2016-253*RDINANCE NO,2016-253
•• • ..•.• r . r
CUSTOMARYweliqual"E
• • • r r• •.• •
ImENTON COMPRESSED NATURAL GAS FUELING STATIONPROJECT;PROVIDING F•
THE EXPENDITURE OF FUNDS THEREFORE; PROVIDING AN EFFECTIVE DATE (RFQ
6016—AWARDED TO ZEIT ENERGY LLC IN THE NOT -TO -EXCEED AMOUNT OF
WHEREAS, The professional services provider (the "Provider) mentioned in this ordinance
is being selected as the most highly qualified on the basis of its demonstrated competence and
qualifications to perform the proposed professional services; and
WHEREAS, The fees under the proposed contract are fair and reasonable and are consistent
with and not higher than the recommended practices and fees published by the professional
associations applicable to the Provider's profession and such fees do not exceed the maximum
provided by law; NOW, THEREFORE,
SECTION 1. That the City Manager is hereby authorized to enter into a professional service
contract with Zeit Energy LLC, to provide professional engineering, design and customary
construction services for the proposed Denton Compressed Natural Gas fueling Station project, a
copy of which is attached hereto and incorporated by reference herein.
SECTION 2. The City Manager is authorized to expend funds as required by the attached
contract.
SECTION 3. The City Council of the City of Denton, Texas hereby expressly delegates the
authority to take any actions that may be required or permitted to be performed by the City of Denton
under RFQ 6016 to the City Manager of the City of Denton, Texas, or his designee.
SECTION �C` ION 4. The findings in the preamble of this ordinance are incorporated herein by
reference.
SEC_TI.ON 5. This ordinance shall become effective immediately upon its passage and
approval.
PASSED AND APPROVED this the cal' , 2016,
r, "., ....
;l 11 WATTS, MAYOR
ATTEST:
lEXh0lFKV.
BY:
APPr�-�.D, AR' TO LEGAL FORM:
ANITA BURGESS, CITY ATTORNEY
BY:
STATE OF TEXAS
§ COUNTY OF DENTON §
CONTRACT AGREEMENT #6016
BY AND BETWEEN
CITY OF DENTON, TEXAS AND ZEIT ENERGY, LLC.
THIS CONTRACT is made and entered into this 131 day of Se tember 2016, by and between
I l" =Nl l G ,LLC. a limited liability company, whose address is 1717 McKinney Ave, Suite 7017,
Dallas Texas 75202, hereinafter referred to as "Design -Builder," and the CITY OF DENTON, TEXAS,
a Texas Municipal Corporation and Home -Rule City, hereinafter referred to as "City," to be effective
upon approval of the Denton City Council and the subsequent execution of this Contract by the Denton
City Manager or his duly authorized designee.
WI THNESSETH: That for and in consideration of the payments, covenants and agreements
contained herein, and under the conditions expressed in the bonds attached hereto, Design -Builder
agrees with the Owner to commence and complete the performance of the work specified within the
agreement, in the amount of $2,682,445.00 and for the mutual benefits to be obtained hereby, the parties
agree as follows:
SCOPE OF SERVICES
Design -Builder shall provide design -build services in accordance with the City's RF!2#6016, the
provisions of Texas Government Code 2269, and the Design -Builder's proposal response thereto, a copy
of which is on file at the office of Purchasing Agent and incorporated herein for all purposes as "Exhibit
A — Exhibit I". The Contract consists of this written agreement and the following items which are
attached hereto and incorporated herein by reference:
(a) Design -Builder Response to RFQ#6016 - Pricing (Exhibit "A")
(b) Negotiated Scope of Work and Services and Technical Requirements, Drawings, Graphs,
Charts, etc. (Exhibit "B"); (Technical Specifications and Drawings are available at
the Office of the Purchasing Manager and at
htt) ITwww.ci ofdenton,Eom/de ssrtinents-service*;7d+e artments- - /ma erints-
mama ement- urchasin -distribution-+renter-/bids-and- ro osals%urr+ent-bids-
ropasals
(c) Design -Builder Payments and Performance Milestones (Exhibit "C");
(d) City of Denton Standard Terms and Conditions and Contractual Requirements (Exhibit
"D»)
(e) Special Terms and Conditions (Exhibit "E");
(f) Payment'and Performance Bonds (Exhibit "F");
(g) Insurance Requirements and Documents from Design -Builder (Exhibit "G");
(h) Design -Builder's Business Information (Exhibit
(i) Design -Builder Response to RFP - Conflict of Interest Questionnaire (Exhibit "I");
These documents make up the Contract documents and what is called for by one shall be as
binding as if called for by all. In the event of an inconsistency or conflict in any of the provisions of the
Contract documents, the inconsistency or conflict shall be resolved by giving precedence first to this
written Contract, and then to the contract documents in the sequential order in which they are listed
above. These documents shall be referred to collectively as "Contract Documents."
IN WITNESS WHEREOF, the parties of these presents have executed this agreement in the year
and day first above written.
ATTEST:
JENNIFER WALTERS,
LIM
SECRETARY
LEGAL FORM:
NTY ATTORNEY
ZEIT ENERGY, LLC.
,
r
AUTHORIZED SIGNAT R,r
TYPED NAME: Clint Beauchamp
TITLE: Princi al and Co -Founder
817-223-1401
PHONE NUMBER
clint@zeitenergy.com
E-MAIL ADDRESS
CITY OF DENTON, TEXAS
A Texas Municipal Corporation
V111.r
V �vikU
By:U, '-"It/ V
HOWARD Mt TI1N
CITY MANAGER
10 ", 111".
Contract Price
6.1 Contract Price. Owner shall pay Design -Builder the sum of Two -Million. Six Hundred and
Eighly-J'wo, Thousand, Four IlundLqd and y rty-five Dollars and NO cents $2.682.445.00)
("Contract Price"), subject to adjustments made in accordance with the General Conditions of Contract.
Unless otherwise provided in the Contract Documents, the Contract Price is deemed to include all sales,
use, consumer and other taxes mandated by applicable Legal Requirements.
The Contract Pricing is detailed in accordance with the overall design and construction of the various
construction components as detailed below:
DESIGN DETAILED COSTS:
Phase I — Info Gathering & Schematic Design
$
20,000
Phase 11— Design Development
$
55,000
Phase III — Construction Documents
$
15,000
Phase IV — Bidding and Negotiations
$
8,000
Phase V — Construction Administration
$
23,000
Reimbursable Expenses
$
3,000
Sub -Total — Full Design Costs
$__124
000
CONSTRUCTION DETAILED COSTS:
General Conditions
$
6,500
Mobilization/Demobilization for Project
$
5,000
Bonding for Project
$
42,880
Existing Conditions — selective demolition
$
15,000
Site Work
$
50,000
Concrete Work
$
98,000
Electrical Work
$
129,000
Plumbing Work
$
115,000
Earthwork
$
10,000
Fueling Equipment
$1,135,000
Liquid Fuel 17 quipment bimllation
$
55,400
Install of New Exit Concrete Driveway
$
45,865
Utility Gas Line Extension Allowance
$
66,000
Street Sign Pole Allowance
$
4,200
All other construction items not noted above
$
120,000
Sub -Total —1i ull Construction Costs
$1,89�7845
ALLOWANCE FOR GAS LINE FROM ATMOS CONNECTION
Utility Gas Line Extension Allowance
$
550,000
Street Sign Pole Allowance
$
35,000
Sub -Total — Gas Line Extension from Atmos Connection
$
585,000
THREE (3) YEAR MAINTENANCE SERVICE AGREEMENT
Year I - $2100 per month
$
25,200
Year 2 - $2100 per month
$
25,200
Year 3 - $2100 per month
$
25,200
Sub -Total — 3 Year Eauinment Maintenance Agreement
$
7500
Grand Total for Contract 445
6.2 Markups for Changes. If the Contract Price requires an adjustment due to changes in the Work,
and the cost of such changes is determined within the General. Terms and Conditions of the Contract, the
following markups shall be allowed on such changes:
6.2.1 For additive Change Orders approved by the Independent Architect/Engineer and the
Owner, including additive Change Orders arising from both additive and deductive items, it is
agreed that Design -Builder shall receive a Fee of ten percent (10 %) of the additional costs
incurred for that Change Order, plus any other markups set forth at Exhibit A hereto.
6.2.2 For deductive Change Orders, including deductive Change Orders arising from both
additive and deductive items, the deductive amounts shall include:
An amount equal to the sum of: (a) ten ercent (LO_%) applied to the direct costs of the
net reduction (which amount will account for a reduction associated with Design -
Builder's Fee); plus (b) any other markups set forth at Exhibit A hereto applied to the
direct costs of the net reduction.
6.3 Allowance Items and Allowance Values.
6.3.1 Any and all Allowance Items, as well as their corresponding Allowance Values, are set
forth in an Exhibit hereto.
6.3.2 Design -Builder and Owner have worked together to review the Allowance Items and
Allowance Values based on design information then available to determine that the Allowance
Values constitute reasonable estimates for the Allowance Items. Design -Builder and Owner will
continue working closely together during the preparation of the design to develop Construction
Documents consistent with the Allowance Values. Nothing herein is intended in any way to
constitute a guarantee by Design -Builder that the Allowance Item in question can be performed
for the Allowance Value.
6.3.3 No work shall be performed on any Allowance Item without Design -Builder first
obtaining in writing advanced authorization to proceed from the Independent Architect/Engineer
and the Owner. Owner agrees that if Design -Builder is not provided written authorization to
proceed on an Allowance Item by the date set forth in the Project schedule, due to no fault of
Design -Builder, Design -Builder may be entitled to an adjustment of the Contract Time(s) and
Contract Price.
6.3.4 The Allowance Value for an Allowance Item includes the direct cost of labor, materials,
equipment, transportation, taxes and insurance associated with the applicable Allowance Item. All other
costs, including design fees, Design -Builder's overall project management and general conditions costs,
overhead and fee, are deemed to be included in the original Contract Price, and are not subject to
adjustment, regardless of the actual amount of the Allowance Item.
63.5 Whenever the actual costs for an Allowance Item is more than or less than the stated Allowance
Value, the Contract Price shall be adjusted accordingly by Change Order, subject to Section 6.3.4. The
amount of the Change Order shall reflect the difference between actual costs incurred by Design -Builder
for the particular Allowance Item and the Allowance Value.
Exhibit 1
FCF@6016 - Construction of the CNC Fueling_ Station - PrictnE Street
The
ndent shell co
ate fire rollbwina seuion- which (*mrtly nrcjs to fie s ke id", bWor shall not make '
5 £srt78;
rer09, LLG
2
R2gxnwent
Is a Comorstion. Partnershb, sole Proorletorehtp.
L Mnilad Liabl>UV Cornolony
3
Total working days atter Notice to Proceed is issued bV Nv for
C gns1ruE l6n ❑ @ -j t _- ern, 8-.: $C u. 7
be ccrtpld on or before November 30, 2016. 11 this date
� I
cannot be met; please insert the date that your firm can
' y
c mplele
the project. The remainder of the project shat follow
'Pr
the schedule prouided in Specification Section 01310
3a I
lConstrUction Sch ui :
ictal working da s after t krttce to tied to issued 6v CMhr for
_
ase
% or Usilin-guild firciect per spec R ns-
-Ing in
typed words
item A
QTY
UOM
Product Desarlptlon Subcontractor
Unit Price
Total
81
LS
Phew® l - Information Gathanno ane 8ollemaac Deslan
520.000.00
0.000.00
7
1
=
Phase It - Ch n 0evelppment —__
SwiS n0t1.b0
000.00
8
1
LS
Phase Ill - Conainlcrbn DoCumanfa
$15.000.00
$15,000M
9
1
LS
Phase IV - BM!M and Neaalailom
$8.000.00
58.000.00
10
1
LS
Phase V - Construceon Admirdciradon
$23,000.00
$23,000.00
11
1
LS
Roimlaursa4ie Expenses
$3.OW.00
-000.00
12
1
LS
An other Deagn moms nix noted$0
$0.00
Sub-total Base Price (item a5
124.000.00
Constniction Data
nem*
dry
W$A
Product Description Subcantrsdor
Unit Price
Total
13
1
LS
Gonerad Conidtiona
$6.500.00
$6500.00
14
1
LS
Mobilization tl DemoWlIzallan (x
$5,000.00
$5.000.00
15
1
LS
Bonds (Labor and Materials &
$42,860.00
$42,080.00
Performance)
18
1
LS
Extol Ing Condili - aelective
$15.000.00
$15,000.00
emottion
17
1
LS
Silo W mk
x50.000.00550.000.00
18
1
LS
ConcTew work
398.000.00
598. 00.00
19
1
LS
Metal Fabricaflons
$0,00
20
1
L5
ElectricalWorlt
$12900000
51129.000.90
21
1
LS
PlumbN Work
5715.000.00
$115,000,00
22
1
LS
hwork
$10Uoo,DO
10.000.00
23
1
LS
ElEN Equbrnenf
57.135.000.00
$11AMMO.00
24
1
LS
1Jquld Fuel Equipment Instatailon
$55,400.00
$55,400.00
25
1
LS
Installatton or Now FAR Concrete
$45.885.00
$45.865.00
Driveway
26
1
LS
lililiy Gas line Extension Allowance
$66,000.00
$66,000.00
Pratt and Overhead 12%
27
1
LS
Street ftn Polo Allowame Prol t and
$4,200.00
$4200.00
Overhead 1
28
1
LS
Il other Consinrinlort items not notecl
$120,000.00
$120,000.00
Shin-rural Rana 910 (Mem ash 11,
7,845.00
City of Denton
- Design and Build Services
Z E I T ENERGY
CNG Fueling Station
* � CNG FUELING SERVICES Appendix A
Appendix A
3 year Maintenance Service Proposal
Zeit Energy will provide preventive and scheduled maintenance as detailed in our proposal for
$2100/month, including oil and filters. Repair and emergency maintenance are provided as needed and
approved by the City. Maintenance services include only new CNG and Liquid Fuels equipment installed
by Zeit Energy.
Labor Rate Sheet
Controls/Automation
Training
Repair and emergency maintenance
$119.00/hr or $950/day (8 to 10hrs)
$1,200/day (8 to 10hrs)
$104.00/hr
Repair and emergency maintenance (Preferred Contract Rate) $99.00/hr
(Contract Rate offers)
Discounted labor rate
Preferred service scheduling
Twenty Four/ Seven, telephone support
Over Time and Weekend's baled at rate times one point five
Holidays billed at rate times two
Vehicle mileage $0.89/mi
Note: Preventive maintenance for liquid fuel dispensers includes yearly filters replacement only.
r
Scope of Work
The intent of this Contract is to obtain complete design -build of the project identified with the technical
specifications, as detailed in the RFQ documents, per the plans, drawings, and technical specifications
submitted by the Design -Builder, and approved by the City's Independent Engineer/Architect, as further
identified within this contract, and in full compliance with the provision of Texas Government Code
2269. Design -Builder shall perform all design and construction services, and provide all material,
equipment, tools and labor, necessary to complete the Work described in and reasonably inferable from
the Contract Documents. The work described in the Contract Documents is described in detail in the
Technical Specifications, the Plans, and the Drawings as submitted by the Design -Builder and
approved by the City's Independent Engineer/Architect. The proposal submitted accurately describes
the Design -Builders' understanding of the objectives and scope of the requested design and construction
services, and provides an outline of the process to complete the requirements of the project.
Special Notice and Additional Requirement(s):
1. Additional safety precautions shall be instituted by the awarded Design -Builder, as the work
environment will be in an area where citizens and employees may be present, and work safety
must be coordinated with the owner.
2. The Design -Builder shall be responsible for all spoil removals, and any excess soil that will
require removal.
City of Denton
4 Design and Build Services
Z E I T ENERGY
CNG Fueling Station
CNG FUELING SERVICES Appendix E
Scope of Services
Engineering/Construction Management
• Professional Engineering design.
• PE Sealed Construction Document.
• Construction Management and on-site Supervision.
Permitting
• City of Denton Building Permit
Civil Scope
• Construction signage and barricades.
• Trenching including backfill/compaction.
• Removing existing fuel island area concrete paving, grade and repave. (Approx 6000 so).
• Remove grass island section at the entrance of the fueling facility and pave with concrete.
• Compressor Concrete Pad.
• CNG Dryer Concrete Pad.
e Priority valve Panel Concrete Pad.
e Storage Concrete Pad.
• Modify Dispensers Islands to receive new dispensers
• Materials, labor, and equipment to set and anchor equipment (Dispensers, Dryer, Compressors, Storage
Vessels, valve Panel, Fire Extinguishers, signs).
• Install pipe bollards around Electrical Utility transformer.
• Gravel aggregate in equipment area.
e Install painted CMU block wall around CNG equipment area with steel door.
• Project Signage and Fire Extinguishers.
• Project general (Temporary Toilet, Dumpster, Water Supply etc...).
• Permitting.
Electrical Scope
• Service Entrance disconnects/ Panels (Furnish and Install)
• Emergency Shutdown Buttons (Furnish and Install) and tie to existing ESD loop.
• All Conduits, Conductors and seal -offs (Furnish and install).
• All CNG and liquid fuels equipment Terminations.
• Replace existing canopy lights
• Equipment Grounding.
• Permitting.
Piping Scope
• Furnish and Install Carbon Steel Pipe From gas riser at the CNG equipment area to Dryer.
• Furnish and Install Carbon Steel Pipe from Dryer to Compressor.
• Pressure Test Carbon Steel Pipe.
City of Denton
Design and Build Services
Z E I T ENERGY
CNG Fueling Station
r : a CNG FumxqG SFRvrcEs Appendix E
• Provide and install all high pressure SS tubing Sleeves.
• Install SS tubing in sleeves.
• Provide and Install all high pressure fittings needed to connect SS tubing to CNG Equipment.
• Pressure test high pressure SS tubing.
• Mount and Connect fast fill dispensers.
• Permitting.
Liquid/CNG Fuels Scope
• Install 2 dual hose CNG dispensers with internal card readers and Comdata POS.
• Install 2 high flow dual hose biodiesel dispensers, with internal card readers and Comdata POS.
• Install 1 regular flow dual hose biodiesel dispenser with internal card readers and Comdata POS.
• Install 1 E85/Unleaded dual hose dispenser with internal card readers and comdata POS.
• Replace WARD fuel management system pedestal for DEF dispenser and overhead dispenser
Miscellaneous Scope
• Remove Existing Fuel Management Pedestals (WARD) and store on site.
• Remove existing acuums and compressed air equipment and store on site.
a Remove existing liquid fuel dispensers (4 total) and store on site.
Landscaping Scope
• Install landscaping around Equipment area as required by code.
• Expand existing irrigation system to CNG equipment area.
Pole Street Sign
• Install new street pole sign. location, size and design to be determined.
• Installation includes electrical service.
• Permitting.
Gas line/Service
• Coordination and negotiation with Atmos Energy for Gas line extension to fueling site.
• Install gas pipe underground from gas meter location to CNG equipment area.
• Easement preparation.
• Permitting.
Equipment Services:
Commissioning & Start-up Support (Start-up): The program is designed to provide the basics of maintaining
our systems and ensures that the installation of all site connections is complete and correct as well as
validating warranty.
City of Denton
Design and Build Services
Z E I T ENERGY CNG Fueling Station
CNG FUELING SERVICES Technical/cost proposal
Engineering & Construction Scope
Engineering(Construction Management
• Professional Engineering design.
• PE Sealed Construction Document.
• Construction Management and on-site Supervision.
Permitting
• City of Denton Building Permit
Civil Scope
• Construction signage and barricades.
• Trenching including backflWcompaction.
• Removing existing fuel island area concrete paving, grade and repave. (Approx 6000 sgft).
• Remove grass island section at the entrance .of the fueling facility and pave with concrete.
• Compressor Concrete Pad.
is CNG Dryer Concrete Pad.
• Priority valve Panel Concrete Pad.
• Storage Concrete Pad.
• Modify Dispensers Islands to receive new dispensers
• Materials, labor, and equipment to set and anchor equipment (Dispensers, Dryer, Compressors, Storage
Vessels, valve Panel, Fire Extinguishers, signs).
• Install pipe bollards around Electrical Utility transformer.
• Gravel aggregate in equipment area.
• Install painted CMU block wall around CNG equipment area with steel door.
• Project Signage and Fire Extinguishers.
• Project general (Temporary Toilet, Dumpster, Water Supply etc...).
• Permitting.
Electrical Scope
• Service Entrance disconnects/ Panels (Furnish and Install)
• Emergency Shutdown Buttons (Furnish and Install) and tie to existing ESD loop.
• All Conduits, Conductors and seal -offs (Furnish and Install).
• All CNG and liquid fuels equipment Terminations.
• Replace existing canopy lights
• Equipment Grounding.
• Permitting.
Piping Scope
• Furnish and Install Carbon Steel Pipe From gas riser at the CNG equipment area to Dryer.
• Furnish and Install Carbon Steel Pipe from Dryer to Compressor.
• Pressure Test Carbon Steel Pipe.
• Provide and install all high pressure SS tubing Sleeves.
• Install SS tubing in sleeves.
• Provide and Install all high pressure fittings needed to connect SS tubing to CNG Equipment.
• Pressure test high pressure SS tubing.
• Mount and Connect fast fill dispensers.
City of Denton
Design and Build Services
Z E I T ENERGY
CNG Fueling Station
CNG Furr.Irrc SrRvrcrs Technical/cost proposal
• Permitting.
Liquid/CNG Fuels Scope
• Install 2 dual hose CNG dispensers with internal card readers and Comdata POS.
• Install 2 high flow dual hose biodiesel dispensers, with internal card readers and Comdata POS.
• Install 1 regular flow dual hose biodiesel dispenser with internal card readers and Comdata POS.
• Install 1 E85/Unleaded dual hose dispenser with internal card readers and comdata POS.
• Replace WARD fuel management system pedestal for DEF dispenser and overhead dispenser
Miscellaneous Scope
• Remove Existing Fuel Management Pedestals (WARD) and store on site.
• Remove existing acuums and compressed air equipment and store on site.
• Remove existing liquid fuel dispensers (4 total) and store on site.
Landscaping Scope
• Install landscaping around Equipment area as required by code.
• Expand existing irrigation system to CNG equipment area.
Pole Street Sign
• Install new street pole sign. location, size and design to be determined.
• Installation includes electrical service.
Permitting.
Gas line/Service
• Coordination and negotiation with Atmos Energy for Gas line extension to fueling site.
• Install gas pipe underground from gas meter location to CNG equipment area.
• Easement preparation.
• Permitting.
City of Denton
Design and Build Services
z E I T ENERGY
CNG Fueling Station
-" CNG Furum; SLRvicts Appendix D
Summary of Major Equipment
Equipment
Manufacturer
QTY
Unit Cost
Extended Total
NG300E Duplex Compressor Package,
ANGI
1
$520,490
$520,490
999 scfm capacity @ 264.5 psig inlet
pressure per compressor, 4,500 psi
discharge, 250 Bhp, 480 VAC TEFC
Electric Motor
Duplex Motor Starter Panel
ANGI
1
$36,120
$36,120
Site Controller Panel for 2 compressors
ANGI
1
$15,100
$15,100
with remote monitoring
Inlet Dryer, Model
ANGI
1
$72,270
$72,270
GD -024 -S -M-460-300-3, rated for 2004
scfin at 270 psig
Priority Valve Panel
ANGI
1
$39,130
$39,130
ASME storage 3 -Pack, Storage capacity
FIBA
1
$123,660
$123,660
Of 64,766 scf at 5,500 psig
Fast Fill CNG Dispenser, Gilharco Encore
ANGI
2
$79,600
$159,200
700S, with chip reader
Diesel Fuel Dispenser, Encore 7005 High
GILBARCO
2
$36,215
$72,430
Flow dual hose Dispenser
Diesel Fuel Dispenser, Encore 700S
GILBARCO
1
$28,800
$28,800
Regular Flow dual hose Dispenser
E85/Unleaded Fuel Dispenser, Encore
GILBARCO
1
$28,800
$28,800
7005 Regular Flow dual hose Dispenser
E85 on side Unleaded on the other side
Pegasus Point of Sale pedestal
PEGASUS
1
$13,200
$13,200
Point of sale system software and
COMDATA
1
$25,800
$25,800
hardware
City of Denton
Z E I T ENERGY Design and Build Services
CNG Fueling Station
.. CNG FUELING SERVICES Technica Vcost proposal
City of Denton
Design and Build Services
Z E 1 T ENERGY
CNG Fueling Station
CNG FUELING SFRVTCES Technical/cost proposal
City of Denton
Design and Build Services
Z E I T ENERGY
CNG Fueling Station
�,.-- CNG Fuw-w; SERwEs Technical/cost proposal
Ak,;
ZEIT ENERGY
�e , • CNG FUELING SERVICES
City of Denton
Design and Build Services
CNG Fueling Station
Technicallcost proposal
Pegasus IV pedestal
Services:
The program is designed to provide the basics of maintaining
our systems and ensures that the installation of all site connections is complete and correct as well as
validating warranty.
Fre att: CNG Equipment delivered to site
Requirements:
• 480 volt / 3 Phase from electric utility
270 psig inlet pressure from natural gas utility
• Internet connection
►MececKt �
9L6[ /K Ki ,�Aw I NOLdOI OAYI dVW
L �'
ae �a�nrraxarculV2l3N3'J
s __
Bug,( XL NO1NiO -Icrd n—u Arfd S t9ZT
-OugN9 11W. " WUVIS 9NIIgfld M NOLN30d0 ALIT
JJ10AVI NH LLfw ?1311va sip
�Z NI XLI
OL Its
.+ a
ZUNI �nvvAAWW�r���W WH N39
esc � e�.�.
'i !7w ya wzgi XL Noma 'iia riauvw S [SZT
-M
M.T a
Ain LLV S ONMIM ® 0 dO AID
r.xhibit
Milestones
1. INVOICES AND PAYMENT PROCESSING:
lea anent processing: The City review, inspection, and processing procedures for invoices
ordinarily require thirty (30) days after receipt of invoices, materials, or services. Proposals which
call for payment before thirty (30) days from receipt of invoice, or cash discounts given on such
payment, will be considered only if, in the opinion of the Purchasing Manager, the review,
inspection, and processing procedures can be completed as specified. It is the intention of the City
of Denton to make payment within thirty days after receipt of valid invoices for which items or
services have been received unless unusual circumstances arise. The 30 day processing period for
invoices will begin on the date the invoice is received or the date the items or services are received,
whichever is later.
Direct deposit for payments: Design -Builders are encouraged to arrange for receiving payments
through direct deposit. Information regarding direct deposit payments is available from the City of
Denton Purchasing website: www.dentoLigMhasin .coag.
Invoices:_ Invoices shall be sent directly to the City of Denton Accounts Payable Department, 215 E
McKinney St, Denton, TX, 762014299 with a copy to the attention of Vance Kemler, General
Manager, City of Denton Solid Waste Department, 1527 S. Mayhill Rd, Denton, TX 76208. The
copy may also be emailed to Vance Kemler at vance.kemlcrp itygfdenton.com. Invoices must be
fully documented as to labor, materials, and equipment provided, if applicable, and must
reference the City of Denton Purchase Order Number in order to be processed. No payments
shall be made on invoices not listing a Purchase Order Number. Invoices for partial payments
on construction projects should normally be presented for payment within the first five days of the
month, and submitted on the AIA Pay Application Form.
2. TAX EXEMPTION:
The City of Denton qualifies for sales tax exemption pursuant to the provisions of Article 20.04 (F)
of the Texas Limited Sales, Excise and Use Tax Act. Any Design -Builder performing work under
this contract for the City of Denton may purchase materials and supplies and rent or lease equipment
sales tax free. This is accomplished by issuing exemption certificates to suppliers. Certificates must
comply with State Comptroller's ruling #95-0.07 and #95-0.09.
3. PAYMENT APPLICATIONS AND PAYMENTS TO DESIGN -BUILDER FOR
CONSTRUCTION POSITION OF THE PROJECT:
A. Upon presentation of valid payment requests invoices, which should be within the first week of
each month, the Owner shall make partial payments to the Design -Builder for construction
accomplished during the preceding calendar month on the basis of completed construction
certified to by the Design -Builder and approved by the Owner and Independent
Architect/Engineer solely for the purposes of payment: Provided, however, that such approval
shall not be deemed approval of the workmanship or materials. Only ninety-five percent (95%)
of each payment request approved during the construction of the project shall be paid by the
Owner to the Design -Builder prior to completion of the project. Upon the approval by the
Owner of the Design -Builder's "Final Invoice for Payment" showing the total cost of the
construction performed, the Owner shall make payment to the Design -Builder of all amounts to
which the Design -Builder shall be entitled there under which shall not have been paid: Provided,
however, that such final payment shall be made not later than thirty (30) days after the date of
completion of construction of the project, as specified in the Final Invoice for Payment, unless
withheld because of the fault of the Design -Builder.
B. The Design -Builder shall be paid on the basis of the percentage of the work actually completed
for each construction item. The total amount paid for periodic billings shall not exceed the
maximum contract price for the construction of the project as set forth in the contract, unless
such excess shall have been approved by the Owner, and Owner's Representative, and in writing
by the Purchasing Agent as part of a change order.
C. No payment shall be due while the Design -Builder is in default in respect of any of the
provisions of this contract, and the Owner may withhold from the Design -Builder the amount of
any claim by any third party against either the Design -Builder or the Owner based upon an
alleged failure of the Design -Builder to perform the work hereunder in accordance with the
provisions of this contract. This includes alleged failure of the Design -Builder to make
payments to subcontractors.
E �-
Release of Liens and Certificate of Design -Builder shall be accomplished in accordance with Article
5.3 of the Standard Terms and Conditions for Building Construction.
5. PAYMENTS TO MATERIAL -MEN AND SUBCONTRACTORS:
The Design -Builder shall pay each materialman, and each subcontractor, if any, not later than five
(5) days after receipt of any payment from the Owner, the amount thereof allowed the Design -
Builder for and on account of materials furnished or construction performed by each materialman or
each subcontractor.
6. REMEDIES:
A. Completion of Design -Builder's Default
If default shall be made by the Design -Builder or by any subcontractor in the performance of any
of the terms of this proposal, the Owner, without in any manner limiting its legal and equitable
remedies in the circumstances, may serve upon the Design -Builder and the Surety or Sureties
upon the Design -Builder's bond or bonds a written notice requiring the Design -Builder to cause
such default to be corrected forthwith. Unless within twenty (20) days after the service of such
notice upon the Design -Builder such default shall be corrected or arrangements for the correction
thereof satisfactory to the Owner and/or Engineer shall be made by the Design -Builder or its
Surety or Sureties, the Owner may take over the construction of the project and prosecute the
same to completion by contract or otherwise for the account and at the expense of the Design -
Builder, and the Design -Builder and its Surety or Sureties shall be liable to the Owner for any
cost or expense in excess of the contract price occasioned thereby. In such event the Owner may
take possession of and utilize, in completing the construction of the project, any materials, tools,
supplies, appliances, and plant belonging to the Design -Builder or any of its subcontractors,
which may be situated at the site of the project. The Owner in such contingency may exercise
any rights, claims or demands which the Design -Builder may have against third persons in
connection with this contract and for such purpose the Design -Builder does hereby assign,
transfer and set oyer unto the Owner all such rights claims and demands.
B. Liquidated Damages
The time of the completion of construction of the project is of the essence of the contract.
Should the Design -Builder neglect, refuse or fail to complete the construction witl-in the time
herein agreed upon, after giving effect to extensions of time, if any, herein provided, then, in that
event and in view of the difficulty of estimating with exactness damages caused by such delay,
the Owner shall have the right to deduct from and retain out of such money which may be then
due or which may become due and payable to the Design -Builder the sum of FIVE LlLI DRE
DOLLARS 500.00 per day for each and every day, including weekends, that such
construction is delayed on its completion beyond the specified time, as liquidated damages and
not as a penalty; if the amount due and to become due from the Owner to the Design -Builder is
insufficient to pay in full any such liquidated damages, the Design -Builder shall pay to the
Owner the amount necessary to effect such payment in full: Provided, however, that the Owner
shall promptly notify the Design -Builder in writing of the manner in which the amount retained,
deducted or claimed as liquidated damages was computed.
C. Cumulative Remedies
Every right or remedy herein conferred upon or reserved to the Owner shall be cumulative, shall
be in addition to every right and remedy now or hereafter existing at law or in equity or by
statute, and the pursuit of any right or remedy shall not be construed as an election. Provided,
however, that the provisions of the REMEDIES SECTION shall be the exclusive measure of
damages for failure by the Design -Builder to complete the construction of the project within the
time herein agreed upon.
7. PAYMENTS TO THE DESIGN -BUILDER FOR THE DESIGN PORTION OF THE
CONTRACT:
7.1 DIRECT PERSONNEL EXPENSE
7.1.1 Direct Personnel Expense is defined as the direct salaries of the Design Professional's personnel
engaged on the Project and the portion of the cost of their mandatory and customary contributions
and benefits related thereto, such as employment taxes and other statutory employee benefits,
insurance, sick leave, holidays, vacations, pensions and similar contributions and benefits.
7.2 REIMBURSABLE EXPENSES
7.2.1 Reimbursable Expenses are in addition to compensation for Basic and Additional Services and
include expenses incurred by the Design Professional and Design Professional's employees and con-
sultants in the interest of the Project, as identified in the following Clauses.
7.2.1.1 Expense of transportation in connection with the Project; expenses in connection with
authorized out-of-town travel; long-distance communications; and fees paid for securing
approval of authorities having jurisdiction over the Project.
7.2.1.2 Expense of reproductions (except the reproduction of the sets of documents referenced
in Subsection 2.6.19), postage and handling of Drawings, Specifications and other documents.
7.2.1.3 If authorized in advance by the Owner, expense of overtime work requiring higher than
regular rates.
7.2.1.4 Expense of renderings, models andpock-ups requested by the Owner.
7.2.1.5 Expense of computer-aided design and drafting equipment time when used in
connection with the Project.
7.2.1.6 Other expenses that are approved in advance in writing by the Owner.
7.3 PAYMENTS ON ACCOUNT OF BASIC SERVICES
7.3.1 Payments for Basic Services shall be made monthly and, where applicable, shall be in
proportion to services performed within each phase of service, on the basis set forth in Exhibit A -
Contract Pricing Details and as further detailed in the Scope of Work and Schedule of Delivery of the
Agreement.
7.3.21f and to the extent that the time initially established in the Agreement is exceeded or extended
through no fault of the Design Professional, compensation for any services rendered during the
additional period of time shall be computed in the manner set forth in Exhibit A -Contract Pricing
Details and as further detailed in the. Scope of Work and Schedule of Delivery of the Agreement.
73.3 When compensation is based on a percentage of Construction Cost and any portions of the
Project are deleted or otherwise not constructed, compensation for those portions of the Project shall
be payable to the extent services are performed on those portions, in accordance with the schedule set
forth in Exhibit A -Contract Pricing Details and as further detailed in the Scope of Work and
Schedule of Delivery of the Agreement, based on (1) the lowest bona fide price or (2) if no such price
or proposal is received, the most recent preliminary estimate of Construction Cost or detailed estimate
of Construction Cost for such portions of the Project.
7.4 PAYMENTS ON ACCOUNT OF ADDITIONAL SERVICES
7.4.1 Payments on account of the Design Professional's Additional Services and for Reimbursable
Expenses shall be made monthly within 30 days after the presentation to the Owner of the Design
Professional's statement of services rendered or expenses incurred.
7.5 PAYMENTS WITHHELD No deductions shall be made from the Design Professional's com-
pensation on account of penalty, liquidated damages or other sums withheld from payments to
Design -Builders, or on account of the cost of changes in the work other than those for which the
Design Professional is responsible.
7.6 DESIGN PROFESSIONAL'S ACCOUNTING RECORDS Design Professional shall make
available to Owner or Owner's authorized representative records of Reimbursable Expenses and
expenses pertaining to Additional Services and services performed on the basis of a multiple of Direct
Personnel Expense for inspection and copying during regular business hours for three years after the
date of the final Certificate of Payment, or until any litigation related to the Project is final, whichever
date is later.
Terms u Conditions
and
Contractual geAuirements
for
• '
CITY OF DENTON GENERAL CONDITIONS FOR.
ARCHITECTURAL /ENGINEERING SERVICES ON
DESIGN -BUILD R CC'S
ARTICLE 1. ARCHITECT OR ENGINEER'S RESPONSIBILITIES
1.1 For the Design Portion of the Project, the Architect or Engineer's services consist of those services for
the Project (as defined in the agreement (the "Agreement") and proposal (the "Proposal") to which these
General Conditions are attached) performed by the Architect or Engineer (hereinafter called the "Design
Professional") or Design Professional's employees and consultants as enumerated in Articles 2 and 3 of
these General Conditions as modified by the Agreement and Proposal (the "Services").
1.2 The Design Professional will perform all Services as an independent Design -Builder to the prevailing
professional standards consistent with the level of care and skill ordinarily exercised by members of the
same profession currently practicing in the same locality under similar conditions, including reasonable,
informed judgments and prompt timely actions (the "Degree of Care"). The Services shall be performed as
expeditiously as is consistent with the Degree of Care necessary for the orderly progress of the Project.
Upon request of the Owner, the Design Professional shall submit for the Owner's approval a schedule for
the performance of the Services which may be adjusted as the Project proceeds, and shall include allow-
ances for periods of time required for the Owner's review and for approval of submissions by authorities
having jurisdiction over the Project. Time limits established by this schedule and approved by the Owner
shall not, except for reasonable cause, be exceeded by the Design Professional or Owner, and any
adjustments to this schedule shall be mutually acceptable to both parties.
ARTICLE 2 SCOPE OF BASIC SERVICES
2.1 BASIC SERVICES DEFINED The Design Professional's Basic Services consist of those described
in Sections 2.2 through 2.6 of these General Conditions and include without limitation normal structural,
civil, mechanical and electrical engineering services and any other engineering services necessary to
produce a complete and accurate set of Construction Documents, as described by and required in Section
2.4. The Basic Services may be modified by the Agreement.
2.2 SCHEMATIC DESIGN PHASE
2.2.1 The Design Professional, in consultation with the Owner, shall develop a written program for
the Project to ascertain Owner's needs and to establish the requirements for the Project.
2.2.2 The Design Professional shall provide a preliminary evaluation of the Owner's program,
construction schedule and construction budget requirements, each in terms of the other, subject to the
limitations set forth in Subsection 5.2.1.
2.2.3 The Design Professional shall review with the Owner alternative approaches to design and
construction of the Project.
2.2.4 Based on the mutually agreed-upon program, schedule and construction budget requirements,
the Design Professional shall prepare, for approval by the Owner, Schematic Design Documents
consisting of drawings and other documents illustrating the scale and relationship of Project
components. The Schematic Design shall contemplate compliance with all applicable laws, statutes,
ordinances, codes and regulations.
