating agreement shall be included by the
Contractor in the claim submittal materials.
(ii) The Contractor shall have reviewed the claim of the Subcontractor prior to its
submittal to Owner and shall have independently evaluated such claim in good faith
to determine the extent to which the claim is believed in good faith to be valid. The
Contractor shall also certify, in writing and under oath to the Owner, at the time of the
submittal of such claim, that the Contractor has made a review, evaluation, and
determination that the claim is made in good faith and is believed to be valid.
(iii) The Subcontractor making the claim to the Contractor shall certify in writing and
under oath that it has compiled, revievrred and evaluated the merits of such claim and
that the claim is believed in good faith by the Subcontractor to be valid. A copy of the
certification by the Subcontractor shall be included by Contractor in the claim
submittal materials.
(3) Any failure of the Contractor to comply with any of the foregoing requirements and
conditions precedent with regard to any such claim shall constitute a waiver of any
entitlement to submit or pursue such claim.
(4) Receipt and review of a claim by the Owner under this Subparagraph shall not be
construed as a waiver of any defenses to the claim available to the Owner under the
Contract Documents or law.
(i) Owner's Right to Order Acceleration and to Deny Claimed and Appropriate Time
Extensions, in Whole or in Part. The Contractor acknowledges and agrees that
Substantial Completion of the Work by or before the Scheduled Completion Date is
of substantial importance to Owner. The following provisions, therefore, will apply:
(1) If the Contractor falls behind the approved construction schedule for whatever
reason, the Owner shall have the right, in the Owner's sole discretion, to order the
Contractor to develop a recovery schedule as described in Paragraph 3.10 or to
accelerate its progress in such a manner as to achieve Substantial Completion on
or before the Contract Time completion date or such other date as the Owner may
reasonably direct and, upon receipt, the Contractor shall take all action necessary
to comply with the order. In such event, any possible right, if any, of the
Contractor to additional compensation for any acceleration shall be subject to the
terms of this Subparagraph (i).
(2) In the event that the Contractor is otherwise entitled to an extension of Contract
Time and has properly initiated a Claim for a time extension in accordance with
Subparagraph 4.3(a) above, the Owner shall have the right, in the Owner's sole
discretion, to deny all, or any part, of the Claim fo� �:�t����i�� �f` (:�"�r�tr���t. ,i"�yr�c� ���
giving written notice to the Contractor provided v��t���� ii�r,���"t'����� � 1��r� �'���"� ����"
receipt of the Contractor's Claim. If the Owner d�r�i�� th� ��'�����'��%���'"� �'��n��'� ���"
an extension of Contract Time under this Clause (i)(2), either in whole or in part,
the Contractor shall proceed to prosecute the Work in such a manner as to achieve
Substantial Completion on or before the then existing Scheduled Completion
Date.
(3) If the Contractor would have been entitled to a time extension for a reason
specifically allowed under the Contract Documents, for an amount of time that
would have justified approval by the Owner if not for the need and right to
accelerate, the Contractor may initiate a Claim for acceleration costs pursuant to
Subparagraph 4.3(a). Any resulting Claim for acceleration costs properly initiated
by the Contractor under Subparagraph 4.3(a) above shall be limited to those
reasonable and documented direct costs of labor, materials, equipment, and
supervision solely and directly a�t��iri����t�1� t�� ��u� �������� ��������"������� �'����"���'
necessary to bring the Work back wai�h�i� '1��� t1��ra �xi�tit�� ��g�rc�v�� �������r������-�r�
schedule. These direct costs includ� t�t� ���r�r��i��� ��s��rt�a�m c��'" c����ir��r� �K�y�
additional crew, shift, or equipm�t�t a���i� i� r��t������ ��� ��'�V����� ���" ����
Contractor and approved in writing h;� ���� t�l'����r, ���ct'�������;� �`������� ����" ����
prorated cost of premium on the �aci��i��w� ���'��rrn��r��� a�r�e� ����"������ ������°� �����
required insurance, not to exceed 5�/�, ��11 �� �:����c��'�� �7r� ��� �������'��� ���'�'�k��"�'��°�'
costs. NO OTHER MARKUP FOR i'��.�::�)��"I7�"� C)"����1������`,��:�" ���'�`����,�������"��^9�� ����"��
NOT LIMITED TO HOME OFFICE OVERHEAD) OR ANY OTHER COSTS
WILL BE ALLOWED ON ANY ACCELERATION CLAIM. The Owner shall
not be liable for any costs related to an acceleration claim other than those
described in this Clause (i)(3).
(i) Waiver of Claims; Final Payment. The making of final payment shall constitute a wa�ver
of claims by the Owner except those arising from:
(1) claims, security interests, purported liens, or other attempted encumbrances arising
out of the Contract and remaining unsettled;
(2) defective or nonconforming Work appearing after Substantial Completion;
(3) latent defects, as defined in Subparagraph 12.2(d), appearing after Final Completion;
or
(4) the terms of general and special warranties required by the Contract Documents or
allowed or implied by law.
(k) THE CONTRACTOR SHALL NOT BE ENTITLED TO RECOVER ATTORNEY'S
FEES AS A PART OF ANY CLAIM MADE UNDER THE CONTRACT
DOCUMENTS OR IN ANY SUBSEQUENT LAWSUIT OR ALTERNATIVE
DISPUTE RESOLUTION PROCEEDING.
(1) No Waiver of Governmental Itnmunity. NOTHING IN THE CONTRACT
DOCUMENTS SHALL BE CONSTRUED TO WAIVE THE OWNER'S
GOVERNMENTAL IMMUNITY FROM LAWSUIT, WHICH IMMUNITY IS
EXPRESSLY RETAINED TO THE EXTENT IT IS NOT CLEARLY AND
UNAMBIGUOUSLY WAIVED BY STATE LAW.
ARTICLE 5 SUBCONTRACTORS
5.1 DEFIIVITIONS OF SUBCONTRACTOR
(a) A Subcontractor is person or �ni.��y �r6�� }��� �a. ciir��t �t�t�tr���:i �ritl� t��c� 4:;c�c��r���t��r �a�
perform a portion of the Work �c t.�z+� �'r���:�t �i��� �r �c� �u�g���' r���i�ci�l� t��° �����i�arn���� 1c�
the Contractor by purchase or G���� �"��r �aw� �rt �re��-���uN'������� a�� ��' �a�����"���"�������� m����a t���
Work. The term "Subcontractor" is refe��w�.�' tc} t��r��������a� �1'�� '�'������"��%� ��'����������� �`� ��%
singular in number and means a Subco��te��c�c� r��° �a� �������'�M���� �"������'�����"�� �� ����
Subcontractor. The term "Subcontractor" does not include a separate contractor or
subcontractors of a separate contractor.
(b) A Sub-subcontractor is a person or e���it:� r�lt� h�� �� �ir��� �r ir�c���c�c�� �������"���' '�"���� �
Subcontractor to perform a portion of ��� ����� ��� ��� �'�'��.I��'�� �^��� ���' '�� �������� �"����'°�����"
or equipment to the ���c������r�utc�r c��w ar��i���,�c ��a�a-�u����n�r��t:��r k�� �r�������a�r� r�r ���:�� �i���
use in performance �°�.f"� ��r i����ar����a.�i��t� e���� 1��� ''�"����'%. "�'F�� ��+��� `"����"-`���ta��:�r�tr���t��r"' i�
referred to througho�i� �b�� �"e������ra��k ����a����as�r��� � i�;�ir����tl��r� a�t r����t�N�c�r• �a�r���� ����.�rm� �� �"��ml�-
subcontractor or an authorized representative of the Sub-subcontractor.
5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF
THE WORK
(a) Immediately after the award of the Co��t:r�a�t k�y tk�� [��'�'��c��, �r��.�' ���c��� ���� ���z��������
Construction Services Agreement is si����, b� t��� [�c�r�t:r�r.�:��r ���ci t��� ��w�u�r, d-6��
Contractor shall furnish to the Archite+��t�,fl�r��i�����r i������ ��itn��, f�r ������������� ��" �����
Owner and the Architect/Engineer, a list: �1` ��a� r����i��, ���r������ ���������� ���������ro
M/WBE certifcation numbers (where ap��l�c�����c�j, �rti� t��� c��''�°���"1� �������� ���������'`���°°-�
(including those who are to furnish mat�ri���� �r• ��ud�����t� I���%�'i�����^� �� �������� ���°���������
proposed for the principal portions of t��e "��;�r�.,„ ir��l���'i��� �"►ar��i�M�irr�„� "�rw���'� ����� �����"�
of the Contract. The Contractor shall i��t���a9i�C+�1� ��t���'��"y ti���' '�'"'�����" ��z �''�"N����� ��t z�rr�^
changes in the list as they occur. The �r�}�it��t�"�:r��ir��;��" �'�ii �at"c����li�r �'���v i� ���
Contractor in writing stating whether or ���a1 �.�� ���'����' �p" �� ��'������'�����'�"���� ���'�
due investigation, has reasonable objection to any such proposed person or entity. Failure
of the Owner or ArchitectlEngineer to reply promptly shall constitute notice of no
reasonable objection.
(b) The Contractor shall not contract with a proposed person or entity to whom the Owner or
Architect/Engineer has made reasonable and timely objection.
��� ��.��n�,���/�,������;���n� ;�x�� �)����„�°Y� ����r�va� of or objection to any Subcontractor or of a
�,;���,�,�����. ��������� �� �,�a�z��-���1 v�,i�l r��rt r���ieve the Contractor of his responsibility for
����°��a�a�������� �f �"��a�k�. ���; c��ll�c3 9�.��� r���r��� t��� ��°a�m���r��t �c���r�����rrts� �,�,�u�l ������� ����t �ac�rri�� �
����� ��c� �r�� �.�'����� ��� �z���stir�n�' �� �r� tl�a� p���t �f ti�� �s;��r�tr���t��� ����rca�r�l
� 1 tar��� rar� r7�cr���
shall not be construed to create any co��tr�c�tw��l ��;Wa�t�c'������u� h��w���� ����' `�'����������"�"�����'
and either the Owner or Architect/En�;,i����r. �r� �u� �v�9�t �k���l th� �-�������`x��� ����� ���
increased as a result of the rejection of any Subcontractor.
(d) The Contractor shall not change a Subcontractor previously selected if the Owner or
Architect/Engineer makes reasonable objection to such change.
5.3 SUBCONTRACTUAL RELATIONS
(a) By appropriate agreement, written where legally required for validity, the Contractor
shall require each Subcontractor, to the extent of the Work to be performed by the
Subcontractor, to be bound to the Contractor by the terms of the Contract Documents
(including but not limited to these General Conditions), and to assume toward the
Contractor all the obligations and responsibilities which the Contractor, by the Contract
Documents, assumes toward the Owner and the ArchitectlEngineer. Each subcontract
agreement shall preserve and protec� t���; ���h��� �i ���� �.��w"r��� ���� ���� ��"�����'���°����������
under the Contract Documents (inc����i��� ���a� ��t lor��it��� �<� �k���� (:b�ra�*�`�� ��������������
with respect to the Work to be performe� ��� ���c� ���������'������" �� ����� ��'������'���`'������' '`����
not prejudice the rights of the t��r�t���• ���d ���� �.►��l°�ii,��t��,���i�����c. "����r� �g����"'����'�'�� ����
Contractor shall require each ��a����:�r���'���t���" ��� ���t�r ir�i� �i����1��• ��r������c��'� r�+i��l ;��a���
subcontractors. The Contractor shall make available to each proposed Subcontractor,
prior to the execution of the subcontract agreement, copies of the Contract Documents to
which the Subcontractor is to be bound. Subcontractors shall similarly make copies of
applicable portions of such Documents available to their respective proposed Sub-
subcontractors.
(b) The Contractor is solely responsible for making payments properly to the Contractor's
Subcontractors on the Project. During performance of the Work, the Contractor shall
comply with the following additional rules regarding Subcontractor payments:
(1) The Contractor shall submit, beginning with the Second Application and Certificate
���:���'����,��������� � �������t�r���tc�r ����rr���r�t 1����r� (the "Report") with each Application
�,��� ������������� �'��� ���y��,����. "I"���; ����S��rt ��a�l'1 �how all payments made to date by the
�p��,�����„���� ���„���� ��r������ ��,�,��rr����� t� �;��h �ubcontractor involved in the Project.
The Report shall be made on a form ����rc�u�;+� �r�� s�g��1��+� ��' ���� '��'�"����"• �� ���
alternative to the Report, the Contractor c����r fia�w�i��� �������vi�� ���µ t'��"�r����� ���'���"�'���
with the Application and Certificate for° �'�v�n���C, ^�rhi�9� �a9:°ti�ae�u�s ����11 l�� �a�����t��i.
by ����C� ��.ak:����tr��tt�r ��r c� r���a��u�;� ����1 ��a�ci �q�a�°��� tl��'�r�vacr�.� �rca��•c��:� �a���°����t
p ic��• �r��ri� �� ������r�m,��� �'u,�r��ish�c� �a�°� t���, 1�'�r������ ��,� ��i��l��"i" ��r" `1"��-�b�. (.�`6�'�1�;��
ers ��i
OF T�..�� ��.k.�'1���"T' i��.�� �.d9l�IY��111C"�"5 ��1� �'�`�9h��4�1�➢ ��1:;�;L;i�'�i� ��-��L.,1., k�� �
CONDITION PRECEDENT TO PAYMENT ON ANY APPLICATION.
(2) If, for any reason, the Contractor is withholding payment to a Subcontractor due to a
dispute or other problem with performance, the Contractor shall note the amount
withheld and that payment is in dispute. The Owner may require the Contractor to
document and verify the dispute or other problem in question.
(3) The Owner reserves the right in its sole discretion, to withhold payment to the
Contractor pursuant to Paragraph 9.5(a) of the General Conditions, should it appear
from the Report, statements of payment received or other information furnished to the
Owner that:
(i) the Report has not been properly completed;
(ii) the Contractor has knowingly provided false information regarding payment of
any Subcontractor; or
(iii) the Contractor has otherwise failed to make payments properly to any
Subcontractor.
(4) THE CONTRACTOR SHALL NOT HAVE ANY RIGHT TO MAKE A CLAIM
FOR ADDITIONAL TIME OR ADDIITIONAL COMPENSATION AS A RESULT
OF THE OWNER'S OR ARCHITECT/ENGINEER'S ENFORCEMENT OF THIS
SUBPARAGRAPH 5.3(b). NO PROVISION OF THIS SUBPARAGRAPH OR
ANY OF THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO
CREATE A CONTRACTUAL RELATIONSHIP, EXPRESS OR IMPLIED,
BETWEEN ANY SUBCONTRACTOR AND EITHER THE OWNER OR THE
ARCHITECT/ENGINEER AND SHALL NOT BE CONSTRUED TO MAKE ANY
SUBCONTRACTOR OR ANY OTHER PERSON OR ENTITY A THIRD PARTY
BENEFICIARY OF THE CONTRACT BETWEEN THE OWNER AND THE
CONTRACTOR.
5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS
In the event of a termination of this Contract by the Owner under Article 14, the Contractor shall,
if reyuested in writing by the Owner, within fifteen (15) days after the date notice of termination
is sent, deliver and assign to Owner, or any person or entity acting on the Owner's behalf, any or
all subcontracts made by Contractor in the performance of the Work, and deliver to the Owner
true and correct originals and copies of the subcontract documents. In the event assignment is not
requested by the Owner, Contractor shall terminate all subcontracts to the extent that Owner has
not directed assignment of same and to the extent that they relate to the performance of Work
terminated by the notice of termination.
ARTICLE 6 CONSTRUCTION BY THE OWNER/ SEPARATE CONTRACTORS
6.1 OWNER'S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD
SEPARATE CONTRACTS
(a) The Owner reserves the right to perfor�n� wa;�r��tr���t����a ���' r�����i�c�rt� �"�d���r� t�a �1�� �'�"��.N�'��
with the Owner's own forces, and to �a�v��r�l sep��a°�xt� ���rtr��t� Nr� c�����nr��t���ar� �it�� ��t��:a�
portions of the Project or other cons��r���i�c��u �ar c�q�����i��rros c,��� l�� 1��"c����t �i�� �����
Conditions of the Contract identical or �ti�k��t��ut��l�y� ���rui��r �� �E����'�"+�����"�G ����'�r��"����
including those portions related to insurar��� �ar�� �'���"�'�` ���������"�����'��• ��'����'��'�����"'�'��'���
claims that delay or additional cost is involved because of such action by the Owner, the
Contractor shall make a claim as provided elsewhere in and in accordance with the
Contract Documents.
(b) When separate contracts are awarded f�au� ���ff�r���t ��c�rtic�t�� of the Project or other
construction or operations on the Proj�.t�t �i��, tl�c� ��ca°r�� "C�*c�ntractor" in the Contract
Documents in each case shall mean the C:������r���aar �1`��:� ���;��i��s each separate Building
Construction Services Agreement with the Owner.
(c) The Owner shall provide for coora��x����i��r� c��`tl�a ��c���r�i�j�� ��f't��� t.)wwn�r'� �,�w°�� %rr��� ����i.
of each separate contractor with ii��. 'V�°c��� ���" t��� �"a����,a°��ti�r'� "�'�u� ������ ���<�i���"��'� '"�"����
them. The Contractor shall participate w�utN� c��t��;r ��p����"�i� �������`����.<a�`� ��a� ��� ���'����` �°'
reviewing their construction schedules �rrb��r� ��ir�c�t�� tra a.�ca �c�a FI°l��'�c������c.t��r s�����g "w�'it��
the approval of the Owner, make arw� �'�v���r��r� ��� ��� �������"�������'r� �����'���� ��°�����'��
necessary after a joint review and m�mi���� ��;����r������. "���� ���������"�������� ����������^ ������
then constitute the schedules to be t��t;c8 b� i1�r�:. ��e�c��ra�;i�ar� ���az���t� �c�r�C.r�c������ ����� ���
Owner until subsequently revised by muutiu��� ��;�'��r������ �� ��" '�`�"���'��� ��������� ����°����'• �'�
the Contractor believes it is entitled to ���� �u���j���t���c���ti ��f �:1`u� '��+��"����'���� ����_�� '����'�"�� ��"�
circumstances, the Contractor shall s���T�it �: �r�itt�.�� prca�a����l �e�r ���������� ���'����'
pursuant to Article 7 of the General C���w���tye�����,�. 1�y �.��� ��'��� ��� ���r���"������"��`�� ������'����
Order proposal is denied by the Owner, the Contractor must submit any Claim pursuant
to Paragraph 4.3 of the General Conditions.
(d) Unless otherwise provided in the Co��Cr���i �����������X"�, 'v"�°��� ���� D�er performs
construction or operations related to the �r�j��� '������r ���� ��'�'�"�'���� ��"��� forces, the Owner
shall be deemed to be subject to the same ��Vi����i�xt�� ���� �� ��ar�� i1�� same rights which
apply to the Contractor under these Gener�a9 C"��r�cJit�c:�n�, ��t�;lu�����a without excluding
others, those stated in Article 3, this Article 6, and Articles 10, 11 and 12.
6.2 MUTUAL RESPONSIBILITY
(a) The Contractor shall afford the Owner and separate contractors' re�w��ra�l�l�; c������t�a���ti�
for access to and storage of their materials and equipment and the ia�����u���u�r��� �f ih�ai"
activities and shall coordinate the Contractor's construction and ��er�;la�rr� '�u�� �1��
separate contractors as required by the Contract Documents.
(b) If part of the Contractor's Work dep�r�ck� L�ar ��ra����° �x���������� ��x" �'������ ��1����
construction or operations by the Owner ��r �� ��;�a�z���t� �c����r���:t�'��'a t��� ���r��tr'�+�t�x �������
prior to proceeding with that portior� ��` t���; '"�'`��`�„ ia��������1�" °������� �'� ���'�
Architect/Engineer apparent discrepancies ��� ���t-���� ir� ti1�� ������' ���n�+��"���i�y�� ���� �'°��'��'�
render it unsuitable for proper execution and results. Failure of the Contractor to so report
shall constitute an a���.���a�i��i�r����t t,}��t t.he Owner's or separate contractors completed
or partially compl��t�� �c���:��r��+�t��ar� �� �it <�nd proper to receive the Contractor's Work,
except as to defect� ��c�i tt��;�� ee�a�����a�Naly �c.�coverable.
(c) The Owner shall not be liable to the Contractor for damages suffered by the Contractor
due to the fault or negligence of a separal:e contractor or through failure of a separate
contractor to carry out the directions of the Owner or the Architect/Engineer. Should any
interference occur between the Contractor and a separate contractor, the
ArchitecdEngineer or the Owner may furnish the Contractor with written instructions
designating priority of effort or change in methods, whereupon the Contractor shall
immediately comply with such direction. In such event, the Contractor shall be entitled to
an extension of the Contract Time only for unavoidable delays verified by the
Architect/Engineer; no increase in the Contract Sum, however, shall be due to the
Contractor.
(d) The Contractor �������1 ��rc�n����l^ �°�:n��ciy �����age wrongfully caused by the Contractor to
completed or p��wCw����� �a���h�tu�;� +�c����tr����mon or to property of the Owner or separate
contractors as pr��i��e��i i� ��ib�r�ry��,t��,�a�� l�:�.2(e).
(e) Should the Contractor cause damage to the work or p�°cm���;� a�f" ;��u� s��r,�.c#�ir� ���ca�r���t�w�r
on the Project, the Contractor shall, upon due notice, s�:��:1� w�1��r t��c� ������'��� ������"������"
by agreement, if the separate contractor will so settle. �'�" ���, s�;��r�r'��:�° ����t:���.����° :�+��'� ����
Owner or submits a claim on account of any damage �ll+����i tt� k'���r�' ���x� �c.� `��"����������
the Owner shall notify the Contractor who shall c��:�"e�r�� ��►s��a ��������"������� ��� ����
Contractor's expense� ���� i�' ��r�y .pt�c��n����t or award against the Owner arises from the
separate contractor's �l�i���� �1�� (�°'c�r�ir��t�aa" shall pay or satisfy it and shall reimburse the
Owner for all attorne��� t�e�� �a�� �c���� �r��ich the Owner has incurred.
(� The Owner and each separate contractor shall have the same responsibilities for cutting
and patching as are described for the Contractor in Paragraph 3.14.
6.3 OWNER'S RIGHT TO CLEAN UP
If a dispute arises among t��� �c����r�e:tc��'„ ����rate contractors and the Owner as to the
responsibility under their r��;��+�tiv� ��rat�r���� for maintaining the Project site and
surrounding area free from �^��t� ��t�:�c�°���I;� �nd rubbish as described in Paragraph 3.15, the
Owner may clean up and allocate the cost among those responsible as the ArchitectlEngineer
recommends to be just.
ARTICLE 7 AMENDMENTS
7.1 CHANGE ORDERS
(a) A Change Order is a written order to the Contractor, signed by the Owner and the
Architect/Engineer, issued after executicrn of the Contract, authorizing a change in the
Work, an adjustment in the Contract Sum, or an adjustment to the Contract Time,
consistent with other applicable provisions of this Contract. The Owner, without
invalidating the Contract and without requiring notice of any kind to the sureties, may
order changes to the scope of Work under the Contract by additions, deletions, or other
revisions, the Contract Sum and Contract Time to be adjusted consistent with other
applicable provisions of this Contract. All Change Orders shall be executed on a Change
Order form approved by the Owner and ttee Owner's City Attorney.
(b) In addition to the Owner and the Architect/Engineer, the Contractor shall sign all Change
Orders to verify and confirm the term,� and conditions established by Change Order;
however, should the Contractor refuse tt� ���i�;r� ��'m°.i���r��,� ����°�9�r°�, ��1��„� �hal� ����:��� r�����'� d����r�"�
of his obligation to perform the change dar��:tc�� b�r ���� ���'r���"� �a�r� tl��� �Lr���rt���1��r����r��.;�,r�
to the best of his ability in accordance �w���l� t��a� ���arri��ar�;� �f ���� �rti����1� "�• ,� ���"�������
Order signed by the Contractor indicates ��.i�� ��r���r����ti +��'�6'� �1� c��'t�� cl��t���s �►���u�a.�r�t��,
including the adjustment in the Contra�t ���rr� ���r tl��u ��c�r�ta���c�l� `1`��r��• I��.��� ��"�����< "�°�`�
ORDER SHALL BE SPECIFIC AND FINAL AS TO PRICES AND EXTENSIONS OF
TIME, WITH NO RESERVATIONS OR OTHER PROVISIONS ALLOWING FOR
FUTURE ADDITIONAL MONEY OR TIME AS A RESULT OF THE PARTICULAR
CHANGES IDENTIFIED AND FULLY COMPENSATED 1N THE CHANGE ORDER.
The execution of a Change Order by the Contractor shall constitute conclusive evidence
of the Contractor's agreement to the ordered changes in the Work. The Contractor forever
releases any claim against the Owner for additional time or compensation for matters
relating to or arising out of or resulting from the Work included within or affected by the
executed Change Order. This release applies to claims related to the cumulative impact of
all Change Orders and to any claim related to the effect of a change on other Work.
(c) No extra work (except under emergency conditions) or changes shall be made nor shall
any substitutions, changes or additions to or omissions or deviations from the
requirements of the Drawings and Specifications be made unless pursuant to a written
Change Order signed by the Owner and the Architect/Engineer, it being expressly
understood that the Owner shall not be liable for the cost of extra work or any
substitution, change, addition, omission or deviation from the requirements of the
Drawings or Specifications unless the same shall have been authorized in writing by the
Owner and the Architect/Engineer in a written change order or other Amendment. The
prorr��i���� �i �h�� �'�r��„r����a 'i, ��h�pl control in the event of any inconsistency between
suc�� �r�wzsi��r�� ���� tla� cr�����r �rrr��°isions o�� this Article 7. See Subparagraph 10.3(a) of
the ��n�ra� �'�������ti���r� �c�r +�"l���a�e� �.drders under emergency conditions.
(d) The method of determining the cost or credit to the Owner for any change in the Work
shall be one of the following:
(1) mutua) acceptance of a not-to-exceed lump sum amount properly itemized and
supported by sufficient substantiating data to permit evaluation;
(2) unit prices stated in the Contract Documents or subsequently agreed upon;
(3) cost to be determined in a manner agreed upon by the parties and a mutually
acceptable fixed or percentage fee; or
(4) the force account method provided in Subparagraph 7.1(e)
��) 1�'t.l�� ����'t.i�.� c�����'��t �,�c�� t;c� c�r�� ��C���� ����thods of calculating cost provided in Clauses
��� ���� ��� ���� �r �'�� ���„ �r� �t i�� ��rtu�� ������ee to a method but cannot agree to a final
�����p�� � M������ ��� �� t���;. C;���a�r�ctc�� f�r avha��vcr reason refuses to sign the Change Order in
���,,;�a���$ ��y,� �����,���;�„���r, ��-��+ra��ti ��c. rc.��ives a written order signed by the Owner, shall
��.��������� ��.���,��;� ,,���� ���� a,�,���� ��:��1��,� The cost of the Work involved shall then be
����;�a��t:�t� �aa� th� la��;�:� �a�` �h� r•�a�c�a���l��� j+���;rs�t+� ��p��r��w���r�� �.r�� �av�i��;� ��` t���we
� t.
performing the Work attributable to the ��i������, ir��l+���i�� �� ��y���������� ����'�'"���'�� �"��
overhead and profit, such allowance in ar�;� c��� r��v�:� ta� ������G 1���>� l�r ���'�:�� ���•'�+�, ���'
Contractor shall keep an itemized accountix�r� a��� t1�� Wcsrk ir�vc:�kv��, ���� �� �����" ���"���> ��
such form and with the appropriate suppo�°�N���; t���t�� �� t���a: �rul�tk����"����s���°���"' ������� ��"`�"''�'��'�
may prescribe. Sworn copies of the ���r��rccl ���c�ur�t��,� �ha�� iac ����vs�r+�� ��� ����
ArchitecdEngineer each day during the ����J"�r�������� ���� �c>�"�� �����o��� "+�''�x'�� �'�'���� �'���'��
to the Owner.
