21-89121-891ORDINANCE NO. AN ORDINANCE OF THE CITY OF DENTON, A TEXAS HOME-RULE MUNICPAL CORPORATION, AUTHORIZING THE APPROVAL OF A FIFTH AMENDMENT TO A PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF DENTON AND HAZEN AND SAWYER, P.C., AMENDING THE CONTRACT APPROVED BY CITY COUNCIL ON JULY 21, 2015, IN THE NOT-TO-EXCEED AMOUNT OF $427,368.00; AMENDED BY AMENDMENTS 1. 2. 3, AND 4 APPROVED BY CITY COUNCL; SAn) FirTH AMENDMENT TO PROVH)E ADDITIONAL ENGINEERING SERVICES AND PERMiTTnqG SUPPORT FOR THE HI(_'KORY CREEK BASIN PEAK FLOW DETENTION FACILITY AND THE HICKORY CREEK LWT STATION PROJECT; PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFOR; AND PROVDING AN EFFECTIVE DATE (FEE 5768 – PROVIDING FOR AN ADDITIONAL FHTH AMENDMENT EXPENDITURE AMOUNT NOT-TO-EXCEED $66,742.OO, WITH THE TOTAL CONTRACT AMOUNT NOT-TO-EXCEED $1,413,706.OO). WHEREAS, on July 2 1, 2015, by Ordinance No. 2015-205, the City awarded a contract to Hazen and Sawyer, P.C. in the amount of $427,368.00 for the design of the Hickory Creek Basin Peak Flow Detention Facility; and WHEREAS, on April 5, 2016, the City awarded a First Amendment to Hazen and Sawyer, P.(_'. in the amount of $112,758.00 for the design of the Hickory Creek Basin Peak Flow Detention Facility, and WHEREAS, on February 7, 2017, the City awarded a Second Amendment to Hazen and Sawyer, P.C. in the amount of $192,239.00 for the design of the Hickory Creek Basin Peak Flow Detention Facility, and WHEREAS, on August 13, 2019, the City awarded a Third Amendment to Hazen and Sawyer, P.C. in the amount of $470,449.00 to provide additional design and construction administration services for Hickory Creek Basin Peak Flow Detention Facility, West Peak Flow Storage Basin and Peak Flow Pump Station, and Hickory Creek Lift Station Reconstruction Design, and WHEREAS, on January 12, 2021, the City awarded a Fourth Amendment to Hazen and Sawyer, P.C. in the amount of $144,150.00 to provide additional engineering services and permitting support for the Hickory Creek Basin Peak Flow Detention Facility and the Hickory Creek Lift Station Project, and WHEREAS, the additional fees under the proposed Fifth Amendment are fair and reasonable and are consistent with, and not higher than, the recommended practices and fees applicable to the Provider’s profession, and such fees do not exceed the maximum provided by law; NOW, THEREFORE, THE COUNCL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. The Fifth Amendment, increasing the amount of the contract between the City and Hazen and Sawyer, P.C., which is on file in the office of the Purchasing Agent, in the amount of Sixty-Six Thousand Seven Hundred Forty-Two and 00/100 ($66,742.00) Dollars, is hereby approved and the expenditure of funds therefor is hereby authorized in accordance with said amendment which shall be attached hereto. The total contract amount increases to $1,4 13,706.00. SECTION 2. This ordinance shall become effective immediately upon its passage and approval. The motion to approve this ordinance was made by Tesse. Dew : S and seconded by h I Vh c \tZQ€ . The ordinance was passed and approved by the following vote n- A : Aye Nay Abstain Absent Mayor Gerard Hudspeth: Vicki Byrd, District 1 : Brian Beck, District 2: Jesse Davis, District 3 : Alison Maguire, District 4: Deb Armintor, At Large Place 5 : Paul Meltzer, At Large Place 6: 34 £ d‘ J 7 J Z PASSED AND APPROVED this the 18tb day of 202 1 /“’7-C/ / /kC GERARD HLJDSPETH. MAYOR ATTEST: ROSA RIOS, CITY SECRETARY Alllllltl _ 22.. APPROVED AS TO LEGAL FORM: AARON LEAL, CITY ATTORNEY BY:\XtxxaLia B::HLaJIcs:3:eddcEli HiS:l:=,ndnc=ndad Mk iii:i'T£'”A DocuSign Envelope ID: F17B3FAB-7D754282-95Al-DA4FDD7701 12 DENTON Docusign City Council Transmittal Coversheet 5768PSA File Name I HICKORY ST BASIN PEAK FLOW DETENTION FACILITY-AMEND 5 P.