Loading...
22-2313ORDiNANCE NO. 22-23 13 AN ORDINANCE OF THE CITY OF DENTON, A TEXAS HOME-RULE MUNICIPALCORPORATION, AUTHORiZING THE CITY MANAGER TO EXECUTE TWOGUARANTEED MAXIMUM PRICE (GMP) AMENDMENTS TO THE CONSTRUCTIONMANAGER AT RISK CONTRACT WITH CORE CONSTRUCTION SERVICES OF TEXAS,INC., AMENDING THE CONTRACT APPROVED BY THE CITY COUNCIL ON JUNE 28.2022, IN THE NOT-TO-EXCEED AMOUNT OF $25,000.00; SAID GMP AMENDMENTSFOR CONSTRUCTION SERVICES FOR FIRE STATION NO. 9 FOR THE FACILITIES MANAGEMENT DEPARTMENT; PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFOR; AND PROVIDING AN EFFECTIVE DATE (RFQ 7967 – CMAR GUARANTEEDMAXIMUM PRICE AMENDMENTS AWARDED TO CORE CONSTRUCTION SERVICES OF TEXAS, INC, IN THE FIRST GMP AMENDMENT AMOUNT OF $4,550,786.00 AND THE SECOND GMP AMENDMENT AMOUNT OF $7,503,562 FOR A TOTAL NOT-TO-EXCEEDAMOUNT TO $ 12,079,348.00) WHEREAS, the City of Denton has engaged in a two-step solicitation for the construction of Fire Station No. 9; and WHEREAS, CORE Construction Services of Texas, Inc. was selected as the most qualified firm to provide construction manager at risk (“CMAFC’) services for the construction of Fire Station No. 9, and on June 28, 2022, the City Council approved the CMAR agreement with CORE Construction Services of Texas, Inc., and funded preconstruction services in the not-to-exceed amount of $25,000.00 (Ordinance 22-1290); and WHEREAS, CORE Construction Services of Texas, Inc. and the City, in accordance with the requirements of the CMAR agreement, solicited, received, and tabulated competitive bids and proposals for the CMAR agreement in accordance with the procedures of state laws and city ordinances, and rejected and re-solicited certain bids and proposals. The City Council ratifies and approves any such rejections and finds that the bids and proposals included in the Guaranteed Maximum Price Amendment are the lowest responsible bids, provide the best value, and are in the best interest of the City; and WHEREAS, the City Council desires to establish a not-to-exceed amount of $ 12,079,348.00 for the construction of Fire Station No. 9; and WHEREAS, upon full review of all matters attendant and related thereto, the City Council is of the opinion that the City Manager, or their designee, should be authorized to execute aGuaranteed Maximum Price Amendment with CORE Construction Services of Texas, Inc., for a Guaranteed Maximum Price that will not exceed $12,079,348.00.00 for the renovation of the construction of Fire Station No. 9; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. The recitals contained in the preamble of this ordinance are true and correct and are incorporated herewith as part of this ordinance. SECTION 2, A not-to-exceed amount of $12,079,348.00 for the renovation of the construction of Fire Station No. 9 has been established and reviewed by the City Council and found to be in the best interest of the City of Denton and its citizens, and is in all things approved. SECTION 3. The City Manager, or their designee, is authorized to execute a Guaranteed Maximum Price Amendments, attached hereto and incorporated herein, to the CMAR agreement previously approved by City Council on June 28, 2022 under Ordinance No. 22-1290, and all other necessary and related documents after the same have been reviewed and approved by the City Attorney, or their designee, with CORE Construction Services of Texas, Inc., for the construction ofFire Station No. 9 with a CMAR Guaranteed Maximum Price that will not exceed $ 12,079,348.00. SECTION 4. This ordinance shall become effective immediately upon its passage and approval. Th, m,ti,„ t, ,pp„„, thi, „di„,„„ w„ m,d, by (~J',As L\As and ,econded by kzxj~&4h C+v(££ P&ck© . This ordinance was passed and approved by the following vote q[al Aye/r rV‘ K‘ y/ IZ Nay Abstain Absent Gerard Hudspeth, Mayor:Vicki Byrd, District 1 :Brian Beck. District 2 : Jesse Davis, District 3 : Alison Maguire, District 4:Brandon Chase McGee,At Large Place 5 : Chris Watts, At Large Place 6: PASSED AND APPROVED thi, th, \ Sb d,y ,f NJavevr\\Ipr–2022 GERARD HUDSPETH, MAYOR ATTEST: ROSA RIOS, CITY SECRETARY b\\\11111111, ran– P+22;, J APPROVED AS TO LEGAL FORM: MACK REINWAND, CITY ATTORNEY BY: _ blILV(tUI\ Digitally signed by Marcella Lunn DN: cn=Marcella Lunn, o, ou=CityaNL:I on.com, c=USDate: 2022.11.01 17:35:1 S <)5'00' DocuSign Envelope ID: 2B77208A-B5754C6D-884D-6CA7BC8DAC2F DENTON Docusign City Council Transmittal Coversheet 7967RFP File Name FS 9, GMP Amendment 1 Purchasing Contact ChrIsta Chri stian City Council Target Date NOVEMBER 15’ 2022 Piggy Back Option NQ Contract Expiration Ordinance N/A 22-2313 DocuSign Envelope ID: 2B77208A-B57H+C6D-884D4CA7BC8DAC2F @AIA Document A133"2019 Exhibit A.1 Guaranteed Maximum Price Amendment This Amendment dated the day of in the year Two Thousand Twenty-Two , is incorporated into the accompanying AIA Document A133TM–2019, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed MaximumPrice dated the Twenty-Eighth day of June in the year Two Thousand Twenty-Two (the "Agreement") (in words, indicate day, month, and year.)This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. for the following Work, which is a portion of the PROJECT: (Name and address or location) City of Denton’s Fire Station No. 09 GMP Amendment #01 – Site and Long Lead Items 5000 Airport RdDenton_ Texas 76207 AIA Document A20 1 TM–2017, General Conditions of the Contract for Construction. is adopted in this document byreference. Do not use with other general conditions unless this document is modified. THE OWNER: (Name, legal status, and address) City of Denton 215 East McKinney StreetDenton_ Texas 76201 (940) 349-8307 THE CONSTRUCTION MANAGER: (Name, legal status, and address) CORE Construction Services of Texas, Inc6320 Research Road r TABLE OF ARTICLES A.1 GUARANTEED MAXIMUM PRICE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION A.3 INFORMATION UPON WHICH AMENDMENT IS BASED A.4 CONSTRUCTION MANAGER’S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS ARTICLE A.I GUARANTEED MAXIMUM PRICE SA.1.1 Guaranteed Maximum Price Pursuant to Section 3.2.6 2.2.6 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price. GuaranteedMaximum Price for the scope of Work set forth in Exhibit "A. 1.C" – Scope of the Work –GMP Amendment #01. All references in this Exhibit "A" to the Guaranteed Maximum Price shall mean and refer to the Guaranteed Maximum Price for the entire scope of Work set forth in Exhibit "A. 1.C" – Scope of the Work – GMP Amendment #01, unless the context Init. / AIA Document A133w - 2019 ExhibIt A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “AmericanInstitute of Architects," -AIA,” the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document wasproduced by AIA software at 12:56:08 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for onetime useonjy, and may onjy be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia,org.User Notes: p79772203) 1 DocuSign Envelope ID: 2B77208A-B575'+C6D-884D-6CA7BC8DAC2F clearly indicates otherwise. As agreed by the Owner and Construction Manager, the Guaranteed Maximum Price is an amount that the Contract Sum for the scope of Work set forth in Exhibit " A. I.C" – Scope of the Work – GMP Amendment #01 shall not exceed. The Contract Sum consists of the Construction Manager’s Fee plus the Cost of the Work, as thatterm is defined in Article 6 of the Agreement. SA.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed four million five hundred fiftythousand seven hundred eighty-six dollars and zero cents ($ 4,550,786.00 ), subject to additions and deductions byChange Order as provided in the Contract Documents. SA.1.1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories, including allowances; categories; the Construction Manager’s contingency; alternates; Contingency; the Owner’s Contingency; the Construction Manager’s Fee; and other items that comprise the Guaranteed Maximum Price as defined in Section 3.2.1 of the Agreement. (Provide itemized statement below or reference an attachment.) I See Exhibit "A. I.N" – Itemized Statement of the GMP and Clarifications SA.1.1 .3 The Construction Manager’s Fee is set forth in converted to and fixed as a lump sum in accordance with Section 6. 1.2 of the Agreement. SA.1.1 .4 The method of adjustment of the Construction Manager’s Fee for changes in the Work is set forth in Section 6.1.3 Sections 6.1.2.1 6.1.2.3 of the Agreement. SA.1.1.5 Alternates SA.1 .1.5.1 Alternates, if any, included in the Guaranteed Maximum Price: Item See Exhibit "A. 1.J" – Alternates with Costs and Expiration Dates Price SA.1.1.5.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner followingexecution of this Exhibit A. Upon acceptance, the Owner shall issue a Modification to the Agreement. (Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.) Item See Exhibit "A. 1.J" – Alternates with Costs and Expiration Dates Price Conditions for Acceptance SA.1.1.6 Unit prices, if any: (Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.) Item See Exhibit "A. 1.K" – Unit Costs Units and Limitations Price per Unit ($0.00) ARTICLE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION SA.2.1 The date of commencement of the Work shall be:(Check one of the following boxes .) [XJ [] The date of execution of this Amendment. Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) If a date of commencement of the Work is not selected, then the date of commencement shall be the date of execution ofthis Amendment Init. / AIA Document A133’- – 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “AmericanInstitute of Architects,” “AIA,- the AIA Logo, and “AIA Contract Documents'’ are registered trademarks and may not be used without permission. This document wasproduced by AIA software at 12:56:08 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.User Notes: p79772203) 2 DocuSign Envelope ID: 2B77208A-B5754C6D-884D4CA7BC8DAC2F SA.2.2 Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allotted in the Contract Documents for Substantial Completion of the Work. The Contract Time shall be measured from the date ofcommencement of the Work. SA.2.3 Substantial Completion SA.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Construction Managershall achieve Substantial Completion of the entire Work:Work by the date set forth in: (Check one of the following boxes and complete the necessary information.) [ ] Not later than ( ) calendar days from the date of commencement of the Work. [ ] By the following date: Exhibit " A. 1.D" – Construction Manager’s Project Schedule. Completion of such portions by the follow'ing dates: If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated damages, if any, shall be assessed as set forth in Section 8.6 of the General Conditions of the Agreement.Portion of Work Substantial Completion Date damages, if any, ohall be assessed as set forth in Section 6.1.6 of the Agreement. ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED SA.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract Documents and the following: SA.3.1.1 The following Supplementary and other Conditions of the Contract: AIA A20 1 – General Conditions (2017) as amended and included in the original AIA A 133 – O-CMaR Agreement, which shall remain unchanged by this Amendment. Document Title Date Pages SA.3.1.2 The following Specifications: (Either hst the SpecifIcations here, or refer to an exhibit attached to this Amendment.) I See Exhibit "A.I,C" – Scope of the Work – GMP Amendment #01 Section Title Date Pages SA.3.1.3 The following Drawings: (Either list the Drawings here, or refer to an eIhibit attached to this Amendment.) See Exhibit '’A.I.C" – Scope of the Work – GMP Amendment #01 Number Title Date SA.3.1.4 The Sustainability Plan, if any: (if the Owner identifIed a Sustainable Objective in the Owner’s Criteria, identify the document or documents that comprise the Sustainability Plan by title, date and number of pages, and include other identifying information. The Sustainability Plan identifIes and describes the Sustainable Objective; the targeted Sustainable Measures, Init. / AIA Document A133n - 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “AmericanInstitute of Architects," “AIA,” the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document wasproduced by An software at 12:56:08 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time useonly, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.User Notes: p79772203) 3 DocuSign Envelope ID: 2B77208A-B575d+C6D-884D-6CA7BC8DAC2F implementation strategies selected to achieve the Sustainable Measures; the Owner’s and Constnrction Manager’s roles and responsibilities associated with achieving the Sustainable Measures ; the specifIC details about design reviews, testing or metrics to verify achievement of each Sustainable Measure; and the Sustainability Documentation required for theProject, as those terms are de$ned in Exhibit C to the Agreement.) Title Not Applicable Date Pages Other identifying information: SA.3.1 .5 Allowances, if any, included in the Guaranteed Maximum Price: (Identify each allowance.) I I Item See Exhibit "A. 1.L" – Allowances Price SA.3.1.6 Assumptions and clarifications, if any, upon which the Guaranteed Maximum Price is based:(Identify each assumption and clarifIcation.) See Exhibit " A. I.N" – Itemized Statement of the GMP and Clarifications SA.3.1 .7 The Guaranteed Maximum Price is based upon the following other documents and information: (List any other documents or information here, or refer to an exhibit attached to this Amendment.) Exhibit " A. 1 " – Guaranteed Maximum Price Amendment Exhibit "A. 1.B" – Insurance and Bonds – GMP Amendment #01 Exhibit "A. I.C" – Scope of the Work – GMP Amendment #O 1 Exhibit "A. 1.D" – Construction Manager’s Project ScheduleExhibit "A. 1.E" – Construction Manager’s Soft Costs and Fee Exhibit "A. 1.F" – Key PersonnelExhibit "A. 1.G" – Confidentiality of the Project Exhibit "A. 1.H" – Customary and Usual Labor RatesExhibit "A.I.I" – Rental Rates Exhibit "A. 1.J" – Alternates with Costs and Expiration DatesExhibit "A. 1.K" – Unit Costs Exhibit "A.I.L" – Allowances Exhibit "A. 1.M" – Schedule of Values – GMP Amendment #01 Exhibit "A. I.N" – Itemized Statement of the GMP and Clarifications Exhibit "A. 1.O" – Escrow and Financing Conditions Exhibit "A. 1.P" – Disputed Work ScheduleExhibit "A. 1.Z" – Schedule of Exhibits I ARTICLE A.4 CONSTRUCTION MANAGER’S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, ANDSUPPLIERS SA.4.1 The Construction Manager shall retain the consultants, contractors, design professionals, and suppliers, as may (ormay not) be identified in the Exhibit referenced below: (List name, discipline, address, and other information.) See Exhibit " A. 1.N" – Itemized Statement of the GMP and Clarifications m WITNESS WHEREOF, intending to be bound, the