2.2.5 The Design Professional shall submit to the Owner a preliminary detailed estimate of
Construction Cost based on current area, volume or other unit costs and which indicates the cost of
each category of work involved in constructing the Project and establishes an elapsed time factor for
the period of time from the commencement to the completion of construction.
23 DESIGN DEVELOPMENT PHASE
23.1 Based on the approved Schematic Design Documents and any adjustments authorized by the
Owner in the program, schedule or construction budget, the Design Professional shall prepare for
approval by the Owner, Design Development Documents consisting of drawings and other
documents to fix and describe the size and character of the Project as to architectural, structural,
mechanical and electrical systems, materials and such other elements as may be appropriate, which
shall comply with all applicable laws, statutes, ordinances, codes and regulations. Notwithstanding
Owner's approval of the documents, Design Professional represents that the Documents and
specifications will be sufficient and adequate to fulfill the purposes of the Project.
2.3.2 The Design Professional shall advise the Owner of any adjustments to the preliminary estimate
of Construction Cost in a f rrther Detailed Statement as described in Section 2.2.5.
2.4 CONSTRUCTION DOCUMENTS PHASE
2.4.1 Based on the approved Design Development Documents and any further adjustments in the
scope or quality of the Project or in the construction budget authorized by the Owner, the Design
Professional shall prepare, for approval by the Owner, Construction Documents consisting of
Drawings and Specifications setting forth in detail requirements for the construction of the Project,
which shall comply with all applicable laws, statutes, ordinances, codes and regulations.
2.4.2 The Design -Builder shall ensure that any subcontractor pricing (bidding), if required for the
project, is accomplished in accordance with the requirements of Texas Government Code 2269.
2.4.3 The Design -Builder shall advise the Owner of any adjustments to previous preliminary
estimates of Construction Cost indicated by changes in requirements or general market conditions.
2.4.4 The Design -Builder shall assist the Owner in connection with the Owner's responsibility for
filing documents required for the approval of governmental authorities having jurisdiction over the
Project.
2.5 CONSTRUCTION CONTRACT PROCUREMENT
2.5.1 The Design -Builder, following the Owner's approval of the Construction Documents and of the
latest preliminary detailed estimate of Construction Cost, shall then, secure the resources necessary to
complete the construction of the project, in compliance with Texas Government Code 2269.
2.5.2 If the construction contract amount for the Project exceeds the total construction cost of the
Project as set forth in the approved Detailed Statement of Probable Construction Costs of the Project
submitted by the Design -Builder, then the Design -Builder, at its sole cost and expense, will revise the
Construction Documents as may be required by the Owner to reduce or modify the quantity or quality
of the work so that the total construction cost of the Project will not exceed the total construction cost
set forth in the approved Detailed Statement of Probable Construction Costs.
2.6 CONSTRUCTION PHASE - ADNIINISTRATION OF THE CONSTRUCTION CONTRACT
2.6.1 The Design -Builder's responsibility to provide Basic Services for the Construction Phase under
this Agreement commences with the award of the Contract and terminates at the issuance to the
Owner of the final Certificate for Payment, unless extended under the terms of Subsection 8.3.2.
2.6.2 The Design -Builder shall provide detailed administration of the Contract for Construction as set
forth below. For design professionals the administration shall also be in accordance with AIA
document A201, General Conditions of the Contract for Construction, current as of the date of the
Agreement as may be amended by the City of Denton special conditions, unless otherwise provided
in the Agreement. For engineers the administration shall also be in accordance with the Standard
Specifications for Public Works Construction by the North Central Texas Council of Governments,
current as of the date of the Agreement, unless otherwise provided in the Agreement.
2.6.3 Construction Phase duties, responsibilities and limitations of authority of the Design -Builder
shall not be restricted, modified or extended without written agreement of the Owner and Design
Professional.
2.6.4 The Design -Builder shall be a representative of and shall advise and consult with the Owner (1)
during construction, and (2) at the Owner's direction from time to time during the correction, or
warranty period described in the Contract for Construction. The Design -Builder shall have authority
to act on behalf of. the Owner only to the extent provided in the Agreement and these General
Conditions, unless otherwise modified by written instrument.
2.6.5 The Design -Builder shall observe the construction site at least one time a week, while
construction is in progress, and as reasonably necessary while construction is not in progress, to
become familiar with the progress and quality of the work completed and to determine if the work is
being performed in a manner indicating that the work when completed will be in accordance with the
Contract Documents. Design -Builder shall provide Owner a written report subsequent to each on-site
visit. On the basis of on-site observations the Design -Builder shall keep the Owner informed of the
progress and quality of the work, and shall exercise the Degree of Care and diligence in discovering
and promptly reporting to the Owner any observable defects or deficiencies in the work of Design -
Builder or any subcontractors. The Design -Builder represents that he will follow Degree of Care in
performing all Services under the Agreement. The Design -Builder shall promptly correct any
de%ctive designs or specifications furnished by the Design -Builder at no cost to the Owner. The
Owner's approval, acceptance, use of or payment for all or any part of the Design -Builder's Services
hereunder or of the Project itself shall in no way alter the Design -Builder's obligations or the Owner's
rights hereunder.
2.6.6 The Design -Builder shall have control over and charge of and shall be responsible for
construction means, methods, techniques, sequences or procedures, and for safety precautions and
programs in connection with the work. The Design -Builder shall be responsible for the Design -
Builder schedules or failure to carry out the work in accordance with the Contract Documents except
insofar as such failure may result from Design -Builders negligent acts or omissions. The Design -
Builder shall have control over or charge of acts or omissions of Design -Builder Subcontractors, or
their agents or employees, or of any other persons performing portions of the work.
2.6.7 The Design -Builder shall at all times have access to the work wherever it is in preparation or
progress.
2.6.8 Except as may otherwise be provided in the Contract Documents or when direct
communications have been specially authorized, the Owner and Design -Builder shall communicate
through any assigned Design Professional, and the Independent Architect or Engineer hired by the
Owner to review the Work, in compliance with Texas Government Code 2269. Communications by
and with the Design -Builder's consultants shall be through the Design -Builder.
2.69 Based on the Independent. Architect% or Engineer's observations: at the site of the work and
evaluations of the Design -Builder's Applications for Payment, the Independent Architect or Engineer
shall review and certify the amounts due the Design -Builder.
2.6.10 The Design -Builder's certification for payment shall constitute a representation to the Owner,
based on the Design -Builder's observations at the site as provided in Subsection 2.6.5 and on the data
comprising the Design -Builder's Application for Payment, that the work has progressed to the point
indicated and that the quality of the Work is in accordance with the Contract Documents. The fore-
going representations are subject to minor deviations from the Contract Documents correctable prior
to completion and to specific qualifications expressed by the Design -Builder. The issuance of a
Certificate for Payment shall further constitute a representation that the Design -Builder is entitled to
payment in the amount certified. The Application for Payment shall be reviewed and approved by
the Independent Architect or Engineer, prior to payment authorization by the Owner.
2.6.11 The Independent Architect or Engineer shall have the responsibility and authority to reject
work which does not conform to the Contract Documents. Whenever the Independent Architect or
Engineer considers it necessary or advisable for implementation of the intent of the Contract Docu-
ments, the Independent Architect or Engineer will have authority to require additional inspection or
testing of the work in accordance with the provisions of the Contract Documents, whether or not such
Work is fabricated, installed or completed. However, neither this authority of the Independent
Architect or Engineer nor a decision made in good faith either to exercise or not exercise such
authority shall give rise to a duty or responsibility of the Independent Architect or Engineer to the
Design-BuilderDesign-Builder, Subcontractors, material and equipment suppliers, their agents or
employees or other persons performing the construction portions of the work.
2.6.12 The Design -Builder, in coordination and agreement with the Independent Architect or
Engineer shall review and approve or take other appropriate action upon Design -Builder's submittals
such as Shop Drawings, Product Data and Samples for the purpose of (1) determining compliance
with applicable laws, statutes, ordinances and codes; and (2) determining whether or not the work,
when completed, will be in compliance with the requirements of the Contract Documents. The
Design -Builder shall act with such reasonable promptness to cause no delay in the work or in the con-
struction of the Owner or of separate Design -Builders, while allowing sufficient time in the Design -
Builder's professional judgment to permit adequate review. Review of such submittals is not
conducted for the purpose of determining the accuracy and completeness of other details such as
dimensions and quantities or for substantiating instructions for installation or performance of
equipment or systems designed by the Design -Builder, all of which remain the responsibility of the
Design -Builder to the extent required by the Contract Documents. The Design -Builder's review shall
constitute approval of safety precautions as specifically stated by the Design -Builder's, construction
means, methods, techniques, sequences or procedures. The Design -Builder's approval of a specific
item shall indicate approval of an assembly of which the item is a component. When professional
certification of performance characteristics of materials, systems or equipment is required by the
Contract Documents, the Design -Builder shall be entitled to rely upon such certification to establish
that the materials, systems or equipment will meet the performance criteria required by the Contract
Documents.
2.6.13 The Design -Builder shall prepare Change Orders and Construction Change Directives, with
supporting documentation and data if deemed necessary by the Design -Builder as provided in
Subsections 3.1.1 and 3.3.3, for the Owner's approval and execution in accordance with the Contract
Documents, and may authorize minor changes in the work not involving an adjustment in the
Contract Sum or an extension of the Contract Time which are not inconsistent with the intent of the
Contract Documents.
2.6.14 On behalf of the Owner, the Independent Architect or Engineer shall conduct inspections to
determine the dates of Substantial Completion and Final Completion, and if requested by the Owner,
the Design -Builder shall issue Certificates of Substantial and Final Completion. The Design -Builder
will receive and review written guarantees and related documents required by the Contract for
Construction to be assembled by the Design -Builder and shall issue a final certificate for Payment
upon compliance with the requirements of the Contract Documents.
2.6.15 The Design -Builder shall interpret and provide recommendations on matters concerning
performance under the requirements of the Contract Documents on written request of either the
Owner or the Independent Architect/Engineer. The Design -Builder's response to such requests shall
be made with reasonable promptness and within any time limits agreed upon.
2.6.16 Interpretations and decisions of the Design -Builder shall be consistent with the intent of and
reasonably inferable from the Contract Documents and shall be in writing or in the form of drawings.
When making such interpretations and initial decisions, the Design -Builder shall endeavor to secure
faithful performance Design -Builder of the Contract, and shall not be liable for results or interpre-
tations or decisions so rendered in good faith in accordance with all the provisions of this Agreement
and in the absence of negligence.
2.6.17 The Independent Architect or Engineer shall render written decisions within a reasonable time
on all claims, disputes or other matters in question between the Owner and Design -Builder relating to
the execution or progress of the work as provided in the Contract Documents.
2.6.18 The Design -Builder (1) shall render services under the Agreement in accordance with the
Degree of Care; (2) will reimburse the Owner for all damages caused by the defective designs the
Design -Builder prepares; and (3) by acknowledging payment by the Owner of any fees due, shall not
be released from any rights the Owner may have under the agreement or diminish any of the Design -
Builder's obligations thereunder.
2.6.19 The Design -Builder shall provide the Owner with four sets of reproducible prints showing all
significant changes to the Construction Documents during the Construction Phase.
ARTICLE 3 ADDITIONAL SERVICES
3.1 GENERAL
3.1.1 The services described in this Article 3 are not included in Basic Services unless so identified in
the Agreement or Proposal, and they shall be paid for by the Owner as provided in the Agreement, in
addition to the compensation for Basic Services. The services described under Sections 3.2 and 3.4
shall only be provided if authorized or consumed in writing by the Owner. If services described
under Contingent Additional Services in Section 3.3 are required due to circumstances beyond the
Design -Builder's control, the Design -Builder shall notify the Owner in writing and shall not
commence such additional services until it receives written approval from the Owner to proceed. If
the Owner indicates in writing that all or part of such Contingent Additional Services are not
required, the Design -Builder shall have no obligation to provide those services. Owner will be
responsible for compensating the Design -Builder for Contingent Additional Services only if they are
not required due to the negligence or fault of Design -Builder.
3.2 PROJECT REPRESENTATION BEYOND BASIC SERVICES
3.2.1 If more extensive representation at the site than is described in Subsection 2.6.5 is required, the
Design -Builder shall provide one or more Project Representatives to assist in carrying out such
additional on-site responsibilities.
3.2.2 Project Representatives shall be selected, employed and directed by the Design -Builder; and the
Design -Builder shall be compensated therefor as agreed by the Owner and Design -Builder.
33 CONTINGENT ADDITIONAL SERVICES
3.3.1 Making material revisions in Drawings, Specifications or other documents when such revisions
are:
1. Inconsistent with approvals or instructions previously given by the Owner, including
revisions made necessary by adjustments in the Owner's program or Project budget;
2. Required by the enactment or revision of codes, laws or regulations subsequent to the
preparation of such documents, or
3. Due to changes required as a result of the Owner's failure to render decision in a
timely manner.
33.2 Providing services required because of significant changes in the Project including, but not
limited to, size, quality, complexity, or the Owner`s schedule, except for services required under
Subsection 2.5.2.
33.3 Preparing Drawings, Specifications and other documentation and supporting data, and
providing other services in connection with Change Orders and Construction Change Directives.
3.3.4 Providing consultation concerning replacement of work damaged by fire or other cause during
construction, and furnishing services required in connection with the replacement of such work.
33.5 Providing services made necessary by the default of the Design -Builder, by major defects or
deficiencies in the work of the Design -Builder, or by failure of performance of either the Owner or
Design -Builder under the Contract for Construction.
3.3.6 Providing services in evaluating an extensive number of claims submitted by the Design -
Builder or others in connection with the work.
3.3.7 Providing services in connection with a public hearing, arbitration proceeding or legal
proceeding except where the Design -Builder is party thereto.
3.3.8
3.3.9 Notwithstanding anything contained in the Agreement, Proposal or these General Conditions to
the contrary, all services described in this Article 3 that are caused or necessitated in whole or in part
due to the negligent act or omission of the, Design -Builder shall be performed by. the Design -Builder
as a part of the Basic Services under the Agreement with no additional compensation above and
beyond the compensation due the Design -Builder for the Basic Services. The intervening or
concurrent negligence of the Owner shall not limit the Design -Builder's obligations under this
Subsection 3.3.9.
3.4 OPTIONAL ADDITIONAL SERVICES
3.4.1 Providing financial feasibility or other special studies.
3.4.2 Providing planning surveys, site evaluations or comparative studies of prospective sites.
3.4.3 Providing special surveys, environmental studies and submissions required for approvals of
governmental authorities or others having jurisdiction over the Project.
3.4.4 Providing services relative to future facilities, systems and equipment.
3.4.5 Providing services to investigate existing conditions or facilities or to make measured drawings
thereof.
3.4.6 Providing services to verify the accuracy of drawings or other information furnished by the
Owner.
3.4.7 Providing coordination of construction performed by separate Design -Builders or by the
Owner's own forces and coordination of services required in connection with construction performed
and equipment supplied by the Owner.
3.4.8 Providing detailed quantity surveys.or inventories of material, equipment and labor.
3.4.9 Providing analyses of operating and maintenance costs.
3.4.10 Making investigations, inventories of materials or equipment, or valuations and detailed
appraisals of existing facilities.
3.4.12 Providing assistance in the utilization of equipment or systems such as testing, adjusting and
balancing, preparation of operation and maintenance manuals, training personnel for operation and
maintenance and consultation during operation.
3.4.13 Providing interior design and similar services required for or in connection with the selection,
procurement or installation of furniture, furnishings and related equipment.
3.4.14 Providing services other than as provided in Section 2.6.4, after issuance to the Owner of the
final Certificate for Payment and expiration of the Warranty period of the Contract for Construction.
3.4.15 Providing services of consultants for other than architectural, civil, structural, mechanical and
electrical engineering portions of the Project provided as a part of Basic Services.
3.4.16 Providing any other services not otherwise included in this Agreement or not customarily
furnished in accordance with generally accepted architectural practice.
3.4.17 Preparing a set of reproducible- record drawings -in addition to those required by Subsection
2.6.19, showing significant changes in the work made during construction based on marked -up prints,
drawings and other data furnished by the Design -Builder to the Design -Builder.
3.4.18 Notwithstanding anything contained in the Agreement, Proposal or these General
Conditions to the contrary, all services described in this Article 3 that are caused or necessitated in
whole or in part due to the negligent act or omission of the Design -Builder shall be performed by the
Design -Builder as a part of the Basic Services under the Agreement with no additional compensation
above and beyond the compensation due the Design -Builder for the Basic Services. The intervening
or concurrent negligence of the Owner shall not limit the Design -Builder's obligations under this
Subsection 3.4.18.
ARTICLE 4 OWNER'S RESPONSIBILITIES
4.1 The Owner shall consult with the Design -Builder regarding requirements for the Project,
including (1) the Owner's objectives, (2) schedule and design constraints and criteria, including space
requirements and relationships, flexibility, expendability, special equipment, systems and site
requirements, as more specifically described in Subsection 2.2.1.
4.2 The Owner shall establish and update an overall budget for the Project, including the Design Cost,
the Construction Cost, the Owner's other costs and reasonable contingencies related to all of these
costs.
4.3 If requested by the Design -Builder, the Owner shall furnish evidence that financial arrangements
have been made to fulfill the Owner's obligations under this Agreement.
4.4 The Owner shall designate a representative authorized to act on the Owner's behalf with respect to
the Project (Independent Architect or Engineer). The Owner or such authorized representative shall
render decisions in a timely manner pertaining to documents submitted by the Design -Builder in
order to avoid unreasonable delay in the orderly and sequential progress of the Design -Builder's
services.
4.5 Where applicable, the Owner shall furnish surveys describing physical characteristics, legal
limitations and utility locations for the site of the Project, and a written legal description of the site.
The surveys and legal information shall include, as applicable, grades and lines of streets, alleys,
pavements and adjoining property and structures; adjacent drainage; rights -0f --way, restrictions, ease-
ments, encroachments, zoning, deed restrictions, boundaries and contours of the site; locations,
dimensions and necessary data pertaining to existing buildings, other improvements and trees; and
information concerning available utility services and lines, both public and private, above and below
grade, including inverts and depths. All the information on the survey shall be referenced to a project
benchmark.
4.6 Where applicable, the Owner shall furnish the services of geotechnical engineers when such
services are requested by the Design -Builder. Such services may include but are not limited to test
borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous
materials, ground corrosion and resistivity tests, including necessary operations for anticipating
sub -soil conditions, with reports and appropriate professional recommendations.
4.6.1 The Owner shall furnish the services of other consultants when such services are reasonably
required by the scope of the Project, and are requested by the Design -Builder and. are not retained by
the Design -Builder as part of its Basic Services or Additional Services.
4.7 When not a part of the Additional Services, the Owner shall furnish structural, mechanical,
chemical, air and water pollution tests, tests of hazardous materials, and other laboratory and
environmental tests, inspections and reports required by law or the Contract Documents.
4.8 The Owner shall furnish all legal, accounting and insurance counseling services as may be
necessary at any time for the Project, including auditing services the Owner may require to verify the
Design -Builder's Applications for Payment or to ascertain how or for what purposes the Design -
Builder has used the money paid by or on behalf of the Owner.
4.9 The services, information, surveys and reports required by Owner under Sections 4.5 through 4.8
shall be furnished at the Owner's expense, and the Design -Builder shall be entitled to rely upon the
accuracy and completeness thereof in the absence of any negligence on the part of the Design -
Builder.
4.10 The Owner shall give prompt written notice to the Design -Builder if the Owner becomes aware
of any fault or defect in the Project or nonconformance with the Contract Documents.
4.11 Design -Builder shall propose language for certificates or certifications to be requested of the
Design -Builder or Design -Builder's consultants and shall submit such to the Owner for review and
approval at least fourteen (14) days prior to execution. The Owner agrees not to request certifications
that would require knowledge or services beyond the scope of the Agreement.
ARTICLE 5 CONSTRUCTION COST
5.1 CONSTRUCTION COST DEFINED
5.1.1 The Construction Cost shall be the total cost or estimated cost to the Owner of all elements of
the Construction of the Project designed or specified by the Design -Builder.
5.1.2 The Construction Cost shall include the cost at current market rates of labor and materials
furnished by the Owner and equipment designed, specified, selected or specially provided for by the
Design -Builder. In addition, a reasonable allowance for contingencies shall be included for market
conditions at the time of award and for changes in the work during construction.
5.13 Project Construction Cost does not include the compensation of the Design -Builder, for the
Design Portion of the Contract, the costs of the land, rights-of-way, financing or other costs which are
the responsibility of the Owner as provided in Article 4.
5.2 RESPONSIBILITY FOR CONSTRUCTION COST
5.2.1 Evaluations of the Owner's Project budget, preliminary estimates of Design and Construction
Cost and detailed estimates of Construction Cost prepared by the Design Professional represent the
Design Professional's best judgment as a design professional familiar with the construction industry.
It is recognized, however, that the Design -Builder has agreed to a firm -fixed cost for the Design
Portion of the Project and the Construction of the Project.
5.2.2 A fixed limit or amount of Construction Cost shall be established by the Design -Builder as a
condition of the Agreement by the furnishing, proposal or establishment of a Project cost. If such a
fixed cost has been established, the Design -Builder shall be permitted to include contingencies for
design, bidding and price escalation, to determine what materials, equipment, component systems and
types of construction are to be included in the Contract Documents, to make reasonable adjustments
in the scope of the Project and to include in the Contract Documents alternate bids to adjust the
Construction Cost to the fixed limit. Fixed limits, if any, shall be increased in the amount of an
increase in the Contract Sum occurring after execution of the Contract for Design -Build.
5.2.3 The Design -Builder shall submitted the final specifications, plans, and drawings (Construction
Documents) to the Owner for final approval, prior to commencement of Construction. The Owner
shall have thirty (30) days to review the Construction Documents. The Owner may 'request
modifications to the Construction Documents. If the Construction Phase portion of the Project has not
commenced within 90 days after the Design -Builder submits the Construction Documents to the
Owner, any Project budget or fixed limit of Construction Cost shall be adjusted to reflect changes in
the general level of prices in the construction industry between the date of submission of the
Construction Documents to the Owner and the date on which Construction has initiated.
ARTICLE 6 OWNERSHIP AND USE OF DOCUMENTS
6.1 The Drawings, Specifications and other documents prepared by the Design Professional for this
Project are instruments of the Design -Builder's service and shall become the property of the Owner
upon payment in full for all Work performed under the Contract Documents. The Design -Builder
transfers to Owner all ownership and property interests, including but not limited to any intellectual
property rights, copyrights and/or patents, in the Work Product. Such transfer is conditioned on
Owner's express understanding that its alteration of the Work Product without the involvement of
Design -Builder is at Owner's sole risk and without liability or legal exposure to Design -Builder or
anyone working by or through Design -Builder, including Design Consultants of any tier. The Design -
Builder is entitled to retain copies of all such documents. Such documents are intended only be
applicable to this Project, and'Owner's use of such documents in other projects shall be at Owner's
sole risk and expense. In the event the Owner uses any of the information or materials developed
pursuant to the Agreement in another project or for other purposes than are specified in the
Agreement, the Design Professional is released from any and all liability relating to their use in that
project.
6.2 Submission or distribution of documents to meet official regulatory requirements or for similar
purposes in connection with the Project is not to beconstrued as publication in derogation of the
Design -Builder's reserved rights.
6.3 Owner's Limited License upon Owner's Termination for Convenience or Design -
Builder's Election to Terminate. if Owner terminates this Agreement for its convenience, or if
Design -Builder elects to terminate this Agreement, Design -Builder shall, upon Owner's payment
in fall of lite amouna due Design -Builder under the Contract Documents for the Design
portion of the project only, grant Owner a limited license to use the Work Product to complete the
Project and subsequently occupy the Project, and Owner shall thereafter have the same rights as
set forth in Section 6.1 above, conditioned on the following:
6.3.1 Use of the Work Product is at Owner's sole risk without liability or legal exposure to
Design -Builder; and
6.4 Owner's Limited License upon Design -Builder's Default. If this Agreement is terminated
due to Design -Builder's default of the General Conditions of Contract, then Design -Builder grants
Owner a limited license to use the Work Product to complete the Project and subsequently occupy
the Project, and Owner shall thereafter have the same rights and obligations as set forth in Section
6.1 above. Notwithstanding the preceding sentence, if it is ultimately determined that Design -
Builder was not in default, Owner shall be deemed to have terminated the Agreement for
convenience, and Design -Builder shall be entitled to the rights and remedies set forth in Section
6.3 above.
ARTICLE 7 TERMINATION, SUSPENSION OR ABANDONMENT
7.1 The Design -Builder may terminate the Agreement upon not less than thirty days written notice
should the Owner fail substantially to perform in accordance with the terms of the Agreement through
no fault of the Design -Builder. Owner may terminate the Agreement or any phase thereof with or
without cause upon thirty (30) days prior written notice to the Design -Builder. All work and labor
being performed under the Agreement shall cease immediately upon Design -Builder's receipt of such
notice. Before the end of the thirty (30) day period, Design -Builder shall invoice the Owner for all
work it satisfactorily performed prior to the receipt of such notice. No amount shall be due for lost or
anticipated profits. All plans, field surveys, and other data related to the Project shall become
property of the Owner upon termination of the Agreement and shall be promptly delivered to the
Owner in a reasonably organized form. Should Owner subsequently contract with a new Design -
Builder for continuation of services on the Project, Design -Builder shall cooperate in providing
information.
7.2 If the Project is suspended by the Owner for more than 30 consecutive days, the Design -Builder
shall be compensated for services satisfactorily performed prior to notice of such suspension. When
the Project is resumed, the Design -Builder's compensation shall be equitably adjusted to provide for
expenses incurred in the interruption and resumption of the Design -Builder's services.
7.3 The Agreement may be terminated by the Owner upon not less than seven days written notice to
the Design -Builder in the event that the Project is permanently abandoned. If the Project is
abandoned by the Owner for more than 90 consecutive days, the Design -Builder or the Owner may
terminate the Agreement by giving written notice.
7.4 Failure of the Owner to make payments to the Design -Builder for work satisfactorily completed
in accordance with the Agreement shall be considered substantial nonperformance and cause for
termination.
7.5 If the Owner fails to make payment to Design -Builder within thirty (30) days of receipt of a
statement for services properly and satisfactorily performed, the Design -Builder may, upon seven
days written notice to the Owner, suspend performance of services under the Agreement.
7.6 In the event of termination not the fault of the Design -Builder, the Design -Builder shall be
compensated for services properly and satisfactorily performed prior to termination.
ARTICLE 8 INDEMNITY
8.1 The Design -Builder shall indemnify -.and save and hold harmless the Owner and its officers,
agents, and employees from and against any and all liability, claims, demands, damages, losses,
and expenses, including, but not limited to court costs and reasonable attorney fees incurred by
the Owner, and including, without limitation, damages for bodily and personal injury, death and
property damage, resulting from the negligent acts or omissions of the Design -Builder or its
officers, shareholders, agents, or employees in the performance of the Agreement.
8.2 Nothing herein shall be construed to create a liability to any person who is not a party to the
Agreement, and nothing herein shall waive any of the parties' defenses, both at law or equity, to
any claim, cause of action, or litigation filed by anyone not a party to the Agreement, including
the defense of governmental immunity, which defenses are hereby expressly reserved.
ARTICLE 9 INSURANCE During the performance of the Services under the Agreement, Design -
Builder shall maintain the following insurance with an insurance company licensed or authorized to do
business in the State of Texas by the State Insurance Commission or any successor agency that has a
rating with Best Rate Carriers of at least an A+ or above:
9.1 Comprehensive General Liability Insurance with bodily injury limits of not less than
$1,000,000 for each occurrence and not less than $2,000,000 in the aggregate, and with property
damage limits of not less than $100,000 for each occurrence and not less than $250,000 in the
aggregate.
9.2 Automobile Liability Insurance with bodily injury limits of not less than $500,000 for each
person and not less than $500,000 for each accident, and with property damage limits of not less
than $100,000 for each accident.
9.3 Worker's Compensation Insurance in accordance with statutory requirements, and
Employers' Liability Insurance with limits of not less than $100,000 for each accident including
occupational disease.
9.4 Professional Liability Insurance with limits of not less than $1,000,000 annual aggregate.
9.5 The Design -Builder shall furnish insurance certificates or insurance policies to the Owner
evidencing insurance in compliance with this Article 10 at the time of the execution of the
Agreement. The General Liability and Automobile Liability insurance policies shall name the
Owner as an additional insured, the Workers' Compensation policy shall contain a waiver of
subrogation in favor of the Owner, and each policy shall contain a provision that such insurance
shall not be canceled or modified without thirty (30) days' prior written notice to Owner and
Design -Builder. In such event, the Design -Builder shall, prior to the effective date of the change
or cancellation, furnish Owner with substitute certificates of insurance meeting the requirements
of this Article 10.
ARTICLE 10 MISCELLANEOUS PROVISIONS
10.1 The Agreement shall be governed by the laws of the State of Texas. Venue of any suit or cause
of action under the Agreement shall lie exclusively in Denton County, Texas.
10.2 The Owner and Design -Builder, respectively, bind themselves, their partners, successors, assigns
and legal representatives to the other party to this Agreement and to the partners, successors, assigns
and legal representatives of such other party with respect to all covenants of this Agreement. The
Design -Builder shall not assign its interests in the Agreement -without the. written oonsent of the
Owner.
10.3 The term Agreement as used herein includes the executed Agreement, the Proposal, these
General Conditions and other attachments referenced in Section 3 of the Agreement which together
represent the entire and integrated agreement between the Owner and Design -Builder and supersedes
all prior negotiations, representations or agreements, either written or oral. The Agreement may be
amended only by written instrument signed by both Owner and Design -Builder. When interpreting
the Agreement the executed Agreement, Proposal, these General Conditions and the other
attachments referenced in Section 3 of the Agreement shall to the extent that is reasonably possible be
read so as to harmonize the provisions. However, should the provisions of these documents be in
conflict so that they cannot be reasonably harmonized, such documents shall be given priority in the
following order:
1. The executed Agreement
2. Attachments referenced in Section 3 of the Agreement other than the Proposal
3. These General Provisions
4. The Proposal
10.4 Nothing contained in the Agreement shall create a contractual relationship with or a cause of
action in favor of a third party against either the Owner or Design -Builder.
10.5 Upon receipt of prior written approval of Owner, the Design -Builder shall have the right to
include representations of the design of the Project, including photographs of the exterior and interior,
among the Design -Builder's promotional and professional materials. The Design Professional's
materials shall not include the Owner's confidential or proprietary information if the Owner has
previously advised the Design -Builder in writing of the specific information considered by the Owner
to be confidential or proprietary. The Owner shall provide professional credit for the Design -Builder
on the construction sign and in the promotional materials for the Project.
10.6 Approval by the Owner shall not constitute, nor be deemed a release of the responsibility and
liability of 'the Design -Builder, its 'employees, associates, agents, subcontractors, and sub -
consultants for the accuracy and competency of their designs or other work; nor shall such
approval be deemed to be an assumption of such responsibility by the Owner for any defect in the
design or other work prepared by the Design -Builder, its employees, subcontractors, agents, and
consultants.
10.7 All notices, communications, and reports required or permitted under the Agreement shall be
personally delivered or mailed to the respective parties by depositing same in the United States
mail to the address shown below signature block on the Agreement, certified mail, return receipt
requested, unless otherwise specified herein. All notices shall be deemed effective upon receipt by
the party to whom such notice is given, or within three (3) days after mailing.
10.8 If any provision of the Agreement is found or deemed by a court of competent jurisdiction to
be invalid or unenforceable, it shall be considered severable from the remainder of the Agreement
and shall not cause the remainder to be invalid or unenforceable. In such event, the parties shall
reform the Agreement to replace such stricken provision with a valid and enforceable provision
which comes as close as possible to expressing the intention of the stricken provision.
10.9 The Design -Builder shall comply with all federal, state, and local laws, rules, regulations, and
ordinances,. applicable to the work, covered hereunder as they -may now -read or hereinafter be
amended during the term of this Agreement.
10.10 In performing the Services required hereunder, the Design -Builder shall not discriminate
against any person on the basis of race, color, religion, sex, national origin or ancestry, age, or
physical handicap.
10.11 The captions of the Agreement are for informational purposes only, and shall not in any way
affect the substantive terms or conditions of the Agreement.
CITY OF DENTON GENERAL CONDITIONS FOR
BUILDING CONSTRUCTION FOR DESIGN BUIL
PROJECTS
ARTICLE 1 GENERAL PROVISIONS
GENERAL DEFINITIONS
1.1 The following definitions apply throughout these General Conditions and to the other
Contract Documents:
a) THE CONTRACT DOCUMENTS
The Contract Documents consist of the formal Design -Build Agreement between the Owner and
the Design -Builder, these General Conditions and other supplementary conditions included by
special provisions or addenda, drawings, specifications, addenda issued prior to execution of the
Contract, other documents listed in the Contract, and Amendments issued after execution of the
Contract. For purposes of these General Conditions, an Amendment is:
(1) a written Supplemental Agreement to the Contract signed by authorized representatives of
both parties;
(2) a Change Order, including Change Orders signed only by the Owner as described in
Subparagraph 7.1(b) and Subparagraph 7.1(e); or
(3) a written order for a minor change in the Work issued by the Independent Architect/Engineer
as described in Paragraph 7.3.
The Contract Documents also include solicitation documents such as the Owner's Instructions to
Bidders, sample forms, the Design -Builder's Proposal and portions of addenda relating to any of
these documents, and any other documents, exhibits or attachments specifically enumerated in
the Design -Build Agreement, but specifically exclude geotechnical and subsurface reports that
the Owner may have provided to the Design -Builder.
b) THE CONTRACT
The Contract Documents, as defined in Paragraph 1. 1, are expressly incorporated into and made
a part of the formal Design -Build Agreement between the Owner and the Design -Builder by
reference in this Paragraph and Paragraph 1.1 (which documents are. sometimes also -referred to
collectively in these General Conditions as the "Contract"). The Contract Documents represent
the entire and integrated agreement between the Owner and the Design -Builder and supersede all
prior negotiations, representations or agreements, either written or oral. The terms and conditions
of the Contract Documents may be changed only by an Amendment. The Contract Documents
shall not be construed to create a contractual relationship of any kind:
(1) Independent Architect/Engineer;
(2) between the Owner and a Subcontractor or Sub -subcontractor; or
(3) between any persons or entities other than the Owner and Design -Builder.
The Independent Architect shall, however, be entitled to performance and enforcement of
obligations under the Contract Documents intended to facilitate performance of the Independent
Architect/Engineer's duties.
c) THE WORK
The term "Work" means the construction and services required by the Contract Documents,
whether completed or partially completed, and includes all labor, materials, equipment, and
services provided or to be provided by the Design -Builder, or any Subcontractors, Sub -
subcontractors, material suppliers, or any other entity for whom the Design -Builder is
responsible, to fulfill the Design -Builder's obligations. The Work may constitute the whole or a
part of the Project.
d) THE PROJECT
The Project is the total construction more particularly described in the Design -Build Contract, of
which the Work performed under the Contract Documents may be the whole or a part of the
Project and which may include construction Design -Builder. All references in these General
Conditions to or concerning the Work or the site of the Work will use the term "Project,"
notwithstanding that the Work may only be a part of the Project.
e) THE DRAWINGS
The Drawings (also known as the "Plans") are the graphic and pictorial portions of the Contract
Documents, wherever located and whenever issued, showing the design, location and dimensions
of the Work, generally including plans, elevations, sections, details, schedules, and diagrams.
fl THE SPECIFICATIONS
The Specifications are that portion of the Contract Documents consisting of the written
requirements for materials, equipment, construction systems, standards, and workmanship for the
Work, performance of related services, and other technical requirements.
g) THE PROJECT MANUAL
The Project Manual is the volume or volumes which contain the, sample forms, General
Conditions for Building Construction, special provisions, and Specifications. The Project Manual
may be modified by written addendums issued by the Owner, in which case the written
addendums become a part of the Project Manual upon their issuance, unless otherwise indicated
by the Owner in writing.
h) ALTERNATE
An Alternate is a variation in the Work on which the Owner requires a price separate from the
City Building General Conditions Base Proposal. If an Alternate is accepted by the Owner, the
variation will become a part of the Contract through the execution of a change order or
amendment to the Contract and the Base Proposal will be adjusted to include the amount quoted.
If an alternate is accepted by the Owner, and later deleted prior to any Work under the alternate
being performed or materials delivered to the Project site, the Owner will be entitled to a credit
in the full value of the alternate as priced in the Design -Builder's Proposal.
i) BASE Proposal
The Base Proposal is the price quoted for the Work before Alternates are considered.
j) HAZARDOUS SUBSTANCE
The term Hazardous Substance is defined to include the following:
(1) any asbestos or any material which contains any hydrated mineral silicate, including
chrysolite, amosite, crocidolite, tremolite, anthophylite or actinolite, whether friable or non -
friable;
(2) any polychlorinated biphenyls ("PCBs"), or PCB -containing materials, or fluids;
(3) radon;
(4) any other hazardous, radioactive, toxic or noxious substance, material, pollutant, or solid,
liquid or gaseous waste;
(5) any pollutant or contaminant (including but not limited to petroleum, petroleum
hydrocarbons, petroleum products, crude oil or any fractions thereof, any oil or gas
exploration or production waste, any natural gas, synthetic gas or any mixture thereof, lead,
or other toxic metals) which in its condition, concentration or area of release could have a
significant effect'on human health, the environment, or natural resources;
(6) any substance that, whether by its nature or its use, is subject to regulation or requires
environmental investigation, monitoring, or remediation under any federal, state, or local
environmental laws, rules, or regulations;
(7) any underground storage tanks, as defined in 42 U.S.C. Section 6991(1)(A)(I) (including
those defined by Section 9001 (1) of the 1984 Hazardous and Solid Waste Amendments to the
Resource Conservation and Recovery Act, 42 U.S.C. Section 6901 et seq.; the Texas,Water
Code Annotated Section 26.344; and Title 30 of the Texas Administrative Code Sections
334.3 and 334.4), whether empty, filled or partially filled with any substance; and
(8) any other hazardous material, hazardous waste, hazardous substance, solid waste, and toxic
substance as those or similar terms are defined under any federal, state, or local
environmental laws, rules, or regulations.
k) OTHER DEFINITIONS
As used in the Contract Documents, the following additional terms have the following meanings:
(1) "provide" means to furnish; install, fabricate, deliver and erect, including all services,
materials, appurtenances and other expenses to complete in place, ready for operation or use;
(2) "shall" means the action of the party to which reference is being made is mandatory;
(3) "as required" means as prescribed in the Contract Documents; and
(4) "as necessary" means all action essential or needed to complete the work in accordance with
the Contract Documents and applicable laws, ordinances, construction codes, and
regulations.
1.2 EXECUTION, CORRELATION AND INTENT
(a) The Design -Build Agreement shall be signed by duly authorized representatives of the Owner
and Design -Builder as provided in the Agreement.
