Loading...
20-1553ORDINANCE NO.20-1553 AN ORDINANCE OF THE CITY OF DENTON, TEXAS ESTABLISHING THE SCHEDULE OF RATES FOR ELECTRIC SERVICE; PROVIDING FOR A REPEALER; PROVIDING FOR A SEVERABILITY CLAUSE; AND PROVIDING FOR AN EFFECTIVE DATE. THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS : SECTION 1. The Schedule of Rates for electrical services as provided for in Chapter 26 of the City of Denton Code of Ordinances, is as follows: ELECTRIC RATE SCHEDULES PAGE RES GS GM GL TG GOS GOM GOL Tl AF LS LT UFL USC UWF LO DD DSL EGR GIP ECA RCA TCRF DGR SFR PAF BIF WNA EVCR Residential Service General Service Small General Service Medium General Service Large General Service Time Of Use Local Government Service Small Local Government Service Medium Local Government Service Large Temporary Service Athletic Field Street Lighting Traffic Lighting Unmetered School Zone/Crossing Flashers Unmetered Security Camera Unmetered Wi-FI Devices Other Lighting Security Lighting Non-Standard Street Lighting Economic Growth Rider GreenSense Incentive Program Energy Cost Adjustment Renewable Cost Adjustment Transmission Cost Recovery Factor Distributed Generation From Renewable Sources Rider Special Facilities Rider Pole Attachment Fee Banner Install Fee Wireless Node Attachments Electric Vehicle Charging Rate 2 4 6 8 10 12 14 16 18 20 22 23 24 25 26 27 28 30 32 34 35 36 37 38 40 41 43 44 46 1 RESDENTLAL ELECTRIC SERVICE (Effective 10/01/20) APPLICATION Applicable to any Customer for all electric service used for residential purposes in an individual private dwelling or an individually metered apartment, supplied at one point of delivery and measured through one meter. This Rate is not applicable to resale service in any event, or to temporary, standby, or supplementary service. MONTHLY RATE (1)Facility Charge Per Bill $ 8.67 $ 17.33 $ 16.02 Single-Phase Service (R2) Three-Phase Service (R2) Prepaid Service (P2) plus; (2)Usage Charge Per kWh Winter (Billing months of November through April): Tier 1: First 600 kWh Tier 2: Additional kWh $0.0684 $0.0455 Summer (Billing months of May through October): Tier 1 : All kWh $0.0684 plus; (3)Energy Cost Adjustment Charge See Schedule ECA plus; (4)Transmission Cost Recovery Factor See Schedule TCRF MINIMUM BILLING For each billing period, the Customer shall be obligated to pay the Facility Charge as a minimum, regardless of actual energy usage. 2 USAGE CHARGE Billing for the Usage Charge shall be based on actual kWh consumption during the billing period. Winter (Billing months of November through April): Usage Charge = kWh in Tier 1 x Tier 1 Rate per kWh kWh in Tier 2 x Tier 2 Rate per kWh, if applicable Summer (Billing months of May through October): Usage Charge = All kWh x Tier I Rate per kWh SPECIAL FACILITIES All services which require special facilities in order to meet Customer’s service requirements shall be provided, subject to Special Facilities Rider. PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance SCHEDULE GS GENERAL SERVICE SMALL (Effective 10/01/20) APPLICATION Applicable to any commercial customer having a maximum demand of less than 21 kW in each of the previous twelve (12) months for all electric service supplied at one point of delivery and measured through one meter. If the demand is equal to or exceeds 21 kW in two consecutive months, account will be adjusted to bill under General Service Medium (GM) and the Customer must remain on the GSM rate for a minimum of twelve (12) billing periods. This Rate is not applicable to resale service in any event, or to temporary, standby, or supplementary service. MONTHLY RATE (1)Facility Charge Per Bill $ 16.60 $22.17 Single-Phase Three-Phase plus; (2)Usage Charge Per kWh $0.0852 $0.0446 Tier 1: First 2,500 kWh Tier 2: Additional kWh plus; (3) plus; Energy Cost Adjustment Charge See Schedule ECA (4)Transmission Cost Recovery Factor See Schedule TCRF MRqIMUM BILLING For each billing period, the Customer shall be obligated to pay the Facility Charge as a minimum, regardless of actual energy usage. USAGE CHARGE Billing for the Usage Charge shall be based on actual kWh consumption during the billing period. Usage Charge =kWh in Tier 1 x Tier 1 Rate per kWh kWh in Tier 2 x Tier 2 Rate per kWh, if applicable 4 SPECLAL FACILITIES All services which require special facilities in order to meet Customer’s service requirements shall be provided, subject to Special Facilities Rider. PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. SCHEDULE GM GENERAL SERVICE MEDIUM (Effective 10/01/20) APPLICATION Applicable to any commercial customer having a maximum demand that meets or exceeds 21 kW but less than 240 kW in each of the previous twelve (12) months for all electric service supplied at one point of delivery and measured through one meter. If the demand is equal to or exceeds 240 kW in two consecutive months, account will be adjusted to bill under General Service Large (GSL), and the Customer must remain on the GSL rate for a minimum of twelve (12) billing periods. Applicable to GSM Customers utilizing City owned and operated facilities and transformation equipment and who are metered at primary voltage. (GM2) Applicable to GSM Customers that own, operate, and maintain all facilities necessary to receive three- phase primary voltage service and all transformation facilities required for conversion to utilization voltage. (GM3) This Rate is not applicable to resale service in any event, or to temporary, standby, or supplementary servIce MONTHLY RATE (1)Facility Charge Per Bill $16.60 $22.17 Single-Phase Three-Phase plus; (2)Demand Charge Per kW $4.78All kW plus; (3)Usage Charge Per kWh GM Tier 1: First 6,000 kWh Tier 2: Additional kWh $0.0523 $0.0432 GM2 Tier 1: First 6,000 kWh Tier 2: Additional kWh $0.0513 $0.0422 $0.0493 $0.0402 GM3 Tier 1: First 6.000 kWh Tier 2: Additional kWh plus; 6 (4) plus; Energy Cost Adjustment Charge See Schedule ECA (5)Transmission Cost Recovery Factor See Schedule TCRF MINIMUM BILLING For each billing period, the Customer shall be obligated to pay the Facility Charge plus the Demand Charge, regardless of actual energy usage. DETERMINATION OF DEMAND The demand used in calculating the Demand Charge for the billing period shall be the greater of: (1 ) the actual monthly kW demand as measured during the fifteen (15) minute period of maximum use each month; or (2) 21 kW; or (3) seventy percent (70%) of the maximum monthly actual demand for any month during the previous billing months of May through October in the twelve (12) months ending with the current month. USAGE CHARGE Billing for the Usage Charge shall be based on actual kWh consumption during the billing period. Usage Charge =kWh in Tier 1 x Tier 1 Rate per kWh kWh in Tier 2 x Tier 2 Rate per kWh, if applicable SPECIAL FACILITIES All services which require special facilities in order to meet Customer’s service requirements shall be provided, subject to Special Facilities Rider. PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. SCHEDULE GL GENERAT, SERVICE LARGE (Effective 10/01/20) APPLICATION Applicable to any commercial customer having a minimum demand of 240 kW for all electric service supplied at one point of delivery and measured through one meter. Customers who elect to discontinue service under this Rate are ineligible for service under this Rate for twelve (12) months. Applicable to GSL Customers utilizing City owned and operated facilities and transformation equipment and who are metered at primary voltage. (GL2) Applicable to GSL Customers that own, operate, and maintain all facilities necessary to receive three- phase primary voltage service and all transformation facilities required for conversion to utilization voltage. (GL3) This Rate is not applicable to resale service in any event, or to temporary, standby, or supplementary service. MONTHLY RATE (1)Facility Charge Per Bill $69.06Three-Phase plus; (2)Demand Charge Per kVA $10.80All kVA plus; (3)Usage Charge Per kWh GL Tier 1: First 200,000 kWh Tier 2: Additional kWh $0.0245 $0.0140 GL2 Tier 1: First 200,000 kWh Tier 2: Additional kWh $0.0235 $0.0130 SO.021 5 $0.0110 GL3 Tier 1: First 200,000 kWh Tier 2: Additional kWh plus; 8 (4) plus; Energy Cost Adjustment