„h„i„g C,.t„t c 'y;t;1 w =;tb'''k City Council Target Date MAY 18’ 2021 Piggy Back Option Contract Expiration 21Ordinance 891 I SV L mF/ F/ 1 1 \_ELla IC N/A DocuSign Envelope ID: F17B3FAB-7D754282-95Al-DA4FDD7701 12 FIFTH AMENDMENT TO CONTRACT BY AND BETWEEN THE CITY OF DENTON, TEXAS AND HAZEN AND SAWYER P.C. Contract 5768 THE STATE OF TEXAS § §COUNTY OF DENTON THIS FIFTH AMENDMENT TO CONTRACT 5768 (“Amendment”) by and between the City of Denton, Texas (“City”) and Hazen and Sawyer P.C. (“Consultant” or “Hazen”); to that certain contract executed on July 21, 2015, in the original not-to-exceed amount of $427,368 (the “Original Agreement”); amended on April 05, 2016 in the additional amount of $112,758 aggregating a not-to-exceed amount of $540, 126 (the “First Amendment”); amended on February 07, 2017 in the additional amount of $192,239 aggregating a not-to-exceed amount of $732,365 (the “Second Amendment”); amended on August 13, 2019 in the additional amount of $470,449 aggregating a not-to-exceed amount of $1,202,814 (the “Third Amendment”); amended on January 12, 2021 in the additional amount of $144,150 aggregating a not-to-exceed amount of $1,346,964 (the “Fourth Amendment”) (collectively, the Original Agreement, the First Amendment, the Second Amendment, the Third Amendment and the Fourth Amendment are the “Agreement” ) are for services related to the Hickory Street Basin Peak Flow Detention Facility project. WHEREAS, the City deems it necessary to further expand the services provided by Consultant to the City pursuant to the terms of the Agreement, and to provide an addition to the design contract in a not-to-exceed amount of $66,742 with this Amendment for an aggregate not-to-exceed amount of $ 1,413,706; and FURTHERMORE, the City deems it necessary to further expand the goods/services provided by CONSULTANT to the City; NOW THEREFORE, the City and Consultant (hereafter collectively referred to as the “Parties”), in consideration of their mutual promises and covenants, as well as for other good and valuable considerations, do hereby AGREE to the following Amendment, which amends the following terms and conditions of the said Agreement, to wit: 1.The additional services described in Attachment “A“ of this Amendment, attached hereto and incorporated herein for all purposes, for addition to the design contract and additional construction administration services for Hickory Street Basin Peak Flow Detention Facility Project, are hereby authorized to be performed by Consultant. For and in consideration of the additional services to be performed by Consultant, the Owner agrees to pay, based on the cost estimate details attached as Attachment “A“ to this Amendment, a total fee, including reimbursement for non- labor expenses an amount not to exceed $66,742. 5768 Contract – Amendment # 4 Page 1 of 2 DocuSign Envelope ID: F17B3FAB-7D754282-95Al-DA4FDD770112 2. This Amendment modifies the Agreement amount to provide an additional $66,742 for the additional services with a revised aggregate not to exceed total of $ 1 ,413,706. The Parties hereto agree, that except as specifically provided for by this Amendment, that all of the terms, covenants, conditions, agreements, rights, responsibilities, and obligations of the Parties, set forth in the Agreement remain in full force and effect. IN WITNESS WHEREOF, the City and the Consultant, have each executed this Amendment ele:!onically, b&57ig BBslgh their respective duly authorized representativesand officers on this date "“ '- ’ “CITY” “CONSULTANT” Hazen and Sawyer P.C.CITY OF DENTON, TEXAS A Texas Municipal Corporation SMA HtML? DocuSigned by: By: AUTHORIZEb SIGNATURE, TITLE SARA HENSLEY, INTERIM CITY MANAGER DocuSlgned bF LA'„"DocuSlgned by: By ATTEST: APPROVED AS TO LEGAL FORM: AARON LEAL, CITY ATTORNEYATTEST: ROSA RIOS, CITY SECRETARY By: THIS AGREEMENT HAS BEEN BOTH REVIEWED AND APPROVED as to financial and operational obligations and business terms. Stephen D. Gay SIGNATURE PRINTED NAME Di rector , Water and Wastewater TITLE Water and Wastewater DEPARTMENT Page 2 of 2 DocuSign