21-1868ORDINANCE NO. 21-1868 AN ORDINANCE OF THE CITY OF DENTON, A TEXAS HOME -RULE MUNICIPAL CORPORATION, AUTHORIZING THE APPROVAL OF A FIFTH AMENDMENT TO A PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF DENTON AND PEAK PROGRAM VALUE, LLC, AMENDING THE CONTRACT APPROVED BY CITY COUNCIL ON OCTOBER 13, 2020, IN THE NOT -TO -EXCEED AMOUNT OF $696,074.00; AMENDED BY AMENDMENTS 1-4 APPROVED BY PURCHASING AND CITY COUNCIL; SAID FIFTH AMENDMENT TO PROVIDE PRECONSTRUCTION AND CONSTRUCTION MANAGEMENT SERVICES FOR THE SOLID WASTE FLEET MAINTENANCE SHOP IN THE EXPENDITURE AMOUNT OF $221,567.00, DENTON MUNICIPAL ELECTRIC RENOVATION IN THE EXPENDITURE AMOUNT OF $271,189.00, AND PRE -CONSTRUCTION ESTIMATION SERVICES IN THE EXPENDITURE AMOUNT OF $47,500.00; PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFOR; AND PROVIDING AN EFFECTIVE DATE (FILE 7425 —PROVIDING FOR AN ADDITIONAL FIFTH AMENDMENT EXPENDITURE AMOUNT NOT -TO -EXCEED $540,256.00, WITH THE TOTAL CONTRACT AMOUNT NOT -TO - EXCEED $1,782,016.00). WHEREAS, on October 13, 2020, by Ordinance No. 20-1995, the City awarded a contract to Peak Program Value, LLC in the amount of $696,074.00 for program management services for the construction phase of the Public Safety Buildings (Police Headquarters, Police Substation, and Firing Range) and additional services for new or renovations of City buildings; and WHEREAS, the additional fees under the proposed Fifth Amendment are fair and reasonable and are consistent with, and not higher than, the recommended practices and fees applicable to the Provider's profession, and such fees do not exceed the maximum provided by law; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. The Fifth Amendment, increasing the amount of the contract between the City and Peak Program Value, LLC, which is on file in the office of the Purchasing Agent, in the amount of Five Hundred Forty Thousand Two Hundred Fifty -Six and 001100 ($540,256.00) Dollars, is hereby approved, and the expenditure of funds therefor is hereby authorized in accordance with said amendment which shall be attached hereto. The total contract amount increases to $1,782,016.00. SECTION 2. This ordinance shall become effective immediately upon its passage and approval. The motion to approve this ordinance was made by and seconded by 'Rr ; c,,n ;tee�C_ This ordinance was passed and approved by the following vote [-7 - j2]: Mayor Gerard Hudspeth: Vicki Byrd, District 1: Brian Beck, District 2: Jesse Davis, District 3: Alison Maguire, District 4: Deb Armintor, At Large Place 5: Paul Meltzer, At Large Place 6: Aye Nay J Abstain Absent IT - PASSED AND APPROVED this the t Ll'' day of Se--cmbe.0 , 2021. GERARD ITUISSPETH, MAYOR ATTEST: ROSA RIOS, CITY SECRETARY APPROVED AS TO LEGAL FORM: CATHERINE CLIFTON, INTERIM CITY ATTORNEY Digitally signed by Marcella Lunn DN: cn=Marcella Lunn, o, ou=City o BY.hP1r��1 ` 1^ fenton, D r y,.� email-marcella.lunn@cityofdent on.com, c=US Date: 2021.08.30 18:28:14 -05'00' DocuSign Envelope ID: 69FO80AF-C7A4-4E7B-B68D-431 C10EOEC6E CITY OF DENTON Docusign City Council Transmittal Coversheet PSA 7425 File Name Program Management services - Amendment 5 Purchasing Contact Christa Christian City Council Target Date SEPTEMBER 14, 2021 Piggy Back Option No Contract Expiration N/A Ordinance 21-1868 1 DS VW DocuSign Envelope ID: 6917080AF-M44EM-MD-431 C1 CEOEC6E FIFTH AMENDMENT TO CONTRACT BY AND BETWEEN THE CITY OF DENTON, TEXAS AND PEAK PROGRAM VALUE, LLC. PSA 7425 THE STATE OF TEXAS COUNTY OF DENTON THIS FIFTH AMENDMENT TO CONTRACT 7425 ("Amendment") by and between the City of Denton, Texas ("City") and PEAK PROGRAM VALUE, LLC. ("Consultant"); to that certain contract executed on October 13, 2020, in the original not - to -exceed amount of $696,074.00 (the "Original Agreement"); amended on February 8, 2021 in the additional amount of $44,910.00 aggregating a not -to -exceed amount of $740,984.00 (the "First Amendment"); amended on April 8, 2021 to include task order 3, project controls and City support for The Junction Project, in the additional amount of $0 aggregating a not -to -exceed amount of $740,984.00 (the "Second Amendment"); amended on June 15, 2021 to include task orders 4, 5 and 6, in the additional amount of $ $463,985.00 aggregating a not -to- exceed amount of $1,204,969.00 (the "Third Amendment"); amended on August 20, 2021 to include Task Order 5, Revision 1 and Task Order 7, in the additional amount of $36,791.00 aggregating a not -to- exceed amount of $1,241,760.00 (the "Fourth Amendment") (collectively, the Original Agreement, the First Amendment, the Second Amendment, The Third Amendment, and the Fourth Amendment are the "Agreement") for services related to Program Management Services. WHEREAS, the City deems it necessary to further expand the services provided by Consultant to the City pursuant to the terms of the Agreement, and to provide an additional not -to -exceed amount $540,256.00 with this Amendment (Task Order's 8, 9 and 10) for an aggregate not -to -exceed amount of $1,782,016.00; and FURTHERMORE, the City deems it necessary to further expand the services provided by Consultant to the City; NOW THEREFORE, the City and Consultant (hereafter collectively referred to as the "Parties"), in consideration of their mutual promises and covenants, as well as for other good and valuable considerations, do hereby AGREE to the following Amendment, which amends the following terms and conditions of the said Agreement, to wit: The additional services described in Exhibit "A" of this Amendment, attached hereto and incorporated herein for all purposes, for professional services related to the Program Management Services, are hereby authorized to be performed by Consultant. For and in consideration of the additional services to be performed by Consultant, the City agrees to pay, based on the cost estimate detail attached as 7425 PSA — Amendment #5 Page 1 of 2 DocuSign Envelope ID: 69FO80AF-C7A4-4E7B-B68D-431 C10EOEC6E Exhibit "A", a total fee, including reimbursement for non -labor expenses an amount not to exceed $540,256.00. 