Charge See Schedule ECA (5)Transmission Cost Recovery Factor See Schedule TCRF MINIMUM BILLING For each billing period, the Customer shall be obligated to pay the Facility Charge plus the Demand Charge, regardless of actual energy usage. DETERMINATION OF DEMAND The demand used in calculating the Demand Charge for the billing period shall be the greater of (1 ) the actual monthly kVA demand as measured during the fifteen (15) minute period of maximum use each month; or (2) 250 kVA; or (3) seventy percent (70%) of the maximum monthly kVA actual demand for any month during the previous billing months of May through October in the twelve (12) month period ending with the current month. USAGE CHARGE Billing for the Usage Charge shall be based on actual kWh consumption during the billing period. Usage Charge =kWh in Tier 1 x Tier I Rate per kWh kWh in Tier 2 x Tier 2 Rate per kWh, if applicable SPECLAL FACILITIES All services which require special facilities in order to meet Customer’s service requirements shall be provided, subject to Special Facilities Rider. PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. SCHEDULE TG GENERAI, SERVICE TIME OF USE (Effective 10/01/20) APPLICATION Applicable to any Customer having a minimum demand of 240 kW for all electric service supplied at one point of delivery and measured through one meter. Customers electing this Rate must remain on this Rate for a minimum of twelve (12) continuous billing months. If the Customer is new or does not have a history of on-peak use for June through September, and elects to accept service on the TGS Rate. the Customer’s demand shall be billed at the GSL Demand Rate until the Customer establishes a separate on-peak and off-peak demand during an on-peak month. Applicable to TGS Customers utilizing City owned and operated facilities and transformation equipment and who are metered at primary voltage. (TG2) Applicable to TGS Customers that own, operate, and maintain all facilities necessary to receive three- phase primary voltage service and all transformation facilities required for conversion to utilization voltage. (TG3) This Rate is not applicable to resale service in any event, or to temporary, standby, or supplementary service. MONTHLY RATE (1)Facility Charge Per Bill $80.54Three-Phase plus; (2)Demand Charge Per kVA $13.76 $ 2.72 On-Peak Off-Peak plus; (3)Usage Charge Per kWh TG AllkWh $0.0082 $0.0072 $0.0052 TG2 All kWh TG3 AII kWh plus; 10 (5) plus; (6) Energy Cost Adjustment Charge See Schedule ECA Transmission Cost Recovery Factor See Schedule TCRF MINIMUM BILLING For each billing period, the Customer shall be obligated to pay the Facility Charge plus the On-Peak and Off-Peak Demand Charges, regardless of actual energy usage. DEFINITION OF TIME OF USE HOURS The City’s on-peak hours, for the purpose of this rate schedule, are designated as being from 2:00 P.M. to 7:00 P.M. each Monday through Friday, for the months of June through September excluding Independence Day and Labor Day. The City's on-peak hours may be changed from time to time. The City's off-peak hours, for the purpose of this rate schedule, shall be all hours not designated as on-peak hours. DETERMINATION OF DEMAND On-Peak Demand Charge for the billing period shall be the greater of: (1) the kVA actual demand supplied during the fifteen (15) minute period of maximum use each month during on-peak hours as recorded by the City’s demand meter; or (2) 250 kVA; or (3) one hundred percent (100%) of the actual maximum on-peak demand similarly determined during the billing months of June through September in the twelve (12) months immediately preceding the current month. The On-Peak Demand Charge will be applied to each billing period. Off-Peak Demand Charge for the billing period shall be the greater of: (1) the kVA actual demand supplied during the fifteen (15) minute period of maximum use each month during on-peak hours as recorded by the City’s demand meter; or (2) 250 kVA. The Off-Peak Demand Charge will be applied to each billing period. USAGE CHARGE Billing for the Usage Charge shall be based on actual kWh consumption during the billing period. Usage Charge =All kWh x Rate per kWh SPECLAL FACILITIES All services which require special facilities in order to meet Customer’s service requirements shall be provided, subject to Special Facilities Rider. PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. 11 SCHEDULE GOS LOCAL GOVERNMENT SERVICE SMALL (Effective 10/01/20) APPLICATION Applicable to any local City, County or School District customer having a maximum demand of less than 21 kW in each of the previous twelve (12) months for all electric service supplied at one point of delivery and measured through one meter. If the demand equals or exceeds 21 kW in two consecutive months, account will be adjusted to bill under Local Government Service Medium (GOM), and the Customer must remain on the GOM Rate for a minimum of twelve (12) billing periods. This Rate is not applicable to resale service in any event, or to temporary, standby or supplementary service. NET MONTHLY RATE (1)Facility Charge Per Bill $ 16.60 $22.17 Single-Phase Three-Phase plus; (2)Usage Charge Per kWh $0.0852 $0.0446 Tier 1: First 2,500 kWh Tier 2: Additional kWh plus; (3) plus; Energy Cost Adjustment Charge See Schedule ECA (4)Transmission Cost Recovery Factor See Schedule TCRF MINIMUM BILLING For each billing period, the Customer shall be obligated to pay the Facility Charge as a minimum, regardless of actual energy usage. USAGE CHARGE Billing for the Usage Charge shall be based on actual kWh consumption during the billing period. Usage Charge =All kWh x Rate per kWh 12 SPECLAL FACILITIES All services which require special facilities in order to meet Customer’s service requirements shall be provided, subject to Special Facilities Rider. PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. 13 SCHEDULE (,OM LOCAL GOVERNMENT SERVICE MEDIUM (Effective 10/01/20) APPLICATION Applicable to any local City, County, or School District customer having a maximum demand that meets or exceeds 21 kW but less than 240 kW in each of the previous twelve (12) months for all electric service supplied at one point of delivery and measured through one meter. If the demand is equal to or exceeds 240 kW in two consecutive months, account will be adjusted to bill under Local Government Service Large (GOL), and the customer must remain on the GOL rate for a minimum of twelve (12) billing periods. This Rate is not applicable to resale service in any event, or to temporary, standby, or supplementary service. NET MONTHLY RATE (1)Facility Charge Per Bill $ 16.60 $22.17 Single-Phase Three-Phase plus; (2)Demand Charge Per kW $4.78All kW plus; (3)Usage Charge Per kWh $0.0523 $0.0432 Tier 1: First 6,000 kWh Tier 2: Additional kWh plus; (4)Energy Cost Adjustment Charge See Schedule ECA plus; (5)Transmission Cost Recovery Factor See Schedule TCRF MINIMUM BILLING For each billing period, the Customer shall be obligated to pay the Facility Charge plus the Demand Charge, regardless of actual energy usage. 14 DETERMINATION OF DEMAND The demand used in calculating the Demand Charge for the billing period shall be the greater of: (1) The actual kW demand supplied during the fifteen (15) minute period of maximum use each month; or (2) fifty percent (50%) of the maximum monthly actual demand for any month during the previous billing months of May through October in the twelve (12) months ending with the current month. USAGE CHARGE Billing for the Usage Charge shall be based on actual kWh consumption during the billing period. Usage Charge =kWh in Tier 1 kWh x Rate per kWh kWh in Tier 2 kWh x Rate per kWh, if applicable SPECLAL FACILITIES All services which require special facilities in order to meet Customer’s service requirements shall be provided, subject to Special Facilities Rider. PAYMENT The due date for the payment of the bill for utility services shall not be less than ten (10) business days after issuance. 