2015-292
%(+$1$%$1$-"$%.1,
2015292
AdditionalFileExists
AdditionalFileContainsRecordsNotPublic,AccordingtothePublicRecordsAct
Other
%(+$Ș2ș#§º«(´¯º¯§²¹
AmendedbyOrdinanceNo.201627209/20/16JR
ORDINANCE NO. 201 5 -292
AN ORDINANCE OF THE CITY OF DENTON, TEXAS AMENDING THE SCHEDULE OF
RATES CONTAINED IN ORDINANCE NO. 2014-285 FOR ELECTRIC SERVICE; AMENDING
THE PROVISIONS OF THE RESIDENTIAL SERVICE RATE SCHEDULE (SCHEDULE RES);
AMENDING THE PROVISIONS OF THE RESIDENTIAL RENEWABLE ENERGY SERVICE
RIDER (SCHEDULE RG); AMENDING THE PROVISIONS OF THE RESIDENTIAL PREPAID
SERVICE SCHEDULE (SCHEDULE RPP); ADDING THE PROVISIONS OF THE
RESIDENTIAL TIME OF USE SCHEDULE (SCHEDULE RTOU); AMENDING THE
PROVISIONS OF THE GENERAL SERVICE SMALL SCHEDULE (SCHEDULE GSS);
AMENDING THE PROVISIONS OF THE GENERAL SERVICE MEDIUM SCHEDULE
(SCHEDULE GSM); AMENDING THE PROVISIONS OF THE GENERAL SERVICE LARGE
SCHEDULE (SCHEDULE GSL); AMENDING THE PROVISIONS OF THE GENERAL TIME
OF USE SCHEDULE (SCHEDULE TGS); AMENDING THE PROVISIONS OF THE LOCAL
GOVERNMENT SMALL SCHEDULE (SCHEDULE G2); AMENDING THE PROVISIONS OF
THE LOCAL GOVERNMENT SCHEDULE (SCHEDULE G1); AMENDING THE PROVISIONS
OF THE WEEKEND SERVICE SCHEDULE (SCHEDULE WK); AMENDING THE
PROVISIONS OF THE ATHLETIC FIELD SCHEDULE (SCHEDULE AF); AMENDING THE
PROVISIONS OF THE STREET LIGHTING SCHEDULE (SCHEDULE LS); AMENDING THE
PROVISIONS OF THE TRAFFIC LIGHTING SCHEDULE (SCHEDULE LT); AMENDING THE
PROVISIONS OF THE UNMETERED SCHOOL ZONE /CROSSING FLASHERS SCHEDULE
(SCHEDULE UFL); AMENDING THE PROVISIONS OF THE UNMETERED TRAFFIC
LIGHTS SCHEDULE (SCHEDULE ULT); AMENDING THE PROVISIONS OF THE
UNMETERED SECURITY CAMERA SCHEDULE (SCHEDULE USC); ADDING THE
PROVISIONS OF THE UNMETERED WI -FI DEVICES SCHEDULE (SCHEDULE UWF);
AMENDING THE PROVISIONS OF THE OTHER LIGHTING SCHEDULE (SCHEDULE LO);
AMENDING THE PROVISIONS OF THE SECURITY LIGHTING SCHEDULE (SCHEDULE
DD); AMENDING THE PROVISIONS OF THE DECORATIVE DOWNTOWN LIGHTING
SCHEDULE (SCHEDULE DDL); AMENDING THE PROVISIONS OF THE NON STANDARD
STREET LIGHTING SCHEDULE (SCHEDULE DSL); AMENDING THE PROVISIONS OF
THE TEMPORARY SERVICE SCHEDULE (SCHEDULE T1); AMENDING THE PROVISIONS
OF THE GREENSENSE ENERGY EFFICIENCY REBATE PROGRAM AND RENAMING IT
THE " GREENSENSE INCENTIVE PROGRAM" (SCHEDULE GRP); AMENDING THE
PROVISIONS OF THE ENERGY COST ADJUSTMENT SCHEDULE (SCHEDULE ECA);
AMENDING THE PROVISIONS OF THE RENEWABLE COST ADJUSTMENT SCHEDULE
(SCHEDULE RCA); AMENDING THE PROVISIONS OF THE TRANSMISSION COST
RECOVERY FACTOR SCHEDULE (SCHEDULE TCRF); AMENDING THE PROVISIONS OF
THE DARK FIBER SCHEDULE (SCHEDULE DFR); PROVIDING FOR A REPEALER;
PROVIDING FOR A SEVERABILITY CLAUSE; AND PROVIDING FOR AN EFFECTIVE
DATE.
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS:
SECTION 1. The Schedule of Rates for electrical services as provided for in Chapter 26 of
the City of Denton Code of Ordinances, is amended to read as follows:
1
ELECTRIC RATE SCHEDULES
PAGE
RES
Residential Service
3
RG
Residential Renewable Energy Service Rider
5
RPP
Residential Prepaid Service
7
RTOU
Residential Time of Use
9
GSS
General Service Small
12
GSM
General Service Medium
14
GSL
General Service Large
16
TGS
General Service Time of Use
18
G2
Local Government Small
21
GI
Local Government
23
WK
Weekend Service
25
AF
Athletic Field
27
LS
Street Lighting
29
LT
Traffic Lighting
30
UFL
Unmetered School Zone /Crossing Flashers
31
ULT
Unmetered Traffic Lighting
32
USC
Unmetered Security Camera
33
UWF
Unmetered Wi -Fi Devices
34
LO
Other Lighting
35
DD
Security Lighting
37
DDL
Decorative Downtown Lighting
39
DSL
Non Standard Street Lighting
40
T1
Temporary Service
42
EGR
Economic Growth Rider
44
GRP
GreenSense Incentive Program
46
ECA
Energy Cost Adjustment
47
RCA
Renewable Cost Adjustment
48
TCRF
Transmission Cost Recovery Factor
49
DGR
Distributed Generation From Renewable Sources Rider
51
IWG
Independent Wholesale Generator Rider
53
CGR
Commercial Renewable Energy Service Rider
56
SFR
Special Facilities Rider
58
DFR
Dark Fiber Rate
59
0a
SCHEDULE RES
RESIDENTIAL SERVICE
(Effective 10101115)
APPLICATION
Applicable to any Customer for all electric service used for residential purposes in an individual
private dwelling or an individually metered apartment, supplied at one point of delivery and measured
through one meter. This rate is not applicable to resale service in any event, or to temporary, standby,
or supplementary service.
NET MONTHLY RATE
plus;
plus;
plus;
WINTER SUMMER
Billing months of Billing months of
November through April May through October
(1) Facility Charge
Single -Phase $ 8.25/bill $ 8.25/bill
Three -Phase $16.50/bill $16.50/bill
(2) Energy Charge per billing period
First 600 kWh 6.51 0/kWh
Additional kWh 4.33¢/kWh
All kWh 6.51 0/kWh
(3) Energy Cost Adjustment Charge
See Schedule ECA See Schedule ECA
(4) Transmission Cost Recovery Factor
See Schedule TCRF See Schedule TCRF
3
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
Single -Phase Facility Charge
Three -Phase Facility Charge
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh in rate block x Rate per kWh in rate block
TYPE OF SERVICE
The City will supply single -phase service (or three -phase service if available at the point of delivery)
at sixty (60) cycles and at any standard voltages available from the City's distribution system through
one standard transformation. Additional contractual arrangements between the City and the
Customer, subject to the Special Facilities Rider, may be required where service of the type desired
by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
4
SCHEDULE RG
RESIDENTIAL RENEWABLE ENERGY SERVICE RIDER
(Effective 10101115)
APPLICATION
Applicable to any Customer for all electric service used for residential purposes in an individual
private dwelling or an individually metered apartment, supplied at one point of delivery and
measured through one meter. This rate is not applicable to resale service in any event, or to
temporary, standby, or supplementary service.
In light of additional costs associated with the Residential Renewable Energy Service Rider and to
mitigate potential risk to ratepayers, any participant in the Residential Renewable Energy Service
Rider must be, at the time this rider is applied for and continuing while such rider is in effect, a
customer in good standing of all Denton Municipal Utilities, including Solid Waste services. Unless
legal review procedures have been invoked in good faith regarding the obligation, a customer in good
standing for the purpose of this Rate Rider is defined as a customer not owing any unpaid utility or
solid waste debt obligation that is over forty-five (45) days past due to the City of Denton, Texas
during the previous 12 months.
NET MONTHLY RATE
plus;
plus;
plus;
(1) Facility Charge
Three -Phase
WINTER
Billing Months of
November through April
$ 8.25 /bill
$16.50 /bill
(2) Energy Charge per billing period
First 600 kWh 6.51 0/kWh
All Additional kWh 4.33¢ /kWh
Billing Months of
May through October
$ 8.25 /bill
$16.50/bill
All kWh 6.51¢ /kWh
(3) Renewable Cost Adjustment Charge
See Schedule RCA See Schedule RCA
(4) Transmission Cost Recovery Factor
See Schedule TCRF See Schedule TCRF
1' .. LA
Customers wishing to receive Renewable Energy Service must sign a Residential Renewable Energy
Agreement and commit to accept this service for a minimum term of 6 months. At the end of each 6
month period, a customer's Renewable Energy Service will be extended for another 6 month period
unless that customer provides a written request to terminate that service to the City of Denton
Customer Service Department 15 days prior to the end of the then - current 6 -month participation
period.