2. This Amendment modifies the Agreement amount to provide an additional $540,256.00 for the additional services with a revised aggregate not to exceed total of $1,782,016.00. The Parties hereto agree, that except as specifically provided for by this Amendment, that all of the terms, covenants, conditions, agreements, rights, responsibilities, and obligations of the Parties, set forth in the Agreement remain in full force and effect. IN WITNESS WHEREOF, the City and the Consultant, have each executed this Amendment electronically, by and through their respective duly authorized representatives and officers on this date 09/14/2021 "Consultant" PEAK PROGRAM VALUE, LLC. Ea;.s Signed by: By: S . f x Chris Syuadra, Partner ATTEST: ROSA BIOS, CITY SECRETARY DocuSigned by: By: I Pl~ PZ04 %.......__ 1 C5CA8C5E1 75493... AUTHORIZED SIGNATURE, TITLE APPROVED AS TO LEGAL FORM: DocuSigned by: B NaI''Gt" (,utak, "CITY" CITY OF DENTON, TEXAS A Texas Municipal Corporation DocuSigned by: By: S H SARA HENSLEY, INTERIM CITY MANAGER THIS AGREEMENT HAS BEEN BOTH REVIEWED AND APPROVED as to financial and operational obligations and business terms. DocuSigned by: SIGNATURE Scott Gray PRINTED NAME Director - Airport & Facilities TITLE y' Facilities Management CATHERINE CLIFTON, INTERIM CITY ATTORNEY DEPARTMENT 7425 PSA — Amendment #5 Page 2 of 2 DocuSign Envelope ID: 69FO80AF-C7A4-4E7B-B68D-431C10EOEC6E &A Exhibit A Peak Program Value, LLC 4450 Arapahoe • Suite 100 • Boulder CO • 80303 • 303.503.1155 City & Consultant PSA 7425 - Task Order 08 "As Needed" On Call Project Controls Services Consultant's Scope; Services; Fees; and Schedule This Task Order # 08 provides the authorization to provide project controls services to the City as may be requested in the future, under the terms and conditions of Professional Services Agreement # 7425, and as defined in the following attachment: Attachment A -- Project Scope, Services, Fees, and Schedule CITY OF DENTON, TEXAS OWNER DocuSigned by: E� N F�RAf1R�OR�7�E�� SARA HENSLEY, INTERIM CITY MANAGER ATTEST: ROSA RIOS, CITY SECRETARY DocuSigned by, 12.44 B iV : 9C5CMCSP75493... PEAK PROGRAM VALUE, LLC "CONSULTANT" E DocuSigned by: S s,wra D9FFDCA63E204B8... BY: Chris Squadra, Its: Partner Page 1 of 1 DocuSign Envelope ID: 69FO80AF-C7A4-4E78-868D-431C10EOEC6E &A Peak Program Value, LLC s 4450 Arapahoe • Suite 100 • Boulder CO • 50303 a 303.503.1155 To Whom It May Concern: August 16, 2021 Peak Program Value, LLC (Consultant) appreciates the opportunity to provide value to the City of Denton (City) for upcoming projects, and working with the Facilities Department to support the City's stakeholders. Based on the scope outlined in discussions with the City team, PPV has prepared a proposal for the services we believe will meet the City's requirements, and will help with decision-making on future projects. A. The Projects The project(s) are to be determined by the City, as needs arise. This Task Order # 08 does not define any projects, or guarantee any compensation to the Consultant. IB. Basic Services PPV will provide the following services as the City may request from time to time: A. Project Goals & Implementation Plan Meet with the team and discuss the City's goals. Review the options and process for due diligence, land acquisition, design, entitlement, procurement, construction, start-up and occupancy by the stakeholders, and their impact on risk management. Prepare a draft project charter, showing the steps by phase for implementing the project, as well as the owner's move -in, occupancy and start-up activities. Review with the project team, revise and resubmit until approved by the Client. B. Conceptual, Schematic, Design Development, and Other Detailed Construction Cost Estimates Prepare construction cost estimate(s) from the project information package(s) provided by the City, and meet with the City to review with the project team. Make requested edits, and re -submit as a final deliverable. C. Owner's Development Budget Creation or Validation Create (or review the City's) costs to be used for each master site development component (e.g. site utilities, drainage structures, pedestrian paving, vehicular paving, site furnishings, etc.), as well as the budget for the building's furnishings, fixtures, and equipment (FF&E) costs outside the scope of the construction cost estimate. Discuss and correct significant variations in the City's costs from historic data, and probable component and system requirements, given the known project program and Client's requirements. Integrate these three direct cost estimates (e.g. site development, building construction cost, and FF&E) with their appropriate budgets for design, engineering, materials testing, escalation, permits, tap fees, and contingency. Review with the project team, edit and re -submit until approved. Validate the alignment of the project's scope, quality and budget; offer ideas for eliminating variances (if any). D. Conceptual Master Project Schedule Meet with the team and facilitate a "scheduling charette" to understand the goals, major milestones and integration of design, entitlement, procurement, construction and beneficial occupancy milestones of the stakeholders. Expand the discussion to include other Client activities (e.g. funding milestones, land acquisition, master site development, etc.) that may affect the project's schedule. DocuSign Envelope ID: 69F080AF-C7A4-4E7B-B68D-43lClCEOEC6E Task Order # 08 - Project Control Services for the City of Denton's Upcoming Projects August 16, 2021 Page 2 of 2 E. Conceptual Construction Phasing Plan Prepare three (3) different construction phasing plans for the project, assuming different site ownership and property acquisition options. Show the impact on the project occupancy in above Conceptual Master Project Schedule for the three different acquisition options, and lead a discussion on each. F. Value Engineering, Life Cycle Cost Analysis & Evaluation of Alternatives Collaborate with the project team to identify value engineering ideas, ascertain their first cost impact on the budget, as well as their impact to the operational costs of the facility over a thirty (30) year building