FAILURE OF THE CONTRACTOR TO SUBMIT THE SWORN-TO ITEMIZED
ACCOUNTING DAILY AS REQUIItED HEREIN SHALL CONSTITUTE A WANER
BY THE CONTRACTOR OF ANY RIGHT TO DISPUTE THE OWNER'S
DETERMINATION OF THE AMOUNT DUE THE CONTRACTOR FOR FORCE
ACCOiJNT WORK. Costs to be charged under this Subparagraph for force account work
are limited to the following:
(1) costs of labor, including social security, old age and unemployment insurance, fringe
benefits required by agreement or custom, and workers compensation insurance;
(2) costs of materials, supplies and equipment (but not to include off-site storage unless
approved in writing by the Owner), whether incorporated or consumed;
(3) rental costs of machinery and equipment, exclusive of hand tools, whether rented
from the Contractor or others;
(4) costs of premiums for all bonds and insurance related to the Work; and
(5) additional costs of supervision and field office personnel directly attributable to the
changed Work. Pending final determination of cost to the Owner, payment of
undisputed amounts on force account shall be included on the ArchitecdEngineer's
Certificate of Payment as work is completed.
(� The amount of credit to be allowed to the Owner for any deletion of Work or any other
change which results in a net decrease of the Contract Sum shall be the amount of actual
net cost confirmed by the Architect/Engineer plus the stated percentage for overhead and
profit. When both additions and deletions or credits covering related Work or
substitutions are involved in any one change, the allowance for overhead and profit shall
be figured on the basis of the net increase or decrease with respect to that change.
7.2 SUPPLEMENTAL AGREEMENTS
A written Supplemental Agreement can also be used to implement changes in the Work
instead of a Change Order form, including but not limited to situations involving partial
occupancy of the Work under �'�r��r��k� "� ������t��u ����9� t� t�� L��°t�vva���� �a�° �1��
Specifications without an increa�� ion t�d� �"c���k'r'��� �Aa�a��� ��' ����M�� �i�"���'��`�������� "�'`���'~'��` �� �"�
necessary or more appropriate �c�� t��� ��"�����' t�� ���� �� `��i��1����x�t�l ��r'�+���%���, "�r��t�r�
�����1�������w1 �1�„re�r��+�r�t� ��a�V'N h�a� �� �;t����.�� �����1 tca t���t �:af" (�:1���a�� �r�Nc,r� �'���c �a�rp�r��r�� �rt.
��rri�r�:t�! r�i �'ca�7t�a�;!l ����u�r��nt� ��t+�r�rr�t�t�ca��, �,:����a�l t��:t t�� th.c; �;�c��t�t c�f' � �.c��yi'1���, l��t�.�
�u����l�r����°���V ��a����x��rit� �r� �uarro�� c����t�°c�� �iv�x• �a��-�r�rW �a�a���l��r�����i C��������rst�, ��r�� 11a�
��t�s� �"���r��c: (��tB�r� c�r ��a��l��xa�r�t�al �.�r��n�c;t�t �a� tzc�x� ��:�rtit�°rals �a��r r;arm��r� c��t�� �,"l��r��;�
,��.����� �a��,� ��u��V���n�.a�t;�� �1�r��;��7���G��. '1'h�� �wles of Subparagraphs 7.1(b) through (� shall
�I�c� ��q�ly� tc� t��c� n�,������C��� �r�� t�x��r�tu+a�� ��f �upplemental Agreements.
7.3 MINOR CHANGES IN THE WORK
The Architect/Engineer, after notifying the Owner, shall be authorized to order minor
changes in the Work not involving an adjustment in the Contract Sum or an extension of the
Contract Time and not inconsistent with the intent of the Contract Documents. Minor
changes shall be effected by written order, and shall be binding on the Owner and the
Contractor. The Contractor shall carry out such written orders promptly. These written orders
shall not be deemed to change or impact the Contract Sum or the Contract Time. Contractor
shall have no Claim for any minor change ordered to the Work under this Paragraph 7.3
unless the Contractor submits its change proposal, prior to complying with the minor change
ordered and in no event later than ten (10) working days from the date the minor change was
ordered, to the Owner for approval.
7.4 TIME REQUIRED TO PROCESS AMENDMENTS
(a) All of the Contractor's responses �� q��c��������1 �e����:�'�°� ������ �� �������1�������' �'Y �
complete, itemized breakdown of ��s��. �����+��3��"� �� f��'�����"��� r������'�'��" ����� �"�
submitted sufficiently in advance of t:��,� r�a:��tu�'�c� "a�'�X� t�7 �1�4�'�" ��7� ��"�`�'�°` ^���'� ���'�
Architect/Engineer a minimum of thi�m�y ���� ���������' ���Y'� ����� ���'���� �� ���"
ArchitecdEngineer to review the itemi:��:�i ��a������C�c��r� ��� �� ��"������"� ���" ���`��"�N���'p'�
additional documents as may be necessa��. .�e�l� ��f th�� C��ab����������'"� ��`+�����`��� ��� ��`���`'��
requests shall include a st�t���r����t th��t 1�� �cr�t ��s�rib�� ar� �1��. r�,��������� r�}�r�,�e:�r�«; tN��
complete, total and final c�a�� ���r� �clditicanal Contract Time associated with the extra
work, change, addition to, caw�a���ie�n, +��v�;�tion, substitution, or other grounds for seeking
extra compensation under the Contrac�t Documents, without reservation or further
recourse.
(b) All Amendments require approval by �i�h�r c1�� ��'�t�^ �'<�u��,i� �a�°, v�r�c��°� �����'�.'�`���� ��" ����
state law and City ordinance, by the C�i�:y iv���������' ����"�+�.r����� %� �a�����d►�iwz.�rativ�� �c����r�.
The approval process requires a mir�it�u��r'� iaf ��t'��-�r�� ���� �"°�Z������° ���"'� ����
submission to the Owner in final form �v�tik� ��11 ����aaac�r��,n� ���i�• ���:�M�d �'��' ��'���°°�����������
by Owner does not constitute acc���t�x7�� �:�r �N��rF��v��l ca�" ��c��a��a�s��8„ r��� �i+��� it �:�����tiluut�,
a warranty that the propos�6 �ri�l k��: ���t���s°ix��i t�� Cit�r C�c�r�r��iN T�c���al�tuc�w� ��r
Administrative Action. THE `1"�h������ ���;�����f�� :�:� �����"�. � � 16;�. /��'l�'���.���°��'� �'T'��-��"�"��
SHALL NOT BE CONSIDERED A�7������" ��1�� ��� ��r�,�-s�����"�`� m�j�� ����""
������"���,�"^'�" -��������o ���1� ���,���.�?/�,�f�� IN THE CONTRACT SUM WILL BE
,�K������)�r�x���� ��� ���,q,�'����"f;I;� ,�w„��" � RESULT OF THIS PROCESS. Pending the
�������,�� ��,��„�,�.y���,� ��'��y�, t���. ��.�2u��i�•��t;c�r will proceed with the work under a pending
,�.����r�dm��:rit c>��1� ii'"cV�r��te� ir� +r�ritmr�� �g� the Owner.
ARTICLE 8 CONTRACT TIME
8.1 DEFIIVITIONS
(a) Unless otherwise provided, the Contract Time is the period of time, including authorized
adjustments, allotted in the Contract Documents for Substantial Completion of the Work.
(b) The date of commencement of the Work is the date established in the notice to proceed
from the Owner. The date of commencement shall not be postponed by the failure of the
Contractor, or of persons or entities �"r�� ����a��� �k�� �."tacl��r��rc��" i� r���c���w���� �ck ���
promptl� tca ��at�arort����.� ���, 1��rir. If t�°�� �"�v�rr���m ��ns•���s�r����ly ��l�ys tl�� ��s�a�r��� �� �}��
notice t.�� prc����� �h.�c;�r��h ta� t��lt of mw��, C�c.���lr�.������ t,l�� �."��t�t�•;��tar �h��Vl �� cr�tit1�� ca��N�
to an ���it��l�, ��t�r��S����. ��i" t1�e �"�a��lam�u�t "�T"6rr��, t.M�� �s���t�°<��:1: ������ ���aV� a��r��r��u��
unchanged.
(c) The date of Substantial Completion is the date certified by the ArchitecdEngineer in
accordance with Paragraph 9.7.
(d) The term "day" as used in the Contract Documents shall mean a calendar day, beginning
and ending at 12:00 midnight, unless otherwise specifically defined by special provision.
8.2 PROGRESS AND COMPLETION
(a) Time limits stated in the Contract Documents are of the essence of the Contract. By
executing the Building Construction Services Agreement, the Contractor confirms that
the Contract Time is a reasonable period for performing the Work.
(b) The Contractor shall not knowingly, e�c��.�:�t k�y ���������s�r�t �'Nth ��r i����c"��c�ii���� ���` ����
Owner in writing, prematurely comm������ r����°�ti��r��� ���� ��� 1��"���^��� tii��� <�e �,1����v���c�
prior to the effective date of insurance tc� l�� �a�r��i:����e� �� ��� �%����"������` ��`� �"�"��"��'�"��� ��"
Article 11. The date of commencement �af'�1�� "i�1"��°� �1���� ����� �� ��������'�"� �� ���� ����'���"��''
date of insurance required by Article 11.
(c) Liquidated Damages. The Contractor shall proceed expeditiously with adequate forces,
materials, and equipment, and shall achieve Substantial Completion within the Contract
Time. If the Contractor fails or refuses to ��wn�le�t� th�� '�v"c��6� "��"it�tic� t��� +�r�r��r`��� "I°��� ��
���.c�it��ci ��� �;�ae �uc9 I'rc���c���l ��r�r�n, 1��+� i�ma�i9��a�� C:"��s�r�c��c���u ��rv���w �a�a��;�r�°�c�r��„ �ar �r�
�rz��" �arc��r��° e��c;���;iu�� e�� t1�a� {��;"��►��r��t "I"ir�� ,�r��tc:e� �a�r �1�� �C,)w���c°, th�a� thc� �:�c���tr�������w
���x°���, ��� � ���� �f� t��� ��r��r�����ut:�r�r� f��r �,1�t, P�w�rcii�� c��" t�� C��r�tr��t, �ca ��a�y �c� ��a�:
�:)r�rr�:r �I�e ����c��ur�ti ��C 1ic��,�i��t�,� dat����;� ('k�c�r�in����r �;�l�e� t1�r� "��ti���l�i��&' �ar��c���r�t"� ���.
stipulated in the Bid Proposal form and m;�� E�������c�ir��, �`<����t������.tia�i� ��rvze���� ��;���°�'����'���
for each calendar day that the Contractor �a�� ���t ���k��������i�li� +��c�r�r�A�t�� t6�e `'�`���`� a���°�'
the expiration of the Contract Time ��r���v��c��. ���M��� �t��a�l��t��l r������t�������� b� ��t�� i� ��:'
considered as a penalty, but shall be d���ri�ci, ������, �'�� ��'�"����� �� ����������1� l���r�����
��rra��;�.�� �x�c�' �i��ci x��z���c� �a�a�a� k�� �r��i 1���w�t�r� �hu� C�+���a�r��tic�r �ar��� t��� (,�w���r t�����u��:;
C�{' ��,� ������,�;����im�� �Ga�� �xtr��r�� c�i:tii��,�lty of fixing and ascertaining the actual damages
���,� ���,,.����- ,������,� �u���;���� ��7 ����� �rr�+�w�t�� c��"�the Contractor's late completion of the Project,
and the stipulated amount is agreed to '��� t���� �����i�� �rr�i�w���t< <:a��' ��m�����:� t����.w� tl��� ��'ww���r
would sustain. The Stipulated Amount, a� i� �c�a-��,�� �ilV �� �m�t<�i��e�i �c'a�r� �r��r ��a�"tica�, ��"
the Contract Sum due or that may becoza��; c�t�+� �a� t�� ��c�►a�r�a�t�ar• 1�� �}�a� cv����� 1��� ����������
of the Contract Sum retained by the (;�wra�� i� i��:����`��i�r�� tm� r�.�ccr�r�,�r w:�a+� �tM��������d
Amount, then the Contractor or the Contractor's Surety shall pay to the Owner any
additional liquidated damages due that are in excess of the funds remaining unpaid in the
Contract Sum. The Owner shall be the sa��le. j������ tt� i'��r '�'��c�t���" +��` ����� ���' �'"'���� ��'�`� ������
Substantially Completed within the c����r�����r ��,�yw ��l��tq,��l�� �"��i+��� �+1����� w���%���r��'� ����
�r����„in,�1 �,��r��t����t '�'ir��� ����� �u����° ��rc��acr ��t�����c����� c�t �i7�:�� �"���c�tr�ct "1"ir���� �r����t��' i� �r�at����
�a�r tk�� +��vvi��r. �1���aal� tl�c� C:°a���ic����c�� c�i����c�� �.N��� ��^�w���a°"� d�t�rrr��r��►t��.�ar� ��" li�,p���c���a��l
�i�������� �r��, 1�ea�u�verr �r ����a�alc� t�� C:c����r��tc��°, ��aµ t}�� +�ta'a��ac;tcrr'� rr�;;����� c�� ������w��,
���������� ���,� �,��,�� �����,�� ������� ���� Owner to enforce rights under the Contract
Documents, then this Subparagraph 8.2(c) shall not be construed to prevent the Owner
from seeking full recovery for any and all actual damages suffered by the Owner and
attributable to the Contractor, as an alternative to all liquidated damages due.
8.3 DELAYS AND EXTENSIONS OF TIME
(a) If the Contractor is delayed at any time in the progress of the Work by an act or neglect
of the Owner or ArchitecdEngineer, or of an employee of either, or of a separate
contractor employed by the Owner, or by changes ordered in the Work, or by labor
disputes, fire, unusual delay in deliveries, unavoidable casualties or other causes beyond
the Contractor's control, or by delay authorized by the Owner pending a claim, or by
other causes which the ArchitecdEngineer determines may justify delay, then the
Contract Time shall be extended by Change Order for such reasonable time as the
ArchitecdEngineer and Owner may determine.
(b) Claims relating to Contract Time and time extensions shall be made in accordance with
the applicable provisions of Paragraph 4.3.
(c) No Damages for Delay. NOTWITHSTANDING ANY OTHER PROVISIONS OF THE
CONTRACT DOCUMENTS, INCLUDING THE GENERAL CONDITIONS, NO
ADJUSTMENT SHALL BE MADE TO THE CONTRACT SUM AND THE
CONTRACTOR SHALL NOT BE ENTITLED TO CLAIM OR RECEIVE ANY
ADDITIONAL COMPENSATION AS A RESULT OF OR ARISING OUT OF ANY
DELAY, HINDRANCE, DISRUPTION, FORCE MAJEURE, IMPACT, OR
INTERFERENCE, INTENTIONAL OR UNINTENTIONAL, FORESEEN OR
UNFORESEEN, WHICH INCREASES THE TIME TO COMPLETE THE WORK,
INCLUDING BUT NOT LIMITED TO ANY DELAYS CAUSED IN WHOLE OR 1N
PART BY THE ACTS, OMISSIONS, FAILURES, NEGLIGENCE, OR FAULT OF
THE OWNER, THE ARCHITECTBNGINEER, OR THE OWNER'S
REPRESENTATIVE, AN EXTENSION OF THE CONTRACT TIME UNDER
SUBPARAGRAPH 8.3(a) BEING THE CONTRACTOR'S SOLE REMEDY.
(d) The C�����:r s���t�l )�u��v�. �t�� �i���� kca �a�:cupy, without prejudice to the right of either party,
any �c�r�����c,� c�r ��c��d� �c�rra�l���c� portions of the structure or Work, notwithstanding
the fi��t ���at �I�� ��c�t��-��c�t "�"ir��c� �'��►" ��"�mpleting all or a portion of the Work may not have
expired. Partial occupancy and use shall not be deemed as an acceptance of the Work
taken or used.
(e) The Contractor shall promptly suspend the Wor� �r1��t� ��t�a��° tl�� �"+:7��t:�<��t�r or the
Owner is ordered to do so by a court order from �a c��:�t�ri ����w'�n�, �"a�w'�"��� J�.ur"M�cir��ie�n, and
the Contractor will not be entitled to ad��itional �t�r����r����tic.�r� k�� vi�t��� �a�" �r��^ delays
resulting from the court order. The Contractor wi1� �x��� ��c�� ��c 9��k�i�, tc� ���� ��.��"���r for a
delay caused in fact by the Work being suspended by a court order.
(� The Architect/Engineer, with the consent of the f;�w��c��, �t��11 I��v� t��� ���r�h��rNty to
suspend the Work, in whole or in part, for �����Y� ��r����i ��� ���'r���� �a� the
Architect/Engineer deems necessary due to unusual �m :��v�r� w���N��r �:a��ae���i�r�� �� are
considered unfavorable for the suitable prosecution c��` ���� "�r"ca�°�.�, ��" ���� ��a ��a�Gr.��� ��r� the
part of the Contractor to correct conditions considered unsafe for workmen or the general
public. If it should become necessary ��a�:� �t�,��� ���� 'V�"��rk ����� ��o� ������������� 1���������� ���'
Contractor shall store all materials in su��� �� ���r�?���' �.��� ����� "�'��� �°�� ���������� ��°M �������'
the public unnecessarily or become dam�,��:cl ir� ��n�° ��y, ��� ����z11 �����` ��''�x�" ��"�'��'�������'
to prevent damage or deterioration of th� ""+�r�c���. ���'����������• �r� '����"� 4�� ���^l��x�����°� ��� ti��
Work under this Subparagraph, the Con�r�u����• �����1� ���« �r�a�md� ����t����1� �r�ir���� ������,��
the Work and erect temporary structure� r�w�u�r°� ��rc��������'� ��'��+� '���!��������" ����� ����
suspend the Work in whole or in part without written authority from the
ArchitecUEngineer or the Owner, and shall resume the Work promptly when notified by
the Architect/Engineer or the Owner to resume operations.
(g) In the event of a delay that is the responsibility of the Contractor or any of the
Subcontractors, for which the Contractor is not entitled to a time extension under the
provisions of this Contract, the Owner may di�µ��t t����t �Na� ��r� �� ���elerated by means
of overtime, additional crews or additional shif�s, c��' �`�����r����"����� F�'���� acceleration shall
be at no cost to the Owner and will continue ���t�0 i1�� �'c��atd��.�� "l�i���t� is restored. In the
event of a delay for which the Contractor is entitled to a time extension, as determined by
the Architect/Engineer, Owner may similarly direct acceleration and the Contractor
agrees to perform same on the basis that the Contractor will be reimbursed only to the
extent described in Subparagraph 4.3(i). THE CONTRACTOR EXPRESSLY WAIVES
ANY OTHER COMPENSATION RESULTING FROM ACCELERATION, SUCH AS
LOSS OF LABOR PRODUCTIVITY OR EFFICIENCY.
ARTICLE 9 PAYMENT'S AND COMPLETION
9.1 CONTRACT SUM
The Contract Sum is stated in the Building Construction Services Agreement and, including
authorized adjustments, is the total amount of compensation payable by the Owner to the
Contractor for the performance of the Work uinder the Contract Documents.
9.2 SCHEDULE OF VALUES
Before the first Application for Payment, the Contractor shall submit to the
ArchitectlEngineer a schedule of values allocated to various portions of the Work, prepared
in such form and supported by such data to substantiate its accuracy as the
Architect/Engineer may require. This schedule, when approved by the ArchitecdEngineer
and the Owner, shall be used as a basis for the Contractor's Application for Payment. The
schedule of values shall follow the trade division of the Specifications. Contractor's
Application for Payment shall be filed on the current version of AIA Form G702
(Application and Certificate for Payment), as approved by the Owner.
9.3 APPLICATIONS FOR PAYMENT
(a) At least ten (10) days before the date established for each progress payment, the
Contractor shall submit to the Architect/Engineer an itemized Application for Payment
for Work completed in accordance with the schedule of values. The Application shall be
notarized, if required, and supported l�� ���� ��a���*���������� ��'� '���"����`�'������T�' ����� ���
� �" � . � �� �r � " �, un��r��ci�r�� t°���t t���t I�M��it�cl ��
� r��a�r�t; �;� t���+�� �)���r� �� ��c.��it+���"���� �����r r��� rr;� u,��r
���w��:,� �� ��:c��a���iti�rn� t��aa��, �a����c�r��r����a�� ��n� �n�t�r��l �����1������;, ���� �•�f���.�;u1�� t���.
�a�a�1m���{a� w•�t�i����� ��.� ����q�a�a��� �n tM�� C'.���Cr�c�� ���zs�r�u����r�t�;. �'c�rrt�����a�°�� ��r�����ti�a�� �iar
����x���,� ��;��p ����;� �g•��vi�� ��i���r wa���c�rting documentation as the Owner or the other
���di��k�l� �arc��i:�u�a�:� �fCk�� ��r��w'��� G����:uments may require.
(b) Applications for Payment may not include requests for payment of amounts the
Contractor does not intend to pay to a Subcontractor because of a good faith dispute,
unless the Contractor complies with Clause 5.3(b) (2) of these General Conditions and
the Contractor's Payment Bond Surety consents in writing to payment to the Contractor
of the funds deemed to be in dispute.
(c) 4�r���s� �t°����•�i�� �a�°�wri��c� ir� �h� �scar�t:ar��� ��:��u�rr��a���, �rca��r��s ���rr�ent� ����ui� include
�,��r���at. �`c�r rn�at��i;��� ��a�l t��x�i����c��t cl�l,iv�c�c�' ��� �;r.��t�bl� �t�r�� ��t ti�� d�r�aj���t site for
�:��l�s�t���;r�t i���;�r��r�rati��� i:t�t� i��� �'�.�r� rr�itl��r� t�u��-�� ����� ���+� �f��� ��lirr��•�r to the
Project site. If approved in advance by the �����crro ���;����m�r�t ����y� �ir���l��l�^ l�� r�uade for
materials and equipment suitably stored a�;�� �x�a��� t1�� ��"r�����t. �i�� �t ���,�a���ic�� agreed
upon in writing. Payment for costs incurred in storage of materials or equipment away
from the Project site will NOT be made by Owner unless:
(1) the Owner has given prior approval of such off-site storage in writing;
(2) the materials or equipment are stored in a bonded warehouse located in Denton
County and identified with the Project for which they are stored, as evidenced by
warehouse receipts and appropriate documents of title; and
(3) the materials or equipment stored off-site will be incorporated into the Work within
thirty (30) days after delivery. STORAGE IN FACILITIES OF THE
MANCTFACTURER OR THE CONTRACTOR WILL NOT BE PERMITTED OR
PAID FOR, UNLESS THE OWNER HAS EXPRESSLY GIVEN PRIOR
APPROVAL OF SUCH STORAGE IN WRITING.
�,�� �p���,� ,�������z,����p� ����;���� ���,;� ���Z� t� ��� t�,r"�rk covered by an Application for Payment will
�a��;�� ir� t:��� C.��r���° rwcs �a��.r th�a� ��� �i���a �al" �a�ya���n�� 'I'V�� �"�a�a�r��C�ar �i��rth�;r w��c•�°��r�t� 1���r:t
���s��� ���l�r�utC�l ��� �.�� ���li�:�tac�r� f�r� �''a������� ���1� �'"e�rk. ��a� ^wl°�i��� C'��-titi��t�s �'car
�'"��+r��:r�t t���� ����r� �r�vi���l� i�s�:z��� �r�cf ��y���.��t� �+���;uv�� ��cacn �h�c �:�w�r��:.e s���Vl ��
free and clear of liens, claims, security ir��t�r�c��ts �a� �����r�k�►`�r��c� i�'� fi�����' ��' �'���
Contractor, Subcontractors, material suppliers, or other persons or entities making a claim
by reason of having provided labor, materials, and equipment relating to the Work.
(e) All materials or equipment delivered to th� a'��.��j��t �i�� ��ar�i�r� t��� ��rirt� (:�f�) ���y:� ��ci���
to an approved schedule for delivery to t��� 1''�°�aj�:�t �i�� ��a��ll ta� �1<�s�if��� ��� �n "`���r��'
delivery." All early delivery materials t��• �����a�a��r�t ��uwa�i h�v� t�7�; �����`��� �"r�t����
permission of the Owner to be stored o��a t��� ��•a�j��t �it�. ��` �r�y �ar����a�ta�ri�e�� ��r��
delivery occurs, Contractor shall, at Cor�t����tc��'"� �����m��� ��r �t t�� �����w� ��' ���
responsible Subcontractor or Supplier, cause such early delivery to be removed from the
Project site and stored off-site until required at the Project site. All costs of labor,
transportation and storage will be included as��r� ��� t�i� ��c:��r���:. �� ��� '�"��ti�����'��" ������
or refuses to remove unauthorized early deliv��� ���i�r��.l;�� �k�� ��e�"r�r�r a���Y ������ �u���,
materials to be removed at the Contractor's sol� ��������, ��� �g�►������ �►►��� �� "�"�'��������
from the Contractor's �,��du����c��� �'c�ow 1'�yr�t�nt to reimburse t���, C:������ ���r ���y^ ���t,�;
incurred in removing �at�<���t��c��°i��c� ���rl� �1c�li�v�ry materials. ()"'4�"�[�;f� '�N'��,1�� �9(�T" 1�.��s
RESPONSIBLE FOR 1�-���:^; �`���w�"�':f��'"1"��"��� ������°� OR RISK OF i.���� �:�'�»d' �I�� l�'�.��.�.�`�"�
DELIVERY MATERIALS OR EQUIPMENT, NOR WILL OWNER BE LIABLE FOR
ANY PAYMENT FOR THE EARLY DELIVERY MATERIALS OR EQUIPMENT.
Any materials or equipment classified as early delivery will not be approved for payment
as stored materials prior to thirty (30) days before the incorporation of the materials or
equipment into the Work, unless storage and payment at an earlier date is expressly
approved in writing by the Owner.
(� If the Contract Sum is equal to or less than $25,000.00 and performance and payment
bonds are not furnished by the Contractor, no payment applied for will be payable under
the Contract until the Work has been Finally Completed and accepted.
9.4 CERTIFICATES FOR PAYMENT
(a� "�"1�� ��°�1,~����;c:����it����' will, within ten (10) days after receipt of the Contractor's
��������ti��y fi��r'1����ac���ti� either issue to the Owner a Certificate for Payment, with a copy
�� �h� C�����r�.c�t�a��, f��� ���h amount as the Architect/Engineer determines is properly due,
or notify the Contractor and Owner in writing of the Architect/Engineer's reasons for
withholding certification in whole or in part as provided in
(a) ���:� ��f C������ �x��eral Condit����� :��ar [��u�l��r�� C����:a��s�r��ti��ra.
(b) ��k�N��r��r����� '�, +(�t). The Certi.f���ta� �:���• I��������t �l��aCl 1�� i�;���r��! �a�� ���� �urr����� °v�c��c�:�s�
c�f",�1� �^c�rrr� �:�74? �APPlicaticar� �.��� C;�a•ti:(i��t�: 1'�s�° ���ar����ni') i�� ���r��.�vc�ci ti���+ tY��, �::)v,�r��r.