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
Single -Phase Facility Charge
Three -Phase Facility Charge
ENERGY CHARGE
Billing for the energy charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh in rate block x rate per kWh in rate block
TYPE OF„ SERYICE
The City will supply single -phase service (or three phase service if available at the point of delivery)
at sixty (60) cycles and at any standard voltages available from the City's distribution system through
one standard transformation. Additional contractual arrangements between the City and the
Customer, subject to the Special Facilities Rider, may be required where service of the type desired
by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
SCHEDULE RPP
RESIDENTIAL PREPAID SERVICE
(Effective 10101115)
APPLICATION
Applicable to any Customer for prepaid electric service used for residential purposes in an individual
private dwelling or an individually metered apartment, supplied at one point of delivery and measured
through one meter. This rate is not applicable to resale service in any event, or to temporary, standby,
or supplementary service.
Residential Prepaid Service may initially not be available in all areas.
NET MONTHLY RATE
plus;
plus;
plus;
WINTER SUMMER
Billing months of Billing months of
November through April May through October
(1) Facility Charge
Single -Phase $15.25 /bill $15.25/bill
Three -Phase $22.50/bill $22.50/bill
(2) Energy Charge per billing period
First 600 kWh 6.51¢/kWh
Additional kWh 4.33¢/kWh
All kWh 6.51 0/kWh
(3) Energy Cost Adjustment Charge
See Schedule ECA See Schedule ECA
(4) Transmission Cost Recovery Factor
See Schedule TCRF See Schedule TCRF
7
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
Single -Phase Facility Charge
Three -Phase Facility Charge
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh in rate block x Rate per kWh in rate block
TYPE OF SERVICE
The City will supply single -phase service (or three -phase service if available at the point of delivery)
at sixty (60) cycles and at any standard voltages available from the City's distribution system through
one standard transformation. Additional contractual arrangements between the City and the
Customer, subject to the Special Facilities Rider, may be required where service of the type desired
by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
SCHEDULE RTOU
RESIDENTIAL TIME OF USE
(Effective 10101115)
APPLICATION
Applicable to any Customer for all electric service used for residential purposes in an individual
private dwelling or an individually metered apartment, supplied at one point of delivery and measured
through one meter. Customers electing this rate must remain on this rate for a minimum of twelve
(12) continuous billing months. This rate is not applicable to resale service in any event, or to
temporary, standby, or supplementary service.
In light of additional costs associated with the Residential Time of Use rate and to mitigate potential
risk to ratepayers, any participant in the Residential Time of Use rate must be, at the time this rate is
applied for and continuing while such rate is in effect, a customer in good standing of all Denton
Municipal Utilities, including Solid Waste services. Unless legal review procedures have been
invoked in good faith regarding the obligation, a customer in good standing for the purpose of this
Rate Rider is defined as a customer not owing any unpaid utility or solid waste debt obligation that is
over forty-five (45) days past due to the City of Denton, Texas during the previous 12 months.
Residential Time Of Use may initially not be available in all areas.
NET MONTHLY RATE
plus;
plus;
WINTER
Billing months of
November through April
(1) Facility Charge
Single -Phase $ 8.25 /bill
Three -Phase $16.50 /bill
(2) Energy Charge per billing period
First 600 kWh 6.51 0/kWh
Additional kWh 4.33¢ /kWh
U1 11 A1
(3) Energy Cost Adjustment Charge
0
SUMMER
Billing months of
May through October
$ 8.25/bill
$16.50 /bill
6.51 0/kWh
plus;
Super -Peak Hours See Schedule ECA
On -Peak Hours See Schedule ECA
Off -Peak Hours See Schedule ECA
(4) Transmission Cost Recovery Factor
See Schedule TCRF See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
Single — Phase Facility Charge
Three — Phase Facility Charge
DEFINITION OF SUPER -PEAK HOURS
The City's super -peak hours, for the purpose of this rate schedule, are designated as being from 3:00
P.M. to 8:00 P.M. each day, for the months of June through September. The City's super -peak hours
may be changed from time to time.
DEFINITION OF ON -PEAK HOURS
The City's on -peak hours, for the purpose of this rate schedule, are designated as being from 7:00
A.M. to 3:00 P.M. and 8:00 P.M. to 10:00 P.M. each day, for the months of June through September.
The City's on -peak hours for the months of October through May include all hours. The City's on-
peak hours may be changed from time to time.
DEFINITION OF OFF -PEAK HOURS
The City's system off -peak hours, for the purpose of this rate schedule, shall be all hours not
designated as on -peak hours and super -peak hours for the months of June through September.
Off -Peak I On -Peak I Super -Peak I On -Peak
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh x kWh Rate
TYPE OF SERVICE
10
The City will supply single -phase service (or three -phase service if available at the point of delivery)
at sixty (60) cycles and at any standard voltages available from the City's distribution system through
one standard transformation. Additional contractual arrangements between the City and the
Customer, subject to the Special Facilities Rider, may be required where service of the type desired
by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
11
SCHEDULE GSS
GENERAL SERVICE SMALL
(Effective 10101115)
APPLICATION
The General Service Small (GSS) rate is applicable to any commercial or industrial customer having
a maximum demand of less than 21.0 kW in each of the previous twelve (12) months for all electric
service supplied at one point of delivery and measured through one meter. If the demand in any
month is equal to or exceeds 21.0 kW, billing will be made under the Rate Schedule GSM and
Customer must remain on the GSM rate for a minimum of twelve (12) billing periods. This rate is
not applicable to resale service in any event, or to temporary, standby, or supplementary service.
NET MONTHLY RATE
plus;
plus;
plus;
(1)
Facility Charge
Single -Phase
$15.80 /bill
Three -Phase
$21.10 /bill
(2)
Energy Charge per billing period
First 2,500 kWh
8.11¢ /kWh
Additional kWh
4.25¢/kWh
(3)
Energy Cost Adjustment Charge
See Schedule ECA
(4)
Transmission Cost Recovery Factor
See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
Single -Phase
Three -Phase
12
Facility Charge
Facility Charge
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh in rate block x Rate per kWh in rate block
TYPE OF SERVICE
The City will supply single -phase service (or three -phase service if available at the point of delivery)
at sixty (60) cycles and at any standard voltages available from the City's distribution system through
one standard transformation. Additional contractual arrangements between the City and the
Customer, subject to the Special Facilities Rider, may be required where service of the type desired
by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
13
SCHEDULE GSM
GENERAL SERVICE MEDIUM
(Effective 10101115)
APPLICATION
The General Service Medium (GSM) rate is applicable to any commercial or industrial customer
having a maximum demand that meets or exceeds 21.0 kW in any one of the previous twelve (12)
months but less than 250 kVA in each of the previous twelve (12) months for all electric service
supplied at one point of delivery and measured through one meter. This rate is not applicable to resale
service in any event, or to temporary, standby, or supplementary service.
NET MONTHLY RATE
(1) Facility Charge
Single -Phase $15.80 /bill
Three -Phase $21.10 /bill
plus;
plus;
plus;
plus;
(2) Demand Charge
(3) Energy Charge per billing period
First 6,000 kWh
Additional kWh
(4) Energy Cost Adjustment Charge
(5) Transmission Cost Recovery Factor
$4.55/kW (all kW)
4.98¢ /kWh
4.11¢/kWh
See Schedule ECA
See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
(1) The Facility Charge,
plus;
(2) The Demand Charge
14
DETERMINATION OF DEMAND
The demand used in calculating the Demand Charge for the billing period shall be the greater of: (1)
the actual monthly kW demand as measured during the fifteen (15) minute period of maximum use
each month; or (2) seventy percent (70 %) of the maximum monthly actual demand for any month
during the previous billing months of May through October in the twelve (12) months ending with
the current month.
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh in rate block x Rate per kWh in rate block
PRIMARYµ - SERVICE DISCOUNT
Customers who receive service at secondary voltage (GM 1) shall receive no Energy Charge discount.
Customers utilizing City owned and operated facilities and transformation equipment and who are
metered at primary voltage (GM2) shall receive an Energy Charge discount of 0.1 0/kWh. Customers
who own, operate, and maintain all facilities necessary to receive three -phase primary voltage service
and all transformation facilities required for conversion to utilization voltage (GM3) shall receive an
Energy Charge discount of 0.3¢ /kWh. The City shall own, operate and maintain all metering
facilities, either at primary or secondary voltage.
TYPE OF SERVICE
The City will supply single -phase service (or three -phase service if available at the point of delivery)
at sixty (60) cycles and at any standard voltages available from the City's distribution system through
one standard transformation. Additional contractual arrangements between the City and the
Customer, subject to the Special Facilities Rider, may be required where service of the type desired
by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
15
SCHEDULE GSL
GENERAL SERVICE LARGE
(Effective 10101115)
APPLICATION
The General Service Large (GSL) Rate is applicable to any commercial or industrial customer
having a minimum actual demand of 250 kVA for all electric service supplied at one point of
delivery and measured through one meter. Customers other than commercial and industrial may
be allowed service under this rate, subject to the minimum billing provision. Customers who elect
to discontinue service under this rate are ineligible for service under this rate for twelve months.
This rate is not applicable to resale service in any event, or to temporary, standby, or supplementary
service.