Parties have entered into this Agreement as of the day and year first written above. OWNER (Signaflrrc)CONSTRUCTION MANAGER (Signature) Init. / AIA Document A133n - 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by nIe American Institute of Architects. All rights reserved. The “AmericanInstitute of Architects,” -AIA,- the AIA Logo, and “AIA Contract Documents" are registered trademarks and may not be used without permission. This document wasproduced by AIA software at 12:56:08 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time useonly, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations. e-mail copyright@aia.org.User Notes: p79772203) 4 DocuSign Envelope ID: 2B77208A-B57WtC6D-884D4CA7BC8DAC2F &title)(Printed name and title) Init. / AIA Document A133n - 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “AmericanInstitute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents" are registered trademarks and may not be used without permission. This document wasproduced by AIA software at 12:56:08 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time useonly, and may only be used in accordance with the AIA Contract Dacuments® Terms of Service. To report copyright violations, e-mail copyright@aia.orgUser Notes: p79772203) 5 DocuSign Envelope ID: 2B77208A-B575-+C6D-884D-6CA7BC8DAC2F THIS AGREEMENT HAS BEEN BOTH CON/S_T_w£gm MANAGERREVIEWED AND APPROVED as to financial and operational obligations and busi_nea$ tI dh.,& iRiWTtW AUTHORIZED SIGNATURE Trevor Crain PRINTED NAME Date. Gary Aanenson Interim DI rector of Fac11ities Printed Name:Gary Aanenson TITLE Faci 11t1 es Management Title. Vice President DEPARTMENT 214-885 -1039 PHONE NUMBER garyaanenson@coreconstructi on . com EMAIL ADDRESS 2022 -949777 TEXAS ETHICS COMMISSIONATTEST:CERTIFICATE NUMBER ROS+U%e£JTY SECRETARY By; I RatARiofngc}AT81 B,; t "„„” („„":Z CITY OF DENTON, TEXAS A Texas Municipal Corporation APPROVED AS TO LEGAL FORM:'[>wuSigned by: SMA H&M££yM :LEYS.MACbRJkV:yAND, CITY ATTORNEY CITY MANAGER Init. / AIA Document A133'- - 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “AmericanInstitute of Architects,” -AIA,- the AIA Logo, and “AIA Contract Documents'’ are registered trademarks and may not be used without permission. This document wasproduced by AIA software at 12:56:08 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time useonly, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.User Notes: p79772203) 6 DocuSign Envelope ID: 2B77208A-B5754C6D-884D4CA7BC8DAC2F Certification of Document’s AuthenticityAIAS Document D401 TM – 2003 I, Chris Squadra, hereby certify, to the best of my knowledge, information and belief, that I created the attached final document simultaneously with this certification at 12:56:08 ET on 10/21/2022 under Order No. 2114332942 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text ofAIA® Document A133TM – 2019 Exhibit A, Guaranteed Maximum Price Amendment, as published by the AIAin its software, other than changes shown in the attached final document by underscoring added text and striking overdeleted text -DocuSigned br / CJLyjs SVMZra (SigneD Chris Squadra, Peak Program va1 ue, LLC (Title) 10/31/2022 (Dated) AIA Document D401 TH - 2003. Copyright © 1992 and 2003 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,"AIA," the AIA Logo, and “AIA Contract Documents'’ are registered trademarks and may not be used without permission. This document was produced by AIAsoftware at 12:56:08 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time use only. and may onlybe used in accordance with the AIA Contract Dacuments® Terms of Service. To report copyright violations, e-mail copyright@aia.orgUser Notes: O79772203) 1 DocuSign Envelope ID: 2B77208A-B575-+C6D-884D-6CA7BC8DAC2F Exhibit A.1.B - Insurance and Bonds To be sent after GMP Amendment is signed. D'”uSig'1 EIwel')pe ID: 2B77208A-B5754C6D-884D-6CA=,?,8,P,e,e21,. , .C - Scope of Work CPRE ENUMERATION OF DOCUMENTS City of Denton Fire Station No.9 GMP 1 August 26, 2022 Description Not Used PROJECT MANUAL e S Fine D -(m(o a oIT:6To a D Not UsedD m 05gliliIIMel Joists e I led Shear 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22mun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 29-Jun-22BaIn-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22791n-22 29-Jun-22==un-22 29-Jun-22 29-Jun-22 -B-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22T:Fun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 a)-Jun-22 NONE NONE NONE NONE moM NONE NONE NONE NONE NONE NONE NONE NONE 05 31 13lStuds D SITES Not Used D ROTECTIONiiiTHWarT;niiimai 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22:mun-22 28-Jun-22 29-Jun-22 29-Jun-22 -2TJu n-22 29-Jun-22 29-Jun-22 29-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 NONE NONE NONE NONE NONE NONE DIVISIONS 08 - 091 Not Used S T)–mTr 28-Jun-22 28-Jun-22 28-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 30-Jun-22 30-Jun-22 -3mu n-22 NONE NONE NONE DIVISIONS 11 - 131 Not UsedD 28-Jun-22Ii;i=r -22 29-Jun-22 29-Jun-22 30-Jun-22 30-Jun-22 NONE NONE 14 24 oo1 Machine Room-Less Hydraulic Passen I Not Used D e D ar 26 05 o o mmemFi=IEmmso e 26mr I Not Used D {i3mma=mo e a 31 14 00e c g 31 armga;l=iin2l][Fm;mr ler Elevators 28-Jun-22 28-Jun-22B:1Tr -22 28-Jun-22 28-Jun-22 -28-Jun-22 28-Jun-22-2mun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22mun-22 28-Jun-22-Mun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22:8-Jun-22 28-Jun-22 28-Jun-22r 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Ju M 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22mLTl:ii 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 30-Jun-22 NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE Page 1 of 3 Dcy-Sig- E-"eIQpe ID: 2B772C)8A-B5754C6D-884D-6CA7n?:nfl. , .C - Scope of Work CPRE ENUMERATION OF DOCUMENTS City of Denton Fire Station No.9 GMP 1 August 26, 2022 cation/ Drawing Spec Date Stamp Date : a] r BIng e I nTmzTgiFSiIa e a D o Fl8BJ:1'Ii,Ha 28-Jun-22 28 JH -2-F-JF2-i 28-Jun-22 28-Jar :Eii:ml i 28-Jun-22 29-Jun–22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 29-Jun-22 fC)RF Rnrai IInd nato Pas/iciAn3(5m 30-Jun-22 30-Jun-2: 3Ciljnl 30-Jun-2230-Ju;== 30-T:Fr:a 30-Jun-22 KM NONE NONE NONE NONE NONE NONE NONE DIVISIONS 34 - 481 Not Used 28-Jun-22 DRAWINGS 29-Jun-22 30-Jun-22 NONE =! IHRIRI-1I= PP HH= H=• H -F 1EEE I LE +I+ mIlin C1 .01 C1 .02 C1 .03 C1 .04 C1 .05 C1 .06 C1 .07 C1 .08 C1 .09 C1.10 C1.11 C1.12 C1.13 C1.14 C1.15 C1.16 C1.17 C1.18 C1.19 C1 .20 C2.01 C2.02 C2.03 C2.04 C2.05 C2.06 C2.07 C2.08 C2.09 C2.10 C2.11 C2.12 C2.13 C2.14 C2.15 C2.16 C2.17 C2.18 C2.19 C2.20 C2.21 C2.22 C2.23 IW24] @ M3General Notes General Notes 2 Site Plan Demolition Plan Dimension ControT-pma ' Overall Grading Plan Grading Plan Grading Plan 2mi;;-pliT Grading Plan 4 Water Plan Water Profile Sanitary Sewer Plan Sanitary Sewer Profile W Drainage Area Map Drainage Area MaIStorm SewTr-FBI Storm Sewer Profiles Sediment CoTiRma Sediment Control Notes SidewnifaR1Pavingm- Signage & Striping Details Embedment Details Storm Sew;rBa SedirrFeFl-at City Details City Details City Details City Details City Details City Details City Detailsmy Details City Details City Details City Details City Details City Details City Details City Details City Details City Details City Details 28-Jun–2228-Jun-27 28-Jun-2228-Jun-Z 28-Jun-22 28-Jun-27 28-Jun-22 28-Jun-2: 28-Jun-2228-_! 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-Z 28-Jun-22 28-Jun-22 28-Jun-2228-Jun 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-==1 = 28-Jun-22 28-Jun -22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 MML 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-2228-Jnr -Z 28-Jun-22m== 28-Jun-22 28-Jun 3: 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-2228-Jun-Z 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-21 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-Z 28-Jun-22 28-J=1 E- 28-JiM 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-2228-Ju==D 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun -22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-2228-Jun-22 28-J=1 :Z 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-2g 28-Jun-22 28-Jun -22 28-Jun-22 28-Jun-22 I We NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE Page 2 of 3 D'”uSign EnveIQpe ID: 2B77208A-B575-+C6D-884D4CA7E9.?Pee.25.. , .C - Scope of Work CPRE ENUMERATION OF DOCUMENTS City of Denton Fire Station No.9GMP 1 August 26, 2022 cation Drawing Tsp„.,;Stamp DateiBn if aaa ]+F I-[F +-r :F M C2.26 S-101 A S-101 B S-102 S-103 S-l04S S-l05S S-1 1 1 S-121 S-131 S-301 S-310 S-401 S-501 S-502 S-503 S-511 S-512 S-520 A-141 A A-41 OA E-001 A E-lOOA E-501 A [@l©bEa4 B e Structural NoteS Structural Notes Special Inspections Perspectives Storm Shelter Structural Notes & Plans Storm Shelter Typical DetailsFoundation Plan=TinIan Low & High Roof Framing Plans Typical Concrete DetailsFoundation Details =m Details & Key Plan Typical Steel Details Typical Steel Details Typical Steel Details Second Floor Details Roof Details Ti;iia m and Details Roof Plan Stairs and Elevator Electrical Abbreviations & Legend Electrical SMPlan Electrical Riser Diagram 28-Ju @28-Jun-22 28-Jun-22 Ti-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22mun-22 28-Jun-22 28-Jun-22miT-2228-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 TdInLn-22 28-Jun-22 28-Jun-22 X-Jun-22 AE g 28-JM 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22:FiLl n-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 conF RPreived 1>atP RPvjqjnn HiaML 28-Jun-22B-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22!i:iTn-22 28-Jun-22:bTtrI-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 28-Jun-22 Mm NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE f: Page 3 of 3 a)a R IODr\la)dIin€; WE :L/)JC BL6RDalD qrS:}} q+!!\DHI'\qaaE rn!!inS 8E N N$ S$ S r\I\bq-i=. C0E hIeqtrI-S al 1: frIN'\InNaTCaE cr)fNaqbLn-laal3 frI +fbI\bLn-laa)B frIt-Ihi\lLO-3£b frIr\1 r\1\ CaE \Ln at frIr\I anQ NNfrIHIiTHI Q)3b r\1it{}aaE Nr\1 C0E \0-SHI alCNLT ==.,1a) =1- b &q < hI }\I\bpr Li a)3b LEaDjt;b-TuEnoB ngg gl: lg ::Cfj b-a bZ nIS!!10 g N NINk !!B !HI(1 T-1 aa3a1- NNiTahpIHIi al(Nq\ hi-\b t-Ial3I N;(,iq \ alIJ fbII.I }\I \ a)IJ r\I(1r\IIN \•-r ala1- NNaN ToeaE alhI a -qb_ata 0E N hIk= \T-1- a) hegg g Cbe j ) glaalLnq+ S10Db10 laLnHIN :+W3 ) ){ IE:;} }+ O ON N m SCDla10N } I}a UbtrifrI '> LIO O Oa m $la : :D D g\ : :B + A } { g g g g g b :D Dc' Q-9 di 1: 0 0 O O O Q 0 6 aalalEeu30 raIE0E0FI3aab [aa)aalCD EEe3 Ig B)a+2 aVlaa Q)SGBQC a)al9tXBQ) g=== L= allQJalaa alIBalgIQe LL ISgr)frI3E r) :A Ed<tk }r)d LII .b) ga !i C/) Ea)EQ)38a\I Li .IIaECD aELPa)aalga ldhEgUUac IEraaaa >JO3a)5a)ac aE CD Q,i aDE89 E58 abG $ g ga'=IE To92'=C) N E CDa) ELg)aahEa) >a8ac iE(qaa;iBa)5alcrHIaECD ng QhE(9albd8a iaC)>,G a)a gtIa)'aa 3LL FilaE CD fU >aalal < E -a baCqB 'San al T)ala) To3IUP ar 1I9ii g g 6 :al noC B0ac aalDOJq 'i Ca 'Sa gaC) alq aIQiC aala10Hi Fi a (:=t-J Z al:a)iigqT r1:<(tHE Egajh-FDEno lg aDalD VIlaDa) lg ;! a) : g0a ;1i0aa b toa)ea) CD E\lgC)Elac aon : al3laa)E EClaG)la3Ig8aJC3a)3 LL g g) & 8)A qt B < Ra8 :IfI rD g i g Ca ELE8BeP33LP) U Ig liaI3 EC03aE0(Jnc <EC) DOCa0 EE0C)aa a/ Ea) C# eQ) 8L == LEe9EaeLI laQ)a) Ig leQ)'=aa 0 aC30 eDe'C IE;)Cg a) >0E;)Cg aE103aaal F=laa) = tFl Ca TDlaC =a Q)Ear'\g3dU3a Ca'€3 triCaC) 1)iF)IEba3aac 4)J;IiT >E0rdE a)baJC ;B DocuSign Envelope ID: 2B77208A-B5754C6D-884D6CA7BC8DAC2FEX111Ult A' 1 -e - City of Denton'sConstruction Manager's Fire Station No. 9 Soft Costs and Fee Cost Proposal Detail Updated on August 30th, 2022 Exhibit C - Construction Manager's Soft Costs and Fee Item # 1 Description I Quantity 1 Unit 1 Unit Cost 2.000 FS # 3 - CMAR's Proposa1 of Costs to Be Reimbursed (Not to Exceed Topset) 2.A Insurance Total Cost 2.001 2.002 2.003 2.004 2.005 2.006 2.007 2.008 2.009 Performance & Payment Bonds Maintenance Bond Builder's Risk Insurance General Liability Insurance Professional Liability Insurance Pollution Liability Insurance Excess\Umbrella Liability Insurance Other Insurance Requirements Subcontractor Default Insurance 1 1 1 1 LS LS LS LS LS LS LS LS LS 29,983 3000 4,195 44,751 31 ,937 3,000 4,195 44,751 INCLUDED INCLUDED INCLUDED NOT IN PROJECT 67,127167, 127 s e 2.B CMAR's Onsite Staff 151 ,011 2.009 2.010 2.011 2.012 2.013 2.014 2.015 2.016 2.017 2.018 2.019 2.020 2.021 2.022 2.023 2.024 Project Manager Project Superintendent Assistant Superintendent Mechanical/Electrical Coordinator Working Foreman Project Engineer Project Manager Field Engineer Field Estimator General Laborer Timekeeper Field Office Manager Warehouse Manager Field Secretal Other On-site Contractor Staff Proiect Accountant 3 3 MO MO MO MO MO MO MO MO MO MO MO MO MO MO LS MO 17,500 18,229 52,500 54,688 NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT DocuSign Envelope ID: 2B77208A-B575JIC6D-884D4CA7BC8DAC2F Construction &£nager's FlIYSl!::=t£=:59 Soft COStS and Fee Cost Proposal Detail Updated on August 30th, 2022 Item #Description Quantity 1 Unit 1 Unit Cost Total Cost 2.025 2.026 2.027 2.B 2.C Project Coordinator 1 ,500 31 MO 1 1,200 31 MO 1 1,000 CMAR's Estimated Cost of Onsite Staff - Subtotal CMAlts Onsite Reimbursable Expenses Mobilization 31 MO 4,500 3,600 3,000 118,288 Safety Manager QA/QC Manager 2.024 2.025 2.026 2.027 2.028 2,029 2.030 2.031 2.032 2.033 2.034 2.035 2.036 2.037 2.038 Field Engineering Equipment Site Survey Layout Within Site Office Trailer Office Supplies & Equipment Storage Trailer Warehouse Set Up Onsite Office Set Up Onsite Storage\Laydown Areas Set Up Onsite Parking Temporary Roadways Temporary Fencing Temporary Toilets Project Sign All Other Temporary Project Site Signage Safety Safety Equipment First Aid Supplies Fire Protection Fire Extinguishers Fall Protection Third Party Safety Inspections Temporary Walkways Barricades Traffic Control Securitv\Watchman Services LS LS LS MO MO MO MO LS LS LS LS LF MO EA EA BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) 4,500 1 ,500 2,250 NOT IN PROJECT 10,000 5,000 BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) 2,250 1 ,250 BY SUBCONTRACTOR(S 3 3 3 1 1 1 ,500.00 500.00 750.00 10,000.00 5,000.00 3 1 750,00 1 ,250.00 2.038 2.039 2.040 2.041 2.042 2.043 2.044 2.045 2.046 2.047 1 3 3 0 LS MO LS EA LS MO LS LS LS MO 3,500.00 1 150.oo I 3,500 450 BY SUBCONTRACTOR(S 225 To be included in GMP#2 EXCLUDED BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S EXCLUDED 75.00 13,650.00 DocuSign Envelope ID: 2B77208A-B575-lC6D-884D-6CA7BC8DAC2FEAI 11UIL f*' ' -E - City of Denton'sConstruction Manager’s Fire'Station No. 9 Soft COStS and Fee Cost Proposal Detail Updated on August 30th, 2022 Item #Description i Quantity I Unit Unit Cost Total Cost 2.048 1 Temp Walls and Enclosures Utilities MO BY SUBCONTRACTOR(S 2.048 2.049 2.050 2.051 2.052 2.053 2.054 2.055 Install Temporary Electric Service