(c) The issuance of a Certificate for Payi���rt va��l �����tii�atiu r� ���?r'������������ ��" ����
Architect/Engineer to the Owner, based on the Architect/Engineer's observations at the
site and the data comprising the Application for Payment, that the Work has progressed
to the point indicated and that, to the best of the ArchitecdEngineer's knowledge,
information and belief, quality of the Work is in accordance with the Contract
Documents. The foregoing representatio��� �r� s�ak�jc�C �� a�� ��"�M�������� ���TM ���'� ''�"'����"� ��-���
conformance with the Contract Docum�.a�u�w t����:�r� �t���i�����1 �n� �' ����1 ����r������t���r ���
results of subsequent tests and inspectf��r��, t�� �i��am° ��'�v'z������� ��'�z� ���'� '������"����
Documents correctable prior to Final Cot���a��t���nw ��� t�r ����;��� �q�������������►�� ����"�����'
by the Architect/Engineer. The issuancep c�� ���:�r�i9"i����� f��' �'�������� '�'►�� ����'���'
constitute a representation that the Contractor is entitled to payment in the amount
certified, subject to the Owner's approval. The issuance of a Certificate for Payment is
not a representation that the Architect/Engineer has:
(1) made e�chaustive or continuous on-site inspections to check the quality or quantity of
the Work;
(2) reviewed construction means, methods, techniques, sequences or procedures;
(3) reviewed copies of requisitions received from Subcontractors and material suppliers
and other data requested by the Owner to substantiate the Contractor's right to
payment; or
(4) made examination to ascertain how or for what purpose the Contractor has used
money previously paid on account of the Contract Sum.
(d) Whenever the Application for Payment for Work done since the last previous Application
for Payment exceeds one hundred dollars ($100.00) in amount, Owner will pay a
percenta�� c�� d:���, ������i�ation, less appli��ble: rc�t�u���,��„ tra t��� �'���tr��tur w�19�i�� �hir��
(30) day;� �'caNl���+i�� (:�°�°��t'"s receipt and ������a! c�f'�1�� ��rt��'ic��,�� ��r f��y�na�r�t c��rti�ic�cl
by the r'��c��it��c�t/��.r���ir������. The Appli��ul�c���� r���r i��l���� ,a�a�����%I� r��.�r�����i��l����l�"
materials delivered to the Work or stor�:c� ��� �r��vi�lc.�9 �"c��• ira i���r���'�pi� ��.:�(c,j ��� th�
payment will be allowed on the net invoic�� ��l�x��g Ie,�� ��a��� ��r��1 ����������� �'�����x�������
(e) The City is required to withhold retainage for public works contracts in which the total
contract price estimate at the time of execution is more than $400,000; however, this
requirement is typically applied by the +��it� �'a�� ��V p�����lac� '�'ca�°k� �����tm<��i� �ra �����s �.���
$50,000. The City may require varyin� ���c���tt��;� "+��tl���c����n� �r���au����� hc�"�«'"�'°���", ���u�
City typically requires five percent. For rs�t���ta�� g�+�r��,x�t��„�� m�� �xce�� +a�` %v� ���'c��r1t„
the City must deposit the retainage into �� ir�t�ac��i-���uir�� �����r�r�t ���c� ��y t1�� �rz��t"�:��
earned to the contractor on completion of the contract. The retainage will be withheld by
the Owner from each progress payment until final completion of the Work by the
Contractor, approval of final completion b�° t��� ,�r��ai�c��.�'�'��ir����'„ �a�a� 1����� u����t�ca�c�
of the Work by the Owner. Unless ot.l���`v�vi�� r�c���ir��' b� �t�►t�; l�a�", ti�c r�t�i�����
percentage as specified above is based u��as� �h� c��i�i�xw1 �,'�ar�tr��c�� ��.a�n„ ���� �"���' '���� N'��
affected in the event the original Contracf �u��a� �� ������;ac��u�e��.�� mr��,m`c�a��ci ��� �i��������a� �:��'
Change Order.
(� No progress payments shall be made on contracts where performance and payment bonds
are not required or furnished. In such instances, payment for the Work performed will be
made upon final completion and acceptance by the Owner of all Work.
9.5 DECISIONS TO WITHHOLD CERTIFICATION
(a) The ArchitecUEngineer or the Owner may decide not to ce�°�i�"�^ ����^w�ro���l ���� �����
withhold a Certificate for Payment in whole or in part, to the ext�r�t ra��a�����;�ty ��:��s:��r°�^
to protect the Owner's interest, if in the ArchitecUEngineer's c��° �^w�'�����'� c���ir�ic��� i1��
representations to the Owner required by ��aia�a��`��ca��l°t �•��,�� ��������� �� �ro7���"� If the
Architect/Engineer or the Owner is unab�� tr:� �,��lr��^ �a��r��t��tt i�� ti�c ��-t�c�tar�t of the
Application, the Architect/Engineer or the f�rva���r ���1 r�c�tii;� ���c ��r�t`r���:��r �� '���ovided
in Subparagraph 9.4(a). If the Contractor and Architect/Engineer or the Owner cannot
agree on a revised amount, the Archite+�t���.a����r����r '�'il� �r����1��1�� a����� �� �^����'���x� �������
���,yr�����t ��ar ti��� �rne,��r�t for whic�� �k�� �,.r�1�i���tlF,��������u�r is �a1�1� ��a ������ m}�r� ����ir��.
r��ar���,���ti�z�� �� th�. (�wner. The ��ch�t+���l��,7��i����c �r thc, i��v��:,�• r����r ��:C��a �y'�ci��c� m�a��
t�� �a���kw1"� �r���c��r�t ��r, because �.��` :��.�i�a����,r���tl� �m��.�av�:�r�ci a�ad�����; �.�r� �r�1���c;��.��
observations, may nullify the whole or �a ���rt�� ra1' ����.dtic��t� 9"+��" I'��r�����t �a�'��i<�������"
issued to such extent as may be necess���y, ��� ���� ��"���������"��t�����'��''� �ar' C�"w"w'r��,�r'`'
opinion, to protect the Owner from loss because of:
(1) defective or nonconforming Work not remedied;
(2) third party claims filed or reasonable evidence indicating probable filing of such
claims;
(3) failure of the Contractor to make payments properly to Subcontractors or for labor,
materials, or equipment;
(4) reasonable evidence that the Work cannot be completed for the unpaid balance of the
Contract Sum;
(5) damage to the Owner or another contractor;
(6) reasonable evidence that the Work will not be completed within the Contract Time,
and that the unpaid balance would not be adequate to cover actual or liquidated
damages for the anticipated delay;
(7) persistent failure to carry out the Work in accordance with the Contract Documents;
or
(8) mathematical or other errors that are discovered in the Application for Payment.
(b) When each of the above reasons that existed for withholding certification are removed or
remedied, certification will be made for amounts previously withheld.
(c) The Owner may, at its option, offset any progress payment or final payment under the
Contract Documents against any debt (including taxes) lawfully due to the Owner from
the Contractor, regardless of whether the �,imount due arises pursuant to the terms of the
Contract Documents or otherwise and regardless of whether or not the debt due to the
Owner has been reduced to judgment by a court.
9.6 PROGRESS PAYMENTS
(a) After the ArchitecdEngineer has issu�ri �� C'��i��t��i� I:c�t" F"��,yt������, ���� �-�'��'����" ������ �����'�
payment in the manner and within t��cw ti�n� �aar�a�ri���i ir� th�� C;c.a�ai:w�a�;� [��a����°�°t�����, t�.��t�
shall so notify the Architect/Engine�r. �"l�c� 4�v����r �h�.dl r�c�t ��� Oi�b�� �r�� iraC����t ��ar� ����
late or delayed progress payment or final ��yc�a�,r�t �a�a�c�� ��� �n� ��a�d�a ��` �l��➢��a��, ��x��'
discrepancy in quantities, any failure to ���c�vi+�c� �!u���rti��,� c����.���r��������� ���" ������"
information required with the Application f�arr �"��x������: �a�' �� ����"�"�������������� ��� I����������
under the Contract Documents, or ���: t,�� ��� �"��"������ ���� '�'"�`A'���"� ���` ���
ArchitecdEngineer has a right to withhold or not certify under the Contract Documents.
Notwithstanding the foregoing, the Owner may refuse to make payment on any
Certificate for Payment (including, without limitation, the final Certificate for Paytnent)
for any default under the Contract Documents, including but not limited to those defaults
set forth in Subparagraph 9.5(a), Clauses (1) through (7). The Owner shall not be deemed
in default by reason of withholding payment while any Contractor default remains
uncured.
(b) The Contractor shall promptly pay each Subcontractor, upon receipt of payment from the
Owner, out of the amount paid to the Contractor on account of each Subcontractor's
portion of the Work, the amount to which said Subcontractor is entitled, reflecting
percentages actually retained from payments to the Contractor on account of such
Subcontractors portion of the Work. The Contractor shall, by appropriate agreement with
each Subcontractor, require each Subcontractor to make payments to Sub-subcontractors
in similar manner.
(c) The Architect/Engineer will, on request, furnish to a Subcontractor, if practicable,
information regarding percentages of completion or amounts applied for by the
Contractor and action taken thereon by the Architect/Engineer and the Owner on account
of portions of the Work done by such Subcontractor.
(d) Neither the Owner nor the Architect/Engineer shall have an obligation to pay or to see to
the payment of money to a Subcontractor except as may otherwise be required by law.
That obligation belongs to the Contractor or, in the event of the Contractor's failure to
pay a Subcontractor, to the Surety on the Payment Bond as required under Paragraph
11.3.
(e) Payment to material suppliers shall be treated in a manner similar to that provided in
Subparagraphs 9.6(b), (c), and (d).
(� A Certificate for Payment, a progress payment, or partial or entire use or occupancy of
the Project by the Owner shall not constitute acceptance of Work not performed in
accordance with the Contract Documents.
9.7 SUBSTANTIAL COMPLETION
(a) The Date of Substantial Completion of the Work, or designated portion of the Work, is the
date certified by the Architect/Engineer when construction is sufficiently completed in
accordance with the City Of Denton General Conditions For Building Construction.
(a) the Contract Documents such that the Owner ���ay h�a�+��"��i�Y1y <��c����aY and use the Work,
or designated portions of the Work, for the �atrr�a����s t��ar wl°�:��h �i is intended and only
trivial and insignificant items remain which d�,� t��t ��i'fc;c�t t��� "�''t�ar�. �� a whole.
(b) When the Contractor considers that the '�'c.a�°i�., �.�r t�u�; ���r°�i��,�tt ��' t��u ���"1� '�'������ ���'�
Owner agrees to accept separately, is �����t����,i���ly C;r���°t�����, �hc� C"�a��t�`��t���' '��►�1�
prepare and submit to the Architect/Engir����° ��c��t����k�t�r�sdw� 1i�� <�f� r��������r�� W.����'� ���
be completed or corrected. The �c�rttr��tc�a- ��r�ll ��������:�1 �ara�r���tM� ��� u�rr����l�t� xa.t���'
correct items on the list (hereinafter ��.11�� ��fl��� ����a�r����� C�i�t�'). ��^�iV��e� t�� �r��l�,�c9�� ��u� i�t�a��� t�:���
the punch list does not alter the responsil�rlit� c�t' t'�� �€��tr��t«sr lc� �a�r���aN�t� ��l "��a�"k �u�
accordance with the Contract Docucr�����s. ll�c:��z �'���,i�t c�%' ti�� ��w'��1� Vist= ����
ArchitecdEngineer will make an inspecti����� ��� c����r,r�i��� ����t:��+�r ti��� '�?'��e�� �r �:'i���b►��i���i
portion of the Work, is Substantially Complete. I�" ��h�; �irr���rl�,�tf1`����it����r';� inspection
discloses any item, whether or not included on the r.���r��i� li��., �rk�rc�� �� ����t irr accordance
with the requirements of the Contract Documents �m�� �v6�i�� r������°:� t��a� ''�'V"c��k inspected
not Substantially Complete the Contractor shall, before issuance of the Certificate of
Substantial Completion, complete or correct the item upon notification by the
Architect/Engineer. The Contractor shall then submit a request for another inspection by
the ArchitecdEngineer to determine Substantial Completion. When the Work or
designated portion of the Work is �r��i�i����r�tv,���y �'r������c�t�r ���k�� ���I'�����1�"������������" '+�'���
prepare a Certificate of Substanti�l ��ar��ls�t��� "��i�h ����u1! ��t�a��Ci�6� i��sc� �9�t� ����
Substantial Completion, shall estabVisl� r����������bilitv�:� ���" �h� C�''a�'x��� �r��� th� �,`c��a'is����tcac�
for security, maintenance, heat, utilities, d�r�n��� 1�� tl�� �'"c��r� ����d i������'a���a ��� ����,� ���
the time within which the Contractor �1��,��� �.ini�,k� �k1 itcir�:� crr� t��� ��u��ti��� �����'
accompanying the Certificate.
(c) The Certificate of Substantial Completion shall be submitted to the Owner and the
Contractor for their written acceptance of responsibilities assigned to them in the
Certificate.
(d) Upon Substantial Completion of the Work or designated portion thereof and upon
application by the Contractor and certifcation by the Architect/Engineer, the Owner shall
make payment, reflecting adjustment in retainage, if any, for the Work, or portion of the
Work, as provided in the Contract Documents.
9.8 PARTIAL OCCUPANCY OR USE
(a) The Owner may occupy or use any completed or partially compl���ei �ca�A¢�rr e��� t�c� �'`���k
at any stage when such portion is designated by separate Suppl����r�t�� ��r��ct���at 'a�'ith
the Contractor, provided such occupancy or use is consented to k>;� t�� irts�a��.r �� c�����ir�d
under Subparagraph 11.����� ���� ����G�����'ix���� t�y ����ali� ��tl��ru����s ���r��r��; ��a�'isdiction over
the Work. Such partial �r��,�������� ���' ���� ����� �'�������^�" �����'�r ��"�" ����� the portion is
Substantially Complete, ��rc��ric�ec� tl�� �r�rr��*r ac�c� �.�c�r�ir������` ��v'� �+���p���� in writing the
responsibilities assignec� t�:� ���� a:��` t�'�.em for payments, retainage if any, security,
maintenance, heat, utilities, damage to the Work and insurance, and have agreed in
writing concerning the period for correction of the Work and commencement of
warranties required by the Contract Documents. When the Contractor considers a portion
Substantially Complete, the Contractor shall prepare and submit a list to the
ArchitecdEngineer as provided under S�xl��r��r���r���k� �."7(�). �-��►������ ��� ��� ���a��°"�����M°� ��'
partial occupan�,� �r� ���� �'���Vl ���t ��� r�nr������x����3� �itlzh�N� ����"���� �t��� t��"�����
�a) Progress of the "�W"��k �I��VI t�u ��t��°r���r���� k�y� +�rri�t�n ��r��i��w�� b���r��r� tP�� �)°u�r��r ����i
Contractor or, i�"���� �a�re�r��r�t i� r��t�����3, Y�v c3�����r�r� ���"tl�a�, �r�I�i���.iJ�.r��,ir�c,�r.
(b) Immediately prior to such partial occupancy or use, the Owner, Contractor, and
Architect/Engineer shall jointly inspect the area to be occupied or portion of the Work to
be used in order to determine and record the condition of the Work.
(c) Unless otherwise agreed upon, partial occupancy or use of a portion or portions of the
Work shall not constitute acceptance of Work not complying with the requirements of the
Contract Documents.
9.9 FINAL COMPLETION AND FINAL PAYMENT
(a) Upon receipt of written notice that the Work is ready for final inspection and acceptance
and upon receipt of a ftnal Application for Payment, the Architect/Engineer,
accompanied by the Owner's representative, will promptly make final inspection and,
whe�� t���c J���t�����tJl�ra��r����• �nc�� t.h� '�i"��r� acceptable under the �:"�c�tr���, C�c����rr��r�t:�
and tl�c; �"�r��tr��t. ���a�u�r��ed��� �`�a�N� ��r���rr�r��'„ the Architect/Engineer vai1Y ��•c����tly i:����
a fir��l G��ti���t� i�:�� ���;������at �Catum�� l��t to the best of the �r��il�r�tlF�r�,����r'�
knowledge, information and belief, and on the basis of the Architect/Engineer's
observations and inspections, the Work has been completed in accordance with terms and
conditions of the Contract Documents and that the entire balance found to be due the
Contractor and noted in said final Certificate is due and payable. The
Architect/Engineer's final Certificate for Payment will constitute a further representation
that conditions listed in Subparagraph 9.9(b) as a condition precedent to the Contractor's
�,���� ,������q,��, �� ���� ��y�;���,��t 1���� ��cr� fulfilled. Owner will normally make fnal
�,�,�,����y� ,w�,,�����,� ������� ���p� �,�,��; ��"���r �)�r�,�;r"� receipt and approval of the final Certificate
���� r,����,���� ����,������� ��c��i�c��i �a� t9t� �"a��tract Documents shall commence on the date
����,����������� �,������,�,�y�aa� ��,�f"th� ���r�, ��r���ss otherwise provided by separate agreement
between the Owner and the Contractor.
(b) Neither final payment nor any remaining retained percentage shall become due until the
Contractor submits to the Architect/Engineer:
(1) an affidavit that payrolls, bills for materials and equipment, and other indebtedness
connected with the Work for which the Owner or the Owner's property might be
responsible or encumbered (less amounts withheld by Owner) have been paid or
otherwise satisfied;
(2) a certificate evidencing that insurance required by the Contract Documents to remain
in force after final payment is currently in effect and will not be cancelled or allowed
to expire until at least thirty (30) days prior written notice has been given to the
Owner;
(3) a written statement that the Contractor knows of no substantial reason that the
insurance will not be renewable to cover the period required by the Contract
Documents;
(4) a consent of surety to final payment; and
(5) if required by the Owner, other data establishing payment or satisfaction of
obligations, such as receipts, releases and waivers of liens, claims, security interests
or encumbrances arising out of the Contract, to the extent and in such form as may be
designated by the Owner.
(c) As a precondition to final payment by the Owner under this Contract, the Contractor's
affidavit under Clause (b)(1) shall state that the Contractor has paid each of his
subcontractors, laborers or materialmen in full for all labor and materials provided to him
for the Work under this Contract. In the event the Contractor has not paid each of his
subcontractors, laborers or materialmen in full, the Contractor shall state in the affidavit
the amount owed and the name of each subcontractor, laborer or materialmen to whom
such payment is owed. IN ANY EVENT, THE CONTRACTOR SHALL BE
REQUIRED TO EXECUTE THE OWNER'S STANDARD AFFIDAVIT OF FINAL
PAYMENT AND RELEASE AS A PRECONDITION TO RECEII'T OF FINAL
PAYMENT.
���� 1�'� �a�t��• ���b�t�������1 ����rr������a� �i����, 'u"�r����, final completion �al�'tl�� "'�'c��� a�, ��n���ri��lly
cla�V��'�c� tl'urc�u�;�t ��+� i°�ult �f t�w� �;c��ai�'�c�tea�° or by issuance of �;k��r��� ��k��ia�r;� ��f��c��ir�g
�����a�� �c�����l�t��r�� �rr�l ����� �r�hi��.���� ���,i���ri° coniirms the dela�„ �k��: �:.���vr����c ���18� ra�a��n
������,������; �y ���; �;'�,�r��r���t�r ���� �:��ti�i��ti�� by the Architect/Engineer, and without
�,������������� ���� �*���������, r���,,� pt►yr�'w�r�� �f` ��� balance due for that portion of the Work
������, �;��a���,��,��� ���� �,��„����:�p, 1I'ti�e x°�����ir�ang balance for Work not fully completed or
�,�����,��,�,� r�, ���� ���� ��,��ir���� �tipu��t��i ir� the Contract Documents, and if bonds have
been furnished, the written consent of s��c��y t�� �s��`������ <��' ��� �^������'� ���� ����� ����
portion of the Work fully completed ar��l ���r����� ;���11 k�� ����a��nit��c� k��` ����'�������"�����` ��
the Architect/Engineer prior to certi�i����i�ru t:��" ���r�t��iw I'���r��c��t �����1 b� ��r�c�c� ���u��r
terms and conditions governing final pa��7����1,, ��.���� t�'��t it ��a�ll x�s�t c�rz:��it�t� �^�'�mv�P
of claims.
��;� s�•��;, ��,�,�������� ��r ���� �,�"�ni,:r;a�t�r ��I" th� fina) payment shall operate as and shall be a
,��������,��� ������� ��` ��'� �),,����r• �"��,��� �..�1 claims or liabilities under the Contract, for
����,�J���� ������� �� �"�a��,�������� ���° �~�q�tna�� tc� the Work or the Project, or for any act or neglect
c��"���� �ww�r��;r ��,N��nr�� �a� �ar �a�r����t�cl �i�� the Work or the Project.
ARTICLE 10 SAFETY, SECURITY AND UTILITY PROVISIONS; ENVIRONMENTAL
COMPLIANCE
10.1 SAFETY PRECAUTIONS AND PROGRAMS
The Contractor shall be responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the performance of the Contract, and will
comply with all applicable City, County, State and Federal health and safety regulations.
10.2 SAFETY OF PERSONS AND PROPERTY
(a) The Contractor shall take reasonable precautions for safety of, and shall provide
reasonable protection to prevent damage, injury or loss to:
(1) employees on the Work and other persons who may be affected thereby;
(2) the Work and materials and equipment to be incorporated therein, whether in storage
on or off the site, under care, custody or control of the Contractor or the Contractor's
Subcontractors or Sub-subcontractors; and
(3) other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks,
pavements, roadways, structures and utilities not designated for removal, relocation
or replacement in the course of construction.
(b) The Contractor shall give notices and comply with applicable laws, ordinances, rules,
regulations and lawful orders of public authorities bearing on safety of persons or
property or their protection from damage, injury or loss.
Cc�� "�`��� C:;�a��c•�+��c.ar° �Iz�li �r��t �n�� ���rai��t�in� � r�c�ui�•��i b� c�i��ir�� �;c�r��itions and
���µ6��c�t����� ���' t��c� �:rc�r��r°��t, r�������h1�; ��F��w��•�,� ta� ��f��� ���� g�a°+�����uti�ra, including
�����i��� c�����;�� �i�r�w ax�� c��ka��° «�°�.r����a�,� �,�;a��tai �������c��, �ax•c�a,�a������ir�� ;����t�a regulations
�n�V' r�ca#i�y���� ca����rs �r�c� G�s��µs c�d'��j�cer�t: sites and utilities.
(d) When use or storage of explosives or oth�� ������r`c�ta�s ���t�a"i�l� �a� equipment or unusual
methods are necessary for execution oi" ���; "v��r�� t�"�� {�'�r���"���e�� shall exercise utmost
care and carry on such activities under sup��°v�sie�� ��"�rca����� c�r��M�fied personnel.
(e) USE OF EXPLOSNES - CLAIMS AND TOTAI� l�i�L���fi�^1�`�F�1':"'��"�"1�.�N. '!"8�u� �r�'r��r
shall have the right to pre-approve the use of ���,�' ���l�a�i��� r��� ti�� 1'��a�j��:�, �la�
Contractor shall not assume in its bid that permiss����� t� �ws� e���lca�i��� '�'i�l �i� �a���rut���
The Owner shall NOT be liable for any claim for ��c��i�li��r��►1 ti���: �ar ua���������t:�c��� ��� ��
result of the Owner's denial of permission to use explosives. Where use of explosives is
permitted by the Owner, the Contractor EXPRESSLY AGREES TO BE SOLELY
RESPONSIBLE for the determina��a�r� �� t� vv���1:����r ��x�a������i^��� �����ll �������i�1ly be used,
and for any result from the �,���, ��ra��ww�� c�r �tc���.�� �i' �x,�lr.���v��z and shall
INDEMNIFY, DEFEND AND ��.���"�L.1:� �'L�I"��'�.�Mi"���1���' ��L������'�� ti�� Owner, its
officers, agents and employees, and the ArchitecUEngineer against any and all claims,
lawsuits, judgments, costs or expenses ����r �S�:r��r��l ���j����';� �i��������"�� ���'���������� ���"����`���"
damage or other harm for which rec�v���� �ai' �'�r������� 6w� ����'�������I�+ ���b����"�'�� ���' ��"J ���=����'��
or persons, as the result of the u�e, 1������li�� ca�' :�tr�s°�6� c�� ���� ��i����"����� ���" ����'
Contractor or any Subcontractor, ���1:���r� 1�1�:��� k`��� �����" "'�'FO����"����"� � l`��'� ������' � r`����
HANDLING OR STORAGE WAS NEGLIGENT OR NOT, AND REGARDLESS OF
WHETHER THE DAMAGE OR INJURY WAS CONTRIBUTED TO IN ANY WAY
BY THE NEGLIGENCE OR FAULT OF THE OWNER, ITS OFFICERS, AGENTS,
EMPLOYEE�, �.�� 1'��1�������`��� i��'1:?a�� OR THE ARCHITECT/ENGINEER AND
ITS OFFICE�.�� .r"�C:��i�d��"u'�, ��9'������-�'�"�'f.��:�� OR REPRESENTATIVES. In the event of
conflict with ����� c��h�,r ir���rnt�it� �:����a�ra�a1� in this Contract, this paragraph controls. This
indemnity paragraph is intended solely for the benefit of the parties to this Contract and is
not intended to create or grant any rights, contractual or otherwise, to or for any other
person or entity. The Contractor shall furnish the Owner and the Architect/Engineer with
evidence of insurance sufficient to cover possible damage �ar ia�,j�ax•�, �vk�i�l� i���wr�c����
shall either include the Owner and the Architect/Engineer �-�� {��d��ic����1 Va��t��r�c�� t��" ��
sufficiently broad in coverage as to fully protect the Owner �r�� i}�� l�rc;6������JC;��d�����',
All explosives shall be stored in a safe ��aai ���r�r� �����rar��rµ� ra.r����r t��� ��xr�. ��f ����r���c���rai
watchman at all times, and all storage ��al�,��;�� ;�k��ar11 %� r������k`.�� �l���l�^ ""����!'��I-��������'����
EXPLOSIVES." The method of storing a��� N������lin�� ��c���c���'��� ���� �������" ����r�r����l�
materials shall conform to Federal and St��t�. ��r,�rr�, �;��y ��` G.������:��z ���`�t��<������ry ��'� ��'��
City of Denton Fire Department regulations. The Contractor shall notify any
telecommunications and public utility company and any private property owners having
structures in the proximity of the Project Site of the Contractor's intention to use
explosives, and such notice shall be �i�c��=� �;�A��"��i�i���tG�' ��� ���^�Ne��� �t� �"�������° ����'
telecommunications and public utility cc�n��������� ���� �ra��i�, �rt��a�r`ty �a'�^'���a��' �� ����
such steps as they may deem necessary to ���°��c��t �k���r ��•���rCy trc���� i�a.����°� �"���` r�a�t���
shall not relieve the Contractor of any r�;��t�r��wl�ility ����° d������ cc��a1�L���' ��m����� �'��Y
blasting operations.