life cycle. Evaluate alternative designs, materials and/or site options to achieve maximum value for the lowest cost. Attend, and if requested, lead interactive work session(s) with the project team to evaluate the acceptability of the first cost and life cycle cost impacts of the preferred value engineering options. Encourage the project team to use stakeholder goals and a value analysis process to finalize these value engineering decisions. G. Cash Flow Prediction Load the budget into the schedule, showing the costs to be incurred by quarter throughout the project. H. Public Private Partnership Ideas Collaborate with the project team to identify potentially viable public-private partnership ideas. Evaluate each for financial, legal and financial soundness; prepare pro formas for each; and present the results to the project team and other stakeholders. Assist with strategies for implementing the preferred public-private partnership alternative(s). "Owner -friendly" Contracting Team Selection Ideas Review the various processes available for selecting the contracting team, and identify, present and discuss the risks and benefits of each method. Facilitate an interactive work session that results in a contracting team procurement method being selected. J. Other Project Control Services PPV will provide other project control services for the City not listed above, as determined by the City from time to time to be useful. C. Compensation Not To Exceed $47,500 The fees for each of these assignments will be lump sums as mutually agreed in advance, on an "as needed" basis. The aggregate for all assignments under D. Schedule The schedule for each assignment will be as mutually agreed by the City and Consultant in writing in advance of commencement of work. DocuSign Envelope Io: 69F080AF-M44E76-86813-431 C10EOEC6E A& Peak Program Value, LLC - 4450 Arapahoe - Suite 100 - Boulder CO • 80303 ■ 303503.1155 City & Consultant PSA 7425 - Task Order 09 Project Controls + City Support Services — Solid Waste Fleet Maintenance Facility Consultant's Project Scope; Services & Fees; and Project Schedule This Task Order# 09 provides the authorization to proceed with project controls and City support services, under the terms and conditions of Professional Services Agreement # 7425, and as defined in the following attachments: Attachment A — Project Scope Attachment B — Services and Fees Attachment C — Project Schedule CITY OF DENTON, TEXAS OWNER DocuSigFied by: S 1161-44 15270422 -- SARA HENSLEY, INTERIM CITY MANAGER ATTEST: ROSA RIOS, CITY SECRETARY DocuSigned by: C~ PZ&4 BY: 1C5CA8C5Ei T5493... PEAK PROGRAM VALUE, LLC "CONSULTANT" DocuSigned by: 1 D9FFOCA63F20468 BY: Chris Squadra, Its: Partner Page 1 of 1 DocuSign Envelope I1):69FO80AF-C7A4-4E76-B68D-431 C10EOEC6E City of Denton - Solid Waste Fleet Maintenance Facility Updated on 07JUL 2021 ,,.,".ea ..., .111 v,r,,, ,. — — DSWF -Project Charter CoUs PSA # 7425 - Task Order # 09 Exhibit A -Project Scope Project Charter Faculties Management Department Planning and Construction The purpose of chis Project Cliarler is to dooument initial information and establlsh processes to ensure that the Project Team works collaboratively and with well defined roles and responsibilities in order deliver a quality, project within scope, budget, and on schedule. The project information provided herein Is high-level and used to initiate project planning only. A. General information Project Name city of Denton Solid Waste Address 1527 S. Mayhill Rd. Denton, TX 76205 Fleet Maintenance Facility Project Description Design and Construction of a 6 bay Heavy Equipment Fleet ServicelMaintenance Facility with a canopy, parking, and ready and downline Project Manager Email Phone Client Department Fleet Services Client Contract Terry Kader Email: Terry.Kader@cityofdenton.com Phone: 940-349-8729 Initial Project Budget Estimate TBD; Pending Discovery Funding Source Certificate of Obligation (C.0) Solid Waste Funds B. Project Information Business Case Justification for initiatEng a project) The City of Denton Solid Waste and Recycling Department is exclusively responsible for the collection of residenfial and commercial solid waste and recycling and landfilling activities in the City of Denton To complete this charge, the Department must muster and maintain an significant and unique fleet of specialty heavy equipment. Maintenance and repair of this fleets was historically undertaken onsite b contractors or City of Denton (COD) Field Technicians or transported offsite to the City's Centralized Fleet Facility, located on Texas Street, for any maintenance required resulting is significant downtime, lost productivity, and operational inefficiencies. in 2017, a third party solid waste consultant (Blue Ridge Services) completed an operationa[ review and staffing assessment of the Solid Waste and Recycling Department, which included the recommendation, "The City should consider constructing a maintenance shop annex close to CDCs truck parking facility. A shop next to the parking facility ma it convenient for drivers to drop off their truck for repairs, reducing driver frustration and encouraging them to tum in their truck for repair immediately when needed. It also makes It convenient for fleet services to retrieve trucks for preventative maintenance services and other repairs." in FY201912020, a metal building was converted to a temporary, onsite 2 -bay Fleet Services Annex was established where minor repairs, hose changes, oil services, and other minor issues to get a truck on the road in the morning are completed. while this has significantly affected SWR fleet up -time, more intense PM services and major repairs must still be completed at Texas Street. By establishing a Satellite Fleets Services f=acility at the City of Denton Landfill, the uniqueness of the SWR fleet can be addressed, maintenance can be prioritized, Solid waste Services can be ensured. Project Scope Design and Construction of a 6 bay Heavy Equipment Fleet Service/Maintenance Facility with a canopy, parking, and ready and deadline. Design MUST include fixed methane monitors in the enclosed