at Site Office Install Temporary Teledata Service at Site Office LS LS LS LS 1 31 MO 1 500.OO I 3 1 1 MO 1 1 NOT I MO MO BY SUBCONTRACTOR(S NOT IN PROJECT BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S 1 ,500 NOT IN PROJECT 750 900 Install Temporary Water & Sewer Service at Site Install Temporary Gas Service at Site Ongoing Electric Charges for the Site Office Ongoing Teledata Charges for the Site Office Ongoing Water & Sanitary District Charges 3 3 3 500.00 250.00 300.00Ongoing Gas Utility Charges (exluding Temp Heat) Ongoing Expenses 2.056 2.057 2.058 2.059 2.060 2.061 2.062 2.063 2.064 2.065 2.066 2.067 2.068 2.069 2.070 2.071 2.072 2.073 2.074 2.075 Jobsite Cell Phone(s) for Site Staff 3 1 1 13 MO MO LS LS LS WK MO MO LS LS LS MO ilina to\frorn Site 1 1 LS 1 1 LS MO MO LS LS LS WK 400,00 1 ,200 INCLUDED INCLUDED 3,130 11 ,250 325 INCLUDED BY SUBCONTRACTOR(S) NOT IN PROJECT NOT IN PROJECT 2,500 150 BY SUBCONTRACTOR(S) NOT IN PROJECT BY SUBCONTRACTOR(S) 150 BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S 1.200 IT Expenses for Staff Project Schedule Setup & Maintenance BIM Model Setup & Maintenance 3, 130.00 11 ,250.00 25.00 Project Extranet Setup & Maintenance Project Photo Documentation Video\Webcam Documentation I = = Employee Parking Home Office Travel Cost! Moving & Subsistence Additional Plans & Specs during Construction Shipping, Couriers, & Postage Project-specific Delivery & Hauling to\from Site Temporary Radios Temporary Wiring & Lights Water, Ice & Cups Ladders & Stairs 11 31 2,500.00 50.00 3 50.00 Erosion Control Shoring Weekly Clean-ul 3 400.00 DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2FCX111UIL n- 1 -c - City of Denton'sConstruction Manager's Fire- Station No. 9Soft Costs and Fee Cost Proposal Detail Updated on August 30th, 2022 Item #Description Quantity I Unit Unit Cost Total Cost 2.076 2.077 2,078 2.079 2.080 2.081 2.082 2.083 2.084 2.085 2.086 2.087 Final Clean-ul E 1 sf 1 1 F MO 1 100.00 1 EA 1 MO 1 1 BYSUBC LS LS 1 SF 1 1 MO 1 700.00 1 1 MO 1 1 31 MO 1 MO MO BY SUBCONTRACTOR(S) 300 2,250 BY SUBCONTRACT@@) BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) 2,100 NOT IN PROJECT 750 NOT IN PROJECT BY SUBCONTRACTOR(S Dumpster Rental 3 5 100.00 450.00Dumpster Pulls Temporary Generator Misc. Power Equipment Equipment Repairs & Maintenance Temporary Partitions Pick-Up Rental Automobile Rental 3 3 700.00 250.00Pick-Up Fuel & Maintenance Automobile Fuel & Maintenance Water Truck Hoisting & Material Management 2.088 2.089 2.090 2.091 2.092 2.093 2.094 2.095 2.096 2.097 2.098 2.099 Forklift Rental LS LS WK LS WK LS LS LS MO LS LS LS BY BY BY SUBCONTRACTOR(S NOT IN PROJECT SUBCONTRACTOR(S) SUBCONTRACTOR(S NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT SUBCONTRACTOR(S SUBCONTRACTOR(S) SUBCONTRACTOR(S) Tower Crane Rental/Mobilization/Demobilization Hydro-Crane Rental Other Crane Costs Material Hoist Personnel Hoist Erect Hoists Hoist Landings Temporary Hoist Operation Hoisting for Subs Scaffoldin! BY BY BYOther Hoisting & Materials Management Costs Temporary Protection of the Work 2.100 2.101 2.102 2.103 2.104 Temporary Site Protection not w/Erosion Control Temporary Building Protection Temporary Building Heat not w/Gas Charges Dewatering System & Other Water Removal LS WK WK LS LS BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S)Snow Removal DocuSign Envelope ID: 2B77208A-B575-4C6D-884D4CA7BC8DAC2FExhibit A.1 .E - City of Denton's Construction Manager's Fire Station No- 9soft costs and Fee Cost Proposal Detail Updated on August 30th, 2022 Item #Description Quantity 1 Unit i Unit Cost Total Cost 2.105 Other Protection of Work Items Testing Soil Testinl Concrete Testinl Masonry Testin$ Weld Testing Other Materials Testinl Permits & Fees WK BY SUBCONTRACTO 2.106 2.107 2.108 2.109 2.110 LS LS LS LS LS BY OWNER BY OWNER BY OWNER BY OWNER BY OWNER 2.111 2.112 2.113 2.114 2.115 2.116 2.117 2.118 Building Permit Plan Check Fee LS LS LS LS LS LS LS LS BY OWNER BY OWNER BY OWNER BY OWNER Water Tap Fees Sanitary Sewer Tap Fees Elevator Permit & Inspection!BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S Mechanical & Electrical Permits & Inspections Health Department Permits & Inspections Other Government Fees\Permits Required for FCO Other CMAR Onsite Reimbursable Costs BY SUBCONTRACTOR(S 2.119 2.C 2.000 Other CMAR's OnsIte Costs Needed for the Work 1 1 LS CMAR's Estimated Onsite Reimbursable Expenses - Subtotal CMAR's Total Proposed Costs to Be Reimbursed NOT IN PROJECT 59,380 328,678 DocuSign Envelope ID: 2B77208A-B575zlC6D-884D-6CA7BC8DAC2F Exhibit A.1.F - Key Personnel Unchanged in this Amendment DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F CPREExhibit A.1.H - Labor Rates Denton Fire Station #9 Customary and Usual Labor Rates Construction Manager will provide Labor Rates for billing of the cost of the Construction Manager's staff' as mutually agreed with the Owner not later than ten (10) business days prior to Notice to Proceed with construction, or 22 NOV 2022 (whichever is earlier). The Construction Manager acknowledges the Owner's requirement to confirm in writing with all subcontractors performing Work they will be paying their labor at orabove the State of Texas Prevailing Wage Rates current as of the date of thisAmendment. The Owner likewise confirms certified payrolls are not a requirement on thisproject . D' fEll'WIEn.q1 PRe' ID: 2B77208A-B5754C6D-884D4CA7BC8DAC2F SAM.g.v Exhibit A.1.H - Labor Rates "General Decision Number: TX20220243 Q8/65/2022 Superseded General Decision Number: TX20210243 State : Texas Construction Type: Building County: Denton County in Texas . BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories) . Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage raterequired under Executive Order 14026 or Executive Order 13658.Please note that these Executive Orders apply to coveredcontracts entered into by the federal government that aresubject to the Davis-Bacon Act itself, but do not apply tocontracts subject only to the Davis-Bacon Related Acts,including those set forth at 29 CFR 5.1(a) (2) - (66) . 1 if the contract is entered I . Executive Order 14026 1I into on or after January 36, 1 generally applies to the 112022, or the contract is 1 contract. I I renewed or extended (e.g. , an I. The contractor must pay Ijoption is exercised) on or 1 all covered workers at 11 after ]anuary 30, 2022: 1 least $15.00 per hour (or I I ! the applicable wage rate II I listed on this wage I I I determination, if it is II I higher) for all hours II I spent performing on the 1 I contract in 2022. 1I llf the contract was awarded on 1. Executive Order 13658 11 or between lanuary 1, 2015 and I generally applies to the 11 January 29, 2022, and the 1 contract . II contract is not renewed or 1. The contractor must pay alllI extended on or after lanuary I covered workers at least I130, 2022: 1 $11.25 per hour (or the 1 I I applicable wage rate listed I 1 1 on this wage determination, I1 1 if it is higher) for all I1 1 hours spent performing on 1I I that contract in 2022. 1 The applicable Executive Order minimum wage rate will beadjusted annually. If this contract is covered by one of theExecutive Orders and a classification considered necessary forperformance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request . Additional information on contractor requirements and workerprotections under the Executive Orders is available athttps : //www . dol . gov/agencies/whd/government -contracts . Modification Number Publication Datea 01/07/20221 01/21/2022 https://sam.gov/wage-determinationfTX20220243/5 1 /7 DocuSign Envelope ID: 2B77208A-B575-4C6D-884D6CA7BC8DAC2FIVr IVr ALI UP . V 1 rbI VI SAM .gov 2 34 5 02/18/202202/25/202204/29/202208/05/2022 ASBEe021-011 08/01/2017 Rates Fringes ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe andMechanical System Insulation) . . . .$ 25.87 BOIL0674-603 01/61/2621 7.23 Rates Fringes 24.10BOILERMAKER. . . . . . . . . . . . . . . . . . . . . .$ 29.47 CARP1421-002 16/61/2021 Rates Fringes 11 . 27MILLWRIGHT. . . . . . . . . . . . . . . . . . . . . . .$ 29.58 ELEVO021-006 el/61/2022 Rates Fringes 36 . 885+a+bELEVATOR MECHANIC . . . . . . . . . . . . . . . .$ 45 . 54 FOOTNOTES :A. 6% under 5 years based on regular hourly rate for allhours worked . 8% over 5 years based on regular hourly ratefor all hours worked . B. New Year's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day,Christmas Day, and Veterans Day. ENGIg178-005 06/01/2020 Rates Fringes 13 . le POWER EQUIPMENT OPERATOR(1) Tower Crane. . . . . . . . . . . . .$ 32.85(2) Cranes with PileDriving or CaissonAttachment and HydraulicCrane 60 tons and above. . . . .$ 28.75 (3) Hydraulic cranes 59Tons and under. . . . . . . . . . . . . .$ 32.35 + IRON0263-005 06/01/2022 10 . 60 13.10 Rates Fringes 7.68IRONWORKER (ORNAMENTAL ANDSTRUCTURAL) . . . . . . . . . . . . . . . . . . . . . .$ 27.14 PLUMOI06-008 11/01/2021 Rates Fringes https://sam.gov/wage-determinationfTX20220243/5 2/7 DocuSign Envelope ID: 2B77208A-B575-4C6D-884D4CA7BC8DAC2F HVAC MECHANIC (HVAC UnitInstallation Only) . . . . . . . . . . . . . . . $ 34.48 + SUTX2014-019 07/21/2014 SAM.gov 13 . 07 Rates BRICKLAYER. . . . . . . . . . . . . . . . . . . . . . .$ 19.89 CARPENTER, Excludes DrywallHanging, Form Work, and MetalStud Installation . . . . . . . . . . . . . . . .$ 19.25 CAULKER. . . . . . . . . . . . . . . . . . . . . . . . . .$ 16.63 CEMENT MASON/CONCRETE FINISHER. . .$ 12.93 ++ DRYWALL HANGER AND METAL STUDINSTALLER. . . . . . . . . . . . . . . . . . . . . . . .$ 15.42 ELECTRICIAN (AlarmInstallation 0nly) . . . . . . . . . . . . . . .$ 18.83 ELECTRICIAN (CommunicationTechnician Only) . . . . . . . . . . . . . . . . .$ 19.98 ELECTRICIAN (Low VoltageWiring Only) . . . . . . . . . . . . . . . . . . . . .$ 15.86 ELECTRICIAN, Excludes Low Voltage Wiring andInstallation of Alarms/Soundand Communication Systems . . . . . . . .$ 18.82 FORM WORKER. . . . . . . . . . . . . . . . . . . . . .$ 12.13 ++ GLAZIER. . . . . . . . . . . . . . . . . . . . . . . . . .$ 16.55 Fringes g . gO a . eg g . eg O . gO 0.00 3.32 3.64 2.18 0.83 g . gO 3.13 2.31HIGHWAY/PARKING LOT STRIPING:Operator (Striping Machine) . . . . .$ 16.04 ++ INSTALLER - SIDING (METAL/ALUMINUM/VINYL) . . . . . . . . . . .$ 14.74 ++ INSTALLER - SIGN. . . . . . . . . . . . . . . . .$ 15.61 INSULATOR - BATT . . . . . . . . . . . . . . . . .$ 13. eg ++ IRONWORKER, REINFORCING . . . . . . . . . .$ 14.02 ++ LABORER: Common or General. . . . . .$ 11.76 ++ LABORER: Mason Tender - Brick. . .$ 16.54 ** LABORER: Mason Tender - Cement/Concrete. . . . . . . . . . . . . . . . . .$ 10.75 ++ LABORER: Pipelayer . . . . . . . . . . . . . .$ 13.eg ++ .$ 12.22 ++ .$ 11.28 ++ e . gO g . eg a . gO a . gO 0.00 g . gO g . gO 0.35 a . OO 0.60 LABORER: Plaster Tender . LABORER : Roof Tearoff . . . LABORER: Landscape andIrrigation . . . . . . . . . . . . . . . . . . . . . . .$ 12.50 ++ https://sam.gov/wage-determination/TX20220243/5 0.48 3/7 DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2FIVf IUrE=L I V . V I rtlv I SAM,gov e . gOLATHER. . . . . . . . . . . . . . . . . . . . . . . . . . .$ OPERATOR : Backhoe/Excavator/Trackhoe. . . . . . .$ OPERATOR : Bobcat/SkidSteer/Skid Loader . . . . . . . . . . . . . . . .$ OPERATOR: Bulldozer . . . . . . . . . . . . .$ OPERATOR: Drill. . . . . . . . . . . . . . . . .$ OPERATOR: Forklift . . . . . . . . . . . . . .$ OPERATOR: Grader/Blade. . . . . . . . . .$ OPERATOR: Loader . . . . . . . . . . . . . . . .$ OPERATOR : Mechanic . . . . . . . . . . . . . .$ OPERATOR : Paver (Asphalt,Aggregate, and Concrete) . . . . . . . . .$ OPERATOR : Roller . . . . . . . . . . . . . . . .$ PAINTER (Brush, Roller andSpray) , Excludes DrywallFinishing/Taping. . . . . . . . . . . . . . . . .$ PAINTER: DrywallFinishing/Taping Only. . . . . . . . . . . .$ PIPEFITTER, Excludes HVACPipe Installation . . . . . . . . . . . . . . . .$ PLASTERER. . . . . . . . . . . . . . . . . . . . . . . .$ PLUMBER (HVAC PipeInstallation Only) . . . . . . . . . . . . . . .$ PLUMBER, Excludes HVAC PipeInstallation . . . . . . . . . . . . . . . . . . . . .$ ROOFER. . . . . . . . . . . . . . . . . . . . . . . . . . .$ SHEET METAL WORKER (HVAC DuctInstallation Only) . . . . . . . . . . . . . . .$ SHEET METAL WORKER, ExcludesHVAC Duct Installation . . . . . . . . . . .$ SPRINKLER FITTER (FireSprinklers) . . . . . . . . . . . . . . . . . . . . . .$ TILE FINISHER. . . . . . . . . . . . . . . . . . . .$ TILE SETTER. . . . . . . . . . . . . . . . . . . . . .$ TRUCK DRIVER: 1/Single AxleTruck. . . . . . . . . . . . . . . . . . . . . . . . . . . . $ TRUCK DRIVER: Dump Truck. . . . . . . .$ TRUCK DRIVER: Flatbed Truck. . . . .$ https://sam.gov/wage-determination/TX20220243/5 16 . gO 12.83 ++e . gO 13.93 ++ 18 . 29 15 . 69 13.21 ++ 12.48 ++ 13.46 ++ 17.52 e . gO 1.31 0.50 0.81 g . gO 0.85 3.33 18 . 44 15 . 04 a . gO g . gO 13.21 ++2.33 13.76 ++2 . 84 22.98 15.75 6.35 a . gO 22.16 5.46 20 . 84 17 . 19 4.74 g . gO 20 . 88 5.19 24.88 5.97 22 . 94 11.22 ++ 14.25 ++ a . gO a . gO g . gO 16 . 40 12.39 ++ 19.65 0.81 1.18 8.57 4/7 DocuSign Envelope ID: 2B77208A-B5754C6D-884D4CA7BC8DAC2F SAM.gov TRUCK DRIVER: Semi-TrailerTruck. . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 12.50 ++e . gO 4.11TRUCK DRIVER:Water Truck. . . . . . .$ 12.00 ++ === = = = = = = = = = = = = = = = = = = = = = = = = = = = = == = = = = = = = = = = = = = = = = = = = = = = = = === WELDERS - Receive rate prescribed for craft performingoperation to which welding is incidental. ** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.60) or 13658 ($11.25) . Please see the Note at the top of the wagedetermination for more information . Note: Executive Order (EO) 13706, Establishing Paid Sick Leavefor Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and anysolicitation was issued) on or after January 1, 2017. If thiscontract is covered by the EO, the contractor must provideemployees with 1 hour of paid sick leave for every 30 hoursthey work, up to 56 hours of paid sick leave each year.Employees must be permitted to use paid sick leave for theirown illness, injury or other health-related needs, includingpreventive care; to assist a family member (or person who islike family to the employee) who is ill, injured, or has otherhealth-related needs, including preventive care; or for reasonsresulting from, or to assist a family member (or person who islike family to the employee) who is a victim of, domesticviolence, sexual assault, or stalking. Additional informationon contractor requirements and worker protections under the EOis available at https : //www . dol . gov/agencies/whd/government - contracts . Unlisted classifications needed for work not included withinthe scope of the classifications listed may be added afteraward only as provided in the labor standards contract clauses(29CFR 5.5 (a) (1) (ii) ) . The body of each wage determination lists the classificationand wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wagedetermination. The classifications are listed in alphabeticalorder of ""identifiers"" that indicate whether the particularrate is a union rate (current union negotiated rate for local) ,a survey rate (weighted average rate) or a union average rate (weighted union average rate) . Union Rate Identifiers A four letter classification abbreviation identifier enclosedin dotted lines beginning with characters other than ""SU"" or""UAVG'’" denotes that the union classification and rate were prevailing for that classification in the survey. Example :PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier ofthe union which prevailed in the survey for thisclassification, which in this example would be Plumbers. 