15 SCHEDULE GOL LOCAL GOVERNMENT SERVICE LARGE (Effective 10/01/20) APPLICATION Applicable to any local City, County, or School District customer having a minimum demand of 240 kW for all electric service supplied at one point of delivery and measured through one meter. Customers who elect to discontinue service under this Rate are ineligible for service under this Rate for twelve (12) months. Applicable to GOL Customers utilizing City owned and operated facilities and transformation equipment and who are metered at primary voltage. (G02) Applicable to GOL Customers that own, operate, and maintain all facilities necessary to receive three- phase primary voltage service and all transformation facilities required for conversion to utilization voltage. (G03) This Rate is not applicable to resale service in any event, or to temporary, standby, or supplementary service. MONTHLY RATE (1)Facility Charge Per Bill $69.06Three-Phase plus; (2)Demand Charge Per kVA $10.80All kVA plus; (3)Usage Charge Per kWh GOL Tier 1: First 200,000 kWh Tier 2: Additional kWh $0.0245 $0.0140 G02 Tier 1: First 200,000 kWh Tier 2: Additional kWh $0.0235 $0.0130 $0.0215 $0.0110 G03 Tier 1: First 200.000 kWh Tier 2: Additional kWh plus; 16 (4) plus; Energy Cost Adjustment Charge See Schedule ECA (5)Transmission Cost Recovery Factor See Schedule TCRF MINIMUM BILLING For each billing period, the Customer shall be obligated to pay the Facility Charge plus the Demand Charge, regardless of actual energy usage. DETERMINATION OF DEMAND The demand used in calculating the Demand Charge for the billing period shall be the greater of: (1 ) the actual monthly kVA demand as measured during the fifteen (15) minute period of maximum use each month; or (2) fifty percent (50%) of the maximum monthly kVA actual demand for any month during the previous billing months of May through October in the twelve (12) month period ending with the current month. USAGE CHARGE Billing for the Usage Charge shall be based on actual kWh consumption during the billing period. Usage Charge =kWh in Tier 1 x Tier 1 Rate per kWh kWh in Tier 2 x Tier 2 Rate per kWh, if applicable SPECIAL FACILITIES All services which require special facilities in order to meet Customer’s service requirements shall be provided, subject to Special Facilities Rider. PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. 17 SCHEDULE Tl TEMPORARY SERVICE (Effective 10/01/20) APPLICATION Applicable to short term or temporary electric service where a Customer has received a permit. This Rate is not applicable after the certificate of occupancy or building final inspection has been issued. NET MONTHLY RATE (1 ) Facility Charge Single-Phase Three-Phase Per Bill $16.61 $22.19 plus; (2) Usage Charge All kWh Per kWh $0.0854 plus; (3) Energy Cost Adjustment Charge plus; (4) Transmission Cost Recovery Factor MINIMUM BILLING For each billing period, the Customer shall be obligated to pay the Facility Charge regardless of actual energy usage. USAGE CHARGE Billing for the Usage Charge shall be based on actual kWh consumption during the billing period. Usage Charge = All kWh x Rate per kWh See Schedule ECA See Schedule TCRF 18 ADDITIONAL TEMPORARY SERVICE CHARGES Labor Regular time or overtime labor hourly rates in effect at the time the work is performed for all personnel performing the work. Labor charges shall be based on a one (1) hour minimum with all additional time above the minimum to be measured to the nearest one-quarter hour Transportation To be billed by hours or miles, as applicable, according to the estimated cost of operating the required equipment. Material Material that cannot be salvaged shall be billed at the City’s Warehouse cost plus twenty five percent (25%), plus applicable sales tax. At the time a temporary service is removed or converted, any loss of the installed material due to negligence or willful action by the Customer will be billed separately to the Customer at replacement cost plus twenty five percent (25%), plus applicable sales tax. Administrative Fee Ten percent (10%) of the total labor, transportation, and material costs. SPECIAL FACILITIES All services which require special facilities in order to meet Customer’s service requirements shall be provided, subject to Special Facilities Rider. PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. 19 SCHEDULE AF ATHLETIC FIELD (Effective 10/01/20) APPLICATION Applicable to all electric service metered at one point for use to light specified areas for athletic events. This Rate is not applicable to resale service in any event, or to temporary, standby, or supplementary service except in conjunction with applicable rider. NET MONTHLY RATE (1)Facility Charge Per Bill $22.75 $34. 1 1 Single-Phase Three-Phase plus; (2)Demand Charge Per kW $6.06 $ 1.44 On-Peak Off-Peak plus: (3)Usage Charge Per kWh $0.0977 $0.0489 On-Peak Off-Peak plus; (4) plus; Energy Cost Adjustment Charge See Schedule ECA (5)Transmission Cost Recovery Factor See Schedule TCRF MINIMUM BILLING For each billing period, the Customer shall be obligated to pay the Facility Charge, regardless of actual energy usage. 20 DEFINITION OF ON-PEAK AND OFF-PEAK HOURS The City’s on-peak hours, for the purpose of this rate schedule, are designated as being from 2:00 P.M. to 7:00 P.M., for the months of June through September. The City’s on-peak hours may be changed from time to time. The City’s off-peak hours, for the purpose of this rate schedule, shall be all hours not designated as on-peak hours. DETERMINATION OF DEMAND The demand used in calculating the Demand Charge for the billing period shall be the actual kW demand supplied during the fifteen (15) minute period of maximum use during the current billing period as determined by the City’s demand meter. USAGE CHARGE Billing for the Usage Charge shall be based on actual kWh consumption during the billing period. Usage Charge =On-Peak kWh x Rate per kWh Off Peak kWh x Rate per kWh SPECIAL FACILITIES All services which require special facilities in order to meet Customer’s service requirements shall be provided, subject to Special Facilities Rider. PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. 21 SCHEDULE LS STREET LIGHTING (Effective 10/01/20) APPLICATION Applicable to all street lighting owned and maintained by the City. NET MONTHLY RATE (1)Facility Charge Per Bill Luminaire Style Type 100 W Sodium Cobra (LSA) 250 W Sodium Cobra (LSB) 400 W Sodium Cobra (LSC) 100 W LED Cobra (LSD) 250 W LED Cobra (LSE) 400 W LED Cobra (LSF) 85 W LED Post (LSG) $6.08 $8.62 $10.86 $6.08 $8.62 $10.86 $10.86 plus; (2)Energy Cost Adjustment Charge See Schedule ECA ENERGY COST ADJUSTMENT CHARGE Current ECA multiplied by respective kWh based on the following Bulb Wattage Factors: Luminaire Type 100 W Sodium (LSA) 250 W Sodium (LSB) 400 W Sodium (LSC) IOOWLED (LSD) 250 WLED (LSE) 400 WLED (LSF) 85 WLED (LSG) Bulb Wattage Factor 48 kWh 105 kWh 159 kWh 25 kWh 96 kWh 148 kWh 23 kWh PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance 22 TRAFFIC LIGHTING (Effective 10/01/20) APPLICATION Applicable to State and Local Government agencies that operate and maintain their own traffic signals. METERED TRAFFIC LIGHTING NET MONTHLY RATE (LT) (1 ) Usage Charge $0.0664 per kWh plus; (2) Energy Cost Adjustment Charge See Schedule ECA plus; (3) Transmission Cost Recovery Factor USAGE CHARGE Billing for the Metered Traffic Lighting Usage Charge shall be based on actual kWh consumption during the billing period. Usage Charge = All kWh x Rate per kWh UNMETERED TRAFFIC LIGHTING NET ANNUAL RATE (ULT) (1 ) Usage Charge $0.0664 per kWh plus; (2) Energy Cost Adjustment Charge See Schedule ECA plus; (3) Transmission Cost Recovery Factor USAGE CHARGE Billing for the Unmetered Traffic Lighting Usage Charge shall be based on historical recorded annual kWh consumption. Usage Charge = All kWh x Rate per kWh Annual Usage = 904 kWh per account See Schedule TCRF See Schedule TCRF PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. 