(b) Execution of the Design -Build Agreement by the Design -Builder is a representation that the
Design -Builder has visited the site, become familiar with local conditions, including subsurface
conditions as described and identified in the Geotechnical Report, under which the Work is to be
performed and correlated personal observations with requirements of the Contract Documents.
(c) The intent of the Contract Documents is to include all items necessary for the proper execution
and completion of the Work by the Design -Builder. The Contract Documents are
complementary, and what is required by one shall be as binding as if required by all;
performance by the Design -Builder shall be required only to the extent consistent with the
Contract Documents and reasonably inferable from them as being necessary to produce the
intended results.
(d) Organization of the Specifications into divisions, sections, and articles, and arrangement of
Drawings shall not control the Design -Builder in dividing the Work among Subcontractors or in
establishing the extent of Work to be performed by any trade.
(e) Unless otherwise stated in the Contract Documents, words which have well-known technical or
construction industry meanings are used in the Contract Documents in accordance with such
recognized meanings.
(f) The Drawings and Specifications are intended to agree with one another, and Work called for by
Drawings and not mentioned in Specifications, or vice versa, shall be furnished as if set forth by
both. Specifications shall govern materials, methods and quality of work. In the event of a
conflict on the Drawings between scale and dimension, figured dimensions shall govern over
scale dimensions and large scale drawings shall govern over small scale drawings. Conflict
between two or more dimensions applying to a common point shall be referred to the
Independent Architect/Engineer for final adjustment. If discrepancies or conflicts occur within or
between the Drawings and Specifications regarding the Work, or within or between other
Contract Documents, the Design -Builder shall not perform such Work without having obtained a
clarification from the Architect/Engineer and resolution by the Owner. The Owner's decision as
to the appropriate resolution of a conflict or discrepancy shall be final. Should the Drawings or
the Specifications disagree within themselves or with each other; the Base Bid will be based on
the most expensive combination of quality and quantity of Work indicated.
(g) Deviations from Contract Documents shall be made only after written approval is. obtained
from Independent Architect/Engineer and Owner, as provided in Article 7.
(h) The intention of the Contract Documents is to include all materials, labor, tools, equipment,
utilities, appliances, accessories, services, transportation, and supervision required to
completely perform the fabrication, erection and execution of the Work in its final position.
(i) The most recently issued Drawing or Specification takes precedence over previous issues of
the same Drawing or Specification. In the event of a conflict, the order of precedence of
interpretation of the Contract Documents is as follows:
(1) Amendments (see Paragraph 7.2 for order of precedence between Amendments);
(2) the Design -Build Agreement;
(3) addenda, with those addenda of later date having precedence over those of an earlier date;
(4) the Supplementary General Conditions and Special Provisions, if any;
(5) the General Conditions for Building Construction;
(6) the Specifications and Drawings.
1.3 OWNERSHIP AND USE OF DESIGN BUILDER'S DRAWINGS, SPECIFICATIONS AND
OTHER DOCUMENTS
All Drawings, Specifications, and copies thereof furnished by the Design -Builder are and shall
remain the property of the Owner and are, with the exception of the Contract set for each party, to be
returned to the Owner upon request at the completion of the Work.
1.4 CAPITALIZATION
Terms capitalized in these General Conditions include those which are:
(1) specifically defined in these General Conditions (except the terms defined in Subparagraph
1.16), which terms are of common grammatical usage and are not normally capitalized);
(2) the titles of numbered articles and identified references to Paragraphs, Subparagraphs, and
Clauses;
(3) the titles of other documents published or used by the Owner as manuals or official policy
statements; or
(4) proper nouns or other words required under standard grammatical rules to be capitalized.
ARTICLE 2 THE OWNER
2.1 DEFINITION OF OWNER
The Owner is the City of Denton, a Texas municipal corporation, and is identified as such in the
Design -Build Agreement, and is referred to throughout the Contract Documents as if singular in
number. The term "Owner" means the Owner or the Owner's authorized representatives.
2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER
(a) The Owner shall furnish the most recent survey describing the physical characteristics, legal
limits, utility locations, and a permanent benchmark for the site of the Project. The Owner shall
also fitrnish any environmental site assessments that may have been given to the Owner or
conducted for the property upon which the Project is to be constructed. THIS INFORMATION
IS FURNISHED TO THE DESIGN -BUILDER ONLY IN ORDER TO MAKE DISCLOSURE
OF THIS MATERIAL AND FOR NO OTHER PURPOSE. BY FURNISHING THIS
MATERIAL, THE,OWNER DOES NOT REPRESENT, WARRANT, OR GUARANTEE ITS
ACCURACY EITHER IN WHOLE, IN PART, IMPLICITLY OR EXPLICITLY, OR IN ANY
OTHER WAY, AND THE OWNER SHALL HAVE NO LIABILITY FOR THIS MATERIAL.
(b) Except for permits and fees which are provided for in Subparagraph 33(a), the Owner shall
secure and pay for necessary approvals, easements, assessments, and charges required for
construction, use, or occupancy of permanent structures or for permanent changes in existing
facilities.
(c) Information or services under the Owner's control shall be furnished by the Owner with
reasonable promptness to avoid delay in the orderly progress of the Work. It is incumbent upon
the Design -Builder to identify, establish, and maintain a current schedule of latest dates for
submittal and approval, as required in Paragraph 3. 10, including when such information or
services must be delivered. If Owner delivers the information or services to the Design -Builder
as scheduled and Design -Builder is not prepared to accept or act on such information or services,
then Design -Builder shall reimburse Owner for all extra costs incurred of holding, storage, or
retention, including redeliveries by the Owner to comply with the current schedule.
(d) Unless otherwise provided in the Contract Documents, the Design -Builder will be furnished
electronic copies of the Drawings and Specifications for bid purposes and one hard copy
approved by Building Inspections upon execution of the Contract. Design -Builder may obtain
additional copies by paying the cost of additional printing or reproduction.
(e) The obligations described above are in addition to other duties and responsibilities of the Owner
enumerated in the Contract Documents and especially those in respect to Article 6 (Construction
by Owner or by Separate Design -Builders), Article 9 (Payments and Completion), and Article 11
(Insurance and Bonds).
(f) The Owner shall forward all instructions to the Design -Builder through the Independent
Architect/Engineer, except for the Owner's Notice to Proceed and the Owner's decision to carry
out Work as described in Paragraph 2.4.
(g) The Owner's employees, agents, and consultants may be present at the Project site during
performance of the Work to assist the Independent Architect/Engineer in the performance of the
Independent Architect/Engineer's duties and to verify the Design -Builder's record of the number
of workmen employed on the Work, their occupational classification, the time each is engaged in
the Work, the equipment used in the performance of the Work, and for purpose of verification of
Design -Builder's Applications for Payment.
2.3 OWNER'S RIGHT TO STOP THE WORK
If the Design -Builder fails to correct any portion of the Work which is not in accordance with the
requirements of the Contract Documents as required by Paragraph 12.2 or refuses or fails to carry
out all or any part of the Work in accordance with the Contract Documents, the Owner, by written
order, may order the Design -Builder to stop the Work, or any portion of the Work, until the cause for
the order has been eliminated. The right of the Owner however, to stop the Work shall not create or
imply a duty on the part of the Owner to exercise this right for the benefit of the Design -Builder or
any other person or entity. The rights of the Owner under this Paragraph 2.3 shall be in addition to,
and not in restriction of, the Owner's rights under Paragraph 12.2.
2.4 OWNER'S RIGHT TO CARRY OUT THE WORK
If the Design -Builder fails or refuses to carry out the Work or perform any of the terms, covenants,
or obligations of the Contract Documents, and fails or refuses to correct any failure or refusal with
diligence and promptness within twenty (20) days after receipt of notice from the Owner, the Owner
may correct the Design -Builder's failure or refusal or cause such failure or refusal to be corrected,
without affecting, superseding, or waiving any other contractual, legal, or equitable remedies the
Owner has, including but not limited to the Owner's termination rights under Article 13. In that case,
an appropriate Change Order will be issued deducting the Owner's cost of correction, including
Independent Architect/Engineer's compensation for additional services and expenses made necessary
by the failure or refusal of the Design -Builder from payments then or thereafter due to the Design -
Builder. The cost of correction is subject to verification (but not approval) by the Independent
Architect/Engineer. If payments then or thereafter due the Design -Builder are not sufficient to cover
the cost of correction, the Design -Builder shall pay the difference to the Owner.
2.5 NOTICE TO PROCEED
After final execution of the Contract and receipt and approval of the required performance and
payment bonds and evidence of required insurance, the Owner will issue a written notice to proceed
with the Work, including the designated Contract Time within which Substantial Completion of the
Work must be achieved. If the Owner unreasonably delays issuance of a written notice to proceed
through no fault of the Design -Builder, the Design -Builder shall be entitled only to an equitable
adjustment of the Contract Time, if properly claimed pursuant to the requirements of Paragraph 4.3;
but the Design -Builder shall not be entitled to any increase to the Contract Sum whatsoever for this
reason.
ARTICLE 3 THE DESIGN -BUILDER
3.1 DEFINITION OF DESIGN -BUILDER
The Design -Builder is the person or business entity identified as such in the Design -Build
Agreement, and is referred to throughout the Contract Documents as if singular in number. The term
"Design -Builder" means the Design=Builder or the Design -Builder's authorized employees or
representatives.
3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY DESIGN -
BUILDER
(a) The Design -Builder shall carefully check, study, and compare the Contract Documents with each
other and shall at once report to the Independent Architect/Engineer in writing any inconsistency,
ambiguity, error, omission, conflict, or discrepancy the Design -Builder may discover. The
Design -Builder shall also verify all dimensions, field measurements, and field conditions before
laying out the Work. The Design -Builder will be held responsible for any known or reasonably
discovered subsequent error, omission, conflict, or discrepancy which might have been avoided
by the above-described check, study, comparison, and reporting. In the event the Design -Builder
continues to work on an item where an inconsistency, ambiguity, error, omission, conflict, or
discrepancy exists without obtaining such clarification or resolution or commences an item of the
Work without giving written notice of an error, omission, conflict, or discrepancy that might
have been avoided by the check, study, and comparison required above, it shall be deemed that
the Design -Builder bid and intended to execute the more stringent, higher quality, or state of tile
art requirement, or accepted the condition as is in the Contract Documents, without any increase
to the Contract Sum or Contract Time. The Design -Budder shall also be responsible to correct
any failure of component parts to coordinate or fit properly into final position as a result of
Design -Builder's failure to give notice of and obtain a clarification or resolution of any error,
omission, conflict, or discrepancy, without any right to any increase to the Contract Sum or
Contract Time.
(b) The Design -Builder shall perform the Work in accordance with the Contract Documents and
submittals approved pursuant to Paragraph 3.12.
3.3 SUPERVISION AND CONSTRUCTION PROCEDURES
(a) The Design- - Builder shall supervise and direct the Work, using the Design -Builder's best skill
and attention. The Design -Builder shall be solely responsible for and have control over
construction means, methods, tecluliques, sequences, and procedures and for coordinating all
portions of the Work, unless the Contract Documents set forth specific instructions concemig
these matters.
(b) The Design -Builder shall be responsible to the Owner for the acts and omissions of the Design -
Builder's employees, Design -Builder's Subcontractors, Sub -subcontractors, and their respective
agents and employees, and any other persons perfortning portions of the Work under a
subcontract with the Design -Builder or with any Subcontractor, and all other persons or entities
for which the Design -Builder is legally responsible. All labor shall be performed by mechanics
that are trained and skilled in their respective trades. Standards of work required throughout shall
be of a quality that will bring only first class results. Mechanics whose work is unsatisfactory, or
who are considered careless, incompetent,, unskilled., or otherwise objectionable shall be
dismissed promptly from the Work and immediately replaced with competent, skilled personnel.
Any part of the Work adversely affected by the acts or omissions of incompetent, unskilled,
careless, or objectionablc personnel shall be immediately corrected by the Design -Builder.
(c) The Design -Builder shall not be relieved of its obligation to perform the Work in accordance
with the Contract Documents either by activities or duties of the Independent Architect/Engineer
in the Independent Architect/Engineer's administration of the Contract, or by tests, inspections,
or approvals required or performed by persons other than the Design -Builder.
(d) The Design -Builder shall be responsible for inspection of portions of Work already performed
Under this Contract -to determine that such portions are in proper condition to receive subsequent
Work. The Design -Builder's responsibility under this paragraph will not in any way eliminate the
Independent Architect/Engineer's responsibility to the Owner -under the Independent
Architect/Engineer/Owner Agreement.
(e) Any Design -Builder, Subcontractor, Sub -subcontractor, or separate Contractor who commences
Work over, in, or under any surface prepared by the Owner or by any other Design -Builder,
subcontractor, sub -subcontractor or, separate Contractor without the Design -Builder having given
written notice to the Independent Architect/Engineer of the existence of any known or
reasonably discovered faulty surface or condition in the surface that prevents achieving the
quality of workmanship specified by the Contract Documents and without having obtained the
prior approval of the Independent Architect/Engineer and the Owner to proceed is deemed to
have accepted the surface or condition in the surface as satisfactory at the commencement of
such Work. Any unsatisfactory Work subsequently resulting from such a faulty surface or
condition in the surface that was not pre -approved by the Independent Architect/Engineer or the
Owner after notice as provided 4ove may be rejected and replacement requirod, without. any
increase to the Contract Sum or Contract Time.
(f) All grades, lines, levels, and benchmarks shall be established and maintained on an ongoing
basis by the Design -Builder. The Design -Builder is solely responsible for any errors made in
establishing or maintaining proper grades, lines, levels, or benchmarks. Each Design -Builder for
his own Work shall verify all grades, lines, levels, and dimensions as indicated on Drawings. He
shall report any errors, omissions, conflicts, or inconsistencies to Independent Architect/Engineer
before commencing any Work affected by these conditions. Design -Builder shall establish and
safeguard benchmarks in at least two widely separated places and, as Work progresses, establish
benchmarks at each level and lay out partitions on rough floor in exact locations as guides to all
trades. The Design -Builder shall, from the permanent benchmark provided by the Owner,
establish and maintain adequate horizontal and vertical control.
3.4 LABOR AND MATERIALS
(a) Except as is otherwise specifically provided in the Contract Documents as being the
responsibility of the Owner, the Design -Builder shall provide and pay for labor, materials,
equipment, tools, construction equipment and machinery, water, heat, utilities, transportation,
and other facilities and services necessary for proper execution and completion of the Work,
whether temporary or permanent and whether or not incorporated or to be incorporated in the
Work.
(b) The Design -Builder shall enforce strict discipline and ;good order among the Design -Builder's
employees and other persons carrying out the Contract. The Design -Builder shall not permit
employment of unfit persons or persons not skilled in tasks assigned to them.
(c) The Design -Builder shall give preference, when qualified labor is available to perform the Work
to which the employment relates, to all labor hired for the Project in the following order:
(1) to bona fide residents of the City of Denton, Texas;
(2) to bona fide residents of the County of Denton, Texas;
(3) to bona fide residents of the State of Texas;
(4) to bona fide residents of the United States.
3.5 WARRANTY
(a) General Warranty. The Design -Builder warrants to the Owner that all Work shall be
accomplished in a good and workmanlike manner and that all materials and equipment furnished
under the Contract will be of good quality, new (unless otherwise specified), and free from faults
or defects, and that the Work will otherwise conform to the Contract Documents. Work not
conforming to these requirements; including substitutions not properly approved and authorized,
will be considered defective or nonconforming. The Design -Builder's warranty excludes any
remedy for damage or defect caused by abuse, modifications not executed by the Design -
Builder, improper or insufficient maintenance, improper operation, or normal wear and tear
under normal usage. If required by the Independent Architect/Engineer, the Design -Builder shall
furnish satisfactory evidence as to the kind and quality of materials and equipment. THE
GENERAL WARRANTY PROVIDED IN THIS SUBPARAGRAPH IS IN ADDITION TO
AND DOES NOT LIMIT OR DISCLAIM ANY OTHER WARRANTY OR REMEDY
REQUIRED OR PROVIDED BY LAW OR THE CONTRACT DOCUMENTS AND SUCH
WARRANTY SHALL REQUIRE THE DESIGN -BUILDER TO REPLACE DEFECTIVE
MATERIALS AND RE -EXECUTE DEFECTIVE WORK THAT IS DISCLOSED BY THE
OWNER TO THE DESIGN -BUILDER WITHIN A PERIOD OF TWO (2) YEARS AFTER
SUBSTANTIAL COMPLETION OF THE ENTIRE WORK OR, IF A LATENT DEFECT,
WITHIN TWO (2) YEARS AFTER DISCOVERY BY THE OWNER OF THE LATENT
DEFECT.
(b) Special Warranties. The Design -Builder shall assign to the Owner in writing, as a condition
precedent to final payment, the terms and conditions of all special warranties required under the
Contract Documents.
3.6 TAXES
The Owner qualifies for exemption from state and local sales and use taxes, pursuant to the
provisions of Section 151.309 of the Texas Tax Code, as amended. Therefore, the Owner shall not
be liable for, or pay the Design -Builder's cost of, such sales and use taxes which would otherwise be
payable in connection with the purchase of tangible personal property furnished and incorporated
into the real property being improved under the Contract Documents or the purchase of materials,
supplies and other tangible personal property, other than machinery or equipment and its accessories
and repair and replacement parts, necessary and essential for performance of the Contract which is to
be completely consumed at the job site. The Design -Builder shall issue an exemption certificate in
lieu of the tax on such purchases.
3.7 PERMITS, FEES AND NOTICES
(a) The Design -Builder will apply and arrange for the issuance of the City of Denton Building
Permit. The Design -Builder and Subcontractors will apply and arrange for the issuance of all
other required permits, and will not be required to pay a fee for any City of Denton permits
required for the Project. The Owner will pay all service extension charges, including tap fees,
assessed by the Water Utilities Department.
(b) The Design -Builder shall comply with and give notices required by laws, ordinances, rules,
regulations, and lawful orders of governmental entities or agencies applying to performance of
the Work.
(c) Except as provided in Subparagraph (d) below, it is the Design -Builder's responsibility to
ascertain that the Contract Documents are in accordance with applicable laws, ordinances,
construction codes, and rules and regulations. However, if the Design -Builder observes that
portions of the Contract Documents are at variance with applicable laws, ordinances,
construction codes, rules or regulations, the Design -Builder shall promptly notify the
Independent Architect/Engineer and the Owner in writing, and necessary changes shall be
accomplished by appropriate Amendment.
(d) If the Design -Builder performs Work knowing it to be contrary to laws, ordinances, construction
codes, or rules and regulations without notifying the Independent Architect/Engineer and the
Owner, the Design -Builder shall assume full responsibility for the Work and shall bear the
attributable costs of the correction of the Work and any other Work in place that may be
adversely affected by the corrective work.
3.8 ALLOWANCES
(a) The Design -Builder shall include. -in the Contract Sum all allowances stated in the Contract
Documents. Items covered by allowances shall be supplied for the amounts identified in the
Contract, and by persons or entities as the Owner may direct, but the Design -Builder shall not be
required to employ persons or entities against which the Design. -Builder makes reasonable
objection.
(b) Unless otherwise provided in the Contract Documents:
(1) materials and equipment under an allowance shall be selected promptly by the Owner to
avoid delay in the Work;
(2) the amount of each allowance shall cover the cost to the Design -Builder of materials and
equipment delivered at the site less all exempted taxes and applicable trade discounts;
(3) the amount of each allowance includes the Design -Builder's costs for unloading and handling
at the site, labor, installation costs, overhead, profit, and other expenses contemplated for
stated allowance Work;
(4) whenever costs are more than or less than allowances, the Contract Sum shall be adjusted
accordingly by Change Order. The amount of the Change Order shall reflect:
(i) the difference between actual costs and the allowances under Clause (b) (2); and
(ii) changes in Design -Builder's costs under Clause (b) (3);
(5) the Owner retains the right to review and approve Subcontractors selected by the Design -
Builder to perform work activities covered by allowances.
3.9 SUPERINTENDENT
The Design -Builder shall employ a competent superintendent and necessary assistants who shall be
in attendance at the Project site during performance of the Work. The superintendent shall represent
the Design -Builder, and communications given to the superintendent shall'be as binding as if given
to the Design -Builder. Important communications shall be confirmed in writing. Other
communications shall be similarly confirmed on written request in each case. The Owner reserves
the right to request that the Design -Builder replace its superintendent at any time and the Design -
Builder will replace said superintendent at the Owner's direction.
3.10 DESIGN -BUILDER'S CONSTRUCTION SCHEDULES
(a) The Design -Builder shall, immediately after award of the Contract and before submittal of the
first Application for Payment, prepare and submit the construction schedule for the Independent
Architect/Engineer's and Owner's information, review, and approval in accordance with the
following provisions:
(1) Unless otherwise approved in writing by the Owner, the construction schedule shall not
exceed the Contract Time limits currently in effect under the Contract Documents and shall
provide for expeditious and practicable execution of the Work.
(2) The construction schedule shall include all shop drawing and submittal data requirements,
indicating for each:
(i) the latest date to be submitted by the Design -Builder; and
(ii) the latest date for approval by the Independent Architect/Engineer:..
(3) The construction schedule shall be in the form of a critical path management schedule, and
shall indicate each critical task (the "predecessor") of all the major construction activities of
the Work in a logical and sequential order (the "project network") which requires completion
prior to commencement of the task next following (the "successor"). Each task shall be
identified with:
(i) actual work time, exclusive of slack time, for accomplishment;
(ii) the latest start date;
(iii) the latest finish date;
(iv) the amount of float associated with each task;
(v) the amount of labor, material, and equipment associated with each task; and
(vi) the percentage of completion as of the date of the current schedule.
(4) The construction schedule shall be revised and updated monthly to reflect the actual status of
the Work and shall be submitted with each Application for Payment.
(5) On or before the first day of each month, following the date of commencement of the Work
as stated in the notice to proceed, the Design -Builder shall prepare and submit to the
Independent Architect/Engineer and the Owner an up-to-date status report of the progress of
the various construction phases of the Work in the form of an updated construction schedule.
This status report shall consist of a time scale drawing indicating actual progress of the
various phases of the Work and the percentage of completion of the entire Work. The
original construction schedule shall be updated or changed to indicate any adjustments to the
Contract Time granted by the Owner. The updated schedule must be submitted with the
Design -Builder's Application for Payment. No application will be certified without a
satisfactory update to the construction schedule.
(6) The construction schedule will also be revised to show the effect of change orders and other
events on Contract Time. No request for an increase in Contract Time will be considered
unless it is accompanied by a schedule revision demonstrating the amount of time related to
the cause of the request. If the Design -Builder's status schedules reflect that the Design -
Builder has fallen behind the pace required to complete the Work within the Contract Time,
through no fault of the Owner, the Design -Builder shall prepare a recovery schedule
demonstrating how it intends to bring its progress back within the Contract Time. This
recovery schedule shall be in a form acceptable to the Owner.
(7) Costs incurred by the Design -Builder in preparing and maintaining the required construction
schedule, any updated schedule, and any recovery schedule required by the Owner will not
be paid as an additional or extra cost and shall be included in the Contract Sum.
(8) The Contract Sum is deemed to be based upon a construction schedule requiring the full
Contract Time. NO CLAIM FOR ADDITIONAL. COMPENSATION SHALL BE
ALLOWED AS A RESULT OF THE DESIGN -BUILDER BASING HIS PROPOSAL ON
AN EARLY COMPLETION .SCHEDULE, OR AS A RESULT OF DELAYS AND COSTS
ATTRIBUTABLE TO COMPLETION LATER THAN THE PLANNED EARLY
COMPLETION DATE.
(b) The Design -Builder shall also prepare and keep current, for the Independent
Architect/Engineer's approval, a schedule of submittals which is coordinated with the
Design -Builder's construction schedule and allows the Independent Architect/Engineer
reasonable time to review submittals.
(c) The Design -Builder shall conform to the most recent schedules approved as to form by
the Independent Architect/Engineer and the Owner. Any subsequent revisions made by
the Design -Builder to schedules in effect shall conform to the provisions of Subparagraph
3.10(a)
(d) If the Work falls behind the approved construction schedule, the Design -Builder shall
tape such steps as may be necessary to improve his progress, and the Independent.
Architect/Engineer and the Owner may require hire to increase the number of shifts,
overtime operations, days of work, or the amount of construction plant, and to submit for
approval revised schedules in the form required above in order to demonstrate the manner
in which the agreed rate of progress will be regained, all without additional cost to the
Owner.
3.11 DOCUMENTS AND SAMPLES AT THE PROJECT SITE
The Design -Builder shall maintain at the Project site for the Owner one record copy of the
Drawings, Specifications, addenda, and Amendments in good order and marked currently to record
changes and selections made during construction, and in addition shall maintain at the Project site
approved Shop Drawings, Product Data, Samples, and similar required submittals. These shall be
available to the Independent Architect/Engineer and shall be delivered to the Independent
Architect/Engineer for submittal to the Owner upon completion of the Work.
3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
(a) Shop Drawings are drawings, diagrams, schedules, and other data specially prepared for the
Work by the Design -Builder or a Subcontractor, Sub -subcontractor, manufacturer, supplier, or
distributor to illustrate some portion of the Work.
(b) Product Data are illustrations, standard schedules, performance charts, instructions, brochures,
diagrams, and other information furnished by the Design -Builder to illustrate materials or
equipment for some portion of the Work.
(c) Samples are physical examples which illustrate materials, equipment, or workmanship and
establish standards by which the Work will be judged.
(d) Shop Drawings, Product Data, Samples,. and similar submittals are not Contract Documents. The
purpose of their submittal is to demonstrate for those portions of the Work for which submittals
are required the way the Design -Builder proposes to conform to the information given and the
design concept expressed in the Contract Documents. Review by the Independent
Architect/Engineer is subject to the limitations of Paragraph 4.2.
(e) The Design -Builder shall review, approve and submit to the Independent Architect/Engineer
Shop Drawings, Product Data, Samples, and similar submittals required by the Contract
Documents with reasonable promptness and in such sequence as to cause no delay in the Work
or in the activities of the Owner or of separate Design -Builders. Submittals made by the Design -
Builder which are not required by the Contract Documents may be returned without action.
(f) The Design -Builder shall perform no portion of the Work requiring submittal and review of Shop
Drawings, Product Data, Samples, or similar submittals until the respective submittal has been
approved by the Independent Architect/Engineer. Work requiring this submittal and review shall
be in accordance with approved submittals and any identified exceptions noted by the
Independent Architect/Engineer.
(g) By approving and submitting Shop Drawings, Product Data, Samples and similar submittals, the
Design -Builder represents that the Design -Builder has determined and verified materials, field
measurements, and related field construction criteria, or will do so, and has checked and
coordinated the information contained within submittals with the requirements of the Work and
of the Contract Documents. The Design -Builder's attention is directed to Paragraph 3.2 of these
General Conditions and the requirements stated in that Paragraph.
(h) The Design -Builder shall not be relieved of responsibility for deviations, substitutions, changes,
additions, deletions or omissions from requirements of the Contract Documents by the
Independent Architect/Engineer's approval of Shop Drawings, Product Data, Samples, or similar
submittals unless the Design -Builder has specifically informed the Independent
Architect/Engineer in writing of such substitutions, changes, additions, deletions, omissions, or
deviations involved in the submittal at the time of submittal and the Independent
Architect/Engineer, subject to a formal Change Order signed by the Owner, Independent
Architect/Engineer and Design -Builder, has given written approval to the specific substitutions,
changes, additions, deletions, omissions, or deviations. The Design -Builder shall not be relieved
of responsibility for errors or omissions in Shop Drawings, Product Data, Samples, or similar
submittals by the Independent Architect/Engineer's approval thereof. Further, notwithstanding
any approval of a submittal by the Independent Architect/Engineer, the Design -Builder shall be
responsible for all associated Project costs, including costs of coordination's, modifications, or
impacts, direct or indirect, resulting from any and all substitutions, changes, additions, deletions,
omissions, or deviations, whether or not specifically identified by the Design -Builder to the
Independent Architect/Engineer at the time of the above-mentioned submittals, including
additional consulting fees, if any, in any and all accommodations associated with such
substitutions, changes, additions, deletions, omissions, or deviations to the requirements of the
Contract Documents.
(i) The Design -Builder shall direct specific attention, in writing or on resubmitted Shop Drawings,
Pfoduct Data, Samples, or similar submittals, to additional revisions other than those requested
by the Independent Architect/Engineer on previous submittals..
0) informational submittals upon which the Independent Architect/Engineer is not expected to take
responsive action may be so identified in the Contract Documents.
(k) When professional certification of performance criteria of materials, systems, or equipment is
required by the Contract Documents, the Design -Builder shall be entitled to rely upon the
accuracy and completeness of such calculations and certifications.
3.13 USE OF THE PROJECT SITE
The Design -Builder shall confine operations at the Project site to areas permitted by law,
ordinances, permits, and the Contract Documents and shall not unreasonably encumber the Project
site with materials or equipment.
3.14 CUTTING AND PATCHING
(a) ' The Design-Builderr shall be responsible for cutting, fitting or patching required to complete
the Work or to make its parts fit together properly.
(b) The Design -Builder shall not damage or endanger a portion of the Work or any fully or
partially completed construction of the Owner or separate Design -Builders by cutting,
patching, or otherwise altering the,,construction, or by excavating. The Design -Builder shall not
cut or otherwise alter the construction by the Owner or a separate Sub -Contractor except with
the written consent of the Owner and of the separate Sub -Contractor; consent shall not be
unreasonably withheld. The Design -Builder shall not unreasonably withhold from the Owner
or a separate Sub -Contractor the Design -Builder's consent to cutting or otherwise altering the
Work.
(c) A Hot Work Permit must be obtained from the City of Denton's Facilities Management
Department, 869 S. Woodrow Lane, Denton, Texas (940 349-7200) for any temporary
operation involving open flames or producing heat and/or sparks. This includes, but is not
limited to: Brazing, Cutting, Grinding, Soldering, Torch Applied Roofing and Welding.
3.15 CLEANING UP
(a) The Design -Builder shall keep the Project site and surrounding area free from accumulation of
waste materials or rubbish caused by operations under the Contract. Upon the completion of
the Work the Design -Builder shall remove from and about the Project site all waste materials,
and rubbish, and all of the Design -Builder's tools, construction equipment, machinery, and
surplus materials.
(b) If the Design -Builder fails to clean up as provided in the Contract Documents, the Owner may
clean up and the Owner's cost of cleaning up shall be charged to the Design -Builder.
3.16 ACCESS TO WORD
The Design -Builder shall provide the Owner and the Independent Architect/Engineer access to the
Work in preparation and progress wherever located during the course of construction.
3.17 TESTS AND INSPECTIONS
(a) Tests, inspections, and approvals of portions of the Work required by the Contract Documents or
by laws, ordinances, rules, regulations, or orders of governmental entities or agencies having
jurisdiction over the Work shall be made at appropriate times. Unless otherwise provided, the
Design -Builder shall make arrangements for such tests, inspections, and approvals' with an
independent testing laboratory or entity acceptable to the Owner or with the appropriate
governmental entity or agency, and the Design -Builder shall bear all related costs of tests,
inspections, and approvals. The Design -Builder shall give the Independent Architect/Engineer
timely notice of when and where tests and inspections are to be made so the Independent
Architect/Engineer may observe such procedures. The Owner shall bear costs of tests,
inspections, or approvals which become requirements after bids or proposals are received.
(b) If the Independent Architect/Engineer, the Owner or other public authorities having jurisdiction
over the Work determine that portions of the Work require additional testing, inspection or
approval not included under Subparagraph 3.17(a), the Independent Architect/Engineer will,
upon written authorization from the Owner, instruct the Design -Builder to make arrangements
for such additional testing, inspection or approval by an entity acceptable to the Owner, and the
Design -Builder shall give timely notice to the Independent Architect/Engineer of when and
where tests and inspections are to be made so that the Independent Architect/Engineer may
observe such procedures. The Owner shall bear such costs except as provided in Subparagraph
3.17(c).
(c) If procedures for testing, .inspection;:. or approval under Subparagraphs 3.17(a) and 3.17(b) reveal
deficiencies or nonconformities in the Work, the Design -Builder shall bear all costs made
necessary to correct the deficiencies or nonconformities, including those of repeated procedures
and compensation for the Independent Architect/Engineer's services and expenses, if any. The
Design -Builder shall bear the costs of any subsequent testing, inspection, or approval of the
corrected Work.
(d) Required certificates of testing, inspection or approval shall, unless otherwise required by the
Contract Documents, be secured by the Design -Builder and promptly delivered to the
Independent Architect/Engineer.
(e) If the Independent Architect/Engineer is to observe tests, inspections or approvals required by
the Contract Documents, the Independent Architect/Engineer will do so promptly and, where
practicable, at the normal place of testing or inspection.
(f) Tests or inspections conducted pursuant to the Contract Documents shall be made promptly to
avoid unreasonable delay in the Work.
3.18 ROYALTIES AND PATENTS
The Design -Builder shall pay all royalties and license fees. DESIGN -BUILDER SHALL
COMPLETELY DEFEND, INDEMNIFY AND HOLD OWNER AND INDEPENDENT
ARCHITECT/ENGINEER HARMLESS FROM ANY AND ALL SUITS OR CLAIMS FOR
INFRINGEMENT OF PATENT RIGHTS, REGARDLESS OF WHETHER OR NOT THE
OWNER OR THE INDEPENDENT ARCHITECT/ENGINEER SPECIFIED A PARTICULAR
DESIGN, PROCESS OR PRODUCT IN THE CONTRACT DOCUMENTS THAT MAY BE
THE SUBJECT OF A PATENT INFRINGEMENT OR OTHERWISE ACTIVELY INDUCED
OR CONTRIBUTED TO THE INFRINGEMENT. In the event the Design -Builder has reason to
believe that a particular design, process or product specified infringes a patent, the Design -Builder
shall immediately notify the Owner and the Independent Architect/Engineer of same.
3.19 INDEMNIFICATION
(a) THE DESIGN -BUILDER AGREES TO DEFEND, INDEMNIFY AND HOLD THE OWNER,
ITS OFFICERS, AGENTS AND EMPLOYEES, AND THE INDEPENDENT
ARCHITECT/ENGINEER, HARMLESS AGAINST ANY AND ALL CLAIMS, LAWSUITS,
JUDGMENTS, FINES, PENALTIES, COSTS AND EXPENSES FOR PERSONAL INJURY
(INCLUDING DEATH), PROPERTY DAMAGE OR OTHER HARM OR VIOLATIONS FOR
WHICH RECOVERY OF DAMAGES, FINES, OR PENALTIES IS SOUGHT, SUFFERED
BY ANY PERSON OR PERSONS, THAT MAY ARISE OUT OF OR BE OCCASIONED BY
DESIGN -BUILDER'S BREACH OF ANY OF THE TERMS OR PROVISIONS OF THIS
CONTRACT, VIOLATIONS OF LAW, OR BY ANY NEGLIGENT, GROSSLY
NEGLIGENT, INTENTIONAL, OR STRICTLY LIABLE ACT OR OMISSION OF THE
DESIGN -BUILDER, ITS OFFICERS, AGENTS, EMPLOYEES, SUBCONTRACTORS, OR
SUB -SUBCONTRACTORS AND THEIR RESPECTIVE OFFICERS, AGENTS, OR
REPRESENTATIVES, OR ANY OTHER PERSONS OR ENTITIES FOR WHICH THE
DESIGN -BUILDER IS LEGALLY RESPONSIBLE IN THE PERFORMANCE OF THIS
CONTRACT; EXCEPT THAT THE INDEMNITY PROVIDED FOR IN THIS PARAGRAPH
SHALL NOT APPLY TO ANY LIABILITY RESULTING FROM THE SOLE -NEGLIGENCE
OR FAULT OF THE OWNER, ITS OFFICERS, AGENTS, EMPLOYEES OR SEPARATE
DESIGN -BUILDERS, OR OF THE INDEPENDENT ARCHITECT/ENGINEER, AND IN THE
EVENT OF JOINT AND CONCURRENT NEGLIGENCE OR FAULT OF THE DESIGN -
BUILDER, THE OWNER, AND THE INDEPENDENT ARCHITECT/ENGiNEER,
RESPONSIBILITY AND INDEMNITY, IF ANY, SHALL BE APPORTIONED IN
ACCORDANCE WITH THE LAW OF THE STATE OF TEXAS, WITHOUT, HOWEVER,
WAIVING ANY GOVERNMENTAL IMMUNITY. AVAILABLE TO THE OWNER UNDER
TEXAS LAW AND WITHOUT WAIVING ANY DEFENSES OF THE PARTIES UNDER
TEXAS LAW. THE PROVISIONS OF THIS PARAGRAPH ARE SOLELY FOR THE
BENEFIT OF THE PARTIES HERETO AND ARE NOT INTENDED TO CREATE OR
GRANT ANY RIGHTS, CONTRACTUAL OR OTHERWISE, TO ANY OTHER PERSON OR
ENTITY.
(b) In claims against any person or entity indemnified under this Paragraph 3.19 by an employee of
the Design -Builder, a Subcontractor, anyone directly or indirectly employed by them or anyone
for whose acts they may be liable, the indemnification obligation under this Paragraph 3.19 shall
not be limited by a limitation on amount or type of damages, compensation or benefits payable
by or for the Design -Builder or a Subcontractor under workers compensation acts, disability
benefit acts or other employee benefit acts.
(c) Indemnification under this Paragraph 3.19 shall include, but is not limited to, liability which
could result to or be created for the Owner, its officers, agents, or employees, or the Independent
Architect/Engineer pursuant to State or Federal laws or regulations relating to pollution of the
environment and State or Federal laws or regulations relating to the occupational safety and
health of workers. The Design -Builder specifically agrees to comply with the above-mentioned
laws and regulations in the performance of the Work by the Design -Builder and that the
obligations of the Owner, its officers, agents, and employees, and the Independent
Architect/Engineer under the above-mentioned laws and regulations are secondary to those of the
Design -Builder.
ARTICLE 4 CONTRACT ADMINISTRATION
4.1 THE DESIGN PROFESSIONAL (ARCHITECT/ENGINEER) FOR THE DESIGN -
BUILDER
(a) The design professional is the person lawfully licensed to practice architecture or engineering or
a firm or other business entity lawfully practicing architecture/engineering identified as such in
the formal Design -Build Agreement and is referred to throughout the Contract Documents as if
singular in number. The term "Independent , rchitect/Engincer" means the Architect/Engineer or
the Architect/Engineer's authorized representative of the Owner. The Owner shall, designate a
qualified Owner representative to serve as the Independent Architect/Engineer on the Project
instead of an outside firm or person. In such event, the references in these General Conditions
that refer to the Independent Architect/Engineer shall apply to the Owner -designated
Independent Architect/Engineer representative and the Owner -designated Independent
Architect/Engineer representative shall be accorded that same status by the Design -Builder, in
compliance with Texas Government Code 2269.