areas Background/ History (describe the situation, context of, or history, and include current status of the project) See Business Case Purpose, Objective, & Goals (specific project objective that correlates with the issue or opportunity. Objective must relate to at least one issue and include measurable outcomes) See Business Case Other Relevant Project Information Attached is a recently completed map indicating the proposed location f this facility. Additionally, as -built infrastructure maps for the existing onsite improvements for the old DTE Gen -Set, which is to be remved from the property within the next 90 days. C, Project Delivery Method Proposed Design Delivery Method Standard Owner-Areht Agmnt Proposed Construction Delive Method CMAR on Board at 50% DDs Initial Project Schedule Preconstructiow 15 Months Construction: 10 Months Construction Phase End Date -&t-Aeg-2'J- 01 OCT 2023 D. Project Team Roles 8r Responsibilities (list all key internal and external project team members and associated project responsibilities including participation in public outreach meetings, presentations to Boards & Commissions, etc. ) Name Organization Project Role Responsibilities Terry Kader CoD - Fleet Services Client Department End user for building, present at PUB/CC Meetings Mark Bartek CoD - Fleet Services Client Department, Site End user for building Contact Brian Bomer CoO - Solid Waste Client - Client Department _ Client of end user, present at PUB/CC Meetings Scott Gray CoD - Facilities Project Delivery E. Stakeholder Communications (list all anticipated internal and external communications including project and public meetings) Event, Issue Communication Type Description Frequency Deliverable Updates to CMO/Council Friday Report Updates regarding project construction progressions As needed 219]0] MWGProject Charterfnr0g11R2022 Mtg REV04.01 to Team • OKOa FxMan Edits Page 1 of 2 9 2020A Anne—W— ucai right: -d DocuSign Envelope ID: 69FOBOAF-C7A4-4E7B-B68D-431C10EOEC6E City of Denton - Solid Waste Fleet Maintenance Facility Updated an 07 JUL 2021 DSWF -Project Charter Printed on 8/11/2021 at 8:07 AM Project Charter Fa6(lltles Management Department Planning and Construction The purpose of this Project Charter is to document initial information and establish processes to ensure that the Project Team works collaboratively and with well defined roles and responsibi#hies in order deliver a quality project within scope, du ation provided herein is high-level and tmq to initiate project planning only. Contract Approval for Architect & Construction PUB & City Council PUB & CC Approvals of contracts As needed F. Related Subprojects (describe their relationship and impact on each other) Removal of methane generator from existing site location - Denton Municipal Electric is leading that project. G. Attachments Checklist Preliminary Budget Est, Project Location Map H. Approvals Name Signature Date Client Contact Terry Kader Gaila Barnett FacMan (PPV) Project Manager Director of Airport, Real Estate & Facilities Scott Gray DCM or ACM Chief Frank: Dixon 21670765WGFgi charterfo061U1.2021 Mtg FEV 04.011*7eam♦a lfa+F—,Edits Page 2 oft ®2020Peak`,.gramvarve, LLC All ngh.reserved DocuSign Envelope ID: 69F080AF-C7A4-4E7B-B68D-431 C10EOEC6E a,ay a �,vrlsundln r-oK 7425 - Task Order 09 - Exhibit B Updated 12 AUG 2021 Project Controls Scope of Services &Fees -Service Center Renovation Printed - V12J2021 M 2:48 PM Service Item # Description Included (If Checked) Fees Expenses 1.0 Basic Services - Preconstruction Included (If Checked) 1.0 2.0 11.A Goal -setting, Scheduling & Information Management 3.0 wlFees Below 1.0 Project Goals & Implementation Planning ./ Not Applicable 2.0 Public Private Partnership Ideas 3.0 Communication & Information Management Plan ./ Proposed Change Orders 4.0 Conceptual Master Project Schedule Pending Commitments 5.0 Conceptual Construction Phasing Plan .5 6.0 Detailed Master Project Schedule .6 Commitments vs. Budget ./ .7 Payments vs. Commitments 1.B Cost Management wlFees Below 1.0 Programmatic Construction Cost Estimate - One Scheme Not Applicable Not Applicable 2.0 Programmatic Construction Cost Estimate -Additional Schemes (Each) 3.0 Owner's Development Budget Validation 4.0 Conceptual Design Construction Cost Estimate - One Scheme 5.0 Conceptual Design Construction Cost Estimate - Additional Schemes (Each) 6.0 Cash Flow Prediction 7.0 50% Schematic Design Construction Cost Estimate (Assumes Single Scheme) 8.0 100% Schematic Design Construction Cost Estimate (Assumes Single Scheme) 9.0 Validation of GC's Initial Construction Cost Estimate 10.0 50% Design Development Construction Cost Estimate (Assumes Single Scheme) 11.0 12.0 GC's Estimate Validation at 100% Design Development Validation of the GC's Proposed Final Guaranteed Maximum Price (GMP) ./ 13.0 Value Engineering, Life Cycle Cost Analysis and Evaluation of New Alternatives 14.0 Coordination of Furnishings, Fixtures & Equipment (FF&E), IT, AV and Security Budgets x BesEValue:procur�merit Processes One Time Tasks - Preconstruction 1.A 1.B & 1.0 II 37,37 1.0 "Owner -friendly' Design Team Selection Strategies V 2.0 Design Team Selection Assistance 3.0 "Owner -friendly' Contracting Team Selection Strategies 4.0 Contracting Team Selection Assistance ./ 5.0 ContractorlSub Prequals, Solicitation, Bid Analysis & Award Recommendation Validation 1.D Ongoing Preconstruction Services - 01 SEP 20211 to 01 OCT 2022 15 Months 3,943 per Month 59,150 1.0 Interactive Work Sessions and Meetings Required for Basic Preconstruction Services 1/ Services Duration = Current Project Contract Schedule; Extensions Calc'd at Monthly Rate Total Fees for Basic Services - Preconstruction (w/o Reimbursable Expenses) 96,521 2.0 Alternate 01- Construction Services (at the Option of the City) Included (If Checked) 2.A One Time Tasks - Set Up Project Controls & Information Management Systems Concurrent w12.B Below 1.0 2.0 Cost Management Options Review Schedule Management Options Review Completed Completed 3.0 Information Management Options Review Completed 4.0 Set Up the Chosen Systems, Processes & Tools for Tracking: .1 