NET MONTHLY RATE
(1) Facility Charge
plus;
plus;
plus;
plus;
(2) Demand Charge
(3) Energy Charge per billing period
First 200,000 kWh
Additional kWh
(4) Energy Cost Adjustment Charge
(5) Transmission Cost Recovery Factor
$65.55/bill
$10.25 /kVA (Minimum of 250 kVA
billed)
2.33¢ /kWh
1.33¢/kWh
See Schedule ECA
See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
(1) The Facility Charge,
plus;
(2) The Demand Charge
16
DETERMINATION OF DEMAND
The demand used in calculating the Demand Charge for the billing period shall be the greater of (1)
the actual monthly kVA demand as measured during the fifteen (15) minute period of maximum use
each month; or (2) 250 kVA; or (3) seventy percent (70 %) of the maximum monthly kVA actual
demand for any month during the previous billing months of May through October in the twelve (12)
month period ending with the current month.
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh in rate block x Rate per kWh in rate block
PRIMARY SERVICE DISCOUNT
Customers who receive service at secondary voltage (GL I) shall receive no Energy Charge discount.
Customers utilizing City owned and operated facilities and transformation equipment and who are
metered at primary voltage (GL2) shall receive an Energy Charge discount of 0.1 0/kWh. Customers
who own, operate, and maintain all facilities necessary to receive three -phase primary voltage service
and all transformation facilities required for conversion to utilization voltage (GL3) shall receive an
Energy Charge discount of 0.3¢ /kWh. The City shall own, operate and maintain all metering
facilities, either at primary or secondary voltage.
TYPE OF SERVICE
The City will supply single -phase service (or three -phase service if available at the point of delivery)
at sixty (60) cycles and at any standard voltages available from the City's distribution system through
one standard transformation. Additional contractual arrangements between the City and the
Customer, subject to the Special Facilities Rider, may be required where service of the type desired
by the Customer is not available at the point of service.
IMULVAINNI
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
17
SCHEDULE TGS
GENERAL SERVICE TIME OF USE
(Effective 10101115)
APPLICATION
Applicable to any customer having a minimum demand of 250 kVA for all electric service supplied
at one point of delivery and measured through one meter, with the City providing all facilities
necessary to receive primary voltage service. Customers electing this rate must remain on this rate
for a minimum of twelve (12) continuous billing months. This rate is not applicable to resale service
in any event, or to temporary, standby, or supplementary service.
In light of additional costs associated with the General Service Time of Use rate and to mitigate
potential risk to ratepayers, any participant in the General Service Time of Use rate must be, at the
time this rate is applied for and continuing while such rate is in effect, a customer in good standing of
all Denton Municipal Utilities, including Solid Waste services. Unless legal review procedures have
been invoked in good faith regarding the obligation, a customer in good standing for the purpose of
this Rate Rider is defined as a customer not owing any unpaid utility or solid waste debt obligation
that is over forty-five (45) days past due to the City of Denton, Texas during the previous 12 months.
NET MONTHLY RATE
plus;
plus;
plus;
plus;
plus;
(1) Facility Charge $76.45/bill
(2) On -Peak Demand Charge $13.06 /kVA
(3) Off -Peak Demand Charge $2.58 /kVA
(4) Energy Charge per billing period 0.78¢/kWh
(5) Energy Cost Adjustment Charge See Schedule ECA
(6) Transmission Cost Recovery Factor See Schedule TCRF
18
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
plus;
plus;
(1) The Facility Charge,
(2) The Off -Peak Demand Charge,
(3) The On -Peak Demand Charge
DEFINITION OF ON -PEAK HOURS
The City's on -peak hours, for the purpose of this rate schedule, are designated as being from 2:00
P.M. to 7:00 P.M. each Monday through Friday, for the months of June through September excluding
Independence Day and Labor Day. The City's on -peak hours may be changed from time to time.
DEFINITION OF OFF -PEAK HOURS
The City's system (off -peak) hours, for the purpose of this rate schedule, shall be all hours not
designated as on -peak hours.
DETERMINATION OF ON -PEAK DEMAND
The demand used in calculating the On -Peak Demand Charge for the billing period shall be the greater
of. (1) the kVA actual demand supplied during the fifteen (15) minute period of maximum use each
month during on -peak hours as recorded by the City's demand meter, or (2) one hundred percent
(100 %) of the actual maximum on -peak demand similarly determined during the billing months of
June through September in the twelve (12) months immediately preceding the current month. The
On Peak Demand Charge will be applied to each billing period.
DETERMINATION OF OFF -PEAK DEMAND
The demand used in calculating the Off -Peak Demand Charge for the billing period shall be the actual
kVA demand supplied during the fifteen (15) minute period of maximum use during off -peak hours
each month as recorded by the City's demand meter. The Off -Peak Demand Charge will be applied
to each billing period.
DETERMINATION OF DEMAND BILLING 1`011 CUSTOMERS WITH NO PEAK DEMAND
19
HISTORY DURING OFF -PEAK MONTHS
If the Customer is new or does not have a history of on -peak use for June through September, and
elects to accept service on the TGS rate, the Customer's billed demand shall be the off -peak demand
billed at the GSL demand rate. The off -peak demand will be billed every month at the GSL rate until
the customer establishes a separate on -peak and off -peak demand during an on -peak month. At this
time, both on -peak and off -peak demand will then begin billing at the TGS rate.
PRIMARY SERVICE DISCOUNT
Customers who receive service at secondary voltage (TG1) shall receive no Energy Charge discount.
Customers utilizing City owned and operated facilities and transformation equipment and who are
metered at primary voltage (TG2) shall receive an Energy Charge discount of 0.1 0/kWh. Customers,
who own, operate and maintain all facilities necessary to receive three -phase primary voltage service
and all transformation facilities required for conversion to utilization voltage (TG3) shall receive an
Energy Charge discount of 0.3¢ /kWh. The City shall own, operate and maintain all metering
facilities, either at primary or secondary voltage.
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh x kWh Rate
TYPE OF SERVICE
The City will supply single -phase service (or three -phase service if available at the point of delivery)
at sixty (60) cycles and at any standard voltages available from the City's distribution system through
one standard transformation. Additional contractual arrangements between the City and the
Customer, subject to the Special Facilities Rider, may be required where service of the type desired
by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
20
SCHEDULE G2
LOCAL GOVERNMENT SERVICE SMALL
(Effective 10101115)
APPLICATION
Applicable to any local City, County or School District having a maximum demand of less than 21.0
kW in each of the previous twelve (12) months for all electric service supplied at one point of delivery
and measured through one meter. If the demand in any month equals or exceeds 21.0 kW, billing
will be made under the Rate Schedule GI and Customer must remain on the G1 rate for a minimum
of twelve (12) billing periods. This rate is not applicable to resale service in any event, or to
temporary, standby or supplementary service.
NET MONTHLY RATE
plus;
plus;
plus;
(1) Facility Charge
Single -Phase $15.80 /bill
Three -Phase $21.10 /bill
(2) Energy Charge 7.36¢ /kWh
(3) Energy Cost Adjustment Charge See Schedule ECA
(4) Transmission Cost Recovery Factor See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
(1) Facility Charge
21
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh x kWh Rate
TYPE OF SERVICE
The City will supply single -phase service (or three -phase service if available at the point of
delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution
system through one standard transformation. Additional contractual arrangements between the City
and the Customer, subject to the Special Facilities Rider, may be required where service of the type
desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
22
SCHEDULE G1
LOCAL GOVERNMENT SERVICE
(Effective 10101115)
APPLICATION
The Local Government Service (G1) rate is applicable to any local City, County, or School District
having a maximum demand that equals or exceeds 21.0 kW in any one of the previous twelve (12)
months but less than 250 kVA in each of the previous twelve (12) months for all electric service
supplied at one point of delivery and measured through one meter. This rate is not applicable to resale
service in any event, or to temporary, standby, or supplementary service.
NET MONTHLY RATE
(1) Facility Charge
Single -Phase $15.80 /bill
Three -Phase $21.10 /bill
plus;
(2) Demand Charge $7.78/kW
plus;
(3) Energy Charge 3.52¢ /kWh
plus;
(4) Energy Cost Adjustment Charge See Schedule ECA
plus;
(5) Transmission Cost Recovery Factor See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
(1) Facility Charge,
plus;
(2) Demand Charge
23
DETERMINATION OF DEMAND
The demand used in calculating the Demand Charge for the billing period shall be the greater of:
(1) The actual kW demand supplied during the fifteen (15) minute period of maximum use during
the current month as determined by City's demand meter; or (2) not less than 50% of the highest
monthly actual demand determined during the billing months of May through October in the
twelve (12) months immediately preceding the current month.
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh x kWh Rate
TYPE OF SERVICE
The City will supply single -phase service (or three -phase service if available at the point of
delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution
system through one standard transformation. Additional contractual arrangements between the City
and the Customer, subject to the Special Facilities Rider, may be required where service of the type
desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10)
business days after issuance.
24
SCHEDULE WK
WEEKEND SERVICE
(Effective 10101115)
APPLICATION
Applicable to any commercial and industrial user whose maximum demand load occurs during the
period from Thursday at 12 midnight through Sunday at 12 midnight and does not experience a
demand load during the period from Sunday 12 midnight through Thursday 12 midnight that exceeds
80% of the maximum demand load. Customers who violate the 80% requirement more than four (4)
times during the month, or more than twice on the same day of the week, during the months of June
through September, are ineligible for service under this rate for twelve (12) months.
This rate is not applicable to resale service in any event, or to temporary, standby or supplementary
service except in conjunction with applicable rider.