(b) In the event the Independent Architect/Engineer is an outside person or firm and the Independent
Architect/Engineer's employment is terminated, the Owner may, at its option, contract with a
new outside Independent. Architect/Engineer to replace -the former, or.may designate a qualified
Owner representative to serve as the Independent Architect/Engineer. The replacement
Independent Architect/Engineer, whether an Owner representative, an Independent
Architect/Engineer or any other qualified person or entity, shall be regarded as the Independent
Architect/Engineer for all purposes under the Contract Documents and shall be accorded that
same status by the Design -Builder. Any dispute in connection with such appointment shall be
reviewed and settled by the Owner, whose decision shall be final and binding.
(c) Owner reserves the right to appoint a representative empowered to act for the Owner during the
Construction Phase and to supersede the Design -Builder's Construction Phase responsibility.
Owner shall notify the Independent Architect/Engineer and Design -Builder in writing at least 10
days in advance, if electing to appoint a representative empowered to act for the Owner during
the Construction Phase. Similarly, from time to time the Owner may expand or reduce the
Owner's delegation of powers to the Independent Architect/Engineer, with the Owner notifying
the Design -Builder of any such changes. The Independent Architect/Engineer shall not be
construed as a third party beneficiary to the Contract and can in no way object to any expansion
or reduction of powers as set forth in this Subparagraph (c). In no event, however, shall the
Owner have control over charge of, or be responsible for, construction means, methods,
techniques, sequences, or procedures, or for safety precautions or programs in connection with
the Work since these are solely the Design -Builder's responsibility. The Owner will not be
responsible for the Design -Builder's failure to carry out the Work in accordance with the
Contract Documents. The Owner will not have control over or charge of and will not be
responsible for acts or omissions of Design -Builder, Subcontractors, or their agents or
employees, or of any other persons performing portions of the Work.
4.2 DESIGN -BUILDER'S RESPONSIBILITIES DURING CONSTRUCTION
(a) The Design -Builder will administer the Contract as described in the Contract Documents and in
accordance with the terms of the Design -Build agreement with the Owner, where applicable,
subject to the direction and approval of the Owner. If requested by the Design -Builder, the
provisions of the Owner/Independent Architect/Engineer Agreement will be made available to
the Design -Builder.
(b) The Independent Architect/Engineer shall provide, during performance of the Work, adequate
and competent periodic on-site construction observation, periodically visiting the Project site to
the extent necessary to personally familiarize themselves with the progress and quality of the
Work, and to determine il'the Work is proceeding in accordance with the Contract Documents.
The Independent Arch tectl"Engineer shall not, however,: be required to make continuous ori -site
inspections to check the Work. Field reports of each visit shall be prepared by the Independent
Architect/Engineer and submitted to the Owner. The Design -Builder shall employ all reasonable
measures to safeguard the Owner against defects and nonconformities in the Work. The
Independent Architect/Engineer shall not be responsible for the construction means, methods,
techniques, sequences of procedures, nor for the safety precautions and programs employed in
connection with the Work. The Independent Architect/Engineer will, however, immediately
inform the Owner whenever defects or nonconformities in the Work are observed, or when any
observed actions or omissions are undertaken by the Design -Builder or any Subcontractor which
are not in the best interests of the Owner or the Project.
(c) The Independent Architect/Engineer and the Owner will not have control over or charge of and
will not be responsible for construction means, methods, techniques, sequences, or procedures,
or for -safety precautions and.programs in connection with the Works since these are- solely the
Design -Builder's responsibility as provided in Paragraph 4.3. The Independent
Architect/Engineer and the Owner will not be responsible for the Design -Builder's failure to
carry out the Work in accordance with the Contract Documents. The Independent
Architect/Engineer and the Owner will not have control over or charge of and will not be
responsible for acts or omissions of the Design -Builder, Subcontractors, Sub -subcontractors, or
their respective agents or employees, or of any other persons performing portions of the Work
for which the Design -Builder is responsible.
(d) Except as otherwise provided in the Contract Documents or when direct communications have
been specially authorized, the Owner and Design -Builder shall endeavor to communicate
through the Independent Architect/Engineer. Communications by and with the Design Builder or
its consultants shall be through the Independent Architect/Engineer. Communications by and
with Subcontractors and material suppliers shall be through the Design -Builder.
Communications by and with separate contractors will be through the Owner. The Design -
Builder shall provide written confirmation of communications made directly with the Owner and
provide copies of such confirmation to the Independent Architect/Engineer.
(e) Based on the Independent Architect/Engineer's observations and evaluations of the Design -
Builder's Applications for Payment, the Independent Architect/Engineer will review and certify
the amounts due the Design -Builder and will issue Certificates for Payment in such amounts.
(f) The Independent Architect/Engineer and the Owner will each have authority to reject Work
which does not conform to the Contract Documents. Whenever the Independent
Architect/Engineer considers it necessary or advisable for implementation of the intent of the
Contract Documents, the Independent Architect/Engineer will have authority to require
additional inspection or testing of the Work in accordance with Subparagraphs 3.17(b) and
3.17(c), whether or not such Work is fabricated, installed or completed. However, neither this
authority of the Independent Architect/Engineer nor a decision made in good faith either to
exercise or not to exercise such authority shall give rise to any duty or responsibility of the
Independent Architect/Engineer to the Design -Builder, Subcontractors, material and equipment
suppliers, their agents or employees, or other persons performing portions of the Work.
(g) The Independent Architect/Engineer will review and approve or take other appropriate action
upon the Design -Builder's submittals such as Shop Drawings, Product Data, and Samples, but
only for the limited purpose of checking for conformance with information given and the design
concept expressed in the Contract Documents. The Independent Architect/Engineer's action will
be taken with such reasonable promptness as to not delay the Work or the activities of the
Owner, Design -Builder, or separate Sub-Contractor(s). Review of such submittals is not
conducted for the purpose of determining the accuracy and completeness of other details such as
dimensions and quantities, or for substantiating instructions for installation or performance of
equipment or systems, all of which remain the responsibility of the Design -Builder as required
by the Contract Documents. The Independent Architect/Engineer's review of the Design -
Builder's submittals shall not relieve the Design -Builder of any obligations under Paragraphs
3.3, 3.5, and 3.12. The Independent Architect/Engineer's review shall not constitute approval of
safety precautions or, unless otherwise specifically stated in writing by the Independent
Architect/Engineer, of any construction means, methods, techniques, sequences, or procedures.
The Independent Architect/Engineer's approval of a specific item shall not indicate approval of
an assembly of which the item is a component.
(h) -The Independent Architect/Engineer will approve Change Order requests from the Design -
Builder and may recommend to the Owner, authorization of minor changes in the Work as
provided in Paragraph 7.3.
(i) The Independent Architect/Engineer will conduct inspections to determine the date or dates of
Substantial Completion and the date of final completion, will receive and forward to the Owner
for the Owner's review and records written warranties and related documents required by the
Contract and assembled by the Design -Builder, and shall review, and may recommend to the
Owner approval for a final Certificate for Payment upon compliance by the Design—Builder
with the requirements of the Contract Documents.
If the Owner and Independent Architect/Engineer agree, the Independent Architect/Engineer will
provide one or more Project representatives to assist in carrying out the Independent
Architect/Engineer's responsibilities at the site. The duties, responsibilities, and limitations of
authority of such Project representatives shall be as set forth in an exhibit to be incorporated into
the Contract Documents.
(k) The Independent Architect/Engincer will interpret mid make recommendations to the Owner
concerning performance under and requirements of the, Contract Documents upon written request
of either the Owner or Design -Builder. The Independent Architect/Engineer's response to such
requests will be made with reasonable promptness and within any time limits agreed upon. The
Independent Architect/Engineer shall secure the Owner's written approval before issuing
instructions, interpretations, or judgments to the Design -Builder which change the scope of the
Work or which modify or change the terms and conditions of any of the Contract Documents.
(1) Interpretations and decisions of the Independent Architect/Engineer will be consistent with the
intent of and reasonably inferable from the Contract Documents and will be in writing or in the
form of Drawings. When making such interpretations and decisions, the Independent
Architect/Engineer will endeavor to secure faithful performance by the Design -Builder.
(in) The Independent Architect/Engineer's decisions on matters relating to aesthetic effect will be
final if consistent with the intent expressed in'the Contract Documents provided that the
Independent Architect/Engineer and the Design -Builder has prior written approval of the Owner.
4.3 CLAIMS AND DISPUTES
(a) Definition; General Notice of Claim Procedure. As used in these General Conditions, a "Claim"
means a demand or assertion by one of the parties to the Contract seeking an adjustment of the
terms of the Contract Documents, of the Contract Sum, of the Contract Time, or some other
relief in respect to the terms of the Contract Documents. The term also includes all other disputes
between the Owner and the Design -Builder arising out of or relating to the Project or the
Contract Documents, including but not limited to claims that work was outside the scope of the
Contract Documents. The responsibility to substantiate the Claim and the burden of
demonstrating compliance with this provision shall rest with the party making the Claim. Except
where otherwise provided in the Contract Documents, a Claim by the Design -Builder, whether
for additional compensation, additional time, or other relief, including but not limited to claims
arising from concealed conditions, MUST BE MADE BY WRITTEN NOTICE TO THE
INDEPENDENT ARCHITECT/ENGINEER AND THE OWNER WITHIN FOURTEEN (14)
DAYS AFTER OCCURRENCE OF THE EVENT OR EVENTS GIVING RISE TO THE
PARTICULAR CLAIM. Every Claim of the Design -Builder, whether for additional
compensation, additional time, or other relief, including but not limited to claims arising from
concealed conditions; shall. be signed and sworn to by an authorized corporateofficer (if not a
corporation, then an official of the company authorized to bind the Design -Builder by his
signature) of the Design -Builder, verifying the truth and accuracy of the Claim. THE DESIGN -
BUILDER SHALL BE DEEMED TO HAVE WAIVED ANY CLAIM NOT MADE
STRICTLY IN ACCORDANCE WITH THE PROCEDURE AND TIME LIMITS SET OUT IN
THIS PARAGRAPH.
(b) Referral to the Independent Architect/Engineer. Claims, disputes, and other matters in question
between the Design -Builder and the Owner relating to the progress or execution of the Work or
the interpretation of the Contract Documents shall be referred to the Independent
Architect/Engineer for recommendation to the Owner, which recommendation the Independent
Architect/Engineer will furnish in writing within a reasonable time, provided proper and
adequate substantiation has been received. Failure of the Design -Builder to submit the Claim to
the Independent Architect/Engineer for rendering of a recommendation to the Owner shall
constitute a waiver of the Claim.
(c) Continuing Contract Performance. Pending final resolution of a claim the Design -Builder shall
proceed diligently with performance of the Work and the Owner shall continue to make
payments in accordance with the Contract Documents.
(d) Claims for Concealed or Unknown Conditions. No adjustrnent in the Contract Sum or Time
associated with concealed or unknown conditions will normally be considered or allowed;
provided, however, that the Contract Sum or Time may be adjusted by the Owner in such
circumstances only if.
(1) a concealed subsurface condition is encountered in the course of performance of the Work;
(2) a concealed or unknown condition in an existing structure is at variance with conditions
indicated by the Contract Documents; or
(3) an unknown physical condition is encountered below the surface of the ground or in an
existing structure which is of an unusual nature and materially different from those ordinarily
encountered and generally recognized as inherent in the character of the Work; and
(4) a notice of claim with proper and adequate substantiation is presented pursuant to
Subparagraph 4.3(a) of these General Conditions; and
(5) the Owner and the Independent Architect/Engineer determine that:
(i) prior to submitting its bid for the Work, the Design -Builder used reasonable diligence to
fully inspect the portion of the Project site where the condition was discovered; and
(ii) the work caused or required by the concealed or unknown condition at issue can be
considered extra work to the extent that additional new Drawings must be prepared and
issued and new construction beyond the scope of the Contract Documents is required.
(e) Disclaimer of Warranties as to Reports, Drawings, and Specifications. PROJECT SITE
INFORMATION AND REPORTS (INCLUDING BUT NOT LIMITED TO SOILS TESTING
REPORTS, GEOTECHNICAL REPORTS, OR ENVIRONMENTAL SITE ASSESSMENTS)
PROVIDED BY THE OWNER AND THE INDEPENDENT ARCHITECT/ENGINEER IN
THE PROJECT MANUAL OR BY OTHER MEANS SHALL BE UTILIZED BY THE
DESIGN -BUILDER AT THE DESIGN -BUILDER'S OWN RISK. THE OWNER AND THE
INDEPENDENT ARCHITECT/ENGINEER DO NOT GUARANTEE OR WARRANT ANY
INFORMATION SHOWN IN THE PROJECT SITE INFORMATION AND REPORTS.
(f) Claims for Additional Cost. If the Design -Builder wishes to make a claim for an increase in the
Contract Sum, written notice as provided in this Paragraph 4.3 shall be given before proceeding
to execute the Work. Prior notice is not required for claims relating to an emergency endangering
life or property arising under Paragraph 10.3. In addition, the Design -Builder's request for an
increase in the Contract Sum for any reason (other than work performed under emergency
conditions) shall be made far enough in advance of required work to allow the Owner and the
Independent Architect/Engineer a sufficient amount of time, without adversely affecting the
construction schedule, to review the request, prepare and distribute such additional documents as
may be necessary to obtain suitable estimates or proposals and to negotiate, execute and
distribute a Change Order for the required work if the Design -Builder believes that additional
cost is involved for reasons including but not limited to:
(1) a written interpretation from the Independent Architect/Engineer;
(2) a written order for a minor change in the Work issued by the Independent
Architect/Engineer;
(3) failure of payment by the Owner;
(4) termination of the Contract by the Owner;
(5) the Owner's temporary suspension of all or any portion of the Work where the Design -
Builder was not at fault; or
(6) other reasonable grounds.
(g) Injury or Damage to Person or Property. If the Design -Builder suffers injury or damages to
person or property because of an act or omission of the Owner, or of any of the Owner's officers,
employees or agents, written, sworn -to notice of any claim for damages or injury shall be given
as provided in Subparagraph 4.3(a). The notice shall provide sufficient detail to enable the
Independent Architect/Engineer and the Owner to investigate the matter.
(h) Subcontractor Pass -Through Claims. In the event that any Subcontractor of the Design -Builder
asserts a claim to the Design -Builder that the Design -Builder seeks to pass through to the Owner
under the Contract Documents, any entitlement of the Design -Builder to submit and assert the
claim against the Owner shall be subject to:
(1) the requirements of Paragraph 4.3 of these General Conditions; and
(2) the following additional three requirements listed below, all three of which additional
requirements shall be conditions precedent to the entitlement of the Design -Builder to seek
and assert such claim against the Owner:
(ii) The Design -Builder shall either (A) have direct legal liability as a matter of contract,
common law, or statutory law to the Subcontractor for the claim that the Subcontractor is
asserting or (B) the Design -Builder shall have entered into a written liquidating agreement
with the Subcontractor, under which agreement the Design -Builder has agreed to be legally
responsible to the Subcontractor for pursing the assertion of.such claim against -the Owner
under the Contract and for paying to the Subcontractor any amount that may be recovered,
less Design -Builder's included markup (subject to the limits in the Contract Documents for
any markup). The liability or responsibilities shall be identified in writing by the Design -
Builder to the Owner at the time such claim is submitted to Owner, and a copy of any
liquidating agreement shall be included by the Design -Builder in the claim submittal
materials.
(ii) The Design -Builder shall have reviewed the claim of the Subcontractor prior to its
submittal to Owner and shall have independently evaluated such claim in good faith to
determine the extent to which the claim is believed in good faith to be valid. The Design -
Builder shall also certify, in writing and under oath to the Owner, at the time of the submittal
of such claim, that the Design -Builder has made a review, evaluation, and determination that
the claim is made in good faith and is believed to be valid.
(iii) The Subcontractor making the claim to the Design -Builder shall certify in writing and,
under oath that it has compiled, reviewed and evaluated the merits of such claim and that the
claim is believed in good faith by the Subcontractor to be valid. A copy of the certification by
the Subcontractor shall be included by Design -Builder in the claim submittal materials.
(3) Any failure of the Design -Builder to comply with any of the foregoing requirements and
conditions precedent with regard to any such claim shall constitute a waiver of any
entitlement to submit or pursue such claim.
(4) Receipt and review of a claim by the Owner under this Subparagraph shall not be construed
as a waiver of any defenses to the claim available to the Owner under the Contract
Documents or law.
(i) Owner's Right to Order Acceleration and to Deny Claimed and Appropriate Time
Extensions, in whole or in Part. The Design -Builder acknowledges and agrees that
Substantial Completion of the Work by or before the Scheduled Completion Date is of
substantial importance to Owner. The following provisions, therefore, will apply:
(1) If the Design -Builder falls behind the approved construction schedule for whatever
reason, the Owner shall have the right, in the Owner's sole discretion, to order the
Design -Builder to develop a recovery schedule as described in Paragraph 3.10 or to
accelerate its progress in such a manner as to achieve Substantial Completion on or
before the Contract Time completion date or such other date as the Owner may
reasonably direct and, upon receipt, the Design -Builder shall take all action necessary to
comply with the order. In such event, any possible right, if any, of the Design -Builder to
additional compensation for any acceleration shall be subject to the terms of this
Subparagraph (i).
(2) In the event that the Design -Builder is otherwise entitled to an extension of Contract
Time and has properly initiated a Claim for a time extension in accordance with
Subparagraph 4.3(a) above, the Owner shall have the right, in the Owner's sole
discretion, to deny all, or any part, of the Claim for extension of Contract Time by giving
written notice to the Design -Builder provided within fourteen (14) days after receipt of
the Design -Builder's Claim. If the Owner denies the Design -Builder's claim for an
extension of Contract Time under this Clause (i)(2), either in whole or in part, the
Design -Builder shall proceed to prosecute the Work in such a manner as to achieve
Substantial Completion on or before the then existing Scheduled Completion Date.
(3) If the Design -Builder would have been entitled to a time extension for a reason
specifically allowed under the Contract Documents, for an amount of time that would
have justified approval by the Owner if not for the need and right to accelerate, the
Design -Builder may initiate a Claim for acceleration costs pursuant to Subparagraph
4.3(a). Any resulting Claim for acceleration costs properly initiated by the Design -
Builder under Subparagraph 4.3(a) above shall be limited to those reasonable and
documented direct costs of labor, materials, equipment, and supervision solely and
directly attributable to the actual acceleration activity necessary to bring the Work back
within the then existing approved construction schedule. These direct costs include the
premium portion of overtime pay, additional crew, shift, or equipment costs if requested
in advance by the Design -Builder and approved in writing by the Owner. A percentage
markup for the prorated cost of premium on the existing performance and payment bonds
and required insurance, not to exceed 5%, will be allowed on the claimed acceleration
costs. NO OTHER MARKUP FOR PROFIT, OVERHEAD (INCLUDING BUT NOT
LIMITED TO HOME OFFICE OVERHEAD) OR ANY OTHER COSTS WILL BE
ALLOWED ON ANY ACCELERATION CLAIM. The Owner shall not be liable for any
costs related to an acceleration claim other than those described in this Clause (i)(3).
(i) Waiver of Claims; Final Payment. The making of final payment shall constitute a waiver of
claims by the Owner except those arising from:
(1) claims, security interests, purported liens, or other attempted encumbrances arising out of the
Contract and remaining unsettled;
(2) defective or nonconforming Work appearing after Substantial Completion;
(3) latent defects, as defined in Subparagraph 12.2(d), appearing after Final Completion; or
(4) the terms of general and spdcial warranties required by the Contract Documents or allowed or
implied by law.
(k) THE DESIGN -BUILDER SHALL NOT BE ENTITLED TO RECOVER ATTORNEY'S FEES
AS A PART OF ANY CLAIM MADE UNDER THE CONTRACT DOCUMENTS OR IN
ANY SUBSEQUENT LAWSUIT OR ALTERNATIVE DISPUTE RESOLUTION
PROCEEDING.
(1) No Waiver of Governmental Immunity. NOTHING IN THE CONTRACT DOCUMENTS
SHALL BE CONSTRUED TO WAIVE THE OWNER'S GOVERNMENTAL IMMUNITY
FROM LAWSUIT, WHICH IMMUNITY IS EXPRESSLY RETAINED TO THE EXTENT IT
IS NOT CLEARLY AND UNAMBIGUOUSLY WAIVED BY STATE LAW.
ARTICLE 5 SUBCONTRACTORS
5.1 DEFINITIONS OF SUBCONTRACTOR
.{a) A Subcontractor is person or entity who- has a direct contract with the Design -Builder to perform
a portion of the Work at the Project site or to supply materials or equipment to the Design -
Builder by purchase or lease for use in performance of or incorporation into the Work. The tern
"Subcontractor" is referred to throughout the Contract Documents as if singular in number and
means a Subcontractor or an authorized representative of the Subcontractor. The term
"Subcontractor" does not includea separate Design -Builder or subcontractors of a separate
Design -Builder.
(b) A Sub -subcontractor is a person or entity who has a direct or indirect contract with a
Subcontractor to perform a portion of the Work at the Project site or to supply materials or
equipment to the Subcontractor or another Sub -subcontractor by purchase or lease for use in
performance of or incorporation into the Work. The term "Sub -subcontractor" is referred to
throughout the Contract Documents as if singular in number and means a Sub -subcontractor or
an authorized representative of the Sub -subcontractor.
5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE
WORK. WITH REGARDS TO MWBE, THE CITY OF DENTON ONLY REQUIRE A
GOOD FAITH EFFORT, THERE IS NO PERCENTAGE REQUIREMENT.
(a) Immediately alter the award of the Contract by the towner, and before the Design -Build
Agreement is signed by the Design -Builder and the Owner, the Design -Builder shall furnish to
the Independent Architect!Engineer in writing, for acceptance by the. Owner and the Independent
Architect/Engincer, a. list of the names, addresses, telephone numbers, 'M/WBE certification
numbers (where applicable), and type of work of the Subcontractors (including those who are to
furnish materials or equipment fabricated to a special design), proposed for the principal portions
of the Work, including furnishings when made a partof the Contract. The Design -Builder shall
immediately notify the Owner in writing of any changes in the list as they occur. The
Independent Architect/Engineer will promptly reply to the Design -Mi lder in writing stating
whether or not the Owner or the Independent Architect/Engineer, after due investigation, has
reasonable objection to any such proposed person or entity. Failure of the Owner or Independent
Architect/Engineer to reply promptly shall constitute notice of no reasonable objection.
(b) The Design -Builder shall not contract with a proposed person or entity to whom the Owner or
Independent Architect/Engineer has made reasonable and timely objection.
(c) The Independent Architect/Engincer's and Owners approval of or objection to any Subcontractor
or of a particular process or material will not relieve the Design -builder of his responsibility for
performance of Work as called for under the Contract Documents, and shall not provide a basis
for any claim for additional time or money on the part of the Design -Builder. Approval shall not
be construed to create any contractual relationship between the Subcontractor and either the
Owner or Independent Architect/Engineer. In no event shall the Contract Sum be increased as a
result of the rejection of any Subcontractor.
(d) The Design -Builder shall not change a Subcontractor previously selected if the Owner or
Independent Architect/Engineer makes reasonable objection to such change.
5.3 SUBCONTRACTUAL RELATIONS
(a) By appropriate agreement, written where legally required for validity, the Design -Builder shall
require each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be
bound to the Design -Builder by the terms of the Contract Documents (including but not limited
to these General Conditions); and to assume toward the Design -Builder all the obligations and
responsibilities which the Design -Builder, by the Contract Documents, assumes toward the
Owner and the Independent Architect/Engineer. Each subcontract agreement shall preserve and
protect the rights of the Owner and the Independent Architect/Engineer under the Contract
Documents (including but not limited to these General Conditions) with respect to the Work to
be performed by the Subcontractor so that subcontracting will not prejudice the rights of the
Owner and the Independent Architect/Engineer. Where appropriate, the Design -Builder shall
require each Subcontractor to enter into similar agreements with Sub -subcontractors. The
Design -Builder shall make available to each proposed Subcontractor, prior to the execution of
the subcontract agreement, copies of the Contract Documents to which the Subcontractor is to be
bound. Subcontractors shall similarly make copies of applicable portions of such Documents
available to their respective proposed Sub -subcontractors.
(b) The Design -Builder is solely responsible for making payments properly to the Design -Builder's
Subcontractors on the Project. During performance of the Work, the Design -Builder shall
comply with the following additional rules regarding Subcontractor payments:
(1) The Design -Builder shall submit, beginning with the Second Application and Certificate for
Payment, a Subcontractor Payment Report (the "Report") with each Application and
Certificate for Payment, along with partial waivers of liens for all Work included in the
application for payment. The Report shall show all payments made to date by the Design -
Builder (plus existing retainage) to each Subcontractor involved in the Project. The Report
shall be made on a form approved and supplied by the Owner. Pay applications will not be
reviewed or certified by the Architect to the Owner without accompanying partial lien
waivers after the first Certificate for payment. With each Application for Payment, the
Design -Builder shall certify that there are no mechanics' or materialmen's Liens outstanding
at the date of the Application for Payment, and that all bills due with respect to the Work
have been paid to date, and that there is no known basis for filing of any liens against the
Surety or the Owner in connection with the Work. Upon completion by the Design -Builder
of the construction of the project, but prior to final payment to the Design -Builder, the
Design -Builder shall deliver to the Owner conditional releases of all liens, which shall
identify the remaining sums to be paid pending receipt of final payment. The conditional
releases of liens, upon final payment by the Owner, shall release the Owner of all liens, and
of all rights to claim any lien, from all manufacturers, material -men, and subcontractors
furnishing services or materials for the project, to the effect that all materials or services used
on or for the project have been paid for and indicating that the Owner is released from all
such claims. As an alternative to the Report, the Design -Builder may furnish Affidavits of
Payment Received with the Application and Certificate for Payment, which affidavits shall
be executed by each Subcontractor owed money and paid during the previous progress
payment period for work or materials furnished on the Project. RECEIPT BY THE OWNER
OF THE REPORT OR AFFIDAVITS OF PAYMENT RECEIVED SHALL BE A
CONDITION PRECEDENT TO PAYMENT ON ANY APPLICATION.
Provided that the Owner has been notified by written correspondence (a lien notice) from any
manufacturer, material -men, or subcontractor furnishing services or materials for the project that
an outstanding debt is owed, the Owner shall ensure that the Design -Builder is notified of such
notice within ten (10) days of receipt of such notice. The Design -Builder shall ensure that
resolution has been achieved for each written notice filed with the Owner, and provide sufficient
written documentation to the Owner that payment has been rendered, or a resolution has been
achieved that is satisfactory to the Owner.
(2) If, for any reason, the Design -Builder is withholding payment to a Subcontractor due to a
dispute or other problem with performance, the Design -Builder shall note the amount
withheld and that payment is in dispute. The Owner may require the Design -Builder to
document and verify the dispute or other problem in question.
(3) The Owner reserves the right in its sole discretion, to withhold payment to the Design -
Builder pursuant to Paragraph 9.5(a) of the General Conditions, should it appear from the
Report, statements of payment received or other information furnished to the Owner that:
(i) the Report has not been properly completed;
(ii) the Design -Builder has knowingly provided false information regarding payment of any
Subcontractor; or
(iii) the Design -Builder has otherwise failed to make payments properly to any
Subcontractor.
(4) THE DESIGN -BUILDER SHALL NOT HAVE ANY RIGHT TO MAKE A CLAIM FOR
ADDITIONAL TIME OR ADDITIONAL COMPENSATION AS A RESULT OF THE
OWNER'S OR INDEPENDENT ARCHITECT/ENGINEER'S ENFORCEMENT OF THIS
SUBPARAGRAPH 5.3(b). NO PROVISION OF THIS SUBPARAGRAPH OR ANY OF
THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO CREATE A
CONTRACTUAL RELATIONSHIP, EXPRESS OR IMPLIED, BETWEEN ANY
SUBCONTRACTOR AND EITHER THE OWNER OR THE INDEPENDENT
ARCHITECT/ENGINEER AND SHALL NOT BE CONSTRUED TO MAKE ANY
SUBCONTRACTOR OR ANY OTHER PERSON OR ENTITY A THIRD PARTY
BENEFICIARY OF THE CONTRACT BETWEEN THE OWNER AND THE DESIGN -
BUILDER.
5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS
In the event of a termination of this Contract by'the Owner under Article 14, the Design -Builder shall, if
requested in writing by the Owner, within fifteen (15) days after the date notice of termination is sent,
deliver and assign to Owner, or any person or entity acting on the Owner's behalf, any or all
subcontracts made by Design -Builder in the performance of the Work, and deliver to the Owner true and
correct originals and copies of the subcontract documents. In the event assignment is not requested by
the Owner, Design -Builder shall terminate all subcontracts to the extent that Owner has not directed
assignment of same and to the extent that they relate to the performance of Work terminated by the
notice of termination.
ARTICLE 6 CONSTRUCTION BY THE OWNER! SEPARATE CONTRACTORS
6.1 OWNER'S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE
CONTRACTS
(a) The Owner reserves the right to perform construction or operations related to the Project with the
Owner's own forces, and to award separate contracts in connection with other portions of the
Project or other construction or operations on the Project site under Conditions of the Contract
identical or substantially similar to these General Conditions, including those portions related to
insurance and waiver of subrogation. If the Design -Builder claims that delay or additional cost is
involved because of such action by the Owner, the Design -Builder shall make a claim as
provided elsewhere in and in accordance with the Contract Documents.
(b) When separate contracts are awarded for different portions of the Project or other construction or
operations on the Project site, the term "Contractor" in the Contract Documents in each case
shall mean the Contractor who executes each separate Building Construction Services
Agreement with the Owner.
(c) The Owner shall provide for coordination of the activities of the Owner's own forces and of each
separate contractor with the Work of the Design -Builder, who shall cooperate with them. The
Design -Builder shall participate with other separate contractors and the Owner in reviewing their
construction schedules when directed to do so. The Design -Builder shall, with the approval of
the Owner, make any revisions to the construction schedule deemed necessary after a joint
review and mutual agreement. The construction schedules shall then constitute the schedules to
be used by the Design -Builder, separate contractors, and the Owner until subsequently revised by
mutual agreement or by written Change Order. If the Design -Builder believes it is entitled to an
adjustment of the Contract Sum under the circumstances, the Design -Builder shall submit a
written proposal for a Change Order pursuant to Article 7 of the General Conditions. In the event
the Design -Builder's Change Order proposal is denied by the Owner, the Design -Builder must
submit any Claim pursuant to Paragraph 4.3 of the General Conditions.
(d) Unless otherwise provided in the Contract Documents, when the Owner performs construction or
operations related to the Project with the Owner's own forces, the Owner shall be deemed to be
subject to the same obligations and to have the same rights which apply to the Design -Builder
under these General Conditions, including, without excluding others, those stated in Article 3,
this Article 6, and Articles 10, 11 and 12.
6.2 MUTUAL RESPONSIBILITY
(a) The Design -Builder shall afford the Owner'and separate contractors' 'reasonable opportunity for
access to and storage of their materials and equipment and the performance of their activities and
shall coordinate the Design -Builder's construction and operations with the separate contractors
as required by the Contract Documents.
(b) If part of the Design -Builder's Work depends for proper execution or results upon construction
or operations by the Owner or a separate contractor, the Design -Builder shall, prior to proceeding
with that portion of the Work, promptly report to the Independent Architect/Engineer and Owner
apparent discrepancies or defects in the other construction that would render it unsuitable for
proper execution and results. Failure of the Design -Builder to so report shall constitute an
acknowledgment that the Owner's mor separate contractors completed or partially completed
construction is fit and proper to receive the Design -Builder's Work, except as to defects not then
reasonably discoverable.
(c) The Owner shall not be liable to the Design -Builder for damages suffered by the Design -Builder
due to the fault or negligence of a separate contractor or through failure of a separate contractor
to carry out the directions of the Owner or the Independent Architect/Engineer. Should any
interference occur between the Design -Builder and a separate Design -Builder, the Independent
Architect/Engineer or the Owner may furnish the Design -Builder with written instructions
designating priority of effort or change in methods, whereupon the Design -Builder shall
immediately comply with such direction. In such event, the Design -Builder shall be entitled to an
extension of the Contract Time only for unavoidable delays verified by the Independent
Architect/Engineer; no increase in the Contract Sum, however, shall be due to the Design -
Builder.
(d) The Design -Builder shall promptly remedy damage wrongfully caused by the Design -Builder to
completed or partially completed construction or to property of the Owner or separate
contractors as provided in Subparagraph 10.2(e).
(e) Should the Design -Builder cause damage to the work or property of any separate contractor on
the Project, the Design -Builder shall, upon due notice, settle with the separate contractor by
agreement, if the separate contractor will so settle. If the separate contractor sues the Owner or
submits a claim on account of any damage alleged to have been so sustained, the Owner shall
notify the Design -Builder who shall defend such proceedings, at the Design -Builder's expense,
and if any judgment or award against the Owner arises from the separate contractor's claim, the
Design -Builder shall pay or satisfy it and shall reimburse the Owner for all attorney's fees and
costs which the Owner has incurred.
(f) The Owner and each separate contractor shall have the same responsibilities for cutting and
patching as are described for the Design -Builder in Paragraph 3.14.
6.3 OWNER'S RIGHT TO CLEAN UP
If a dispute arises among the Design -Builder, separate contractors and the Owner as to the
responsibility under their respective contracts for maintaining the Project site and surrounding area
free from waste materials and rubbish as described in Paragraph 3.15, the Owner may clean up and
allocate the cost among those responsible as the Independent Architect/Engineer recommends to be
just.
ARTICLE 7 AMENDMENTS
7.1 CHANGE ORDERS
(a) A Change Order is a written order to the Design -Builder, signed by the Owner and the
Independent Architect/Engineer, issued after execution of the Contract, authorizing a change in
the Work, an adjustment in the Contract Sum, or an adjustment to the Contract Time, consistent
with other applicable provisions of this Contract. The Owner, without invalidating the Contract
and without requiring notice of any kind to the sureties, may order changes to the scope of Work
under the Contract by additions, deletions, or other revisions, the Contract Sum and Contract
Time to be adjusted consistent with other applicable provisions of this Contract. All Change
Orders shall be executed on a Change Order form approved by the Owner and the Owner's City
Attorney.
(b) In addition to the Owner and the Independent Architect/Engineer, the Design -Builder shall sign
all Change Orders to verify and confirm the terms and conditions established by Change Order;
however, should the Design -Builder refuse to sign a Change Order, this shall not relieve him of
his obligation to perform the change directed by the Owner and the Independent
Architect/Engineer to the best of his ability in accordance with the provisions of this Article 7. A
Change Order signed by the Design -Builder indicates his agreement with all of the changes
approved, including the adjustment.in the Contract Sum or the Contract Time: EACH CHANGE
ORDER SHALL BE SPECIFIC AND FINAL AS TO PRICES AND EXTENSIONS OF TIME,
WITH NO RESERVATIONS OR OTHER PROVISIONS ALLOWING FOR FUTURE
ADDITIONAL MONEY OR TIME AS A RESULT OF THE PARTICULAR CHANGES
IDENTIFIED AND FULLY COMPENSATED IN THE CHANGE ORDER. The execution of a
Change Order by the Design -Builder shall constitute conclusive evidence of the Design -
Builder's agreement to the ordered changes in the Work. The Design -Builder forever releases
any claim against the Owner for additional time or compensation for matters relating to or
arising out of or resulting from the Work included within or affected by the executed Change
Order. This release applies to claims related to the cumulative impact of all Change Orders and
to any claim related to the effect of a change on other Work.
(c) No extra work (except under emergency conditions) or changes shall be made nor shall any
substitutions, changes or additions to or omissions or deviations from the requirements of the
Drawings and Specifications be made unless pursuant to a written Change Order signed by the
Owner and the Independent Architect/Engineer, it being expressly understood that the Owner
shall not be liable for the cost of extra work or any substitution, change, addition, omission or
deviation from the requirements of the Drawings or Specifications unless the same shall have
been authorized in writing by the Owner and the Independent Architect/Engineer in a written
change order or other Amendment. The provisions of this Paragraph 7.1 shall control in the event
of any inconsistency between such provisions and the other provisions of this Article 7. See
Subparagraph 10.3(a) of the General Conditions for Change Orders under emergency conditions.
(d) The method of determining the cost or credit to the Owner for any change in the Work shall be
one of the following:
(1) mutual acceptance of a guaranteed maximum price amount properly itemized and supported
by sufficient substantiating data to permit evaluation;
(2) unit prices stated in the Contract Documents or subsequently agreed upon;
(3) cost to be deternnined in a manner agreed upon by the parties and a mutually acceptable fixed
or percentage fee; or
(4) the force account method provided in Subparagraph 7.1(e)
(e) If the parties cannot agree to one of the methods of calculating cost provided in Clauses (d) (1),
(d) (2), or (d) (3), or if the parties agree to a method but cannot agree to a final dollar figure, or if
the Design -Builder for whatever reason refuses to sign the Change Order in question, the
Design -Builder, provided he receives a written order signed by the Owner, shall promptly
proceed with the Work involved. The cost of the Work involved shall then be calculated on the
basis of the reasonable jobsite expenditures and savings of those performing the Work
attributable to the changes, including a reasonable allowance for overhead and profit, such
allowance in any case never to exceed 15%. In such case, the Design -Builder shall keep an
itemized accounting of the Work involved, on a daily basis, in such form and with the
appropriate supporting data as the Independent Architect/Engineer and Owner may prescribe.
Sworn copies of the itemized accounting shall be delivered to the Independent
Architect/Engineer each day during the performance of force account work, with copies to the
Owner.
FAILURE.OF THE DESIGN -BUILDER TO SUBMIT THE.SWORN-TO ITEMIZED
ACCOUNTING DAILY AS REQUIRED HEREIN SHALL CONSTITUTE A WAIVER BY
THE DESIGN -BUILDER OF ANY RIGHT TO DISPUTE THE OWNER'S
DETERMINATION OF THE AMOUNT DUE THE DESIGN -BUILDER FOR FORCE
ACCOUNT WORK. Costs to be charged under this Subparagraph for force account work are
limited to the following:
(1) costs of labor, including social security, old age and unemployment insurance, fringe benefits
required by agreement or custom, and workers compensation insurance;
(2) costs of materials, supplies and equipment (but not to include off-site storage unless
approved in writing by the Owner), whether incorporated or consumed;
(3) rental costs of machinery and equipment, exclusive of hand tools, whether rented from the
Design -Builder or others;
(4) costs of premiums for all bonds and insurance related to the Work; and
(5) additional costs of supervision and field office personnel directly attributable to the changed
Work. Pending final determination of cost to the Owner, payment of undisputed amounts on
force account shall be included on the Independent Architect/Engineer's Certificate of
Payment as work is completed.
(f) The amount of credit to be allowed to the Owner for any deletion of Work or any other change
which results in a net decrease of the Contract Sum shall be the amount of actual net cost
confirmed by the Independent Architect/Engineer plus the stated percentage for overhead and
profit. When both additions and deletions or credits covering related Work or substitutions are
involved in any one change, the allowance for overhead and profit shall be figured on the basis
of the net increase or decrease with respect to that change.