Budgets Against Commitments .2 Proposed Change Orders .3 Pending Commitments .4 GC, Design Team, and Consultant Contract Changes .5 Contingency Use Log(s) .6 Commitments vs. Budget ./ .7 Payments vs. Commitments Page 1 of 4 * 2021 Peak Program vaNe. LLC PII WghLs P e ed DocuSign Envelope ID: 69FO80AF-C7A4-4E7B-B68D-43lC10EOEC6E %.ILY a %.vnsuna IL roe+► 7425 - Task Order 09 - Exhibit B tlpdatod 12 AUG 2021 Project Controls Scope of Services & Fees -Service Center Renovation Pr M PI 8112JZ021 .12:98 PM Service Fees + 5.0 Set Up Buyout Savings Tracking Process with GC 6.0 7,0 8.0 Set Up the Allowances & Fumishings/Equipment Budget Tracking System Review Project Controls Systems with Team Project Controls Systems Training for Architect & Owner Team Subtotal; One Time Tasks - Set Up Project Controls & Information Management Systems 4,515 2.B Ongoing Project Control Services - Cost, Schedule Information Management 1.0 2.0 3.0 4.0 .1 .2 Ongoing Cast Management Ongoing Schedule Management Ongoing Information Management Meetings During Construction: Project Executive Senior Project Manager Monthly NIA .3 Project Manager 4X per Month A Assistant PM NIA 5.0 Review Project Status & Interview Team Members 6,0 7.0 8.0 Read Weekly Meeting Minutes & Status Logs Reporting to Owner Review Applications for Payment Monthly: 4X per Month .1 Note Compliance with the Contract and Standards of the Industry .2 Compare Scheduled/Completed Work vs. Amount Billed .3 Review Appropriateness of Contingency Reallocations .4 Validate Proper Documentation of Expenditures .5 Track Use of Allowances .6 Track Invoices for Furnishings & Equipment ./ .7 Confirm Buyout Savings Status ./ 9.0 Update Owner's Budget ./ 10.0 Maintain and Update Project Budget Tracking System 11.0 Publish Monthly Reports wExecutive Summary + Detailed Findings 12.0 Establish Schedule Tracking Procedures 13.0 Validate GC's Proposed Change Requests (up to a Max of 5.0% of GC's Contract Amount) (5.0% CO Max is Calculated on Contract without City's Owner's Contingency Line Included) 14.0 (Evaluating & Negotiating COs Above this 5.0% Amount Is An Additional Service) Validate Project Turnover, Start-up, Owner Move -in, and Closeout Procedures Services Duration = Current Project Contract Schedule; Extensions Calc'd at Monthly Rate Below Subtotal: Ongoing Project Control Services -Cost, Schedule & information Management 12 Months 6,996 per Month 83,948 2.0 City Stakeholder Management 12 Months 1,441 !MO 17,290 1.0 2.0 3.0 Provide Direct Interface with End-users and Other Stakeholders as Required Maintain a Single Point of Project Contact for the City Team Provide Briefings of Officials, Council, Boards, Commissions, & Ad-hoc Committees 4.0 Plan, Coordinate & Lead Project Update Meetings & Status Report Distribution for Above 5.0 Provide a Public Communication Plan for Neighborhoods & Community -wide Citizens %/ 6.0 7.0 Assist Staff in Coordination of Ground -breaking, Announcements & Press Conferences Coordinate Design, Approval & Placement of Project Signage V 7.0 Serve as the City's Point of Contact during Construction V/ 8.0 Conduct Construction Update Meetings at Construction Sites ./ Page 2 of 4 .62011 Pe kPragmmvaue.LLC AlMgMSRese d DocuSign Envelope ID: 69FO80AF-C7A4-4E7B-B68D-431C10EOEC6E r-.rty Ot %,0F1bu11La91L r-oiA 7425 - Task Order 09 - Exhibit B Updated 12 AUG 2021 Project Controls Scope of Services & Fees -Service Center Renovation P` an8112J20¢1a12:48PM Service Item # Description r3_1 2.D Quality Management 12 Months wlAbove 1.0 2.0 Coordinate Project Close Out, including Obtaining Final As -Built Plans from Contractor ✓ ✓ ✓ ./ Monitor Construction Progress 3.0 Advise the City of Any Observations of Non -Conforming Work or Other Quality Concerns 4.0 Manage the Geotechnical Investigations and Develop Contracts for Geotechnical Firms 5.0 Review Results from Geotechnical Investigations 6.0 Review Contractors Quality Control Plan 7.0 Provide Oversight of City's Quality Assurance Pian ./ ✓ 8.0 Review Submittals Prepared by the Contractor & Processed by the Design Team 9.0 Coordinate City Staff Review of Submittals Where Required 10.0 Coordinate City Vendors, to Include Security, Data, Telecom, & Move Management ./ 11.0 Coordinate Furnishings Installation (Furnishings Procurement by Others) ✓ 12.0 Coordinate City's Architect's Site Visits & Facilty`s Punchlist Distribution/Tracking ✓ 13.0 Monitor Contractors Completion of Punchlist Items & Architect's Confirmation of Same V 14.0 Coordinate City's Commissioning Consultant's Site Visits & Review Reports ✓ 15.0 Monitor Contractors Compliance wlCommissioning Consultant's Findings & Final Cx Report ✓ 16.0 Coordinate Turnover of Closeout Documention & Project Information Management System 17.0 Coordinate City's Architect's 11 Month Warranty Site Visit & Distribution Findings 2.E Support Services for Other City Project Management Responsibilities 12 Months wlAbove 1.0 Issue "Notices to Proceed" on Appropriate Phases ✓ Coordinate TAS Consultant's Site Visit(s) & Review TAS Consultant's Findings ✓ 2.0 Subtotal - Support Services for Other City Project Management Responsibilities 12 Months wlAbove Fees for Alternate One - Construction Services (w/o Reimbursable Expenses) (at City's Option) 105,753 raerzcrotws�miem Pan„z-nrmnswr �o,a-s..a�.o�p.-mo, rev o,ma�.amrta�numrao �scMx� Page 3 of x2021 Peak"m V.M.. LJ c M Rlgrt R --d AL Summary of Fees & Expenses r3_1 Basic Services - Preconstruction Only One Time + Ongoing Preconstruction Services (Assumes 15 Months) 96,521 3.3 Reimbursable Expenses for Preconstruction Services (Billed at Actual Cost; 15 Months) 10,718 Subtotal: Basic Services Only - Preconstruction 107,240 Basic Services - Construction Only 3.2 One Time + Ongoing Construction Services (Assumes 12 Months) 105,753 3.4 Reimbursable Expenses for Construction Services (Billed at Actual Cost; 12 Months) 8,575 Subtotal: Add Alternate One - Construction Services 114,327 6� � raerzcrotws�miem Pan„z-nrmnswr �o,a-s..a�.o�p.