0198indicates the local union number or district council number where applicable, i . e. , Plumbers Local 0198. The next number, https://sam.gov/wage-determination/TX20220243/5 5/7 DocuSign Envelope ID: 2B77208A-B575z+C6D-884D4CA7BC8DAC2F SAM .gov gas in the example, is an internal number used in processingthe wage determination . 07/01/2014 is the effective date of themost current negotiated rate, which in this example is luly I,2014 Union prevailing wage rates are updated to reflect all ratechanges in the collective bargaining agreement (CBA) governingthis classification and rate. Survey Rate Identifiers Classifications listed under the ""SU’"' identifier indicate that no one rate prevailed for this classification in the survey andthe published rate is derived by computing a weighted averagerate based on a11 the rates reported in the survey for thatclassification . As this weighted average rate includes all rates reported in the survey, it may include both union andnon-union rates . Example : SULA2012-007 5/13/2014. SU indicatesthe rates are survey rates based on a weighted averagecalculation of rates and are not majority rates . LA indicatesthe State of Louisiana . 2012 is the year of survey on whichthese classifications and rates are based . The next number, 007in the example, is an internal number used in producing thewage determination . 5/13/2014 indicates the survey completiondate for the classifications and rates under that identifier . Survey wage rates are not updated and remain in effect until a new survey is conducted . Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicatethat no single majority rate prevailed for thoseclassifications; however, lee% of the data reported for theclassifications was union data . EXAMPLE : UAVG-oH-gale 68/29/2614. UAVG indicates that the rate is a weighted unionaverage rate. 0H indicates the state. The next number, 0010 inthe example, is an internal number used in producing the wagedetermination . 08/29/2014 indicates the survey completion datefor the classifications and rates under that identifier . A UAVG rate will be updated once a year, usua11y in ]anuary ofeach year, to reflect a weighted average of the currentnegotiated/CBA rate of the union locals from which the rate isbased . WAGE DETERMINATION APPEALS PROCESS 1. ) Has there been an initial decision in the matter? This canbe + + + + an existing published wage determinationa survey underlying a wage determinationa Wage and Hour Division letter setting forth a position ona wage determination mattera conformance (additiona1 classification and rate) ruling On survey related matters, initial contact, including requestsfor summaries of surveys, should be with the Wage and HourNational Office because National Office has responsibility forthe Davis-Bacon survey program. If the response from this https://sam.gov/wage-determination/TX20220243/5 6/7 DocuSign Envelope ID: 2B77208A-B5754C6D-884D4CA7BC8DAC2FIVf IVf ILL 1 V • V 1 fII VI SAM.gov initial contact is not satisfactory, then the process describedin 2. ) and 3 . ) should be followed . With regard to any other matter not yet ripe for the formalprocess described here, initial contact should be with theBranch of Construction Wage Determinations . Write to: Branch of Construction Wage DeterminationsWage and Hour DivisionU.S. Department of Labor290 Constitution Avenue, N. W. Washington, DC 20210 2. ) if the answer to the question in 1. ) is yes, then aninterested party (those affected by the action) can requestreview and reconsideration from the Wage and Hour Administrator(See 29 CFR Part 1.8 and 29 CFR Part 7) . Write to: Wage and Hour AdministratorU.S. Department of Labor206 Constitution Avenue, N. W. Washington, DC 20210 The request should be accompanied by a full statement of theinterested party’s position and by any information (wagepayment data, project description, area practice material,etc . ) that the requestor considers relevant to the issue. 3. ) if the decision of the Administrator is not favorable, aninterested party may appeal directly to the AdministrativeReview Board (formerly the Wage Appeals Board) . Write to: Administrative Review Board U.S. Department of Labor200 Constitution Avenue, N. W. Washington, DC 20210 4. ) All decisions by the Administrative Review Board are final. = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = == = = = = = = = = = = = = = END OF GENERAL DECISIO" https://sam.gov/wage-determination/TX20220243/5 7/7 DocuSign Envelope ID: 2B77208A-B575-4C6D-884D-6CA7BC8DAC2F CPRE Exhibit A.1.1 - Rental Rates Denton Fire Station #9 Rental Rates See attached rental rate information approved and included as part of the GMPAmendment. Equipment will be billed at these rates when such equipment is available from theConstruction Manager, and is demonstrably the most economical (or the most expedient) option for advancing the Work. Rental billing and payment terms and conditions will be per Section 7.5.2 of the A1 33 Agreement, and nothing in this Exhibit A.1.1 is intended to supersede thoseterms, which shall govern. DocuSign Envelope ID: 2B77208A-B575=lC6D-884D4CA7BC8DAC2F- ' bxnIDlt A.1.1 - Rental Rates Rental Rates for CORE owned Equipment Equipment Air Compressor Air Compressor Coring Machine Equipment AttachmentGenerator Generator Skid Steer Skid Steer Sweeper Welder Drop Deck Trailer Drop Deck Trailer Drop Deck Trailer Dump Trailer Equipment Trailer Hydraulic Ground Level Equip Trailer Hydraulic Ground Level Equip Trailer Mobile Restoration Trailer Mobile Restoration Trailer Permanent Fuel Tank for Trailer Tilt Trailer Tilt Trailer Tilt Trailer Trailer Hitch Utility Trailer Utility Trailer Vacuum Trailer Walk-behind Trencher Trailer Water Trailer Track Loader Track Loader Track Loader Track Loader Track Loader Walk-behind Track Loader Skid Steer Loader Skid Steer Loader Skid Steer Loader Skid Steer Loader Skid Steer Loader 2-seat UTV 2-seat UTV 2-seat UTV 2-seat UTV 2-seat UTV Pressure Washer Pressure Washer Pressure Washer Pressuer Washer Pressuer Washer Sandblast Pot 4-set UTV 4-seat UTV 4-seat UTV Golf Cart Industrial Electric Cart UTV Pressure Washer Pressure Washer Pressure Washer Pressure Washer Pressure Washer Pressure Washer Equipment Specs Portable diesel air compressor Sullair Compressor Coring Machine and Accessories Jack Hammer 3500W or 3,800W Honda Generator Honda Generator 5000 Watt Multi Terrain Loader Auger AttachmentRide on Broom 6' 3-wheel Miller Bobcat 225 Welder 14 ft. - 16 ft., Tandem Axle 16 ft. - 18 ft., Tandem Axle 18 ft. - 20 ft., Tandem Axle 10 ft. x 12 ft., Tandem Axle Double Axle 6 ft. x 14 ft., Single Axle 6 ft. x 14 ft., Tandem Axle UR Rate/Daily $81 $81 $50 $50 $50 $50 $250 $30 $250 $50 $125 $61 $ 146 $261 $67 $47 $63 N/A N/A N/A $55 $70 $58 $11 $75 $66 $431 $33 $ 149 $709 $499 $524 $531 $647 $285 $413 $434 $435 $436 $416 $85 $164 $ 169 $163 $160 $12 $11 $16 $12 $41 $207 $113 $173 $170 $89 $90 $ 186 $98 $206 $95 $324 $112 $189 UR Rate/Weekly $195 $195 $150 $ 140 $150 $ 180 $1 ,000 $225 $ 1 ,000 $150 $339 $ 182 $394 $749 $135 $327 $258 N/A N/A N/A $158 $303 $ 189 $32 $281 $ 193 $1 ,699 $66 $492 $1 ,683 $1,319 $1,385 $ 1 ,489 $ 1 ,674 $757 $1,105 $1,160 $1,161 $1 ,233 $1,175 $267 $322 $332 $320 $314 $35 $35 $35 $24 $112 $628 $285 $342 $334 $281 $282 $436 $257 $904 $369 $1,155 $404 $520 UR Rate/Monthly $650 $650 $450 $390 $380 $395 $4,200 $675 $4.200 $450 $879 $559 $1 ,020 $2.045 $404 $572 $551 N/A N/A N/A $402 $649 $515 $86 $571 $424 $3,736 $147 $946 $3,337 $2,725 $2,861 $3,247 $3.336 $2.430 $2,900 $3,045 $3,309 $3,509 $3,969 $681 $718 $746 $716 $709 $69 $77 $68 $69 $231 $ 1 ,098 $729 $969 $751 $615 $728 $ 1 ,692 $690 $1 ,962 $751 $2,414 $789 $ 1 ,435 14 ft. 12 ft., Single Axle 14 ft. - 16 ft.. Tandem Axle 14 ft. - 16 ft., Tandem Axle Slide-in Pintle BaII Combination 10 ft. - 14 ft.. Tandem Axle 8 ft. to 10 ft„ Single Axle512-575 CFM, Diesel Powered 500 Gallons Large, 2,8004107 lbs.Small, 1,300-1,699 lbs. Small, 1,700 lbs. Small, 2,000-2,399 lbs. Small, 2,400-2,999 lbs. 1,351-1,699 lbs 1,700-1,899 lbs. 1,900-1,999 lbs 2,001-2,799 lbs 2,600-3,499 lbs. 2WD, Electric Powered 2WD, Gas Powered 4WD, Diesel Powered 4WD, Diesel Powered, Rollover Protection 4WD, Gas Powered Chemical Injector AttachmentHose Hose, 50 ft Spray Wand Surface Cleaner. 4,000 PSI, Hydro ScrubberXL350 2WD, Gas or Electric Powered 4WD, Diesel Powered, Rollover Protection 4WD, Gas Powered. Rollover ProtectionGas Powered 2WD 4WD, Diesel 3,000 PSI, Gas Powered 3,000-3,500 PSI, Towable, Gas Powered 3,500 PSI, Gas Powered 3,500 PSI, Towable, Gas Powered 4,000 PSI, Gas Powered Hot Water, 3.500 PSI. Gas Powered DocuSign Envelope ID: 2B77208A-B575-:tC6D-884D-6CA7BC8DAC2F Exhibit A.1. J - Alternates with Costs and Expiration Dates No Alternates in this Amendment DocuSign Envelope ID: 2B77208A-B575-4C6D-884D4CA7BC8DAC2F Exhibit A.1.K - Unit Costs Denton Fire Station #9 a. Piers - Pier Untts CPRE Unit Costs Pier DmFMl F8 F4 DocuSign Envelope ID: 2B77208A-B5754C6D-884D-6CA7BC8DAC2F CPREExhibit A.1.L - Allowances Denton Fire Station #9 Allowances • • • • • Allowance #1 – Permit Review Comments - $50,000 Allowance #2 - Fiber Line Conduit - $50,000 Allowance #3 - Franchise Utilities - $50,000 Allowance # 4 - Temporary Generator - $50,000 Allowance #5 - Pier Casing - $75,000 Allowance #6 – Texas Labor Rates - $100,000 DocuSign Envelope ID: 2B77208A-B575=lC6D-884D-6CA7t=xrrIDlt A.1 .N libmlzed Statement of GMP and Clarifications October 20, 2022 VIA ELECTRONIC MAIL Sara Hensley City Manager City of Denton 215 East McKinney Street Denton, Texas, 76201 RE:GUARANTEED MAXIMUM PRICE PROPOSAL I Denton Fire Station #9 1 GMP #1 of 2 Dear Sara, On behalf of CORE Construction, I am pleased to submit our Guaranteed Maximum Price (GMP #1) proposal for the Denton Fire Station #9. GMP #1 Summary: Total Guaranteed Maximum Price $ 4,550,786 Enclosed you will find the Basis of GMP Clarifications, GMP Cost Summary and Schedule of Values, an Enumeration of Documents, and a Construction Schedule. We look forward to a successful and enjoyable project together. Thank you for this opportunity, please do not hesitate to contact me directly with any questions or comments. Respectfully submitted, 5#e4J%@ Steven Normand Director of Preconstruction CORE Construction 6320 R„,„,h Rd. st,. 200 1 Frisc,, T, 75033 1 PH, 972.668.9340 1 www.COREconstruction.com DocuSign Envelope ID: 2B77208A-B57$4C6D4&+D4CA7BC8DAC2F Basis of Estimate- GMP Denton Fire Station #9 lent of GMP and Clarifications The Basis of Estimate is a written explanation clarifying the scope, assumptions and exclusions used in establishing the GMP estimate dated 8/25/2022. All costs are based on CORE's incorporation of the scope shown on the 6/28/2022 Package #1 Set of construction documents and the scope clarifications below. ASSUMPTIONS, CLARIFICATIONS, & EXCLUSIONS Schedule Project Construction Duration and Substantial Completion shall remain dependent upon the Building Permit Approval and the following criteria: •The following milestones are to be met. The dates listed below are the latest possible dates to meet these milestones and any delays will impact the Substantial Completion Date. o GMP approval to be received no later than 11/1 5/2022 o NTP received by 11/22/2022 o if NTP is received prior to the date listed above, the Substantial Completion date will not adjust to an earlier date, due to material lead times. o if the above criteria are unachievable Substantial Completion will need to be adjusted oracceleration costs further discussed. Substantial Completion: March 5#1, 2024• Owner Items • • • • • • Material Testing, Assembly Testing, as well as and Special Inspections, are by Owner, and are not included. Third-party Commissioning is by Owner and is not included. CORE will provide coordination as required. Platting and/or re-platting, licensing agreements, land-use permitting, and site development permits as well as any cost related thereto, is not included. General Condition expenses included through date of Final Completion. Contractor Fee shall be considered a Lump Sum and subject to the terms of the Agreement. Building permit costs, plan expediter fees, plan check fees, impact fees and their associated permits, site development permits/fees, gas and electrical service charges, utility recovery or tap fees, and/or water meter fees shall be paid for by Owner and are not included. Contingency and Allowances • • • • Preconstruction Contingency ($102,393 direct cost) – Escalation Allowance is included in this proposal Additional Marketplace Risk of 1% ($45,508 direct cost) - is included in this proposal Construction Contingency of 1% ($45,508 direct cost) is included in this proposal Owner Contingency of 2% ($91,016 direct cost) - is included in this proposal www.coreconstruct lon.comq Page 2 of 4 DocuSign Envelope ID: 2B77208A-B5754c6Dq84DacA7Bc8DAc2F Basis of Estimate- GMP Denton Fire Station #9 i Statement of GMP and Clarifications • • • • • • Allowance #1 - Permit Review Comments - $50,000 Allowance #2 - Fiber Line Conduit - $50,000 Allowance #3 - Franchise Utilities - $50,000 Allowance # 4 - Temporary Generator - $50,000 Allowance #5 - Pier Casing - $75,000 Allowance #6 - Texas Labor Rates - $100,000 General Assumptions 1. Price is based on documents issued by Parkhill as enumerated in the List of Documents. 