Envelope ID: F17B3FAB-7D754282-95Al-DA4FDD7701 12 ATTACHMENT A Hazen Hazen and Sawyer 8150 N. Central Expressway, Suite 700 Dallas, TX 75206 ' 214.382.5750 April 1, 2021 Chris Campbell Superintendent - Capital Projects Water and Wastewater Utilities City of Denton 901-A Texas Street Denton, TX 76209 Re: Construction Management Services Amendment Contract 5768 - Hickory Creek Lift Station Dear Mr. Campbell: Hazen and Sawyer (Hazen) has prepared this amendment request for Contract 5768 for additional engineering services during construction for the Hickory Creek Lift Station (HCLS). This is the second amendment for engineering services during construction of the HCLS. The first amendment continued construction services through October 2020. With further construction delays, Hazen was able to extend services by an additional 4 months to February 2021 and is currently out of budget. Based on the current progress of the project, Hazen estimates that the final completion of the project will occur by September 1, 202 1, which is the basis for this amendment. With this amendment, Hazen will continue to provide construction administration services in the role of Engineer as described in the Contract Documents. Below is a list of tasks that Hazen will perform: 1. 2 3. 4. 5. 6. 7 Construction Progress Meetings – Conduct up to six (6) construction progress meetings to review construction progress. Hazen will provide agenda and meeting minutes. Additional Site Visits – Hazen will provide additional site visits, not including construction progress meetings, to observe the progress and the quality of work and for coordination of the work. Hazen will provide up to 4 additional site visits. Monthly Pay Request Review - Hazen will review and comment on up to 6 monthly and final Progress Payment based on the observations of the performed work. Engineering Support – Review any additional submittals, respond to RFls, review change order proposals and provide any technical evaluations and recommendations for construction ISsues O&M Manual Coordination – Hazen will review and provide comments on preliminary and final O&M manuals. Hazen will review up to 15 O&M manuals. Startup and Commissioning – Hazen will provide assistance with confirming performance and operation of the lift station, as well as provide trouble shooting assistance. Project Closeout – Hazen will perform site visit to develop punch list, review request for substantial completion, perform final walk through and perform other project closeout requirements. Hazen will archive all the construction information and provide electronic copy on a DVD aCaa-} hazenandsawyer.com DocuSign Envelope ID: F17B3FAB-7D754282-95Al-DA4FDD7701 12 Hazen Chris Campbell April !, 2021 8. Record Drawings – Hazen will revise the construction drawings in accordance with the information furnished by the Contractor, reflecting changes made during construction. Hazen will provide one full-size (22“x34”) and one half-size (ll“x17”) bound set and one electronic copy in PDF format. Schedule This amendment is based on the latest schedule from Rey-Mar received on March 25, 2021. Note that the construction schedule did not include the demolition of the existing lift station electrical equipment, which is the reason for the longer proposed schedule below: • • • • • • • Force main tie-in – End of April 202 1 Start-Up and Commissioning – May 202 1 30-Day Performance Test – June 202 1 Demolition of Existing Lift Station Electrical – July 202 1 Substantial Completion – August 1, 2021 Final Completion – September 1, 202 1 Submission of Record Drawings and Project Records – October 1, 2021 Very truly yours, %'&? Scott A. Hardy, PE, PMP Senior Associate Enclosure: Draft Level of Effort Page 2 of 2 hazenandsawyer.com I gl :1 :gI iVN 9 1 g 1 8 1 g 1 8 f 8 SO aa in N :In(DbeiiOID eoc a {> '?O = LU 8 a & : hI ii E 6 Bg LEI i rnIa 61 ; 3 a 4) E C}{ aa 7) 27)Ca C) dQ g {{ it IE cB El g11 1gLUo bea) g BUlJd