7.2 SUPPLEMENTAL AGREEMENTS
A written Supplemental Agreement can also be used to implement changes in the Work instead of a
Change Order form, including but not limited to situations involving partial occupancy of the Work
under Paragraph 9.8, a change made to the Drawings or the Specifications without an increase in the
Contract Sum, or special circumstances where it is necessary or more appropriate for the Owner to
use a Supplemental Agreement. Written Supplemental Agreements shall have a status equal to that
of Change Orders for purposes of priority of Contract Documents interpretation, except that to the
extent of a conflict, later Supplemental Agreements in time control over earlier Supplemental
Agreements, and the latest Change Order or Supplemental Agreement in time controls over earlier
dated Change Orders and Supplemental Agreements. The rules of Subparagraphs 7.1(b) through (f)
shall also apply to the negotiation and execution of Supplemental Agreements.
7.3 MINOR CHANGES IN THE WORK
The Independent Architect/Engineer, after notifying the Owner, shall be authorized to order minor
changes in the Work not involving an adjustment in the Contract Sum or an extension of the
Contract Time and not inconsistent with the intent of the Contract Documents. Minor changes shall
be effected by written order, and shall be binding on the Owner and the Design -Builder. The Design -
Builder shall carry out such written orders promptly. These written orders shall not be deemed to
change or impact the Contract .Sum or the Contract Time. Design -Builder shall have no Claim for
any minor change ordered to the Work under this Paragraph 7.3 unless the Design -Builder submits
its change proposal, prior to complying with the minor change ordered and in no event later than ten
(10) working days from the date the minor change was ordered, to the Owner for approval.
7.4 TIME REQUIRED TO PROCESS AMENDMENTS
(a) All of the Design -Builder's responses to proposal requests shall be accompanied by a complete,
itemized breakdown of costs. Responses to proposal requests shall be submitted sufficiently in
advance of the required work to allow the Owner and the Independent Architect/Engineer a
minimum of thirty (30) calendar days after receipt by the Independent Architect/Engineer to
review the itemized breakdown and to prepare or distribute additional documents as may be
necessary. All of the Design -Builder's responses to proposal requests shall include a statement
that the cost described in the response represents the complete, total and final cost and additional
Contract Time associated with the extra work, change, addition to, omission, deviation,
substitution, or other grounds for seeking extra compensation under the Contract Documents,
without reservation or further recourse.
(b) All Amendments require approval by either the City Council or, where authorized by the state
law and City ordinance, by the City Manager pursuant to Administrative Action. The approval
process requires a minimum of forty-five (45) calendar days after submission to the Owner in
final form with all supporting data. Receipt of a submission by Owner does not constitute
acceptance or approval of a proposal, nor does it constitute a warranty that the proposal will be
authorized by City Council Resolution or Administrative Action. THE TIME REQUIRED FOR
THE APPROVAL PROCESS SHALL NOT BE CONSIDERED A DELAY AND NO
EXTENSIONS TO THE CONTRACT TIME OR INCREASE IN THE CONTRACT SUM
WILL BE CONSIDERED OR GRANTED AS A RESULT OF THIS PROCESS. Pending the
approval described above, the Design -Builder will proceed with the work under a pending
Amendment only if directed in writing by the Owner.
ARTICLE 8 CONTRACT TIME
8.1 DEFINITIONS
(a) Unless otherwise provided, the Contract Time is the period of time, including authorized
adjustments, allotted in the Contract Documents for Substantial Completion of the Work.
(b) The date of commencement of the Work is the date established in the notice to proceed from the
Owner. The date of commencement shall not be postponed by the failure of the Design -Builder,
or of persons or entities for whom the Design -Builder is responsible to act promptly to
commence the Work. If the Owner unreasonably delays the issuance of the notice to proceed
through no fault of the Design-Builder,�the Design -Builder shall be entitled only to an equitable
extension of the Contract Time; the Contract Sum shall remain unchanged.
(c) The date of Substantial Completion is the date certified by the Independent Architect/Engineer in
accordance with Paragraph 9.7.
(d) The term "day" as used in the Contract Documents shall mean a calendar day, beginning and
ending at 12:00 midnight, unless otherwise specifically defined by special provision.
8.2 PROGRESS AND COMPLETION
(a) Time limits stated in the Contract Documents are of the essence of the Contract. By executing
the Design -Build Agreement, the Design -Builder confirms that the Contract Time is a reasonable
period for performing the Work.
(b) The Design -Builder shall not knowingly, except by agreement with or instruction of the Owner
in writing, prematurely commence operations on the Project site or elsewhere prior to the
effective date of insurance to be furnished by the Design -Builder as required by Article 11. The
date of commencement of the Work shall not be changed by the effective date of insurance
required by Article 11.
(c) Liquidated Damages. The Design -Builder shall proceed expeditiously with adequate forces,
materials, and equipment, and shall achieve Substantial Completion within the Contract Time. If
the Design -Builder fails or refuses to complete the Work within the Contract Time as specified
in the Bid Proposal form, the Design -Build Agreement, or in any proper extension of the
Contract Time granted by the Owner, then the Design -Builder agrees, as a part of the
consideration for the awarding of the Contract, to pay to the Owner the amount of liquidated
damages (hereinafter called the "Stipulated Amount") as stipulated in the Proposal form and the
Design -Build Agreement for each calendar day that the Design -Builder has not Substantially
Completed the Work after the expiration of the Contract Time provided. The Stipulated Amount
is not to be considered as a penalty, but shall be deemed, taken, or treated as reasonable
liquidated damages, fixed and agreed upon by and between the Design -Builder and the Owner
because of the impracticality and extreme difficulty of fixing and ascertaining the actual
damages the Owner would sustain in the event of the Design -Builder's late completion of the
Project, and the stipulated amount is agreed to be the daily amount of damages that the Owner
would sustain. The Stipulated Amount, as it accrues, will be retained from any portion of the
Contract Sum due or that may become due to the Design -Builder. In the event the portion of the
Contract Sum retained by the Owner is insufficient to recover the Stipulated Amount, then the
Design -Builder or the Design -Builder's Surety shall pay to the Owner any additional liquidated
damages due that are in excess of the funds remaining unpaid in the Contract Sum. The Owner
shall be the sole judge as to whether or not the Work has been Substantially Completed within
the calendar days allotted, which shall include the original Contract Time and any proper
extension of the Contract Time granted in writing by the Owner. Should the Design -Builder
dispute the Owner's determination of liquidated damages due, however, or should the Design -
Builder, or the Design -Builder's agents or assigns, institute any legal action against the Owner to
enforce rights under the Contract Documents, then this Subparagraph 8.2(c) shall not be
construed to prevent the Owner from seeking full recovery for any and all actual damages
suffered by the Owner and attributable to the Design -Builder, as an alternative to all liquidated
damages due.
8.3 DELAYS AND EXTENSIONS OF TIME
(a) If the Design -Builder is delayed at any time in the progress of the Work by an act or neglect of
the Owner or Independent Architect/Engineer, or of an employee of either, or of a separate
Design -Builder employed by the Owner, or by changes ordered in the Work, or by labor
disputes, fire, unusual delay in deliveries, unavoidable casualties or other causes beyond the
Design -Builder's control, or by delay authorized by the Owner pending a claim, or by other
causes which the Independent Architect/Engineer determines may justify delay, then the
Contract Time shall be extended by Change Order for such reasonable time as the Independent
Architect/Engineer and Owner may determine.
(b) Claims relating to Contract Time and time extensions shall be made in accordance with the
applicable provisions of Paragraph 4.3.
(c) No Damages for Delay. NOTWITHSTANDING ANY OTHER PROVISIONS OF THE
CONTRACT DOCUMENTS, INCLUDING THE GENERAL CONDITIONS, NO
ADJUSTMENT SHALL BE MADE TO THE CONTRACT SUM AND THE DESIGN -
BUILDER SHALL NOT BE ENTITLED TO CLAIM OR RECEIVE ANY ADDITIONAL
COMPENSATION AS A RESULT OF OR ARISING OUT OF ANY DELAY, HINDRANCE,
DISRUPTION, FORCE MAJEURE, IMPACT, OR INTERFERENCE, INTENTIONAL OR
UNINTENTIONAL, FORESEEN OR UNFORESEEN, WHICH INCREASES THE TIME TO
COMPLETE THE WORK, INCLUDING BUT NOT LIMITED TO ANY DELAYS CAUSED
IN WHOLE OR IN PART BY THE ACTS, OMISSIONS, FAILURES, NEGLIGENCE, OR
FAULT OF THE OWNER, THE INDEPENDENT ARCHITECT/ENGINEER, OR THE
OWNER'S REPRESENTATIVE, AN EXTENSION OF THE CONTRACT TIME UNDER
SUBPARAGRAPH 8.3(a) BEING THE DESIGN -BUILDER'S SOLE REMEDY.
(d) The Owner shall have the right to occupy, without prejudice to the right of either party, any
completed or largely completed portions of the structure or Work, notwithstanding the fact that
the Contract Time for completing all or a portion of the Work may not have expired. Partial
occupancy and use shall not be deemed as an acceptance of the Work taken or used.
(e) The Design -Builder shall promptly suspend the Work when either the Design -Builder or the
Owner is ordered to do so by a court order from a court having lawful jurisdiction, and the
Design -Builder will not be entitled to additional compensation by virtue of any delays resulting
from the court order. The Design -Builder will also not be liable to the Owner for a delay caused
in fact by the Work being suspended by a court order.
(f) The Independent Architect/Engineer, with the consent of the Owner, shall have the authority to
suspend the Work, in whole or in part, for such period or periods as the Independent
Architect/Engineer deems necessary due to unusual or severe weather conditions as are
considered unfavorable for the suitable prosecution of the Work, or due to failure on the part of
the Design -Builder to correct conditions considered unsafe for workmen or the general public. If
it should become necessary to stop the Work for an indefinite period, the Design -Builder shall
store all materials in such a manner that they will not obstruct or impede the public unnecessarily
or become damaged in any way, and shall take every precaution to prevent damage or
deterioration of the Work performed. In cases of suspension of the Work under this
Subparagraph, the Design -Builder shall also provide suitable drainage about the Work and erect
temporary structures where necessary. The Design -Builder shall not suspend the "Work in whole
or in part without written authority from the Independent Architect/Engineer or the Owner, and
shall resume the Work promptly when notified by the Independent Architect/Engineer or the
Owner to resume operations.
(g) In the event of a delay that is the responsibility of the Design -Builder or any of the
Subcontractors, for which the Design -Builder is not entitled to a time extension under the
provisions of this Contract, the Owner may direct that the Work be accelerated by means of
overtime, additional crews or additional shifts, or resequencing. This acceleration shall be at no
cost to the Owner and will continue until the Contract Time is restored. In the event of a delay
for which the Design -Builder is entitled to a time extension, as determined by the Independent
Architect/Engineer, Owner may similarly direct acceleration and the Design -Builder agrees to
perform same on the basis that the Design -Builder will be reimbursed only to the extent
described in Subparagraph 4.3(i). THE DESIGN -BUILDER EXPRESSLY WAIVES ANY
OTHER COMPENSATION RESULTING FROM ACCELERATION, SUCH AS LOSS OF
LABOR PRODUCTIVITY OR EFFICIENCY.
ARTICLE 9 PAYMENTS AND COMPLETION
9.1 CONTRACT SUM
The Contract Sum is stated in the Design -Build Agreement and, including authorized adjustments, is
the total amount of compensation payable by the Owner to the Design -Builder for the performance
of the Work under the Contract Documents.
9.2 SCHEDULE OF VALUES
Before the first Application for Payment, the Design -Builder shall submit to the Independent
Architect/Engineer and the Owner a schedule of values allocated to various portions of the Work,
prepared in such form and supported by such data to substantiate its accuracy as the Independent
Architect/Engineer may require. This schedule, when approved by the Independent
Architect/Engineer and the Owner, shall be used as a basis for the Design -Builder's Application for
Payment. The schedule of values shall follow the trade division of the Specifications. Design -
Builder's Application for Payment shall be filed on the current version of AIA Form G702
(Application and Certificate for Payment), as approved by the Owner.
9.3 APPLICATIONS FOR PAYMENT
(a) At least ten (10) days before the date established for each progress payment, the Design -Builder
shall submit; to the Independent Architect/Engineer an iterni7ed Application for Payment for
Work completed in accordance with the schedule of values. The Application shall be notarized,
if required, and supported by data substantiating the Design -Builder's right to payment as the
Owner or Independent Architect/Engineer may require, including but not limited to copies of
requisitions from Subcontractors and material suppliers, and reflecting the applicable retainage
as required in the Contract Documents. Design -Builder's Application for Payment shall also
provide other supporting documentation as the Owner or the other applicable provisions of the
Contract Documents may require.
(b) Applications for Payment may not include requests for payment of amounts the Design -Builder
does not intend to pay to a Subcontractor because of a good faith dispute, unless the Design -
Builder complies with Clause 5.3(b) (2) of these General Conditions and the Design -Builder's
Payment Bond Surety consents in writing to payment to the Design -Builder of the funds deemed
to be in dispute.
(c) Unless otherwise provided in the Contract Documents, progress payments shall include payment
for materials and equipment delivered and suitably stored at the Project site for subsequent
incorporation into the Work within thirty (30) days after delivery to the Project site. If approved
in advance by the Owner, payment may similarly be made for materials and equipment suitably
stored away from the Project site at a location agreed upon in writing. Payment for costs incurred
in storage of materials or equipment away from the Project site will NOT be made by Owner
unless:
(1) the Owner has given prior approval of such off-site storage in writing;
(2) the materials or equipment are stored in a bonded warehouse located in Denton County and
identified with the Project for which they are stored, as evidenced by warehouse receipts
and appropriate documents of title; and
(3) the materials or equipment stored offsite will be incorporated into the Work within thirty
(30) days after delivery. STORAGE IN FACILITIES OF THE MANUFACTURER OR
THE DESIGN -BUILDER WILL NOT BE PERMITTED OR PAID FOR, UNLESS THE
OWNER HAS EXPRESSLY GIVEN PRIOR APPROVAL OF SUCH STORAGE IN
WRITING.
(d) The Design -Builder warrants that title to all Work covered by an Application for Payment will
pass to the Owner no later than the time of payment. The Design -Builder further warrants that
upon submittal of an Application for Payment all Work for which Certificates for Payment have
been previously issued and payments received from the Owner shall be free and clear of liens,
claims, security interests or encumbrances in favor of the Design -Builder, Subcontractors,
material suppliers, or other persons or entities making a claim by reason of having provided
labor, materials, and equipment relating to the Work.
(e) All materials or equipment delivered to the Project site earlier than thirty (30) days prior to an
approved schedule for delivery to the Project site shall be classified as an "early delivery." All
early delivery materials or equipment must have the express written permission of the Owner to
be stored on the Project site. If any unauthorized early delivery occurs, Design -Builder shall, at
Design -Builder's expense or at the expense of the responsible Subcontractor or Supplier, cause
such early delivery to be removed from the Project site and stored off-site until required at the
Project site. All costs of labor, transportation and storage will be included as part of the expense.
If the Design -Builder fails or refuses to remove unauthorized early delivery materials, the Owner
may cause such materials to be removed at the Design -Builder's sole expense, and amounts may
be withheld from the Design -Builder's Application for Payment to reimburse the Owner for any
costs incurred in removing unauthorized early delivery materials. OWNER WILL NOT BE
RESPONSIBLE FOR THE PROTECTION OF OR RISK OF LOSS ON ANY EARLY
DELIVERY MATERIALS OR EQUIPMENT, NOR WILL OWNER BE LIABLE FOR ANY
PAYMENT FOR THE EARLY DELIVERY MATERIALS OR EQUIPMENT. Any materials or
equipment classified as early delivery will not be approved for payment as stored materials prior
to thirty (30) days before the incorporatich of the materials or equipment into the Work, unless
storage and payment at an earlier date is expressly approved in writing by the Owner.
(f) If the Contract Sum is equal to or less than $25,000.00 and performance and payment bonds are
not furnished by the Design -Builder, no payment applied for will be payable under the Contract
until the Work has been Finally Completed and accepted.
9.4 CERTIFICATES FOR PAYMENT
(a) The Independent Architect/Engineer will, within ten (10) days after receipt of the Design -
Builder's Application for Payment; either issue to the Owner a Certificate for Payment, with a
copy to the Design -Builder, for such amount as the Independent Architect/Engineer determines
is properly due; or notify the Design -Builder and Owner in writing of the Independent
Architect/Engineer's reasons for withholding certification in whole or in part as provided in
(a) City of Denton General Conditions for Building Construction.
(b) Subparagraph 9.5(a). The Certificate for Payment shall be issued on the current version of AIA
Form G702 (Application and Certificate for Payment) as approved by the Owner.
(c) The issuance of a Certificate for Payment will constitute a representation by the Independent
Architect/Engineer to the Owner, based on the Independent Architect/Engineer's observations at
the site and the data comprising the Application for Payment, that the Work has _progressed to the
point indicated and that, to the best of the Independent Architect/Engineer's knowledge.,
information and belief, quality of the Work is in accordance with the Contract Documents. The
foregoing representations are subject to an evaluation of the Work for conformance with the
Contract Documents upon Substantial and Final Completion, to results of subsequent tests and
inspections, to minor deviations from the Contract Documents correctable prior to Final
Completion and to specific qualifications expressed by the Independent Architect/Engineer. The
issuance of a Certificate for Payment will further constitute a representation that the Design -
Builder is entitled to payment in the amount certified, subject to the Owner's approval. The
issuance of a Certificate for Payment is not a representation that the Independent
Architect/Engineer has:,
(1) made exhaustive or continuous on-site inspections to check the quality or quantity of the
Work;
(2) reviewed construction means, methods, techniques, sequences or procedures;
(3) reviewed copies of requisitions received from Subcontractors and material suppliers and
other data requested by the Owner to substantiate the Design -Builder's right to payment; or
(4) made examination to ascertain how or for what purpose the Design -Builder has used money
previously paid on account of the Contract Sum.
(d) Whenever the Application for Payment for Work done since the last previous Application for
Payment exceeds one hundred dollars ($100.00) in amount, Owner will pay a percentage of the
Application, less applicable retainage, to the Design -Builder within thirty (30) days following
Owner's receipt and approval of the Certificate for Payment certified by the Independent
Architect/Engineer. The Application may include acceptable nonperishable materials delivered
to the Work or stored as provided for in Paragraph 9.3(c) and the payment will be allowed on the
net invoice value, less taxes and applicable retainage.
(e) The City is required to withhold retainage for public works contracts in which the total contract
price estimate at the time of execution is more than $400,000; however, this requirement is
typically applied by the City for all public works contracts in excess of $50,000. The City may
require varying percentage withholding amounts; however, the City typically requires five
percent. For retainage percentages in excess of five percent, the City must deposit the retainage
into an interest-bearing account and pay the interest earned to the Design -Builder on completion
of the contract. The retainage will be withheld by the Owner from each progress payment until
final completion of the Work by the Design -Builder, approval of final completion by the
Independent Architect/Engineer, and final acceptance of the Work by the Owner. Unless
otherwise required by state law, the retainage percentage as specified above is based upon the
original Contract Sum, and will not be affected in the event the original Contract Sum is
subsequently increased or decreased by Change Order.
(f) No progress payments shall be made on contracts where performance and payment bonds are not
required or furnished. In such instances, payment for the Work performed will be made upon
final completion and acceptance by the Owner of all Work.
9.5 DECISIONS TO WITHHOLD CERTIFICATION
(a) The Independent Architect/Engineer or the Owner may decide. not to certify payment and may
withhold a Certificate for Payment in whole or in part, to the extent reasonably necessary to
protect the Owner's interest, if in the Independent Architect/Engineer's or Owner's opinion the
representations to the Owner required by Subparagraph 9.4(b) cannot be made. If the
Independent Architect/Engineer or the Owner is unable to certify payment in the amount of the
Application, the Independent Architect/Engineer or the Owner will notify the Design -Builder as
provided in Subparagraph 9.4(a). If the Design -Builder and Independent Architect/Engineer or
the Owner cannot agree on a revised amount, the Independent Architect/Engineer will promptly
issue a Certificate for Payment for the amount, for which the Independent Architect/Engineer is
able to make the required representations to the Owner. The Independent Architect/Engineer or
the Owner may also decide not to certify payment or, because of subsequently discovered
evidence or subsequent observations, may nullify the whole or a part of a Certificate for Payment
previously issued to such extent as may be necessary, in the Independent Architect/Engineer's or
Owner's opinion, to protect the Owner from loss because of:
(1) defective or nonconforming Work not remedied;
(2) third party claims filed or reasonable evidence indicating probable filing of such claims;
(3) failure of the Design -Builder to make payments properly to Subcontractors or for labor,
materials, or equipment;
(4) reasonable evidence that the Work cannot be completed for the unpaid balance of the
Contract Sum;
(5) damage to the Owner or another contractor;
(b) reasonable evidence that the Work will not be completed within the Contract Time, and that
the unpaid balance would not be adequate to cover actual or liquidated damages for the
anticipated delay;
(7) persistent failure to carry out the Work in accordance with the Contrdct Documents; or
(8) mathematical or other errors that are discovered in the Application for Payment.
(b) When each of the above reasons that existed for withholding certification are removed or
remedied, certification will be made for amounts previously withheld.
(c) The Owner may, at its option, offset any progress payment or final payment under the Contract
Documents against any debt (including taxes) lawfully due to the Owner from the Design-
Builder, regardless of whether the amount due arises pursuant to the terms of the Contract
Documents or otherwise and regardless of whether or not the debt due to the Owner has been
reduced to judgment by a court.
9.6 PROGRESS PAYMENTS
(a) After the Independent Architect/Engineer has issued a Certificate for Payment, the Owner shall
make payment in the manner and within the time provided in the Contract Documents, and shall
so notify the Independent Architect/Engineer. The Owner shall not be liable for interest on any
late or delayed progress payment or final payment caused by any claim or dispute, any
discrepancy in quantities, any failureto•provide supporting documentation or -other information
required with the Application for Payment or as a precondition to payment under the Contract
Documents, or due to any payment the Owner or the Independent Architect/Engineer has a right
to withhold or not certify under the Contract Documents. Notwithstanding the foregoing, the
Owner may refuse to make payment on any Certificate for Payment (including, without
limitation, the final Certificate for. Payment) for any default under the Contract Documents,
including but not limited to those defaults set forth in Subparagraph 9.5(a), Clauses (1) through
(7). The Owner shall not be deemed in default by reason of withholding payment while any
Design -Builder default remains uncured.
(b) The Design -Builder shall promptly pay each Subcontractor, upon receipt of payment from the
Owner, out of the amount paid to the Design -Builder on account of each Subcontractor's portion
of the Work, the amount to which said Subcontractor is entitled, reflecting percentages actually
retained from payments to the Design -Builder on account of such Subcontractors portion of the
Work. The Design -Builder shall, by appropriate agreement with each Subcontractor, require each
Subcontractor to make payments to Sub -subcontractors in similar manner.
(c) The Independent Architect/Engineer will, ora :reuest, furnish to a Subcontractor, if practicable,
information regarding percentages ofcompletion or amounts applied for by the Design -Builder
and action taken thereon by the Independent Architect/Engineer and the Owner on account of
portions of the Work done by such Subcontractor.
(d) Neither the Owner nor the Independent Architect/Engineer shall have an obligation to pay or to
see to the payment of money to a Subcontractor except as may otherwise be required by law.
That obligation belongs to the Design -Builder or, in the event of the Design -Builder's failure to
pay a Subcontractor, to the Surety on the Payment Bond as required under Paragraph 11.3.
(e) Payment to material suppliers shall be treated in a manner similar to that provided in
Subparagraphs 9.6(b), (c), and (d).
(f) A Certificate for Payment, a progress payment, or partial or entire use or occupancy of the
Project by the Owner shall not constitute acceptance of Work not performed in accordance with
the Contract Documents.
9.7 SUBSTANTIAL COMPLETION
(a) The Date of Substantial Completion of the Work, or designated portion of the Work, is the date
certified by the Independent Architect/Engineer when construction is sufficiently completed in
accordance with the City Of Denton General Conditions For Building Construction.
(a) the Contract Documents such that the Owner may beneficially occupy and use the Work, or
designated portions of the Work, f an I I and
.or the purposes for which it is intended d only trivia
insignificant items remain which do not affect the Work as a whole.
(b) When the Design -Builder considers that the Work, or the portion of the Work which the Owner
agrees to accept separately, is Substantially Complete, the Design -Builder shall prepare and
submit to the Independent Architect/Engineer a comprehensive list of remaining items to be
completed or corrected. The Design -Builder shall proceed promptly to complete and correct
items on the list (hereinafter called the "punch list"). Failure to include an item on the punch list
does not alter the responsibility of the Design -Builder to complete all Work in accordance with
the Contract Documents. -Upon receipt of the punch list, the, Independent Architect/Engineer will
make an inspection to determine whether the Work, or designated portion of the Work, is
Substantially Complete. If the Independent Architect/Engineer's inspection discloses any item,
whether or not included on the punch list, which is not in accordance with the requirements of
the Contract Documents and which renders the Work inspected not Substantially Complete the
Design -Builder shall, before issuance of (he Certificate of Substantial Completion, complete or
correct the item upon, notification by the Independent Architect/Engineer. The Design -Builder
shall then submit a request for another inspection by the Independent Architect/Engineer to
determine Substantial Completion. When the Work or designated portion of the Work is
Substantially Complete, the Independent Architect/Engineer will prepare a Certificate of
Substantial Completion which shall establish the date of Substantial Completion, shall establish
responsibilities of the Owner and the Design -Builder for security, maintenance, heat, utilities,
damage to the Work and insurance, and shall fix the time within which the Design -Builder shall
finish all items on the punch list accompanying the Certificate.
(c) The Certificate of Substantial Completion shall be submitted to the Owner and the Design -
Builder for their written acceptance of responsibilities assigned to them in the Certificate.
(d) Upon Substantial Completion of the Work or designated portion thereof and upon application by
the Design -Builder and certification by the Independent Architect/Engincer, the Owner shall
make payment, reflecting adjustment in retainage, if any, for the Work, or portion of the Work,
as provided in the Contract Documents.
9.8 PARTIAL OCCUPANCY OR USE
(a) The Owner may occupy or use any completed or partially completed portion of the Work at any
stage when such portion is designated by separate Supplemental Agreement with the Design -
Builder, provided such occupancy or use is consented to by the insurer as required under
Subparagraph 11.2(e) and authorized by public authorities having jurisdiction over the Work.
Such partial occupancy or use may commence whether or not the portion is Substantially
Complete, provided the Owner and Design -Builder have accepted in writing, the responsibilities
assigned to each of them for payments, retainage if any, security, maintenance, heat, utilities,
damage to the Work and insurance, and have agreed in writing concerning the period for
correction of the Work and commencement of warranties required by the Contract Documents.
When the Design -Builder considers a portion Substantially Complete, the Design -Builder shall
prepare and submit a list to the Independent Architect/Engincer as provided under Subparagraph
9.7(b). Consent of the Design -Builder to partial occupancy or use shall not be unreasonably
withheld. The stage of the progress of the Work shall be determined by written agreement
between the Owner and Design -Builder or, if no agreement is reached, by decision of the
Independent Architect/Engineer.
(a) Immediately prior to such partial. occupancy or use, the Owner, Design -Builder, and Independent
Architect/Fngincer shall jointly inspect the area to be occupied or portion of the Work to be used
in order to determine and record the condition of the Work.
(b) Unless otherwise agreed upon, partial occupancy or use of a portion or portions of the Work
shall not constitute acceptance of -Work not complying with the requirements of the Contract
Documents.
9.9 FINAL COMPLETION AND FINAL PAYMENT
(a) Upon receipt of written notice that the Work is ready for final inspection and acceptance and
upon receipt of a final Application for Payment, the Independent ArchitectTngineer,
accompanied by the Owner's representative, will promptly make final inspection and, when the
Independent Architect/Engineer finds the Work acceptable under the Contract Documents and
the Contract Documents fully performed, the Independent Architect/Engineer will promptly
issue a final Certificate for Payment stating that to the best of the Independent
Architect/Engineer's knowledge, information and belief, and on the basis of the
Architect/Engineer's observations and inspections, the, Work has been completed in accordance
with terms and conditions of the Contract Documents and that the entire balance found to be due
the Design -Builder and noted in said final Certificate is due and payable. The Independent
Architect/Engineer's final Certificate for Payment will constitute a further representation that
conditions listed in Subparagraph 9.9(b) as a condition precedent to the Design -Builder's being
entitled to final payment have been fulfilled. Owner will normally make final payment within
thirty (30) days after Owner's receipt and approval of the final Certificate for Payment.
Warranties required by the Contract Documents shall commence on the date of Substantial
Completion of the Work, unless otherwise provided by separate agreement between the Owner
and the Design -Builder.
(b) Neither final payment nor any remaining retained percentage shall become due until the Design -
Builder submits to the Independent Architcct/Engineer and Owner:
(1) an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected
with the Work for which the Owner or the Owner's property might be responsible or
encumbered (less amounts withheld by Owner) have been paid or otherwise satisfied;
(2) a certificate evidencing that insurance required by the Contract Documents to reIn ain � in fore
c
after final payment is currently in effect and will not be cancelled or allowed to expire until
at least thirty (30) days prior written notice has been given to the Owner;
(3) a written statement that the Design -Builder knows of no substantial reason that the insurance
will not be renewable to cover the period required by the Contract Documents;
(4) a consent of surety to final payment; and
(5) if required by the Owner, other data establishing payment or satisfaction of obligations, such
as receipts, releases and waivers of liens, claims, security interests or encumbrances arising
out of the Contract, to the extent and in such form as may be designated by the Owner.
(c) As a precondition to final payment by the Owner under this Contract, the Design -Builder's
affidavit under Clause (b)(1) shall state that the Design -Builder has paid each of his or the
subcontractors, laborers or materialmen in full ]*or all labor and materials provided to him f
Work under this Contract, In the event the Design -Builder has not paid each of his
subcontractors, laborers or materialmen in full, the Design -Builder shall state in the affidavit the
amount owed and the name of each subcontractor, laborer or inaterialmen to whom such
payment is owed. IN ANY EVENT, THE DESICjN-BUILDERSHALL BE REQUIRED TO
EXECUTE THE OWNER'S STANDARD AFFIDAVIT OF FINAL PAYMENT AND
RELEASE AS A PRECONDITION TO RECEIPT OF FINAL PAYMENT:
(d) If, after Substantial Completion of the Work, final completion of the Work is materially delayed
through no fault of the Design -Builder or by issuance of Change Orders affecting final
completion and the Independent Architect/Engineer confirms the delay, the Owner shall, upon
application by the Design -Builder and certification by the Independent Architect/Engineer, and.
without terminating the Contract, make payment of the balance due for that portion of the Work
fully completed and accepted. If the remaining balance for Work not fully completed or
corrected is less than retainage:stipulated in the Contract Documents, and if bonds have been
furnished, the written consent of surety to payment of the balance due for that portion of the
Work fully completed and accepted shall be submitted by the Design -Builder to the Independent
Architect/Engineer prior to certification of payment. Payment shell be made under terms and
conditions governing final payment, except that it shall not constitute a waiver of claims.
(e) The acceptance by the Design -Builder of the final payment shall operate as and shall be a
complete release of the Owner from all claims or liabilities under the Contract, for anything done
or furnished or relating to the Work or the Project, or for any act or neglect of the Owner relating
to or connected with the Work or the Project.
ARTICLE 10 SAFETY, SECURITY AND UTILITY PROVISIONS; ENVIRONMENTAL
COMPLIANCE
10.1. SAFETY PRECAUTIONS AND PROGRAMS
The Design -Builder shall be responsible for initiating, rnnaintair�ing and supervising all safety
precautions and programs in connection with the performance of the Contract, and will comply with
all applicable City, County, State and Federal health and safety regulations.
10.2 SAFETY OF PERSONS AND PROPERTY
(a) The Design -Builder shall take reasonable precautions for safety of, and shall provide reasonable
protection to prevent damage, injury or loss to:
(1) employees on the Work and other persons who may be affected thereby;
(2) the Work and materials and equipment to be incorporated therein, whether in storage on or
off the site, under care, custody or control of the Design -Builder or the Design -Builder's
Subcontractors or Sub -subcontractors; and
(3) other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements,
roadways, structures and utilities not designated for removal, relocation or replacement in the
course of construction.
(b) The Design -Builder shall give notices and comply with applicable laws, ordinances, rules,
regulations and lawful orders of public authorities bearing on safety of persons or property or
their protection from damage, injury or loss.
(c) The Design -Builder shall erect an&maintain, as required by existing conditions and performance
of the Contract, reasonable safeguards for safety and protection, including posting danger signs
and other warnings against hazards, promulgating safety regulations and notifying owners and
users of adjacent sites and utilities.
(d) When use or storage of explosives or other hazardous materials or equipment or unusual methods
are necessary for execution of the Work, the Design -Builder shall exercise utmost care and carry
on such activities under supervision of properly qualified personnel.
(e) USE OF EXPLOSIVES - CLAIMS AND TOTAL INDEMNIFICATION. The Owner shall have
the right to pre -approve the use of any explosives on the Project; the Design -Builder shall not
assume in its bid that permission to use explosives will be granted. The Owner shall NOT be
liable for any claims for additional time or compensation as a result of the Owner's denial of
permission to use explosives. Where use of explosives is permitted by the Owner, the Design -
Builder EXPRESSLY AGREES TO BE SOLELY RESPONSIBLE for the determination as to
whether explosives shall actually be used, and for any result from the use, handling or storage of
explosives, and shall INDEMNIFY, DEFEND AND HOLD COMPLETELY HARMLESS the
Owner, its officers, agents and employees, and the Independent Architect/Engineer against any
and all claims, lawsuits, judgments, costs or expenses for personal injury (including death),
property damage or other harm for which recovery of damages is sought, suffered by any person
or persons, as the result of the use, handling or storage of the explosives by the Design -Builder
or any Subcontractor, REGARDLESS OF WHETHER SAID USE, HANDLING OR STORAGE
WAS NEGLIGENT OR NOT, AND REGARDLESS OF WHETHER THE DAMAGE OR
INJURY WAS CONTRIBUTED TO IN ANY WAY BY THE NEGLIGENCE OR FAULT OF
THE OWNER, ITS OFFICERS, AGENTS, EMPLOYEES, OR REPRESENTATIVES, OR
THE INDEPENDENT ARCHITECT/ENGINEER AND ITS OFFICERS, AGENTS,
EMPLOYEES, OR REPRESENTATIVES. In the event of conflict with any other indemnity
paragraph in this Contract, this paragraph controls. This indemnity paragraph is intended solely
for the benefit of the parties to this Contract and is not intended to create or grant any rights,
contractual or otherwise, to or for any other person or entity. The Design -Builder shall furnish
the Owner and the Independent Architect/Engineer with evidence of insurance sufficient to cover
possible damage or injury, which insurance shall either include the Owner and the Independent
Architect/Engineer as additional insureds or be sufficiently broad in coverage as to fully protect
the Owner and the Independent Architect/Engineer. All explosives shall be stored in a safe and
secure manner, under the care of a competent watchman at all times, and all storage places shall
be marked clearly "DANGEROUS -EXPLOSIVES." The method of storing and handling
explosives and highly flammable materials shall conform to Federal and State laws, City of
Denton ordinances, and the City of Denton Fire Department regulations. The Design -Builder
shall notify any telecommunications and public utility company and any private property owners
having structures in the proximity of the Project Site of the Design -Builder's intention to use
explosives, and such notice shall be given sufficiently in advance to enable the
telecommunications and public utility comnpinies and privateproperty owners to take such steps.
as they may deem necessary to protect their property from injury. The notice shall not relieve the
Design -Builder of any responsibility for damage resulting from any blasting operations.
(f) 1"he Design -Builder shall promptly remedy damage and loss (other than damage or loss insured
under property insurance required by the Contract Documents) to property referred to in Clauses
10.2(a)(2) and 10.2(a)(3) caused in whole or in part by the Design -Builder, a Subcontractor, or
anyone directly or indirectly employed by any of theta, or by anyone for whose act's they may be
liable and for which the Design -Builder is responsible under Clauses 10.2(a)(2) and 10.2(a)(3),
except damage or loss attributable to acts or omissions of the Owner or Independent
Architect,Tmgincer or anyone directly or indirectly employed by either of them, or by anyone for
whose acts either of them may be liable, and not attributable to the fault or negligence of the
Design -Builder or any of its Subcontractors. The foregoing obligations of the Design -Builder are
in addition to the Design -Builder's obligations under Paragraph 3.19. To the extent that any such
damage or loss may be covered by property insurance or other insurance required by the
Contract Documents, the Owner and the Design -Builder shall exercise their best efforts to make
a claim and obtain recovery from the insurers to provide for the cost, in whole or in part, of the
repair work or to provide for reimbursement for such damage or loss.
(g) The Design -Builder shall designate a responsible member of the Design -Builder's organization
at the site whose duty shall be the prevention of accidents. This person shall be the Design -
Builder's superintendent unless otherwise designated by the Design -Builder in writing to the
Owner and Independent Architect/Engineer.
(h) The Design -Builder shall not load or permit any part of the Work or the Project site to be loaded
so as to endanger its safety.
10.3 EMERGENCIES
In an emergency affecting safety, health, or security of persons or property, the Design -Builder
shall act, at the Design -Builder's discretion, to prevent threatened darnage, injury, or loss.
Additional compensation or extension of time claimed by the Design -Builder on account of an
emergency shall be determined as provided in Paragraph 4.3 and Article 7.
10.4 PUBLIC CONVENIENCE AND SAFETY
(a) The Design -Builder shall place materials stored about the Work and shall conduct the Work at
all times in a manner that causes no greater obstruction to the public than is considered
necessary by the Owner. Sidewalks or streets shall not be obstructed, except by special
permission of the Owner. The materials excavated and the construction materials or plant used
in the performance of the Work shall be placed in a manner that does not endanger the Work or
prevent free access to all fire hydrants, water mains and appurtenances, water valves, gas
valves, manholes for the telephone, telegraph signal or electric conduits, wastewater mains and
appurtenances, and fire alarm or police call boxes in the vicinity.
(b) The, Owner reserves the right to rernedy any neglect on the part of the, Design -Builder in regard
to public convenience and safety which may come to the Owner's attention, after twenty-four
(24) hours' notice in writing to the Design -Builder. In, case of an emergency, the Owner shall
have the right to immediately remedy any neglect without notice. in either case, the cost of any
work done by the Owner to remedy the Design -Builder's neglect shall be deducted from the
Contract Sum. The Design -Builder shall notify the City Traffic Control Department when any
street is to be closed or obstructed. The notice shall. in the case of major thoroughfares or street
upon which transit lines operate, be forty-eight (48) hours in advance. The Owner reserves the
right to postpone or prohibit any closure or obstruction of any streets or thoroughfares to the
extent necessary for the safety and benefit of the traveling public. The Design-BuIlder shall,
when directed by the Independent Architect/Engineer or the Owner, keep any street or streets
in condition for unobstructed use by City departments. When the Design -Builder is required. to
construct temporary bridges or make other arrangements for crossing over ditches or around
structures, the Design -Builder's responsibility for accidents shall include the roadway
approaches as well as the crossing structures.