2. We assume normal working hours. However, to maintain the schedule we may perform work outside of normal working hours. We will request permission from the City, as required by local ordinances, when weplan to work outside of normal work hours. Specific Exclusions to GMP a.Guaranteed Delivery Date of Generator - Due to the long lead time and volatility of this item, delays to the delivery and installation of the generator caused by circumstances not the responsibility of the Contractor under the agreement will not be subject to liquidated damages. It is assumed that we can achieve substantial completion and occupancy prior to the arrival of the generator. Other Scope Specific Assumptions and Clarifications: DIVISION 7 1 Earthwork & Paving A. Included: a. Lime Stabilization DIVISION 8 1 Site Utilities A. Included: a. CORE reserves the right to cap and abandon existing utilities in place. B. Excluded: a. Site electrical and technology conduit. This will be included as part of the electrical scope in GMP#2. b. Fiber Line Relocation & Coordination DIVISION 27 1 ConcreteA. Included: a. S" Slab at apparatus bay per the current construction documents. Any changes will be covered in GMP#2 www.coreconstructlon.comq Page 3 of 4 DocuSign Envelope ID: 2B77208A-B57H}C6D4&+D4CA7BC8DAC2FEXIIIL)it A. I .IN -' ltellllzeuBasis of Estimate- GMP Denton Fire Station #9 Dtatement of GMP and Clarifi DIVISION 30 1 Steel PackageA. Included: a. Structural Steel as shown. B. Excluded: a. Any changes to structural design will be priced in GMP#2. DIVISION 49 1 Roofing A. Included: a. Roofing price is subject to change at time of manufacturing. Any change in cost at the time of material production will be covered by the preconstruction contingency, if this contingency is exceeded, owner contingency will be used. DIVISION 104 1 Generator A. Included: a. 400KW Kohler Generator B. Excluded: a. Generator Installation. This will be included in GMP #2. b. Specification modifications to generator. Any changes to the generator specifications will result in further delays to the procurement of the generator. www.careconstructlon.comq Page 4 of 4 DocuSign Envelope ID: 2B77208A8575-+C6D484D4CA7BC8DAC2FExhibit A.1.N - Itemized Statement of GMP and Clarifications Denton Fire Station #9GMP #7 LOCATION: Denton. TX ARCHITECT: Martinez & Parkhill15 WARRANTY(yrs): 1 SITE ACREAGE: 4.0 SQUARE FOOTA6E, 14,421 Description 0 GeiMe I mI line N 19 C Steel30' MEalF=--tMB BMe P r nC gel Contractor's Construction $9.62 iiBaz•R22a%noF f/I ) o 5 m$25.95 nT T9E::- @(]n2a%$6.93IaM $3.16 U“n53.16 m EsM m1 Subtotal nN A L Subt©ta1 (viKh General R€quir:ern ents)$3.677,628 mBMInsurance ana Perfe BuildBe FM iiI ;iFi;iTs m8 1;7IHliIIITII Mm1®lilm] 6 Sut3total (GR's, Prof Services, Insurance. Tax. & Fee) ms OwnerTaB=;mlmr=E;ie #2 - Fiber Line ConduitEIM) #3 Allowance #4 Allowance #5 - Pier Casing Allowance #6 - Texas Labor Rates u m4 o m4 m© Doc;-S'gn En"eIQpe ID: 2B77208A-B5754C6D-884D-6£:tFeP£%5ltvn's Fire Station No. 9 Updated 22 AUG 2022 GMP Amendment #01 - Site and Long Lead Items P''-t'd '" 9/8/2022 ’t 1'18 PMExhibit "A.1.Z" - Schedule of Exhibits Exhibits to A1 33 E Exhibit "A.I" – Exhibit "A.1.B" – Exhibit "A.1.C" – Exhibit "A.1.D" – Exhibit "A.1.E" – Exhibit "A.1.F" – Exhibit "A.1.G" – Exhibit "A.1.H" – Exhibit ’'A.1.1" – Exhibit "A.1.J" – Exhibit "A.1.K'’ – Exhibit ’'A.1.L" – Exhibit "A.1.M" – Exhibit "A.I.N" – Exhibit "A.1.Z" – =hibit A.1 - Guaranteed Maximum Price Amendment #01 Guaranteed Maximum Price Amendment Insurance and Bonds - GMP Amendment #01 Scope of Work - GMP Amendment #01 Construction Manager’s Project Schedule Construction Manager’s Soft Costs and Fee Key Personnel Confidentiality of the Project Customary and Usual Labor Rates Rental Rates Alternates with Costs and Expiration Dates Unit Costs Allowances Schedule of Values - GMP Amendment #01 Itemized Statement of GMP and Clarifications Schedule of Exhibits for Exhibit A.1 Owner Construction Manager Construction Manager Construction Manager Construction Manager Construction Manager Owner Construction Manager Construction Manager Construction Manager Construction Manager Construction Manager Construction Manager Construction Manager Construction Manager Attached After GMP Amdmt #01 is Signed Attached Unchanged in thisAmendment Attached Unchanged in thisAmendment TBD Attached Attached Not Applicable Attached Attached After GMP Amdmt #01 is Signed Attached This Document copy of 220822 DFS9 A133 Exhibit A. i.z . sch,d.1, ,t E,hibit, (GMP) REV 01.oo t, T,,m Page 1 of 1 © 2022 Peak Program Value, LLC All Rights Reserved [kx:uSign Certificate Of Completion Envelope Id: 2B77208AB5754C6D884D6CA7BC8DAC2F Subject: Please DocuSign: City Council Contract 7967 - FS 9, GMP Amendment 1 Source Envelope: Document Pages: 39 Status: Completed Signatures: 6 Initials: 1Certificate Pages: 6 Envelope Originator: Christa Christian AutoNav: Enabled Envelopeld Stamping: Enabled Time Zone: (UTC-06:00) Central Time (US & Canada) 901 B Texas Street Denton, TX 76209 Christa.Christian@cityofdenton.com IP Address: 198.49.140.10 Record Tracking Status: Original 10/26/2022 9:43:17 AM Holder: Christa Christian Christa.Christian@cityofdenton.com Location: DocuSign Signer Events Christa Christian christa.christian@cityofdenton.com Senior Buyer City of Denton Security Level: Email, Account Authentication(None) Electronic Record and Signature Disclosure:Not Offered via DocuSign Signature Timestamp Sent: 10/26/2022 10:04:08 AM Viewed: 10/26/2022 10:04:19 AM Signed: 10/26/2022 10:05:26 AM Completed Using IP Address: 198.49.140.10 Lori Hewell lori.hewell@cityofdenton.com Purchasing Manager City of Denton Security Level: Email, Account Authentication(None) Sent: 10/26/2022 10:05:30 AM Viewed: 10/26/2022 10:38:25 AM Signed: 10/26/2022 10:39:05 AM Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Electronic Record and Signature Disclosure:Not Offered via DocuSign Marcella Lunn marcella.lunn@cityofdenton.com Deputy City Attorney City of Denton Security Level: Email, Account Authentication(None) Sent: 10/26/2022 10:39:09 AM Viewed: 10/26/2022 10:49:40 AM Signed: 10/26/2022 10:51 :54 AM Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Electronic Record and Signature Disclosure:Not Offered via DocuSign Gary Aanenson garyaanenson@coreconstruction.comVice President CORE Construction Security Level: Email, Account Authentication(None) Sent: 10/26/2022 10:51 :57 AM Viewed : 10/28/2022 7:47:34 AM Signed: 10/31/2022 9:10:07 AM Signature Adoption: Pre-selected Style Using IP Address: 162.247.135.154 Electronic Record and Signature Disclosure:Accepted: 6/13/2022 4:01 :32 PMID: 96bdaf1 3-b4a549f0-ae76-ac4851 1280c5 Signer Events Chris Squadra csquadra@peakprogramvalue.com Chris Squadra, Peak Program Value, LLC Security Level: Email, Account Authentication(None) Signature Timestamp Sent: 10/31/2022 9:10: 12 AM Viewed: 10/31/2022 10:51 :20 AM Signed: 10/31/2022 10:51 :47 AM 'Docu8tgrnd bv Elk=Mr& Signature Adoption: Pre-selected Style Using IP Address: 71.229.204.176 Electronic Record and Signature Disclosure:Accepted: 10/31/2022 10:51:20 AMID: 8aa00e62-27fc21870-948b-6858bb91e06d Trevor Crain trevor.crain@cityofdenton.com Interim Director of Facilities Security Level: Email, Account Authentication (None) Sent: 10/31/2022 10:51 :52 AM Viewed: 10/31/2022 10:57:30 AM Signed: 10/31/2022 10:57:48 AM Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Electronic Record and Signature Disclosure:Accepted : 10/31/2022 10:57:30 AMID: f68e3efl-8c4e49cd-blf6-33b3c5202a92 Cheyenne Defee cheyenne.defee@cityofdenton.com Procurement Administration Supervisor City of Denton Security Level: Email, Account Authentication(None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Completed Sent: 10/31/2022 10:57:54 AM Viewed: 11/16/2022 9:36:55 AM Signed: 11/16/2022 9:37:00 AMUsing IP Address: 198.49.140.10 Sara Hensley sara .hensley@cityofdenton.com City Manager City of Denton Security Level: Email, Account Authentication(None) ’Docu31gned by:I SMA Hu.4lq ' 523608296270423 Sent: 11/16/2022 9:37:04 AM Resent: 11/1 7/2022 10:27:10 AM Viewed: 11/17/2022 10:29:55 AM Signed: 11/17/2022 10:30:02 AMSignature Adoption: Pre-selected Style Using IP Address: 107.77.198.132 Signed using mobile Electronic Record and Signature Disclosure:Not Offered via DocuSign Rosa Rios rosa.rios@cityofdenton.com City Secretary Security Level: Email, Account Authentication(None) DoeuSlgn6d by:1 R+%R&B1 IC5CA8C5EI 75493 Sent: 11/17/2022 10:30:07 AM Viewed: 11/17/2022 11:12:15 AM Signed: 11/17/2022 1 1:12:53 AM Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Electronic Record and Signature Disclosure:Accepted: 11/17/2022 1 1:12:15 AMID: a7e5e311-ed2 14989-9e7c-2ee60cb4 1070 In Person Signer Events Signature Status Timestamp Editor Delivery Events Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Status Timestamp Certified Delivery Events Timestamp Carbon Copy Events Cheyenne Defee cheyenne.defee@cityofdenton.com Procurement Administration Supervisor City of Denton Security Level: Email, Account Authentication(None) Electronic Record and Signature Disclosure:Not Offered via DocuSign Status Timestamp Sent: 10/26/2022 10:05:30 AM Gretna Jones gretna.jones@cityofdenton.com Legal Secretary City of Denton Security Level: Email, Account Authentication(None) Electronic Record and Signature Disclosure:Not Offered via DocuSign Sent: 10/31/2022 10:57:52 AM Viewed: 10/31/2022 11:15:53 AM City Secretary Office citysecretary@cityofdenton.com Security Level: Email, Account Authentication(None) Electronic Record and Signature Disclosure:Not Offered via DocuSign Sent: 11/1 7/2022 11:12:57 AM Viewed: 11/1 7/2022 11 :47:39 AM Hailey Payne hailey.payne@cityofdenton.com Administration Manager City of Denton Security Level: Email, Account Authentication(None) Electronic Record and Signature Disclosure:Not Offered via DocuSign Sent: 11/17/2022 11:12:59 AM Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps 10/26/2022 10:04:08 AM 11/17/2022 1 1 :12:15 AM 11/17/2022 1 1 :12:53 AM 11/17/2022 1 1 :12:59 AM Envelope Sent Certified Delivered Hashed/Encrypted Security Checked Security Checked Security Checked Signing Complete Completed Payment Events Status Timestamps Electronic Record and Signature Disclosure Electronic Record and Signature Disclosure created on: 7/21/2017 3:59:03 PM Parties agreed to: Gary Aanenson, Chris Squadra, Trevor Crain, Rosa Rios ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Denton (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom ofthis document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after suchdocuments are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format,and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact City of Denton: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent toreceive notices and disclosures electronically as follows: To contact us by email send messages to: purchasing@cityofdenton.com To advise City of Denton of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at melissa.kraft@cityofdenton.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address..In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign.To request paper copies from City of Denton To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to purchasing @cityofdenton.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any.To withdraw your consent with City of Denton To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and accountnumber. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Rl luired hardware and software rating Systems0 Browsers (for SENDERS) Browsers (for SIGNERS) r 1 mlet Explorer 6.0?, Mozilla FireFox 1.0 NetScape 7.2 (or above c x Email Screen Resolution Enabled Security Settings •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings viaProxy connectIon ## These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you willhave the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the ’I agree' button below. By checking the ’I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify City of Denton as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by City of Denton during the course of my relationship with you. f ; P B n DocuSign Envelope ID: 37816300-4E28JIFOA-93F6-EC349F096102 DENTON Docusign City Council Transmittal Coversheet 7967 FS 9, GMP Amendment 2 NO File Name Purchasing Contact Christa chrls tIan City C,,„,iI T„g,t D,t, ~ '“="'=- 15’ 2022 Piggy Back Option Contract Expiration Ordinance N/A AIL - LJ IJ DocuSign Envelope ID: 37816300-4E28-4FOA-93F6-EC349F096102 Document A133 2019 Exhibit A.2 Guaranteed Maximum Price Amendment This Amendment dated the day of in the year Two Thousand Twenty-Two , is incorporated into the accompanying AIA Document A133TM–2019, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the Twenty-Eighth day of June in the year Two Thousand Twenty-Two (the "Agreement") (in words, indicate day, month, and year.)This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. for the following Work, which is a portion of the PROJECT: (Name and address or location) City of Denton’s Fire Station No. 09GMP Amendment #02 MaLAirLod_EyDenton, Texas 76207 AIA Document A20 1 TM–2017. General Conditions of the Contract for Construction. is adopted in this document byreference. Do not use with other general conditions unless this document is modified THE OWNER: (Name, legal status, and address) City of Denton 215 East McKinney StreetDenton. Texas 76201 (940) 349-8307 THE CONSTRUCTION MANAGER: (Name, legal status. and address) CORE Construction Services of Texas, Inc 6320 Research Road Frisco, TX 75033 TABLE OF ARTICLES A.1 GUARANTEED MAXIMUM PRICE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION A.3 INFORMATION UPON WHICH AMENDMENT IS BASED A.4 CONSTRUCTION MANAGER’S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS ARTICLE A.I GUARANTEED MAXIMUM PRICE SA.1.1 Guaranteed Maximum Price Pursuant to Section 3.2.6 2.2.6 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price. Guaranteed Maximum Price for the scope of Work set forth in Exhibit "A.2.C" – Scope of the Work –GMP Amendment #01. All references in this Exhibit " A’' to the Guaranteed Maximum Price shall mean and refer to the Guaranteed Maximum Price for the entire scope of Work set forth in Exhibit '’A.2.C" – Scope of the Work – GMP Amendment #01, unless the context Init. / AIA Document A1 33u - 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “AmericanInstitute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents'’ are registered trademarks and may not be used without permission. This document wasproduced by AIA software at 13:12:05 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for onetime useonly, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyrfght@aia.org.User Notes: 845050954) 1 DocuSign Envelope ID: 37816300-4E28-4FOA-93F6-EC349F0961 02 clearly indicates otherwise. As agreed by the Owner and Construction Manager, the Guaranteed Maximum Price is an amount that the Contract Sum for the scope of Work set forth in Exhibit " A.2.C" – Scope of the Work – GMP Amendment #01 shall not exceed. The Contract Sum consists of the Construction Manager’s Fee plus the Cost of the Work1 as thatterm is defined in Article 6 of the Agreement. SA.