NET MONTHLY RATE
plus;
plus;
plus;
plus;
(1) Facility Charge
Single -Phase $20.86/bill
Three -Phase $26.08/bill
(2) Demand Charge $7.31 /kW (First 20 kW not billed)
(3) Energy Charge per billing period
First 2,500 kWh 8.11 0/kWh
Next 3,500 kWh 4.25¢ /kWh
Additional kWh 3.13¢/kWh
(4) Energy Cost Adjustment Charge See Schedule ECA
(5) Transmission Cost Recovery Factor See Schedule TCRF
MINIMUM BILLING
(1) Facility Charge
plus;
(2) Demand Charge
25
DETERMINATION OF DEMAND
The demand used in calculating the Demand Charge for the billing period shall be the greater of: (1)
the actual kW demand supplied during the fifteen (15) minute period of maximum use during the
current billing period as determined by the City's demand meter less 20 kW; or (2) zero (0).
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period..
Energy Charge = kWh in rate block x Rate per kWh in rate block
TYPE OF SERVICE
The City will supply single -phase service (or three -phase service if available at the point of delivery)
at sixty (60) cycles and at any standard voltages available from the City's distribution system through
one standard transformation. Additional contractual arrangements between the City and the
Customer, subject to the Special Facilities Rider, may be required where service of the type desired
by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
26
SCHEDULE AF
ATHLETIC FIELD
(Effective 10101115)
APPLICATION
Applicable to all electric service metered at one point for use to light specified areas for athletic events.
This rate is not applicable to resale service in any event, or to temporary, standby, or supplementary
service except in conjunction with applicable rider.
NET MONTHLY RATE
(1) Facility Charge
Single -Phase $21.07 /bill
Three -Phase $31.60/bill
plus;
plus;
plus:
plus;
(2) Energy Charge per billing period
Billing months of June through September:
Peak (2:00 PM to 7:00 PM) 9.05¢/kWh
Off Peak (All Other Hours) 4.53¢/kWh
Billing months of October through May:
All hours 4.53¢/kWh
(3) Demand Charge
Billing months of June through September:
Peak (2:00 PM - 7:00 PM) $5.61/kW
Off Peak (All Other Hours) $1.33/kW
Billing months of October through May:
All hours $1.33/kW
(4) Energy Cost Adjustment Charge See Schedule ECA
(5) Transmission Cost Recovery Factor See Schedule TCRF
27
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
Single -Phase Facility Charge
Three -Phase Facility Charge
DETERMINATION OF DEMAND
The demand used in calculating the Demand Charge for the billing period shall be the actual kW
demand supplied during the fifteen (15) minute period of maximum use during the current billing
period as determined by the City's demand meter.
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh in rate block x Rate per kWh in rate block
TYPE OF SERVICE
The City will supply single -phase or three -phase service at sixty (60) cycles and at any standard
voltages available from the City's distribution system through one standard transformation.
Additional contractual arrangements between the City and the Customer, subject to the Special
Facilities Rider, may be required where service of the type desired by the Customer is not available
at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
28
SCHEDULE LS
STREET, LIGHTING
(Effective 10101115)
APPLICATION
Applicable to all street lighting owned and maintained by the City of Denton.
NET MONTHLY RATE
plus;
(1) Facility Charge
Rate Luminaire Type
LSA 100 W
LSB 250 W
LSC 400 W
(2) Energy Cost Adjustment Charge
Rate
LSA
LSB
LSC
LSD
LSE
LSF
TYPE OF SERVICE
Luminaire Type
100 W Sodium Vapor
250 W Sodium Vapor
400 W Sodium Vapor
100 W Equivalent LED
250 W Equivalent LED
400 W Equivalent LED
Facilfty Charge
$5.53 /bill
$7.84/bill
$9.87/bill
(Current ECA per Schedule ECA) x
(Bulb Wattage Factor where the
following Bulb Wattage Factors
apply);
Bulb Wattage Factor
48 kWh
105 kWh
159 kWh
25 kWh
96 kWh
148 kWh
The City will supply single - phase, sixty (60) cycle service at 120, 240, or 480 volts from the City's
distribution system through one standard transformation. Additional contractual arrangements
between the City and the customer, subject to the Special Facilities Rider, may be required where
service of the type desired by the customer is not available at the point of service.
MAVAJ51061,01
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
29
SCHEDULE LT
TRAFFIC LIGHTING
(Effective 10101115)
APPLICATION
Applicable to State and Local Government agencies that operate and maintain their own traffic
signals.
NET MONTHLY RATE
plus;
plus;
(1) Energy Charge per billing period 6.32¢/kWh
(2) Energy Cost Adjustment Charge See Schedule ECA
(3) Transmission Cost Recovery Factor See Schedule TCRF
ENERGY CHARGE
Billing for the energy charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh x kWh Rate
TYPE OF SERVICE
The City will supply single - phase, sixty (60) cycle service at 120 or 240 volts from the City's
distribution system through one standard transformation. Additional contractual arrangements
between the City and the Customer, subject to the Special Facilities Rider, may be required where
service of the type desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
SCHEDULE UFL
UNMETERED SCHOOL ZONE /CROSSING FLASHERS
(Effective 10101115)
APPLICATION
Applicable to Local Government agencies that operate and maintain their own unmetered school
zone /crossing flashers.
NET ANNUAL RATE
plus;
plus;
(1) Energy Charge per billing period 6.32¢/kWh
(2) Energy Cost Adjustment Charge See Schedule ECA
(3) Transmission Cost Recovery Factor See Schedule TCRF
ENERGY CHARGE
Billing for the energy charge shall be based on historical recorded annual kWh consumption. The
total billed usage divided by number of school zone /crossing flashers will determine the average kWh
usage. This average consumption will be billed for each school zone /crossing flasher once every
twelve (12) months at the end of the fiscal year. Any accounts that are added during the year will be
billed on prorated consumption.
Energy Charge = kWh x kWh Rate
Annual Usage = 48 kWh per account
TYPE OF SERVICE
The City will supply single - phase, sixty (60) cycle service at 120 or 240 volts from the City's
distribution system through one standard transformation. Additional contractual arrangements
between the City and the Customer, subject to the Special Facilities Rider, may be required where
service of the type desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment,of the bill for utility services shall not be less than ten (10) business
days after issuance.
31
SCHEDULE ULT
UNMETEREDmTRAFFIC LIGHTING
(Effective 10/01/15)
APPLICATION
Applicable to Local Government agencies that operate and maintain their own unmetered traffic
signals.
NET ANNUAL RATE
plus;
plus;
(1) Energy Charge per billing period 6.32¢/kWh
(2) Energy Cost Adjustment Charge See Schedule ECA.
(3) Transmission Cost Recovery Factor See Schedule TCRF
ENERGY CHARGE
Billing for the energy charge shall be based on historical recorded annual kWh consumption. The
total billed usage divided by number of lighted intersections will determine the average kWh usage.
This average consumption will be billed for each lighted intersection once every twelve (12) months
at the end of the fiscal year. Any accounts that are added during the year will be billed on prorated
consumption.
Energy Charge = kWh x kWh Rate
Annual Usage = 904 kWh per account
TYPE OF SERVICE
The City will supply single - phase, sixty (60) cycle service at 120 or 240 volts from the City's
distribution system through one standard transformation. Additional contractual arrangements
between the City and the Customer, subject to the Special Facilities Rider, may be required where
service of the type desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
32
SCHEDULE USC
UNMETERED SECURITY CAMERA
(Effective 10101115)
APPLICATION
Applicable to Local Government agencies that operate and maintain their own unmetered security
cameras.
NET. ANNUAL RATE
plus;
plus;
plus;
(1) Facility Charge $16.96
(2) Energy Charge 6.32¢ /kWh
(3) Energy Cost Adjustment Charge See Schedule ECA
(4) Transmission Cost Recovery Factor See Schedule TCRF
ENERGY CHARGE
Billing for the energy charge shall be based on technical information of installed equipment. This
calculated consumption will be billed for each camera once every twelve (12) months at the end of
the fiscal year. Any accounts that are added during the year will be billed on prorated consumption.
Energy Charge = annual kWh per camera x kWh Rate
Annual Usage = 300 kWh per camera per account
TYPE OF SERVICE
The City will supply single - phase, sixty (60) cycle service at 120 or 240 volts from the City's
distribution system through one standard transformation. Additional contractual arrangements
between the City and the Customer, subject to the Special Facilities Rider, may be required where
service of the type desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
33
SCHEDULE UWF
UNMETERED WI -FI DEVICES
mm _(Effective 1010. 1.1. 15 .) ............................
APPLICATION
Applicable to Local Government agencies that operate and maintain their own unmetered Wi -Fi
devices.
NET ANNUAL RATE
plus;
plus;
plus;
(1) Facility Charge $16.96
(2) Energy Charge 6.32¢ /kWh
(3) Energy Cost Adjustment Charge See Schedule ECA
(4) Transmission Cost Recovery Factor See Schedule TCRF
ENERGY CHARGE
Billing for the energy charge shall be based on technical information of installed equipment. This
calculated consumption will be billed for each device once every twelve (12) months at the end of the
fiscal year. Any accounts that are added during the year will be billed on prorated consumption.
Energy Charge = annual kWh per device x kWh Rate
Annual Usage = 300 kWh per device per account
TYPE OF SERVICE
The City will supply single - phase, sixty (60) cycle service at 120 or 240 volts from the City's
distribution system through one standard transformation. Additional contractual arrangements
between the City and the Customer, subject to the Special Facilities Rider, may be required where
service of the type desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
34
SCHEDULE LO
OTHER LIGHTING
(Effective 10101115)
APPLICATION
Applicable to Texas Department of Transportation unmetered and metered safety lighting systems
and continuous lighting systems as those terms are defined in Texas Administrative Code, Title 43,
Part 1, Chapter 25, Subchapter A, Rule §25.11.