-mo, rev o,ma�.amrta�numrao �scMx� Page 3 of x2021 Peak"m V.M.. LJ c M Rlgrt R --d DocuSign Envelope ID: 69F080AF-C7A4-4E7B-B68D-431C10EOEC6E %,ny a L,U11Su1idfu rasa 7425 - Task Order 09 - Exhibit B Updated 12 AUG 2021 Project Controls Scope of Services & Fees - Service Center Renovation P.M d°n 6!1212021 A24 PFA Stem # 4.1 4.2 4.3 Description &E Safety Plan and Logistics Coordination Are Solely the Resonsibilty of the Contractor Quality Management of Materials & Installation Are Solely the Resonsibilty of the Contractor Consultant Will Be Performing Qrsite Observations, not Continuous or Exhaustive Inspections fees + Expenses Excluded Excluded Excluded 4.4 4.5 Consultant Will Not be Held Responsible for Contractor's or Vendor's Nonconforming Work Consultant is Not Responsible for Architect's or Contractor's Failure to Perform Excluded Excluded 4.6 Fees for for Architect's or Contractor's Failure to Perform, or Project Delays are Add Services Excluded 4:7 Design, Procurement, and Delivery of Furnishings is by Others Excluded 4.8 Design, Procurement, and Delivery of Security, Data, Telecom Equipment is by Others Excluded 4.9 Services. Not Checked in Sections Above (Even if Included In PSA Exhibit A) Are Excluded Excluded Page 4of4®2o21P..kPrag—VA.,LLC All Rght.�.a—d DocuSign Envelope ID: 69FO80AF-C7A4-4E7B-B68D-431C10EOEC6E I c r�uv c.vG I i We are her now. Facilities site Staff Collaborates ► Assessment w/Stakeholders City Stakeholder Staff identify Project Needs 11 / Facility \ Opens; Capture Lessons Learned / Staff Training; Project Clean & Start -Up I Construction /City Council Approval to Proceed with Phase V -,- Facilities U Staff Initiates Project Analysis I Stakeholder Fills ► Out Project Charter Consultant Report Preparation Facilities Assessment Assumes Construction Complete on 01 OCT 2023 FF&E Installation FF&E Procurement Updated 06 JUL 2021 CoUs PSA # 7425 - Task Order # 09 Exhibit C - Project Schedule Initial Scope Identification / Staff \ Review & Approval to Proceed with \Phase IV Prioritize Scope Procure Designer 1 Engineer Order of Magnitude Budget & Rough Schedule DSWF — Solid Waste Fleet Repair Facility Project Execution Plan IOCITY F DENTON Assumes Preconstruction Complete on 01 OCT 2022 Budget Validation Procure & Reconciliation General wl Staff Contractor TEAMWORK DMDES THE EFFORT AND MLILTIPLIRS THE EFFFCT... - City Approval Gateways = Project Initiation = Preconstruction = Construction F - Progress Prepare Estimates & i� Stakeholder — Design • Input`s Documents Approval to Proceed with Phase IV Present Recommendations to Staff & Council /City Council\ Approval to Proceed with � Phase III - Conceptual Design & Cost Estimate Finalize \ Master Budget & Schedule wl Staff ! A Peak Program Value, LLC 0]Rl Peek Rmg VW,% LLC All rlghte mored DocuSign Enveiope ID: 69F080AF-C7A4-4E76-668D431C10EOEUE &A Peak Program Value, LLC - 4450 Arapahoe . Suite 100 - Boulder CO - 80303 • 303.503.1155 City & Consultant PSA 7425 - Task Order 10 Project Controls + City Support Services — Denton's Municipal Electric Campus Renovations Consultant's Project Scope; Services &f=ees; and Project Schedule This Task Order # 10 provides the authorization to proceed with project controls and City support services, under the terms and conditions of Professional Services Agreement # 7425, and as defined in the following attachments: Attachment A — Project Scope Attachment B — Services and Fees Attachment C — Project Schedule CITY OF DENTON, TEXAS OWNER Lt"M3132962M DocuSigned by:fl SARA HENSLEY, INTERIM CITY MANAGER ATTEST: ROSA RIOS, CITY SECRETARY --Doe Signed by: BY: RIO" Pa" C 8C5 1 493... PEAK PROGRAM VALUE, LLC "CONSULTANT" E Do Signed by: avis SVA4 m D9FFDCA63F-20468... BY: Chris Squadra, Its: Partner Page 1 of 1 DocuSign Envelope ID: 69FO80AF-C7A4-4E7B-668D-431C10EOEC6E CoD's PSA # 7425 - Task Order # 10 A& Exhibit A - Project Scope Peak Program Value, LLC City of Denton's Municipal Electric Campus Renovation Project - DMER Project Controls Kickoff Meeting Minutes 29 JUL 2021 @ 11:00 AM Admin. Conference RM - DME Campus @ 1659 Spenser Road, Denton, TX (Notes/Edits Added by PPV After Meeting for Task Order # 10 Project Scope Clarity) I. Attendees Marissa Barrett; Facilities Management Naulty; Assistant Terry GM — Denton Municipal Electric Chris Squadra; Project Controls Lead — PPV Gaila Barnett; Sr. Project Manager - PPV II. General Information 1. 10 -Year Staffing Projection 2. New Service Center Near DEC W. Side of Town (2026-2028 Completion) 3. Growth will be SW of City 4. Hunter Cole Ranch is a 20 Year Buildout (2050) 5. 250,000 is Expected City of Denton Population in 2050. Current Population is 130,000 Ill. Project Overview 1. DME Campus A. Administration & Energy Management Office (EMO) - Admin. 15 people - EMO Can't be shut down - EMO operational back up site available @ Denton Electric Center (DEC) B. Engineering & Systems Operation -Newest Building - Systems Operations Class IV Structure (Force 5 Tornado Proof) C. Field Operations -Maintenance of Power Distribution - 60 Lockers D. Transmission Engineering Dept. (TED) -IT & Safety - Prefab Building - Equipment Storage DocuSign Envelope ID; 69F080AF-C7A4-4E7B-668D-43lClCEOEG6E DMER Team Kick Off Meeting at DME Admin. Conference RM. on 29 JUL 2021 at 11:00 AM Page 2 of 2 IV. Budget: 1. $750,000 - $1M 2. Additional funding can be obtained V. VI. VII. Schedule: 29 JUL 2021 Kick Off Meeting Note Added for TO # 10: Reasonable Preconstruction Completion Target: 01 MAY 2022 Phase 1: Completion Target 01 11 IPJ -3022 Note Added for TO # 10: Reasonable Construction Completion Target: 01 DEC 2022 ✓ Phase 1.A Move Energy Management Office (EMO) Out of Admin Building (7 FTEs; 24 Hour EMO Staff to DEC; Balance to Their Home Offices) ✓ Phase 1.B Renovate Existing EMO Space for Admin Staff (13 FTEs) ✓ Phase 1.0 Move Admin Staff (Temporarily) to Newly Renovated, Existing EMO Space ✓ Phase 1.D Renovate Existing, Vacated Admin Space for Engineering Team ✓ Phase 1.E Move Engineering Team to Newly Renovated, Existing Admin Space ✓ Phase 1.F Move Admin Staff to Engineering Building (No Renovation Required) ✓ Phase Z.F Move EMO to Permanent EMO (Old Temp Admin) Renovated Space' Phase 2: Completion Target 01 JUN 2023 Renovation of North % of Field Operations Building