2015-175ORDINANCE NO. 2015 -175 AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NUMBER THREE TO THE CONTRACT BETWEEN THE CITY OF DENTON AND NORTH TEXAS CONTRACTING, INC. FOR THE US HWY 380 UTILITY RELOCATIONS PROJECT WHICH CONSISTS OF THE INSTALLATION OF 9440 FEET OF WATER LINE AND 6570 FEET OF SEWER LINE PARALLELING US HWY 380 FROM BONNIE BRAE STREET TO CARROLL BOULEVARD; PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFOR; AND PROVIDING AN EFFECTIVE DATE (BID 5190 -US HWY 380 UTILITY RELOCATIONS - CHANGE ORDER NUMBER THREE IN THE AMOUNT OF $231,613.67 FOR A TOTAL CONTRACT AWARD OF $3,749,989.25). WHEREAS, on March 19, 2013 by Ordinance No. 2013 -064, the City awarded a public works contract to North Texas Contracting, Inc., in the amount of $3,446,977 for the Us Highway 380 Utility Relocations; WHEREAS, the Staff having recommended, and the City Manager having recommended to the Council that a change order be authorized to amend such contract agreement with respect to the scope of work and an increase in the payment amount, and said change order fees under the proposed contract are fair and reasonable and are consistent with and not higher than the recommended practices and fees published by the professional associations applicable to the Provider's profession and such fees do not exceed the maximum provided by law; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. The Change Order No. One in the amount of $36,731.58, and Change Order No. Two in the amount of $34,667 were both within the approval limit of the City's Purchasing staff. Now, the Change Order No. Three, increasing the amount of the contract between the City and North Texas Contracting, Inc., which is on file in the office of the Purchasing Agent, in the amount of $231,613.67, is hereby approved and the expenditure of funds therefore is hereby authorized in accordance with said change order. The total purchase order amount increases to $3,749,989.25. SECTION 2, This ordinance shall become effective immediately upon its passage and approval. PASSED AND APPROVED this the day oI "L w mm� , 2015. CHRIS M /ATE. a TS, MAYOR ATTEST: JENNIFER WALTERS, CITY SECRETARY .• ANITA BURGESS, CITY ATTORNEY BY: CITY OF DENTON CHANGE ORDER I 'I. Division (Department) 2. Purchase Order No. 3. Change Order No. Engineering 162777 3 4. Name of Project 5, Project Acct No. 6. Date Prepared US 380 Utility Relocations 630043517.1360.40100 5/11/2015 640035545.1360.40100 7. Name and Address of Contractor North Texas Contracting, Inc. 4999 Keller Haslet Road Fort Worth, Texas 76244 8. Description of Work Included in Contract Installation of water line relocations associated with US 380 Utility Relocations project. I. Changes ordered and reason ordered Final contract quantities versus bid quantities. 10. Water Bid Item No Original Estimated Contract Unit :Negotiated C.O. Original Estimated Revised Estimated Contract Changes Quantity Price R8564.23 Price Cost Cost Excavation 107.19.3 6926 $1.00 N/A $6,926.00 $8,564.23 Protection Temp Erosion Ctrl, Sed. and 201 9310 $2.00 9577 N/A $18,620.00 $19,154.00 Water Poll. Control Rem & Repl Asphalt Parking 302 -A 765 $75.00 751.08 N/A $57,375.00 $56,331.00 Lot Rem & Repl Asphalt 302 -B 880 $75.00 1262.92 N/A $66,000.00 $94,719.00 Pavement Rem & Repl Concrete Parking 303 -A 339 $95.00 415.25 N/A $32,205.00 $39,448.75 Lot Rem & Repl Concrete 303 -B 80 $95.00 N/A $7,600.00 $6,747.85 Pavement Rem Concrete 305.1 -A 370 $15.00 E454.78 N/A $5,550.00 $6,821.70 Curb & Gutter (Replace Concrete Curb & Gutter 305.1 -B 370 $20.00 454.78 N/A $7,400.00 $9,095.60 Rem & Repl Concrete 305.2 -A 120 $110.00 301.44 N/A $13,200.00 $33,15$.40 Sidewalk Rem & Repl Concrete Drive 305.2 -13 20 $110.00 78 N/A $2,200.00 $8,580.00 Approach Asphalt Saw Cut 402.3 -A 5332 $2.00 12810.03 N/A $10,664.00 $25,620.06 Concrete Saw 402.3 -13 1727 $4.00 1724.25 N/A $6,908.00 $6,897.00 Cut 12" C -900 PVC Water Line OC I 501.14 -B 2346 $120.00 2354 N/A $281,520.00 $282,480.00 (Paved) L Page 1 of 5 16" WL 24 "X0.5" W05 65 $410.00 