(� The Contractor shall promptly remedy damage and loss (other than damage or loss
insured under property insurance require°.� �� i��� �:.ca�������� 1����ua��ar�r�t�� t� ��`����'�ti�
referred to in Clauses 10.2(a)(2) and 1�G�,�(�)(:3) �r��b��c� ��� "�"������ �>�' �� ����'� ��Y ��'�
Contractor, a Subcontractor, or anyone dir���l„� �r� i���ir�s�tl� �r������'� �y ����" ��� ����r�� ���
by anyone for whose acts they may be liable and 1�a� w�t��k� �1'�� �,'�r�t:r���t�a�r �� r°���c.���ik�l�
under Clauses 10.2(a)(2) and 10.2(a)(3), except damage or loss attributable to acts or
omissions of the Owner or Architect/Engineer or anyone directly or indirectly employed
by either of them, or by anyone for whose acts either of them may be liable, and not
attributable to the fault or negligence of the Contractor or any of its Subcontractors. The
foregoing obligations of the Contractor ��� i�r� �c�c�������y'� t�� �t�� �r�����"��������`��"� obligations
under Paragraph 3.19. To the extent tha�� ��u� ��u��7 ������u���� ����" ������� �����' ��� covered by
property insurance or other insurance r�:���s�r�� �a� �h�: �"�a¢���'��t ������ar��"���`�. the Owner
and the Contractor shall exercise their t���t ��i��ar�� �c;� c���.� �� �1�ir'�� ��c� �������n recovery
from the insurers to provide for the cost, in whole or in part, of the repair work or to
provide for reimbursement for such damage or loss.
(g) The Contractor shall designate a responsible member of the Contractor's organization at
the site whose duty shall be the prevention of accidents. This person shall be the
Contractor's superintendent unless otherwise designated by the Contractor in writing to
the Owner and Architect/Engineer.
(h) The Contractor shall not load or permit any part of the Work or the Project site to be
loaded so as to endanger its safety.
10.3 EMERGENCIES
In an emergency ��1"t°��ii.��� ��i�t:�„ health, ��� ����arity t�%' �a�r���rr�� ��� g��c�����°ty� t�iu �;c�r�tr���ctor
shall act, at the C"+ax�������+���� ���cretion, t�.� �a'��+�r�t t�r��t����;cC d�r���,�� ��j��`�� �r loss.
Additional comp����ati��r� �ar a��tcr�sion of tie��� ���i���ci ��� t��� ��`������'��t��r ���� �s�c���t�''�� ��f an
emergency shall be determined as provided in Paragraph 4.3 and Article 7.
10.4 PUBLIC CONVENIENCE AND SAFETY
(a) The Contractor shall place materials stored about the Work and shall conduct the Work
at all times in a manner that causes no greater obstruction to the public than is
considered necessary by the Owner. Sidewalks or streets shall not be obstructed, except
by special permission of the Owner. The materials excavated and the construction
materials or plant used in the performance of the Work shall be placed in a manner that
does not endanger the Work or prevent free access to all fire hydrants, water mains and
appurtenances, water valves, gas valves, manholes for the telephone, telegraph signal or
electric conduits, wastewater mains and appurtenances, and fire alarm or police call
boxes in the vicinity.
(b) The Owner r���r��� i��� r�i����� ��a�� r�,F�����+��y any neglect on ������ ��ar� �a(� t��'��� �"��r�tr��^t��r %��
regard to publi� ��'a����r�����t���� ���� ���"+���y which may come t���� ti�e* C��+��r"� �a���;;�t�r���� ��"�����
twenty-four (��) %���r� r�c�t��� �r� �r�ti���; to the Contractor. Nr� c��:��� ��"�� ����r�����"ro tk�c�
Owner shall have the right to immediately remedy any neglect without notice. In either
case, the cost of any work done by the Owner to remedy the Contractor's neglect shall
be deducted from the Contract Sum. The Contractor shall notify the City Traffic
Control Department when any street is to be closed or obstructed. The notice shall, in
the case of major thoroughfares or street upon which transit I���� ����r���, h� �i�rt�r-���;���
(48) hours in advance. The Owner reserves the right to post�cat�� c�r �ar�h�Y��� �r�� �Ic�;��i�"�
or obstruction of any streets or thoroughfares to the extent nc��,a����,m�' ��r tk�a� s����i� �zr��
beneft of the traveling public. The Contractor shall, when directed by the
Architect/Engineer or the Owner, keep any street or streets in condition for
unobstructed use by City departments. When the Contractor is required to construct
temporary bridges or make other arrangements for crossing over ditches or around
structures, the Contractor's responsibility for accidents shall include the roadway
approaches as well as the crossing structures.
10.5 BARRICADES, LIGHTS AND WATCHMEN
If the Work is carried on or adjacent to ������` �t�����t� �11��r r�r ��1�Vi� ����c��, t��l�� '�"�►��r�������"
shall, at the Contractor's own cost and �����r����, �i�������, �"�"���� ����' ����������°'� �����°��'������
barricades, fences, lights and danger signal�, �1���� �r�,�^�oc�� ���i�r�i�;�r�C' '����k��t����� ��u�� "�����
take such other precautionary measures a� �r�: r��,c�;���a�°y t��� �ka� �ar�.���t��i��nu ��t ���z����'�� ���'
property and of the Work. All barricades ���61 b�� ����i��tr;�;N ixt �� c���la�t' i:�����t "�°i�N ��� v����1� �t
night, shall indicate in bold letters thereor� ti�� ����t.�`��������"� �������" �c���� ������N �� ����������"�����
by lights from sunset to sunrise. The term "lights," as used in this Paragraph, shall mean
flares, flashers, or other illuminated devices. A sufficient number of barricades with
adequate markings and directional devices shall also be erected to keep vehicles from being
driven on or into any Work under construction. The Contractor will be held responsible for
all damage to the Work due to failure of b���ri��c���� ���,���„ I������ �atc� �r��l�l�rra�t� �cr �r�����
the Work. Whenever evidence is found of �ta+�la +�x�rns���,, ��ra� �r���ii���1����,��'����- ����� t��"�i�r
the damaged portion immediately remove�9 �r�� �°��1�����1 �� �1�� �:`���i����:��rr �t �.w.�rrir"�+�ta�r"�
cost and expense. The Contractor's res��a�aa�:�il��Vi��r �"c��' �����i��t�������� ���� k���°�"�������� ������4 �r��
lights, and for providing watchmen, :����1� u��,�t ��.��,�� �a.c��iV �.�r� �`rc����� ���.� h�,�a� �t�K�Mly
accepted by the Owner.
10.6 PUBLIC UTILITIES AND OTHER PROPERTIES TO BE CHANGED
In case it is necessary to change or �r���°� tl�t �a'c���r'i,� a:��' �1�� <�"'����" ��`�" ���N `����°
telecommunications or public utility, such �axc���r��^ �iz�9l r��,�� �� �'�������"�`� ��" �������x"��� ''�"'"���
until ordered to do so by the Architect/En���i�~��'. �I��� ri�;l�t i� u��:��c��� �c� ii�a� ��'�'x��� ��� e����
�u�alic� c:�� �r����� aa�ilit�a:� ti�� +�a�t�x° �.a�r��� �kt� 1�"rr.rj��:�,t :��d:� i��r t��aa ��t�r�c��� ��r�' rr����u�r� �uc�.
c�l������„�s ca�r ra���i�� c�t" �k��,ir ��µc��a��•�� t����t �r��� lac�c;��r�� ���c�+����a��° �iur�r�� t���; �a�rii�r������c;� e��`
t���, "wd�c�r�.. 11�� 4:�����r �°������� ���. r��t�;t c��` �;��tinµy �����,�r� tl�u �'"�-+����c;t. �it� �car �r��r ����r���a��m
including repairing or relaying sewer and water li���� �r��' a����rle:�arac�s, repairing
structures, and for making other repairs, changes, or �;xt�r°�:�ic�r�� t�a �r�� ���" a�e Owner's
property. The Owner's actions shall conform to the �"c�w��r��tc�r"� �wurr���t �r�� approved
schedule for the performance of the Work, provided that proper notification of schedule
requirements has been given to the Owner by the Contractor.
10.7 TEMPORARY STORM SEWER AND DRAIN CONNECTIONS
�r�y�� ��N«������ ������ ���,,�a•� �� �p�°���� p���c t� �a� d������ up or removed, the Contractor shall
�l ���� �,��� ���y��,�� �������� ���� ������at�in ���r���ca���;� c�u,�tilets and connections for all public
��,� �,pi��,��, ������ ���,,�;��, ���� �Ir�i���„ '1'i�� �c�r�t���:��'r� shall also take care of all storm
�„�,,,�,��� ���� c�C•�i,�����< ^�v���ct� r�r��I �� r�;��ir��d from these storm drains and sewers; for this
purpose, the Contractor shall provide and maintain, at the Contractor's own expense,
adequate pumping facilities and temporary outlets or diversions. Th� Contractor shall, at
the Contractor's own expense, construct s�c�� tr���i�s� ���c�s, �ar �rt���r �tr��.l�z�-a�'� ��c�c������
and shall be prepared at all times to dispo�� �s� ������� ���r��nu�,�� �a�� ��"�"��,�� ��'����"�%'� �°���
these temporary connections until such timr��: �� �fa� ��c;rrr���a����� ��t�r����a����� �'��� ����� ^�7�� N��
service. The existing storm sewers and co������;ct�ica��� �I�al� ���' ���a� ��� ����'"������ ���� �'����������r���"
under the Contract, except where specified or ordered to be abandoned by the
Architect/Engineer. All storm water and sewage shall be disposed of in a satisfactory
manner so that no nuisance is created �ind that the Work under construction will be
adequately protected.
10.8 ARRANGEMENT AND CHARGE FOR WATER FURNISHED BY THE OWNER;
ELECTRICITY FOR THE PROJECT
(a) When the Contractor desires to use the Owner's water in connection with the Work, the
Contractor shall make complete and satisfactory arrangements with the Denton Water
Utilities Department and shall be responsible for the cost of the water the Contractor
uses. Where meters are used, the charge will be at the regular established rate; where no
meters are used, the charge will be as prescribed by City ordinance, or where no
ordinance applies, payment shall be based on estimates made by the Denton Water
Utilities Department.
(b) The Contractor shall make complete and satisfactory arrangements for electricity and
metered electrical connections with the Owner or with Denton Municipal Electric in the
event that separately metered electrical connections ���� a-���ui�°����,� �a���' ������� N°'rc����t� °�°he
Contractor shall pay for all electricity used in the ��rf��r���r���� ca� t�� �»^"c'.�r� tl��c�uSh
separate metered electrical connections obtained by t.ha°• 4����'�tr�c�tc��° t��rc��►�� t1a� �,'��� of
Denton.
10.9 USE OF FIRE HYDRANTS
The Contractor, Subcontractors, and any �atl��r ��rs�a�� �c�c�i��� �r�'� t��+� �"��?4��%� ������ ���'�
open, turn off, interfere with, attach any p��a� ��� ���a��, t�„ ��r cc���at��ti ��"a����i��� 'wd���r ��r�� �Er�`
hydrant, stop valve, or stop cock, or ta�a �ca� �ra���:�.r r�r�ir� l��N������� t�a il��. ��',���c��; tar�l���
duly authorized to do so by the Denton `�"v'�1c�° �.�t�V'i�i�� I:�����trt��r�t i�z �c��<.��"�1�����:� '+�"""��� ����
Denton City Code.
10.10 ENVIRONMENTAL COMPLIANCE
(a) The Contractor and its Subcontractors are deemed to have made themselves familiar
with and at all times shall comply with all applicable federal, state or local laws,
rules, regulations, ordinances, and rules of common law now in effect (including any
amendments now in effect), relating to the environment, Hazardous Substances or
exposure to Hazardous Substances, including but not limited to the Comprehensive
Environmental Response, Compensation and Liability Act of 1980, 42 U.S.C.A. §§
9601, et ���.„ ��� �������'���� ������r���� �����������������on Act, 49 U.S.C.A. §§ 1801, et
seq.; the ��.�.��r�r�r�� �.�'a�r���rv����a��, �i�c# f�����rr�,t'y t��� of 1976, 42 U.S.C.A. §§ 6901, et
seq.; the I���ic�x•��l '�ater �'r�ll�a�.i�r� �����t��1 A�t, :��� �S'.S.C.A §§ 1201, et seq.; the Toxic
Substanc+�� �.��1�°c�i �.��, I 5 1.���,C"y�'�• §§ 2601, et seq.; the Clean Air Act, 42 U.S.C.A.
§§ 7401, et seq.; the Safe Drinking Water Act, 42 U.S.C.A. §§ 3808, et seq., and any
current judicial or administrative interpretation of these laws, rules, regulations,
ordinances, or rules of common law, including but not limited to any judicial or
administrative order, consent decree, or judgment affecting the Project.
(b) In the event the Contractor encounters on the site materials reasonably believed to be
a Hazardous Substance that have not been rendered harmless, and removal of such
materials is not a part of the scope of Work required under the Contract Documents,
the Contractor shall immediately stop W ork in the affected area and report in writing
the facts of such encounter to the Architect/Engineer and the Owner. Work in the
affected area shall not thereafter be resumed except by written order of the Owner
unless and until the material is determined not to be a Hazardous Substance or the
Hazardous Substance is remediated. The Owner may choose to remediate the
Hazardous Substance with a separate contractor or through a Change Order with the
Contractor. If the Owner determines that the Hazardous Substance exists in the
affected area due to the fault or negligence of the �c�t�ic•��tr.�r ���' ���' ��' ���
Subcontractors, the Contractor shall be responsible for re�r���i��tir�� tlroc� ���a���i��c�sn ��
the sole expense of the Contractor in accordance with the ��nt�a��:ta�'�« ,�&�M'"���"�'"�.'��
Spi1) Remediation Plan. �� ����r�;�i��rw c�r�� t�� Contract Time for an� c��l��r a�� tN��:
progress schedule caused �� �. ��s�l� ��f` t��a� c����overy and remediation s�f � 6��ar��'����a�
Substance may be grantec� �,�� tt�� �7����r �ar��� if all remaining Work rar� t�� �'rc�j���.
must be suspended and the delay cac��a�R: b� made up elsewhere ia�r ib�� �r�a�r���
schedule. Any request for an extension of the Contract Time related to the discovery
and remediation of a Hazardous Substance is subject to the provisions of Paragraph
4.3 and Article 8.
(c) The Contractor shall be responsible ��ar �cl����r�'c���tca�c�, '<�%��tc��r�����, �1�����'�� ��°��������
removal, remediation, and disposal o�` �o�y �-�������t6��u� ��tribst�ut�c�� �����m�,�� ur���`� �`�� u�������
���� �;�t� ��^ ii�� ��e�r�t�•,���E:,� �aa• arn� 'w5��s��r�tr�u�:�� �a�w ������Ni�r. `T`l�c; �'�u�tr����.��° :�1°��1�
�hrt�Mir� a��� �r���� a�N p�r���i��s r�������ry� i�w�� t��r; l��aV' ��nci �r�a��� ������'i���„ tir���;����rt�ti�r�,
�n�i �ii��c���l �a� th� f-1a��r���u� �aa���t�n�� �ra�� �h�ll� �aruc�r �c� ����8c�r��i����� ���ay
�����,�������, c�G�����r;��, c�r�tat;rcal, r�e���xv�1r �emediation, and disposal, notify the Owner
and the Architect/Engineer so that they may observe the activities; provided,
however, that it shall be the Contractor's sole responsibility to comply with all
applicable laws, rules, regulations, or ordinances governing the activities.
(d) Spill Preventio� F'4�t��. .�,t 1����;t �e;����r.t�-tvvo (72) hours prior to commencing
performance of ��� c��" t��� '6�v"C:�r� ��t i��� �a"c.�Nect site, the Contractor shall submit to the
Owner for revie� �r��� ���aN���.i ���i1� �'r�vention and Response Plan (SPRP) meeting
th� r�����r���nt� �af federal and state law, rules, and regulations. The SPRP shall be
����i�]t� ci����TM����l for the Contractor's planned work methods and procedures. The
������ ��y�li i�� ���igned to complement all ���a��ic;��l� ��l�ty �ta►���r��, fir�. g�r���ntic�r�
regulations, and pollution prevention polici�� �r�d �r�c��i��r�s. "1��� `��'�.N� ������ ���������
estimates of the quantity and rate of f����� �;1�����ul� ��usi�����.r�t �"�h�� aox� �������
containment or diversionary structures �c�a �m�a�v��t ��i�l� �t'c.���� Z������� �:1�� ���� ��°"
migrating into adjacent properties or a��w����1�1�� ^�v��i��c•�. "��N��� �I'"���.��� �h,�11 N��l����
methods of recovery of spilled materi�uis �r��1 �l1 ������a�:a'�l� tr��n��-�'���a° {2�� l���r
emergency phone numbers, including with�-��at �i���i:�r�tw+a� t��t r��" ti��� 4:l'w�m���'�� 1'm"��j��t
Manager or other designated representative. The Contractor shall not commence any
field work prior to approval of such plan by the Owner. The following additional
rules shall apply with respect to spills caused by the Contractor or a Subcontractor:
(1) The Contractor shall immediately report any spill or release at the Project site,
whether or not it is associated with this Contract, to the Owner's Project Manager
or other designated representative. Thereafter, within two (2) working days after
the occurrence of such event, the Contractor shall submit a written report
describing such event in a degree of detail reasonably acceptable to the Owner.
(2) The Contractor shall immediately respond in accordance with the SPRP in the
event of a spill.
(3) The Contractor shall dispose of spilled materials in accordance with EPA and
Texas Commission on Environment�V C����Iit� �"i �'[�%�� rc��ul����a�u� �nc� �ri� c������`
applicable federal, state, or local ��w�p ��C�;;�, �at` r'����l��i����• ��� ��������'��°� '�"����
such disposals, the Contractor s����li� �,a��� ����1��' �k��a�� ir��'������`������ ���� ��������'""���
facilities that are approved in adva���e; it� �e`it'trra� 1�� t�� ��'�'�r�r�• r� ���?���' ��� ����
transport manifests for the spilled m�t��i�l� �h��11 �� c����it��� ��r��� �`�t�i��c� ir� t���
+��>�mt�°�����•"� re�r�r�3� for reference purposes, to be provided upon request of the
,e�����m��;���"�����;i���+�r� the Owner, or any governmental regulatory agency with
j��ri�c���tr�r� ���°r t��� matter. ALL COSTS OF COLLECTION, CONTAINMENT,
,�'��'� ����^����,r��, OF SPILLED MATERIALS SHALL BE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
(4) For purposes of this Subparagraph (e), the term "spill" includes any kind of
environmental discharge or release.
(e) Clean Air Management Pl�tt�. "1'N�� ��°c���tr���:4c�r shall �t�o��r��;� �+i�lx �l�t� �`���r� l�.ic�
Management Plan submitte� t� �n�t! �a����a•�a��c� l�y the ��)wr���� ���ru��� t}�� ��.�r��r��i�.xr
selection process. The Own�r �°u�c�rv��� t1�� ��b�b���„ at the ��"���titrK��t���c�� "� ���.��c ��a������� ����
require the removal or retrofitting of any �a��m�a7���nt use� ��� ��7� �:ca���s��.� �:�� �������m"���������
that does not comply with the Plan submitted to and approved by the Owner.
(� The Contractor shall deposit surplus or �wr���'� ����^vati��� c��. tat�-��ar ����t`������+ �"������"��
as part of the Work at a legal disposal �;�C� it� ��c�c�rs��x��� '�'i��w ��M ����M������ �����>
federal, and local laws, rules, regulat����u�, �ar�� �r��i����►������+� ������� ��`�`�t���"^��'����� ������
submit to the Owner for review and app��•�v�l �a�� }�������i ���������� ������ ��"� ��"�'i'�����
uses for the surplus or waste excavation or other materials prior to removal of any
excavation or other material from the Project site. A copy of all transport manifests
for surplus or waste excavation or other materials shall be obtained and retained in the
Contractor's records for reference purposes, to be provided upon request to the
Architect/Engineer, the Owner, or any governmental regulatory agency with
jurisdiction over the matter.
(g) The Contractor is responsible for ob��ir�i�u� ��Vl 'i"�1���� �t�rsrr� '"�''��er Permits from
TCEQ for construction of the Project ufi�d�r r���ul�tic�ra� �unt�ir��� in �0 CFR Part 122,
as amended, pursuant to the Clean "a�"��tc�r ��t, �� iJ �.��..�• �� R�� 1 et seq. These
regulations require the filing of a notice of intent to obtain and abide by the general
storm water permit for construction activities promulgated by EPA, including but not
limited to cleaning, grading, and excavation that disturb the applicable amount of
total land area. In addition, the Contractor shall comply with all regulations of the
Owner relating to storm water and storm water runoff management at the Project site
pursuant to Chapter 19, Article IX, Denton City Code, as amended.
(h) The Contractor shall not install any materials in the performance of the Work that
contain asbestos or asbestos-related material such as hydrated mineral silicate,
including chrysolite, amosite, crocidolite, tremolite, anthophylite or actinolite,
whether friable or non-friable.
(i) "�'l�� ��r�vd��r r���a•��� Cl�� �'i�;��t ��� iti� sole option to exercise the following remedies
��,�����„�y� ,,�,������,� �}�� p���}��, t� ���•�;��,� the imposition of any civil or criminal fines or
��,��,��i�«; t���tt r���� h� ��a���a�+��.i t�r�c��r state, federal, or local laws or ordinances), at no
��i�ztWC���;�M ���s� t�� ttl�r� ���rr�c�r �.w�� �rithout an extension of the Contract Time, in the
event the Contractor fails or refuses after seven (7) days advance written notice from
the Owner to comply with the provisions of this Paragraph 10.10, the terms of the
SPRP, the terms of the Clean Air Management Plan, any storm water permit or other
environmental permit issued in connection with the Work, or any applicable
environmental law, rule, regulation, or ordinance:
(1) suspend all or any portion of the Work until the noncompliance is corrected, or
until a detailed plan to achieve compliance within a reasonably prompt period of
time is prepared by the Contractor and approved by the Owner;
(2) if the Contractor fails to properly address the noncompliance within the time
stipulated by the Owner, perform the necessary remediation or correction work
and backcharge the Contractor for the cost of the remediation or correction; or
(3) terminate the Contract for cause as provided in Article 13.
ARTICLE 11 INSURANCE AND BONDS
11.1 CONTRACTOR'S INSURANCE
Contractors shall refer to Attachment A for all City of Denton insurance requirements.
11.2 PROPERTY INSURANCE
Contractors shall refer to Attachment A for all City of Denton insurance requirements.
11.3 `UMBRELLA' LIABILITY INSURANCE
Contractors shall refer to Attachment A for all City of Denton insurance requirements.
11.4 POLICY ENDORSEMENTS AND SPECIAL CONDITIONS
Contractors shall refer to Attachment A for all City of Denton insurance requirements.
11.6 PERFORMANCE AND PAYMENT BONDS
(a) Subject to the provisions of Subparagraph 11.3(b), the Contractor shall, with the
execution and delivery of the Construction Services Agreement, furnish and file with the
Owner in the amounts required in this Paragraph, the surety bonds described in Clauses
(a)(1) and (a)(2) below, which surety bonds shall be in accordance with the Charter of the
City of Denton and the provisions of Chapter 2253, Texas Government Code, as
amended; each bond shall be signed by the Contractor, as Principal, and by an established
���,�,���� �,�r����,���„ a�s �urety, meeting the reyuirements of Subparagraph 11.3(c) and
;�;p���r�v��� !�y t��,� (��a��r. The surety bonds shall be accompanied by an appropriate
I��,���r-��1=�ti��r��;y �9�aa-]y establishing the extent and limitations of the authority of each
signer to so sign:
(1) Performance Bond. A good and sufficient bond in an amount equal to $250,000
guaranteeing the full and faithful execution of the Work and performance of the
Contract in accordance r�v�tl� 6'�����, ����c���i�ations and all other Contract Documents,
including any Amendm�:a�t� tl�r�r+��f, ��a� ���� protection of the Owner. This bond shall
also provide for the rep�air u���V rr��ir���������c of all defects due to faulty materials and
workmanship that appear within a period of two (2) year from the date of final
completion and acceptance of the improvements by the Owner or lesser or longer
periods as may be otherwise designated in the Contract Documents.
(2) Payment Bond. A good and sufficient bond in an amount equal to$250,000,
guaranteeing the full and prompt payment of all claimants supplying labor or
materials in the prosecution of the Work provided for in the Contract Documents and
any Amendments thereto, and for the use and protection of each claimant.
(b) If the a single project sum, including Owner-accepted alternates and allowances, if any, is
greater than $250,000, Performance and Payment Bonds in 110% of the Contract Sum
are mandatory and shall be provided by the Contractor
(c) No surety will be accepted by the Owner who is now in default or delinquent on any
bonds or who is a party to any litigation against the Owner. All bonds shall be made and
executed on the Owner's standard forms, shall be approved by the Owner, and shall be
executed by not less than one corporat� ��ur���y t1��ti i� ��rtk���r���c� ���1 ���rn������ ���� �����
business in the State of Texas, is license� �� tY�� �ta���; c��"�'�a��� �c� i����� �����x�" ���������� ��
listed in the most current United States 1�������ta��r�t c�1" th� T'r�<��;�a:r�� l.•i�i ���' �����������
Sureties, and is otherwise acceptable to t���; �iva���M. I���N� l�c�r�c� �h��l �a�: �a����aQar� �� ����'
Contractor and the surety, and shall specify that legal venue for enforcement of each
bond shall lie exclusively in Denton County, Texas. Each surety shall designate an agent
resident in Denton County, Texas to whom any requisite statutory notices may be
delivered and on whom service of process may be had in matters arising out of the
suretyship.
(d) The person or persons, partnership, �t����y��ur��, ��r�n, q���r�it�� L.�i�l�iV:�ty ���.��r��a�r�y�.
association, corporation, ar other busine;�� �rati�;y i'c� w���,a�� t,h� �C�t���im•���t �s ��'��'��a� �����1�,
within ten (10) days after such award, ����N ���� �c�c���irc�d C:����r��`t "�"��"�� ��`��" ���"�"����° �W���
provide the necessary surety bonds and eviai�xro�.� c;�N" in:�+�:r�r�c��: ��s r����air�ci �ar���.r` ���
Contract Documents. No Contract shall be binding on the Owner until it has been
approved as to form by the City Attorney, executed for the Owner by the City Manager,
the performance and payment bonds and evidence of insurance have been furnished as
required by the Contract Documents, and the fully executed contract has been delivered
to the Contractor.
(e) The failure of the Contractor to execut�� �h� ��ac���'��fi a�r eN�n�i��:�" �1'a� r�c�a�iGred statutory
bonds and evidence of insurance within b�n �l��i ����� ����r' t��; �,"c�����"��� �� ��warded or as
soon thereafter as the Owner can asse����w1�. ��r�� d��%w�r �h� '�"ca��tc��0 s��al� constitute a
material breach of the Contractor's bid proposal and the Owner may rescind the Contract
award and collect or retain the proceeds of the bid security. By reason of the uncertainty
of the market prices or materials and la��-�r� �t���� i� ��+��ir�,� u���r��;tiu���l� �r��¢� �u�'���a�� ���
determine accurately the amount of d�����„�;� �c�c�ar�r�rir�}� tc� tN�c� �:��'��r �� �"������ �� ���
Contractor's failure to execute and furni�t� tf�� ����utc��� �ac����� ���9 �� ����� ���� ��������"�'��
within ten (10) days, the filing of a bid p��a�a��i vyritl� �k�� ���c���)�axa�i��� �a�d s�.���rrt� "w'g�1
be considered as an acceptance of this �a�il��������a�,��'� l I.:�(:��• �r� �1�re �v�A��� ���c '��"�'►���
should re-advertise for bids, the defaultir�,� �c�r�ir��tc�a �l�u�l1 �a��� k�� �li�i�al� tc� ����, �raaM t��c�
lowest responsible bid obtained in the re����������aw�t;m�t �l�all la� tl�� 1:�ic� c���"���°c;r� t�� ��z i�i�.