DEFINITION
The following definitions apply to this Schedule LO:
Hours of Operation Per Billing Period = 333 hours
Bulb Wattage is the rated wattage of the luminaire bulb
NET MONTHLY RATE LOA ( Unmetered Lighting) _
plus;
(1) Energy Charge per billing period
(2) Energy Cost Adjustment Charge
ENERGY CHARGE Lt AlUnmetered Lighting
6.32¢ /kWh
(Current ECA per Schedule ECA) x
(Bulb Wattage /1000) x (Hours of
Operation Per Billing Period)
Billing for the Energy Charge shall be based on estimated kWh consumption during the billing
period.
Energy Charge = (kWh Rate x Bulb Wattage /1000) x (Hours of Operation Per Billing Period)
NET MONTHLY RATE LOB (Metered Lighting)
plus;
(1) Energy Charge per billing period
(2) Energy Cost Adjustment Charge
35
6.32¢ /kWh
See Schedule ECA
ENERGY CHARGE LOB (Metered Lighting)
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period.
Energy Charge = kWh x kWh Rate
TYPE OF SERVICE
The City will supply single - phase, sixty (60) cycle service at 120 or 240 volts from the City's
distribution system through one standard transformation. Additional contractual arrangements
between the City and the Customer, subject to the Special Facilities Rider, may be required where
service of the type desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
9M
SCHEDULE DD
SECURITY LIGHTING
(Effective 10101115)
APPLICATION,
Applicable to any customer within the area served by the City's electric distribution system for outdoor
area lighting when such lighting facilities are operated as an extension of the City's distribution system.
MONTHLY RATE
(1) Facility Charge
plus;
Rate
Luminaire Type
Facility Charge
DSA
100 W Sodium Vapor
$ 9.15 /bill
DSB
250 W Sodium Vapor
$12.10 /bill
DSC
400 W Sodium Vapor
$14.58 /bill
DHA
250 W Metal Halide
$14.23/bill
DHB
400 W Metal Halide
$16.96/bill
(2) Energy Cost Adjustment Charge
(Current ECA per Schedule ECA) x (Monthly Bulb Wattage Factor where the following Bulb
Wattage Factors apply);
Rate
Luminaire Type
DSA
100 W Sodium Vapor
DSB
250 W Sodium Vapor
DSC
400 W Sodium Vapor
DHA
250 W Metal Halide
DHB
400 W Metal Halide
TYPE OF SERVICE
Bulb Wattage Factor
48 kWh
105 kWh
159 kWh
105 kWh
159 kWh
The City shall furnish, install, maintain and deliver electric service to automatically controlled, metal
halide or sodium vapor lighting fixtures conforming to the City's standards and subject to its published
rules and regulations.
Where necessary for proper illumination or where existing poles are inadequate, the City will install
37
or cause to be installed, one (1) wood pole with the necessary lighting hardware and overhead
conductor for each installed light, at a distance not to exceed eighty (80') feet from existing lines, at no
charge to the Customer. Additional contractual arrangements between the City and the customer,
subject to the Special Facilities Rider, may be required where the eighty (80') feet distance limit is
exceeded or service of the type desired by the Customer is otherwise not available at the point of
service.
TERM OF CONTRACT
A two (2) year contract shall be agreed to and signed by each Customer desiring Security Lighting
Service authorizing fixed monthly charges, which may be reviewed annually, and to be applied to the
Customer's monthly municipal utilities bill. In the event that a Customer requests the removal of the
unit or discontinuance of the service prior to completion of two (2) years, the remainder of the contract
period shall become due and payable. After the end of the initial two (2) year contract, service shall
continue on a month -to -month basis and may be canceled by either party upon thirty (30) days' notice.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business days
after issuance.
38
SCHEDULE DDL
DOWN] "OWN DI,C( R)\'1 "1VI,', l <I al- 11 "MNt;
w� ... ..............................- �.
Effective 1 0 /15)
APPLICATION
Applicable to any Customer requesting service on the perimeter of the historic County Courthouse
Square located in downtown Denton and served by the City's existing electric distribution system for
outdoor area lighting at said location.
NET MONTHLY RATE
plus;
(1) Facility Charge $4.55 /bill
(2) Energy Cost Adjustment (Current ECA per Schedule ECA) x
(350 kWh per Customer)
TYPE OF SERV,IC„E
The City shall furnish, install, maintain and deliver electric service to automatically controlled lighting
fixtures conforming to the City's standards and subject to its published rules and regulations. The
service is provided between dusk and midnight. Additional contractual arrangements between the
City and the Customer, subject to the Special Facilities Rider, may be required where service of the
type desired by the Customer is not available at the point of service.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
FACILITY CHARGE
The Facility Charge shall be assessed on each bill rendered.
39
SCHEDULE DSL
NON - STANDARD STREET LIGHTING
(Effective 10101115)
APPLICATION
Applicable to street lighting owned and maintained by the Customer. Availability of this service is
contingent on the existence of an executed Special Facilities Rider between the legally responsible
party and the City under which the legally responsible party accepts all responsibilities, both legal and
financial, related to operation and maintenance of the subject lights, including but not limited to
payment of all applicable energy charges.
NET MONTHLY RATE
(1) Facility Charge
plus;
plus;
$8.74/bill
(2) Energy Charge 6.32¢ /kWh
Energy Charge = (kWh Rate) x (Bulb Wattage Factor)
(3) Energy Cost Adjustment Charge
(Current ECA per Schedule ECA) x (Monthly Bulb Wattage Factor where the following
Bulb Wattage Factors apply);
Rate
Luminaire Type
Bulb Wattage Factor
DLSA
100 W Sodium Vapor
48 kWh
DLSB
250 W Sodium Vapor
105 kWh
DLSC
400 W Sodium Vapor
159 kWh
DLHA
250 W Metal Halide
105 kWh
DLHB
400 W Metal Halide
159 kWh
Other — For any lamp types installed by owner that are not included in the list above, a
Bulb Wattage Factor will be determined for each unique type.
TYPE OF SERVICE
The City shall deliver single - phase, sixty (60) cycle service at 120 or 240 volts to the site for non-
standard streetlight fixtures supplied by the customer, and installed by the City in accordance with
Municipal Code requirements. Additional contractual arrangements between the City and the
customer, subject to the Special Facilities Rider, may be required where service of the type desired
by the Customer is not available at the point of service.
40
ADDITIONAL SERVICE CHARGES
If the City is required to maintain the privately owned lights to ensure public safety, the owner of the
lights may be subject to additional service charges. The additional service charges shall be the actual
cost of performing any work required to perform the necessary maintenance including but not limited
to:
Labor Regular time or overtime labor hourly rates in effect at the time the work is
performed for all personnel performing the work. Labor charges shall be
based on a one (1) hour minimum with all additional time above the minimum
to be measured to the nearest one - quarter hour.
Transportation To be billed by hours or miles, as applicable, according to the estimated cost
of operating the required equipment.
Material Any material needed to repair and /or maintain facilities will be billed at City
of Denton Warehouse cost plus 25 %.
Administrative Fee 10% of the total labor, transportation, and material costs.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
41
SCHEDULE TI
TEMPORARY SERVICE
(Effective 10101115)
APPLICATION
Applicable when a Customer requests electric service on a short term or temporary basis where a
customer has received a permit from the City Building Inspections Department. This rate is not
applicable after the certificate of occupancy or building final inspection has been issued.
NET MONTHLY RATE
(1) Facility Charge
plus;
plus;
plus;
Single -Phase
Three -Phase
(2) Energy Charge per billing period
(3) Energy Cost Adjustment Charge
(4) Transmission Cost Recovery Factor
MINII'vll..lM BILLING
$15.80 /bill
$21.10 /bill
8.12¢ /kWh
See Schedule ECA
See Schedule TCRF
For each billing period, the Customer shall be obligated to pay the following charges as a minimum,
whether or not any energy was actually used:
Single -Phase Facility Charge
Three -Phase Facility Charge
ENERGY CHARGE
Billing for the Energy Charge shall be based on actual kWh consumption during the billing period,
Energy Charge = kWh x kWh Rate
42
TYPE OF SERVICE
The City will supply single -phase service at sixty (60) cycles at a standard secondary voltage available
at the site. Additional contractual arrangements between the City and the Customer, subject to the
Special Facilities Rider, may be required where service of the type desired by the Customer is not
available at the point of service.
ADDITIONAL TEMPORARY SERVICE CHARGES
Labor Regular time or overtime labor hourly rates in effect at the time the
work is performed for all personnel performing the work. Labor
charges shall be based on a one (1) hour minimum with all additional
time above the minimum to be measured to the nearest one - quarter
hour.
Transportation To be billed by hours or miles, as applicable, according to the estimated
cost of operating the required equipment.
Material Material that cannot be salvaged shall be billed at City of Denton
Warehouse cost plus 25 %, plus applicable sales tax. At the time a
temporary service is removed or converted, any loss of the installed
material due to negligence or willful action by the Customer will be
billed separately to the Customer at replacement cost plus 25 %, plus
applicable sales tax.
Administrative Fee 10% of the total labor, transportation, and material costs.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten (10) business
days after issuance.
43
SCHEDULE EGR
ECONOMIC GROWTH RIDER
(Effective 10101115)
PURPOSE
The purpose of this rider is to facilitate local economic growth and expand the ad valorem tax base of
the City of Denton.