10.5 BARRICADES, LIGHTS AND WATCHMEN
If the Work is carried on or adjacent to any street, alley or public place, the Design -Builder shall,
at the Design -Builder's own cost and expense, furnish, erect and maintain sufficient barricades,
fences, lights and danger signals, shall provide sufficient watchmen, and shall take such other
precautionary measures as are necessary for the protection of persons or property and of the Work.
All barricades shall be painted in a color that will be visible at night, shall indicate in bold letters
thereon the Design -Builder's name and shall be illuminated by lights from sunset to sunrise. The
term "lights," as used in this Paragraph, shall mean flares, flashers, or other illuminated devices. A
sufficient number of barricades with adequate markings and directional devices shall also be
erected to keep vehicles from being driven on or into any Work under construction. The Design -
Builder will be held responsible for all damage to the Work due to failure of barricades, signs,
lights and watchmen to protect the Work. Whenever evidence is found of such damage, the
Independent Architect/Engineer may order the damaged portion immediately removed and
replaced by the Design -Builder at Design -Builder's cost and expense. The Design -Builder's
responsibility for maintenance of barricades, signs, and lights, and for providing watchmen, shall
not cease until the Project has been finally accepted by the Owner.
10.6 PUBLIC UTILITIES AND OTHER PROPERTIES TO BE CHANGED
In case it is necessary to change or move the Property Of the Owner Or Of any telecommunications
or public utility, , such property shall not be removed or interfered with until ordered to do so by the
Independent Architect/Engineer. The right is reserved to the owner of any public or private utilities
to enter upon the Project site for the purpose of making such changes or repairs of their property
that may become necessary during the performance of the Work, The Owner reserves the right of
entry upon the Project site for any purpose, including repairing or relaying sewer and water lines
and appurtenances, repairing structures, and for making other repairs, changes, or extensions to
any of the Owner's property. The Owner's actions shall conform to the Design -Builder's current
and approved schedule for the performance of the Work, provided that proper notification of
schedule requirements has been given to the Owner by the Design -Builder.
10.7 TEMPORARY STORM SEWER AND DRAIN CONNECTIONS
When existing storm sewers or drains have to be taken up or removed, the Design -builder shall at
his own expense provide and maintain temporary outlets and connections for all public and private
storm sewers and drains. be Design -Builder shall also take care of all storm sewage and drainage
which will be received from these storm drains and sewers; for this purpose, the Design -Builder
shall provide and maintain, at the Design -Builder's own expense, adequate pumping facilities and
temporary outlets or diversions. The Design -Builder shall, at the Design -Builder's own expensi,-,
construct such troughs, pipes, or other structures necessary and shall be prepared at all times to
dispose of storm drainage and sewage received from these temporary connections until such time
as the permanent connections are built and in service. The existing storm sewers and connections
shall be kept in service and maintained under the Contract. except where specified or ordered to be
abandoned by the Independent Architect/Engineer. All storm water and sewage shall be disposed
of in a satisfactory manner so that no nuisance is created and that the Work under construction will
be adequately protected.
10.8 ARRANGEMENT AND CHARGE FOR WATER FURNISHED BY THE OWNER;
ELECTRICITY FOR THE PROJECT
(a) When the Design -Builder desires to use the Owner's water in connection with the Work, the
Design -Builder shall make complete and satisfactory arrangements with the Denton Water
Utilities Department and shall be responsible for the cost of the water the Design -Builder uses.
Where meters are used, the charge will be at the regular established rate; where no meters are
used, the charge will be as prescribed by City ordinance, or where no ordinance applies, payment
shall be based on estimates made by the Denton Water Utilities Department.
(b) The Design -Builder shall make -complete and satisfactory arrangements for electricity and
metered electrical connections with the Owner or with Denton Municipal Electric in the event
that separately metered electrical connections are rewired for the Project. The Design -Builder
shall pay for all electricity used in the performance of the Work through separate metered
electrical connections obtained by the Design -Builder through the City of Denton.
10.9 USE OF FIRE HYDRANTS
The Design -Builder, Subcontractors, and any other person working on the Project shall not open,
turn off, interfere with, attach any pipe or hose to, or connect anything with any lire hydrant, stop
valve, or stop cock, or tap any water main belonging to the Owner, unless duly authorized to do so
by the Denton Water Utilities Department in accordance with the Denton City Code.
10.10 ENVIRONMENTAL COMPLIANCE
(a) The Design -Builder and its Subcontractors are deemed to have made themselves familiar
with and at all times shall comply with all applicable federal, state or local lawns, rules,
regulations, ordinances, and rules of common law now in effect (including any amendments
now in effect), relating to the environment, Hazardous Substances or exposure to Hazardous
Substances, including but not limited to the Comprehensive Environmental Response,
Compensation and Liability Act of 1980, 42 U.S.C.A. §§ 9601, et seq.; the Hazardous
Materials Transportation.Act, 49 U.S.C.A. §§ 1801, et seq.; the Resource Conservation and
Recovery Act of 1976,42 U.S.C.A. §§ 6901, et seq.; the Federal Water pollution Control
Act, 33 U.S.C.A §§ 1201, et seq.; the Toxic Substances Control Act, 15 U.S.C.A. §§ 2601, et
seq.; the Clean Air Act, 42 U.S.C.A. §§ 7401, et seq.; the Safe Drinking Water ,Act, 42
U.S.C.A.. §§ 3808, et seq., and any current judicial or administrative interpretation of these
laws, rules, regulations, ordinances, or rules of common law; including but not limited to any
judicial or administrative order, consent decree, or judgment affecting the Project.
(b) In the event the Design -Builder encounters on the site materials reasonably believed to be a
Hazardous Substance that have not been rendered harmless, and removal of such materials is
not a part of the scope of Work required'under the Contract Documents, the Design -Builder'
shall immediately stop Work in the affected area and report in writing the facts of such.
encounter to the Independent A,rchitect/l ngincer and the Owner. Work in the affected area
shall not thereafter be resumed except by written order of the Owner unless and until the
material is determined not to be a Hazardous Substance or the Hazardous Substance is
remediated. The Owner may choose to remediate the Hazardous Substance with a separate
Design -Builder or through a Change Order with the Design -Builder. if the Owner determines
that the Hazardous Substance exists in the affected area due to the fault or negligence of the
Design -Builder or any of its Subcontractors, the Design -Builder shall be responsible for
remediating the condition at the Sole expense of the Design -Builder in accordance with the
Design -Builder's APPROVED STAII Remediation, Plan. An extension of the Contract Time
for any delay in the progress schedule caused as a result of the discovery and remediation of
a Hazardous Substance may be granted by the Owner only if all remaining Work on the
Project must be suspended and the delay cannot be made up elsewhere in the progress
schedule. Any request for an extension of the Contract Time related to the discovery and
remediation of a Hazardous Substance is subject to the provisions of Paragraph 4.3 and
Article 8.
(c) The Design -Builder shall be responsible for identification, abatement, cleanup, control,
removal, remediation, and disposaLof any Hazardous Substance brought into or upon the site
by the Design -Builder or any Subcontractor or Supplier, 'Fhe Design-Buildcr shall obtain any
and all permits necessary for the legal and proper handling, transportation, and disposal of
the Hazardous Substance and shall, prior to undertaking any abatement, cleanup, control,
removal, remediation, and disposal, notify the Owner and the Independent
Architect/Engineer so that they may observe the activities; provided, however, that it shall be
the Design -Builder's sole responsibility to comply with all applicable laws, rules,
regulations, or ordinances governing the activities.
(d) Spill Prevention Plan. At least seventy-two (72) hours prior to commencing performance of
any of the Work at the Project site, the Design -Builder shall submit to the Owner for review
and approval a Spill Prevention and Response Plan (SPRP) meeting the requirements of
federal and state law, rules, and regulations. The SPRP shall be specially designed for the
Design -Builder's planned work methods and procedures. The SPRP shall be designed to
complement all applicable safety standards, lire prevention regulations, and pollution
prevention policies and procedures, The SPRP shall include estimates, of the quantity and rate
of flow should equipment fail, and detail containment or diversionary structures to prevent
spills from leaving the site or migrating into adjacent properties or navigable waters, The
SPRP shall include methods of recovery of spilled materials and all applicable twenty-four
(24) hour emergency phone numbers, including without limitation that of the Owner's
Project Manager or other designated representative. The Desigli-Builder shall not commence
any field work prior to approval of such plan by the Owner. The following additional rules
shall apply with respect to spills caused by the Design -Builder or a Subcontractor:
(1) The Design -Builder shall immediately report any Spill or release at the Project site,
whether or not it is associated with this Contract, to the Owner's Project Manager or
other designated representative. Thereafter, within two (2) working days after the
occurrence of such event, the Design -Builder shall submit a written report describing
such event in a degree of detail reasonably acceptable to the Owner.
(2) The Design -Builder shall immediately respond in accordance with the SPRP in the event
of a spill.
(3) The Design -Builder shall dispose of spilled materials in accordance with EPA and Texas
Commission on Environmental Quality (TCEQ) regulations and any other applicable
federal, state, or local laws, rules, or regulations. In connection with such disposals, the
Design -Builder shall use only those transporters and disposal facilities that are approved
in advance in writing by the Owner. A copy of all transport manifests for the spilled
materials shall be obtained and retained in the Design -Builder's records for reference
purposes, to be provided upon request of the Independent Architect/Engineer, the Owner,
or any governmental regulatory agency with jurisdiction over the matter. ALL COSTS
OF COLLECTION, CONTAINMENT, AND DISPOSAL OF SPILLED MATERIALS
SHALL BE THE SOLE RESPONSIBILITY OF THE DESIGN -BUILDER. -
(4) For purposes of this Subparagraph (e), the term "spill" includes any kind of
environmental discharge or release.
(e) Clean Air Management Plan. The Design -Builder shall comply with the Clean Air
Management Plan submitted to and approved by the Owner during the Design -Builder
selection process. The Owner reserves the right, at the Design -Builder's sole expense, to
require the removal -or retrofitting of any equipment used in the course of construction that
does not comply with the Plan submitted to and approved by the Owner.
(t) The Design -Builder shall deposit surplus or waste excavation or other materials removed as
part of the Work at a legal disposal site in accordance with all applicable state, federal, and
local laws, rules, regulations, and ordinances. The Design -Builder shall submit to the Owner
for review and approval all planned disposal sites or proposed uses for the surplus or waste
excavation or other materials prior to removal of any excavation or other material from the
Project site. A copy of all transport manifests for surplus or waste excavation of other
materials shall be obtained and retained in the Design -Builder's records for reference
purposes, to be provided upon request to the Independent Architect/Engineer, the Owner, or
any goverturientat regulatory agency with jurisdiction over the matter.
(g) The Design -Builder is responsible for obtaining all TXPDES Storm Water Permits from
TCEQ for construction of the Project under regulations contained in 40 CFR Part 122, as
amended, pursuant to the Clean Water Act, 33 U.S.C.A. §§1.251 et seq. These regulations
require the filing of a notice of intent to obtain and abide by the general storm water permit
for construction activities promulgated by EPA, including but not limited to cleaning,
grading, and excavation that disturb the applicable amount of total land area. In addition, the
Design -Builder shall comply with all regulations of the Owner relating to storm water and
storm water runoff management at the Project site pursuant to Chapter 19, Article IX, Denton
City Code, as amended.
(h) The Design -Builder shall not install any materials in the performance of the Work that
contain asbestos or asbestos-related material such as hydrated mineral silicate, including
chrysolite, amosite, crocidolite, tremolite, anthophylite or actinolite, whether friable or non -
friable.
(i) The Owner reserves the right in its sole option to exercise the following remedies (without
waiving the right to pursue the imposition of any civil or criminal fines or penalties that may
be imposed under state, federal, or local laws or ordinances), at no additional cost to the
Owner and withoutanextension of the Contract Time, in the event the Design -Builder fails
or refuses after seven (7) days advance written notice from the Owner to comply with the
provisions of this Paragraph 10. 10, the terms of the SPRP, the terms of the Clean Air
Management Plan, any storm water permit or other environmental permit issued in
connection with the Work, or any applicable environmental law, rule, regulation, or
ordinance:
(1) suspend all or any portion of the Work until the noncompliance is corrected, or until a
detailed plan to achieve compliance within a reasonably prompt period of time is
prepared by the Design -Builder and approved by the Owner;
(2) if the Design -Builder fails to properly address the noncompliance within the time
stipulated by the Owner, perform the necessary remediation or correction work and
backcharge the Design -Builder for the cost of the remediation or correction; or
(3) terminate the Contract for cause as provided in Article 13.
ARTICLE 11 INSURANCE AND BONDS
11.1 DESIGN -BUILDER'S INSURANCE
Design -Builders shall refer to Attachment A for all City of Denton insurance requirements.
11.2 PROPERTY INSURANCE
Design -Builders shall refer to Attachment A for all City of Denton insurance requirements.
11.3'UMBRELLA'LIABILITY INSURANCE
Design -Builders shall refer to Attachment A for all City of Denton insurance requirements.
11.4 POLICY ENDORSEMENTS AND SPECIAL CONDITIONS
Design -Builders shall refer to Attachment A for all City of Denton insurance requirements.
11.6 PERFORMANCE AND PAYMENT BONDS
(a) Subject to the provisions of Subparagraph 11.3(b), the Design -Builder -,hall, with the execution
and delivery of the Construction Services Agreement, ftimish and file with the Owner in the
amounts required in this Paragraph, the surety bonds described in Clauses (a)(]) and (a)(2)
below, which surety bonds shall be in accordance with the Charter of the City of Denton and the
provisions of Chapter 2253, Texas Government Code, as amended; each bond shall be signed by
the Design -Builder, as Principal, and by an established bonding company, as surety, meeting the
requirements of Subparagraph 11.3(c) and approved by the Owner. The surety bonds shall be
accompanied by an appropriate Power -of -Attorney clearly establishing the extent and limitations
of the authority of each signer to so sign:
(1) Performance Bond, A good and sufficient bond in an amount equal to 100% of the total
Contract Sum, guaranteeing the ftal and faithfijl execution of the Work and performance of
the Contract in accordance with Plans, Specifications and all other Contract Documents,
including any Amendments thereof, for the protection of the Owner. This bond shall also
provide for the repair and maintenance of all defects due to faulty materials and
workmanship that appear within a period of two (2) year from the date of final completion
and acceptance of the improvements by the Owner or lesser or longer periods as may be
otherwise designated in the Contract Documents.
(2) Payment Bond. A good and sufficient bond in an amount equal to 100% of the total Contract
Sum, guaranteeing the full and prompt payment of all claimants supplying labor or materials
in the prosecution of the Work provided for in the Contract Documents and any Amendments
thereto, and for the use and protection of each claimant.
(b) If the Contract Sum, including Owner -accepted alternates and allowances, if any, is greater than
$100,000, Performance in 100% of the Contract Sum are mandatory and shall be provided by the
Design -Builder. If the Contract Sum is greater than $50,000 but less than or equal to $100,000,
only a Payment Bond in 100% of the Contract amount is mandatory; provided, however, that the
Design -Builder may elect to furnish a Performance Bond in the same amount if the Design -
Builder so chooses.. If the Contract Sum is less than or equal to $25,000; the Design -Builder may
elect not to provide Performance and Payment Bonds; provided that in such event, no money will
be paid to the Design -Builder until final completion and acceptance of all work by Owner. If the
Design -Builder elects to provide Performance and Payment Bonds 100% of the total Contract
Sum, progress payments in accordance with these General Conditions shall be disbursed.
(c) No surety will be accepted by the Owner who is now in default or delinquent on any bonds or
who is a party to any litigation against the Owner. All bonds shall be made and executed on the
Owner's standard forms, shall be approved by the Owner, and shall be executed by not less than
one corporate surety that is authorized and admitted to do business in the State of Texas, is
licensed by the State of Texas to issue surety bonds, is listed in the most current United States
Department of the Treasury List of Acceptable Sureties, and is otherwise acceptable to the
Owner. Each bond shall be executed by the Design -Builder and the surety, and shall specify that
legal venue for enforcement of each bond shall lie exclusively in Denton County, Texas. Each
surety shall designate an agent resident in Denton County, Texas to whom any requisite statutory
notices may be delivered and on whom service of process may be had in matters arising out of
the suretyship.
(d) The person or persons, partnership, company, firm, Limited Liability Company, association,
corporation, or other business entity to whom the Contract is awarded shall, within ten (10) days
after such award, sign the required Contract with the Owner and provide the necessary surety
bonds and evidence of insurance as required under the Contract Documents. No Contract shall be
binding on the Owner until it has been approved as to form by the City Attorney, executed for
the Owner by the City Manager, the performance and payment bonds and evidence of insurance
have been furnished as required by the Contract Documents, and the fully executed contract has
been delivered to the Design -Builder.
(e) The failure of the Design -Builder to execute the Contract or deliver the required statutory bonds
and evidence of insurance within ten (10) days after the Contract is awarded or as soon thereafter
as the Owner can assemble and deliver the Contract shall constitute a material breach of the
Design -Builder's bid proposal and the Owner may rescind the Contract award and collect or
retain the proceeds of the bid'security. By reason of the'uncertainty of the market'prices or
materials and labor, and it being impracticable and difficult to determine accurately the amount
of damages occurring to the Owner by reason of the Design -Builder's failure to execute and
furnish the statutory bonds and to sign the Contract within ten (10) days, the filing of a bid
proposal with the accompanying bid security will be considered as an acceptance of this
Subparagraph 11.3(e). In the event the Owner should re -advertise for bids, the defaulting Design -
Builder shall not be eligible to bid, and the lowest responsible bid obtained in the re -
advertisement shall be the bid referred to in this Paragraph.
ARTICLE 12 DEFECTIVE AND NONCONFORMING WORK
12.1 UNCOVERING OF WORK
(a) if a portion of the Work is covered contrary to the Independent Arebitect/Engineer's request or
to requirements specifically expressed in the Contract Documents, the Work must, if required
in writing by the Independent Architect/Engincer, be uncovered for the Independent
Architect/Engineer's observation and be replaced at the Design -Builder's expense without
change in the Contract Time.
(b) If a portion of the Work, has been covered which the Independent Architect/Enginccr has not
specifically requested to observe prior to it being covered, the Independent Architect/Engineer
may request to see such Work and it shall be uncovered by the Design -Builder. If such Work is
in accordance with the Contract Documents, costs of uncovering and replacement shall, by
appropriate Change Order, be charged to the Owner. If any Work is not in accordance with the
Contract Documents, the Design -Builder shall pay the costs of uncovering, repair, replacement
unless the condition was caused by the Owner or a separate Design -Builder in which event the
Owner shall be responsible for payment of such costs.
12.2 CORRECTION OF WORK
(a) The Design -Builder shall promptly correct Work rejected by the Independent
Architect/Engineer as failing to conform to the requirements of the Contract Documents,
whether observed before or after Substantial Completion and whether or not fabricated,
installed or completed. The Design -Builder shall bear costs of correcting such rejected Work,
including additional testing and inspections and compensation for the Independent
Architect/Engineer's services and expenses made necessary thereby.
(b) if any of the Work is found to be defective or nonconforming with the requirements of the
Contract Doctu-nents, the Design -Builder shall correct it promptly after receipt of written notice
from the Independent Architect/Engineer or the Owner to do so unless the Owner has
previously given the Design -Builder a written acceptance or waiver of the defect or
nonconformity. The Design -Builder's obligation to correct defective or nonconforming Work
remains in effect for:
(1) one year after the date of Substantial Completion of the Work or designated portion of the
Work;
(2) one year after the date for commencement of warranties established by agreement in
connection with partial occupancy under Subparagraph 9.8(a); or
(3) the stipulated duration of any applicable special warranty required by the Contract
Documents.
(c) The one-year period described in Clauses (b)(1) and (b)(2) shall be extended with respect to
portions of the Work performed, repaired, or corrected after Substantial Completion by the
period of time between Substantial Completion and the actual completion of the Work.
(d) The obligations of the Design -Builder under this Paragraph 12.2 shall survive final acceptance
of the Work and termination of this Contract, The Owner shall give notice to the Design-
Builder promptly after discovery of a defective or nonconforming condition in the Work. The
one-year period stated in Clauses (b)(1) and (b)(2) doers not limit the ability of the Owner to
require the Design -Builder to correct latent defects or nonconformities in the Work, which
defects or nonconformities could not have been discovered through reasonable diligence by the
Owner or the Independent Architect/Engineer at the time the Work was performed or at the
time of inspection for certification of Substantial Completion or Final Completion. The one
year period also does not relieve the Design -Builder from liability for any defects or
deficiencies in the Work that may be discovered after the expiration of the one year correction
period.
(e) The Design -Builder shall remove from the Project :site portions of the Work which are not in
accordance with the requirements of the Contract Documents and are neither corrected by the
Design -Builder nor accepted by the Owner.
(f) If the Design -Builder fails to correct defective or nonconforming Work within a reasonable
time after notice front the Owner or the Independent Architect/Engineer, the Owner may
correct it in accordance with Paragraph 2.4. If the Design -Builder does not proceed with
correction of defective or nonconforming Work within a reasonable time fixed by written
notice from the Independent Architect/Engineer, the Owner may remove or replace the
defective or nonconforming Work and store the salvageable materials or equipment at the
Design -Builder's expense. If the Design -Builder does not pay costs of removal and storage
within ten days after written notice, the Owner may, upon ten (10) additional days written
notice, sell the materials and equipment at auction or at private sale and shall account for the
proceeds after deducting costs and damages that should have been borne by the Design -
Builder, including compensation for the Independent Architect/Engineer's services and
expenses made necessary as a result of the sale. If the proceeds of sale do not cover costs
which the Design -Builder should have borne, the Contract Sum shall be reduced by the
deficiency. If payments due to the Design -Builder then or thereafter are not sufficient to cover
the deficiency, the Design -Builder shall pay the difference to the Owner.
(g) The Design -Builder shall bear the cost of correcting destroyed or damaged construction of the
Owner or separate Design -Builders, whether the construction is completed or partially
completed, that is caused by the Design -builder's correction or removal of Work which is not
in accordance with the requirements of the Contract Documents.
(h) Nothing contained in this Paragraph 12.2 shall be construed to establish a period of limitation
with respect to other obligations which the Design -Builder might have trader the Contract
Documents. Establishment of the one-year time period as described, in Subparagraph 12.2(b)
relates only to the specific obligation of the Design. -Builder to correct the Work, and has no
relationship to the time within which the obligation to comply with the Contract Documents
may be sought to be enforced, nor to the time within which proceedings may be commenced to
establish the Design -Builder's liability with respect to the Design-Btdlder's oblig tiohs other
than specifically to correct the Work.
(i) Any Work repaired or replaced pursuant to this Article 12 shall be subject to the provisions of
Article 12 to the same extent as Work originally performed or installed.
12.3 ACCEPTANCE OF NONCONFORMING WORK
The Owner may, in the Owner's sole discretion, accept Work, which is not in accordance with the
requirements of the Contract Documents instead of requiring its removal and correction, in which
case the Contract Sinn will be reduced as appropriate and equitable. The adjustment will be
accomplished whether or not final payment has been made.
ARTICLE 13 COMPLETION OF THE CONTRACT; TERMINATION; TEMPORARY
SUSPENSION
13.1 FINAL COMPLETION OF CONTRACT
The Contract will be considered completed, except as provided in any warranty or maintenance
stipulations, bond, or by lav, when all the Work has been finally completed., the final inspection is
made by the Independent Architect/Engineer, and final acceptance and final payment is made by the
Owner.
13.2 WARRANTY FULFILLMENT
Prior to the expiration of"the specified warranty period provided for in the Contract Documents, the
Independent Architect/Engineer will make a detailed inspection of the Warp and will advise the
Design -Builder and the Design -Builder's Surety of the items that require correction. The
Independent Architect/Engineer will make a subsequent inspection and if the corrections have been
properly performed, the Independent Architect/Engincer will issue a letter of release on the
maintenance stipulations to the Design -Builder and the 'Surety. If for any reason the Design. -Builder
has not made the required corrections before the expiration of the warranty period, the warranty
provisions as provided for in the Contract Documents shall remain in effect until the corrections
have been properly performed and a letter of release issued.
13.3 TERMINATION BY THE OWNER FOR CAUSE
(a) Notwithstanding any other provision of these General Conditions, the Work or any portion of
the Worts may be terminated immediately by thc' Owner for any good cause after giving seven
(7) days advance written notice and opportunity to cure to the Design -Builder, including but
not limited to the following causes:
(1) Failure or refusal of the Design -Builder to start the Work within ten (10) days after the
date of written notice by the Owner to commence the Work.
(2) A reasonable belief that the progress of the Work being made by the Design -Builder is
insufficient to complete the Work within the specified time.
(3) Failure or refusal of the Design -Builder to provide sufficient and proper equipment or
construction forces to properly execute the Work in a timely manner.
(4) A reasonable belief that the Design -Builder has abandoned the Work.
(5) A reasonable belief that the Design -Builder has become insolvent, bankrupt, or otherwise
financially unable to carry on the Work.
(6) Failure or refusal on the part of the Design -Builder to observe any requirements of the
Contract Documents or to comply with any written orders given by the independent
Architect/Engineer or the Owner as provided for in the Contract Documents.
(7) Failure or refusal of the Design -Builder to promptly make good any defects in materials or
workmanship, or any defects of any nature, the correction of which has been directed in
writing by the independent Architect/Engineer.
(S) A reasonable belief by the Owner that collusion exists or has occurred for the purpose of
illegally procuring the Contract or a Subcontractor, or that a fraud is being perpetrated on
the Owner in connection with the construction of Work under the Contract.
(9) Repeated and flagrant violation of safe working procedures.
(10) The filing by the Design -Builder of litigation against the Owner prior to completion of
the Work.
(b) When the Work or any portion of the Work is terminated for any of the causes itemized above
or for any other cause except termination for convenience pursuant to Subparagraph 13.3(e),
the Design -Builder shall, as of the date specified by the Owner, discontinue the Work or
portion of the Work as the Owner shall designate, whereupon the surety shall, within twenty
(20) days after the written notice of termination for cause has been served upon the Design -
Builder and the surety or its authorized agents, assn me the obligations of the Design -Builder
for the Work or that portion of the: Work which the Owner has ordered the Design -Builder to
discontinue and may:
(1) perform the Work with forces employed by the surety;
(2) with the written consent of"the Owner, tender a replacement Design -Builder to take over
and perform the Work, in which event the surety shall be responsible for and pay the
amount of any costs required to be incurred for the completion of the Work that are in
excess of the amount of fluids remaining under the Contract as of the time of the
termination; or
(3) with the written consent of the Owner, tender and pay to the Owner in settlement the
amount of money necessary to finish the balance of uncompleted Work under the
Contract, correct existing defective or nonconforming Work, and compensate the Owner
for any other loss sustained as a result of Design -Builder's default.
In the event of termination for cause involving Clause (b)(1) or (b)(2), the Surety shall
assume the Design -Builder's place in all respects, and the amount of funds remaining
unpaid under the Contract shall be paid by the Owner for all Work performed by the
surety or the replacement Design -Builder in accordance with the terms o#'the Contract
Documents, subject to any rights of the Owner to deduct any costs, damages, or liquidated
or actual' damages that the Owner may have incurred, including but not limited to
additional fees and expenses of the Independent Architect/Engineer and attorney's fees, as
a result of such termination.
(c) The balance of the Contract Sum remaining at the time of the Design -Builder's default and of
the termination shall become due and payable to the surety as the Work progresses, subject to
all of the terms, covenants, and conditions of the Contract Documents. If the surety does not,
within the time specified in Subparagraph 13.3(b), exercise its obligation to assume the
obligations of the Contract, or that portion of the Contract which the Owner has ordered the
Design -Builder to discontinue, then' the Owner shall have the power to complete the Work by
contract or otherwise, as it may deem necessary. The Design -Builder agrees that the Owner
shall have the right to take possession of or use any or all of the materials, plant, tools,
equipment, supplies, and property of every kind provided by the Design -Builder for the
purpose of the Work, and to procure other tools, equipment, labor, and materials for the
completion of the Work, and to charge to the account of the Design -Builder the expenses of
completion and labor, materials, tools, equipment, and incidental expemses. The expenses
incurred by the Owner to complete the Work shall be deducted by the Owner out of the
balance of the Contract Sum remaining unpaid to or unearned by the Design -Builder. The
Design -Builder and the surety shall be liable to the Owner for any costs incurred in excess of
the balance of the Contract Sum for the completion and correction of the Work, and for any
other costs, damages, expenses (including but not limited to additional fees of the Independent
Architect/Engineer and attorney's fees), and liquidated or actual damages incurred as a result
of the termination.
(d) The Owner shall not be required to obtain the lowest bid for the Work of completing the
Contract as described in Subparagraph 13.3(c), but the expenses to be deducted from the
Contract Sum shall be the actual cost of such Work. In case the Owner's expense is less than
the sum which would have been payable under the Contract, if the same had been completed
by the Design -Builder, then the Owner may pay to the Design -Builder (or the Surety, in the
event of a complete termination for cause) the difference in the cost, provided that the Design -
Builder (or the Surety) shall not be entitled to any claim for damages or for loss of anticipated
profits. In case such expenses for completion shall exceed the amount which would have been
payable under the Contract if the same had been completed by the Design -Builder, then the
Design -Builder and his Sureties shall pay the amount of the excess to the Owner on notice
from the Owner for excess due. When only a particular part of the Work is being carried on by
the Owner by contract or otherwise under the provisions of this Subparagraph, the Design -
Builder shall continue the remainder of the Work in conformity with the terms of the
Contract, and in such manner as not to hinder or interfere with the performance of workmen
employed and provided by the Owner.
(e) The right to terminate this Contract for the convenience of the Owner (including but not
limited to nonappropriation of funding) is expressly retained by the Owner. In the event of
termination for convenience, the Owner shall deliver at least ten (10) days advance written
notice of termination for convenience to the Design -Builder. Upon the Design -Builder's
receipt of such written notice, the Design -Builder shall cease the performance of the Work
and shall take reasonable and appropriate action to secure and protect the Work in place. The
Design -Builder shall then be reimbursed by the Owner in accordance with the terms and
provisions of the Contract Documents, not to exceed actual labor costs incurred, materials
stored at the Project site or away from the Project site as approved by the Owner but not yet
paid for, plus actual, reasonable, and documented termination charges, if any, paid by the
Design -Builder in connection with the Work in place which is coinpleted and in conformance
with the Contract Documents to the date of termination for convenience. leo amount shall ever
be due to the Design -Builder for lost or anticipated profits.
13.4 TEMPORARY SUSPENSION OF THE WORK
(a) The Work or any portion of the Work may be temporarily suspended by the Owner
immediately upon written notice to the Design -Builder for any reason, including but not
limited to:
(1) the causes described in Clauses 13.1(a)(1) through (a)(10) above;
(2) where other provisions in the Contract Documents require or permit temporary suspension
of the Work;
(3) situations where the Work is threatened by, contributes to, or causes an immediate threat
to public health, safety, or security; or
(4) other unforeseen conditions or circumstances.
(b) The Design. -Builder shall irmnediately resume the temporarily suspended Work when ordered
in writing by the Owner to do so. The Owner shall not under any circtunstanccs be liable for
any claim of the Design -Builder arising from a temporary suspension due to a cause described;
in Clause (a)(1) above; provided, however, that in the case of a temporary suspension for any
of the reasons described under Clauses (a)(2) through (a)(4), where the Design -Builder is not
a contributing cause of the suspeD.sibn under one of those Claims or where the provision of
the Contract Docurnents in question specifically provides that the suspension is at no cost to
the Owner, the Owner will make an equitable adjustment for the following items, provided
that a claim is properly made by the Design -Builder wider Subparagraph 4.3 of these General
Conditions:
(1) an equitable extension of the Contract Time, not to exceed the actual delay caused by the
temporary suspension as determined by the Independent Architect/Engineer and the
Owner;
(2) an equitable adjustment to the Contract Sum for the actual, necessary, and reasonable
costs of properly protecting any Work that is finished or partially finished during the
period of the temporary suspension (no profit and overhead shall be allowed on top of
these costs); and
(3) if it becomes necessary to move equipment from the Project site and then return it to the
Project site when the Work is ordered to be resumed, an equitable adjustment to the
Contract Sum for the actual, necessary, and reasonable cost of these moves; provided,
however, that no adjustment shall be due if the equipment is moved to another Project
site of the Owner.
ARTICLE 14 MISCELLANEOUS PROVISIONS
14.1 GOVERNING LAW; COMPLIANCE WITH LAWS AND REGULATIONS
(a) This.Contract shall be governed by the laws and case decisions of the State of Texas, without
regard to conflict of law or choice of law principles of Texas or of any other state.
(b) This Contract is entered into subject to and controlled by the Charter and ordinances of the
City of Denton and all applicable laws, rules, and regulations of the State of Texas and the
Government of the United States of America. The Design -Builder shall, during the
performance of the Work, comply with all applicable City codes and ordinances, as amended,
and all applicable State and Federal laws, rules and regulations, as amended.
14.2 SUCCESSORS AND ASSIGNS
The Owner and the Design -Builder respectively bind themselves, their partners, successors, assigns,
and legal representatives to the promises, covenants, terms, conditions, and obligations contained in
the. Contract Documents. The Design -Builder shall not assign, transfer, or convey its interest or
rights in the Contract, in part or as a whole, without written consent of the Owner. If the Design -
Builder attempts to make an assignment, transfer, or conveyance without the Owner's written
consent, the Design -Builder shall nevertheless remain legally responsible for all obligations under
the Contract Doctunents. The Owner shall not assign any portion of the Contract Sum due or to
become due under this Contract without the written consent of the Design -Builder, except where
assignment is compelled or allowed by court order, the terms of the Contract Documents, or other
operation of law.
14.3 WRITTEN NOTICE
Except as otherwise provided in Article 16, any notice, payment, statement, or demand required or
permitted to be given -under this Contract by either party to the other may be effected by personal
delivery in writing or by mail, postage prepaid to the Project Manager or Superintendent of either
party, or to an officer, partner, or other designated representative of either party. Mailed notices
shall be addressed to the parties at an address designated by each party, but each party may change
its address by written notice in accordance with this section. Mailed notices shall be deemed
communicated as of three (3) days after mailing.
14.4 RIGHTS AND REMEDIES; NO WAIVER OF RIGHTS BY OWNER
(a) The duties and obligations imposed on the Design -Builder by the Contract Documents and the
rights and remedies available to the Owner under the Contract Documents shall be in addition to,
and not a limitation of, any duties, obligations, rights, and remedies otherwise imposed or made
available by law.
(b) No action or failure to act by the Owner shall constitute a waiver of a right afforded the Owner
under the Contract Documents, nor shall any action or failure to act by the Owner constitute
approval of or acquiescence in a breach of the Contract by Design -Builder, except as may be
specifically agreed in writing by Change Order or Supplemental Agreement.
14.5 INTEREST
The Owner shall not be, liable for interest on any progress or final payment to be made under the
Contract Documents, except as may be provided by the applicable provisions of the Prompt
Payment Act, Chapter 2251, Texas Government Code, as amended, subject to Paragraph 9.6(a) of
these General Conditions.
14.6 OFFICERS OR EMPLOYEES OF THKOWNER NOT TO HAVE FINANCIAL INTEREST
IN ANY CONTRACT OF THE OWNER
No officer or employee of the Owner shall have a financial interest, direct or indirect, in any
Contract with the Owner, or be financially interested, directly or indirectly, in the sale to the Owner
of any land, materials, supplies or services, except on behalf of the Owner as an officer or
employee. Any violation of this article shall constitute malfeasance in office, and any officer or
employee of Owner guilty thereof shall there by forfeit his office or position. Any violation of this
section, with the knowledge, express or implied, of the person, persons, partnership, company, firm,
association or corporation contracting with the Owner shall render the Contract involved voidable
by the Owner's City Manager or City Council.
14.7 VENUE
This Contract is deemed to be performed in Denton County, Texas, and if legal action is necessary
to enforce this Contract, exclusive venue shall lie in Denton County, Texas.
14.8 INDEPENDENT DESIGN -BUILDER
In performing the Work under this Contract, the relationship between the Owner and the Design -
Builder is that of an independent Design -Builder. The Design -Builder shall exercise independent
judgment in performing the Work and is solely responsible for setting working hours, scheduling or
prioritizing the Work flow and determining the means and methods of performing the, Work,
subject only to the requirements of the Contract Documents. No term or provision of this Contract
shall. be construed as making the Design -Builder an agent, servant, or employee of the Owner, or
making the Design -Builder or any of the Design* -Builder's employees, agents, or servants eligible
for the fringe benefits, such as retirement, insurance and worker's compensation, which the Owner
provides to its employees.
14.9 NONDISCRIMINATION
As a condition of this Contract, the Design -Builder covenants that he will take all necessary actions
to insure that, in connection with any work under this Contract, the Design -Builder and its
Subcontractors will not discriminate in the treatment or employment of any individual or groups of
individuals on the grounds of race, color, religion, national origin, age, sex, or handicap unrelated to
job performance, either directly, indirectly or through contractual or other arrangements. The
Design -Builder shall also comply with all applicable requirements of the Americans with
Disabilities Act, 42 U.S.C.A. §§12101-12213, as amended. In this regard, the, Design -Builder shall,
keep, retain and safeguard all records relating to his Contract or Work performed thereunder for a
minimum. period of three (3) years from final Contract completion, with full access allowed to
authorized representatives of the Owner, upon request, for purposes of evaluating compliance with
this and other provisions of the Contract.
14.10 GIFTS TO PUBLIC SERVANTS
(a) The Owner may terminate this Contract miu-nediately if the Design -Builder has offered,
conferred, or agreed to confer any benefit on a City of Denton employee or official that the
City of Denton employee or official is prohibited by law from accepting.
(b) For purposes of this Article, "benefit" means anything reasonably regarded as pecuniary gain
or pecuniary advantage, including benefit to any other person in whose welfare the
beneficiary has a direct or substantial interest, but does not include a contribution or
expenditure made and reported in accordance with law.
(c) Notwithstanding any other legal remedies, the Owner may require the Design -Builder to
remove any employee of the Design -Builder from the Project who has violated the
restrictions of this Article or any similar State or Federal law, and obtain reimbursement for
any expenditures made to the Design -Builder as a result of the improper offer, agreement to
confer, or conferring of a benefit to a City of Denton employee or official.