Paragraph.
ARTICLE 12 DEFECTIVE AND NONCONFORMING WORK
12.1 UNCOVERING OF WORK
(a) If a portion of the Work is covered contrary to the Architect/Engineer's request or to
requirements specifically expressed in the Contract Documents, the Work must, if
required in writing by the ArchitecUEngineer, be uncovered for the
ArchitecdEngineer's observation and be replaced at the Contractor's expense without
change in the Contract Time.
(b) If a po��ii��tr c�6` ���� '�r'+����� ���� b���� covered which the ArchitecdEngineer has not
specific��Gly �•��t���t�ci t� ��1����"�'� ���`��,�r to it being covered, the Architect/Engineer may
request i�a ;��.�u �a���� '�w'`�a��� ����I g� �1'����1 be uncovered by the Contractor. If such Work is
in accordance with the Contract Documents, costs of uncovering and replacement shall,
by appropriate Change Order, be charged to the Owner. If any Work is not in
accordance with the Contract Documents, the Contractor shall pay the costs of
uncovering, repair, replacement unless the condition was caused by the Owner or a
separate contractor in which event the Owner shall be responsible for payment of such
costs.
12.2 CORRECTION OF WORK
(a) The Contractor shall �rc�w���tl�^ c�a�r���:i 4�'ram�� rejected by the Architect/Engineer as
failing to conform to t�� a°��ra�r`���c,��ut� ��" ti�� Contract Documents, whether observed
before or after Subst�a���i�l C�"t����u��t�ti�ara <�nd whether or not fabricated, installed or
completed. The Contractor shall bear costs of correcting such rejected Work, including
additional testing and inspections and compensation for the ArchitecdEngineer's
services and expenses made necessary thereby.
(b) If any of the Work is found to be defective or nonconforming with the requirements of
the Contract Documents, the Contractor shall correct it promptly after receipt of written
notice from the ArchitecdEngineer or the Owner to do so unless the Owner has
previously given the Contractor a written acceptance or waiver of the defect or
nonconformity. The Contractor's obligation to correct defective or nonconforming
Work remains in effect for:
(1) one year after the date of Substantial Completion of the Work or designated portion
of the Work;
(2) one year after the date for commencement of warranties established by agreement
in connection with partial occupancy under Subparagraph 9.8(a); or
(3) the stipulated duration of any applicable special warranty required by the Contract
Documents.
(c) The one-year period described in Clauses (b)(1) and (b)(2) shall be extended with
respect to portions of the Work performed, repaired, or corrected after Substantial
Completion by the period of time between Substantial Completion and the actual
completion of the Work.
(d) The obligations of the Contractor under this Paragraph 12.2 shall survive final
acceptance of the Work and termination of this Contract. The Owner shall give notice
to the Contractor promptly after discovery of a defective or nonconforming condition in
the Work. The one-year period stated in Clauses (b)(1) and (b)(2) does not limit the
ability of the Owner to require the Contractor to correct latent defects or
nonconformities in the Work, which defects or nonconformities could not have been
discovered through reasonable diligence by the Owner or the ArchitecdEngineer at the
time the Work was performed or at the time of inspection for certification of
Substantial Completion or Final Completion. The one year period also does not relieve
the Contractor from liability for any defects or deficiencies in the Work that may be
discovered after the expiration of the one year correction period.
(e) The Contractor shall remove from the Project site portions of the Work which are not in
accordance with the requirements of the Contract Documents and are neither corrected
by the Contractor nor accepted by the Owner.
(fl If the Contractor fails to correct defectiv� ��r m�����uc�n����t'��W���'�`t�c"I� v�"i�h��� ��`�����������
time after notice from the Owner or the �rc�i�ii��tl�����;o��a��r� t1�� �.)^�'r��'° r���Y ��rr'��t °� w"�
accordance with Paragraph 2.4. If the �"c�ar�ttµ�a�t�r ���:� r��`at �raa���� �°a�:�� �:��r�r��l���� c��'
defective or nonconforming Work wit��w�� � r�a��ar���r�� �i��� ���� �� �'"�'����'� ���'�����
from the ArchitectlEngineer, the O�A�uc�a� n�«�� r�an��� �r c"�:'�6��+� ���'� +��������"�" ��'
nonconforming Work and store the ���v�����1�1� ����t�aru�1� c�r ��,�w�ig�������t �i �1��
Contractor's expense. If the Contractea�° �i��,� ��c�� I��ay �<�*��� ���' �������'�� �,�'� ��������'
within ten days after written notice, t�t� (:��'�'���' �'���, ���� ��`°� � � �� �'����������� ��'�°"
written notice, sell the materials and e�,����������t �kt �s���.ti��� ��r �t �a���^��� ��'��� ������ ������
account for the proceeds after deductin� a�r��t� ����1 r��r���;�� tl��t ������!�1� ��a��� �����u I���x���
by the Contractor, including compensation for tl���. �r��7i����t�t��:�:����������'�� ���"�a��`� ���^��
expenses made necessary as a result of the sale. If the proceeds of sale do not cover
costs which the Contractor should have borne, the Contract Sum shall be reduced by the
deficiency. If payments due to the Contractor then or thereafter are not sufficient to
cover the deficiency, the Contractor shall pay the difference to the Owner.
(g) The Contractor shall bear the cost of correcting destroyed or damaged construction of
the Owner or separate contractors, whether the construction is completed or partially
completed, that is caused by the Contractor's correction or removal of Work which is
not in accordance with the requirements of the Contract Documents.
(h) Nothing contained in this Paragraph 12.2 shall be construed to establish a period of
limitation with respect to other obligations which the Contractor might have under the
Contract Documents. Establishment of the one-year time period as described in
Subparagraph 12.2(b) relates only to the specific obligation of the Contractor to correct
the Work, and has no relationship to the time within which the obligation to comply
with the Contract Documents may be sought to be enforced, nor to the time within
which proceedings may be commenced to establish the Contractor's liability with
respect to the Contractor's obligations other than specifically to correct the Work.
(i) Any Work repaired or replaced pursuant to this Article 12 shall be subject to the
provisions of Article 12 to the same extent as Work originally performed or installed.
12.3 ACCEPTANCE OF NONCONFORNIING WORK
The Owner may, in the Owner's sole discretion, accept Work which is not in accordance
with the requirements of the Contract D��cuments instead of requiring its removal and
correction, in which case the Contract Sum will be reduced as appropriate and equitable.
The adjustment will be accomplished whether or not final payment has been made.
ARTICLE 13 COMPLETION OF THE CONTRACT; TERMINATION; TEMPORARY
SUSPENSION
13.1 FINAL COMPLETION OF CONTRACT
The Contract will be considered completed, except as provided in any warranty or
maintenance stipulations, bond, or by law, when all the Work has been finally completed,
the fnal inspection is made by the Architect/Engineer, and final acceptance and final
payment is made by the Owner.
13.2 WARRANTY FULFILLMENT
Prior to the expiration of the specified w��rrar�t,� p��'��;�� ���'����+��"� �'��?" �� ���� �-°�����`����
Documents, the Architect/Engineer will m��l�e � c��'����������� ����������'�r� ���" ���� ��a���� ������ '"�"�"��
advise the Contractor and the Contractor's ���r�t� q��' ���� it���"�s �1���� r��1����� ��,�rr���.�c�r�, �"l��
Architect/Engineer will make a subsequer�t �r��,���t�r�a� ��� i�" il�� �r��`i'��ti����� ��"�� ���w�
properly performed, the Architect/Engineer will issue a le�tte;�� �l" r�1���� ���� th�; r��u�r►t��������
stipulations to the Contractor and the Surety. If for any reason the Contractor has not made
the required corrections before the expiration of the warranty period, the warranty
provisions as provided for in the Contract Documents shall remain in effect until the
corrections have been properly performed and a letter of release issued.
13.3 TERMINATION BY THE OWNER FOR CAUSE
��� ���������t���gr�� ��z� ca����r pr��vi�i�n of these General Conditions, the Work or any
����������, ���° ���,� �r����� ��� ��� ���r�iro���;�� �r���c�c��iately by the OvvYer for any good cause
�{�,�� ��,�p�� �,�,�,��� ��7� ���� ���r�����.� ��it1���r notice and opportunity to cure to the
C,���tt���:t��r, i�w+�luucii�a�,1���� a�<�t ii�nit�r� t� the following causes:
(1) Failure or refusal of the Contractor to start the W ork within ten (10) days after the
date of written notice by the Owner to commence the Work.
(2) A reasonable belief that the progress of the Work being made by the Contractor is
insufficient to complete the Work �vithin the specified time.
(3) Failure or refusal of the Contractor to provide sufficient and proper equipment or
construction forces to properly execute the Work in a timely manner.
(4) A reasonable belief that the Contractor has abandoned the Work.
(5) A reasonable belief that the Contractor has become insolvent, bankrupt, or
otherwise financially unable to carry on the Work.
(6) Failure or refusal on the part of the Contractor to observe any requirements of the
Contract Documents or to comply with any written orders given by the
Architect/Engineer or the Owner as provided for in the Contract Documents.
(7) Failure or refusal of the Contractor to promptly make good any defects in materials
or workmanship, or any defects of any nature, the correction of which has been
directed in writing by the Architect/Engineer.
(8) A reasonable belief by the Owner that collusion exists or has occurred for the
purpose of illegally procuring the Contract or a Subcontractor, or that a fraud is
being perpetrated on the Owner in connection with the construction of Work under
the Contract.
(9) Repeated and flagrant violation of safe working procedures.
(10) The filing by the Contractor of litigation against the Owner prior to completion of
the Work.
(b) When the Work or any portion of the Work is terminated for any of the causes
itemized above or for any other cause except termination for convenience pursuant to
Subparagraph 13.3(e), the Contractor shall, as of the date specified by the Owner,
discontinue the Work or portion of the Work as the Owner shall designate, whereupon
the surety shall, within fifteen (15) days after the written notice of termination for
cause has been served upon the Contractor and the surety or its authorized agents,
assume the obligations of the Contractor for the Work or that portion of the Work
which the Owner has ordered the Contractor to discontinue and may:
(1) perform the Work with forces employed by the surety;
(2) v�rit�� t�7� �°�'itt��� �.c��r��t�t c�f`tl�� C�����r, �,���c��r �� r��l�c:�r��r�t ���m��r��tc��° tc� t��c c�^��r
�r�c� ��;�°�`�rr�c� ti�e "�'�r�� i�r� w���i�h �v��t tl�� �;r���i�Q� ����.ql, h� ar���ar�n�ib9� t�sr araci ���"
�t�� �r�rca����t �f'��� ���ti� r�.��r��6�w�� �,� k�� ir�u�r°���c� %ar t�� ��������i:;����-� csf°ti�e W��ri� t����t
are in excess of the amount of funds remaining under the Contract as of the time of
the termination; or
(3) with the written consent of the Owner, tender and pay to the Owner in settlement
the amount of money necessary to finish the balance of uncompleted Work under
the Contract, correct existing defective or nonconforming Work, and compensate
the Owner for any other loss sustained as a result of Contractor's default.
Cd� t���: �.v���t ��t" �r�r���ix���ion for cause involving Clause (b)(1) or (b)(2), the Surety
�����1 �t����ua�� t��� ��t���t�r�actor's place in all respects, and the amount of funds
�°�:rra<�ir������ t�rb�a�i�l �����r the Contract shall be paid by the Owner for all Work
performed by the surety or the replacement contractor in accordance with the terms
of the Contract Documents, subject to any rights of th�, �")�rz���° tc� �i�ci�z�� �.��� ��,�t�,
damages, or liquidated or actual damages that the ���r�+�� ����^ J��w� i���ta�r���,
including but not limited to additional fees and expen��^� ��t�� t'"��'��7�����������;�d�^��r
and attorneys fees, as a result of such termination.
(c) The balance of the Contract Sum remaining at the time of the Contractor's default and
of the termination shall become due and payable to the surety as the Work progresses,
subject to all of the terms, covenants, �n� c���r��iti���r� ���'tY'�� ���s��tr���;i ����'���ments. If the
surety does not, within the time s���i��d i� �����ar�;�����ti M=�•��"��'� exercise its
obligation to assume the obligations ��� t�a� �"�.�r�kr���, �r R��t �ac��tac�r� c��` the Contract
which the Owner has ordered the Contracl�r tca �i����r�tir�'�.��, tl��� t.d'�� C��r't�er shall have
the power to complete the Work by cc.rr�i�•���i +�� c�M.N�e;rw�r��, �s �t �7��y ���r�� ���������'��
The Contractor agrees that the Owner �C��M6 ����� tl�� r����� ����� ���� ���������r� ���� ��" �r�'�
any or all of the materials, plant, tooi�, ����i��°r��7t� ��a���l��s� �►rtic� ����'��a�a'�,� c�i�" ��r��r�' �.�imr��ei
provided by the Contractor for the �ur��r��� �a1" �t�� �'aa�, �rad t�� �rr�u�r�� a������` ������+
equipment, labor, and materials for ��� u�wat����+�ti�r� r��" �1�� "�w''�c�� ���ci �e�r �1����� �� x���
account of the Contractor the expenses a��' ���rt��l����ax� ��t� w�1���`,r ��"�����"��a�> �������
equipment, and incidental expenses. 'I°}a�. ���+�ras+�� `tm��urr'+��V ��' t��'�"'�'��� �� �%�����'��'�
the Work shall be deducted by the ��rr���' ���� ��� �N�� ���������� �� ��� '���°����� �����
remaining unpaid to or unearned by the Contractor. The Contractor and the surety
shall be liable to the Owner for any costs incurred in excess of the balance of the
Contract Sum for the completion and conection of the Work, and for any other costs,
damages, expenses (including but not limited to additional fees of the
ArchitecdEngineer and attorney's fees), and liquidated or actual damages incurred as a
result of the termination.
(d) The Owner shall not be required to obtain the lowest bid for the Work of completing
the Contract as described in Subparagraph 13.3(c), but the expenses to be deducted
from the Contract Sum shall be the actual cost of such Work. In case the Owner's
expense is less than the sum which wou�c� l��v� bc:��� ����y���� ������" ����� "�'�����'����� �� ���`�
same had been completed by the Cc��r�r���c�r, t1��c� t��� "�"�"����' ��Y 1��Y �� ���
Contractor (or the Surety, in the event �a1' � ��aT��l��� �����������<��� ����" ������ ����
difference in the cost, provided that the ���ai��t���+�����' ���' ���� 'S�u�"�C��"� ���b��� ������ �� ���������
to any claim for damages or for loss of ;��t�.i�i����t�� pr��fst���. l�� �������. ������ �����'��� ����"�"
completion shall exceed the amount wl��c�� vvca�.�V+� h�av� ����� ��Y���'� ���''�'��" ���''�
Contract if the same had been completed by the Contractor, then the Contractor and
his Sureties shall pay the amount of the excess to the Owner on notice from the Owner
for excess due. When only a particular part o�" t���, '�r'��r� i� ��i��� ����'�'i��� �sn by the
Owner by contract or otherwise under the ��•�v'u�i��;� ��t tt�i,� `��.G������°����"aph, the
Contractor shall continue the remainder of the ''�"�r� i��a ��ar��c�rnr�il� °�`�th th� terms of
the Contract, and in such manner as not to hinder or interfere with the performance of
workmen employed and provided by the Owner.
(e) The right to terminate this Contract for the convenience of the Owner (including but
not limited to nonappropriation of funding) is expressly retained by the Owner. In the
event of termination for convenience, the Owner shall deliver at least ten (10) days
advance written notice of termination for convenience to the Contractor. Upon the
Contractor's receipt of such written notic��, ti��c �.'ra����'��i�r ;�1��11 ����� ����, ���rt�rr��zatt��
of the Work and shall take reasonable ���� a.��a�'r����`i��t� �c�ti�>�"� i�� ��+���-m�� ���� �������� �"��'�
Work in place. The Contractor shall tha�� �� r�ar��k�u�°��� �y �h� ���w�����' ia� �������"�����'�
with the terms and provisions of the C��nt�r��t C��t�awr������, �r�� ��� ������� ������ �^��'���
���t� a�����rr��, d���t�r���s stored at the PaT��+�ci �it�: ��� ��'v�� �'�r��'r�'a the Project site as
�����-c��wc�y ta�r ���� ��w��r but not yet paid �a���, �ai�a� ��t�a�k, �����a�����e, and documented
��r�r�i���tr`�r� ch�r�;c��, di? any, paid by the ��r��tr��t��� �� ��ar�����ti�"�� with the Work in
place which is completed and in conformance with the Contract Documents to the date
of termination for convenience. No amount shall ever be due to the Contractor for lost
or anticipated profits.
13.4 TEMPORARY SUSPENSION OF THE WORK
(a) The Work or any portion of the Work may be temporarily suspended by the Owner
immediately upon written notice to the Contractor for any reason, including but not
limited to:
(1) the causes described in Clauses 13 .1(a)(1) through (a)(10) above;
(2) where other provisions in the Contract Documents require or permit temporary
suspension of the Work;
(3) situations where the Work is threatened by, contributes to, or causes an immediate
threat to public health, safety, or security; or
(4) other unforeseen conditions or circumstances.
(b) The Contractor shall immediately resume the temporarily suspended Work when
ordered in writing by the Owner to do so. The Owner shall not under any
circumstances be liable for any claim of the Contractor arising from a temporary
suspension due to a cause described in Clause (a)(1) above; provided, however, that in
the case of a temporary suspension for any of the reasons described under Clauses
(a)(2) through (a)(4), where the C:ontractor is not a contributing cause of the
suspension under one of those C�au��.� �r�' ^�a��r� i�,�: �+a'c�v��i�c�a� of the Contract
Documents in question specifically ��a��vi�V�°s kl��t t.���� ��r�������ic��� �� at no cost to the
Owner, the Owner will make an �c�m�its���l� ;����s�t����r�t fi�r t��; following items,
provided that a claim is properly ma�N�^ 6� �N�� �"c��i�°�c����r ��a��i�r �i�bparagraph 4.3 of
these General Conditions:
(1) an eyuitable extension of the Contract Time, not to exceed the actual delay caused
by the temporary suspension as determined by the ArchitecdEngineer and the
Owner;
(2) an equitable adjustment to the Contract Sum for the actual, necessary, and
reasonable costs of properly protecting any Work that is finished or partially
finished during the period of the temporary suspension (no profit and overhead
shall be allowed on top of these costs); and
(3) if it becomes necessary to move equipm���� Ir�a.rrw tit�� �"r��+��t �ii� �a�t� then return it
to the Project site when the Work i� «r�a��r����i ��� '�� r�;�w��t�e��a, an equitable
adjustment to the Contract Sum for the �►�;�u��V, n�����s�r'�r, ��n�� r���canable cost of
these moves; provided, however, that no adjustment shall be due if the equipment
is moved to another Project site of the Owner.
ARTICLE 14 MISCELLANEOUS PROVISIONS
14.1 GOVE1tNING LAW; COMPLIANCE WITH LAWS AND REGULATIONS
(a) This Contract shall be governed by the laws and case decisions of the State of Texas,
without regard to conflict of law or choice of law principles of Texas or of any other
state.
(b) This Contract is entered into subject to and controlled by the Charter and ordinances of
the City of Denton and all applicable laws, rules, and regulations of the State of Texas
and the Government of the United States of America. The Contractor shall, during the
performance of the Work, comply with all applicable City codes and ordinances, as
amended, and all applicable State and Federal laws, rules and regulations, as amended.
14.2 SUCCESSORS AND ASSIGNS
The Owner and the Contractor respectively bind themselves, their partners, successors,
assigns, and legal representatives to the promises, covenants, terms, conditions, and
obligations contained in the Contract Documents. The Contractor shall not assign, transfer,
or convey its interest or rights in the Contract, in part or as a whole, without written consent
of the Owner. If the Contractor attempts to make an assigmment, transfer, or conveyance
without the Owner's written consent, the Contractor shall nevertheless remain legally
responsible for all obligations under the Contract Documents. The Owner shall not assign
any portion of the Contract Sum due or to become due under this Contract without the
written consent of the Contractor, except where assignment is compelled or allowed by
court order, the terms of the Contract Documents, or other operation of law.
14.3 WRITTEN NOTICE
%,��;��� �� c��}��r�rr%�� �ar��ri���.d ir� ���.i�le 16, any notice, payment, statement, or demand
r���,aw��t� �r�° ��a�r����t�i��l �t4r� �� �;�iv�,r� ���a�+�r this Contract by either party to the other may be
�f"������i �ry ��,r������ll �l+�l���r� �a�r �ei����; or b�� ����il, p�st���,�� pr�,�a��i� t� �h� �'�r�����t �w1����;,��
or Superintendent of either party, or to an oC`1t�c�r, �a��tr'��;r„ c�r ��tl��r ci����r��a��c�' r��r�����t��ive
of either party. Mailed notices shall be add���,s;�r�c� ��c� tl�� ����rti���' �tt ;�r� ;����r�,�� ����i��r������� �'�'
each party, but each party may change its ���a�r��� ��� �+��`����t�� ��,<������ i�� �����a�r�����c� w�itt� ��.��
section. Mailed notices shall be deemed co��t�rr���r�i���t��9 �� �r1'���r�:�� ��� c����� ����;r �r►��i�k����.
14.4 RIGHTS AND REMEDIES; NO WANER OF RIGHTS BY OWNER
(a) The duties and obligations imposed on the Contractor by the Contract Documents and
the rights and remedies available to the Owner under the Contract Documents shall be in
addition to, and not a limitation of, any duties, obligations, rights, and remedies otherwise
imposed or made available by law.
(b) No action or failure to act by the Owner shall constitute a waiver of a right afforded the
Owner under the Contract Documents, nor shall any action or failure to act by the Owner
constitute approval of or acquiescence in a breach of the Contract by Contractor, except as
may be specifically agreed in writing by Change Order or Supplemental Agreement.
14.5 INTEREST
F�v��� ��,�,,���� �����y a��t ��� 1����a1� %r ir�t�r�;„;t �x� ��ny progress or final payment to be made under
�p�� ,�������.���� �����,�������� �,����� �� �;,�y �� provided by the applicable provisions of the
���������� ���„-������� ���� ��,������ ����� "�'c����s Government Code, as amended, subject to
1'a�w��:c��}a�� 9.+�{;�) ��t"t��c�s� �a��n�r�l t�;���t�1i�a�r��.
14.6 OFFICERS OR EMPLOYEES OF THE OWNER NOT TO HAVE FINANCIAL
INTEREST IN ANY CONTRACT OF THE OWNER
No officer or employee of the Owner shall have a financial interest, direct or indirect, in any
Contract with the Owner, or be financially interested, directly or indirectly, in the sale to the
Owner of any land, materials, supplies or services, except on behalf of the Owner as an
officer or employee. Any violation of this article shall constitute malfeasance in office, and
����r rr�'���r ��a° c;ar�p�lu�c«� ���`��rr��.r �;rai��� tl��reof shall thereby forfeit his office or position.
r�;r�� ��c���t%¢.��a ��f tiai� ���cpc���, �raih t�t� �r����Me����, ���r��� or implied, of the person,
���ur���r��m ��ri�������i�fi �c��r�������,�, ti�•r��� �����i��ic�� t�r ��r�a�����r�r� contracting with the Owner
������ ����c��� tl�� �,'�����r���.� ���rrcalr���J va�ia�alal�: ���� t��a� �w�����•4� ����� Manager or City Council.
14.7 VENLIE
This Contract is deemed to be performed in Denton County, Texas, and if legal action is
necessary to enforce this Contract, exclusive venue shall lie in Denton County, Texas.
14.8 INDEPENDENT CONTRACTOR
In performing the Work under this Contract, the relationship between the Owner and the
Contractor is that of an independent contractor. The Contractor shall exercise independent
judgment in performing the Work and is solely responsible for setting working hours,
scheduling or prioritizing the Work flow and determining the means and methods of
��rfc�rr��ir�� tM��:. 'U����r�e� �aa�j�c�l ca�ly �.� �N:i��. �•�c�tG�rcr���x�ts �f'4��� !�.�"����1r�c:� '��.�+��i���rat�. �t'�� t��r�
car �a�'��vi�i�p�rt �t ����:� �:+�c��.r���t s�����1 �c� ��.���!�trt��c� �;� ����k���� t�tc� ��.����r���::t��r ��r� ;���r�at� �c�rv�taat,
�'tr �ar��alc��^�� c��" lt'��: ��nar, ��r nr��,�1���� tl�� �"<����Cr�at�tc��� �.�p° �a��� t��.,t:l�c� ��rrutra���c�'� ��rs��l�r�e��;�,
���t�t�� ca�° ��r���r�tll� �1i�ii�l� l�c�r t�'a� �'r•�ru�� t��.�i�tits, ��ac�a ��� �°�tir�.N�ti�.ra�;, �r�,�;�wt°���c�� a��d ��a�°9c��'':�
��arr��a����ti�r�� w��ri�� ����; (���r���r ��°c>�ic��,� t:c� its employees.
14.9 NONDISCRIMINATION
As a condition of this Contract, the Contractor covenants that he will take all necessary
actions to insure that, in connection with any work under this Contract, the Contractor and
its Subcontractors will not discriminate in the treatment or employment of any individual or
�r�u�� �rl" ir�ti���w�d+�aa,�1� ������ �.}�� �cr�ar�s�� ��f` r�����, ���1����, u�c����i���a, t����i��ra�� ��a•u�i��r�, ��+��, �u�� ���am�
��r�cl�+��s��� ����c�N��c�� �ca j�l� ��r�r�c�rrn�a����„ c;i�hc:r aiir��tl�, ir��.���'��t.l'� ��r l:}�rc,�.��,1� c.��a�ttr���t���l �ar
�rtw��a� ��•r�a���.mer���. 'D"l�� C'r�ntr�c�t��r �h��l� �l�c� +������I�ly� vvith �11 ���li���l� r�.���ircr�r-i���t�; ��1'.
�k�� �rr��r"u�;aa�� �^��;Y� I�����a�liti�s ��t, �"�' �:I,��C',.�� �� 1 � 1 � 1— � �� � �, �� �a���t�ti��. �� �:k���
r���rd� ��� �;+�.k���r��t��r ����arl� k�c��, �'�t�ir� ���°wd ��i"�.����e�J �a11 �°�ctar�� ��I�tira�, �r3 k�i� �."c�w��,�-���.1 c�r
��r� �a��t��r���+�� t��r�u�t�er �s�r a c��i��i���� ���rMi�cl ���" thrc�� (�} ���r� irc��a� �r��l �"����t�°���t
��mnu�lc����, vvpt� ��r�l a���,�� �ll�r��� tc� a:�a����cuza�.� z°r���ar���r�t�tw�ac,� �9� 1:q�� �������•, u����
�c�c�u��d, f��e �au��r����� c��° �r��l��u�taa�� c�c��x��Cia��c�� v��iti� t.�i� ���� ��k��r �r���i�ur.���� ��f" tl°a�
Contract.
14.10 GIFTS TO PUBLIC SERVANTS
(a) The Owner may terminate this Contract immediately if the Contractor has offered,
conferred, or agreed to confer any benefit on a City of Denton employee or official
that the City of Denton employee or official is prohibited by law from accepting.
(b) For purposes of this Article, "benefit" means anything reasonably regarded as
pecuniary gain or pecuniary advantage, including benefit to any other person in
whose welfare the beneficiary has a direct or substantial interest, but does not include
a contribution or expenditure made and reported in accordance with law.