AVAILABILITY
This rider is available to the Customers who:
(1) Receive service from Rate Schedules GSL or TGS; and
(2) Pay City of Denton ad valorem tax; and
(3) Receive no electric service discounts other than those specifically defined in the GSL
or TGS rate schedules.
APPLICATION
This rider is available to electric service supplied at any one location. It is for firm electric service
applicable to new and existing Customers as described below, over a five (5) year period. This rider
is available to the following classes of Customers:
(1) New customers whose electric service represents demand not previously served by
the City at any location in the City's service area in the last twelve (12) months, where
such metered demand will be in excess of 1,000 kVA, as estimated and mutually
agreed upon by the DME General Manager and the customer.
(2) Existing customers served under Rate Schedules GSL or TGS who increase their prior
existing metered demand by 1,000 kVA. This increase shall be verified by sub -
metering (at the Customers expense) the additional load. If sub - metering is not
possible, at the discretion of the General Manager, the increase may be verified by
comparing a three -month rolling average of the new level of demand to the prior
demand averaged for corresponding months. During periods in which this verification
method cannot be applied, the General Manager and the Customer may develop a
mutually agreed -upon formula to estimate the base and additional demand levels.
In light of additional costs associated with the Economic Growth Rider and to mitigate potential risk
to ratepayers, any participant in the Economic Growth Rider must be, at the time this rider is applied
for and continuing while such rider is in effect, a customer in good standing of all Denton Municipal
44
Utilities, including Solid Waste services. Unless legal review procedures have been invoked in good
faith regarding the obligation, a customer in good standing for the purpose of this Rate Rider is defined
as a customer not owing any unpaid utility or solid waste debt obligation that is over forty-five (45)
days past due to the City of Denton, Texas during the previous 12 months.
NET MONTHLY RATE
The Customer shall be charged under the appropriate applicable rate schedules with the exception
that the monthly billing demand (for GSL) or system demand and on -peak demand (for TGS) will be
adjusted in accordance with the following table:
Time Period
First Year
Second Year
Third Year
Fourth Year
Fifth Year
CONTRACT PERIOD
Reduction to Billing Demand
50%
40%
30%
20%
10%
The term of the contract will be for five (5) years.
45
SCHEDULE GIP
GREENSENSE INCENTIVE PROGRAM
(Effective 10101115)
PROGRAM SUMMARY
The objective of the GreenSense Incentive Program ( "Program ") is to reduce energy demand and
consumption by promoting energy conservation, thereby reducing the utility bills of Denton
Municipal Electric (DME) customers, reducing the peak load of the DME's electric system, reducing
emissions in the state, and promoting energy conservation. The Program offers incentives, in the
form of credits on the electric service bills of DME retail customers. Cash incentives may be paid to
retail customers for the installation of photovoltaic applications.
In light of additional costs associated with the GreenSense Incentive Program and to mitigate
potential risk to ratepayers, any participant in the GreenSense Incentive Program must be, at the
time this program is applied for and continuing while such program is in effect, a customer in good
standing of all Denton Municipal Utilities, including Solid Waste services. Unless legal review
procedures have been invoked in good faith regarding the obligation, a customer in good standing for
the purpose of this Rate Rider is defined as a customer not owing any unpaid utility or solid waste
debt obligation that is over forty -five (45) days past due to the City of Denton, Texas during the
previous 12 months.
Program applicants will be able to qualify for multiple incentives simultaneously, unless specified in
the individual guidelines. A separate application may be necessary for each incentive. The Program
will be in effect each fiscal year beginning on October 1, until the allotted funding is depleted or until
cancellation of the program by DME. At the time the funds are depleted, no additional applications
for participation will be accepted until the next fiscal year.
Qualifying applicants must receive electric service from DME. The Program guidelines and
payments are subject to change by DME without prior notice. DME may, at any time, discontinue
the Program without prior notice. The current program guidelines may be found in the GreenSense
Incentive Program Manual located at www.dmepower.com.
46
SCHEDULE ECA
ENERGY COST ADJUSTMENT
(Effective 10101115)
The Energy Cost Adjustment (ECA) rate shall be set by the Public Utilities Board (PUB). The ECA
rate shall be reviewed on a quarterly basis and adjusted as defined below to recover the variable cost of
energy delivered to customers and to maintain DME in a financially sound position.
ENERGY C OS 'i ADJC.) l Nil N'I' BAI,ANC ING f.'C`0(JN 1" C TALC "l,,.CLA` ION
The ECA Balancing Account shall be calculated using the following formula:
Where:
ECA Balancing Account = (Actual plus Projected ECA revenue) — (Projected Energy Cost)
Projected Energy Cost = (Actual plus Projected cumulative cost of fuel) + (Actual plus
Projected cumulative variable purchased energy cost).
The General Manager, Denton Municipal Electric (DME) or his /her designee shall calculate the ECA
Balancing Account monthly. In the event that the ECA Balancing Account calculated during the last
month of each fiscal quarter (December, March, June, and September) is over /under collected by
$5,000,000 or more during the next quarter, the General Manager, DME or his /her designee may
recommend to the PUB any actions to maintain DME in a financially sound position.
ENERGY COST ADJUSTMENT CALCULATION
ECA = [(Projected Energy Cost) + (ECA Balancing Account)] / (Projected kWh sales)
ENERGY COST ADJUSTMENT CHARGE
The Energy Cost Adjustment Charge shall be based on actual kWh consumption during the billing
period.
Energy Cost Adjustment Charge = kWh x ECA rate
Residential Time -Of -Use (Schedule RTOU):
Super -Peak ECA Charge = kWh x [ECA + (ECA x 53.5 %)]
On -Peak ECA Charge = kWh x ECA rate
Off -Peak ECA Charge = kWh x [ECA — (ECA x 48.8 %)]
47
SCHEDULE RCA
RENEWABLE COST ADJUSTMENT
(Effective 10 101 / 15)
The Renewable Cost Adjustment (RCA) rate shall be set by the Public Utilities Board (PUB). The
RCA rate shall be reviewed on a quarterly basis and adjusted as defined below to recover the cost of
renewable energy delivered to customers. Renewable energy cost includes the Energy Cost
Adjustment Charge (see Schedule ECA) plus the cost of Renewable Energy Credits (REC) purchased.
RENEWABLE COST ADJUSTMENT BALANCING ACCOUNT CALCULATION
The RCA Balancing Account shall be calculated using the following formula:
Where:
RCA Balancing Account = (Actual plus Projected RCA revenue) — (Projected Renewable
Energy Cost)
Projected Renewable Energy Cost = (Actual plus Projected cumulative ECA cost) + (Actual
plus Projected REC cost)
During the last month of each fiscal year quarter (December, March, June, and September), the DME
General Manager or his/her designee shall calculate the RCA Balancing Account. In the event that the
RCA Balancing Account calculated during the last month of each fiscal quarter is over /under collected
by $100,000 or more during the next quarter, the General Manager or his/her designee may recommend
to the PUB any actions to maintain DME in a financially sound position.
RENEWABLE COST ADJUSTMENT CALCULATION
Where:
RCA = ECA + [(Projected Renewable Energy Cost) / (Projected kWh sales)]
Projected Renewable Energy Cost = Actual + Projected REC cost
RENEWABLE COST ADJUSTMENT CHARGE
The Renewable Cost Adjustment Charge shall be based on actual kWh consumption during the billing
period.
Renewable Cost Adjustment Charge = kWh x RCA rate
Residential Time -Of -Use (Schedule RTOU):
Super -Peak RCA Charge = kWh x [RCA + (RCA x 53.5 %)]
On -Peak RCA Charge = kWh x RCA rate
Off -Peak RCA Charge = kWh x [RCA — (RCA x 48.8 %)]
48
SCHEDULE TCRF
TRANSMISSION COST RECOVERY FACTOR
(Effective 10101115)
The Transmission Cost Recovery Factor (TCRF) rate shall be set by the Public Utilities Board
(PUB) effective October 1, 2014. Thereafter, the TCRF rate shall be reviewed on a monthly basis
and adjusted by the Public Utilities Board as defined below to recover the costs of transmission
service within the boundaries of the Electric Reliability Council of Texas ( ERCOT) region which
are billed and charged to Denton Municipal Electric (DME). Transmission rates included in the
TCRF shall be the net Transmission Cost of Service (TCOS) billed to DME as calculated, which
net TCOS is also billed and distributed to all ERCOT utilities by ERCOT; as such TCOS rates are
approved by the Public Utility Commission of Texas (PUCT).
TRANSMISSION COST Ill ',;(O V1: RY FACTOR 1,3AI, NCI ACCOI,.�N`l' ('AL C l![ ...A IAION
The TCRF shall be calculated using the following formula:
TCRF Annual Billing = (Actual monthly net TCOS billing amounts charged by ERCOT
transmission service providers to DME) + (Projected Increases or Decreases PUCT-
approved TCOS billing amount charges to ERCOT utilities)
The General Manager, DME, or his /her designee shall calculate the TCRF Balancing Account
monthly. The TCRF billed amount will be calculated monthly and adjusted accordingly by
annualizing the PUCT- approved TCOS billing amounts for the current calendar year. The total
TCRF Annual Billing shall be allocated to DME's various rate classes based on projected kWh
sales for that rate class. The TCRF charge will be developed by DME for each applicable customer
billing schedule herein, based on projected kWh sales for billing schedules without a demand
component and on monthly peak kW for billing schedules with a demand component.