Phase 3: Completion Target 01 JUN 2023 Renovation of Transmission Engineering Dept. (TED) Phase 4: Not in PPV Scope of Work Equipment Storage Phase 5: Not in PPV Scope of Work Warehouse Building Information Management Not Discussed Communication Plan Not Discussed VIII. Next Steps Completion Target TBD by City Completion Target TBD by City DocuSign Envelope ID: 69F080AF-C7A4-4E7B-B68D-431C10EGEC6E %.ny a a,VrrsuitanL rant 7425 - Task Order 10 - Exhibit B Updated 12 AUG 2021 Project Controls Scope of Services & Fees - Municipal Electric Renovation P.Wd- all =C21 d340 PM Service (tem # Description Included (if Checked) Fees + Expenses 1.0 Basic Services - Preconstruction Included (If Checked) 1.0 1.A Goal -setting, Scheduling & Information Management 2.0 wlFees Below 1.0 Project Goals & Implementation Planning Public Private Parinership Ideas Not Applicable 1 2.0 3.0 Communication & Information Management Plan I/ 4.0 Conceptual Master. Project Schedule ,/ .4 5.0 Conceptual Construction Phasing Plan .5 Contingency Use Log(s) 6.0 Detailed Master Project Schedule Commitments vs. Budget .7 Payments vs. Commitments 1.6 Cost Management wlFees Below 1.0 Programmatic Construction Cost Estimate - One Scheme Programmatic Construction Cost Estimate -Additional Schemes (Each) Not Applicable Not Applicable 2.0 3.0 Owner's Development Budget Validation 4;0 Conceptual Design Construction Cost Estimate - One Scheme 5.0 Conceptual Design Construction Cost Estimate - Additional Schemes (Each) 6.0 Cash Flow Prediction 7.0 50% Schematic Design Construction Cost Estimate (Assumes Single Scheme) V 8.0 100% Schematic Design Construction Cost Estimate (Assumes Single Scheme) V 9.0 Validation of GC's Initial Construction Cost Estimate I/ 10.0 50% Design Development Construction Cost Estimate (Assumes Single Scheme) V 11.0 GC's Estimate Validation at 100% Design Development Validation of the GC's Proposed Final Guaranteed Maximum Price (GMP) Value Engineering, Life Cycle Cost Analysis and Evaluation of New Alternatives V 12.0 13.0 14.0 Coordination of Fumishings, Fixtures & Equipment (FF&E), IT, AV and Security Budgets 1.0 Best Value Procurement Processes One Time Tasks - Preconstruction 1.0 41,755 1.0 'Owner -friendly" Design Team Selection Strategies Design Team Selection Assistance 2.0 3.0 `Owner -friendly' Contracting Team Selection Strategies Contracting Team Selection Assistance Contractor/Sub Prequals, Solicitation, Bid Analysis & Award Recommendation Validation 4.0 6.0 1.0 tangoing Preconstruction Services - 01 SEP 2021 to 01 OCT 2022 8 Months 4,556 per Month 36,448 1.0 Interactive Work Sessions and Meetings Required for Basic Preconstruction Services Services Duration = Current Project Contract Schedule; Extensions Called at Monthly Rate Total Fees for Basic Services - Preconstruction (w/o Reimbursable Expenses) 78,203 2.0 Alternate 01- Construction Services (at the Option of the City) Included (if Checked) 2.A One Time Tasks - Set Up Project Controls & Information Management Systems Concurrent w12.13 Below 1.0 Cost Management Options Review Schedule Management Options Review Information Management Options Review Completed Completed Completed 2.0 3.0 4.0 Set Up the Chosen Systems, Processes & Tools for Tracking: 1 Budgets Against Commitments .2 Proposed Change Orders .3 Pending Commitments r/ .4 GC, Design Team, and Consultant Contract Changes .5 Contingency Use Log(s) ,/ .6 Commitments vs. Budget .7 Payments vs. Commitments Page 1 of 02821P -k P, g- V.N.,LLC Ail wahUR--d DocuSign Envelope ID:69F080AF-C7A4-4E7B-B68D-431 C10EOEC6E 1,1Ly a �,unsunant ram 7425 -Task Order 10 - Exhibit B Updated 12 AUG 2021 Project Controls Scope of Services & Fees -Municipal Electric Renovation PMWd ort 81272021 at3AO P.J ServiceAL Fees + Expenses 5.Q Bet Up Buyout Savings Tracking Process with GC 6.0 Set Up the Allowances & Furnishings/Equipment Budget Tracking System Review Project Controls Systems with Team Project Controls Systems Training for Architect & Owner Team 7.0 8.0 Subtotal: One Time Tasks - Set Up Project Controls & Information Management Systems 4,515 2.B Ongoing Project Control Services - Cost, Schedule & Information Management 1.0 2.0 Ongoing Cost Management Ongoing Schedule Management 3.0 Ongoing Information Management ./ 4.0 Meetings During Construction: .1 Project Executive Monthly .2 Senior Project Manager NIA .3 Project Manager Assistant PM i 4X per Month NIA ,4 5.0 Review Project Status & Interview Team Members Read Weekly Meeting Minutes & Status Logs ./ 6.0 7.0 Reporting to Owner 4X per Month 8.0 Review Applications for Payment Monthly: .1 Note Compliance with the Contract and Standards of the Industry ./ .2 Compare Scheduled/Completed Work vs. Amount Billed .3 Review Appropriateness of Contingency Reallocations V .4 Validate Proper Documentation of Expenditures .5 Track Use of Allowances .6 Track Invoices for Furnishings & Equipment .7 Confirm Buyout Savings Status 9.0 Update Owner's Budget 10,0 Maintain and Update Project Budget Tracking System 11.0 Publish Monthly Reports wExecutive Summary + Detailed Findings 12.0 Establish Schedule Tracking Procedures 13.0 Validate GC's Proposed Change Requests (up to a Max of 5.0% of GC's Contract Amount) (5.0% CO Max is Calculated on Contract without City's Owner's Contingency Line Included) (Evaluating & Negotiating COs Above this 5.0% Amount Is An Additional Service) Validate Project Turnover, Start-up, Owner Move -in, and Closeout Procedures Services Duration = Current Project Contract Schedule; Extensions Calc at Monthly Rate Below 14,0 Subtotal: Ongoing Project Control Services - Cost, Schedule & Information Management 25 Months 5,367 per Month 134,173 2.0 City Stakeholder Management 25 Months 1,443 1MO 36,076 1.0 Provide Direct Interface with End-users and Other Stakeholders as Required Maintain a Single Point of Project Contact for the City Team 2,0 3.0 Provide Briefings of Officials, Council, Boards, Commissions, & Ad-hoc Committees 4.0 Plan, Coordinate & Lead Project Update Meetings & Status Report Distribution for Above Provide a Public Communication Plan for Neighborhoods & Community -wide Citizens 5.0 6.0 Assist