23 SCHEDULE UFL UNMETERED SCHOOL ZONE/CROSSING FLASHERS (Effective 10/01/20) APPLICATION Applicable to local government agencies that operate and maintain their own unmetered school zone/crossing flashers. NET ANNUAL RATE (1) plus; Usage Charge $0.0664 per kWh (2) plus; Energy Cost Adjustment Charge See Schedule ECA (3)Transmission Cost Recovery Factor See Schedule TCRF USAGE CHARGE Billing for the Usage Charge shall be based on historical recorded annual kWh consumption. The total billed usage divided by number of school zone/crossing flashers will determine the average kWh usage. This average consumption will be billed for each school zone/crossing flasher once every twelve (12) months at the end of the fiscal year. Any accounts that are added during the year will be billed on prorated consumption. Usage Charge =All kWh x Rate per kWh Annual Usage =48 kWh per account PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance 24 SCHEDULE USC UNMETERED SECURITY CAMERA (Effective 10/01/20) APPLICATION Applicable to Local Government agencies that operate and maintain their own unmetered security cameras. NET ANNUAL RATE (1) plus; Facility Charge $17.82 per bill (2) plus; Usage Charge $0.0664 per kWh (3) plus; Energy Cost Adjustment Charge See Schedule ECA (1)Transmission Cost Recovery Factor See Schedule TCRF USAGE CHARGE Billing for the Usage Charge shall be based on technical information of installed equipment. This calculated consumption will be billed for each camera once every twelve (12) months at the end of the fiscal year. Any accounts that are added during the year will be billed on prorated consumption. Usage Charge =annual kWh per camera x kWh Rate Annual Usage =300 kWh per camera per account PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. 25 SCHEDULE UWF UNMETERED WI-FI DEVICES (Effective 10/01/20) APPLICATION Applicable to local government agencies that operate and maintain their own unmetered Wi-FI devices. NET ANNUAL RATE (1) plus; Facility Charge $ 17.82 per bill (2) plus; Usage Charge $0.0664 per kWh (3) plus; Energy Cost Adjustment Charge See Schedule ECA (4)Transmission Cost Recovery Factor See Schedule TCRF USAGE CHARGE Billing for the Usage Charge shall be based on technical information of installed equipment. This calculated consumption will be billed for each device once every twelve (12) months at the end of the fiscal year. Any accounts that are added during the year will be billed on prorated consumption. Usage Charge =annual kWh per device x kWh Rate Annual Usage =300 kWh per device per account PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. 26 SCHEDULE LO OTHER LIGHTING (Effective 10/01/20) APPLICATION Applicable to Texas Department of Transportation unmetered and metered safety lighting systems and continuous lighting systems as those terms are defined in Texas Administrative Code, Title 43, Part 1, Chapter 25, Subchapter A, Rule §25.11. METERED LIGHTING NET MONTHLY RATE (LOB) (1) plus; (2) Usage Charge $0.0664 per kWh Energy Cost Adjustment Charge See Schedule ECA METERED LIGHTING USAGE CHARGE (LOB) Billing for the Usage Charge shall be based on actual kWh consumption during the billing period. Usage Charge = All kWh x Rate per kWh UNMETERED LIGHTING NET MONrHLY RATE (LOA) (1) plus; (2) Usage Charge $0.0664 per kWh Energy Cost Adjustment Charge See Schedule ECA UNMETERED LIGHTING USAGE CHARGE (LOA) Billing for the Usage Charge shall be based on estimated kWh consumption during the billing period. Usage Charge = (kWh Rate x Bulb Wattage/1000) x (Hours of Operation per Billing Period) Hours of Operation per Billing Period = 333 hours Bulb Wattage is the rated wattage of the luminaire bulb PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. 27 SCHEDULE DD SECURITY LIGHTING (Effective 10/01/20) APPLICATION Applicable to all outdoor area lighting when such lighting facilities are operated as an extension of the City's distribution system. NET MONTHLY RATE (1)Facility Charge Per Bill Luminaire Type 100 W Sodium Vapor (DSA) 250 W Sodium Vapor (DSB) 400 W Sodium Vapor (DSC) 250 W Metal Halide (DHA) 400 W Metal Halide (DHB) 100 W Equivalent LED (DSD) 250 W Equivalent LED (DSE) 400 W Equivalent LED (DSF) $ 9.61 $12.71 $15.32 $14.95 $ 17.82 $ 9.61 $12.71 $15.32 plus; (2)Energy Cost Adjustment Charge See Schedule ECA ENERGY COST ADJUSTMENT CHARGE Current ECA multiplied by respective kWh based on the following Bulb Wattage Factors: Luminaire Type 100 W Sodium Vapor (DSA) 250 W Sodium Vapor (DSB) 400 W Sodium Vapor (DSC) 250 W Metal Halide (DHA) 400 W Metal Halide (DHB) 100 W Equivalent LED (DSD) 250 W Equivalent LED (DSE) 400 W Equivalent LED (DSF) Bulb Wattage Factor 48 kWh 105 kWh 159 kWh 105 kWh 159 kWh 25 kWh 96 kWh 148 kWh 28 TYPE OF SERVICE The City shall furnish, install, maintain and deliver electric service to automatically controlled lighting fixtures conforming to the City’s standards and subject to its published rules and regulations. Where necessary for proper illumination or where existing poles are inadequate, the City will install or cause to be installed, one (1) wood pole with the necessary lighting hardware and overhead conductor for each installed light, at a distance not to exceed eighty (80’) feet from existing lines, at no charge to the Customer. Additional contractual arrangements between the City and the Customer are subject to the Special Facilities Rider. TERM OF CONTRACT A two (2) year contract shall be agreed to and signed by each Customer desiring security lighting service authorizing fixed monthly charges, which may be reviewed annually, and to be applied to the Customer’s monthly municipal utilities bill. In the event that a Customer requests the removal of the unit or discontinuance of the service prior to completion of two (2) years, the remainder of the contract period shall become due and payable. After the end of the initial two (2) year contract, service shall continue on a month-to-month basis and may be canceled by either party upon thirty (30) days’ notice. SPECLAL FACILITIES All services which require special facilities in order to meet Customer’s service requirements shall be provided, subject to Special Facilities Rider. PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance 29 SCHEDULE DSL NON-STANDARD STREET LIGHTING (Effective 10/01/20) APPLICATION Applicable to street lighting owned and maintained by the Customer. Availability of this service is contingent on the existence of an executed Special Facilities Rider between the legally responsible party and the City under which the legally responsible party accepts all responsibilities, both legal and financial, related to operation and maintenance of the subject lights, including but not limited to payment of all applicable energy charges. NET MONTHLY RATE (1) plus; Facility Charge $9.18 per bill (2)Usage Charge $0.0664 per kWh plus; (3)Energy Cost Adjustment Charge See Schedule ECA USAGE CHARGE Current usage charge and ECA rates are multiplied by respective kWh based on the following Bulb Wattage Factors: Luminaire Type 100 W Sodium Vapor (DLSA) 250 W Sodium Vapor (DLSB) 400 W Sodium Vapor (DLSC) 250 W Metal Halide (DLHA) 400 W Metal Halide (DLHB) Bulb Wattage Factor 48 kWh 105 kWh 159 kWh 105 kWh 159 kWh ADDITIONAL SERVICE CHARGES If the City is required to maintain the privately owned lights to ensure public safety, the owner of the lights may be subject to additional service charges. The additional service charges shall be the actual cost of performing any work required to perform the necessary maintenance including but not limited to 30 Labor Regular time or overtime labor hourly rates in effect at the time the work is performed for all personnel performing the work. Labor charges shall be based on a one (1 ) hour minimum with all additional time above the minimum to be measured to the nearest one-quarter hour. Transportation To be billed by hours or miles, as applicable, according to the estimated cost of operating the required equipment. Material Any material needed to repair and/or maintain facilities will be billed at City Warehouse cost plus twenty five percent (25%). Administrative Fee Ten percent (10%) of the total labor, transportation, and material costs. PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. 