TRANSMISSION COST RECOVERY FACTOR CALCULATION
TCRF Rate Class Allocation Amount = [(TCRF Annual Billing) x (Projected Rate Class
kWh Usage)] / (Total Projected Usage for all Rate Classes).
TRANSMISSION COST RECOVERY FACTOR CHARGE
The Transmission Cost Recovery Factor Charge shall be based on projected kWh consumption for
each rate class:
19
RATE
esidential
General Service Small
General Service Medium
General Service Large
General Service Time of Use
Local Government Service Small
Local Government Service
Weekend Service
Temporary Service
Athletic Field
Traffic Lighting
Non - Traffic Lighting
Unmetered School Zone /Crossing
Unmetered Security Camera
Unmetered Wi -Fi Devices
kWh x TCRF Rate
kWh x TCRF Rate
kW x TCRF Rate
kVA x TCRF Rate
kVA x TCRF Rate
kWh x TCRF Rate
kW x TCRF Rate
kW x TCRF Rate
kWh x TCRF Rate
kWh x TCRF Rate
kWh x TCRF Rate
kWh x TCRF Rate
kWh x TCRF Rate
kWh x TCRF Rate
kWh x TCRF Rate
50
SCHEDULE DGR
DISTRIBUTED GENERATION FROM RENEWABLE SOURCES RIDER
(Effective 10101115)
APPLICATION
This Rider is available to any retail customer receiving electric service under a DME electric rate
schedule who owns and operates an on -site generating system powered by a renewable resource
capable of producing power, and who interconnects with the DME electric system. Renewable
energy technology is any technology that exclusively relies on an energy source that is naturally
regenerated over a short time and derived directly or indirectly from the sun or wind. A renewable
energy technology does not rely on energy resources derived from fossil fuels, waste products
from fossil fuels, or waste products from inorganic sources. This Rider applies to a Customer -
owned generating system that primarily offsets part or all of the Customer's electric service
provided by DME. If the Customer -owned generating system larger than 50kW or if the system's
primary purpose is to sell energy to the grid and not offset the Customer's consumption, special
arrangements and contract may be necessary.
In light of additional costs associated with the Distributed Generation From Renewable Sources
Rider and to mitigate potential risk to ratepayers, any participant in the Distributed Generation From
Renewable Sources Rider must be, at the time this rider is applied for and continuing while such
rider is in effect, a customer in good standing of all Denton Municipal Utilities, including Solid Waste
services. Unless legal review procedures have been invoked in good faith regarding the obligation, a
customer in good standing for the purpose of this Rate Rider is defined as a customer not owing any
unpaid utility or solid waste debt obligation that is over forty -five (45) days past due to the City of
Denton, Texas during the previous 12 months.
CONDITIONS OF SERVICE
All charges, character of service, and terms and conditions of the electric rate schedule under which
the Customer receives service shall apply except as expressly altered by this Rider.
The Customer shall comply with the current DME technical requirements for distributed
generation interconnection. The Customer shall obtain approval from DME before the Customer
energizes the customer's on -site generating system or interconnects it with the DME electric
system. The Customer shall submit to DME a completed interconnection application form and
signed Standard Agreement for Interconnection and Parallel Operation of Distributed Generation
Agreement. The minimum term of an Agreement under this Rider is one year, extended
automatically unless terminated by either party with sixty days advance written notice
The Customer is responsible for the costs of interconnecting with the DME electric system,
including transformers, service lines, or other equipment determined necessary by DME for safe
installation and operation of the Customer's equipment with the City's system. The Customer is
responsible for any costs associated with required inspections and permits.
51
METERING
Metering under this Rider shall be performed by a single meter capable of registering the flow of
electricity in two directions (delivered and received) to determine the Customer's net energy flow.
RATE
Beginning in a billing period after a Customer receives approval to interconnect the Customer's
on -site generating system from the City of Denton; all energy generated by the Customer's system
and delivered to the DME electric system will be considered renewable energy. The Customer
shall be billed for all energy delivered by DME to the Customer under the approved residential
rates.
For any generation delivered by the Customer's system to the DME system up to the amount of
energy delivered by DME to the Customer, the City shall credit the Customer's account for the
energy generated as follows:
Generation Credit = [(kWh delivered from the Customer's approved system)
x (Customer's base electric service rate)] + [(kWh delivered from the
Customer's approved system) x (RCA rate)]
For all energy delivered by the Customer's system to the DME system that exceeds the amount of
energy delivered by DME to the Customer, the City shall credit the Customer's account for the
energy generated as follows:
Excess Generation Credit = (kWh delivered from the Customer's system)
x RCA rate (see Schedule RCA).
Any Billing Period Credit shall be applied to the utility charges due from the Customer to the City
of Denton for the billing period.
INDEMNIFICATION
The Customer operating the renewable distributed generation system indemnifies DME and holds
DME harmless for all damages and injuries to DME, the Customer, or others arising out of
Customer's use, ownership or operation of Customer's distributed generation facilities in parallel
with DME's system. Customer is solely responsible for providing adequate protection for
operating in parallel with DME's system in such a manner that faults or other disturbances on the
DME system do not cause damage to the Customer's distributed generation equipment.
52
SCHEDULE IWG
INDEPENDENT WHOLESALE GENERATOR
(Effective 10101115)
APPLICATION
The Independent Wholesale Generator (IWG) rate is applicable to non - renewable generating
installations of ten (10) MW or less interconnected to and operating in parallel with DME's
distribution system, for the sole purpose of delivering the net output (gross output minus auxiliary
load and step up transformer loses) of said generating installation to the Electric Reliability
Council of Texas ( ERCOT) transmission grid for sale in the ERCOT wholesale power market.
DME will interconnect the IWG pursuant to the terms of the DME standard Agreement for
Interconnection and Parallel Operation of Independent Wholesale Generation. Other services or
special requirements for interconnection of a specific generating facility not included in the DME
standard Agreement for Interconnection and Parallel Operation of Independent Wholesale
Generation, requested by the IWG Customer, or required by DME may be provided pursuant to
negotiation and agreement by both the IWG Customer and DME. The provision of said additional
services or requirements shall be recorded in the form of an addendum to the DME standard
Agreement for Interconnection and Parallel Operation of Independent Wholesale Generation.
TERMS AND CONDITIONS OF SERVICE
At a minimum, the IWG Customer shall comply with the current DME technical requirements for
independent wholesale generation interconnection specified in the DME standard Agreement for
Interconnection and Parallel Operation of Distributed Generation. The IWG Customer may not
begin construction of its facilities until an Agreement for Interconnection and Parallel Operation
of Distributed Generation has been signed by both the IWG Customer and the City of Denton. The
IWG Customer shall obtain approval from DME before the IWG Customer begins operation of its
generating system or interconnects it with the DME electric system. The IWG Customer is
responsible for any costs associated with required City of Denton and /or DME inspections and
permits.
PRE - INTERCONNECTION STUDIES
DME may, at its sole discretion perform pre- interconnection studies DME or the City of Denton
deems appropriate, which may include, but are not restricted to, a service study, coordination
study, emissions impact study, and utility system impact study. In instances where such studies
are deemed necessary, the scope of such studies shall be based on the characteristics of the
particular IWG generation system to be interconnected, DME's distribution system at the specified
proposed location(s), and environmental characteristics of the Denton County area. Such studies
will also determine whether the electric interconnection can be made consistent with safe and
reliable operation of DME's distribution system. The cost of such analysis will be the
responsibility of the IWG Customer. A cost estimate will be provided and agreed to by the IWG
Customer prior to DME or the City performing the studies.
SYSTEM MODIFICATIONS
53
The IWG Customer will be required to install, operate, and maintain in good order and repair, and
without cost to DME, all facilities required by DME for the safe operation of the IWG system in
parallel with DME's electric system. The IWG Customer's IWG system shall be installed,
operated, and maintained by the IWG Customer at all times in conformity with good electrical
practice and shall comply with the National Electric Code, the National Electric Safety Code, any
applicable local codes and any applicable DME service standards included in the DME Agreement
for Interconnection and Parallel Operation of Independent Wholesale Generation
Any modifications or additions to DME's electrical system caused by the addition of the
Customer's IWG system will be solely at the IWG Customer's expense. However, the IWG
Customer will not acquire any ownership in these facilities. The modifications and additions may
include, but are not restricted to, the upgrading of transformer insulation levels and lightening
arrester ratings, the replacement of circuit breakers due to increased fault current levels, additional
protective relaying and any additional metering. Further, DME may require that a communications
channel(s) be installed at the IWG Customer's expense as part of the relay protection, remote
control, remote metering, SCADA telemetry, and /or direct voice contact between DME and the
IWG Customer.
RATE
The IWG Customer shall be subject to special contract arrangements and the rates charges to the
Customer may consist of a minimum monthly Facility Charge plus a monthly distribution charge
plus a monthly distribution line loss charge. These charges shall be calculated as follows:
Monthly Facility Charge:
The IWG Customer shall pay DME a monthly facility charge sufficient to
compensate DME for its investment in special facilities dedicated exclusively to
providing the IWG Customer service and /or that are necessary to ensure that the
quality of service provided to other customers is not adversely affected pursuant to
the requirements of the SYSTEM MODIFICATION provisions set forth above.
The minimum monthly facility charge shall be $65.55.