(c) Notwithstanding any other legal remedies, the Owner may require the Contractor to
remove any employee of the Contractor from the Project who has violated the
restrictions of this Article or amwv similar State or Federal law, and obtain
reimbursement for any expenditures made to the Contractor as a result of the
improper offer, agreement to confer, or conferring of a benefit to a City of Denton
employee or official.
ARTICLE 15 RIGHT TO AUDIT CONTRACTOR'S RECORDS
�� �,�,��������� ��°���� �„�������� C.'��c�����v��i�a�� ��rvac��� Agreement, the Contractor grants the OwYer
��� ����� �,� ������� �� ��,� ���,��p;; ,�y��t������ �by ���" t��� Contractor's records and billings relating to
���� ��,����������y�� ��%��� �,ay���� ,��,�,�� ��� �;��������� Documents. The Contractor agrees to retain its
��a����,��� m.���,���q� ����� �����������,����� �p�" ������r� ���� ����r� 1:�w���N�owing completion of the Work. The Owner
���,��� ����;�� �� ����� ,������;��� �}y� �,y�,��� t� �e��it r�a�w�� ��i reasonable hours. City r�ay review any and
al1 cri" i��� �+��vi��� ��rf�����a��1 I�y ��c�ra��`��`tc�� �u�°�c��r this Contract. Any payment, settlement,
satisfaction, or release made or provided during the course of performance of this Contract shall
be subject to City's rights as may be disclosed by an audit under this section.
ARTICLE 16 NOTICE OF CONTRACT CLAIM
This Contract is subject to the provisions of t��� 1:���'��c��� �ai�y �=���'�� �� �t��'����"��y �"'���"��r�� �°�'
requirements for filing a notice c�M ���r��=���� �a� �;a-�n�r�ct �l��gr� �����z�:�� ��'"�ty C:'car�t�-�r���ar ��3��,IM
comply with the requirements of tii�.� or��a����z�� ��,� ��.���c����c�it�<��r ��m�tM�y li��i,��tAr��� ����Car�� ��� thi�
Contract, in addition to all other ��c�t�ix������������� ir� t�}��� �;����t���c�� r��C�t�� ���a �I�,�t��u� ����c� a°�s.�t����.� ����1'
claims.
����r��i� � ��a������t �����r� i��t���n il�� 1"� l�[�l' ���c������t �r,� ���u�r� ��r���:� r�a� �.��r�t����,�;• t�� t���t��
��c� ��r�ciiti��a� ��e� ����.th iu� ��u� �+� ����i��1�+� ��arw�tm�°���� �t���� ��^��iy.
EXHIBIT D
PERFORMANCE BOND
STATE OF TEXAS §
COUNTY OF DENTON §
KNOW ALL MEN BY THESE PRESENTS: That MABAK DIRECTIONAL
DRILLING, INC.whose address is
hereinafter called Principal, and , a corporation
organized and existing under the laws of the State of , and
fully authorized to transact business in the State of Texas, as Surety, are held and firmly bound
unto the City of Denton, a municipal corporation organized and ����i�ti���� ��������' t���:� �����'� ���1:` t����
State of Texas, hereinafter called Owner, in the penal sum ofi� �ar�� l��r����1r���_ ������`,-��������!.���
DOLLARS ($150,000), in lawful money of the United States, t.c� N��; ���.ic� ia� �:7��rr�c��� t.;<.�����t�,
Texas, for the payment of which sum well and truly to be made, we hereby bind ourselves, our
heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these
presents.
THE OBLIGATION TO PAY SAME is conditioned as follows: Whereas, the Principal
entered into a certain Contract, identified by RFP 5419, with the City of Denton, the Owner,
dated thRFP #5419 ���i .... da of _ A D. --- -, for _
_.— W .
Y -- –
�.I�AL ( "��� �'1���:""_�" f 4��� DRY_A���.,�� BORIN .,._ . . _...
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform and fulfill
all of the undertakings, covenants, terms, conditions and agreements of said Contract in
accordance with the Plans, Specifications and Contract Documents during the original term
thereof and any extension thereof which may be ,��•�m�'��� �+� t�ia, ��w'��e��', ���� ����' "+�'�����)�� ������� ��
the Surety, and during the life of any guaranty o�T ����rr���1�y� r����i�-�.� ��r�+���r ��i� �;�arotr"��t.� �r��� �Ia��11
also well and truly perform and fulfill all the ��rr����k���������� ¢����`��������'���� ���'���, ��������������T�� ���"�
agreements of any and all duly authorized m��i���:�t��am�� ���" ���i�i �'f�fi���"���t t��t ��a�� 1���'�����"�' ��"
made, notice of which modifications to the ��a�°�.t� ��i���„ h�:r���� "+�"��ivc�c�� �r��, �� ���� �'�'�����'1����
shall repair and/or replace all defects due to fault� r����t�ri��:� ���c� �wr��r����������i�a ���i �}�q���a' "�V4��i�
a period of two (2) years from the date of �i����� �a�n����uii��r� �r►� 1���1 �a�c�����w��� ���' ���� �'"��e'� ���"
the Owner; and, if the Principal shall fully ir���rr�r�zf� �N�c� �av� �u�r�'a�l��� t�� �e�'���' ��"�y�� ���� ���'���
and damages which Owner may suffer by reasa�r� a�1 �:��1����� ��� �� ����+�ru�� ��;r��a� ���°�c� �k��a�� 1'i�lV�
reimburse and repay Owner all outlay and expense which the Owner may incur in making good
any default or deficiency, then this obligation shall be void; otherwise, it shall remain in full
force and effect.
PROVIDED FURTHER, that if any legal action be filed upon this Bond, exclusive venue
shall lie in Denton County, State of Texas.
AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates
and agrees that no change, extension of time, all.er�tz��� �r �r�+�i�i�r� lt� t�� t�rm�� ���'t��� �������L����
or to the Work to be performed thereunder, ��r� t� ���� ��1����, ������r���������� �-��'���'����`'� �t�R�
accompanying the same, shall in anywise affect ��� c��l����i��� ��� t1�i� ������.��, �t��� �� �I��� ]��;�'��Y
waive notice of any such change, extension of ti���, �1��r������� �,�r �c��3����:�'�w �� ��� ������ ���TM ��"��
Contract, or to the Work to be performed there���t��r� ���' t.a� ���c l'������ �����►������������ ���'���""������
etc.
This Bond is given pursuant to the provisions of Chapter 2253 of the Texas Government
Code, as amended, and any other applicable statutes of the State of Texas.
The undersigned and designated agent i� ���r��y c���i�a��ti�c� 1a� t��!� `���"��� ������� �� ���
Resident Agent in Denton County to whom any r���,�i�it� ����.i��� r��� �r� �i�lzv�rc�r:� �un�C �a� ��r���ca�
service of process may be had in matters arisin� �at��t ��t :���c�t �u�'��ys6'���a, �� I��"���"����� �� ^°�"T���%��
7.19-1 of the Insurance Code, Vernon's Annotat��� ��i��V !�t�tta��� z��� ��� `������ ��� ���'����
IN WITNESS WHEREOF, this instrument is executed in four copies, each one of which
shall be deemed an original, this the day of �wy� �, ,�....,,,,�.,�.. ..•
ATTEST:
BY:
SECRETARY
ATTEST:
BY:
PRINCIPAL
BY, __ ��
PRESID.. _�,....._..
ENT
SURETY
BY: ._... �_ _ .�
__
ATTORNEY-IN-FACT
The Resident Agent of the Surety in Denton County, Texas for delivery of notice and service of
the process is:
NAME:
STREET ADDRESS:
(NOTE: Date of Performance Bond must be date of ContracG If Residen� Agenl is not a corporation,
give a person's name.)
EXHIBIT D
PAYMENT BOND
STATE OF TEXAS
COUNTY OF DENTON
KNOW ALL MEN BY THESE PRESENTS: That .___ .,_--- .. ..----- M�.-------- ...�
whose address is _ _ hereinafter called Principal, and
of the �.. .�, ._... � �_
, a corporation organized and existing under the laws
State of ___ , and fully authorized to transact business in the State o
.. .....__
Texas, as Surety, are held and firmly bound unto the City of Denton, a municipal corporation
organized and existing under the laws of the State of Texas, hereinafter called Owner, and unto
all persons, firms, and corporations who may furnish materials for, or perform labor upon, the
building or improvements hereinafter referred to, in the penal sum of one hundred, iifty-thousand
DOLLARS $1( 50,000) in lawful money of the United States, to, be paid in Denton, County,
Texas, for the payment of which sum well and truly to be made, we hereby bind ourselves, our
heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these
presents.
THE OBLIGATION TO PAY SAME is conditioned as follows: Whereas, the Principal
entered into a certain Contract, identiiied by RFP 5419, with the City of Denton, the Owner,
dated the — �.eeA... ...r__ da of �--- .�...... A.D. , for ..
_ Y
RFP #5419 ANNUAL_�.C��i"f"I���T FOR DRY �UGER BORING .__ _ . . .
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties
and make prompt payment to all persons, firms, subcontractors, corporations and claimants
supplying labor and/or material in the prosecution of the Work provided for in said Contract and
any and all duly authorized modifications of said Contract that may hereafter be made, notice of
which modifications to the Surety being hereby expressly waived, then this obligation shall be
void; otherwise it shall remain in full force and effect.
PROVIDED FURTHER, that if any legal action be filed on this Bond, exclusive venue
shall lie in Denton County, Texas.
AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates
and agrees that no change, extension of time, alteration or addition to the terms of the Contract,
or to the Work to be performed thereunder, or to the Plans, Specifications, Drawings, etc.,
accompanying the same, shall in anywise affect its obligation on this Bond, and it does hereby
waive notice of any such change, extension of time, alteration or addition to the terms of the
Contract, or to the Work to be performed thereunder, or to the Plans, Specifications, Drawings,
etc.
This Bond is given pursuant to the provisions of Chapter 2253 of the Texas Government
Code, as amended, and any other applicable statutes of the State of Texas.
w���� ��,������.���,� ���� ��,������t�� �����: i� l�a��°��y designated by the Surety herein as the
��,������ ����� �� ������� ,�;�,����,�y �,� ,,�,r������ ���� ����������t� notices may be delivered and on whom
��twr���� �C�c��c;���� rn;�� �� 1��� �a� r��tte;�°� �����ira� c:���t a.��"���ch surety, as provided by Article 7.19-1
�,�` ��� ���;���.��y�:� �'A����, �'"c���r���"� C����cat��t��i �"i�^�B Statutes of the State of Texas.
IN WITNESS WHEREOF, this instrument is executed in four copies, each one of which
shall be deemed an original, this the day of �� mm __� •
ATTEST:
BY:
SECRETAR
— .... Y
ATTEST:
BY:
PRINCIPAL
BY: ...,.. –
PRESI �---- �
DENT
SURETY
BY: �.w e�... - .. ..__�
_
ATTORNEY-IN-FACT
The Resident Agent of the Surety in Denton County, Texas for delivery of notice and service of
the process is:
NAME:
STREET ADDRESS:
(NOTE: Date of Payment Bond must be date of Contract. If Resident Agent is not a
corporation, give a person's name.)
EXHIBIT E
INSURANCE REQUIREMENTS AND
WORKERS' COMPENSENTATION REQUIREMENTS
Upon contract execution, all insurance reguirements shall become contractual o6ligations, which the
successful contractor shall have a duty to maintain thr��ughout the course of this contract.
STANDARD PROVISIONS:
Without Cir���'i�ir��� ,�r��r +a�' ��hc� ra�,��r ��1r"�,`rx�"i���° �r+" ��u�+�ilities of the Con�rac[or, lhe Contractor shall
provide r�rr� rt��r���r�+��`� ��'���� ���+� �'�����^���'�'� �'���'°� ��'��' been completed and accepled by the City of
Denton, �"►�r���, t�� r�er"rair�r�a��' ��'r:��ranc`� �����"�,�'� ����` indicated hereinafler.
�ra►atrc�c�tr�� s�rai��t� w����� �"�� d�t�rcJr�u„sir�,� ��j��+rt�r����' ti��r°,^�f�r��tr�ry c��rltf�������� �'�f"r"+�'���rt,rrr��x irrc��rr�"�r��„
r�r�y ��c�r��1�c°r�hi� �u�,�c��ar��;�r►� �r ���"�����rr�r�de�� �r�r��t�a��^eerz�,� ��,� �°r�r��'r���t r��rrr�%�r �rt��i ���1a� a�af" 11ec ,�r�����.��:t.
�'nrrlr�rc�`ra�,r �e,�,��� a��nrr wr��'t�r� r^c,�,��r�ks,t �� ���^� �'"��a^���a���,sr��� ,���!�c�r�'a��r��!,� r�,�k �"�� �t�rrr,�ic���'��ra�� ��" ��i�
ir�����r����r r°�r��er"r��r���r��� ��i �rr�,y� t�r���; 1ra�wr����.>r�p �"rrra�r�rc�rrr ��l�rr11 r��t ccr���»�����c� e�rr,� v�ra�r% �rr� �""���r��r r�r��
rr�r�r�'��ricx� x���"r"�" Nr� �ar ��J�c� �r����v�a�� n�t;r'�i��r�Pr'r��c tJ��af t,l�+� ��r��ratd�ua��' l��r� �"�re�r� r�c���r�"�rt, c,w�,��rur��r�', ���r,� �w�,�,���r�"
by 1he City of Denton.
�Ii1 ir��sr�r�r�cW�� ��c��"1�,���° �rr��;��sed or �xlat�r�r��� �:i� ��`��"r"�fu�a"r�rr+ �r�"����se requirements shall comply wi/h the
�;����p�,����;x �,•�r�c�r�� ,���c����:°�rtions, ��� ds'�r�'�t �� ���i����'��"��+� in compliance with lhese general
;y;����.����;r�ti���r� ���rra�r���e�r��' �'h�' dura��t��� rxf'd�tr� �"�r����ct, or longer, if so noted:
• Each policy shall be issued by a company authorized to do business in the State of Texas with an
A.M. Best Company rating of at least A- VII ��,�� la��k��.
�„ ,���� ,��,��������q�� ��� ��1���r�;��u���� r+���t��i���� �1�a11 be declared in the proposal. If requested by the
�y��, ��� i������.�� ������ �,�,��c;� �s�u ����r����a�l� sa���l°� deductibles or self-insured retentions with respect
�� ���, �����.� ��� ����N�;���� ���yb��y, ������������ ������� volunteers; or, the contractor shall procure a bond
�����.�,a��,,���y� �������-����� ��• p�,�;��� �r��i r�lazt��i investigations, claim administration and defense
expenses.
• Liability policies shall be endorsed to provide the following:
■ Name as Additional Insured the City of Denton, its Officials, Agents, Employees and
volunteers.
■ That such insurance is primary to any �at���a• urr�r.�r'�n'n�c �v���1���1�' ����� the Additional Insured
with respect to claims covered under tl�� T��alicy ����J tl�ai t���� r#�:;�acance applies separately
to each insured against whom claim �� ����:�r�� ��` s�li� i� �r���h�� The inclusion of more
than one insured shall not operate to increase the insurer's limit of liability.
• Cancellation: City requires 30 day written notice should any of the policies described on the
certificate be cancelled or materially changed before the ex�iration date.
• Should any of the required insurance be �����vdc{��� ur���r° � t�G�irn� �nk��� ���'���� �ws������'`����� ��'�°�M
maintain such coverage continuously throu�,k�a�at th�� �s*�'x�� e���t��� �����"��� ���'�� �"��a������ k''������ �''���'�`
period of three years beyond the contract ���ir�t�i�a��� :�u�.1� ��h���t �x�����rz�►��^u� �rr��r�� ����1i��� �����
contract term which give rise to claims mad� �[��:�° ���.�ir�tirar� caftl�c �c���i���i ;�1��N;1 k�r� u��v�.�rc:z�.
File # 5419
Should any of t��� ��s��a:i��t�c! it��m��a°���ce be provided under a form of coverage that includes a
general annual ���re�;�t� lir�r�it pam°���iding for claims investigation or legal defense costs to be
included in the ��n�r�l �r����ar�l ���rugate limit, the Contractor shall either double the occurrence
limits or obtain Owners and Contractors Protective Liability Insurance.
��1���N�c� ����r ����ai��ct irro�ur��n�;�, 1���� r��ri���; th� contract t�rr��, �•��t��sts ���• ���y��a���ts c�r`v�;i��a�ia��
�t`Q�r ��.��}� ����JS� �17�11 nt�� �a� ��c��.c����l, u���i� C�� City re�em��� ����i�;�"����ary ��r��l�rt�� c�� �°�m�st�t�d
����r��� a� r�q�:��r�� k�� 4i�i� ��antra�;C, �6"f��t���e �s of the l��as� �i�t�, i�' is���rr��rc;� is �roc�� r�ins��t��l,
���;��y� �ry��y �� ��� ��1�,��t��r�g t��rn����wi� ���i� ��a'�ement effective on the date ofthe lapse.
SPECIFIC ADDITIONAL INSURANCE REQUIREMENTS:
,��� ����;������,�,� ��,�,��,���,,� �;r�����a��� �yr �,r�t�xr�c>r� �,rr e�rtia�"�ction of this Con/racr shal! additionally comply
��,���� ����,�,����,��,�,��� ���,�,�� ����,�g�'������,����;�, �r��" ,��J�r�!! %c� maintained in compliance wilh /hese additional
�+��,����a��rr"���r�s tl�r,�re��al��a�l �lr� �"r�rca�^i��r r��"fl�+� +�"ra�r�truct, or longer, if so noted:
[X] A. General Liability Insurance:
General Liability insurance with combined single limits of not less than $1.000.000.00 shall
be provided and maintained by the Contractor. 'The policy shall be written on an occunence
basis either in a single policy or in a combination of underlying and umbrella or excess
policies.
If the Commercial General Liability form (ISO Form CG 0001 current edition) is used:
• Coverage A shall include premises, operations, products, and completed operations,
independent contractors, contractual liability covering this contract and broad form
property damage coverage.
• Coverage B shall include personal injury.
• Coverage C, medical payments, is not required.
If the Comprehensive General Liability form (ISO Form GL 0002 Current Edition
and ISO Form GL 0404) is used, it shall include at least:
• Bodily injury and Property Damage Liability for premises, operations, products and
completed operations, independent contractors and property damage resulting from
explosion, collapse or underground (XCU) exposures.
• Broad form contractual liability (preferably by endorsement) covering this contract,
personal injury liability and broad form property damage liability.
[X] Automobile Liability Insurance:
Contractor shall provide Commercial Aut�m��¢�k�il�� t�i��M�i��ty ��'�su�'�'�i��� "�'���"� �=���������'�'��� `���r��'�'
Limits (CSL) of not less than ;"�� �ii�l��:r ��� �� .sir��l+� �a�li�;� �r� ir� � c��a�t�ai�����ia�r� r�P��a��� ��N�al
umbrella or excess policies. �"l�e �r�li�,y �avili u��c.��F�l� k���c�il� ir�j���',�+ �sr�c3 �a��°¢���ri.� ��rs���� l�a�k�ili��+
arising out of the operation, maintenance az��i ���-� ����� ���� �X����������+�� ���� �7��"��'�a�� ���"��������� �����'�
in conjunction with this contract.
File # 5419
Satisfaction of the above requirement shall be in the form of a policy endorsement for:
• any auto, or
• all owned hired and non-owned autos.
[X] Workers' Compensation Insurance
Contractor shall purchase and maintain Workers' Compensation insurance which, in addition to
C����y��� �q��, r�������M��� ������r�r� r��t�ir�rn�nts for issuance of such insurance, has Employer's
��i��k�ifi�� lartt.i�� �:,�1` ��1. ���s� "�1��,��(�� �a�r �a�:l� �ac�cic�ucro�, �1��,�G�C)� ��r ��c�h �rr►�l��y��, �nc1 �
���JQ1xC�f�C� p�wlic� �a����� f��° ���a����tia���� c�i��a�� �°I�c� (:�iy rae�� ���t �Z� n����c��� �u� <ai� "",��c��tic�m��l
����������" ��o���� lk��� ��s�rr�r sh�all ��rc:� �ta �v�dr�� ���I r��;���w�; c�# ������c����tica� ��;���a��� �1�� ����t�, ��� ����'Fa�i��l»s,.
agents, employees �an� ���I�rrai���•� �`t�r �n� �t��'k ��r���r����c& fc�a^ ttt� �"ity l�s� t6�� 1��,�r����� ir��ra�°�da
For building or ct�s�a�tr��ii�ri �ar�,����, �1�� �ca��t���x+���r�' ±�lt�ll �c���aiy �rit�4 i�� �r`c�visiur�� c�f"
Attachment 1 in ac���c����;� r�rith �4��.(f�6 ���' �h� °�'�:��� ���.k�ar �".r,a�� �yr�� ra�le„ ��"�,.��,. � 1 �C�� l I �1 ��"
the Texas Workers' Compensation Commission (TWCC).
[] Owner's and Contractor's Protective Liability Insurance
The Contractor shall obtain, pay for and mainta�s� �i ��1� l°i���� ¢i�ur���� tl�� �'�r�����t��►� ��� ��� "��'�"�
under this contract, an Owner's and Contractor's 1�'rc���+�ti�r�� i���►k��l��;y' ���;�a�m"�'���c�� ��'K�Id�:� m���m��i��� t.'��
�:�t� �� i��stars�� ��r° ��������•t.� ��rr�����:, �.rt�i b���Cily ia�j�ury wr��ici� r�u�y �� ��;� i�� ���c �rru�c,c��l:��c��c a��" �i��
u+�,�s-k t�� ��rti:r�ct�c"s ����r�at�<�t�� ����s��r Ri�i� c��rt�k�•�c�.. �`�avc;r���; �h�l� l�� �aa� ��i "c.�c�.u�re�n�:�:'" 1�����
��a��� ����� �.a�al��}� �4��i1 k�� r„�;����i �y� ��� ��a���� �r��u�r��r��c s�waa������� tl7��l c���r���, t}�c� �����t1r���ta��'"�
Viak���i�y �nsr�r��rs��� ����l��:y ������ot� �rill �� �t ������� ���l��[����i.�l�l a��rrrl��YZ�:�i �����c�i�� ir�;p���y as���i
��rr����t� cl�r7�a�� ��r ���c;��rr��rt�� vwit�� ,� �!�QN, ,��,I�.t��u aggregate.
[] Fire Damage Legal Liability Insurance
Coverage is required if Broad form General Liability is not provided or is unavailable to the
contractor or if a contractor leases or rents a portion of a City building. Limits of not less than _
each occurrence are reyuired.
[ ] Professional Liability Insurance
Professional liability insurance with limits not less than $1,000.000.00 per claim with respect to
negligent acts, errors or omissions in connection with professional services is required under this
Agreement.
[ ] Builders' Risk Insurance
Builders' Risk Insurance, on an All-Risk form for 100% of the completed value shall be provided.
Such policy shall include as "Named Insured" the City of Denton and all subcontractors as their
interests may appear.
[ ] Commercial Crime
Provides coverage for the theft or disappearance of cash or checks, robbery inside/outside the
premises, burglary of the premises, and employee fidelity. The employee fidelity portion of this
coverage should be written on a"blanket" basis to cover all employees, including new hires. This
File # 5419
type insurance should be required if the contractor has access to City funds. Limits of not less
than $ each occurrence are required.
[ ] Additional Insurance
Other insurance may be required on an individual basis for extra l���r�c��� �.t�r�t�'�c�� ����� ���cific
service agreements. If such additional insurance is requirec� f�a� � s��+���Crc� c,���������, that
requirement will be described in the "Specific Conditions" of the cr�ca�r�acti �;�a���Fi�;�tic,�'��•
File # 5419
ATTACHMENT 1
[X] Workers' Compensation Coverage for Building or Construction Projects for
Governmental EnNNes
A. Definitions:
Certificate of coverage ("certificate")-A copy of a certificate of insurance, a
,���.����,����� ���° �,��q������� ��a ;��4� i����ar� issued by the commission, or a coverage
���.,��a���� ��•�,,r��-� �' ro T�'��;�..��;, "i�WCC-83, or TWCC-84), showing statutory
,,�������.�+ �,,���������a�y� ���,��r����„� �;��erage for the person's or entity's employees
��.�,�a����� ���-,���,�� ���, ,� �����„��,� ���� al�� duration of the project.
Duration of t�� �r<�jc;�:� ��r��i���� 4�w� time from the beginning of the work on the
project until �l�a� �c���ra�t�ar"������'�����'� vvork on the project has been completed and
accepted by t��� �c�w�r���►c�r�t�� ���tit�y.
I'�r�c�r�� �ar�avi����� ��s�i�us ���� th�; �ar����� �a"�uta�;�,�r�tr;��.���r,% ir� ��41t� 4,�'��) 4 ia�u1���'�� ��ll
�e�r���rr�� c�r ��a���i��; ���rf'��r����i�� �l1 ��v �a���°t �,� th� ��rv%��s tM�� ��r�tr��ct�a�• 1���
��ruc���•t���:r� t�� �ae,�lc�r��� ��r� t�� prc�j��t, c����ir����� c�� �a+����.6�c�r t��,�t ��c:���e� ��.��ta°�������.
cViaW�c�1y� �itB� ��� �ra�°�tr«��;tc�r ���c1 �c��rc��c:�� �E" ��u�;th�� ti��t ��;a•sca�� 1�;�� c�r�������y�.u��
����� ������,��„�� �,������� ����it��t:i�ar�„ i��l�.��endent contractors, subcontractors, leasing
companies, �����+�r a�rr��r�, e�rr�rr�c�r°-u���°�t��r�„ ��a��a���c�� a��` �r��y s�,xc��a �r�ti��, ��r
employees ���" ���r���r ����it�� �v�i�l� �"t�r��;�1��� ��r������ �c� �r�>rr��i� �;���v���� g�,�r� �i�� ��c�,��c��.
��Services" ir�c�l�re��, wr���}�c���t lic�6��:t�or�„ �rc�v�cli��, �����lir��, a�w• ����v�r�r�� e���i�a���u�.t�i ��r
materials, or providing labor, transport��it;►�a� �r +�t���,�" ��r'�'7�� �'�����'� ��� � ��x�l�'��
"Services" does not include activities unr��i�r���c� ��c��� �I�� ����������� ���� �� ����������`��'�'�'�������
vendors, office supply deliveries, and delivery of portable toilets.
B. The contractor shall provide coverage, N�a��c�+� �.������ ��'���'�� �`������"���f� ���� '�����"'�����'�����
code�; ��c� ��r��r��il �an�c������ and fling c��' ����! c��rc�r���� ���r���r��;���, e�ti�i�1� r���t� tN��
statucc�r,� ����i��r���nt� ��`"i"exas Labor �w"c��,��., �a���i���� �f��,41� �(��'�� fi�r ��I� �Nau�°�1��c:�s
of th� �:;c�m�tr��t.c�a° �a�r��i�a�,� services on 11�� ��ra�j���9 �ia� t➢�� ��ar��ic�rd� ca� i��� ���•'c�p��t.
C. The Contractor must provide a certificate of coverage to the governmental entity
prior to being awarded the contract.
�� ��� �.�� ��,������ ��;��,�,� �„������� �,�� ��� �����tractor's current certificate of coverage ends
�����.�m�� �}�� ��,��.������� �>��" t��� ��a��j�;�t� i���u� contractor must, prior to the end of the
�,�y,�����, ,���-����� ��� ,� ���,;� ��r�i�ic;ale of coverage with the governmental entity
�;��w�i�� �:R����� cHc�v�r�w�� hs�� br���� ��t�g���r3.