31 SCHEDULE EGR ECONOMIC GROWTH RIDER (Effective 10/01/20) PURPOSE The purpose of this Rider is to facilitate local economic growth and expand the ad valorem tax base of the City. AVAILABILITY This Rider is available to the Customers who: (1) (2) (3) Receive service from Rate Schedules GSL or TGS; and Pay City ad valorem tax; and Receive no electric service discounts other than those specifically defined in the GSL or TGS Rate Schedules. APPLICATION This Rider is available to electric service supplied at any one location. It is for firm electric service applicable to new and existing customers as described below, over a five (5) year period. This Rider is available to the following classes of customers: (1)New Customers whose electric service represents demand not previously served by the City at any location in the City’s service area in the last twelve (12) months, where such metered demand will be in excess of 1 ,000 kVA and customer load factor must be greater than the City’s electric system load factor, as estimated and mutually agreed upon by the General Manager of the City’s electric utility and the Customer. (2)Existing Customers served under Rate Schedules GSL or TGS who increase their prior existing metered demand by 1,000 kVA and customer load factor must be greater than the City’s electric system load factor. This increase shall be verified by sub- metering (at the Customer’s expense) the additional load. If sub-metering is not possible, at the discretion of the General Manager of the City’s electric utility, the increase may be verified by comparing a three-month rolling average of the new level of demand to the prior demand averaged for corresponding months. During periods in which this verification method cannot be applied, the General Manager and the Customer may develop a mutually agreed-upon formula to estimate the base and additional demand levels. 32 In light of additional costs associated with the Economic Growth Rider and to mitigate potential risk to ratepayers, any participant in the Economic Growth Rider must be, at the time this Rider is applied for and continuing while such Rider is in effect, a Customer in good standing of all City utilities, including solid waste services. Unless legal review procedures have been invoked in good faith regarding the obligation, a Customer in good standing for the purpose of this Rider is defined as a Customer not owing any unpaid utility or solid waste debt obligation that is over forty-five (45) days past due to the City during the previous twelve (12) months. NET MONTHLY RATE The Customer shall be charged under the appropriate applicable rate schedules with the exception that the monthly billing demand (for the GSL Rate) or system demand and on-peak demand (for the TGS Rate) will be adjusted in accordance with the following table: Time Period Reduction to Billing Demand First Year Second Year Third Year Fourth Year Fifth Year 50% 409/8 30% 20% l09/a CONTRACT PERIOD The term of the contract will be for five (5) years. 33 SCHEDULE GIP GREENSENSE nqCENTIVE PROGRAM (Effective 10/01/20) PROGRAM SUMMARY The objective of the GreenSense Incentive Program (“Program”) is to reduce energy demand and consumption by promoting energy conservation, thereby reducing the utility bills of City Customers, reducing the peak load of the City’s electric system, reducing emissions in the state, and promoting energy conservation. The Program offers incentives, in the form of credits on the electric service bills of City retail customers. Cash incentives may be paid to retail customers for the installation of photovoltaic applications. In light of additional costs associated with the GreenSense Incentive Program and to mitigate potential risk to ratepayers, any participant in the GreenSense Incentive Program must be, at the time this program is applied for and continuing while such program is in effect, a Customer in good standing of all City utilities, including solid waste services. Unless legal review procedures have been invoked in good faith regarding the obligation, a Customer in good standing for the purpose of this Program is defined as a Customer not owing any unpaid utility or solid waste debt obligation that is over forty-five (45) days past due to the City during the previous twelve (12) months. Program applicants will be able to qualify for multiple incentives simultaneously, unless specified in the individual guidelines. A separate application may be necessary for each incentive. The Program will be in effect each fiscal year beginning on October 1, until the allotted funding is depleted or until cancellation of the program by the City. At the time the funds are depleted, no additional applications for participation will be accepted until the next fiscal year. Qualifying applicants must receive electric service from the City. The program guidelines and payment provisions are subject to change by the City without prior notice. The City may, at any time, discontinue the Program without prior notice. The current program guidelines may be found in the GreenSense Incentive Program Manual located at www.cityofdenton.com. 34 SCHEDULE ECA ENERGY COST ADJUSTMENT (Effective 10/01/20) The Energy Cost Adjustment (ECA) Rate shall be set by the Public Utilities Board (“PUB”). The EC'A Rate shall be reviewed on a quarterly basis and adjusted as defined below to recover the net cost of energy delivered to Customers and to maintain the City’s electric utility in a financially sound position. NET MONTHLY RATE ( 1 ) Energy Cost Adjustment Charge $0.0341 per kWh ENERGY COST ADJUSTMENT BALANCING ACCOUNT CALCULATION The ECA Balancing Account shall be calculated using the following formula: ECA Balancing Account = (Beginning ECA Account Balance) – (Projected Net Energy Cost) Where: Projected Net Energy Cost = For the next fiscal quarter, the electric utility’s projected cost of electric load purchases from ERCOT PILB aII projected electric utility power/energy related costs for that same period including, but not limited to, power production (including the Denton Energy Center debt and all other costs); purchased power; applicable transmission services, losses and congestion; other ERCOT charges; renewable energy credits; and financial and/or physical power/energy trades; less all projected revenue to be received by the electric utility for power/energy related sales and/or trades. The General Manager of the City’s electric utility or his/her designee shall calculate the ECA Balancing Account monthly. In the event that the ECA Balancing Account calculated during the last month of each fiscal quarter (December, March, June, and September) is projected to be over/under collected by $5,000,000 or more during the next quarter, the General Manager or his/her designee may recommend to the PUB and City Council a revision to the ECA to maintain the City’s electric utility in a financially sound position. ENERGY COST ADJUSTMENT CALCULATION ECA = [(Projected Net Energy Cost) + (ECA Balancing Account)] / (Projected kWh sales) ENERGY COST ADJUSTMENT CHARGE The Energy Cost Adjustment Charge shall be based on actual kWh consumption during the billing period . Energy Cost Adjustment Charge = kWh x ECA Rate 35 SCHEDULE RCA RENEWABLE COST ADJUSTMENT (Effective 10/01/20) Applicable to any Customer receiving City electric service that owns an on-site distributed generation powered by a renewable resource which is interconnected with the City’s electric system. The Renewable Cost Adjustment (RCA) Rate shall be set by the Public Utilities Board (“PUB”). The RCA Rate shall be reviewed on a quarterly basis and adjusted as defined below to reflect an economically neutral value of distributed generation energy. NET MONTHLY RATE (1 ) Renewable Cost Adjustment $0.0381 per kWh RENEWABLE COST ADJUSTMENT CALCULATION The RCA shall be calculated using the nodal market price and renewable hourly output factor: RCA = (Nodal Market Price) x (Renewables Hourly Output) / (Total Annual Renewables Production) RENEWABLE COST ADJUSTMENT CREDIT The Renewable Cost Adjustment Charge shall be based on actual kWh delivered from Customer to the City’s electric system during the billing period. Renewable Cost Adjustment Credit = kWh x RCA Rate 36 SCHEDULE TCRF TRANSMISSION COST RECOVERY FACTOR (Effective 10/01/20) The Transmission Cost Recovery Factor (TCRF) Rate shall be set by the Public Utilities Board (“PUB”). The TCRF Rate shall be reviewed on a quarterly basis and adjusted as defined below to recover the costs of transmission service within the boundaries of the