ARTICLE 15 RIGHT TO AUDIT DESIGN -BUILDER'S RECORDS
By execution of the Design -Build Agreement, the Design -Builder grants the Owner the right to audit, at
the Owners election, a of the Design -Builder's records and billings relating to the performance of the
Work under the Contract Documents. The Design -Builder agrees to retain its Project records for a
minimum of five (5) years following completion of the Work. Ilie Owner agrees that it will exercise the
right to audit only at reasonable hours. City may review any and all of the services peribrined by
Design -Builder under this Contract. Any payment, settlement, satisfaction., or release made or provided
during the course of performance of this Contract shall be subject to City's rights as may be disclosed by
an audit under this section.
ARTICLE 16 NOTICE OF CONTRACT CLAIM
This Contract is subject to the provisions of the Denton City Code, as amended, relating to requirements
for filing a notice of a breach of contract claim against City. Design -Builder shall comply with the
requirements of this ordinance as a precondition of any litigation relating to ibis Contract, in addition to
all other requirements in this Contract related to claims and notice of claims.
Should a conflict arise between the PO. RFP document, sae ppGar terrors drawings, specifications,
eonstruction document, or contract; the terms and conditions set forthinthe Ci tv of Denton General
il.
City of •
nton
nopeclal Terms and Conditions
ADDITIONAL TERMS AND CONDITIONS
Contract Term
It is the intention of the City of Denton to award a contract for construction of the project as described in the
drawings and specifications. Materials and services undertaken pursuant to this RFP will be required to
commence within fourteen (14) days of delivery of a Notice to Proceed. The services shall be
accomplished per the Scope of Work as identified in Section III, the Procurement Process and Procedures
as outlined in Section II, and shall conform to the requirements contained in the Technical Specification in
Exhibit 2, and Technical Drawings in Exhibit 3.
The Contract shall commence upon the issuance of a Notice to Proceed by the City of Denton and shall
automatically expire upon completion of the work and acceptance by the City of Denton.
Priein
Only firm, lump sum pricing with no escalation will be accepted for this project.
Price Adiustinents
Price adjustments will not be allowed for this project unless a change in scope is approved that increases
or decreases the amount of work required.
Requests or proposals for changes in scope must be submitted in writing with documentation that
provides justification for the change and supporting evidence that describes the basis for the cost change.
Upon receipt of such request, the City of Denton reserves the right to either: accept the proposed change
as competitive with the general market price at the time and issue appropriate authorizations or reject the
increases within 30 calendar s, after receipt of a properly submitted request. leo work shall be
undertaken on a proposed change until authorized by the City of Denton in the form of a Purchase Order
change and/or other documentation appropriate to amending the contract.
The request can be sent by e-mail to:tiro s eg giLtygfdenton.m
Or mail to:
City of Denton
Attn: Purchasing Manager
RFP # 5687
901B Texas Street
Denton, Texas 76209
Or call:
City of Denton Purchasing
(940) 349-7100
The City of Denton reserves the right to accept, reject, or negotiate any proposed price changes.
Quantities
The quantities indicated on the drawings and in the Technical Specification are believed to be accurate
but shall be considered only as estimates. The project requires complete; and functional construction of
the substation perimeter fence in accordance with the dimensions presented on the project documents.
Differences between the quantities of material required and the estimated quantities will not be
considered as basis for a change in the price 1'or the project. In submitting a proposal, the proposer is
stating that he has reviewed the project drawings and specifications and understands their intent and has
checked the quantities and dimension and is asserting that the proposal is intended to account for all
conditions and quantities to complete the project as described in the plans and specification.
Substitutions
Substitutions are not permitted without the written approval of the City of Denton Purchasing
Department. For substitutions prior to the proposal deadline, this will be accomplished with a submittal
to the Independent Architect/Engineer, and approval by the City representative, and issuance of a written
addendum. For substitutions after contract award, this will be accomplished with a submittal request to
the Independent Architect/Engineer, and approval by the City representative, and issuance of a written
contract change order.
Product Changes during Contract Term
The supplier shall not change specifications during the contract term without prior approval. Any
deviation in the specifications or change in the product must lac approved in advance by the City of
Denton. Notice of a change, shall be submitted in writing to the Project Manager with the RFP number
in the subject line, for review. Products found to have changed specifications without notification, and
acceptance, will be rejected and must be removed from the site at the supplier's expense. Products that
have been installed shall be replaced at the supplier's expense.
Patent Rights
The Design -Builder agrees to indemnify and hold harmless the City from any claim involving patent
right infringement or copyrights on goods supplied.
Asbestos Free Materials
The Design -Builder shall provide asbestos -free materials as represented by the Manufacturer's
"Materials Safety Data Sheets"
Rights to :Mata Documents and Computer Software (Government Entity Ownersh
Any software, research, reports studies, data, photographs, negatives or other documents, drawings or
materials prepared by Design -Builder in the performance of its obligations under this contract shall be
the exclusive property of the City and all such materials shall be delivered to the City by the Design -
Builder upon completion, termination, or cancellation of this contract. Design -Builder may, at its own
expense, keep copies of all its writings for its personal files. Design -Builder shall not use, willingly
allow, or cause to have such materials used for any purpose other than the performance of Design -
Builder's obligations under this contract without the prior written consent of the City; provided,
however, that Design -Builder shall be allowed to use non -confidential materials for writing samples in
pursuit of the work.
The ownership rights described herein shall include, but not be limited to, the right to copy, publish,
display, transfer, prepare derivative works, or otherwise use the works.
Addie New Products or Services to the Contract after Award
Following the Contract award, ADDITIONAL services of the same general category that could have
been encompassed in the award of this contract, and that are, not already on the contract, may be added.
A formal written request may be sent to successful Design -Builder to provide a proposal on the
additional services and shall submit proposal to the City as instructed. All submitted prices are subject to
negotiation in accordance with Texas Government Code 2254. The City may accept or reject the
proposal, and may issue a separate RFQ for the services requested, after rejecting some, or all, of the
proposal. The services covered under this provision shall conforin to the statement of work,
specifications, and requirements as outlined in the request. Contract changes shall be made in
accordance with Local Government Code 252.048.
Smnles
Respondents must make samples available in accordance with the specification and upon request by the
City of Denton prior to award with no costs to the City.
Venue
This agreement shall be governed by the law of the State of Texas and venue for its construction and
enforcement shall lie in the courts of Denton County, Texas.
Silence of Specifications
The apparent silence of these specifications as to any detail or the apparent omission from it of a detailed
description concerning any point, shall be regarded as a meaning that the only best commercial practices
are to prevail. All interpretations of these specifications shall be made on the basis of this statement.
P'rcvailir Wage Rat"
In accordance with Texas Government Code 2258, the awarded Design -Builder shall comply with
prevailing wage rates as defined by the United States Department of Labor Davis -Bacon Wage
Determination at :llwww.dol.aov/whdlcontractsl'dbra.htm and at the Wage Determinations website
www.wdol.gov for Denton County, Texas (WD -2509).
Notwithstanding any other provision of this Contract, the awarded Design -Builder hereby represents and
warrants that the Design -Builder shall pay to each of its employees a, wage not less than what is
currently known as the "Federal Minimum Wage" and any increase or amendments thereto.
Furthermore, Design -Builder shall produce proof of compliance with this provision by Design -Builder
to the City. The City shall withhold payments due to Design -Builder until Design -Builder has complied
with this provision. Prior to any payment being made for work satisfactorily completed and accepted,
Design -Builder shall submit wage rate affidavits with its billing documents affirming that all employees
have been paid not less than the current "Federal Minimum Wage".
Special PernnittingReguirements
The awarded Design -Builder shall work with identified City staff to obtain the necessary permits for
construction of the project.
Contracts and Bonds
Successful awarded Design -Builder will be required to sign original contract and submit a performance
and payment bonds for 100 percent of the total proposal submitted before work is to commence. The
Design -Builder shall assume all costs in increasing the bond limits if change orders are formally
approved. Bonds shall be in accordance with the V.T.C.A Government Code Section 2253.021, as
amended.
The City shall normally return the proposal bonds within ten (10) working days after the proposal due
date, except for the three top ranked firms. The three top ranked firms will be retained by the City until
the required contract and bonds have been executed, after which they shall be returned.
SPECIAL CONDITIONS FOR GRANT FUNDED PURCHASES
DAVIS BACON COMPLIANCE REQUIREMENTS
The Design -Builder shall comply with the requirements of the Davis -Bacon Wage Act and the Wage
Rate Requirements under Section 1606 of the Recovery and Reinvestment Act (the Act) and shall
indemnify the City from liability for any failure to pay wages in compliance with the Act. The Design-
Builder shall ensure that all laborers and mechanics employed in the performance of the project for
which the assistance is provided, including those employed by subcontractors, are paid wages at rates
not less than those prevailing on similar work in the locality as determined by the Secretary of Labor in
accordance with subchapter IV of chapter 31 of title 40, United States Code (commonly referred to as
the `Davis -Bacon Act'). The bidder who is awarded the Contract shall pay the wage rate in effect as of
the date the Contract is awarded. The Design -Builder shall cooperate with the City by providing
information in the form and frequency requested by the City concerning the type of work performed, the
number of hours worked, and the hourly rates paid for the various types of work performed by all
workers on the Project. The Design -Builder shall allow City staff to conduct on-site wage interviews and
shall post information concerning the Act as requested by the City.
All Design -Builders and subcontractors must comply with Davis -Bacon Wage Rates and the Wage Rate
Requirements of Section 1606 of the Recovery and Reinvestment Act.
The Wage Rale Requirements, as stated in the Recovely and Reinvestment Act Grant
are as follows:
THIS AWARD TERM IS APPI-ICABLE TO ARRA AWARDS il'IMTN WAGE RATE
gWUJREME,NTS UNDER SEMON 1606 OF, THE RECOVERY ACT TERMIS APPLICABLE.
THIS AWARD TI RMI"SAL OAPPLI APPLICABLE TOSlJB RA.1VTS AND CONTRA C S.
Note: Where necessary to make the context of these articles applicable to this award, the term "Design -
Builder" shall mean "Recipient" and the term "Subcontractor" shall mean "Subrecipient or
Subcontractor" per the following definitions.
Recipient means the organization, individual, or other entity that receives an award from DOE and is
financially accountable for the use of any DOE funds or property provided for the performance of the
project, and is legally responsible for carrying out the terms and conditions of the award.
Subrecipient means the legal entity to which a subaward is made and which is accountable to the
recipient for the use of the funds provided. The term may include foreign or international organizations
(such as agencies of the United Nations).
Davis -Bacon Act
(a) Definition."Site of the work"—
(1) Means --
(i) The primary site of the work. The physical place or places where the construction called
for in the award will remain when work on it is completed; and
(ii) The secondary site of the work, if any. Any other site where a significant portion of the
building or work is constructed, provided that such site is—
(A)Located in the United States; and,
(B) Established specifically for the performance of the award or project;
(2) Except as provided in paragraph (3) of this definition, includes any fabrication plants, mobile
factories, batch plants, borrow pits, job headquarters, tool yards, etc,, provided.—
(i) They are dedicated exclusively, or nearly so, to perfonnance of the award or project; and
(ii) They are adjacent or virtually adjacent to the "primary site of the work" as defined in
paragraph (a)(1)(i), or the "secondary site of the work" as defined in paragraph (a)(1)(ii)
of this definition;
(3) Does not include permanent home offices, branch plant establishments, fabrication plants, or
tool -yards of a Design -Builder or subcontractor whose locations and continuance in operation
are determined wholly without regard to a particular Federal award or project. In addition,
fabrication plants, batch plants; borrow pits, job headquarters, yards, etc., of a commercial or
material supplier which are established by a supplier of materials for the project before
opening of bids and not on the Project site, are not included in the "site of the work." Such
permanent, previously established facilities are not a part of the "site of the work" even if the
operations for a period of time may be dedicated exclusively or nearly so, to the performance
of an award.
(b) (1) All laborers and mechanics employed or working upon the site of the work will be paid
unconditionally and not less ollen than once a week, and without subsequent deduction or
rebate on any account (except such payroll deductions as are permitted by regulations issued
by the Secretary of Labor under the Copeland Act (29 CFR Part 3)), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed
at rates not less than those contained in the wage determination of the Secretary of Labor
which is attached hereto and made a hart hereof, or as may be incorporated for a. secondary
site of the work, regardless of any contractual relationship which may be alleged to exist
between the Design -Builder and such laborers and mechanics. Any wage determination
incorporated for a secondary site of the work shall be effective from the first day on which
work under the award was performed at that site and shall be incorporated without any
adjustment in award price or estimated cost. Laborers employed by the construction Design -
Builder or construction subcontractor that are transporting portions of the building or work
between the secondary site of the work and the primary site of the work shall be paid in
accordance with the wage determination applicable to the primary site of the work.
(2) Contributions made or costs reasonably anticipated for bona fide ffinge benefits under
section 1(b)(2) of the Davis -Bacon Act on behalf of laborers or mechanics are considered
wages paid to such laborers or mechanics, subject to the provisions of paragraph (e) of this
article; also, regular contributions made or costs incurred for more than a weekly period (but
not less often than quarterly) under plans, funds, or programs which cover the particular
weekly period, are deemed to be constructively made or incurred during such period.
(3) Such laborers and mechanics shall be paid not less than the appropriate wage rate and fringe
benefits in the wage determination for the classification of work actually performed, without
regard to skill, except as provided in the article entitled Apprentices and Trainees. Laborers
or mechanics performing work in more than one classification may be compensated at the
rate specified for each classification for the time actually worked therein; provided, that the
employer's payroll records accurately set forth the time spent in each classification in which
work is performed.
(4) The wage determination (including any additional classifications and wage rates conformed
under paragraph (c) of this article) and the Davis -Bacon poster (WH -1321) shall be posted at
all times by the Design -Builder and its subcontractors at the site of the work in a prominent
and accessible place where it can be easily seen by the workers.
(c) (1) The Contracting Officer shall require that any class of laborers or mechanics which is not
listed in the, wage determination and. which is to be employed under the award shall be
classified in conformance with the wage determination.. The Contracting; Officer shall
approve an additional classification and wage rate and fringe benefits therefore only when all
the following criteria have been met:
(i) The work to be performed by the classification requested is not performed by a
classification in the wage determination.
(ii) The classification is utilized in the area by the construction industry.
(iii)The proposed wage rate, including any bona fide fringe benefits, bears a reasonable
relationship to the wage rates contained in the wage determination.
(2) If the Design -Builder and the laborers and mechanics to be employed in the classification (if
known), -or -their representatives and the Contracting Officer agree on the classification and
wage rate (including the amount designated for fringe benefits, where appropriate), a report
of the action taken shall be sent by the Contracting Officer to the Administrator of the:
Wage and Hour Division
Employment Standards Administration
U.S. Department of Labor
Washington, DC 20210
The Administrator or an authorized representative will approve, modify, or disapprove every
additional classification action within 30 days of receipt and so advise the Contracting
Officer or will notify the Contracting Officer within the 30 -day period that additional time is
necessary.
(3) In the event the Design -Builder, the laborers or mechanics to be employed in the
classification, or their representatives, and the Contracting Officer do not agree on the
proposed classification and wage rate (including the amount designated, for fringe benefits,
where appropriate), the Contracting Officer shall refer the questions, including the views of
all interested parties and the recommendation of the Contracting Officer, to the Administrator
of the Wage and Hour Division for determination. The Administrator, or an authorized
representative, will issue a determination within 30 days of receipt and so advise the
Contracting Officer or will notify the Contracting Officer within the 30 -day period that
additional time is necessary.
(4) The wage rate (including fringe benefits, where appropriate) determined pursuant to
subparagraphs (c)(2) and (c)(3) of this article shall be paid to all workers performing work in
the classification under this award from the first day on which work is performed in the
classification.
(d) Whenever the minimum wage rate prescribed in the award for a class of laborers or mechanics
includes a fringe benefit which is not expressed as an hourly rate, the Design -Builder shall either
pay the benefit as stated' in the wage determination or shall pay another bona fide fringe benefit
or an hourly cash equivalent thereof.
(e) If the Design -Builder does not make payments to a trustee or other third person, the Design -
Builder may consider as part of the wages of amy laborer or mechanic the amount of any costs
reasonably anticipated in providing bona fide fringe benefits under a plan or program; provided,
that the Secretary of Labor has found, upon the written request or the Design -Builder, that the
applicable standards of the Davis -Bacon Act have been met. The Secretary of Labor may require
the Design -Builder to set aside in a separate account assets for the meeting of obligations under
the plan or program.
Rates of Wages
The minimum wages to be paid laborers and mechanics under this award involved in performance of
work at the project site, as determined by the Secretary of Labor to be prevailing for the corresponding
classes of laborers and mechanics employed on projects of a character similar to the contract work in the
pertinent locality, are included as an attachment to this award. These wage rates are minimum rates and
are not intended to represent the actual wage rates that the Design -Builder may have to pay.
Payrolls and Basic Records
(a) Payrolls and basic records relating thereto shall be maintained by the Design -Builder during the
course of the work and preserved for a period of 3 years thereafter for all laborers and mechanics
working at the site of the work. Such records shall contain the name, address, and last 4 digits of
the social security number of each such worker, his or her correct classification, hourly rates of
wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or
cash equivalents thereof of the types described in section I(b) (2) (B) of the Davis -Bacon Act),
daily and weekly number of hours worked, deductions made, and actual wages paid. Whenever
the Secretary of Labor has found, under paragraph (d) of the article entitled Davis -Bacon Act,
that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated
in providing benefits under a plan -or program described in section 1(b)(2)(B) of the Davis -Bacon
Act, the Design -Builder shall maintain records which show that the commitment to provide such
benefits is enforceable, that the plan or program is financially responsible, and that the plan or
program has been communicated in writing to the laborers or mechanics affected, and records
which show the costs anticipated or the actual cost incurred in providing such benefits. Design -
Builders employing apprentices or trainees under approved programs shall maintain written
evidence of the registration of apprenticeship programs and certification of trainee programs, the
registration of the apprentices and trainees, and the ratios and wage rates- prescribed in the
applicable programs.
(b) (1) The Design -Builder shall submit weekly for each week in which any award work is performed a
copy of all payrolls to the Contracting Officer. The payrolls submitted shall set out accurately
and completely all of the information required to be maintained under paragraph (a) of this
article. This information may be submitted in any form desired. Optional Form WH -347 (Federal
Stock Number 029-005-00014-1) is available for this purpose and may be purchased from the --
Superintendent of Documents U.S. Government Printing Office Washington, DC 20402
The Prime Design -Builder is responsible for the submission of copies of payrolls by all
subcontractors.
(2) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the
Design -Builder or subcontractor or his or her agent who pays or supervises the payment of the
persons employed under the award and shall certify —
(i) That the payroll for the payroll period contains the information required to be maintained
under paragraph (a) of this article and that such information is correct and complete;
(ii) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on
the award during the payroll period has been paid the full weekly wages earned, without
rebate, either directly or indirectly, and that no deductions have been made either directly or
indirectly from the full wages earned, other than permissible deductions as set forth in the
Regulations, 29 CFR Part 3; and
(iii)That each laborer or mechanic has been paid not less than the applicable wage rates and
fringe benefits or cash equivalents for the classification of work performed, as specified in
the applicable wage determination incorporated into the award.
(3) The weekly submission of a properly executed certification set forth on the reverse side of
Optional Form WH -347 shall satisfy the requirement for submission of the "Statement of
Compliance" required by subparagraph (b)(2) of this article.
(4) The falsification of any of the certifications in this article may subject the Design -Builder or
subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 3729 of
Title 31 of the United States Code.
(c) The Design -Builder or subcontractor shall make the records required under paragraph (a) of this
article available for inspection, copying or transcription by the Contracting Officer or authorized
representatives of the Contracting Officer or the Department of Labor. The Design -Builder or
subcontractor shall permit the Contracting Officer or representatives of the Contracting Officer or
the; Department of Labor to interview employees during working hours on the job. if the Design -
Builder or subcontractor fails to submit required records or to make thein available, the Contracting
Officer may, after written notice to the Design -Builder, take such action as may be necessary to
cause the suspension of any further payment. Furthermore, failure to submit the required records
upon request or to make such records available may be grounds for debarment action pursuant to 29
CFR 5.12.
Withholding of Funds
The Contracting Officer shall, upon his or her own action or upon written request of an authorized
representative of the Department of Labor, withhold or cause to be withheld from the Design -Builder
under this award or any other Federal award with the same Prime Design -Builder, or any other federally
assisted award subject to Davis -Bacon prevailing wage requirements, which is held by the same Prime
Design -Builder, so much of the accrued payments or advances as may be considered necessary to pay
laborers and mechanics, including apprentices, trainees, and helpers, employed by the Design -Builder or
any subcontractor the full amount of wages required by the award. In the event of failure to pay any
laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the
work, all or part of the wages required by the award, the Contracting Officer may, after written notice to
the Design -Builder, take such action as may be necessary to cause the suspension of any further
payment, advance, or guarantee of funds until such violations have ceased.
Apprentices and Trainees
(a) Apprentices.
(1) An apprentice will be permitted to work at less than the predetermined rate for the work they
performed when they are employed—
(i) pursuant to and individually registered in a bona fide apprenticeship program registered
with the U.S. Department of Labor, Employment and Training Administration, Office of
Apprenticeship and Training, Employer, and Labor Services (OA°iTLS) or with a State
Apprenticeship Agency recognized by the OATELS; or
(ii) In the first 90 days of -probationary employment as an apprentice in such an
apprenticeship program, even though not individually registered in the program, if
certified by the OATELS or a State Apprenticeship Agency (where appropriate) to be
eligible for probationary employment as an apprentice.
(2) The allowable ratio of apprentices to jounieymen on the job site in any craft classification
shall not be greater than the ratio permitted to the Design -Builder as to the entire work force
under the registered program.
(3) Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise
employed as stated in paragraph (a)(1) of this article, shall be paid not less than the
applicable wage determination for the classification of work actually performed. In addition,
any apprentice performing work on the job site in excess of the ratio permitted under the
registered program shall be paid not less than the applicable wage rate on the wage
determination for the work actually performed.
(4) Where a Design -Builder is performing construction on a project in a locality other than that
in which its program is registered, the ratios and wage rates (expressed in percentages of the
journeyman's hourly rate) specified in the Design -Builder's or subcontractor's registered.
program shall be observed. Every ,apprentice must be paid at not less than the rate specified
in the registered program for the apprentice's level of progress, expressed as a percentage of
the journeyman hourly rate specified in the applicable wage determination.
(5) Apprentices shall be paid fringe benefits in accordance with the provisions of the
apprenticeship program. If the apprenticeship program does not specify fringe benefits,
apprentices must be paid the full amount of fringe benefits listed on the wage detenninatio
for the applicable classification. If the Administrator determines that a different practice
prevails for the applicable apprentice classification, fringes shall be paid in accordance with
that determination.
(6) In the event OATELS, or a State Apprenticeship Agency recognized by OATELS, withdraws
approval of an apprenticeship prograrn, the Design -builder will no longer be permitted to
utilize apprentices at less than the applicable predetermined rate for the work perfonnedd until
an acceptable program is approved:
(b) Trainees.
(1) Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the
predetermined rate for the work performed unless they are employed pursuant to and
individually registered in a program which has received prior approval, evidenced by formal
certification by the U.S. Department of Labor, Ernployment and Training Administration,
Office of Apprenticeship Training, Employer, and Labor Services (OATE'LS). The ratio of
trainees to journeymen on the job site shall not be greater than permitted under the plan
approved by OATELS.
(2) Every trainee must be paid at not less than the rate specified in the approved program for the
trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified
in the applicable wage determination. Trainees shall be paid fringe benefits in accordance
with the provisions of the trainee program. If the trainee program does not mention fringe
benefits; trainees shall be paid -the full amount of fringe benefits listed in the wage
determination unless the Administrator of the Wage and Hour Division determines that there
is an apprenticeship program associated with the corresponding journeyman wage rate in the
wage determination which provides for less than full fringe benefits for apprentices. Any
employee listed on the payroll at a trainee rate that is not registered and participating in a
training plan approved by the OATELS shall be paid not less than the applicable wage rate in
the,wage determination for the classification of work actually performed. In addition, any
trainee performing work on the job site in excess of the ratio permitted under the registered
program shall be paid 'not less than the applicable wage rate in the wage determination for the
work actually performed.
(3) in the event OATELS withdraws approval of a training program, the Design -Builder will no
longer be permitted to utilize trainees at less than the applicable predetermined rate for the
work performed until an acceptable program is approved.
(4) Equal employment opportunity. The utilization of apprentices, trainees, and journeymen
under this article shall be in conformity with the equal employment opportunity requirements
of Executive Order 11246, as amended and 29 CFR Part 30.
Compliance with Copeland Act Requirements
The Design -Builder shall comply with the requirements of 29 CFR Part 3, which are hereby
incorporated by reference in this award.
Subcontracts (Labor Standards)
(a) Definition. "Construction, alteration or repair," as used in this article means all types of work
done by laborers and mechanics employed by the construction Design -Builder or construction
subcontractor on a particular building or work at the site thereof: including without limitation. ---
(1) Altering, remodeling, installation (if appropriate) on the site of the work of items fabricated
off-site;
(2) Painting and decorating;
(3) Manufacturing or furnishing of materials, articles, supplies, or equipment on the site of the
building or work;
(4) Transportation of materials and supplies between the site of the work within the meaning of
paragraphs (a)(1)(i) and (ii) of the "site of the work' as defined in the article entitled Davis
Bacon Act of this award, and a facility which is dedicated to the construction of the building
or work and is deemed part of the site of the work within the meaning of paragraph (2) of the
"site of work" definition; and
(S) Transportation of portions of the building or work between a secondary site where a
significant portion of the building or work is constructed, which is part of the "site of the
work" definition in paragraph (a) (1) (ii) of the Davis -Bacon Act article, and the ,physical
place or places where the building or work will remain (paragraph (a) (1) (i) of the Davis
Bacon Act article, in the "site of the work" definition).
(b) The Design. -Builder or subcontractor shall insert in any subcontracts for construction, alterations
and repairs within the United States the articles entitled—
(1) Davis -Bacon Act;
(2) Contract Work Hours and Safety Standards Act -- Overtime Compensation (if the article is
included in this award);
(3) Apprentices and Trainees;
(4) Payrolls and Basic Records;
(5) Compliance with Copeland Act Requirements;
(d) Withholding of Funds;
(7) Subcontracts (Labor Standards);
(8) Contract Termination – Debarment;
(9) Disputes Concerning Labor Standards;
(10) Compliance with Davis -Bacon and Related Act Regulations; and
(11) Certification of Eligibility.
(c) The Prime Design -Builder shall be responsible for compliance by any subcontractor or lower tier
subcontractor performing construction within the United States with all the award articles cited
in paragraph (b).
(d) (1) Within 14 days after issuance of the award, the Design -Builder shall deliver to the
Contracting Officer a completed Standard Form (SF) 1413, Statement and
Acknowledgment, for each subcontract for construction within the United States, including
the subcontractor's signed and dated acknowledgment that the articles set forth in paragraph
(b) of this article have been included in the subcontract.
Within 14 days after the award of any subsequently awarded subcontract the Design -Builder
shall deliver to the Contracting Officer an updated completed Sly 1413 for such additional
subcontract.
(e) The Design -Builder shall insert the substance of this article, including this paragraph (e) in all
subcontracts for construction within the United States.
Contract Termination -- Debarment
A breach of the award articles entitled Davis -Bacon Act, Contract Work Hours and Safety Standards Act
-- Overtime Compensation, Apprentices and Trainees, Payrolls and Basic records, Compliance with
Copeland Act Requirements, Subcontracts (Labor Standards), Compliance with Davis -Bacon and
Related Act Regulations, or Certification of Eligibility may be grounds for termination of the whole
award or in part for the Recovery Act covered work only, and for debarment as a Design -Builder and
subcontractor as provided in 29 CFR 5.12.
Compliance with Davis -Bacon and Related Act Regulations
All rulings and interpretations of the Davis -Bacon and Related Acts contained in 29 CFR Parts 1, 3, and
5 are hereby incorporated by reference in this award.
Disputes Concerning Labor Standards
The United States Department of Labor has. set forth in 29 CFR Parts 5, 6, and 7 procedures for
resolving disputes concerning labor standards requirements. Such disputes shall be resolved in
accordance with those procedures and not the, Disputes and Appeals as defined in 10 CFR 600.22.
Disputes within the meaning of this article include disputes between the Design -Builder (and any of its
subcontractors) and the contracting agency, the U.S, Department of Labor, or the employees or their
representatives.
Certification of Eligibility
(a) By entering into this award, the Design -Builder certifies that neither it (nor he or she) nor any
person or firm who has an interest in the Design -Builder's firm is a person or firm ineligible to
be awarded Government awards by virtue of section 3(a) of the Davis -Bacon Act or 29 CFR
5.12(a)(1).
(b) No part of this award shall be subcontracted to any person or firm ineligible for award of a
Government award by virtue of section 3(a) of the Davis -Bacon Act or 29 CFR 5.12(a)(1).
(c) The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001.
Approval of Wage Rates
All straight time wage rates, and overtime rates based thereon, for laborers and mechanics engaged in
work under this award must be submitted for approval in writing by the head of the contracting activity
or a representative expressly designated for this purpose, if the straight time wages exceed the rates for
corresponding classifications contained in the applicable Davis -Bacon Act minimum wage
determination included in the award. Any amount paid by the Design -Builder to any taborer or mechanic
in excess of the agency approved wage rate shall be at the expense of the Design -Builder and shall not
be reimbursed by the Government. If the Government refuses to authorize the use of the overtime, the
Design -Builder is not released from the obligation to pay employees at the required overtime rates for
any overtime actually worked.
BUY AME RICAN ACT COMPLIANCE REQUIREMENTS
The Design -Builder acknowledges to and for the benefit of the City of Denton that it understands the
goods and services under this Agreement are being funded with monies made available by the American
Reinvestment and Rmwery Act of 2009 (Recovery Act) (or are being made available for a project being
funded with monies made available by the Recovery Act) and section 1605 of such, law contains
provisions commonly known as "Buy American." The Buy American requirement prohibits the use of
Recovery Act funds for a project for the construction, alteration, maintenance, or repair of a public
building or public work unless all of the iron, steel, and manufactured goods used in the project are
produced in the United States (`Buy American requirement") including iron, steel, and manufactured
goods provided by the Design -Builder pursuant to this Agreement. The Design -Builder hereby
represents and warrants to and for the benefit of the Department of Energy (DOE) grantee that (a) the
Design -Builder has reviewed and understands the Buy American requirement, (b) all of the iron, steel,
and manufactured goods used in the project will be and/or have been produced in the United States in a
manner that complies with the Buy American requirement, unless an exception to the requirement is
approved, and (c) the Design -Builder will provide any further verified information, certification or
assurance of compliance with this paragraph, or information necessary to support an exception to the
Buy American requirement, as may be requested by the DOE grantee or DOT. Notwithstanding any
other provision of this Agreement, any failure to comply with this paragraph by the Design -Builder shall
permit the DOE,grantee to recover as damages against the Design -Builder any loss expense or cost
(including without limitation attorney's fees) incurred by the DOE grantee resulting from any such
failure (including without limitation any impairment or loss of funding, whether in whole or in part from
DOE). Neither this paragraph (nor any provision of this Agreement necessary to give this paragraph
force or effect) shall be amended or waived without the prior written consent of the DOE grantee.
The requirements for the Buy American Act_ as stated in the Recovery_and
Reinvestment Act Grant are as follows:
REQUIRED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED GOODS --
SECTION 1605 OF THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009
(MAY 2009)
THIS AWARD TERM IS APPLICABLE To ANY REC0VTRY ACT .FUNDS rO
+CON,,VTRUCT.IO ALTERATION tl✓MJNTF/.NANCE 4R REPAIR OFA PUBLIC BUILDING R
,PUBLIC WORKAND T11E TOTAL PROJECT VALUE Jy E T`JMATED LESS TIL4 17
,443,
THI,SAWARD TERMALSOAPPLIES TOALL SUBGRAINT,SAt" D CONTRACTS.
a. Definitions. As used in this award term and condition --
(1) Manufactured good means a good brought to the construction site for incorporation into the
building or work that has been --
(i) Processed into a specific form and shape; or
(ii) Combined with other raw material to create a material that has different properties than
the properties of the individual raw materials.
(2) Public building and public work means a public building of, and a public work of, a
governmental entity (the United States; the District of Columbia; commonwealths, territories,
and minor outlying islands of the United States; State and local governments; and multi -
State, regional, or interstate entities which have governmental functions). These buildings
and works may include, without limitation, bridges, dams, plants, highways, parkways,
streets, subways, tunnels, sewers, mains, power lines, pumping stations, heavy generators,
railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties,
breakwaters, levees, and canals, and the construction, alteration, maintenance, or repair of
such buildings and works.
(3) Steel means an alloy that includes at least 50 percent iron, between '.02 and 2 percent
carbons, and may include other elements.
b. Domestic preference.
(1) This award term and condition implements Section 1605 of the American Recovery and
Reinvestment Act of 2009 (Recovery Act) (Pub. L. 111--5), by requiring that all iron, steel,
and manufactured goods used in the project are produced in the United States except as
provided in paragraph (b)(3) and (b)(4) of this section and condition.
(2) This requirement does not apply to the material listed by the Federal Government as follows:
None
[Award official to list applicable excepted materials or indicate "none"]
(3) The award official may add other iron, steel, and/or manufactured goods to the list in
paragraph (b)(2) of this section and condition if the Federal Government determines that --
(i) The cost of the domestic iron, steel, and/or manufactured goods would be unreasonable.
The cost of domestic iron, steel, or manufactured goods used in the project is
unreasonable when the cumulative cost of such material will increase the cost of the
overall project by more than 25 percent;
(ii) The iron, steel, and/or manufactured good is not produced, or manufactured in the United
States in sufficient and reasonably available quantities and of a satisfactory quality; or
(iii)The application of the restriction of section 1605 of the Recovery Act would be
inconsistent with the public interest.
c. Request for determination of inapplicability of Section 1605 of the Recovery Act.
(1) Any recipient request_ to use foreign iron, steel, and/or manufactured goods in accordance
with paragraph (b) (3) of this section shall include adequate information for Federal
Government valuation of the request, including—
(A) A description of the foreign and domestic iron, steel, and/or manufactured goods;
(B) Unit of measure;
(C) Quantity;
(D) Cost;
(E) Time of delivery or availability;
(F) Location of the project;
(G)Name and address of the proposed supplier; and
(H)A detailed justification of the reason for use of foreign iron, steel, and/or manufactured
goods cited in accordance with paragraph (b) (3) of this section.
(i) A request based on unreasonable cost shall include a reasonable survey of the market
and a completed cost comparison table in the format in paragraph (d) of this section.
(ii) The cost of iron, steel, and/or manufactured goods material shall include all delivery
costs to the construction site and any applicable duty.
(iii)Any recipient request for a determination submitted after Recovery Act funds have been
obligated for a project for construction, alteration, maintenance, or repair shall explain
why the recipient could not reasonably foresee the need for such determination and
could not have requested the determination before the funds were obligated. If the
recipient does not submit a satisfactory explanation, the award official need not make a
determination.
(2) If the Federal Government determines after funds have been obligated for a project for
construction, alteration, maintenance, or repair that an exception to section 1605 of the
Recovery Act applies, the award official will amend the award to allow use of the foreign
iron, steel, and/or relevant manufactured goods. When the basis for the exception is non-
availability or public interest, the amended award shall reflect adjustment of the award
amount, redistribution of budgeted funds, and/or other actions taken to cover costs associated
with acquiring or using the foreign iron, steel, and/or relevant manufactured goods. When the
basis for the exception is the unreasonable cost of the domestic iron, steel, or manufactured
goods, the award official shall adjust the award amount or redistribute budgeted funds by at
least the differential established in 2 CFR 176.110(a).
(3) Unless the Federal Government determines that an exception to section 1605 of the Recovery
Act applies, use of foreign iron, steel, and/or manufactured goods is noncompliant with
section 1605 of the American Recovery and Reinvestment Act.
d. Data. To permit evaluation of requests under paragraph (b) of this section based on unreasonable
cost, the Recipient shall include the following information and any applicable supporting data
based on the survey of suppliers:
List
Foreign and Domestic Items Cost Comparison
Cost
leseri ition Unit of Measure Quantity (dollars)*
Item P
Foreign steel, iron, or manufacturod good
Domestic steel, iron, or manufactured good
Item 2:
Foreign steel, iron, or manufactured good
Domestic steel, iron, or manufactured good
name,
address, telephone number, email address, and contact for suppliers surveyed. Attach copy of response;
if oral, attach summary.
Include other applicable supporting information.
*Include all delivery costs to the construction site.
PERFORMANCE BOND
STATE OF TEXAS
COUNTY OF DENTON
KNOW ALL MEN BY THESE PRESENTS: That Zeit Energy, LIC. whose address is
1717 McKinna, Dallas-, Texas 75202 hereinafter called Principal, and the _City of Denton, a corporation
organized and existing under the laws of the State of Texas, and fully authorized to transact business in the State
of Texas, as Surety, are held and firmly bound unto the City of Denton, a municipal corporation organized and
existing under tile laws of the State of Texas, hereinafter called Owner, in the penal suer ofi`ryo- Million , 'Six
Hundred and E' h -Two Thousand, Dourfiunchtd and i^c�rt -eve dollars and no cents (° 2 t�2,445. 0), in lawful
money of the United States, to be paid in Denton County, Texas, for the payment of which sum well and truly to
be made, we hereby bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and
severally, firmly by these presents. This Bond shall automatically be increased by the amount of any Change
Order or Supplemental Agreement, which increases the Contract price, but in no event shall a Change Order or
Supplemental Agreement, which reduces the Contract price, decrease the penal sum of this Bond.
THE OBLIGATION TO PAY SAME is conditioned as follows: Whereas, the Principal entered into a
certain Contract, identified by Ordinance, with the City of Denton, the Owner, dated the 131"i Daof Se tem r
2016, a copy of which is hereto attached and made a part hereof, for the Construction Services stated within
Request for Qualifications (RFQ) #6016 — Professional Services (Design -Build) for the Compressed Natural Gas
Fueling Station Project.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform and fulfill all of the
undertakings, covenants, terms, conditions and agreements of said Contract in accordance with the Plans,
Specifications and Contract Documents during the original term thereof and any extension thereof which may be
granted by the Owner, with or without notice to the Surety, and during the life of any guaranty or warranty
required under this Contract, and shall also well and truly perform and fulfill all the undertakings, covenants,
terms, conditions and agreements of any and all duly authorized modifications of said Contract that may hereafter
be made, notice of which modifications to the Surety being hereby waived; and, if the principal shall repair and/or
replace all defects due to faulty materials and workmanship that appear within a period of two (2) years from the
date of final completion and final acceptance of the Work by the Owner; and, if the :Principal shall fully indemnify
and save harmless the Owner from all costs and damages which Owner may suffer by reason of failure to so
perform herein and shall fully reimburse and repay Owner all outlay and expense which the Owner may incur in
making good any default or deficiency, then this obligation shall be void; otherwise, it shall remain in full force
and effect.