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed seven million five hundred three thousand five hundred sIxty-two dollars ($ 7,503,562.00 ), subject to additions and deductions by Change Order as provided in the Contract Documents. SA.1.1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories, including allowances; categories: the Construction Manager’s contingency; alternates; Contingency; the Owner’s Contingency; the Construction Manager’s Fee; and other items that comprise the Guaranteed Maximum Price as defined in Section 3.2.1 of the Agreement. (Provide itemized statement below or reference an attachment.) I See Exhibit "A.2.N'’ – Itemized Statement of the GMP and Clarifications § A.1 .1.3 The Construction Manager’s Fee is set forth in converted to and fixed as a lump sum in accordance with Section 6.1.2 of the Agreement. SA.1.1 .4 The method of adjustment of the Construction Manager’s Fee for changes in the Work is set forth in Section6.1.3 Sections 6.1.2.1 6.1.2.3 of the Agreement. SA.1.1.5 Alternates SA.1.1.5.1 Alternates, if any, included in the Guaranteed Maximum Price: ItemSee Exhibit "A.2.J" – Alternates with Costs and Expiration Dates Price SA.1 .1.5.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Exhibit A. Upon acceptance, the Owner shall issue a Modification to the Agreement. (Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.) Item See Exhibit '’A.2.J'' – Alternates with Costs and Expiration Dates Price Conditions for Acceptance SA.1.1 .6 Unit prices, if any: (Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.) Item Units and Limitations Price per Unit ($0.00)See Exhibit "A.2.K" – Unit Costs ARTICLE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION SA.2.1 The date of commencement of the Work shall be:(Check one of the following boxes.) [XJ [] The date of execution of this Amendment. Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) If a date of commencement of the Work is not selected, then the date of commencement shall be the date of execution ofthis Amendment Init. / AIA Document A133'- - 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The "AmericanInstitute of Architects,” “AIA.” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document wasproduced by AIA software at 13:12:05 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations1 e-mail copyright@aia.org.User Notes: p45050954) 2 DocuSign Envelope ID: 378163004E284FOA-93F6-EC349F096102 SA.2.2 Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allotted in the Contract Documents for Substantial Completion of the Work. The Contract Time shall be measured from the date ofcommencement of the Work. SA.2.3 Substantial Completion SA.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Construction Managershall achieve Substantial Completion of the entire Work:Work by the date set forth in: (Check one of the following boxes and complete the necessary information.) [ ] Not later than ( ) calendar days from the date of commencement of the Work. [ ] By the following date: Exhibit "A.2.D" – Construction Manager’s Project Schedule. Completion of such portions by the following dates: If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated damages, if any, shall be assessed as set forth in Section 8.6 of the General Conditions of the Agreement. Portion of Work Substantial Completion Date damages, if any, shall be assessed as set forth in Section 6.1.6 of the Agreement. ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED SA.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the ContractDocuments and the following: SA.3.1.1 The following Supplementary and other Conditions of the Contract: AIA A20 1 – General Conditions (2017) as amended and included in the original AIA A133 – O-CMaR Agreement, whichshall remain unchanged by this Amendment. Document Title Date Pages SA.3.1.2 The following Specifications: (Either list the SpecifIcations here, or refer to an exhibit attached to this Amendment.) See Exhibit " A.2.C" – Scope of the Work – GMP Amendment #01 Section Title Date Pages SA.3.1 .3 The following Drawings: (Either list the Drawings here, or refer to an exhibit attached to this Amendment.) I See Exhibit "A.2.C" – Scope of the Work – GMP Amendment #01 Number Title Date SA.3.1.4 The Sustainability Plan, if any: Of the Owner identifIed a Sustainable Objective in the Owner’s Criteria, identify the document or documents that comprise the Sustainability Plan by title, date and number of pages, and include other identifying information. The Sustainability Plan identifIes and describes the Sustainable Objective; the targeted Sustainable Measures, Init. / AIA Document A133H - 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “AmericanInstitute of Architects,” "AIA.” the AIA Logo, and “AIA Contract Documents" are registered trademarks and may not be used without permission. This document wasproduced by AIA software at 13:12:05 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time useonly, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.User Notes: W50509BI) 3 DocuSign Envelope ID: 37816300'4E28-4FOA-93F6-EC349F096102 implementation strategies seLected to achieve the Sustainable Measures; the Owner’s and Construction Manager’s roles and responsibilities associated with achieving the Sustainable Measures; the specifIC details about design reviews, testing or metrics to verijy achievement of each Sustainable Measure; and the Sustainability Documentation required for theProject, as those terms are defIned in Exhibit C to the Agreement.) Title Not Applicable Date Pages Other identifying information: SA.3.1 .5 Allowances, if any, included in the Guaranteed Maximum Price: (Identify each allowance.) Item See Exhibit "A.2.L" – Allowances Price SA.3.1 .6 Assumptions and clarifications, if any, upon which the Guaranteed Maximum Price is based:(Identify each assumption and clarifIcation.) See Exhibit "A.2.N" – Itemized Statement of the GMP and Clarifications SA.3.1 .7 The Guaranteed Maximum Price is based upon the following other documents and information:(List any other documents or information here, or refer to an exhibit attached to this Amendment.) Exhibit '’A.2" – Guaranteed Maximum Price Amendment Exhibit '’A.2.B" – Insurance and Bonds – GMP Amendment #O 1 Exhibit "A.2.C" – Scope of the Work – GMP Amendment #01 Exhibit "A.2.D" – Construction ManaRer’s Project Schedule Exhibit ’'A.2.E'’ – Construction Manager’s Soft Costs and FeeExhibit ’'A.2.F" – Key PersonnelExhibit "A.2.G" – Confidentiality of the Project Exhibit " A.2.H" – Customary and Usual Labor RatesExhibit "A.2.1" – Rental Rates Exhibit "A.2.J" – Alternates with Costs and Expiration DatesExhibit "A.2.K'’ – Unit Costs Exhibit "A.2.L'’ – Allowances Exhibit "A.2.M'’ – Schedule of Values – GMP Amendment #01 Exhibit "A.2.N" – Itemized Statement of the GMP and Clarifications Exhibit "A.2.O" – Escrow and Financing ConditionsExhibit "A.2.P" – Disputed Work ScheduleExhibit "A.2.Z" – Schedule of Exhibits ARTICLE A.4 CONSTRUCTION MANAGER’S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, ANDSUPPLIERS SA.4.1 The Construction Manager shall retain the consultants, contractors, design professionals, and suppliers, as may (ormay not) be identified in the Exhibit referenced below: (List name, discipline, address, and other information.) See Exhibit "A.2.N" – Itemized Statement of the GMP and Clarifications This Amendment to the Agreement entered into IN WITNESS WHEREOF, intending to be bound, the Parties have entered into this Agreement as of the day and year first written above. I Init. / OWNER (Signal„„) CeRS;RUG;}OkMANAGERWW#„# AIA Document A1 33’- - 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved . The “AmericanInstitute of Architects,” -AIA,“ the AIA Logo, and “AIA Contract Documents" are registered trademarks and may not be used without permission. This document wasproduced by AIA software at 13:12:05 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time useonly, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.orgUser Notes: O'+5050954) 4 DocuSign Envelope ID: 378163004E284FOA-93F6-EC349F096102 )(Printed name and title) Init. / AIA Document A133n - 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “AmericanInstitute of Architects,” “AIA,- the AIA Logo, and “AIA Contract Documents'’ are registered trademarks and may not be used without permission. This document wasproduced by AIA software at 13:12:05 ET on 10/21/2022 under Order No.21 14332942 which expires on 06/09/2023, is not for resale, is licensed for one-time useonly, and may only be used in accordance with the AIA Contract Documents® Terms of Service, To report copyright violations, e-mail copyright@aia.org.User Notes: W50509$4) 5 DocuSign Envelope ID: 37816300-4E28-4FOA-93F6-EC349F096102 THIS AGREEMENT HAS BEEN BOTH CONSTRUCTION MANAGER REVIEWED AND APPROVED as to financial and operational obligations and AUTHORIZED SIGNATURE Trevor Cra1 n SIGNATURE PRINTED NAME Date. 10/31/2022 Interim Director of Facilities Printed Name. Gary AanensonTITLE Faci llt1 es Management Title. vice President DEPARTMENT 214-885 –1039 PHONE NUMBER garyaanenson@coreconstructi OII . comEMAIL ADDRESS 2022-949777 TEXAS ETHICS COMMISSIONATTEST:CERTIFICATE NUMBER ROSA IUOS„.(.]J'Y SECRETARYaRaIxRleIBy: CITY ATTORNEYN/1 7\ By: CITY OF DENTON, TEXAS A Texas Municipal Corporation APPROVED AS TO LEGAL FORM: By SARA HENSLEYCITY MANAGER Init. / AIA Document A133’- – 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved . The “AmericanInstitute of Architects,- “AIA,” the AIA Logo, and “AIA Contract Documents" are registered trademarks and may not be used without permission. This document wasproduced by AIA software at 13:12:05 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time useonly, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyHght@aia.org.User Notes: M15050954) 6 DocuSign Envelope ID: 378163004E28-4FOA-93F6-EC349F096102 Certification of Document’s AuthenticityAIAS Document D401TM – 2003 I, Chris Squadra, hereby certify, to the best of my knowledge, information and belief, that I created the attached final document simultaneously with this certification at 13:12:05 ET on 10/21/2022 under Order No. 2114332942 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text ofAIA® Document A133TM – 2019 Exhibit A, Guaranteed Maximum Price Amendment, as published by the AIAin its software, other than changes shown in the attached final document by underscoring added text and striking overdeleted text Chris Squadra, Peak Program value, LLC (Title) 10/31/2022 (Dated) AIA Document D401 T- - 2003. Copyright © 1992 and 2003 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,"'AIA," the AIA Logo, and “AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIAsoftware at 13:12:05 ET on 10/21/2022 under Order No.2114332942 which expires on 06/09/2023, is not for resale, is licensed for one-time use only, and may onlybe used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.User Notes: M50509&I) 1 DocuSign Envelope ID: 37816300-4E28-4FOA-93F6-EC349F096102 Denton Fire Station #9 - GMP #2 Exhibit 'A.2.B’ Insurance and Bonds To be sent after GMP Amendment is signed. CPRE DocuSign Envelope ID: 37816300-4E28dIFOA-93F6-EC349F096102 Denton Fire Station #9 - GMP #2 Exhibit 'A.2.C’ Scope of Work for GMP Amendment #2 See attached Enumeration of Documents. CPRE DocuSign Envelope ID: 378163004E284FOA-93F6-EC349F096102 CPRE ENUMERATION OF DOCUMENTS City of Denton Fire Station No.9 GMP 2 October 17, 2022 ma ! = t––-–== t-nE[ t-n=t-=E b b PROJECT MANUAL S P e c D a t e S t a 1m P D a t e (RE E e –––+-r -F-InIll-F•EHI + I]I :1 =i =t 1 Pl PIN N IHllIHIHRalIM]I T3lm®o78Ffowg-TxaFcTMo TeR-el=mmRiilSFammmMm8f;D T2DTmRFaiimmmT5MIMITtERMii7tTGmr-aTrm BeT5–in@@a;mB7m o ed Shear 9-Sep-22 ) TSiF)-72FsTi:D-T:gibB337l;z 9-Sep-22 9–Sep-22 )FR)-22gWMm)BirD:bBB:2: 9-Sep-22M9-Se@m) :e EWm)EM3:Sip-Z3:BoB-g::ED-27BP)72- ) ) llP]IIImomomomomomommomomo 05 31 13lStudsm©eamFm®Mae n75–bTmemFsmBTimMmsS OSITES-6fif6t)no NIiFM) iT 1I Ma 1 mMD TTar6Ro n( Ime IBisulatiol®lHMm)m;=iMFG-rTi=mmMaTeJRB)mm;iFF=;T?TxmeemaTtmFTFeFeTrbTaFFIBRim c6m66mo s=mm78imaJ8TMT=0 STgnnATLrB;mcm6TrTa7QIRm7)1ae IM® wlmlTi7mf);D ®zT6TR8Mmcna-mT;iiaTmmvTsil=fmtF3TmEEr-;TrimtF5T3TGaimmtabTQ;emI EMa etFK5lqnaim<wFmBe MamamTTF)iamNFiiMl==6i7mmimPEi;mm-immm 9-Sep-22 ) 9-Sep–22e ) > ) 9-Sep-22 ) 9-Sep-22Ma ) )in 9-Sep-229-Sep@BP) )T:5@9-Sep-229-See@9-seaM)2mp:72-mD:DBiILD' )mp:D9-Se@9-Sep@ )BiT)-22Rgb-22 9-Sep-22W)9-Sep-2.qm- -) 9-Sep-22W 9-Sep–229-Sep-22mp-22 T:Gb-22 9-Sep-22 9-Sep@Fsa%)-22M)9-Sep-22M)9-Sep-22 9-Sep-22m-22e3:ginT-VedaM2WeW 9-Sep-22 9-Sep-22Bmi7:SeE:D 9-Sep-22 )9=SW ) ) 9-Sep-22e e 9-Sep-22 9-Sep-22T:g;p72-3:i-eDn-mp-22 9-Sep-22 ) 9-Sep-22HimB-s-gm ) 9-Sep-22 ) )m)-m)-z-9To-27Hep-22TB-gi-Z > ) ) )mpH3-3-ii)n NONEmomomomomomomomomomomomNmomomomomomomomomomomomomomomomomomomomomomomo 09 77 oo jcorner Guards 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22e )T:sm bmmrt=rTain 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22Mmpa ) 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22nep -22)m>-z> NONE NONE 1 D NONE NONE NONE NONE NONE mmiRBi;-L=RBTgITaammoFaRaiiiaT 1 =–x=aMl iTTFaTiTM D -FoRMeD r=p==m NONE NONEmomomomo Page 1 of 6 DocuSign Envelope ID: 378163004E284FOA-93F6-EC349F0961 02 CORE ! ENUMERATION OF DOCUMENTS City of Denton Fire Station No.9 GMP 2 October 17, 2022 S P :::= == igo n /Ft-la-I=L a mMe MmmmmeTd)o mm) c ad Countertopsom@BmT@uartz A®U® mes I 1lnmc-iMvmCiTe - rD e icriptio I I Jrat= ) Ie –-3-:geTn9--gM )gmm)79-Sep-22BM>:n ) ) 9-Sep-22 9-Sep–22 )m:M ) ) # > ) 9-Sep–22WEB fORF Roraivad nato Ravi qjAnM T-Baam)9–Sep-22 9-Sep-22- )mB@m)79-saTB:sm37)27 ll[•]IIImo mo mo mo momo mo momo moWE mo lression g2 OS 29IHangers and Supports for Plumbing Piping and ValvesL r 1 G. AND AIR-CONDITIONING DIVISION 231 (HVAC) 9-Sep-22M 9-Sep-22mp-22M A+9-Sep-22Wma NONEmomo 9-Sep-22 9-Sep-22 9-Sep-22 NONE 23 05 29IHangers and Supports for HVAC Piping and Equipmentc Him-e Mr a M 23 0WrXgro ItE]lfontrol System for HVACLgrIce oR@tions forUm;inT[miams7iBmFtmIIT=s-= a r2TnmsT)F5MIGTcmFeT; I ms D 7mR®aRmmm tm27Fr8tmlmamim L /ices ©2m3mo=me o I 26 183£wmToTn8mTBMTttTmmm>mE>Bmj;rmmra>miTt;mm©D MArcI as tru ctu remin[xiamm=I RITY e oa EEIc c7fBTCmMmrmiam ITwo-Way Communi aEinD 9-Sep-223%FiTmbamf9–Sep-22 9-Sep-229-Mmp-229-Sep-22 )a;:a9–sT;:nbTen) 'T=iFa-Rep-Z 93m) 3:BiEn )) ) >m-22-9-SeN?