Electric Reliability Council of Texas (“ERCOT”) region which are billed and charged to the City. NET MONTHLY RATE Residential General Service Small Local Government Service Small Temporary Service Athletic Field Traffic Lighting Unmetered Traffic Lighting Unmetered School Zone/Crossing Unmetered Security Camera Unmetered Wi-FI Devices Per kWh $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 NET MONTHLY RATE General Service Medium Local Government Service Medium Per kW $0.00 $0.00 NET MONTHLY RATE General Service Large Local Government Service Large General Service Time Of Use Per kVA $0.00 $0.00 $0.00 TRANSMISSION COST RECOVERY FACTOR BALANCING ACCOUNT CALCULATION The TCRF shall be calculated using the following formula: TCRF Annual Billing = (Actual monthly net TCOS billing amounts charged by ERCOT transmission service providers to the City) + (Projected increases or decreases PUCT- approved TCOS billing amount charges to ERCOT utilities) During the last month of each fiscal year quarter (December, March, June, and September), the General Manager of the City’s electric utility or his/her designee shall calculate the TCRF Balancing Account. The TCRF charge will be developed by the City for each applicable customer billing schedule herein, based on projected kWh sales for billing schedules without a demand component and on monthly peak kW for billing schedules with a demand component. TCRF rate class allocation amount = [(TCRF annual billing) x (Projected rate class kWh usage)] / (Total projected usage for all rate classes). 37 SCHEDULE D(,R DISTRIBUTED GENERATION FROM RENEWABLE SOURCES RIDER (Effective 10/01/20) APPLICATION This Rider is available to any retail Customer receiving electric service under a City electric rate schedule who owns and operates an on-site generating system powered by a renewable resourcecapable of producing power, and which is interconnected with the City’s electric system. Renewable energy technology is any technology that exclusively relies on an energy source that is naturally regenerated over a short time and derived directly or indirectly from the sun or wind. A renewable energy technology does not rely on energy resources derived from fossil fuels, waste products from fossil fuels, or waste products from inorganic sources. This Rider applies to a Customer-owned generating system that primarily offsets all or part of the Customer’s electric service provided by the City. If the Customer-owned generating system is sized such that it produces energy in excess of a Customer’s electric consumption, special arrangements and a contract may be necessary. The current interconnection guidelines may be found in the Distributed Generation Manual located at www.cityofdenton.com. In light of additional costs associated with the Distributed Generation From Renewable Sources Rider and to mitigate potential risk to ratepayers, any participant in the Distributed Generation From Renewable Sources Rider must be, at the time this Rider is applied for and continuing while such Rider is in effect, a Customer in good standing of all City utilities, including solid waste services. Unless legal review procedures have been invoked in good faith regarding the obligation, a Customer in good standing for the purpose of this Rider is defined as a Customer not owing any unpaid utility or solid waste debt obligation that is over forty-five (45) days past due to the City during the previous twelve (12) months. CONDITIONS OF SERVICE All charges, character of service, and terms and conditions of the electric rate schedule under which the Customer receives service shall apply except as expressly altered by this Rider. The Customer shall comply with the City’s current technical requirements for distributed generation interconnection. The Customer shall obtain approval from the City prior to the installation of the on-site generating system. The Customer shall submit to the City a completed interconnection application form and signed Agreement for Interconnection and Parallel Operation of Distributed Generation before the system installation. The minimum term of an agreement under this Rider is one year, extended automatically unless terminated by either party with sixty (60) days advance written notice. The Customer is responsible for the costs of interconnecting with the City’s electric system, including transformers, service lines, or other equipment determined necessary by the City for safe installation and operation of the Customer’s equipment with the City’s electric system. The Customer is responsible for any costs associated with required inspections and permits. 38 METERING Metering under this Rider shall be performed by a single meter capable of registering the flow of electricity in two directions (delivered by the City’s electric system to the Customer, and delivered to the City’s electric system by the Customer’s system) to determine the Customer’s net energy flow. RATE Beginning in the billing period after a Customer receives approval from the City, to interconnect the Customer’s on-site generating system; all energy generated by the Customer’s system and delivered to the City’s electric system will be considered renewable energy. The Customer shall be billed for all energy delivered by the City to the Customer under the approved rates. For any generation delivered by the Customer’s system to the City’s electric system up to the amount of energy delivered by the City to the Customer, the City shall credit the Customer’s account for the energy generated as follows: Generation Credit = [(kWh delivered from the Customer’s approved system) x (Customer’s base electric service rate)] + [(kWh delivered from the Customer’s approved system) x (RCA Rate)] For all energy delivered by the Customer’s system to the City’s electric system that exceeds the amount of energy delivered by the City to the Customer, the City shall credit the Customer’s account for the energy generated as follows: Excess Generation Credit = (kWh delivered from the Customer’s system) x RCA Rate Any Billing Period Credit shall be applied to the utility charges due from the Customer to the City for the billing period. INDEMNIFICATION The Customer operating the renewable distributed generation system indemnifies the City and holds the City harmless for all damages and injuries to the City, the Customer, or others arising out of Customer’s use, ownership or operation of Customer’s distributed generation facilities in parallel with the City’s system. Customer is solely responsible for providing adequate protection for operating in parallel with the City’s system in such a manner that faults or other disturbances on the City’s system do not cause damage to the Customer’s distributed generation equipment. 39 SCHEDULE SFR SPECLAL FACILITIES RIDER (Effective 10/01/20) (1)All service shall be offered from available facilities. If a Customer’s service characteristics require facilities and devices not normally and readily available at the location where the Customer requests service, the total cost incurred by the City for all facilities installed, buried, relocated and/or removed shall be the responsibility of the Customer and subject to a contract entered into between the City and the Customer. This contract shall be signed by both parties prior to the City providing service to the Customer. (2)Any contract under this rider is subject to the following approvals: (a) if the total value of the contract is less than $100,000, the contract may be approved by the City Manager, or his designee. If a contract under this subsection is not approved by the City Manager, or his designee, then it must be recommended for approval by the Public Utilities Board and approved by the City Council. (b) if the total value of the contract is equal to or greater than $100,000, the contract must be recommended for approval by the Public Utilities Board and approved by the City Council 40 SCHEDULE PAF POLE ATTACHMENT FEE (Effective 10/01/20) APPLICATION This Rate is available to a licensee who desires to access designated poles or conduits owned by the City for the purpose of installing and maintaining their facilities and associated equipment to provide