E. The contractor shall obtain from each person providing services on a project, and
provide to the governmental entity:
1. a certificate of coverage, prior to that person beginning work on the project, so
the governmental entity will have on file certifcates of coverage showing
coverage for all persons providing services on the project; and
File # 5419
2����, �����. �.�.���, �,��,�z� ,�,��� �����• ,���,����� �� the contractor, a new certificate of
�;��,����� �}���,,����� ����r�s�<��� �r9" ���v�az��„�� if the coverage period shown on the
����,���� �,��.�������g��� ���,����r����� �,���� �m�-i��� the duration of the project.
F. The contractor shall retain all required certificates of coverage for the duration of the
project and for one year thereafter.
G. The contractor shall notify the governmental entity in writing by certified mail or
personal delivery, within 10 days after the contractor knew or should have known, of
any change that materially affects the provision of coverage of any person providing
services on the project.
H. The contractor shall post on each project site a notice, in the text, form and manner
���,��,��.���� 1�� ���� '�'�;,��� '�r"�r��a�' Compensation Commission, informing all persons
����«����� ��c-w�i��� ���� t�� �ar`����c�t that they are required to be covered, and stating
���,� �� ���x�<>r� r���y r��r��� �c�v�;a•;��„e and report lack of coverage.
I. The contractor shall contractually require each person with whom it contracts to
provide services on a project, to:
1����,�����,�� ���,����,��,� �;���� ��� �������r• a�����r�ti��� ���f classification codes and payroll
����������w� ���� �'��a�� ��t' a��� ���v�r��;� ��rc�n�ents, which meets the statutory
�.������.�������.��� ������;�z�� r������ ����,�a ��;������� ���1.011(44) for all of its employees
�����ti����� �;���r��,�„� �a� ��� ����,gr��t, �'�r the duration of the project;
2. provide to the contractor, prior to that person beginning work on the project, a
certificate of coverage showing that coverage is being provided for all employees
of the person providing services on the project, for the duration of the project;
3. pr���a��� ���� ���m�tt��c�i�r.�r, �ar���° t� t�t�� ���c� �a� tl�� ra����:�•�,��� period, a new certificate of
c����;���;� sh��i��, ��stc�nsi�rta ���" �r�vc��•a��, af �:h� �c�v�rage period shown on the
c�rrrerat���r�,�����t�; �i`�;�av�r��±c u��c�� ��ri�� t1�� �d��r•a1��an ofthe project;
4. obtain from each other person with whom it contracts, and provide to the
contractor:
a. a certificate of coverage, prior to the other person beginning work on the
project; and
b. a new certificate of coverage showing extension of coverage, prior to the end
of the coverage period, if the coverage period shown on the cunent certiiicate
of coverage ends during the duration of the project;
5. retain all required certificates of coverage on file for the duration of the project
and for one year thereafter;
6. notify the governmental entity in writing by certified mail or personal delivery,
File # 5419
within 10 days after the person knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on
the project; and
7. Contractually require each person with whom it contracts, to perform as required
by paragraphs (1) -(7), with the certificates of coverage to be provided to the
person for whom they are providing services.
J. l�� �i��wr�� t��;� ����t�a�t or providing or cau:�ir�� tr� b� �rca�i��c� �� c��rt�f���zt� c��"
�e�w�t°���, �1�� vc��u�c��zcC��ar is representing to the gc�v��-t�t�r�����1 er�ti�^� t����t �11 �:���g�lc�,����
cafi �k�� ����r°a��.t��° vwr��� will provide services ar� �,hc �rcaj���t will �� �a�r�r�� k�y
workers' compensation coverage for the durat'MC��� �a�' �ta� �r��j�+�t, t�a�,� �h� �ca��r�t��
will be based on proper reporting of classification codes and payroll amounts, and
that all coverage agreements will be iiled with the appropriate insurance carrier or, in
the case of a self-insured, with the commission's Division of Self-Insurance
Regulation. Providing false or misleading information may subject the contractor to
administrative penalties, criminal penalties, civil penalties, or other civil actions.
K. The contractor's failure to comply with any of these provisions
contract by the contractor which entitles the governmental entity
contract void if the contractor does not remedy the breach within
receipt of notice of breach from the governmental entity.
File # 5419
is a breach of
to declare the
ten days after
EXHIBIT F
CONFLICT OF INTEREST QUESTIONNAIRE FORM CIQ
��wr vendor or �t���r er�r��r d+��'r� busqr��^�� with ����� sa��r�wn�a�nt�l� �rat��
This questionnaire reflects changes made to the law by H.B. 7491, 80th Leg., Regular 3ession. OFFICE
USE ONLY
This questionnaire is being filed in accordance with chapter 176 of the Local Government Code by a pate Recei�ed
person who has a business relationship as defined by Section 176.001(1-a) with a local governmental
entity and the person meets requirements under Section 176.006(a).
By law this questionnaire must be filed with the records administrator of the local government entity not
later than the 7th business day after the date the person becomes aware of facts that require the
statement to be filed. See Section 176.006, Local Government Code.
A person commits an offense if the person knowingly violates Section 176.006, Local Government
Ga�1�, ,�n affer��� und�r thi� section i� ��I�s� C rr�i�sd�r���n�r.
� Name of person who has a���I'���� r�l�t�ar��h�� with i�rcaul governmental entity.
Check this box if you are filing an update to a previously fled questionnaire.
2 �
�(The law requires that you file an updated completed questionnaire with the appropriate filing authority not
later than the 7'h business day after the date the originally filed questionnaire becomes incomplete or
inaccurate. )
3 Name of local government ofiicer with whom filer has an employment or business relationship.
�Name of Officer
This section, (item 3 inc9��tlfr�g s�k���rts� A, �3� �,� D), must be completed for each officer with whom the filer has an
employment or other bu�ir���s �a�l��f�ar�sh�p �� �1'sfsned by Section 176.001(1-a), Local Government Code. Attach
additional pages to this F"�zrw� �#CE �s ���������Y•
A. Is the local government officer named in this section receiving or likely to receive taxable income, other than
investment income, from the filer of the questionnairE�?
� Yes � No
B. Is the filer of the questionnaire receiving or likely to receive taxable income, other than investment income, from
or at the direction of the local governirent officer named in this section AND the taxable income is not received
from the local governmental entity7
� Yes � No
C. Is the filer of this questionnaire employed by a corporation or other business entity with respect to which the
local government officer serves as an officer or director, or holds an ownership of 10 percent or more?
�� Yes � No
D. Describe each affiliation or business relationship.
_..._—_ ...._—__ .. ��_w� ..�._.�..
M...... ..... — ..�.._—... �..._— ..._—
4
mm�
������� ' �' � ith the governmental � �� �
�Signature of person domg business w� Date
e�tity �...
File # 5419
EXHIBIT G
CONTRACTORS PROPOSAL
RFP 5419 - Pricing Sheet for Dry Auger Boring
Product Proposal
Pricing (FOB
DESTINATION M --- —
EST. ANNUAL Unit Price Extended Price
Item # i qn�^ UOM Product �N�sc��p����arw �. ....
� � ,F ,�
����'"M��' � ��"� ',�w����l���M°�� %�'ri' %/ ` � , ' % �
�N� �F Y, `, , "��;� �,� N� �
o � � F �� � ,�o, � a � � i��
r rr t r� � � php i �
f �M��" a�����'����������� �'���N� �������� �'�� � � �7��' ��9���"�"I����
����r����°����'J�i������w�J��,����,�� � .� �� � r u��������� �����w�r`,� �"�a���
: ,
����r°. ����,M�a�+�°����� � ���'������ ���������� ������,�°���rt , � � �,% ..�..�.�. .m �. ..._.
, H� ; ,, „.
, � � ._.� �
�- , ..�.. ��. �...,�...._ �. .�. _� � . $
��....
1 400 FT 6� Bore in Dirt with Conduit/Line(s) installed in
Steel Casing" $
..�...... �_.. .....� ...�
.... _ ...� ......�.. ... .....a,�
.. . � . , mw .. � � ��.�. $
2 100 FT I 6" Bore in Rock with ConduiULine(s) installed
in Steel Casing' $ � ' ��......,..—..�........
Steel Can Dirt with ConduiULine s install � � ��
__..�. �.. � .._ .. ...,�
. � ., T _ _ m, $
( )' ed in
3 400 FT sing' $ ° �
�������� �� 8" Bore in Roc�k��with CondwULin�� �� � �
... 4 100 ... F e(s) installed $
T in Steel Casin $
113.30 ..... _—....... 5,320.00..__— �
5 400 �.. ..,.— ... ��- Bore in Dirt w�-- ....._— ...�...��.�.....,�
.�.� �....... e.��,,....�_ _ __
FT , ith ConduiULine(s) installed $
m Steel Casing'
ed in Steel Casin � � 212����� ��� � � � ��� �
install...�. ... _ . ..�..._ $
..� .� � � ��� _.�.. .....
100 FT
10' Bore in Rock with ConduiULine s
• g .18 21, 218.00
m ._ .. .�..
in Steel Casin ULine s installed 1� $ m
12" Bore in Di�rt with Condui ����������_ � ���
... ..._ ,..._.... —........._. —_... _—....... � �. �� � ...� � .. $
7 400 FT
. � ).
� ' 23.60 49,440 00
installed in Steel asing" � ������� �������� $ �� � � •� �� �� ����� �� � ��
12' Bore i
.......� .. �.�__._ . _. �... _ $
with ConduiULine(s)
e �oo FT . c 214.24 21,424 00
— ... __ _. _..
14' Bore in Dirt with C YM—
. � . ...n ..,_._ w.. .�...— _ _ $
� ' ' onduiULine(s) installed $
9 400 FT in Steel Casing" 144 20 57 ��'� ��
� �.��.. — .. ._
mstall�....�..� �_�_ a.. � ���._.. e_�. .. $
�.. ..� ...... m . $
10 100 FT 14 Bore in Rock with ConduiULine(s)
' ed in Steel Casing" 216.30 21,630 00
• ( ) � . ___—.� .��.�... _._._
in Steel Casing'.. ... ��� e�� . �..._ 16 �W.. � _— .... . $. ... �r ..�
_._.. � � �rm ..___ 400.—_.�._, ..—.� — w
FT 16 Bore in DiR with CondwVLine s installed
� 4.80 $ �45.00 � �.._
12... ��...._. . � . _
100 FT �6" Bore in Rock with ConduiULine(s) $
installed in Steel Casing" 221.45 2Z,
naSteel CasDig with ConduiVLine(s) installed 85.40 74 16
_ _ _ ..__—
13 400 .. . ._....— ... ..._ ... $
FT . • 0.00
I installed in St ConduiUL ��� �� 'm�mm� ��'^
14��� .V.,... ..... ��...._._
�_� ...,.. �_�.eel Cas n....*
100 FT �B� Bore in R ine(s) '$ $ O i
( ) 226.60 �..__ .
' ' ConduiULine s installed � $ � � �' � ��'660.0
�����.� ������� 20" Bore m Dirt with� ���������� � $
I �.._��� m.... 400...._
FT in Steel Casing' 206.00 82,400.00
16 100.. ...... _�e � � 247.20 � � $ �
� ...�. — ._ FT � .,_� 20 00
. • (s $
i 20 Bore m Rock asi o�nduiUL�ne s installed $ �� �������������� �$������� ����������
installed in Steel C h CCond
��� 17 �'� 400 FT
2 4 B o r e i n D i r t w t ()
in Steel Casing' 247.20 98,880.00
' h ConduiULine��� �... ...._ �.��.....� �_�... $��.�� ..
i nstalled in Steel Ca
e �.�.�.._.. - _�_ ...-- S� $
18 100 FT sing" 288 30 ��,„830 00 � � I
File # 5419
19
20
21
22
23
24
400
100
400
100
400
100
30" Bore in Dirt with ConduiULine(s) installed $ I$
in Steel Casing• 309.00 1��,���.00
. duiULin � .... ���.� .� ..__ � �., ....
30' Bore m Rock with Co F $
n ' e(s) $
.�.. 9 . $ 20.00
36'� B�o e� n DiR w th�CondwULine(s) mstalled $��� �� 35, mm�
in Steel Casing" 350.20 140, .00
.......... 080 ................�
Bore in Rock with ondwULine(s) ���
� .w.�_ _ $
36m m���
C
2' Bore in Dirt with ConduiULine(s) installed mm$��WWmmm ��� $�0
installed in Steel Casin 432.60 43,260.0 �
4
42�Bo e�n�Rock with ConduiULine(s) �$ 0.00 � $ 6,000 00
installed in Steel Casing* 528.00 mmmm�_ „m 52,800.00 �
�......��....�. WATER�.. $
DISTRIBUTION SUBTOTAL: 1,207,187.00
EST.ANNUAL UI�iIt PrICe Extended Price
Item # c�r� UOM Product Descripti�ar� _._.� �.._
,�._...... �
SECTIQM II�� ��.���"�k������,��N��'���' ���,���E) ,�� ��
Ny p',��+t�r ;r�, , � t,y� ,�K s��r/ o �a �I�y, i1@ i1� � �, p�, ��/
Md^��i��,�'"y„�^IfGll"N ���,�«i������ A''�����37Pi :����i ���i��j � +1^),�y������eM^b � ��'�t� ���'"�' � � ���� :
�, ' � ��� ����,��I������������-r ;�� � „��,��� � ;� ���r�����r���r� �w� ;
������, �
���: ��.���w�����,�i���!`�oe �����w�!� � ;�,��w���+���+��'�` , i .�.. m_
, ,�.,
.� � �� � .�_....._. �.....�._.._. � ��nw....._.�—. ..
25 .. 40 � ..._ ��, ... � - _.�. w ..m. _.. $
mm�,„ � p FT 12�� B°re in Dirt with ConduiULine(s) installed $ I
12�Bore�n�Rockwith ConduiULine(s) ������� ��� $ 9•00 � � $ 5,600 00 ��
26 100 FT installed in Steel Casing' 377.00 37 700.00
......�.. � ....��� —.......�.� . .,�._. �_—.._.� .,� a,�
—..27.m — —.. ...... ......._ ... — �.�..., $
.
400 FT �4" Bore in DiR with ConduiULine(s) installed
in Steel Casing' 309.00 123 600 00
h C�onduiVLine(s). .... ,.,..� ....�� � .
� .... � � ...��..� _ ���_�.� i stalled in�SteekCa $
't
28 100 FT • sm 379.00 37,900 00
. .....Line(s) installed �.. ......— ......— ,. .�....... �____—�.. .__ —.......
� 16" Bore�in Di�R wdh ConduiV $
.�., �_....� ,�.---._.._..,... ' $
2g 400 FT in Steel Casin • 329.00 131,600.00
�� 6�.�,$ _.. _ _ _ .�.. ...� �...� _.
� �� � 16 Bore in Rock with ConduiV ���� $
....3. In
0 100 FT � Line(s)
38,400 00
384�00 ....�_— .....—_ $ _._ � . .....
18't Bo eI n Dirt w thSConduiULine s insta � �
I— . _ ....... w�... ..,� ........ ���. ....._ $
31 400 FT . Iled 139,600.00
�� . 9� duiULi e�s_� .....—..... $ 9.00 ...,__ —w.—�� —�....... �e... ...�,.. ..
� �82 ���. 100 � ��FT �B�Bed�n Steel Cas n �� ( � � I $
' g 389.00 38,900.00
� n�S eel CasDirt a_� ..... �.��..A _ 3...� .�.� . $ � �u� ..
�. �.. __ �_ � � _ _�_ .�.�. ... �m._... ��.�
33 400 FT � � with ConduiULine(s) installed $
• p 147,600.00
� 34 100 F�
20' Bore inmRock with Condui"mm���mm��� 69'0mmmm�m ^^�� n$ m��mm�u �mm�
. ..�. � _ �.._� �
� ' ULine(s)
v_. _,...� �._�.._ � 409.00 ...�.�. �.....w—... 40,900.00
installed in S neel Casing� O: mm� ^ �•.._
� 35.. ,�� .� .......�_ ......_
400 FT 24' Bore in Dirt with ConduiULine s installed $ $
in Steel Ca g 409.00 163,600.00
..36.� . — 100 ���......
_.w ��. . .�� . ( ) .... � ,� � .. S � .. �
... �.�
24' Bore in Rock with CondwULine s 0.00
installed in Steel Casin 449.00 44 90mmm� �,
eel CasDi�rtwith ConduiULi������� ������� ���������
37� �..._400 ..... . .....� nOSt . _
FT � ne(s) installed $
• .00
469.00 187,600 m �
..,, 38 . �.�..m � �... .� �..... .�. �.....�� ..... �._�.... ��.._ $
.
00 FT 30" Bore in Rock with ConduiULi e s $ 0,900 00
.... , asin ... �..� �...w�...�.. �. 509.00 5���� ... .�� _
�, ... ...... .�.� ..�..wm .�.�� ._ $
installed in Stee
39 400 FT 36" Bore in Dirt with ConduiULine(s) installed $
��� in Steel Casing* 509.00 203,600.00
File # 5419
40
41
42
100 FT
400 FT
100 FT
36" Bore in Rock with ConduiULine(s)
. i 9.
installed in Steel Cas nmm�� ��
42" Bore in Dirt with ConduiULine(s) installed
in Steel Casing"
Bore in Rock with Cond mm
42^ uiULme(s)
installed in Steel Casing*
S
589.00
.._
$
675.00
$_.....m.�
703.00
5
58,900.00
... _ ...�
$
270,000.00
$ .��
70, 300.00
ELECTRIC $
SUBTOTAL: , 1,901,600.00
�����„ ", �"f"I!� ' �°II�����N�� � f� �,
"��"�'" ��� � ,A���! ,_ ��� ;; �; � � � ; � �� �._ __. _ �i,; ;,�
,,�, ,.. , ,,�, . , ; ��,. �� :
43 m� FT Unit price for bores less than 50' in length $
$ per bore job 13.50
... � ..._.m ...... — . ��.� �... r ,.,. er foot ��.._. 6 � ... g � 45.00.� . —..n �.....��_�
Unit price for bores greater than 200' in len th $
$ P _.....
45 ..... ...�.�� ....... ..�.� �.....��..
._�...� .�...,� ....._.. �
Per linear t�Y adder to cut concrete Pnce $
T shall include restoration of concrete $ 15.75
Per linear foot adder to cPut as h �� ���
����� ������ ���� �� ���� �� FT include restoration of as halt g alt Price shall
p�� IGu���ar �.
46 P Pef �
DIRT BORE: A��� ore $�75 w� �
� ���� �� ���� ���� � �� ts de th to 1 dder per foot (DEPTH) for b�����
47 FT p• p 00
4' 1, 200.
....._.. � Dts d pORE�� sdder per foot �.__...�. �.a.W....
.... .�m.�
. _. w.....
DEPTH) for bore
48 FT P .00
BORE Adder pe� foot (DEPTH) for� �� $���� �
..� DIRT..� .
..�.. ... � � _ .�_ .
� bore
49 FT pits depth to 18 �I 1,200.00
.....� �wn.._. _ ..�.. � �s depth��E: Adder P �..� —
RT BOR er foot
.�,�. 50...
FT DEPTH) for bore $
�200 00
t to 20' � 1,
bore pitB depthA�dder er fo ���
� �w��..� ., �__�. _ .�
� p ot (DEPTH) for $
51 FT p
� � 800 0
14' 1,
FT bore KR�S de��hlo� 8' ... _ � ��. �
..� � .... � ...��� $
. per foot (DEPTH) for
52 p' p 1800.00
6....
mmmmm ROCK BORE: Adder er foot (DEPTH) �m mIT.
� .... �� �
p for $
53
dder erfoot(DEPTH)for � $800.00
_ ____ ....� �.��� _ �... ����.ROCK BORE. A_�. .� .. .._._ �
54 FT P
bore p t depth o 20' 1,800 00
��._ �� pITS - �s r� t��st��d �TION OF BORE�..� . � ....� ��
.� �...._. ..m �_ .. w ..�
,�C�C��&� FOR t,�W�I �� DI TRIBI��Ii.��N.
55 EA BACKFILL AND COMPAC $,��� 00
�'+�w��'�I ��N?M'�,�ii1*+ �"M��9�A�� 'w�«�'#��1�/��l �i� w���IP""�M�*� �!Y�' � �%
� � �� �
„
,�r,� , ,,, „±� ,�/� p�y.
;,;;tia�� 1 ���!4,����T'^h „ : °' ' , , ,, ,;, ..... ..... ....
,- �
�, ,-,; �
/�
t � „, „ , . �/�,,, N�,% , ';' ,;, v,�,
� � �.W ��...,. �� �� ��.,.� ���.�..�.�.. .�. -�
µ�w �mTyITm��ITITIT�� 6" Diameter steel casin wi � $
� .,����
'th 0.375" minimum i
56 500 FT thickness $
� .....���.. ..�_�.e.�.��. ��.�� .....� w .....�.
8" Diameter steel casin with 0.375" mini ��"�� �� $
57 ...,_w.� 500 �.�� .... _ ..
...� .
' mum
FT thickness $ °
�58 500 � �� �F���� minimum thickness g . � �� �� 39.00 �� � � m 9,50�� ������� ��
..� �_.��.. � . _ �
10" Diameter steel casin with 0.375" $
0 00
......� � �� .
.��_.. .... .�.�_ ��.�� 6 �.�m�m..�.._ _ $
��.... .mm �...... _ ... �
59 500 FT ' 12" Diameter steel casing with 0.375" $
minimum thickness 42.90 ! 21,450.00
m.� _..�...�. �,. ..�.�.�� 51.00.. ,... .... ,,,..���.. _,
60 � � ��14 Diameter steel casin with 0 $
500 FT 9 .375" $
minimum thickness 25,500 00
ss 375' $...�.. . �. _
rriinirri�um thickneel casin with 0. � ������� �� ��� ��
.......�� m — . .....�.... ...�._ .�._..�� 9 _ $
61 500 FT 57.68 ��,���•��
File # 5419
��'"�"�'� CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY)
� �r�r����r�^��
THIS CERTIFICATE IS ISSUED AS A MATTEA OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTI�I��"T� HpL�I��N�. Tl�i�
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S)„ AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
ql�n�uC)1�T"ANT: If the certlficate �aald�x �'� an ADDITIONAL INSURED, 4k�� �Sall�y(t�s) must be enc�arzs�cl. If' SUBROGATION �'� WAIVED, subject to
the terms and conditions of the pollcy, certain policfes may requlre an endorsement. A etetement on this certificate does not confer rights to the
c�rt6fl��z&� holder In Ileu o} such �n�car�+��v��r�t(�1,
PRODUCEH
Bowen, Miclette & Britt
Insurance Agency, LLC
1111 North Loop West, #400
Houston TX 77008
INSURED
Mabak Directional Drilling, Inc� ����"�
3447 McReynolds Road
SangerTX 76266
MABAKDNREC �
������M� �. �,�`,���
,o����b��� ��
�
COVERAGES CERTIFICATE NUMBER: ��'%449216 REVISION NUMBER:
"��II� IS "9"i7 ��:�d7IFY THAT THE �f��.p�IfS K��' IN:�4J9��ACV4�� V.II���C� p�C.�4f�d d�E�'V� C���C� N�;��1�� TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN RE
DUCED BY PAID CLAIMS.
_.. � _—_..�......�......,,.. � � ...� .m. .. ..�,._ ...� ,��--� EACHOCC -- �� „.,,... - � ��
tl,il� �C�C �Ui�i#e� P�i.I�Y �N'�r F��6L�'Y C?YCC
� �"i'PE C�F IVd�4�dkd�htlC� INCR wvn 5��49�YUY NEdM��9��, IYYYY �MI t�'"�B+ LIMITS
�o
A � cENERAL r.Rn�N�4T�"° � PP2072842010013 t,°' 10/24/2013 0/24/2014 URRENCE s1.000 000
� COMMERCIAL ��riWL��AL LV�,�YIi.4T'd' D���� �� ���
'�,"�",. �,. Q,R„FMIQFS !Fp nrr.urrnnrPl $2��,���,
7�� �°�� Pu19��d ��41� �l�r�y one �arne�enpr �5,000
..� CLAIMS-MADE �� 47��,b�8�°^ � � . .-. ..� �.....
� PERSONAL & ADV INJURY $1.000,000
,..,._ �—.� ae ...�........�s., ._�..�mm.� GEN � _ ..
�..
�,� 0 000 �h ,,.
ERAL AGGRE6ATE $2 00
. ,..�A.. e — � _... . ._..� , � _.
... . � ... . �...�.�r-„—.�
GEN L At3C#�i.%;f�T�. LIMIT �k�q�� 6�� PER: PRODUCTS COMP/OP AGG 82 000.000
� ..., w.. ...
.r, � .,. �.n ., ... �. � .�� � �
POUCY � ���� C.C7� $
B AuTOMOeILE d�4�4E�ak.,d�'�"" CA20728410301 �"� 0l24/2013 0/24/2014 1,Op0 000 �°
A .�Es�_�°°iden�......�,.,..�..��.,.,.m. � .._._�.�,...
� � ANY AUTO "� � � � INJURY (Per perso
�"� n) $
BODILY.�_ .... ,�
ALL OWNED SCHEDULED BODILY INJURY (Per accident) $
�„m., AUTOS X°... N N�OWNED �'f20�'tF�"�T"w"� B�P1INIa������ $
�P��' ru�.��.. �..�..... . ��......,
HIRED AUTOS AUT0.S -•
— — $
C UMBRELLA LIAB X oCCUR CF4EX00137-131 10/24/2013 0/24/2014 eNCE s9 000;000
EACH OCCURR�.� _ �, _... � ,. _,.......a �.�� ...�... ., ..
X......
� REGATE $9,000,000
EXCESS LIAB CLAIMS-MADE A�G,µ..., _ .....� _....._ _— ....
f1F1'1 RFTFNTION �
. �. . .... ...�..,�.WC STATU . $ ...... .....
� AND ROPRIEOTOR/PAR NER/EXECUTIVE Y�N �C2072840�9�f'��� O/24/2013 0/24/2014 E.L.EACHACCIDENT�E '��, 5100 � m�m, .
W .,.
�TH
MPLOYERS' LIABILITY
0„000 �
OFFICER/MEMBER EXCLUDED? � N �A �
(Mandatory In NH) _ MPLOYEE 51;,000 000
E L. DISEASE - EA E� � °„ r_
, If yes, desufbe under E,L, DISEASE - POLICY LIMIT I�1 000 000
nF4CRIP710N OF OPERATION$ 6elow . .
.�.�.... . . �„-,M�, ....
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Addltlonal Remarks Schedule, I} more space is required)
�'�.'I" �V"C7f�"�� ���S�I�S Wh�B�'Pl f"E:C��111�� i��l WU4"1���'il ��fY�i�G�
T}t� f�69�r,�r�� ��li��r pr�wi�i�rr� ���d�"'�r ���d�ar��N�e����s farrn� ,��r� �f'th� ��lici�s c��'
ru���a����c� re�r�s�nt�d �y ��is c�rt�l��r� �f' iu���ara�a��, i�� ���rrr�� ��rr��n�� H�� ��e policies andlor
��s�d�r��a���a�� su������1� t�� w°�pr���n4��t�n� a�ad� ��c�r�i��. '�I���r�c��� �a��i�� �f the policy provisions
����.��u� ��r��r�����rr1� nN���� k�e���! �r� �u�il��r1� k�y ���ilin�: ��rtC���t�s���blp�c.com
See Attached...
r � � � � .� . ��r � ��,�,
City of Denton ���'��
901 B Texas St.
Denton TX 76209
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED F�F97fAFSF�PViM'i'IW'�
act;�� �''t"�"�:����„„,�
�
O 1988-2010 ACORD COR�����Ni'�1�. All rights reserved.
ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD
:�
AGENCY
Bowen, Miclette & Britt
POL� � .....
�__
ICY NUMBER
CARRIER
AGENCY CUSTOMER ID. MABAKDIREC
�._�.
LOC #:
ADDITIONAL REMARKS SCHEDULE
NAIC CODE
NAMEDINSURED
Mabak Directional Drilling, Inc.
3447 McReynolds Road
Sanqer TX 76266
EFFECTIVE DATE:
Page ��.......... °f ..�.__....
'+vv��v ��� y,��+r�wrv.�va�r
The ACORD name and logo are registered marks of ACORD
THI5 ENDORSEMENT CHANGES THE POLICY, PL�ASE READ fT CAREFULLY.
TEXAS
CONTRACTOR'S BLANKET ADDITIONAL INSURED ENDOFtSEMENT
This ondorSement modiiies insurance provlded under the following:
COMMERCIAL G�NERAL LIABIUTY COVERAGE FORM
All of the terms, provisions, exclusions, and limilations of 1he cOVerage lorm apply 6xcept as specifically stated
below. ...._.. �. ..._.__ ...._ .,.... .__
Qolicy Number
CPP2072842010013
Agency Number
Policy ExplratianJCancel{atlon Date , Date
10/24/2014
n ,.o.,.....�.�,
MABAKDIRECT;ONA�����_��� .��
Namod Insu�ed
Apency
L DRILLING INC. BOWEN, MICL�TTE & BRI7T
'! Policy Effective Date
10/24/2013
__..�.
Account Number
Issuing Company
AMERISLIRE �JIUTUAL INS.
1. �'�°��"f�N F�1 �• °i�'�C� f� A� MN��J��C� 1�� �nraw�r��G;��l Nsa��dd �� ��'d�sur�� �r�n� ��G:���� �� �r±����N�r ��lisa�rw� �9�vn'� y��
���r+� r�yu+r�a� d� r�d� ���� �r� ���9��tlar�c�o qc���ur�d �rr�� 4'N�uA� �acswr�y u�ri�r � rw�i�4�n�u ���tc��� :�� �rit��� �����sro�r�rri r�N�11��
ta �?��r�� ���6r�c��s. "1"C��� �n+rat��rr c�arr�r�cC u�wrtt��n �rr���rr���r r�rA����C �e:��ddr���d��tacac��& i �rG �d������� ����� [���arv�l�
p,�sw�+�� a�u�rir,� tk�� t�r�� af t��i� ��r4w�Y �r��� k��3 vx�c?���� �"'��ar tr� dlw� �t5�d"q�� B�r��"Y�� �' � Y ���� �
�arrd �r�wrc�c���8r,c� iwwac,ay,� c�waran� ����+ k� � ri�Errt ��i�r thi� ��li��. It'� I���wev���, "�r���" �"���"` vw��� �:��ra'w��r�t"�a� ����r
�r tatt�a� �rP i�c�a�r� �r r���4c nw���r, �aat���+wt dea �����:�srt�u�n� r�+:�vc��r��rt id� w�iQl�1� �'il�{u� ��1 ci��s kr�ri°� ��t�h
�:���nM�°r�n�+�cm�eu,4 ��rod ��a�h c�si�r�a��rs ww�h��� ����i��an��r� c.ar�r�r��i� �equa�a i��y ��� ��r^n+�d ��� �r3ri�tirrr��� �r�s�+���9��
+�� nr6Wl �ar��+irl+� ���tiGtrc�d�u�l h�a���rr�r� s����ar�,a� �ga�e�iu��J In �.is endorsement
2, 3EC710N il • WHQ IS AN INSURED is amended to add the f�llowing:
If the additional insured is:
a. An individual, their spouse is also an additional insured.
b. R par:nersh,p or joint venture, members, pa�ners, and their spcuses are also additicnal i�sureds.
c. A limited liability company, members and managers are al5u additicnal insureds.
d. An organizacion other ih�n a partne•ship, joirt venlurevr limited liabllity compeny, execulive afficers and
direCtors of the organiz�ti0n afe alSO addit(ondl Insureds. Stockholdars are also additional insurads, but
only with fespect to thelr liabillty as sto�kholders.
e. A trust, trustaes are also insureds, bul o�ly with reSpect [o lhe�r dutiea as tn.steas.
3, The insurance provided :01he addi:ional insured under tnis endorsement is limited as f�llows:
a. 7hat person or orgenizatior is or.ly an aadilional insured wllh rP.speCt lo Ilabllity' aflSing out o(:
� vn .. m� � ..� �k'wd��� � r���s�r,t �w�� ���:���Mr���� c��a��►��.� ..�
_ �
2� Your �esVfou Q�'na'eo,� U�nless th ihw�rst�on cantract o C���
( i _ � 9 _� _�m__�� r �wra4rt� °�
operaUons covora�e (or wo d�ng to effect„ in ���� �w�� ����"���^� � f��'�� �� ����A
exlend tc your completed ooerations for lhat additional �ra�uracE..
W', mmd in the wPtten contract or wr�ttena+aqreemer�mrnon or public areas about such premise "�"�
__ _ .__.
� � - -- � �� s i1 so
Premises, as ras ects this pr
requue
Includ�s copyrighted material of Insurance Services OffiCe, lnc. pdQe 1 �f 2
CG i0 $5 05 �0
OngOing operations, as respacts this provision, does not apply to "bodify injury" or "property damage"
occur�ing alter:
�s� q:p ?��a��; Ir��:V�adlu�� n'����rlafs, paris vr equipment fumerformed b noeon�behla 1 cf the additionalc project
�o���c ���,� ���,�N�� rn�intenance or repairs) to be p Y
in�ar��(�;} �'� ���� �'wr� �� the c�vered ooerations has been completed; or
(b) T�at portion of "yOUT WO;k" oul Of whlCn lrte injury or damage arisas has bCOn put to its intenrfOfftl�ne
by any person or organiza6on oth�r Ihan anolher cnntractor or sub�ontractor engaged ?n pe 9
o�era:ions for a principal as a part of the same project_
a. The lim'#s rc�� ��:�..�r�n�� ���F�x���►�4� �� '��e addl;ional insured are Cie least oF those snecified in th`c bletto the
contract or r�ra�tr�n ��r��rr���+� �� 9G� ���'�' �eclarations ot tnis policy. The Ilmits of i�surance app'
aodit;onal iru���r�r� �c� ����q��s��� �� ��'�' no1 in addition lo the limits of insurance shown Ir the Declaratlons.
c. Qhma atiton ofla p em�5es lea er o�r�rentayagreement no beyondslhs term of th sYpoia y e�xpiratio� or
d. G'�� �rr��t�r� ��a���"�c� �� ��'i'�'��� agr��p���'� �'� '�����"��� `��v�" r�������" th�t additional inscred status be
�araaui��ri k�y C�a� �a�� �� �'� ��' 1D i`� ��, th�a� 9��� ���r��� �� �I��� ���¢�'�c��r�ent, whiCh are Shpwn beivw, are
ir�c�r��ar�s��td Inr� q�r�� �•°reJ���crc.e�at �s res������ �a��h �dciut����9 ur�*��ar�ra�, to the extent that such terms do
n�at �r������k �v�C��t� s.rlti�rer�°�a�e pr4avr��d ia�^ ���s �+��orsement:
ADDI7IQNA� INSURED - OWNERS, LESSEES dR
COfV7RACTORS (FORM B)
rhis endorsement modities insurance pr�vided unde' the ioflowf�g:
CC]MMERGIAL GENERAL LIABILITY C�V�RAGE PART.
$CHEDULE
Name of Persvn or Organization: Blanket Where Required by Written Contracl or
Agreemen: t!-at the lerms of CG 20 10 1 � 85 apaly.
(li na entry appears a�ove, infoimation required to complete thls e�dorsemeni w•itl
be shown in the Declarations as appl�cable to this endorsemant.)
WHO IS AN INSURED (Secton II) is amended ;o include as an insured the person
or organixation shown in tt�e Schedule, but only with respecl to liabilily arising out of
��yp�� wprk" for Ihat insured by or ipr you.
Copyrig�t, Insur2n�e Services Offlwe, Inc., 1984
CG 20 101185
e. i he insurai�ur� provided to the additio�al insured does not apply to "bodily injury", "property da►riage'�, o�
^personsi anc advertising injur,�'' arising out of an �rchitecYs, engineer's, o� surveyor's rende�ing oi or
failure to render any profess�onaf services iricluding but �ot limited l�:
��) rh� preparing, approving, or feiling lo prepare or approve ma�s, draw�ngs, apinions, reports, surveys.
change ordvrs, design spec'�rioations; and
(2) y�pervisory, insptrctlon, ar ongineoriny servlces.
f. SECTION IV - COMMERCIAL GENERAL L1A61LITY CONDITfONS, para�raph d, Qther Insurance is
deleted and replac0d wilh the `ollowing:
4 �Othcr Insurance���� � ������ ���� � �
�,�,y ��,�r�r��a �sr�r�:r��:c� ar� t�ki�; ��r���r�rs�m�s�k. 6� �xr��� ���� ���' �"��s�c v�1a� ��ud collactfale Insurance available to
������ ��d�kia���l 4r9���wr�w� wr�t��t���� �rwrra�r�,y, �xc���� ��d�t[��eru�, c�N' �r� �,sryr t�l�t�r �as,s unlesS the wrilten cantract or
�w��at�4a�a ��������+��� rc��c���r��� %��1 C��s w�s�r�ar���� I�� 4�r'�9��� �r� ��r���,�w c��'� thl� inSUrance wlll be prlmary wit�out
c�a�ra��fi���kd�a�r� tr�•��� �a��h� u�tk����r ar��x,rr�c��n�� ���i���� 4� ���� ����9I9�r�rr��1 fr��u.�r��9�
- ._... �_..._..� .�...��
Includes oopyrighted maierial of Ins�..rance Services dffice, Inc. Page 2 of 2
CG 70 85 OS 10
i� ��F
� � � � i � �
� ` �
� � � �
Bond No. 4396111
f � , : ,� �►� ,� � ; a, �i► � .,�
i' � -
.�� ,. ., -... .- . .«
. . , - , �-� ` �,i , � - -�� .� - # ���. , � �� . �,
� �� � - �i . � - .� � - , , � � � � � � . ��'
�� -�� � ,� �� � � . � �i ��
�M r�� �- � ��. � �r� �� r +.� -� � � �� �
� - � � � � . - - � . - . • �' � • � � �� � . � ��� � - � � � � u � r , ��;
�i r'' � 'l lflt .� ;� � . � .� ..i . � � �- �, � ��- � �
, r � .� ��. � � �� . � .� �� -
-�, � r� � �
. �, � . 4 . ��� - � � � ���; , � ; � . . . , � . �
�
i .� � � � � � , � , �� � � �� � � '�� �
���
� . . 4 �- � �� ��� �
�, -� , " ���
+ r= , i �. � . I ' i � �� r � r� K
� � 1y � �� � r .� � u . .; . ; � � 1 � � . f . 1
+ ' ! �- �' M1 . 4 if f + .� f . ;M i
� 1 . �, + � � � � 4 � ♦
' '" ` f . � �� . • • �i . . i �. i ` � . ' f� � ., * .. � � � � � . �i
., . . 1 Ii � - �` f . � . .i � . . `� `! ` M .i�/ ��;
r 1 ' �' . M f ' �� 1 �. . i ` 1 ` . '� � � 1 ` r " f 1
i .
� � � r � ♦ `4i ♦� � � ! � f ! I `�� i�."
.i. i'. ` 1, ii . � !, ! ' ., �` , � � 'i . -� �. 1 ` f.i
� � ' M, i� . � � ' 1 .� ' r i' ` ! ' i . . ' i. . ,A i . �� 1 � , � i �, �
. i"� 4i f� #�' '.i 1! ' 1'. ' 4 �� !` li . 1 `4 a ' i` e 4 l�,�
` '� ` " . ! ' �"` i .� . � � ` r � . - , . . � . 1 .t 1
��; 1� .�' �� 1�' 4 i i IN f�',.�f . 1
_ � ., 1 `if. � ` �
. . � � v� , � . . � . . � � ��� . . ! � � # i fi
1 ` � � '." ��; i ► � .� � f If ^� 1 f' : f
i �
PROVIDED FURTHER, that if any legal action be filed upon this Bond, exclusive venue
shall lie in Denton County, State of Texas.
AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates
and agrees that no change, extension of time, alteration or addition to the teims of the Contract,
or to the Work to be performed thereunder, or to the Plans, Specifications, Drawings, etc.,
accompanying the same, shall in anywise affect its obligation on this Bond, and it does hereby
waive notice of any such change, extension of time, alteration or addition to the terms of the
Contract, or to the Work to be performed thereunder, or to the Plans, Specifications, Drawings,
etc.
This Bond is given pursuant to the provisions of Chapter 2253 of the Texas Government
Code, as amended, and any other applicable statutes of the State of Texas.
The undersigned and designated agent is hereby designated by the Surety herein as the
Resident Agent in Denton County to whom any requisite notices may be delivered and on whom
service of process inay be had in matters arising out of such suretyship, as provided by Article
7.19-1 of the Insurance Code, Vernon's Annotated Civil Statutes of the State of Texas.
d in four cop����„��,°ach one of which
2014 � � �� „
shall be deemed an original, this the �s��������f���� �e �e�ute ��
f�
ATTEST:
�
,, ."� _ . ...
�y,� �
�3��'`�"m� ���._ �`�� ll���...���..
Sf���' ��� ��a��.� �Y
ATTEST:
�
���
BY�� . � ��.��������� � � _...e........ _... ..mw.
� ����I�ia �� "V�uc�Nr�r� �+a�n�s��..r
PRINCIPAL
Mabak Directional Drilling, Inc.
� _ ..�.......... �.._. .._a�.. ���� ._.....,
� ~�� '
BY: ��� � � � d
_.. _..�......._�___���.... .�.____.��..�.........�.�
���:I:� , �`�ENT
SURETY
� ��
SureTec Insurance ompa � �
BY: �„�'",��"'"�� �°�����"°"���w
ATTORNEY-IN-FACT �J�J�J� �
�, Rita G. Gulizo
The Resident Agent of the Surety in Denton County, Texas for delivery of notice and service of
the process is:
NAME: SureTec Insurance Company
STREET ADDRESS; 5741 Legacy Drive, #210, Plano, TX 75024
(NOTE: Date of Performance Bond must be date of Cont►•act. If Residen[ Agenl is not a corporatron,
give a person's name.)
��,������,���')
�^°�1 �"��
Bond No. 4396111
' + � ;
� � , �
� � �„„ � � ... � . � .
�, �.. •« ,
�� .�'� .�.- �,, . .. .� w ���^, . �;r
+ .��� . �r ir� *,., ��' . � «- �-
• • . - � - . � � , ^ i� . , � ,. � , �
, . r� ! � � ♦i �. � �. � �� , �: ,
� ��'� � k x' � I i �' M � � 7' 7 i. ��
* :. �, i , � ;... � � �t �' '. 7 I. . � �� } � � � �' � �' � '
� � � � + � F �.� � �, , ., ,., ., ., :� � � ;- �; , x � '� I � t �' . : , � ' i.. .. ' ; � � i I �;.
� . � c �, +� : �" �. . � ; , ' M� • � ., . � � � # ! " . �, � .' . � �
#��: � i- 4" ' 1���` 1 1� 1
,. . .. i . � ' + !f '. � ' - ! . i ., , , �: ., ,:
�
�; + �; R i � M ! ! - �'' � ;
' ! 1 � � A� �"� � � ' �' ! ; � ' ��.
� � , k f . '�., � � �, �� ' �; �
�,� �-.-� �, � �;� r �� ; �► _
,�, M , � �- �;i� � ' :n � � # y'
,r IU ! � , i � � J1 ! � ' ! s ! �� ! � 1� 4 1� ' ,� " 1 �., �
!:! � .! 1' ., l � � ! 1"� 1, �,1 ! i
� # � i�i � ! � .,#i � i ��"' , :#, ` ���
!- ' i ! �- � ' ! � , ,, � � �� �' � 1� � , '
! �-
1 ►. � F' � K ^A� .
:�. � % M � i #" `f � � I�F,w 4 'v
� � ♦ .-
' � � 1- �' �; �. �' . � s .. N � ' � � �... f, ., ! , f f +
�
r IF w�,,. Il . ,,�, , �.,, � �. � � �� � ��. ,, �
�, . , , '
�, �, � � , � � r, � ' � '' � " „ " , 1 "' � i M „ ►, , ; � " �:, � . � � i ' ' � �
. , �. � ,, � , ,. � ., �+ � 4 ��: � i � �1,,#, e � M1„' � , ''4'
�� � �- �1', i .� 1„ J i
� :; , � � ��- �» �, .� :, . ,, !^ �i" � ;, ,, � . f' ' . 4i �' ' �
This Bond is given pursuant to the provisions of Chapter 2253 of the Texas Government
Code, as amended, and any other applicable statutes of the State of Texas.
The undersigned and designated agent is hereby designated by the Surety herein as the
Resident Agent in Denton County to whom any requisite notices may be delivered and on whom
service of process may be had in matters arising out of such surety, as provided by Article 7.19-1
of the Insurance Code, Vernon's Ani�otated Civil Statutes of the State of Texas,
IN WITNESS WHEREOF, this in�trument i e cuted in fou� e,c��,�ies, each one of which
sliall be deemed an original, this the � day of (, 2014 ��
� ...��.. �
ATTEST:
m�,
BY: Y' I(xn�� ,' lCl.�'YI(��
SEC ET Y
ATTEST:
BY° � �, �
a � .� . .�._.e.�� �'������� e_.... �.��....... ...._a..�
nthia S. Vaughn, Witn ��; y�
�w �. .
PRINCIPAL
Mabak Directional Drillin nc
�.�.�.�.......... � �..�. � ��,� � .. .. .�.� _..
BY: r�.�"�,�"����'''"�"` � ' °
�"��..�.�� C��wp � _�. �.��„���..._�..�.�.._.��._
�"'
SURETY
�
SureTec Insurance Company ��
� �
'
� ���� � � �� �
BY; �.....,,µ... � �� �� �,�;. ....._ � . � .
ATTORNEY-IN-FACT , Rita G. Gulizo
The Resident Agent of the Surety in Denton County, Texas for delivery of notice and service of
tlie process is:
NAME: SureTec Insurance Comoanv
STREET ADDRESS: 5741 �egacy Drive, #210, Plano, TX 75024
(NOTE: Date of Paynzerit Bo�id must be dute of Co�rtract. If Reside��t Age�rt is not a
corporatiorz, give a perso�r's na»ie.)
����� ��
�s������������ ,.
SureTec Insurance Company
9737 Great Hills Trail, Suite 320
Austin, TX 78759
512-732-0099
RIDER
To be attached to and form a part of:
Bond Number: 4396111
Principal: Mabak Directional Drilling, Inc.
Obligee: City of Denton
Said bond, issued by SureTec Insurance Comaanv, as Surety, is hereby amended as follows:
It is hereby understood the obligations under this bond are limited to year one of the
referenced multi year contract obligation. Surety shall not be liable to Obligee for Surety's
failure or refusal to write, nor for Principal's failure to obtain bonds for the next renewal period.
The penal sum of the bond is the sum stated in the bond. The penal sum shall not increase or
cumulate by reason of renewal or extension of the initial term of the bonded obligation.
Any change in the underlying contract amount of more than 20% shall require the express
written consent of the surety. All coverage under this bond shall terminate if such consent is
not obtained. A change in the amount of the underlying contract amount shall not increase the
penal sum of the bond without the express written consent of the surety and the execution of
an additional rider to this bond,
Effective date of rider: �kr� l�% , 2014
All other terms and conditions shall remain the same,
Signed and sealed this �� day of � u-l.� , 20 �4
SureTec Insurance Companv
Surety
�� ��
,� �
� ,
By•
�°"�� � � �'�� � � � � ��".��'��,�� .w�
�� Attorney-in-fact , Rita G. Gulizo mm��mmmMITm� �mmmmmmm�mm�
PoA �. _ 4221140
SureTec Insurance Company
:������;�� ������ �� ���������
gieow AU Men by 77tese Presents, ��;�k w'�����`T��(� l��'�.i��1���? ���T�k��i�Y��¢%� �`�".�����'y"'), a corporation duly organized and
existing under the laws of the State ��" �"c;�r,��, �r.'��, ���ir�,� iis q��in���al office in Houston, Harris County, Texas, does by these presents
make, constitute and appoint ,,���
Michael F. Tubbs, Rita G. Guliz�;�`� S��an D. Zapalowski
its true and lawful Attomey-in-fact, with full power and authority hereby conferred in its name, place and stead, to execute, acl�owledge
and deliver any and all bonds, teco�izances, undertaldngs or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for:
Five Million and 00/100 Dollars ($5,000,000.00)a���
and to bind the Company thereby as fully �ra� t�a �� ��r�a� �����t �� if �ucir. �.i�r�ad �r�r� �i�rs�� ��� t�ac� ��r�;�itlea��, ������ �r�th �t°�� �sar���°,�t�e
seal of the Company and.duly attested by �C� a�c���1�ry� Na���la� ra�f�iz�� �r�e� �c��fa.x°ra�in� �all i���C �1�� s�ic! �:ttar��c���� �'��� �n�� �� �r� t1t�;
premises. Said appoin�ent shall continu� ��a ��r�� ���Cx� ���������� ..,.... ���� i� �ad� u�����er �nc1 1��^ �t���rat� �'F �a�: ���l���i�a�
resolutions of the Board of Directors of the Surc�"�"r�� �,n�a��°�a.r��� �'����5�����
Be �t Resolved that the President, any Vice-President, any Assist�rtit V�c;�-��c�i��r�t, �aezy ��s�r�t�►r•y tra� �n;� e�4ssz�t�taik ���sr�t�r�+ s1tm➢1 �� sar�r� i,s
�rw;��l�� vra�^� +����a� �i.��! qvc�r�r��� �un� �t��br��r���� ts�� appoint any one or r���a�e �t��i4��a��� g����z�r�� ���� ����rn���[�,�-i���^���4 C� ��,�r������t� ���r��� �s�� E��a�a� �z��a ���
�ei7�t" a�f" C1�� ����arrptaar� 5�a8�,j��t 4�� ii�� 9'a��l�rv,rirog� provisions:
�1�rraw��r��-d�-l^�.ae�r r�a�y� �� �,iv�� k��� �����r a�ez� authority for and in the name of and of i���r�#� ��" tit� �;��ra,�r�r�� t�a �����t�, ��s'k.��rwledge and
deliver, any and all bonds, recognizances, contracts, agreements ��r indemnity and other ���sna�iti�k�r��l rar �hG��a�t��r°y w����'i�����as�� �zr�' any and al]
notices and documents canceling or terminating the Company's liability thereunder, ��t�' �r�;r �:u�;1� ia��t"ru����r�t� �a� �:xc������r:i taY anY such
�.t���a�a�;y�ia�-F^��ac�� si��ad� �w� k�i���ita� ����n �ta� t��r���aar�a� �� �:Cs��s��cd 9�r t�� ��c�aval�r7c �r�� �c�ai�� ��d ��k"�ct�d �� �h� �"�rrg�r�ca�z.. �+c���e�ary,
�e d1 ��ts�alu��M��"� t��a�� thu ���;r�a�ts�a�� asf rr�r� ttaai���x�r�:c� �a�"�i��r �� �ca� cr�"th� i:.cazr��a��z� kt�r���a�'u�°a, ��r Cwu���xit�r �f��ca� ta �a�ry q���vc�• �a��ttomey or
a�s� ��c�.ata���e rc:��tm�a� t:6���r�ta� l�� �`��r���.��il�s �a� �m�}� ��s�cr �C�tt�arna�;� rar t�����i�;��� hr��ri�� ���:�ir°�i'1� �ci��w�tu.¢°e a� i"���irnii� ��,a� s����� be valid
�ra�� k�ir�reliro,�; ra��a�� �➢�� C,a�ava���'ay rwit�a �•��a���+�t :tia �tt�y� �tarbei �ar ����r��kin��, t� ^�l�sch it i� a���c4t��&. �°�Y�cdra�P�r� eat �r rr��.r.*da`aa� h�lc� �«at ���' of April,
1999.)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be si�ed by its President, and its corporate seal
to be hereto affixed this 21 st day of March, A.D. 2013. .
������,� SURETEC �1�+V���►1�+k�;� COMPANY
.,�'�..n • �., � �-'
�r�' � q '"��'� BY� ._ _..�.,��.�_ . ........
�
� � � � ', John +�� ,��•. ��T�;�i��;n�;
�
State of Texas ss: �� � ,� � °r '
County of Hazris °� •��
� �����������,�
On this 21st day of March, A.D. 2013 before me personally came John Knox Jr., to me lmown, who, being by me duly sworn, did depose and say, that he
resides in Houston, Texas, that he is President of SURET'EC INSURANCE COMPANY, the company described in and which executed the above
instrument; that he lmows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the
Board of Directors of said Company; and that he signed his name thereto by like order,
,�+y� "� JAC�UELYN MALDONADO
Notary Public
� �Y,� StateolTexas
a x a� u�� My Comm. Exp. 5118/2017 '
_�� � ���.._...�._,. ..__
���cc� �1,�� Maldonado, Notary Public
My commission expires May 18, 2017
I, M. Brent Beaty, Assistant Secretary of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attomey, executed by said Cpmpany, which is still in full force and effect; and furthermore, the resolutions of the Bou•d of Directors, set
out in the Power of Attomey are in full force and effect.
Given under my hand and the seal of said Company at Houston, Texas this �� day of �F�,� �-�- ��,;�__ 2014 �,, A.�.
� ._...._
„ Beaty, ... _ ... :�X���r�_._.�wn�._.,
���,����� — Assistant '"� m�y
�'.,,,�,�`"
Any Instrument Issued In excess of the penalty stated above Is totally vofd and without any valldlty.
For verlflcatlon of the authorlty of thls power you may call (713) 812-0800 any buslness day between B;00 am and 5:00 pm CS7'.
_....... w
SureTec Insurance Company
THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION
Statutory Complaint Notice/Filing of Claims
To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make a
complaint or fle a claim at: 1-866-732-0099. You may also write to the Surety at:
SureTec Insurance Corrlpany
9737 Great Hills Trail, Suite 320
Austin, Tx 78759
You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or complaints at 1-800-252-
3439. You may write the Texas Department of Insurance at
PO Box 149104
Austin, TX 78714-9104
Fax#:512-475-1771
Web: htt�//www,,,tdi,state,,.tx.us
Email: ConsumerProtection@tdi.state.tx.us
PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the
Surety first. If the dispute is not resolved, you may contact the Texas Department of Insurance.
Terrorism Risks Exclusion
The Bond to which this Rider is attached does not provide coverage for, and the surety shall not be liable for,
losses caused by acts of terrorism, riot, civil insurrection, or acts of war.
Exclusion of Liability for
Mold, Mycotoxins, Fungi & Environmental Hazards
The Bond to which this Rider is attached does not provide coverage for, and the surety thereon shall not be
liable for, molds, living or dead fungi, bacteria, allergens, histamines, spores, hyphae, or mycotoxins, or their
related products or parts, nor for any environmental hazards, bio-hazards, hazardous materials, environmental
spills, contamination, or cleanup, nor the remediation thereof, nor the consequences to persons, property, or the
performance of the bonded obligations, of the occurrence, existence, or appearance thereof.
Texas Rider 06042014