PROVIDED FURTHER, that if any -legal action be filed upon this Bond, exclusive venue shall lie in
Denton County, State of Texas.
AND PROVIDED FURTRER, that the said Surety, for value received, hereby stipulates and agrees that
no change, extension of time, alteration or addition to the terms of the Contract or to the Work to be performed
thereunder, or to the Plans, Specifications, Drawings, etc., accompanying the same, shall in anywise affect its
obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or
addition to the terms of the Contract, or to the Work to be performed thereunder, or to the Plans, Specifications,
Drawings, etc.
This Bond is given pursuant to the provisions of Chapter 2253 of the Texas Government Code, as
amended, and any other applicable statutes of the State of Texas. :. . .
The undersigned and designated agent is hereby designated by the Surety herein as the Resident Agent in
Denton County to whom any requisite notices may be delivered and on whom service of process may be had in
matters arising out of such suretyship, as provided by Article 7.19-1 of the Insurance Code, Vernon's Annotated
Civil Statutes of the State of Tex".
IN WITNESS WHEREOF, this instrument is executed in copies, each one of which shall be
deemed an original, this the — day of
ATTEST:
BY:
SECRETARY
ATTEST:
BY:
PRINCIPAL
BY:
PRESIDENT
SURETY
BY:
ATTORNEY-IN-FACT
The Resident Agent of the Surety in Denton County, Texas for delivery of notice and service of the process is:
NAME:
STREET ADDRESS:
(NOTE: Date of Performance Bond must be date of Contract. If Resident Agent is not a corporation, give
a person's name.)
PAYMENT BOND
STATE OF TEXAS
COUNTY OF DENTON
KNOW ALL MEN BY THESE PRESENTS: That _ZeitEnergy., nergy, LLC.,whose address is
1717 McKinney°., Dallas, Texas 75202 hereinafter called Principal, and the City of Denton, a corporation
organized and existing under the laws of the State of Texas, and fully authorized to transact business in
the State of Texas, as Surety; are held and firmly bound unto the City of Denton, a- municipal corporation
organized and existing under the laws of the State of Texas, hereinafter called Owner, in the penal sum of
Two -Million, Six Hundred and -Two ThLousancL Four Hundred and9-five dollars and no cents
( 02.445. ffl, in lawful money of the United States, to be paid in Denton, County, Texas, for the
payment of which sum well and truly to be made, we hereby bind ourselves, our heirs, executors,
administrators, successors, and assigns, jointly and severally, firmly by these presents. This Bond shall
automatically Lx increased by the amount of any Change Order or Supplemental Agreement which
increases the Contract price, but in no event shall a Change Order or Supplemental Agreement which
reduces the Contract price decrease the penal sum of this Bond.
THE OBLIGATION TO PAY SAME is conditioned as follows: Whereas, the Principal entered
into a certain Contract, identified by Ordinance, with the City of Denton, the Owner, dated theJ3 ' Day of
ae rte .r,,,,20 §, a copy of which is hereto attached and made a part hereof, for the Construction Services
stated within Request for Qualifications (RFQ) #6016 — Professional Services (Design -Build) for the
Compressed Natural Gas Fueling Station Project.
NOW, THJ--, EFORE-, if the Principal shall well, truly and faithfully perform its duties and make
prompt payment to all persons, firms, subcontractors, corporations and claimants supplying labor and/or
material in the prosecution of the Work provided for in said Contract and any and all duly authorized
modifications of said Contract that may hereafter be made, notice of which modifications to the Surety
being hereby expressly waived, then this obligation shall be void; otherwise it shall remain in full force
and effect.
PROVIDED FURTHER, that if any legal action be filed on this Bond, exclusive venue shall lie in
Denton County, Texas.
AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and
agrees that no change, extension of time, alteration or addition to the terms of the Contract, or to the Work
to be performed thereunder, or to the Plans, Specifications, Drawings, etc., accompanying the same, shall
in anywise affect its obligation on this Bond, and it does hereby waive notice of any such change,
extension of time, alteration or addition to the terms of the Contract, or to the Work to be performed
thereunder, or to the Plans, Specifications, Drawings, etc.
This Bond is given pursuant to the provisions of Chapter 2253 of the Texas Government Code, as
amended, and any other applicable statutes of the State of Texas.
The undersigned and designated agent is hereby designated by the Surety herein as the Resident
Agent in Denton County to whom any.requisite notices may be delivered and on whom service of process
may be had in matters arising out of such surety, as provided by Article 7.19-1 of the Insurance Code,
Vernon's Annotated Civil Statutes of the State of Texas.
IN WITNESS WBEREOF, this instrument is executed in copies, each one of which shall be
deemed an original, this the day of 1, ` . ° 11—
ATTEST: °° '
ATTEST:
BY:
SECRETARY
ATTEST:
BY:
PRINCIPAL
BY:
PRESIDENT
SURETY:
BY:
ATTORNEY-IN-FACT
The Resident Agent of the Surety in Denton County, Texas for delivery of notice and service of the
process is:
NAME:
STREET ADDRESS:
(NOTE. Date of Payment Bond must be date of Contract. If Resident Agent is not a corporation, give a
person's name.)
Insurance
I 1 0 1 HT1 1 11 1 a =
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WH
PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL TIME TERMS
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
JSR ADD' _ _ _.------ POLICY EFFECTIVE POLICY EXPIRATION
.TR INSR TYPE OF INSURANCE POLICY NUMBER DATE MMIDD/YY DATE MN1DD/YY
A ® GENERAL LIABILITY PACE303551 07/01/2016 07/01/2017
❑ COMMERICAL GENERAL LIABILITY
❑❑ CLAIMS MADE ® OCCUR
PgllOtion Lab.
GEN'L AGGREGATE LIMIT APPLIES PER:
❑ POLICY ❑ PROJECT ❑ LOC
B ® AUTOMOBILE LIABILITY 604747791 06/10/2016 06/10/20.17
❑ ANY AUTO
ALL OWNED AUTOS
SCHEDULED AUTOS
II�1 HIRED AUTOS
Ihl NON -OWNED AUTOS
CERTIFICATE OF LIABILITY INSURANCE
O$/W20
DATE IMMIDDJq+THi'S
LIMITS
'RODUCER
DAMAGE TO RENTED
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
PRFMISFR (Fa ommrsncel
❑ ANY AUTO
MED EXP (Any one person)
AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOInDER .1313
PERSONAL & ADV INJURY
Goode Insurance Agency
GENERAL AGGREGATE
CERTIFICATE DOES NOT END, EXTEND
OR AILTER-
s3,000,000
Hwy20
S State Hwy 208
A
COVERAGE AFFORDED BY THE POLICIES BELOW.
EXCESSIUMBRELLA LIABILITY
PACE303551
Rockwall, Tx. 32
07/01/2017
(Per person)
® OCCUR [:]CLAIMS MADE
BODILY INJURY
$
INSURERS AFFORDING COVERAGE
NAIC #
PROPERTY DAMAGE
NSURED
(Per accident)
INSURER A: Colony Insurance
36927
Zeit Energy LLC.
❑ RETENTION $
INSURER B: Farmers Truck
24392'
EACH OCCURRENCE
1717 Mckinney Ave Ste, 700
AGGREGATE
INSURER C: Texas Mutual
22945A
09/04/2016
Dallas, Tx. 75202
C
INSURER D:
EMPLOYERS' LIABILITY
EMPLOY
❑WC STATU-OTH-
❑
TORY LIMITS ER _
INSURER E:
E.L. EACH ACCIDENT
ANY PROPRIETOR/PARTNER/EXECU-
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WH
PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL TIME TERMS
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
JSR ADD' _ _ _.------ POLICY EFFECTIVE POLICY EXPIRATION
.TR INSR TYPE OF INSURANCE POLICY NUMBER DATE MMIDD/YY DATE MN1DD/YY
A ® GENERAL LIABILITY PACE303551 07/01/2016 07/01/2017
❑ COMMERICAL GENERAL LIABILITY
❑❑ CLAIMS MADE ® OCCUR
PgllOtion Lab.
GEN'L AGGREGATE LIMIT APPLIES PER:
❑ POLICY ❑ PROJECT ❑ LOC
B ® AUTOMOBILE LIABILITY 604747791 06/10/2016 06/10/20.17
❑ ANY AUTO
ALL OWNED AUTOS
SCHEDULED AUTOS
II�1 HIRED AUTOS
Ihl NON -OWNED AUTOS
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
Consulting, maintenance and building of CNG fueling stations
Y>i4
City of Denton
901B Texas Street
Denton, Texas 76209
)OLICY PERIOD INDICATED, NOTWITHSTANDING
❑
GARAGE LIABILITY
LIMITS
EACH OCCURENCE $3,000,000
DAMAGE TO RENTED
$50,000
PRFMISFR (Fa ommrsncel
❑ ANY AUTO
MED EXP (Any one person)
$5,000
PERSONAL & ADV INJURY
$3,000,000
GENERAL AGGREGATE
'$3,000,000
PRODUCTS - COMP/OP AGG
s3,000,000
A
®
EXCESSIUMBRELLA LIABILITY
PACE303551
07/01/2016
07/01/2017
(Per person)
® OCCUR [:]CLAIMS MADE
BODILY INJURY
$
(Per eoddent)
PROPERTY DAMAGE
DEDUCTIBLE
(Per accident)
AUTO ONLY - EA ACCIDENT
OTHER THAN EA ACC
❑ RETENTION $
$
AUTO ONLY: AGG
EACH OCCURRENCE
$2,OOQ000
AGGREGATE
WORKERS COMPENSATION AND
SB90001247567
09/04/2016
09/04/2017
C
®
EMPLOYERS' LIABILITY
EMPLOY
❑WC STATU-OTH-
❑
TORY LIMITS ER _
E.L. EACH ACCIDENT
ANY PROPRIETOR/PARTNER/EXECU-
E.L. DISEASE - EA EMPLOYEE
$1,000,000
E. L. DISEASE -POLICY LIMIT $1,000,000
3,000,000
TIVE OFFICERIMEMBER EXCLUDED?
If yes, describe undor
SPECIAL plJOVISIONS below
A
®
OTHER
PACE303551
07/01/2016
07/01/2017
Professional Liab.
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
Consulting, maintenance and building of CNG fueling stations
Y>i4
City of Denton
901B Texas Street
Denton, Texas 76209
)OLICY PERIOD INDICATED, NOTWITHSTANDING
CH THIS CERTIFICATE MAY BE ISSUED OR MAY
EXCLUSIONS AND CONDITIONS OF SUCH
LIMITS
EACH OCCURENCE $3,000,000
DAMAGE TO RENTED
$50,000
PRFMISFR (Fa ommrsncel
MED EXP (Any one person)
$5,000
PERSONAL & ADV INJURY
$3,000,000
GENERAL AGGREGATE
'$3,000,000
PRODUCTS - COMP/OP AGG
s3,000,000
COMBINED SINGLE LIMIT
$1,0001000
(Each Occurrence)
BODILY INJURY
(Per person)
BODILY INJURY
$
(Per eoddent)
PROPERTY DAMAGE
(Per accident)
AUTO ONLY - EA ACCIDENT
OTHER THAN EA ACC
$
$
AUTO ONLY: AGG
EACH OCCURRENCE
$2,OOQ000
AGGREGATE
$2,000,000
❑WC STATU-OTH-
❑
TORY LIMITS ER _
E.L. EACH ACCIDENT
$1,000,000
E.L. DISEASE - EA EMPLOYEE
$1,000,000
E. L. DISEASE -POLICY LIMIT $1,000,000
3,000,000
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE INSURER AFFORDING COVERAGE WILL ENDEAVOR TO
MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT
FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILrrY OF ANY KIND UPON THE
INSURER, ITS AGENTS OR REPRESENTATIVES. - __
(2001/08) v
INSURANCE REQUIREMENTS AND
WOR KE WS COMPENSENTATION REQUIREMENTS
Respondent's attention is directed to the insurance requirements below. it is highly recommended that
respondents confer with their respective insurance, carriers or brokers to determine in advance of
ProposallBid submission the availability of insurance cerifficates and endorsements as prescribed and
provided herein. If an apparent low respondent foils to comply strictly with the insurance requirements,
that respondent may be disqualifliedfrom award of the contract. Upon contract award, all insurance
requirements shall become contractual obligations, which the successful Design -Builder shall have a duty
to maintain throughout the course of this contract.
STANDARD PROVISIONS:
Without limiting any of the other obligations or liabilities of the Design -Builder, the Design -Builder
shall provide and maintain unlit the contracted work has been completed and accepted by the City of
Denton, Owner, the minimum insurance coverage as indicated hereinafter.
As soon as practicable after notification of contract award, Design -Builder shall file with the
Purchasing Department satisfactory certificates of insurance, containing the contract number and title
of the project. Design -Builder may, upon written request to the Purchasing Department, ask for
clarification of any insurance requirements at any time; however, Design -Builders are strongly advised
to make such requests prior it) proposa"id opening, since the insurance requirements may not be
modified or waived after proposanid opening unless a written exception has been submitted with the
proposallbid Design -Builder shall not co Brice any work or deliver any nufferial until he or she
receives notification that the contract has been accepted, appro wred, and signed by the City of Denton -
All insurance policies proposed or obtained in satisfaction of these requirements shall comply wills the
following general specifications, and shall be maintained its compliance with these general
specifications throughout the duration of the Contract, or longer, if so noted.
• Each policy shall be issued by a company authorized to do business in the State of Texas with an
A.M. Best Company rating of at least A.
Any deductibles or self-insured retentions shall be declared in the proposal. If requested by the
City, the insurer shall reduce or eliminate such deductibles or self-insured retentions with respect
to the City, its officials, agents, employees and volunteers; or, the Design -Builder shall procure a
bond guaranteeing payment of losses and related investigations, claim administration and defense
expenses.
Liability policies shall be endorsed to provide the following:
Name as additional insured the City of Denton, its Officials, Agents, Employees and
volunteers.
WN 'chat such insurance is primary to any other insurance available to the additional insured
with respect to claims covered under the policy and that this insurance applies separately
to each insured against whom claim is made or suit is brought. The inclusion of more
than one insured shall not operate to increase the insurer's limit of liability.
• Cancellation: City requires 30 day written notice should any of the policies described on the
certificate be cancelled or materially changed before the expiration date.
• Should any of the required insurance -be provided under a claims made form, Design -Builder shall
maintain such coverage continuously throughout the term of this contract and, without lapse, for a
period of three years beyond the contract expiration, such that occurrences arising; during the
contract term which give rise to claims made after expiration of the contract shall be covered.
• Should any of the required insurance be provided under a form of coverage that includes a
general annual aggregate limit providing for claims investigation or legal defense costs to be
included in the general annual aggregate limit, the Design -Builder shall either double the
occurrence limits or obtain Owners and Design -Builders Protective Liability Insurance.
• Should any required insurance lapse during the contract term, requests for payments originating
after such lapse shall not be processed until the City receives satisfactory evidence of reinstated
coverage as required by this contract, effective as of the lapse date. If insurance is not reinstated,
City may, at its sole option, terminate this agreement effective on the date of the lapse.
SPECIFIC ADDITIONAL INSURANCE REQUIREMENTS:
All insurance policies proposed or obtained in sat sfitetion of this Contract shall adifitionally core'
with the following ntarked specifications, arra shall be maintained in complianc=e with these additional
specifications throughout the duration of the Contract, or longer, if so noted.-
[X]
oted.
[X] A. General Liability Insurance:
General Liability insurance with combined single limits of not less than $1,00,000.00 shall
be provided and maintained by the Design -builder. The policy shall be written on an
occurrence basis either in a single policy or in a combination of underlying and umbrella or
excess policies.
If the Commercial General Liability form (ISO Form CG 0001 current edition) is used:
• Coverage A shall include premises, operations, products, and completed operations,
independent Design -Builders, contractual liability covering this contract and broad
form property damage coverage.
• Coverage B shall include personal injury.
• Coverage C, medical payments, is not required.
If the Comprehensive General Liability form (ISO Form GL 0002 Current Edition
and ISO Form GL 0404) is used, it shall include at least:
• bodily injury and Property Damage Liability for premises, operations, products and
co.npletcul operations, independent Design -Builders and property damage resulting
from explosion, collapse or underground (XCU) exposures.
• Broad form contractual liability (preferably by endorsement) covering this contract,
personal injury liability and broad form property damage liability.
[X] Automobile Liability Insurance:
Design -Builder shall provide Commercial Automobile Liability insurance with Combined Single
Limits (CSL) of not less than00.000 either in a single policy or in a combination of basic and
umbrella or excess policies. The policy will include bodily injury and property damage liability
arising out of the operation, maintenance and use of all automobiles and mobile equipment used
in conjunction with this contract.
Satisfaction of the above requirement shall be in the form of a policy endorsement for:
• any auto, or
• all owned hired and non -owned autos.
[X] Workers Compensation Insurance
Design -Builder shall purchase and maintain Worker's Compensation insurance which, in addition
to meeting the minimum statutory requirements for issuance of such insurance, has Employer's
Liability limits of at least $100,000 for each accident, $100,000 per each employee, and a
$500,000 policy limit for occupational disease. The City need not be named as an "Additional
Insured" but the insurer shall agree to waive all rights of subrogation against the City, its officials,
agents, employees and volunteers for any work performed for the City by the Named Insured.
For building or construction projects, the Design -Builder shall comply with the provisions of
Attachment 1 in accordance with §406.096 of the Texas Labor Code and rule 28TAC 110.110 of
the Texas Worker's Compensation Commission (TWCC).
[ ] Owner's and Design -Builder's Protective Liability Insurance
The Design -Builder shall obtain, pay for and maintain at all times during the prosecution of the
work under this contract, an Owner's and Design -Builder's Protective Liability insurance policy
naming the City as insured for property damage and bodily injury which may arise in the
prosecution of the work or Design -Builder's operations under this contract. Coverage shall be on
an "occurrence" basis and the policy shall be issued by the same insurance company that carries
the Design -Builder's liability insurance. Policy limits will be at least $500_,000.00 combined
bodily injury and property damage per occurrence with a $1,000,000.00 aggregate.
[ ] Fire Damage Legal Liability Insurance
Coverage is required if Broad form General Liability is not provided or is unavailable to the
Design -Builder or if a Design -Builder leases or rents a portion of a City building. Limits of not
less than each occurrence are required.
[ ] Professional Liability Insurance
Professional liability insurance with limits not less than $1.000,000.00 per claim with respect to
negligent acts, errors or omissions in connection with professional services is required under this
Agreement.
[ ] Builders' Risk Insurance
Builders' Risk Insurance, on an All -Risk form for 100% of the completed value shall be provided.
Such policy shall include as 'Named Insured" the City of Denton and all subcontractors as their
interests may appear.
(] Commercial Crime
Provides coverage for the theft or disappearance of cash or checks, robbery inside/outside the
premises, burglary of the premises, and employee fidelity. The employee fidelity portion of this
coverage should be written on a "blanket" basis to cover all employees, including new hires. This
type insurance should be required if the Design -Builder has access to City funds. Limits of not
less than $ each occurrence are required.
[] Additional Insurance
Other insurance may be required on an individual basis for extra hazardous contracts and specific
service agreements. If such additional insurance is required for a specific contract, that
requirement will be described in the "Specific Conditions" of the contract specifications.
[X] Workers' Compensation Coverage for Building or Construction Projects for
Governmental Entities
A. Definitions:
Certificate of coverage ("certificate") -A copy of a certificate of insurance, a
certificate of authority to self -insure issued by the commission, or a coverage
agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory
workers' compensation insurance coverage for the person's or entity's employees
providing services on a project, for the duration of the project.
Duration of the project - includes the time from the beginning of the work on the
project until the Design-Builder's/person's work on the project has been completed
and accepted by the governmental entity.
Persons providing services on the project ("subcontractor" in §406.096) - includes all
persons or entities performing all or part of the services the Design -Builder has
undertaken to perform on the project, regardless of whether that person contracted
directly with the Design -Builder and regardless of whether that person has
employees. This includes, without limitation, independent Design -Builders,
subcontractors, leasing companies, motor carriers, owner -operators, employees of
any such entity, or- employees of any entity which furnishes persons to provide
services on the project. "Services" include, without limitation, providing, hauling, or
delivering equipment or materials, or providing labor, transportation, or other service
related to a project. "Services" does not include activities unrelated to the project,
such as food/beverage vendors, office supply deliveries, and delivery of portable
toilets.
B. The Design -Builder shall 'provide _coverage, based on proper reporting of
classification codes and payroll amounts and filing of • any overage agreements,
which meets the statutory requirements of Texas Labor Code, Section 401.011(44)
for all employees of the Design -Builder providing services on the project, for the
duration of the project.
C. The Design -Builder must provide a certificate of coverage to the governmental
entity prior to being awarded the contract.
D. If the coverage period shown on the Design -Builder's current certificate of coverage
ends during the duration of the project, the Design -Builder must, prior to the end of
the coverage period, file a new certificate of coverage with the governmental entity
showing that coverage has been extended.
E. The Design -Builder shall obtain from each person providing services on a project,
and provide to the governmental entity:
1. a certificate of coverage, prior to that person beginning work on the project, so
the governmental entity will have on file certificates of coverage showing
coverage for all persons providing services on the project; and
2. no later than seven days after receipt by the Design -Builder, a new certificate
of coverage showing extension of coverage, if the coverage period shown on
the current certificate of coverage ends during the duration of the project.
F. The Design -Builder shall retain all required certificates of coverage for the duration
of the project and for one year thereafter.
G. The Design -Builder shall notify the governmental entity in writing by certified mail
or personal delivery, within 10 days after the Design -Builder knew or should have
known, of any change that materially affects the provision of coverage of any person
providing services on the project.
H. The Design -Builder shall post on each project site a notice, in the text, form and
manner prescribed by the Texas Workers' Compensation Commission, informing all
persons providing services on the project that they are required to be covered, and
stating how a person may verify coverage and report lack of coverage.
1. The Design -Builder shall contractually require each person with whom it contracts
to provide services on a project, to:
1. provide coverage, based on proper reporting- of classification codes and payroll
amounts and filing of any coverage agreements, which meets the statutory
requirements of Texas Labor Code, Section 401.011(44) for all of its employees
providing services on the project, for the duration of the project;
2. provide to the Design -Builder, prior to that person beginning work on the project,
a certificate of coverage showing that coverage is being provided for all
employees of the person providing services on the project, for the duration of the
project;
3. provide the Design -Builder, prior to the end of the coverage period, a new
certificate of coverage showing extension of coverage, if the coverage period
shown on the current certificate of coverage ends during the duration of the
project;
4. obtain from each other person with whom it contracts, and provide to the Design -
Builder:
a. a certificate of coverage, prior to the other person beginning work on the
project; and
b. a new certificate of coverage showing extension of coverage, prior to the end
of the coverage period, if the coverage period shown on the current certificate
of coverage ends during the duration of the project;
5. retain all required certificates of coverage on file for the duration of the project
and for one year thereafter;
6. notify the governmental entity in writing by certified mail or personal delivery,
within 10 days after the person knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on
the project; and
7. Contractually require each person with whom it contracts, to perform as required
by paragraphs (1) - (7), with the certificates of coverage to be provided to the
person for whom they are providing services.
J. By signing this contract or providing or causing to be provided a certificate of
coverage, the Design -Builder is representing to the governmental entity that all
employees of the Design -Builder who will provide services on the project will be
covered by workers' compensation coverage for the duration of the project, that the
coverage will be based on proper reporting of classification codes and payroll
amounts, and that all coverage agreements will be filed with the appropriate
insurance carrier or, in the case of a self-insured, with the commission's Division of
Self -Insurance Regulation. Providing false or misleading information may subject
the Design -Builder to administrative penalties, criminal penalties, civil penalties, or
other civil actions.
K. The Design -Builder's failure to comply with any of these provisions is a breach of
contract by the Design -Builder which entitles the governmental entity to declare the
contract void if the Design -Builder does not remedy the breach within ten days after
receipt of notice of breach from the governmental entity.
City of Denton
RFQ 6016
1, Contract Information (for formal cong purposes)!
the following infommlion Hill be used to write a contract, shouldwwrfim be selected for
a4lard.
Firm's Legal Name: 7-X 7f� 0 -2
Address17 ,&Ie t,61 y 4 me
A- �p
o Agent Authorized to sip contract (Name): C li4 �r /0 4P.0 a C
0 Agent's email address: C/f;-�-@ ee,en L or,5 / , c
#7 �'
i, Subsidiary of
2. Or tion Class (circle):
Individual Association
�Partnership' Corporation
3. Tax Payer I D#:
4. Date Established:
5. Historically Undcrutilizod Business: Yes 01(No
6. Does have an established physica;1,#re5C= in the State of T r the city or
r
y r-0)eCj1 C4
Denton77NYon, in which? A-il d
7. Please provide a detailed listing of all products andVor services that your commwProvidle&
(f�6 rC14 1.41 . k- V I G -
j I
y
8. Has your corn I shed or,
becn T=Xin any Knigation involving your company aW the
y
Owner on a contract within the last five years under your current company name or any
other company name? If so provide details of the i,"uL-.s and resolution if available- Include
lawsuits where Owner was involved.
&0
9. Have you ever defaulted on or failed to complete a contract under your current company
name or any other company name? If so, where and why? Give naine- and telephone number
of Owner.
/VO
RFQ 6016 - Main Docwnent Pop l3 .of 25
City ofDenum
RFQ 6016
10. Have you ewer had a contract terminated by the . If so, where and why" Give now
and telephone number (s) of Owner (s).
kD
11. Has your company implernerited an Employee Health and Safety Proparn compliant with 29
CFR 1910 "General Industry S he' and/or 29 CFR 1926 r oral Construction
Standards" as they apply to your Company's customary activities?
lett W.c shit. c v,' 1 +"oa;1 a °o:bf tw srch..-warch f orno? d t 5'f H"joc ICVCL=
I_ &D ,e value -W26
26
12. 'Provide details to support the evaluation critelj& Including, e and -..
I v. `s' r1 '61c .> S 1 A? a. J [� r A " 0
mr` ►' �I of Aj.-, ^--rl ow w s a 1 r' 1 o -+
0 6AG
13. Provid oI tails n how firm owets the
1n tt,m tta s l t s Mal
document Section 3.
a. The details must be completed on this form, and shall not point to another documew
in the respondent's proposal.
b. Sign below and raturn form with 1rinal submission. �e �
,�"'' * f ,�, v ' 416 /j`' J
/ 4/r' v "
/ i we Joy
1 certify that our firm meew the minimum qualifications as stated in this Main document, section 3.
signmmDWCOM
ATTACHMENT --'SU MISSION EXCEPTIONS
RFQ 6016 - Main Document Pune 16 of 25
City of DMOA
RFQ 6016
73-A F1 Las
Please list three (3) refemmeg, other than the City of Demos, who car VMCY the quality Of service Your cP"IWY
provides. The City prerers cutdomm of similar size and wAx orwork to this %alicitation.
GOVERNMENT)COMPANY NAME., 0405-4co /< F,.A'3,V
LOCATION: FLon S'W ntb-5
CONTACT PERSON AND TITLE- el
TELEPHONE N1JM8F.R.,,,-g9,-5-u fac,3 A
SCOPE OF WORK: RNAAKV4 r—.
CONTRACT PERIOD: a12 --
el.4 t-
GOVERNMENT/COMPANY NAME: C I Y ()
LOCATION: 0(4,04r4 7TX----
CONTACT PERSON AND TITLE: Arip
TELEPHONE NUMBER:
SCOPE: OFWORK: C0,9�(1001 4-
�(AC
CONTRACT PrRIOD.-
REFERENCE T1# REE
GOVERNMENT/COMPA, :
C
LOATION: r- NAME
CONTACT P,M" AND TITLr,.-.
TELEPHONE NUMBER.,k5-(
11111111— /-
SCOPE OF WORK. S, 4*1 41 lot AX
CONTRACT PERIOD: 0 L X j21 Z
RFQ 6016 - Main Document Pop 23 of 25
5
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
10f1
Complete Nos. 1- 4 and 6 if there are interested parties.
-
OFFICE USE ONLY
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties.
CERTIFICATION OF FILING
1
Name of business entity filing form, and the city, state and country of the business entity's place
Certificate Number:
of business.
2016-101308
ZeitEnergy LLC
1717 McKinney Ave Ste 700, TX United States
Date Filed:
2
Name of governmental entity or state agency that is a party to the contract for which the farm is
08/18/2016
being filed.
City of Denton
Date Acknowledged:
3
Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
6016
Design Build Compressed Natural Gas Station
Nature of interest
4
Name of Interested Party Ci ty,State Country (place of business) (check applicable)
Controlling Intermediary
City of Denton
Denton, TX United States
X
5
Check only if there is NO Interested Party. ❑
6
AFFIDAVIT I swear, or affirm, under penalty of perjury, that
the above disclosure is true and correct.
" HENRY FRANK CORDOVA II
My Commission Expires
November 3, 2016VP
a
Signature of authorized went
onIracling business entity
AFFIX NOTARY STAMP / SEAL ABOVE
� r
°
Sworn to and subscribed before me, by the said O this the
day of 14U
20 to certify which, witness my hand and seal of office.
t �
f `
Al, �..
LL-
t
S it�tttrc of offi r ado Jnist&irr oath I rir�t€d n rr'�e of officer administering oath
Title of officer administering oath
Forms provided by Texas Ethics Commission www. ethics. state.tx. us
Version V1.0.277
Corporations Section
P.O.Box 13697
Austin, Texas 78711-3697
MMM=
Carlos H. Cascos
Secretary of State
The undersigned, as Secretary of State of Texas, does hereby certify that the attached is a true and
correct copy of each document on file in this office as described below:
ZeitEnergy, LLC
Filing Number: 801088390
Certificate of Formation February 19, 2009
in testimony whereof, I have hereunto signed my name
officially and caused to be impressed hereon the Seal of
State at my office in Austin, Texas on June 07, 2016.
It�
Nw"r-diverjus Mirgly"o
Come visit us on the internet at hltp://www.sos.stale.tx.us/
Phone: (512) 463-5555 Fax: (512) 463-5709 Dial: 7-1-1 for Relay Services
Prepared by: SOS -WEB TID: 10266 Document: 674356920002
Secretary of State
P.O. Box 13697
Austin, TX 78711-3697
FAX: 512/463-5709
Filing Fee: $300
• • 1 0
..
Filed in the Office of the
Secretary of State of Texas
Filing : 801088390 02/19/2009
Document : 247009610002
Image Generated Electronically
for Web Filing
The filing entity being formed is a limited liability company. The name of the entity is:
ZeitEneLqy, LLC
The name of the entity must contain the words "Limited Liability Company" or "Limited Company," or an accepted abbreviation of such terms. The
name must not be the same as, deceptively similar to or similar to that of an existing corporate, limited liability company, or limited partnership
name on file with the secretary of state. A preliminary check for "name availability' is recommended.
%A. The initial registered agent is an organization (cannot be company named above) by the name of:
Zeit Energy Management, Inc.
OR
T—B. The initial registered agent is an individual resident of the state whose name is set forth below:
C. The business address of the registered agent and the registered office address is:
Street Address:
'603 Shelmar Drive Euless TX 76039
TVA. The limited liability company is to be managed by managers.
OR
T—B. The limited liability company will not have managers. Management of the company is reserved to the members.
The names and addresses of the governing persons are set forth below:
Manager 1: (Business Name) Zeit Energy Management, Inc.
Address: 603 Shelmar Drive Euless TX, USA 76039
The purpose for which the company is organized is for the transaction of any and all lawful business for which limited
liability companies may be organized under the Texas Business Organizations Code.
,[The attached addendum, if any, is incorporated herein by reference.]
r aleizer
The name and address of the organizer are set forth below.
Derek Sandler 6600 LBJ Freeway, Suite 170, Dallas -TX 7524
%A. This document becomes effective when the document is filed by the secretary of state.
OR
F-B. This document becomes effective at a later date, which is not more than ninety (90) days from the date of its
,signing. The delayed effective date is:
The undersigned signs this document subject to the penalties imposed by law for the submission of a materially false
or fraudulent instrument.
Derek Sandler
_._ . . -'..... .. e ..
Signature of Organizer
FILING OFFICE COPY
City of Denton Purchasing
901-B Texas St. Denton, TX 76209
Phone: (940) 349-7100 Fax: (940) 349-7302
www.s nlonpurchas'in_9 cram
Substitute W-9 Form
The IRS requires all vendors to complete a W-9 Form. The information on this form must be filled out, signed and submitted by a
vendor representative. All information must be completed before a purchase order or payment will be issued.
Name as shown on your income tax return: ZEITENERGY LLC
Tax ID/Social Security #: 26-4605916
Under penalties of perjury, I certify that: 1. The number shown on this form is my correct taxtaxpayer identification number (or I
am waiting for a number to be issued to' me), and 2. 1 am not subject to backup withholding because (a) I am exempt from
backup witholding, or (b) I have not been notified by the Internal Revenue Service (IRS) that I am subject to backup withholding
as a result of failure to report all interest or dividends, or (c) the IRS has notified me that I am no longer subject to backup
withholding, and 3. 1 am a US citizen or other U.S. person -for fededral tax purposes as defined at the bottom of this page*.
Authorized Signature:
Ma I I Itj Address:
Company Name:
Contact Name:
ZEITENERGY LLC
CLINT BEAUCHAMP
Printed Name: CLINT BEAUCHAMP
Email: BILLS@ZEITENERGY.COM
Website: WWW.ZEITENERGY.COM
Address:
1717 MCKINNEY AVE
Phone Number:
832-693-4149
STE 700
Fax Number:
214-593-3344
DALLAS TX 75202
Check appropriate box for federal tax classification
(roquireq
Individual/
Limited
Other
❑ Sole
❑ Corporation
❑
Partnership
❑
Liability
IN
Please specify:
Proprietor
Corporation
Must designate C or S
LIMITED LIABILITY
❑ C
PARTNERSHIP
El Exempt
❑ S
Payee
Business Type
Real Estate
Rental/Lease (A1)
❑
Equipment
Rental/Lease (A-9)
El❑
Royalties (A-2)
Medical/Health Care (A-6)
Services Only (A-
Merchandise-
Merchandise &
❑ 7)
❑
Goods Only (A-7)
®
Services (A-7)
❑
Legal Firm/Attorney (A -C)
Consultant/Prof
Proceeds from
Fees (A-7)
Real Estate
(x j
n
Purchases (S)
Type of Organization:
❑ MinorityOwned
L1
Female Owned
E]
Non Profit
El
Historically Underutilized
Business
*Definition of a U.S. Person -For Federal Tax purposes, you are considered a U.S. person if you are: (a) an individual who is a U.S. citizen or
U.S. resident (b) a partnership, corporation, company, or association created or organized in the United States or under the laws of the United
States (c) an estate (other than a foreign estate), or (d) a domestic trust (as defined in Regulations Section 301.7701-7).
COD Page 1 9/23/2011
Roe -nit Address (if different from above)
Company Name:
Contact Name:
Address:
Email:
Phone Number:
Fax Number:
Vendor Information Not Required for -9 Form
ACH Information -Voluntary
ABA Routing: 111000614
Contact Name: CLINT BEAUCHAMP
Bank Account#
850050357
Bank Name:
CHASE
ACH Email:
BILLS(a)ZEITENERGY.COM
ACH Email:
Phone Number:
817-223-1401
Fax Number:
214-593-3344
I (we) authorize the City of Denton to deposit
payments into the checking account listed. The
authority remains in effect until the City of Denton
has received written notification from me of
termination in time to allow reasonable opportunity
to act on it, or until the City of Denton has sent me
written notice of termination o, the agreement.
Vendor Signatu
Print Name/Title CLINT BEAUCHAMP / MANAGING
MEMBER
Date 8/18/16
List Products and/or Services Interested in Biddinq:
DESIGN BUILD CNG STATIONS, MAINTENANCE ON CNG STATIONS, PARTS & EQUIPMENT SALES FOR CNG, CONSULTING ON CNG
For Internal Use Only
❑ New Vendor
❑ Vendor Change Vendor Number
❑ Refund
Requesting Department:
Department Representative (Printed Name)
Purchasing Signature: Date:
COD Page 2 9/23/2011
Exhibit I
Form Cl
City of Vcnton
KFQ 6016
CEO=
CONFLICT OF INTEREST QUE - STIONNAIRE - FORM CiQ
For vend*r or othercal governmental entity ---
This questionnaire re is changes made to UK low by N. 1491, 840 LAS, RegabrSesslim.
-chis quemionnairc is bcing tiled in accordance with chapicr 1'76 of IN Local Governractit C0&- by a persun who has a Wiliness reWonshiP
as dditicd by Section 176.00( I -a) with a It al goys tat CatItY and the PCM" mects require meWs under Section.176. m -
By
176.006(&-
By law this questiomitaire must be filed with the records adtWinistrator of Ow k)cW government, entity not later than the 7th busincu OPY after
the date the person bmomcs aware of fiacts that require Ilio glaterrient to be riled. See Section 17,6.006. Local Government C*&.
A person commitl; an offense if the person knowingly violates Section 176.006, Local CAA Cade. An offem under this section is 9
claiq C mWerneanor.
�Wpnrjos who No a Witness refatlmhlp Wilk Wal XvvftumwWW eetky-
f 14
/S,- i 4
0 Check this box ff you are ffitagart update los prey k** Sell e1 noire.
(The law requires that you file 11 uPdaW COMPIN114d qW=i0"Wtife with the xPPmWi'ft'rdi0g -6-1* no later than !be 'I* business day xhw the
date ihe oriefruiltv filed questionnaire becomes -kw of ij -,--
Name of local Itevernoweat eller with whom filer has an eopplaymeW W boollaeft rtk&WAW
.4wiw 0(officar
Bois 1�"jjojL fitein 3 nwluding subpwu A. 0. D), must be coWleied fr cacti ofrwcf wilt whom Ate liter bw on emocy1mris or W- busino" rde*n"bip as
Ausch aMkional pagoto this Form CIO as noccuffy.
A. Is the local goNcrnnieft officer named in this cation rectivingg or likely to receive taxable ificoine, GOW than i"Vemm"t ircoew, Ird"111he rlkf of the
questionnaire?
El Yes Mlt
- W k"
8, It the filter of the qucsfionnairc rocriving or likely to roceivc muble, incow, Mhcr than invc9UxM iucwoc. JIMM01' at fM dim%tkm of
g(ayenjjnmj afficer naomd in thin%vflon ANT) the isubic ovicorne is not mccived from the Wal poily?wAlrmimtal Y?
ED vc,, Ej NO
C. Is the liter of this quoNtionnaire canolycd by a corporation oradiotw husinm entity With k-sliect to which OW Weal F0VMMcnt 0WWW90%Vs as M
officer or dim-clor, or holds M oulmstup of 10 percent or am?
F-1 VkI. ID No
D. Describe each affiliation of business relidionfibip.
I have so Conflict of Interest to discloia
sipmure of person doing
the loverm"MW entity
KFQ 6016 - Main Document Page 24 of 25