services to the public. An agreement between such entity and the City shall be executed separate from, but will reference, the following rate schedule: NET ANNUAL RATE (1) (2) (3) Annual Pole Attachment (“APA”)$ 15.57 per attachment plus; plus; On-Pole Conduit Rate $15.57 per linear foot In-Ground Conduit Rate Rate specified pursuant to Schedule SFR plus; (4) plus; (5) Riser Rate $ 160 per riser Miscellaneous Attachments $ 100 per miscellaneous attachment Note: Annual Rates (2) and (3) listed above are not available on all poles nor in all areas across the City APPLICATION PROCESSING COSTS (1) (2) (3) Application Filing Fee (per submittal)$ 100 per application Per pole cost (review & inspection)$25.00 per pole Per pole cost (mileage)$5.00 per pole All application processing costs are non-refundable. If an application being processed is identified as inaccurate or with errors, the licensee will need to resubmit the application and pay the application filing fee again. MISCELLANEOUS (1)The City or City Contractor Performing Analysis 41 $225 per pole (2) (3) Unauthorized Attachment Penalty $ 1,000 per attachment per pole Undefined Work or Expense Rate pursuant to Schedule SFR MAKE READY COSTS Licensees will be required to pay for any work done or contracted by the City, including but not limited to make ready work and any installed, used or maintained facilities in violation of the Agreement that the licensee has not corrected. The City will invoice licensee, and licensee must pay, for identified expenses as needed before any work will begin and shall include all reasonable fully loaded material (including any applicable overhead), labor, engineering, transportation and administrative costs. PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance 42 SCHEDULE BIF BANNER INSTALL FEE (Effective 10/01/20) APPLICATION Applicable to any person who has completed an application and received approval from the City to have a banner installed on facilities owned by the City for the purpose of marketing and publicizing community events shall be assessed a fee based on the following schedule: NET ANNUAL RATE Over the Street Banner Install $ 100.00 per banner Pole One Time Banner Install $ 15.00 per banner Pole Seasonal Banner Install $27.00 per banner TERMS AND CONDITIONS OF SERVICE Persons requesting the City install an Over the Street Banner must provide the City with a banner that is no more than three (3) feet tall by thirty-five (35) feet in length with six (6) feet of rope. All Over the Street Banners must be made out of mesh only (fish net type material). A sample of the banner material is recommended for approval. The City’s Building Inspections Department requires an application and permit fee of sixty (60) dollars for installation of an Over the Street Banner which needs to be completed prior to contacting the City’s electric utility. Persons requesting the City install a Pole Banner must provide the City’s electric utility with a banner that is no more than thirty (30) inches tall by eighty (80) inches in length with openings of two (2) inches. Pole Banners are required to be made of weather beater or vinyl material only. The appropriate application for each type of banner must be completed prior to installation and returned to a representative of the City’s Electric Operations and Maintenance Division along with applicable fees listed above, a digital image of the banner, and location requests. The City’s electric utility will determine install locations depending on availability. Any banners that promote sponsors or advertisement are strictly prohibited. PAYMENT Payment is required to the City at the time the banners are given for installation. Permit fees, when applicable, are due to Building Inspections in order to reserve specific dates. 43 SCHEDULE WNA WIRELESS NODE ATTACHMENTS (Effective 10/01/20) APPLICATION This Rate is available to a licensee who desires to install and maintain their wireless nodes and associated equipment to provide services to the public. An agreement between such entity and the City shall be executed separate from, but will reference, the following rate schedule: NET ANNUAL RATE (1) (2) (3) (4) Facility Charge $17.82 per node plus; plus; plus; Usage Charge $0.0664 per kWh Energy Cost Adjustment Charge See Schedule ECA Transmission Cost Recovery Factor See Schedule TCRF METERED USAGE CHARGE Billing for the Metered Usage Charge shall be based on actual kWh consumption for each device once every twelve (12) months at the end of the fiscal year. Usage Charge = All kWh per device x Rate per kWh UNMETERED USAGE CHARGE Billing for the Unmetered Usage Charge shall be based on 1) kWh consumption from similarly installed metered equipment; or 2) technical information of installed equipment provided by licensee, if similar equipment is not already metered. This calculated consumption will be billed for each device once every twelve (12) months at the end of the fiscal year. Usage Charge =Annual kWh per device x Rate per kWh Annual Usage =2,000 kWh per device per account (or calculated consumption based on technical information provided by licensee) MISCELLANEOUS (1)Unauthorized Attachment Penalty $ 1,000 per attachment 44 (2) Undefined Work or Expense Rate pursuant to Schedule SFR MAKE READY COSTS Licensees will be required to pay for any work done or contracted by the City, including but not limited to make ready work and any installed, used or maintained facilities in violation of the Agreement that the licensee has not corrected. The City will invoice licensee, and licensee must pay, for identified expenses as needed before any work will begin and shall include all reasonable fully loaded material (including any applicable overhead), labor, engineering, transportation and administrative costs. PAYMENT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. 45 SCHEDULE EVCR ELECTRIC VEHICLE CHARGING RATE (Effective 10/01/20) APPLICATION Applicable to vehicles that utilize charging services from City of Denton owned and operated Level 2 EV chargers. NET ANNUAL RATE (1 ) Usage Charge $0.04 per minute USAGE CHARGE Billing for the Usage Charge shall be based on actual charging time incurred. The billing service will be provided by a third-party vendor Usage Charge = EV Charging duration x Rate per Minute 46 DISCONTINUED AS OF OCTOBER 1, 2020 SCHEDULE RG RESIDENTIAL RENEWABLE ENERGY SERVICE RIDER APPLICATION Applicable to any Customer for all electric service used for residential purposes in an individual private dwelling or an individually metered apartment, supplied at one point of delivery and measured through one meter. This Rider is not applicable to resale service in any event, or to temporary, standby, or supplementary service. In lidrt of additional costs associated with the Residential Renewable Energy Service Rider and to mitigate potential risk to ratepayers, any participant in the Residential Renewable Energy Service Rider must be, at the time this Rider is applied for and continuing while such Rider is in effect, a Customer in good standing of all City utilities, including solid waste services. Unless legal review procedures have been invoked in good faith regarding the obligation, a Customer in good standing for the purpose of this Rider is defined as a Customer not owing any unpaid utility or solid waste debt obligation that is over forty-five (45) days past due to the City during the previous twelve (12) months. NET MONTHLY RATE (1)Facility Charge Single-Phase Three-Phase $ 8.67/bill $ 17.33/bill plus; (2)Usage Charge Winter (Billing months of November through April): Tier 1: First 600 kWh Tier 2: All Additional kWh 6.84#/kWh 4.55#/kWh Summer (Billing months of May through October): Tier 1: All kWh 6.84#/kWh plus; (3) plus; (4) Renewable Cost Adjustment Charge See Schedule RCA Transmission Cost Recovery Factor See Schedule TCRF 47 DISCONTINUED AS OF OCTOBER 1, 2020 SCHEDULE WK WEEKEND SERVICE APPLICATION Applicable to any commercial and industrial user whose maximum demand load occurs during the period from Thursday at 12 midnight through Sunday at 12 midnight and does not experience a demand load during the period from Sunday 12 midnight through Thursday 12 midnight