-9-Sep-22 e e J93;a 9-slaM33Tn) -gM;ITBR)=79-sin 9-Sep-22 9-Sep-22 9-Sep-22 > >9-sea9-Sep-22 ) T:gm 9-Sep-22 )3:m3:imBib-22 9-Sep-2@ ) Tm)-z9-sD 9-Sep-22 9-Sep-22 ) ) )3:gMT3:M)27 )-9R6n9-Sep-22 ) ) 9-Sep-229-Sepa- Hip-22 ) 9-Sep-22 ) )Him)R>27 )m 9-Sep-22T:gmKeN)79 -Sep@ > > 9-Sep-Z9m bUSHBin) >9-SepT mp-22TTa;aT)9--RF27> m)-22 9-SepT2–f9:s-iBn9-Sep-22)mp-229-Sep-22 9-Sep–22 T:-sTDaTBF)27) ) NONEmomomomomomommomomomomomomomEmommomEmomomomomomomomomomomomomomomomomomomomomomomo mo -1-r-r t; I E '’ r-r-E Page 2 of 6 DocuSign Envelope ID: 37816300-4E28-4FOA-93F6-EC349F096102 CPRE ENUMERATION OF DOCUMENTS City of Denton Fire Station No.9 GMP 2 October 17, 2022 Specification/ Drawing Spec Date Stamp Date CaRE Received Date Revision ] F Er- HI A •Fr-• 3 1 iBm[niBlmaMI3mme%rTsla®s-TiMT[BTimTma TwaMriI72TftRWFmi;D BT@slbTinITt7bia®FiFi®WEBWWW TWFSB:D 9-Sep–22@ mi:22-g:3ii;Z g:S-ed:2-2 9–Sep-22EW 9-Sep-22W)Mgm>2T-giT:Zm)9-Sep-22W) 9-Sep-22 ) 9 -smHip-22B-ip-27gnp:72We3-Sep-229-Sep-22mp-22 [1[•]IIImo momo momomomomom D r a w i n g D a t e S t a 1rIn P D a t e (RE Received DateDescriptionIBea4–[–– =––T––––r––3 M 1 4 :I4 ;DR,A\@@{ING§' !] G-011 G-021 G-022 G-023 G-024 G-1 1 1 G-112 G-120 L1 01 L1 02 L500 LIOO 1 mI L1500 A-001 A-002 A-003 A-11 1 A-1 12 A-121 A-122 A-131 A-132 A-141 A A-201 A-202 A-211 A-212 A-213 A-301 A-302 A-31 0 A-311 A-312 A-313 A-401 A-405 A41 OA A-500 A-501 A-502 A-505 A-506 A-510 A-515 mmanmMM;jegends & Abbreviatiois Accessibility Standards Accessibility Standards Accessibility Standards -;F;;;ssibility Standardszma;FTFaR-Z ilanSecond Floor Storm Shelter Requirements Landscape Planting Plane T;mM-w Landscape Details Landscape Irrigation Notes & Schedulesmdscape Iriq®E®n PI iF> iT;iIIiT;i; Architectural / Interior Legendsr aTincFiii;aT: Tii;rT;TRrtition Schedule Dimensioned Floor PlansFirst Floor Dimensioned Floor PlanSecond Floor Annotated Floor PlanFirst Floor-1- Reflected Ceiling PlanFirst Floor Reflected Ceiling PlanSecond FloorRoof Plan Exterior Elevations Exterior Elevations Interior iFe-v-aTii; Interior Elevations Interior Elevations Building Sectionsm=aTiii -ie Wall Sections WaIT Sections Wall Sections Enlarged Plans Enlarged StairStairs and Elevator Details Details Details Plan Details Plan Details Roof Details 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep @3==i;-Z 9-Sep-22 9-Sep-22 9-Seo-22 @ 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 a9lgsmIIBEI 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22A 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9–Sep–22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-229- aM) 9-Sep-22 9-Sep-229-Sep-22 9-Sep-229-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22We 0 9-sqa 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-229-Se@ 3:Sep-22 9-Sep-22i=ej>- Z 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 gIggIE)Eg 9-Sep-22-gap:22 9-Sep-22B= i:22 9-Sep-22 M•!!11 NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONEmo NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONEStair Details Page 3 of 6 DocuSign Envelope ID: 378163004E284FOA-93F6-EC349F0961 02 CPRE ENUMERATION OF DOCUMENTS City of Denton Fire Station No.9 GMP 2 October 17, 2022 -F- ––t––––= Date n=Bri TI 9-Sep-22 9-Sep-22 -[-[-[-[-[=a-F-[U E J r H = JE:R+ MI] A-601 A-602 A-605 I 1-101 1-102 1-111 1-112 1-121 1-1 22 1-131 1-132 WaliIim©cm Door Schedule Hollow Metal Frame & Door Details Aluminum Frame Schedule Interior Legends & AtmFF;FiRms :Tr Finish PlanSecond Floor Floor Finish PlanFirst Floor Floor Finish PlanSecond Floor Wall FinistmRmTJiF Wall Finima-r=e o-imTr Furniture PlanRTmJi Furniture PlanSecond Floor Equipment PlanFirst Floor Equipment PlanSecond FloorFire Prot?getion Plan Plumbing Azm==&Tm Plumbing PlanmiFamm;;mannFi PlumbinH( bEtmBg c e Z;=i;i-$i8TrMech=Imii;tm Mechanical pipimam;}== Mechanical Piping PlanSecond Floor MechaMr iIDeta ils Mechanical Schedules Electrical Abbreviations & Legend Electrical Site PlanLightR-5-mi-m Lighting Plan Second Floor Power PlanFirst Floor Power PlanSecond Floor Mechanical Power PlanFirst Floor Mechanica-PPe Fire Alarm PlanFirst Floor Fire Alarm PlanSecond FloorElectrii=mMRElectrical Details Ele ii=1 m1 Electrical Schedules Electrical Schedules Legend and NotesAudiovisualFallFirst FEa ia;Vi;mI Second Floor FI;I = Reflected Ceiiimirmmii=;ii Reflected Ceiling PlanSecond FloorAudiovisualOne Line DetailsAudiovisual General DetailsAudTm General DetailsAudiovisua Legend and Notesim Site PlanSecurity r PlanSecurity e Security o mM9:GHZ9-Sep@ 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-229-sen 9-Sep-229-Sep3 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-seE:D- 9-Sep-22 9-Sep-22 9-SW9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-229-@ 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22gM 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep 9-Sep 9-Sep 9-Sep-22 9-Sep-22 9-Sep-22 <;tamn nato conF Rnroivnrl nato Pavicir\n9-S@ 9-Sep-22 9-Sep-22 9-Sep-229-sea 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-SeD-22 B mMmo NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONEmo NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONENONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE N NONE NONE 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-229-sea- 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-229-SW 9-Sep-22 9-Sep-22 9-Sep-229-s-8M 9-Sep-22 9-Sep-22 9-Sep-229-siB 9-Sep-22 9-Sep-22 gEgIBB!gIg9-SerB- 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 I–––––––T––-––-–T–-––––[–––-–q eJ-1-[-––T––-––-–r––-–=[-a + P-001 P-110 P-1 1 1 P-1 12 P-501 P-601 M -001 M-111 M-112 M-121r-m M-501 M -601 E-001 B E-lOOB E-1 1 1 E-1 12 E-121 E-122 E-123 E-124 E-131 E-132 E-501 B E-502 E-601 E-602 E-603 AV-001 AV-002 AV-1 1 1 AV-1 12 AV-131 AV-132 AV-301 AV-401 AV-402 SC-001 SC-100 SC-1 11 SC-1 12 SC-30 1 Page 4 of 6 DocuSign Envelope ID: 37816300-4E28-4FOA-93F6-EC349F096102 CPRE ENUMERATION OF DOCUMENTS City of Denton Fire Station No.9 GMP 2 October 17, 2022 onI F J == Stamp Date COREDatensc-461 SC-402 T-001 T-002 T-100 T-1 11 T-1 12T4F–T=BT––-–1 T-302 IM General DetailsSecurity Legend and NotesCommunications Riser DiagramCommunicationsSite PlanCommunications m{}Ti-orplanCommunications Te-Z= Floor PlanCommunicationsno -FPlanCommunications -me Mr GMBit-ms ommuncations E=r iT;betailsCommunications ADDENDU 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 e IS gIBIg[@181 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-22 9-Sep-229-SepT 9-Se1 9-Se1T=1 9-Se1 9-Se1 meM NONE NONE NONE NONE NONE NONE NONE NONE NONE E Stam y +II I=[ Received Date I I 03 3;mS04 22 00 08 11 13 08 31 31 08 33 26 08 35 13 08 36 13 0891 19 10 14 23.16 10 28 00 22 14 29 He mme mm Concrete Unit Mason Hollow e 8M Access Doors and Frames Overhead Coilinq Doors o Sectional Doors Fixed Louvers Iiiim-Identification Panel Signage Toilet, Bath & Laundry Accessories 27-SeE)Eg 27-Sep-22%Me 17--giF): 27-Sep- 27-Sep- 27-Sep-27-SejM 27-Sep-22Hii=22 27-Sep-22 27-Ser@ 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-2227-Sep@ 27-Sep-22 77-Sep-22 27-Sep-22 a 27-Sep@ 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 M NONE NONE NONE NONE NONE NONE NONE NONE NONE NONESump Pumps e race Packaged Air Compressors and22 15 19 22 33 00 23 09 93 23 34 00 ReceiversmeiRIi)-onr ;i;-va;Tern;;ters ia-L=iCe of Operations for HVAC ControlsHVAC Fans 27-Sep-22 27-Sep-22 27-Sep-22 e 27-SeI 27-Se1lal;i2 e 27-Sep-22 27-Sep-22 27-Sep-22e NONE NONE NONE NONE 23 81 27.00 G-101 G-120 S-101 A S-l04S S-1055 S-1 11 S-121 S-131 S-310 S-311 S-501 S-511 S-512 A-121 A-131 A-202 A-211 A-212 A-213 A-31 2 A-521 A-602 A-605 1-121 1-122 F-1 1 1 P-110 SFL Variable Refrjgerant Flow Air Conditioninl7;Z3bTi==ia-iirT -melter Requirements Structural Notes Sr ural Notes & Plans Storm Shelter Plans, Elevations & Details Foundation Framing Plan Second Floor Framing Plan Low & High Roof Framing PlansFoundation Details Site Plans & Details Typical Steel DetailsSecond Floor Details Roof Details Annotated Floor Plan First Floor Reflected Ceiling Plan First Floor Exterior Elevations Interior Elevations Interior Elevations Systems 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 1%Me17:R)72 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22mep-22 27-Sep-22 -Fs-ip-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22FM)2 27-Sep-22T:ETp-22 27-Sep-22 :7--gbT)-22 27-Sep-22DTI:72 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-2227B©F£2 EI t 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 2@BBBM 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 NONE NONE NONE NONEmo NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE Interior Elevation Wall Sections Millwork Sections;=nimeFriii-ihl-G=tma Aluminum Frame Schedule Wall Finish Plan First Floor Wall Finish Plan Second Floor Fire Protection Plan L Page 5 of 6 DocuSign Envelope ID: 378163004E28-4FOA-93F6-EC349F096102 CPRE ENUMERATION OF DOCUMENTS City of Denton Fire Station No.9 GMP 2 October 17, 2022 M P-1 12 P-121 P-122 P-501 P-601 P-901 M- 1 11 M-112 M-121 M-122 M-501 M -601 E-001 B E-lOOB E-1 1 1 E-1 12 E-121 E-122 E-123 E-124 E-501 B E-601 E-602 E–603 AV-1 1 1 AV-131 SC-001 SC-111 SC-112 SC-301 T-1 1 1 T-1 12 T-141 T-301 PJmu Imiarn;r Condensate Pipira ond Floor Plumbing Details PlumbirMl M1 mLa Riser DiMns-aMIn;mi Mechanical Plan Second FT;i Mechanical Piping Plan First Floor Mechanical Piping Plan Second FloorMechanical Details Mechanical Schedules Electrical Abbreviations &-L= Electrical Site Plan Lighting Plan First Floor Lighting Plan Second Floor Power Plan First Floor Power Plan mfWMechanim-Q-imF;i-FT8bT Mechanical Power Plan Second Floor Electrical Riser DiagramTe-inl-=c Electrical Scnl lineEIc = Floor Plan First M-maTs= Reflected Ceiling PTaTm; Legends and Notes Security First Floor Plan Security Second Floor Plan Security Door Details SecurityFloor Plan First FloorCommunM o Roof Plair = Telecom Room Detais = Descrintion S P e= = :te :a :1::: :RE Received Date Revision 11 F I1-1-n)T>Matt-F T2 T2 :iii t a ; :H B [ + 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Se 27--= 27-Se2% 27-Se127:s-;Ba 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-2227-Sea! 27-Sep 27-Sep e 27-Se 27-Se 27-Se 27-Se 27-Se1 27-Sep-2227-Sen) 7 27-Sep-22 27-Sep-22 2 B;J:= 27-Sep-22 27-Sep-22 27–Sep–22 27-seT:-Z 27-Sep–22 27-Sepa 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 e 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Se1 27-Se1 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 :e 27M 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 27-Sep-22 m•NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONET–nNT NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE q–--T––-––-T–––I–-T–––= –––[–––– Page 6 of 6 DocuSign Envelope ID: 37816300-4E28-+FOA-93F6-EC349F096102 CPREDenton Fire Station #9 - GMP #2 Exhibit 'A.2.D’ Construction Managers Project Schedule Unchanged in this amendment, provided again here for reference. r\Ialdr\IdP a)3Da)aLJL/)Da) rDTalD alr\1\brNt\1;1 al3b- &BiSh8 SgIRIPQHE 0 ElalalE103Q i'EaEaq=I30aYJ aCaltD Ca)Eg)3a9a I LE: alalaACEQ-,BalS) $BQC alg Eaa ====(1 allala)atiaq.Bal g U Q"i g E gOLLI IE g Tra ii a }g LB BB)a) g aE(5 8 a89 'Ge (i>,G ONahSLS €E8a aaaC)>,G EalEa)3 g > reLUJIaECD aECD !IDalga ShEa) >a)Ua)ac IE10 8/ >a >JO3a)5alacHIaECD Ia) > gTt) 79EIEC) r\IUECDal Aa)a UhEa) >'a8ac aa &7) g 1:g 3Lin oilahECD IE al >a >JOBa)iacINaECD S9alal < 'EaaanB3aa alalar to3 Ba g g iiaQ iiS >a)be 0 5alUl noCiF0afr gbE itrI aaB3 UCaL) 3alC Ea)IPaIaal3trI r\InJ6ald a)3Da)£LJL/)Da)ADal3 ii Ii i LE Egasb-ueno38 lg }g g g gR g B B,g b g g a) CtqBaa a)C30a)aY0 jaa)Cal CD Tu ETha) >aUfr 5on3 : a)3 a)£C) LeClaa)la3ESCOa aJCAa)3 la Cai;aEa(JBEPa3 BBa aE3a EC08BLE0C)ac <EC) unCC0 EEaL)\ala a) gatgcr) g gfiLb g ;iEl Raa iT) g i 6ea'+=EQ) 8L === LECaEagI LI IBelalIa le8Ba noe 1=ae30 a) >aE alC30 gC gaaG)3laa) = LH faQ alC30 TJR10\,g3dB3i ea'€ = BaLI Fa aJE': DocuSign Envelope ID: 378163004E284FOA-93F6-EC349F096102 CPREDenton Fire Station #9 - GMP #2 Exhibit 'A.2.E' Construction Manager's Soft Costs and Fee This is a not to exceed cost for these cost items, which will be billed at Contractor's actual cost per the terms of the Agreement, and the General Conditions Responsibility Matrix included in this Exhibit DocuSign Envelope ID: 37816300-4E28-4FOA-93F6-EC349F096102 City of DentonFire Station No. 9GMP Amendment #2 Updated on October 7, 20a Item # 2.000 GMP #1 Costs (Previously Approved}MrM FS # 3 . CMAR's Proposa1 of Costs to Be Reimbursed (Not to Exceed Topset) = 76.667 9 INCLUDED IN 246,094 IN IN NOT IN PROJECT NOT IN PROJECT IN PROJECT IT bT IN IN PROJECT PROJECT NOT ROJE IN NOT IN NOT IN 558,544 BY SUBCONTRACI BY BY 125 T IN PROJECT ,000 10.125 BY GMP #1 + GMP #2 Tota1 Cost Ut ‘ Estimated Cost of Insurance2.A o mITnaME2lal MO MO MO 2.012 MO MO MOField MO2 2 General Laborer MC MO MO 2.022 MOield LSStaffOther On-site2.023 2.024 Pr : :: 2.B Estimated Cost of Onsite Staff . SubtotalPtE7XmmmI! NOT IN PROJECT NOT IN PROJECT NOT IN NOT IN PROJECT NOT IN IN IN NOT IN PROJECT NOT IN PROJECT IN NOT IN PROJECT NOT IN NOT NOT NOT IN IN IN PROJE IN BY BY SUBCONI BY SUBCOI DocuSign Envelope ID: 378163004E284FOA-93F6-EC349F0961 02 CIty of DentonFire StatIon No. 9GMP Amendment #2 Unit Unit Cost EA 75.00 LS MO LS I Quantity I Unit Third Party Safety Inspections BY SUBCONTRACTOR(S FBCONTRACTOR(S BY SUBCONTRACTOR(S: BY SUBCONTRACTOR(S 2.048 at Install Site Office 2.051 Gas IN BY SUBCONTRA( BY SUBCONTRACTORI NOT IN PROJECT BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S Ongoing Electric Charges for the Site Office OngoIng Tobdata Charges for the Site Office Qngoing Water & Sanitary District Charges Ongoing Gas Utility Charges (exluding Temp BY SUBCONTRACTOR(SI BY SUBCONTRACTOR(S 2,058 Schedule Setup & 2.059 Photo Documentation 2.062 063 2.aM I Home Offioe Trave BIM Model Setup & Maintenance BY NOT IN PROJECT IN Couriers. & & TI Radios & &Wi Ladders & Stairs Erosion Control 2.071 2.072 2.073 BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S BY BY BY SUBCONTRACTOR(S NOT IN PROJEC TI2 Hoisting & Material Management 2,088 NOT IN PROJECT BY SUBCONTRACTOR(S 1 ]Re RAC NOT IN BY SUBCOb BY SUBCONI BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S DocuSign Envelope ID: 37816300-4E28-4FOA-93F6-EC349F096102 City of DentonFire Station No. 9GMP Amendment #2 Updated on October 7, 2022 QuantKyl Unit ! Unit Cost iQuantltyl Unit I UnIt cost 2.093 1 Personne1 Hoist 2.094 1 Erect Hoists LS MO LS LS NOT IN PROJECTI=EMOU I I]BY [aBY OWNER BY OWNER BY OWNER BY OWNER BY OWNER BY OWNER BY OWNER NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT BY SUBCONTRACTOR(S' BY SUBCONTRACTOR(S: BY SUBCONTRACTOR(S) NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT BY SUBCONTRACTOR(S) LS LS LS 1 1 LS 1 NOT IN PROJECT NOT IN PROJECT NOT IN PROJECT BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) 2.097 Tem 2.098 Hoist Operation Hoisting for Subs 2.099 1 Other Hoisting & Materials Management Costsl { jf the tiM Scaffoldinl BY SUBCONTRACTOR(S) Temporary Site Protection not w/Erosion Control LS BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S: BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) 2. 