Staff in Coordination of Ground -breaking, Announcements & Press Conferences Coordinate Design, Approval & Placement of Project Signage 7.0 7.0 Serve as the City's Point of Contact during Construction 8.0 Conduct Construction Update Meetings at Construction Sites arucxwwv,y,em,,,,evsn-..a-ianmoc,gu r�,B-Su�we. cerm»»r. rsEv o,mv .cowmueanmceo isr,.xa� Page 2of4 02021 P -k PM- Valve, LLC AA Rights Reserved DocuSign Envelope ID: 69FO80AF-C7A4-4E7B-B68D-431C10EOEC6E LAty o< < 0111SU MIL rock 7425 -Task Order 10 - Exhibit B Updated 12 AUG 2021 Project Controls Scope of Services & Fees - Municipal Electric Renovation PftW. 8112n°21 at3[40PM Service # Description Quality Management Fees + Expenses 2.113 25 Months wlAhove 1.0 Coordinate Project Close Out, including Obtaining Final As -Built Plans from Contractor 2.0 Monitor Construction Progress 3.0 Advise the City of Any Observations of Non -Conforming Work or Other Quality Concems ✓ 4.0 Manage the Geotechnical Investigations and Develop Contracts for Geotechnical Firms 5.0 Review Results from Geotechnical Investigations ✓ 6.0 Review Contractor's Quality Control Plan f 7,0 Provide Oversight of City's Quality Assurance Plan 8.0 Review Submittals Prepared by the Contractor & Processed by the Design Team ✓ 9.0 Coordinate City Staff Review of Submittals Where Required ✓ 10.0 Coordinate City Vendors, to Include Security, Data, Telecom, & Move Management 11.0 Coordinate Furnishings Installation (Furnishings Procurement by Others) 12.0 Coordinate City's Architect's Site Visits & Facilty's Punchlist DistributionlTracking 13.0 Monitor Contractors Completion of Punchlist Items & Architecus Confirmation of Same 14.0 Coordinate City's Commissioning Consultant's Site Visits & Review Reports ✓ 15.0 Monitor Contractor's Compliance wlCommissioning Consultant's Findings & Final Cx Report 16.0 Coordinate Turnover of Closeout Documention & Project Information Management System 17.0 Coordinate City s Architect's 11 Month Warranty Site Visit & Distribution Findings ✓ 2.E Support Services for Other City Project Management Responsibilities 25 Months wlAbove 1.0 Issue "Notices to Proceed" on Appropriate Phases ✓ Coordinate TAS Consultant's Site Visit(s) & Review TAS Consultant's Findings ✓ 2.0 Subtotal - Support Services for Other City Project Management Responsibilities 25 Months wlAbove Fees for Alternate One - Construction Services (w/o Reimbursable Expenses) (at City's Option) 174,764 AW Summary of Fees & Expenses Basic Services - Preconstruction Only 3.1 One Time + Ongoing Preconstruction Services (Assumes 8 Months) 78,203 3.3 Reimbursable Expenses for Preconstruction Services (Billed at Actual Cost; 8 Months) 5,716 Subtotal: Basic Services Only- Preconstruction 83,920 Basic Services -Construction Only 3.2 One Time +.Ongoing Construction Services (Assumes 25 Months) 174,764 3.4 Reimbursable Expenses for Construction Services (Billed at Actual Cost; 25 Months) 1Subtotal: 12,505 Add Alternate One - Construction Services 187,269 6m W_ Page 3of4 a2021P-kP�—vaua.LLC All wgm R --d DocuSign Envelope ID: 69FO80AF-C7A4-4E7B-B68D431C10EOEC6E %,ny a %evnaunanll. ra A 7425 - Task Order 10 - Exhibit B Project Controls Scope of Services & Fees - Municipal Electric Renovation Updated 12 AUG 2021 Purled on 9/11/2014 at 340 PM Service Desaintion Fees + Item # Expenses ask Order Clarifications & Exclusions 4.1 Safety Plan and Logistics Coordination Are Solely the Resonsibilty of the Contractor Excluded 4.2 Quality Management of Materials & Installation Are Solely the Resonsibilty of the Contractor Excluded 4.3 Consultant Will Be Performing Onsite Observations, not Continuous or Exhaustive Inspections Excluded 4.4 Consultant Will Not be Held Responsible for Contractor's or Vendor's Nonconforming Work Excluded 4.5 Consultant is Not Responsible for Architect's or Contractors Failure to Perform Excluded 4.6 Fees for for Architect's or Contractor's Failure to Perform, or Project Delays are Add Services Excluded 4.7 Design, Procurement, and Delivery of Furnishings is by Others Excluded 4.8 Design, Procurement, and Delivery of Security, Data, Telecom Equipment is by Others Excluded 4.9 Services Not Checked in Sections Above (Even if Included In PSA Exhibit A) Are Excluded Excluded Page 4 of 4 ®2021 Peal, Program van,, LLC All Rights Reserved DocuSign Envelope ID: 69FO80AF-C7A4-4E7B-B68D-431C10EOEC6E City Stakeholder Staff Identify Project Needs Facility Opens; Capture Lessons \ Learned / Facilities Site Staff Collaborates ► Assessment w/Stakeholders l Facilities / Consultant Staff Initiates 0- Report Project Analysis \ Preparation CoUs PSA # 7425 - Task Order # 10 Prioritize Exhibit C - Project Schedule Scope Initial Scope Identification Staff Review & Procure Approval to Designer 1 Proceed with Engineer Phase I Stakeholder Fills Facilities DECK —Electrical Center Renovation Staff Training; Project Clean & FF&E Installation Start -Up Out Project Assessment Charter 12 AUG 2021 We are here now. Assumes Construction Complete err 0 i .lU�I 2023 Order of I Magnitude Budgets & Rough Schedule Construction /City Council Approval to Proceed with Phase V Project Execution Plan Procurement 4OF TY DENTON Assumes Preconstruction Complete on 01 MAY 2022 Budget Validation — & Reconciliation wl Staff TEAMWORK DIVIDES THE EFFORT AND MULTIPLIES THE EFFECT.:. Progress Procure Estimates & / Prepare General Stakeholder Design Contractor Input Documents Present Recommendations to Staff & Council Approval to Proceed with -,, Phase III - Conceptual Design & Cost i Estimate Finalize Master Budget & Schedule w/ Staff �Cty Council Approval to Proceed with Phase IVB Peak Program Value, LLC L620 Peak Program Volae, LLC All dghls reserved City Approval Gateways = Project Initiation = Preconstruction = Construction Progress Procure Estimates & / Prepare General Stakeholder Design Contractor Input Documents Present Recommendations to Staff & Council Approval to Proceed with -,, Phase III - Conceptual Design & Cost i Estimate Finalize Master Budget & Schedule w/ Staff �Cty Council Approval to Proceed with Phase IVB Peak Program Value, LLC L620 Peak Program Volae, LLC All dghls reserved