that exceeds eighty percent (80%) of the maximum demand load. Customers who violate the eighty percent (80%) requirement more than four (4) times during the month, or more than twice on the same day of the week, during the months of June through September, are ineligible for service under this Rate for twelve (12) months. This Rate is not applicable to resale service in any event, or to temporary, standby or supplementary service except in conjunction with applicable rider. NET MONTHLY RATE (1)Facility Charge Single-Phase Three-Phase $21 .87/bill $27.34/bill plus; (2)Demand Charge $7.66/kW (First 20 kW not billed) plus; (3)Usage Charge Tier 1: First 2,500 kWh Tier 2: Next 3,500 kWh Tier 3: Additional kWh 8.50#/kWh 4.46#/kWh 3.28#/kWh plus; (4) plus; Energy Cost Adjustment Charge See Schedule ECA (5)Transmission Cost Recovery Factor See Schedule TCRF 48 DISCONTINUED AS OF OCTOBER 1, 2020 SCHEDULE DDL DOWNTOWN DECORATrVE LIGHTING APPLICATION Applicable to any Customer requesting service on the perimeter of the historic County Courthouse Square located in downtown Denton and served by the City’s existing electric distribution system for outdoor area lighting at said location. NET MONTHLY RATE (1) plus; (2) Facility Charge $4.78/bill Energy Cost Adjustment (Current ECA per Schedule ECA) x (350 kWh per Customer) 49 DISCONTINUED AS OF OCTOBER 1, 2020 SCHEDULE CGR COMMERCIAL RENEWABLE ENERGY SERVICE RIDER This Rider defines the manner by which commercial customers may purchase predetermined 1,000 kWh blocks of energy or one hundred percent (100%) of actual energy consumption from renewable resources by substituting the Renewable Cost Adjustment Charge (see Schedule RCA) in lieu of the Energy Cost Adjustment (see Schedule ECA) specified in their applicable rate schedule APPLICATION This Rider is applicable to any non-residential customer receiving service under rate schedules GSS, GSM, GSL, Gl, TGS, or WK at one point of delivery and measured through one meter. This Rider is not applicable to resale service in any event, or to temporary, standby, or supplementary service NET MONTHLY RATE A Customer eligible for service under this Rider may elect to purchase renewable energy at the Renewable Cost Adjustment Charge, determined in accordance with Schedule RCA. Said Customer may elect to purchase 1,000 kWh blocks of energy at the RCA Rate, with the remainder of the Customer’s energy use charged at the ECA Rate or to purchase all energy used at the RCA Rate. All other charges contained in the Customer’s applicable rate schedule shall continue to apply, as specified in said schedule. Said Customer’s energy charge shall be calculated as follows. Either: Total Energy Charge = [(Y x 1000 kWh) x RCA] + { [(Total Energy Used) - (Y x 1000 kWh)] x ECA} Where: Customer has elected to purchase a portion of its energy consumption at the RCA and: Y= Number of 1 000 kWh RCA blocks elected by said Customer Or: Total Energy Charge = Total Energy Used x RCA Where: Customer has elected to purchase its entire energy consumption at the RCA 50 DISCONTINUED AS OF OCTOBER 1, 2020 SCHEDULE IW(, INDEPENDENT WHOLESALE GENERATOR APPLICATION The Independent Wholesale Generator (IWG) Rate is applicable to non-renewable generating installations of ten (10) MW or less interconnected to and operating in parallel with the City’s distribution system, for the sole purpose of delivering the net output (gross output minus auxiliary load and step up transformer loses) of said generating installation to the Electric Reliability Council of Texas (“ERCOT”) transmission grid for sale in the ERCOT wholesale power market. NET MONTHLY RATE The Customer shall be subject to special contract arrangements and the rate charges to the Customer shall consist of at a minimum, a monthly Facility Charge plus a monthly Distribution Delivery Charge and a monthly Distribution Line Loss Charge. Additional Service Charges may apply. These charges shall be calculated as follows: Facility Charge: The Customer shall pay the City a monthly Facility Charge sufficient to compensate the City for its investment in special facilities dedicated exclusively to providing the Customer service and/or that are necessary to ensure that the quality of service provided to other Customers is not adversely affected pursuant to the requirements of the SYSTEM MODIFICATION provisions set forth above. The minimum monthly Facility Charge shall be $69.06. Distribution Delivery Charge: The Customer shall pay the City a monthly distribution delivery charge equal to $2.06 times the Customer’s delivery demand. The Customer’s delivery demand shall be the greatest of the Customer’s maximum 15 minute net capacity output as measured at the Customer’s IWG site, the minimum billing kW shall be as established in the City’s Agreement for Interconnection and Parallel Operation of Independent Wholesale Generation, or 1,500 kW. Distribution Line Loss Charge: The Customer shall pay the City a monthly Distribution Line Loss Charge equal to the applicable monthly Energy Cost Adjustment (“ECA”) Charge (see Schedule ECA) times monthly energy losses. Monthly energy losses shall be calculated as the metered monthly kilowatt-hour output of the Customer’s IWG generating unit(s) as measured at the Customer’s IWG site times five percent (5%). 51 MOVED TO TECH SERVICES SCHEDULE DFR DARK FIBER APPLICATION Service is available to any Customer to the extent there is any excess capacity respecting the City’s fiber optic cable facilities, within the area served by the City’s electric distribution system, for the purpose of point-to-point dark fiber optic cable connectivity intended for the transport of high-speed data NET MONTHLY RATE (1) plus; (2) Fiber Mileage Charge $400 per fiber pair/mile, per month; and Building Presence Charge $ 180 per location, per month Total Fiber Rate $580 per fiber pair/mile, per month, per location TERM OF LEASE CONTRACT All dark fiber lease contracts shall be for a minimum term of five (5) years. 52 SECTION 2. The City Manager is hereby authorized to expend funds to authorize credits to Customers on their electric service bills and further to authorize cash incentives for the installation of photovoltaic systems in accordance with the form and type set forth in Schedule GIP, as the installation of energy efficient upgrades is in the best interest of the City, as such will reduce energy demand and consumption, reduce the peak load of the City’s electric system, reduce emissions in the state, and promote energy conservation, which are all public purposes of the City SECTION 3. All ordinances or parts of ordinances in force when the provisions of this ordinance became effective which are inconsistent, or in conflict with the terms or provisions contained in this ordinance are hereby repealed to the extent of any such conflict. SECTION 4. If any section, subsection, paragraph, sentence, clause, phrase or word in this ordinance, or application thereof to any person or circumstances is held invalid by any court of competent jurisdiction, such holding shall not affect the validity of the remaining portions of this ordinance, and the City Council of the City of Denton, Texas, hereby declares it would have enacted such remaining portions despite any such invalidity. SECTION 5. This ordinance and the rates herein adopted shall become effective, charged, and applied to all electric services rendered by the City, and all energy usage by Customers of the City effective with the first billing issued on and after October 1, 2020; and a copy of said rates shall be maintained on file in the Office of the City Secretary of the City of Denton, Texas. SECTION 6.This ordinance shall be effective immediately upon its passage and approval. = eK:\T=== S ==d :fIv=1 P a S S e :iI= n d a P P r 0 : d b y t h e fo 1 1 0 :iT=t: Aye ,/ Nay Abstain Absent Mayor Chris Watts: Gerard Hudspeth, District 1 :,Z J J y’ r a Keely G. Briggs, District 2: Jesse Davis, District 3 : John Ryan, District 4: Deb Armintor, At Large Place 5 : Paul Meltzer, At Large Place 6: PASSED AND APPROVED this the 22'oh d,y ,f SQ \wnba &M/ CHRIS WATTS, MAYOR 53 . 2020 ATTEST BY: _zZmo x,aLf ROSA RTf)S_ CITY SECRETARY APPROVED AS TO LEGAL FORM: 54