Distribution Delivery Charge:
The IWG Customer shall pay DME a monthly distribution delivery charge equal to
$2.06 times the IWG Customer's delivery demand. The IWG Customer's delivery
demand shall be the greatest of the IWG Customer's maximum 15 minute net
capacity output as measured at the IWG Customer's IWG site, the minimum billing
kW shall be as established in the DME Agreement for Interconnection and Parallel
Operation of Independent Wholesale Generation, or 1,500 kW.
54
Distribution Line Loss Charge:
The IWG Customer shall pay DME a monthly distribution line loss charge equal to
the applicable monthly Energy Cost Adjustment (ECA) charge (see schedule ECA)
times monthly energy losses. Monthly energy losses shall be calculated as the
metered monthly kilowatt-hour output of the IWG Customer's IWG generating
unit(s) as measured at the IWG Customer's IWG site times five (5.0) percent.
Generator Auxiliary Load Standby Charge:
The IWG Customer shall pay the DME General Service Large rate for any electric
service used by the IWG Customer to serve generator auxiliary load as a result of
demand and energy requirements placed upon DME resulting from planned or forced
outage of the IWG Customer's IWG generation unit(s).
Electric Service to Structures and Other Facilities Other than Generator Auxiliary Load:
All charges, character of service, and terms and conditions of the applicable City of
Denton electric rate schedule(s) under which the IWG Customer receives DME electric
service for structures or other facilities not specifically supplying auxiliary service
directly to its generating unit(s) shall apply except as expressly altered by this Rider.
55
SCHEDULE CGR
(Effective 10101115)
This Rider defines the manner by which commercial customers may purchase predetermined 1000
kWh blocks of energy or 100% of actual energy consumption from renewable resources by
substituting the Renewable Cost Adjustment Charge (see Schedule RCA) in lieu of the Energy
Cost Adjustment (see Schedule ECA) specified in their applicable rate Schedule.
APPLICATION
This Rider is applicable to any non - residential Customer receiving service under rate schedules
GSS, GSM, GSL, G1, TGS, or WK at one point of delivery and measured through one meter. This
Rider is not applicable to resale service in any event, or to temporary, standby, or supplementary
service.
In light of additional costs associated with the Commercial Renewable Energy Service Rider and to
mitigate potential risk to ratepayers, any participant in the Distributed Commercial Renewable
Energy Service Rider must be, at the time this rider is applied for and continuing while such rider is
in effect, a customer in good standing of all Denton Municipal Utilities, including Solid Waste
services. Unless legal review procedures have been invoked in good faith regarding the obligation, a
customer in good standing for the purpose of this Rate Rider is defined as a customer not owing any
unpaid utility or solid waste debt obligation that is over forty-five (45) days past due to the City of
Denton, Texas during the previous 12 months.
NET MONTHLY RATE
A customer eligible for service under this Rider may elect to purchase renewable energy at the
Renewable Cost Adjustment Charge, determined in accordance with Schedule RCA. Said customer
may elect to purchase 1000 kWh blocks of energy at the RCA rate, with the remainder of the
customer's energy use charged at the ECA rate or to purchase all energy used at the RCA rate. All
other charges contained in the customer's applicable rate Schedule shall continue to apply, as
specified in said Schedule. Said customer's energy charge shall be calculated as follows.
Either:
Total Energy Charge = [(Y x 1000 kWh) x RCA] + { [(Total Energy Used) - (Y x 1000 kWh)] x ECA}
Where:
Customer has elected to purchase a portion of its energy consumption at the RCA and:
Y= Number of 1000 kWh RCA blocks elected by said customer
56
Or:
Total Energy Charge = Total Energy Used x RCA
Where:
Customer has elected to purchase its entire energy consumption at the RCA
TERMS OF SERVICE
To exercise the energy supply choice made available by this Rider, an eligible customer must enter
into a separate written agreement with Denton Municipal Electric that specifies either a specific
number of 1000 kWh energy blocks to be purchased at the Renewable Cost Adjustment Charge or
specifies that 100% of said customer's monthly energy consumption is to be purchased at the
Renewable Cost Adjustment Charge. The minimum term for a Schedule CGR agreement shall be 12
months.
This Rider replaces the Energy Cost Adjustment Charge for participating customers.
57
SCHEDULE SFR
SPECIAL FACILITIES RIDER
(Effective 10101115)
(1) All service shall be offered from available facilities. If a customer service characteristic
requires facilities and devices not normally and readily available at the location which the
customer requests service, the total cost incurred by DME for all facilities installed, buried,
relocated and /or removed shall be the responsibility of the Customer and subject to a special
contract entered into between DME and the Customer. This contract shall be signed by both
parties prior to the DME providing service to the Customer.
(2) Billing for services beyond the delivery of electricity, utilized by the Customer, may be
subject to a special contract entered into between DME and the Customer. This contract shall
be signed by both parties prior to DME providing service to Customer.
58
SCHEDULE DFR
DARK„ FIBER
(Effective 10101115)
APPLICATION
Service is available to any customer to the extent there is any excess capacity respecting Denton
Municipal Electric's fiber optic cable facilities, within the area served by Denton Municipal Electric's
( "DME ") distribution system, for the purpose of point -to -point dark fiber optic cable connectivity
intended for the transport of high -speed data.
MONTHLY RATE
(1) Fiber Mileage Charge $400 per fiber pair /mile, per month; and
(2) Building Presence Charge $180 per location, per month
Total Fiber Rate $580 per fiber pair /mile, per month, per location
RATE GUIDELINES
(1) The minimum quantity of fiber to be leased shall be one (1) fiber pair. All fiber pairs
furnished to the customer shall consist of two (2) fibers.
(2) The minimum Fiber Mileage Charge is for one (1) fiber pair /mile.
(3) After the first mile, Fiber Mileage Charge will be charged in increments of the nearest
one -tenth (0.1) mile.
(4) All costs associated with ingress to a customer's location from the DME right -of -way
shall be billed directly to the customer, and are not included in the Fiber Mileage Charge
and the Building Presence Charge and shall be paid to Denton Municipal Electric within
fifteen (15) calendar days from the date of issuance of the bill.
(5) The Fiber Mileage Charge calculation is based upon the actual fiber pair distance along
the DME distribution system rights -of -way. The Fiber Mileage Charge is not based
upon any other method of calculation. The Fiber Mileage Charge is not based upon any
distance determination, such as the distance the crow flies, or from point -to- point.
(6) The Fiber Mileage Charge distance shall be capped at two (2) times the direct point -to-
point distance.
(7) DME dark fiber by customer cannot conflict with existing private fiber and /or
communications company in any specific area.
(8) All costs associated for new point -to -point fiber spot networks where DME does not
already have fiber installed are to be borne up -front by the customer; including
installation costs, testing cost and any right -of -way or easement procurement costs.
DISCOUNTS
59
Special discounts will be applied for fiber pairs to the same location, and for fiber pairs for long -term
contracts in the amounts as shown in the table below. The discount applicable to a customer shall not
be a cumulative total of all the discounts offered. The discount any customer is entitled to shall be
the largest single discount applicable to that customer's service.
Discount Type
Discount
...�. .� �m
Discount Type
Discount
..._......_
Term of Lease
%
------ ........... .. ... —
Number of Fibers
. .�
%
5 -7 Years
30%
g�
1 -2 Fibers /Mileage Charge
0%
8 -10 Years
45%
...... .
... �� 3 _ ....... . .a
-6 Fibers/ Mileage
9.7%
ar e
I IIII. ..
.._..... .
bers/Mile..wam.._ g
7-12 Fi e Charge
19%
or more Fibers /Mileage
28.7%
Charge
TYPE OF SERVICE
The City shall furnish, install, maintain, and deliver only point -to -point dark fiber connectivity for the
purpose of transporting high -speed data with a maximum loss of no more than 9.0 dB.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
TERM OF LEASE CONTRACT
All dark fiber lease contracts shall be for a minimum term of five (5) years.
:1
SECTION 2. The Assistant City Manager for Utilities is hereby authorized to expend
funds to authorize creditsto DME customers on their electric service bills and further to authorize
cash incentives for the installation of photovoltaic systems in accordance with the form and type
set forth in Schedule GIP, as the installation of energy efficient upgrades is in the best interest of
the City of Denton, Texas, as such will reduce energy demand and consumption, reduce the peak
load of the DME's electric system, reduce emissions in the state, and promote energy conservation,
which are all public purposes of the City.
SECTION 3. All ordinances or parts of ordinances in force when the provisions of this
ordinance became effective which are inconsistent, or in conflict with the terms or provisions
contained in this ordinance are hereby repealed to the extent of any such conflict.
SECTION 4. If any section, subsection, paragraph, sentence, clause, phrase or word in this
ordinance, or application thereof to any person or circumstances is held invalid by any court of
competent jurisdiction, such holding shall not affect the validity of the remaining portions of this
ordinance, and the City Council of the City of Denton, Texas, hereby declares it would have enacted
such remaining portions despite any such invalidity.
SECTION 5. This ordinance and the rates herein adopted shall become effective, charged,
and applied to all electric services rendered by Denton Municipal Electric, and all energy usage by
customers of Denton Municipal Electric effective with the first billing issued on and after October 1,
2015 ; and a copy of said rates shall be maintained on file in the Office of the City Secretary of the City
of Denton, Texas.
PASSED AND APPROVED this the
ATTEST:
JENNIFER WALTERS, CITY SECRETARY
APPROVED AS TO LEGAL FORM:
ANITA BURGESS, CITY ATTORNEY
o p
I
f f
61
day of 2015.
4
�.. -
CHRIS WATTS, MAYOR