70.23 N/A $26,650.00 $28,794.30 STL Casing OC 16" WL g X 503.3 -13 176 $440.00 228 N/A $77,440.00 $100,320.00 STL Casinin g or Bore 12" Tapping Sleeve Valve and 502.6.2 -B 3 $14,000.00 2 N/A $42,000.00 $28,000.00 Box 8" Tapping Sleeve Valve and 502.6.2 -C 2 $3,500.00 1 N/A $7,000.00 $3,500.00 Box 12" Gave Valve 502.6.2 -E 15 $2,500.00 13 N/A $37,500.00 $32,500.00 and Box Air Release Valve 502.6.3 2 $8,000.00 1 N/A $16,000.00 $8,000.00 and Vault TOTAL. $722,758.00 II $798,731.89 11. Original Contract Price (A) $2,083,278.00 Increase in contract price (C) $75,973.89 Total Change Orders to Date (B) $34,667.00 Decrease in contract price (C) Revised Base Bid "A" Water (A) +(B) +(C) $2,193,918.89 12. Wastewater Original Estimated Contract Unit Bid Item No Revised Estimate Negotiated C.O. Original Estimated Revised Estimated Contract Changes Quantity Price Quantity Unit Price Cost Cost Excavation 107.19.3 6200 $1.00 6381.98 N/A $6,200.00 $6,381.98 Protection Rem & Repl Asphalt Parking 302 -A 1190 $75.00 1555.8 N/A $89,250.00 $116,685.00 Lot Rem & Repl Asphalt 302 -B 110 1 $75.00 100.82 N/A $8,250.00 $7,561.50 Pavement Rem & Repl Concrete Parking 303 -A 600 $95.00 1172.66 N/A $57,000.00 $111,402.70 Lot Rem & Repl Concrete 303 -B 50 $95.00 0 N/A $4,750.00 $0.00 Pavement Rem Concrete 305.1 -A 335 $15.00 1069.5 N/A $5,025.00 $16,042.50 Curb & Gutter Replace Concrete 305.1 -13 335 $20.00 1059.5 N/A $6,700.00 $21,190.00 Curb & Gutter Rem & Repl Concrete 305.2 -B 20 $110.00 102.08 N/A $2,200.00 $11,228.80 Sidewalk Page 2 of 5 Asphalt Saw Cut 402.3 -A 4052 $2.00 4355.48 N/A $8,104.00 $8,710.96 Concrete Saw 402.3 -B 1905 $4.00 1900.18 N/A $7,620.00 $7,600.72 Cut 8" ASTM D2241 SDR 26 501.15 -A 279 $70.00 338.72 N/A $19,530.00 $23,710.40 (Unpaved) 8" ASTM D2241 501.15 -B 50 $150.00 14 N/A $7,500.00 $2,100.00 SDR 26 by Bore 8" ASTM D2241 SDR 26 (Paved 501.15 -C 990 $70.00 1195.46 N/A $69,300.00 $83,682.20 Area) 8" ASTM D2241 SWR 16 "X0.5" 503.3 -C 130 $300.00 140 N/A $39,000.00 $42,000.00 STL Casing Bore 18" ASTM D2241 SDR 26 Sewer 501.15 -D 1217 $90.00 1181.8 N/A $109,530.00 $106,362.00 OC (Unpaved) 18" SDR 26 SWR 24 "X0.5" Case SS05 45 $350.00 39 N/A $15,750.00 $13,650.00 Open Cut 18" SDR 26 SWR 24 "X0.5" Case 503.3 -D 165 $400.00 301 N/A $66,000.00 $120,400.00 Bore 20" ASTM D2241 SDR 26 Sewer 501.15 -F 203 $100.00 261 N/A $20,300.00 $26,100.00 OC (Unpaved) 20 "SDR 26 SWR 30 "X0.5" STL 503.3 -E 130 $500.00 40 N/A $65,000.00 $20,000.00 Casing Bore 8" ASTM 3034 SDR 35 Sewer 501.17 -A 24 $90.00 10 N/A $2,160.00 $900.00 OC (Unpaved) 8" ASTM 3034 SDR 35 Sewer 501.17 -B 71 $90.00 0 N/A $6,390.00 $0.00 OC (Paved Areas) 24" ASTM F679 SDR 35 Sewer 501.17 -F 62 $120.00 51 N/A $7,440.00 $6,120.00 OC (Paved Areas) Additional MH 774.9 Depth (51D) ( >6' 502.1 -F 91 $250.00 N/A $22,750.00 $18,725.00 depth) Sanitary Sewer 502.10.4 19 $2,000.00 21 N/A $38,000.00 $42,000.00 Service 4 -18" Well Graded Grouted 803.3 75 $100.00 34 N/A $7,500.00 $3,400.00 Rock Rip Rap Abandon SS02 13 $500.00 10 E $6,500.00 $5,000.00 Manhole Page 3 of 5 18" SDR 26 SWR 30 "X0.5" Case NEW 0 N/A 39 $60.67 $0.00 $2,366.00 Open Cut 18" SDR 26 SWR 30 "X0.5" Casing NEW 0 N/A 301 $67.33 $0.00 $20,267.33 Bore 24" SDR 35 SWR 36 "X0.5" Case NEW 0 N/A 46 $72.00 $0.00 $3,312.00 Open Cut I 24" SDR 35 SWR 36 "X0.5" Case NEW 0 N/A 84 $70.00 $0.00 $5,880.00 Bore Surety Bonds 103.3 0 N/A 1 $609.69 $0.00 $609.69 Total Amount this Change Order $231,613.67 14. Contract time increased /decreased by days. New contract time —285—days. Page 4 of 5 THE AFOREMENTIONED CHANGE, AND WORK AFFECTED THEREBY, IS SUBJECT TO ALL CONTRACT STIPULATIONS AND COVENANTS. 1'15. SUBMITTED BY: 116. ACCEPTED BY CITY ENGINEER: 17. ACCEPTED BY CONTRACTOR: Title 118. ASSISTANT CITY MANAGER: 119. DIRECTOR OF UTILITIES: DITIONS OF APPROVAL: PURCHASING /FINANCE: 121, COUNCIL APPROVAL (IF NEEDED) APPROVED AS TO FORM: CITY ATTORNEY CITY OF DENTON, TEXAS BY: Page 5 of 5 51-i-11f.5 Date 71 . Date Date I Date '° f Signature Date ja(�A� � (t� Signature Date V/6' " Signature " *" Date