1 02 BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S) 2.103 Temporary Building Heat not w/Gas Chars Dewatering System & Other Water Removal Snow Removal Other Protectiolmt WK LS LS 2.106 2.107 Soil Testinl Concrete Testing BY OWNER Masonry Testin€ BY OWNER BY OWNER BY OWNER LS LS LS LS LS BY OWNER BY OWNER BY OWNER Other Materials Permits & Fees BY OWNER 2.111 2.112 2.113 Building Permit Plan Check Fee Water Tap Fees Sanitary Sewer Tap Fees Elevator Permit & Inspections BY OWNER BY OWNER BY OWNER BY OWNER BY OWNER BY OWNER BY OWNER BY OWNER BY OWNER BY OWNER LS LS LS LS LS 2.116 2.117 2.118 BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S ) BY SUBCONTRACTOR(S: BY SUBCONTRACTOR(S BY SUBCONTRACTOR(S) BY SUBCONTRACTOR(S: Health Department Permits & Inspections LS LS 2.119 1 Other CMAR's Onsite Costs Needed for the r 2.000 IN PROJECT 59,380 328,678 IN PROJECT 135,175 789,953 NOT IN PROJECT 194,555 1,118,632 DocuSign Envelope ID: 378163002IE28-4FOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM PRE CONSTSERVICESFEE DESCRIPTION CONST 1 GC REIMB SERVICES 1 GEN CONDCOSTFEE DIRECT COST OF SUB'S WORK COMMENTS REQUIRED OFOWNER AND/OR DESIGN TEAM 1.0 ;ONSTRUCTION SERVICES 1.01 ARCHITECTURALSELECTION STRUCTURAL.MECHANICAL.ELECTRICAL ANDOTHER DESIGNCONSULTANTS 1.02 1.03 SPECIAL CONSULTANTSELECTION 1.04 1 SURVEYORSELECTION . A, I SITE SELECTIONI'uo I RECOMMENDATIONS 1.06 REVIEW DESIGNCONCEPTS DEVELOP BIDPACKAGES ANDPROCUREMENTSTRATEGY 1.07 X 1.08 SITE USERECOMMENDATIONS 1.09 MATERIAL SELECTION RECOMMENDATIONS 1.10 BUILDINGS SYSTEMS RECOMMENDATONS 1.11 BUILDING EQUIPMENTRECOMMENDATIONS (MOVEABLE) 1.12 BUILDING EQUIPMENT RECOMMENDATIONS(FIXED) 1.13 CONSTRUCTIONFEASIBILITY RECOMMENDATIONS X 1.14 PROJECT MASTERSCHEDULING X 1.15 LIFE CYCLE COSTANALYSIS X 1.16 INFORMAL ANDFORMAL VALUEENGINEERING X Page 1 of 18 a 2022 Peak Program Value, LLC All rights reserved DocuSign Envelope ID: 37816300ztE28-4FOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM I) IIt E CONSTSERVICES FEE DESCRIPTION CONST GC REIMB SERVICES ! GEN CONDCOSTFEE DIRECT SUB'S WORK COMMENTS REQUIRED OFOWNER AND/OR DESIGN TEAM 1.17 ENERGY USE ANALYSISAND RECOMMENDATIONS X INITIAL PROJECT PROFORMA ANDFEASIBILITYREVIEW\APPROVAL 1.18 1.19 SUBCONTRACTORS’LABOR AVAILABILITYREVIEW X 1 ,20 MATERIAL, EQUIPMENTAND SUBCONTRACTORAVAILABILITY X 2.0 PROJECT BUDGETING AND COST CONTROL 2.01 TOTAL PROJECT COSTBUDGET 2.02 CONSTRUCTION COSTBUDGET X 2.03 CONSTRUCTION COSTBUDGET ESTIMATES X 2.04 PRELIMINARY COSTMODEL 2.05 CONCEPTUAL DESIGN ESTIMATE 2.06 50% SCHEMATICDESIGN ESTIMATE 2.07 100% SCHEMATICDESIGN ESTIMATE X 2.08 50% DESIGNDEVELOPMENTESTIMATE X 2.09 100% DESIGNDEVELOPMENTESTIMATE X 2.10 50% CONSTRUCTIONDOCS ESTIMATE X 2.11 BID PACKAGE/SUBCONTRACTESTIMATES X 2.12 CASH FLOW PROJECTIONS X Page 2 of 18 a 2022 Peak Program Value, LLC All rights reserved DocuSign Envelope ID: 378163002IE28dIFOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/S/2022 at 6:28 PM PRECONST SERVICESFEE DESCRIPTION CONST 1 GC REIMB SERVICES 1 GEN CONDCOSTFEE DIRECT COST OFSUB'SWORK REQUIRED OFOWNER AND/OR DESIGN TEAM a .a 1 FUNDING MODEL&z' IO 1 REVENUE PHASING X 2 a 1 4 y=5 :rsl 1(1HHp11 U A N T 1 1V X 2.15 TRADE. VENDOR & SUBESTIMATES X 2 H 1 6 1 E :ahi; gER D E R X 2 p 1 7 1 : E)f= f c o u N T 1 N G X 2.18 REPORTING METHODSSET-UP X 2.19 PAYMENTPROCEDURES SET-UP X 2.20 CHANGE ORDERPROCEDURES SET-UP X 2 T 2 1 1 :Sil F1g : 1 S ? T X 3.0 SUB-CONTRACTING SELECTION, PURCHASING, & SCOPE MANAGEMENT 3.01 SET SUB PRE- QUALIFICATIONCRITERIA X RECOMMENDSUBCONTRACTOR PREQUAL & SELECTIONMETHODS 3.02 X RECOMMENDSUBCONTRACTOR BIDDING & AWARDMETHODS 3.03 X 3.04 DEVELOP SUBCONTRACTORINTEREST X 3.05 PREPARE BIDDINGSCHEDULES X 3.06 ISSUE PLANS. SPECS &BIDDING DOCS X 3 n o 7 1 : g E P !:1:NP:LE = B 1 D X Page 3 of 18 o 2022 Peak Program Value, LLC All rights reserved DocuSign Envelope ID: 37816300-:+E284FOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM 1) 1t ECONSTSERVICESFEE CONST GC REIMB SERVICES I GEN CONDCOSTFEE DIRECT COST OFSUB'SWORK DESCRIPTION COMMENTS REQUIRED OFOWNER AND/OR DESIGN TEAM 3.08 1 RECEIVE BIDS X 3.09 1 ANALYZE BIDS X 3.10 1 RECOMMEND AWARD 1 X 3.11 1 VERIFYUNITCOSTS X 3.12 NEGOTIATE UNIONRATES & LABOR COSTS (AS REQUIRED)X 3.13 CONDUCT PRE-AWARDCONFERENCE 3.14 1 PREPARECONTRACTS X 3.15 SUPPLIER ANDSUBCONTRACTORREVIEW X 3.16 ORIGINATE RFI’S AFTERSCREENING 3.17 VALIDATE & PREPARECHANGE ORDERS VERIFY CORRECTNESSOF QUANTITIES ANDPRICES OF CHANGEORDERS 3.18 X 3.19 COORDINATE OWNER-SUPPLIED FIXEDEQUIPMENT X 4.o 1 CONTRACT DOCUI COORDINATION DRAWING, SPEC &DOCUMENT REVIEW & COORDINATION RECOMMENDATIONS 4.01 X 4.02 CONSTRUCTIBILITYREVIEW AND RECOMMENDATIONS X 4.03 SUBCONTRACTOR WORK PACKAGESCOPE COORDINATION X Page 4 of 18 o 2022 Peak Program Value, LLC All rights reserved DocuSign Envelope ID: 37816300JtE28-4FOA-93F6-EC349FC)96102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM PRE CONSTSERVICES FEE DESCRIPTION GC REIMBCONST SERVICES 1 GEN COND FEE COST DIRECT COST OF SUB'SWORK COMMENTS REQUIRED OFOWNER AND/OR DESIGN TEAM 4.04 RESPONSIBILITY FOR:SAFETYPRECAUTIONS X 4.05 SAFETYPROGRAMS 4,06 TEMPORARY FACILITIES 4.07 COMMON USEEQUIPMENT 4.08 COMMON USESERVICES 4.09 REVIEW FORJURISDICTIONALOVERLAP X 4.10 INCLUSION OF ALLWORK X 0 PHASINGSCOPE &SCHEDULE COORDINATION 4.11 X 4.12 IDENTIFY LONGLEAD ITEMS X 4.13 OBTAIN APPROVALS OFAGENCIES HAVING JURISDICTION (AHJ) 4.14 ASSIST IN OBTAINING PERMITS & APPROVALS (AS NEEDED) X X 5.o 1 CONSTRUCTION PHASE STAFF 5.01 PROJECT MANAGER (AS NEEDED)X PM MAY ALSO BE WITH FEE 5.02 PROJECTSUPERINTENDENT X 5.03 ASSISTANT PROJECTSUPERINTENDENT (IFREQUIRED) X 5.04 MECHANICAL COORDINATOR (IFREQUIRED) X 5.05 ELECTRICAL COORDINATOR (IFREQUIRED) X Page 5 of 18 o 2022 Peak Program Value, LLC All rightS reserved DocuSign Envelope ID: 37816300-+E28dIFOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM PRE CONSTSERVICESFEE SERVICES 1 GEN CONDCOSTFEE DIRECT SUB'SWORK DESCRIPTION COMMENTS REQUIRED OFOWNER AND/OR DESIGN TEAM 5 a o 6 : E :1 :1: E I F 1 N E E R W s X FIELD ENGINEER ANDSURVEY CREW:SITE\BUILDING LAYOUT (IF REQUIRED) 5.07 X STAFFING DESCRIPTIONS SHOWN HERE, & THOSESHOWN IN THE CONTRACTOR’S STAFFINGPLANAND\ORFEE & COST PROPOSAL MAY VARY FROM WHAT ISSHOWN HEREPROJECT COST ALLOCATIONS, HOWEVER,WILL BE CONSISTENT WITH THIS MATRIX FIELD ENGINEER ANDSURVEY CREW: LINE AND GRADE (IFREQUIRED) 5.08 X 5.09 RODMAN AND ASSISTANT (IFREQUIRED) X 5.10 TIME KEEPER/ CHECKER (IFREQUIRED) X 5.11 SCHEDULING ENGINEER (IFREQUIRED) X 5.12 PROJECT COORDINATOR (IFREQUIRED)X 5.13 COST ENGINEER (IFREQUIRED)X 5.14 ADMIN ASSISTANT SITE SECRETARY (IFREQUIRED) 5.15 SAFETY ENGINEER & SAFETY INSPECTOR(S) 5.16 GENERAL LABORER (IF REQUIRED) 6.O I TRAVELANDLODGI 6.01 1 STAFF TRAVEL COST X 6 B 0 2 1 i = = P 11b1HHIII11) R TAT I O N X 6 H o 3 1 FMEoa \S : TE :it :s E s X 6 n 0 4 1 : : :g FsTTE : :IE 1(11HHH) S T S X Page 6 of 18 o 2022 Peak Program VaRte, LLC All rights reserved DocuSign Envelope ID: 378163004E284FOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/S/2022 at 6:28 PM f3 RE CONSTSERVICES FEE DESCRIPTION CONST 1 GC REIMB SERVICES 1 GEN COND COSTFEE DIRECT SUB'SWORK REQUIRED OFOWNER AND/OR DESIGN TEAM TEMPORARY FACILITIES7.0 7.01 SAFETY EQUIPMENTAND FIRST AIDSUPPLIES 7.02 HANDRAILS AND TOEBOARDS 7.03 1 OPENING PROTECTION 7.04 1 FIREE>CrINGUISHERS 7.05 WATCHMAN SERVICE (IF NEEDED) 7.06 OFFICE OR TRAILERRENTAL 7.07 1 WATER, ICE AND cups 7 T o 8 1 ; ;TIR ErMYp s 7.09 1 PROJECTSIGNS 7.10 1 BULLETINBOARDS 7.11 CONSTRUCTIONFENCING 7.12 BARRICADES ANDCOVERED WALKWAYS (AS NEEDED) 7.13 SAFETY’ NETS (ASNEEDED) ARCHITECT’S/ENGINEER’S/ OWNER’S TEMPORARY ONSITEOFFICE 7.14 7.15 1 TEMPORARY TOILETS X Page 7 of 18 o 2022 Peak PrOgram Value, LLC All rights reserved DocuSign Envelope ID: 37816300-£IE28-4FOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM PRE CONSTSERVICES FEE DESCRIPTION CONST 1 GC REIMB SERVICES 1 GEN CONDCOSTFEE DIRECT SUB'SWORK COMMENTS REQUIRED OFOWNER AND/OR DESIGN TEAM 7.16 TRAILER SECURITY& SITE SECURITY MONITORIING X 7.17 TEMPORARY PROTECTIVEWALKWAYS & WALLS X 8.O E ON-SITE UTILITIES SERVICES TEMPORARYTELEPHONE INSTALLATION ANDEXPENSE 8.01 X 8.02 TEMPORARY POWERSERVICE &DISTRIBUTION ON SITE X 8 B O 3 ; E : y\ bNEE N T P O W E R X POWER TOONE POINT 8.04 TEMPORARY WATER AND HEATING SERVICE X INCLUDING ALL TEMPORARY HEAT FOR SUBS 8 n o 5 1 B E::1: FsE N E R G Y X 8.06 1 TEMPORARYWIRING X 8 H o 7 1 b Ill; E g FTfNLO R 8.08 1 DAILY CLEAN-UP 8 B o 9 1 :EU : = r 1;i)!\ s H 8.10 1 FINALCLEAN-UP 8 H 1 1 1 P:! !sp p E R M 1 T s A N D X 8 B 1 2 1 E : : r11 : G / R E M o vA L X 8.13 FLAGMANfrRAFFICCONTROL (AS NEEDED)X Page 8 of 18 o 2022 Peak Program Value, LLC All rights reserved DocuSign Envelope ID: 378163002IE28zIFOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM PRE CONSTSERVICES FEE DIRECT COST OF SUB'S WORK DESCRIPTION CONST I GC REIMB SERVICES E GEN CONDCOSTFEE REQUIRED OFOWNER AND/OR DESIGN TEAM 8 a 1 4 1 :: 5 FF FL7rN : 1 T 1 A L X 8.15 1 TEMPORARYROADS 8.16 TEMPORARY ROADWAY MAINTENANCE 8.17 1 DUSTCONTROLS 8.18 TEMPORARY EROSIONCONTROL TEMP. WATER/SEWEREXPENSE & WATER EXPENSES - SITE GRADING &COMPACTION 8.19 8.20 TEMPORARY WATER &SEWER EXPENSES forOFFICE TRAILER 8.21 TWO-WAY RADIO EQUIPMENT & CELL PHONES (AS NEEDED) 8.22 TRASH CHUTE AND HOPPERS (AS NEEDED) 8.22 SOFTWARE LICENSESfor PROJECT FIELDSTAFF X 8.23 PROJECT FIELDINTERNET & WAPS 8.24 1 SITECLEANING 9.O I ON-SITEEQUIPMENT 9.01 AUTOMOBILE AND FUEL (AS NEEDED) 9.02 PICK-UP TRUCK AND FUEL (AS NEEDED)X 9.03 FLATBED TRUCK AND FUEL (AS NEEDED)X Page 9 of 18 o 2022 Peak Program Value, LLC All rights reserved DocuSign Envelope ID: 378163004E284FOA-93F6-EC349F0961 02 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM PRE CONSTSERVICES FEE DESCRIPTION CONST 1 GC REIMB FEE COST DIRECT COST OF SUB'SWORK COMMENTS REQUIRED OFOWNER AND/OR DESIGN TEAM 9 s o 4 :IE:Dl R u c K m s X 9.05 AIR COMPRESSOR AND FUEL (AS NEEDED) 9.06 DEWATERINGEQUIPMENT AND FUEL (AS NEEDED) 9.07 TEMPORARY GENERATOR AND FUEL (AS NEEDED) DEBRIS REMOVAL/HAULING EQUIPMENT (ASNEEDED) 9.08 9.09 TIRES ANDMAINTENANCE COST (AS NEEDED) 9.10 1 FORKUFTOPERATOR 9.11 MATERIAL HOIST OPERATOR (AS REQ'D) 9.12 PERSONNEL HOIST OPERATOR (AS REQ’D) 9.13 FIXED CRANEOPERATOR 9 B 1 4 :1BE;} IS ?!I11\ N E 9 B 1 5 LREVT: FIt AT 1 1111pIIIIII111) N X 9.16 TEMPORARY INTERIORSIGNAGE X 9 n 1 7 1 :: :4 [ f T AT 1 o N X 10.o 1 TEMPORARY PROJECT PROTECTION 10.01 REMOVE SNOW AND ICE (AS NEEDED)X 10.02 TEMPORARY ENCLOSURES (ASNEEDED)X Page 10 of 18 o 2022 Peak Program Value, LLC All rights reserved DocuSign Envelope ID: 37816300z+E28dIFOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM COMMENTS REQUIRED OFOWNER AND/OR DESIGN TEAM 10.03 TEMP BUILDING PIPING(AS NEEDED)X 10.04 FUEL COST FOR HEATING (AS NEEDED) 10.05 POWER COST FOR HEATING (AS NEEDED) 10.06 TEMP FURNACE RENTAL (AS NEEDED) 10.07 TEMP HEATER RENTAL (AS NEEDED) 10.08 TEMP BOILER RENTAL (AS NEEDED) 10.09 OPERATOR -TEMPORARY SYSTEMS (AS NEEDED) 10.10 OPERATION FIRE WATCH (AS NEEDED) 1 o H 1 1 S L1at1:)G c o s T W s 10.12 MAINTENANCE COST(AS NEEDED) X COST IN ADDTION TOSTD ONE YR WARRANTY (IFREQUIRED 10.13 10.14 FILTER CHANGE (ASNEEDED) 10.15 TEMPORARY OFFICE HEATING (AS NEEDED) TEMP WEATHER PROECTION & HEATINGFOR ALL SUBCONTRACTORS (ASMAY BE REQ’D) 10.16 X 10.17 TEMP ELEVATORUSAGE/PROTECTION X 11.0 REPRODUCTION/PRINTING AND IT/DATA PROCESSING COSTS Page 11 of 18 a 2022 Peak Program Value, LLC All rights reserved DocuSign Envelope ID: 37816300-4E284FOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM 1:1 1t E CONSTSERVICES FEE DESCRIPTION CONST E GC REIMB COSTFEE DIRECT COST OFSUB'SWORK COMMENTS REQUIRED OFOWNER AND/ORDESIGN TEAM 11 .01 COST ESTIMATINGDOCUMENTS X 11 .02 SYSTEMS STUDYDOCUMENTS X 11.03 1 BID PACKAGE SETS 1 1 B o 4 1 : : ?FuGc T 1 o N s X 11 .05 CONSTRUCTIONDOCUMENTS ORIGINAL POSTAGE AND 1 1 B o 6 1 Fg:::H=T:::cV2): fs s u E D PLANS) 1 1 n o 7 } : :::1;JTusB 11.08 1 AS-BUILT DOCUMENTS 11.09 1 ACCOUNTING FORMS X 1 1 n 1 o I E Eb S ; E p o R T I N G 11.11 SUBCONTRACT AGREEMENT FORMS X 1 1 n 1 2 1 : 8 E S? L E R E p o R T 11.13 1 ESTIMATING FORMS X 1 1 H 1 4 1 F8: : : E p o R T I N G X 11.15 VALUE ANALYSISSTUDIES 11.16 IT INFRASTRUTURE &DATA PROCESSING X X 1 1 B 1 7 S ::EEFANLT X 1 1 H 1 8 S : aT 1:1::: w 1 N G X Page 12 of 18 o 2022 Peak PrOgram Value, LLC All rights reserved DocuSign Envelope ID: 378163004E28dIFOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM PRE CONSTSERVICES FEE CONST GC REIMB SERVICES 1 GEN CONDCOSTFEE DIRECT COST OFSUB'S WORK DESCRIPTION COMMENTS REQUIRED OFOWNER AND/OR DESIGN TEAM 11.19 ON-SITE FAX, SCANNERAND COPIER X 11 .20 LAPTOPS. IT & DATA PROCESSING (ON-SITE) 11 .21 IT LICENSING FEES & SUPPORT SERVICES (HOME OFFICE & FIELD) X X MAINTENANCE 1 1 s 2 2 1 T:1: 7:Ii:£!IFi :g: y;IF U 1B1 s1 ) MANUALS (FROM SUBS) 1 1 T 2 3 1 : E : :1=:E T 1 1C) N C 0 S T S I X 12.O I QUALITYCONTROL AND TRAINING 12.01 GC’S FIELD QC INSPECTOR (ASNEEDED) X 12.02 GC’S FIELD QC OFFICE (AS NEEDED)X 12.03 GC’S QC INSPECTORS’TRANSPORTATION (ASNEEDED) 12.04 GC’S QC INSPECTORS' EQUIP (AS NEEDED) 1 2 B o 5 1 : E):BlOLII i :: c T 1 o N 12.06 SPECIAL TESTINGCONSULTANTS 12.07 CONCRETESUBSTRUCTURE-OBSERVATIONS 12.08 1 CONCRETE TESTING 12.09 1 MASONRY TESTING 12.10 1 COMPACTION TESTING X 12.11 1 WELDING TESTING X Page 13 of 18 a 2022 Peak Program Value, LLC All rights reserved DocuSign Envelope ID: 37816300-+E28-4FOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM PRE CONSTSERVICES FEE DESCRIPTION CONST GC REIMB COSTFEE DIRECT SUB'S WORK COMMENTS REQUIRED OFOWNER AND/OR DESIGN TEAM 1 2 B 1 2 1 R E : E c T 1 o N rr E s T 1 N G X 12.13 1 SOILS INVESTIGATION 12.14 SPECIAL TESTING SERVICES (EXCEPT ASNOTED) 12.15 PROJECTPHOTOGRAPHS 1 2 a 1 6 1 A e : : T =N s X 1 2 B 1 7 :FL : : : 1 if E R ON-SITE TRAINING OFOWNER’S FACILITYSTAFF & OPERATORS (BY GC) 12.18 ON-SITE TRAINING OFOWNER’S FACILITYSTAFF & OPERATORS (SUBCONTRACTORS) 12.19 COLLATE & PRESENTOPERATION/ MAINTENANCEMANUALS 12,20 PREPARE SUBCONTRACTOR’SOPERATION/ MAINTENANCEMANUALS 12.21 12.22 GC DAILY REPORTSAND PHOTO DOCUMENTATION X 12.23 VIDEO MONITORING & DOCUMENTATION X 13.0 STORAGE, PARKING, PERMITS, LICENSING AND SPECIAL FEES 1 3 H 0 1 1 ::1S = F E Y A R D X PARKING LOT RENTALS 1 3 H o 2 1 : 1: E)E:HSuET [[FsNEEDED) X Page 14 of 18 O 2022 Peak Program Value, LLC All rIghtS reserved DocuSign Envelope ID: 3781630CJJ+E28-4FOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/S/2022 at 6:28 PM PRE CONSTSERVICESFEE DIRECTCOST OFSUB'S WORK DESCRIPTION CONST 1 GC REIMB SERVICES 1 GEN COND COSTFEE REQUIRED OFOWNER AND/OR DESIGN TEAM .n An I FIELDOFFICESTAFFlo'uo I PARKING FEES X 13.04 1 SIGN PERMITS 13.05 1 STREET/CURB PERMIT 13.06 1 BUILDING PERMITS 13.07 1 PLANCHECKFEES 13.08 WATER SYSTEMDEVELOPMENT FEE 13.09 SEWER USE &DRAINAGEPERMIT/DEV. FEE 13.10 PLUMBING &ELECTRICAL PERMITS 13.11 1 ELEVATOR PERMIT FEE 13.12 STORM CONNECTIONFEE 13.13 GAS AND POWERSERVICE CHARGE (PERMANENT) 13.14 GAS AND POWERSERVICE CHARGE (TEMPORARY) 13.15 STEAM SERVICE CHARGE (IF ANY) 13.16 CHILLER WATER SERVICE CHARGE (IFANY) 13.17 1 SPECIALTAP FEES 13.18 SOFTWARE LICENSES(ALL PROGRAMS/APS)X 1 3 H 1 9 1 Fl1: E :1:: T 1C) R S X 13.20 CONSTRUCTION EQUIPMENT LICENSES X Page 15 of 18 o 2022 Peak Program Value, LLC All rights resewed DocuSign Envelope ID: 37816300'4E28-4FOA-93F6-EC349F0961 02 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM PRE CONSTSERVICES FEE CONST GC REIMB COSTFEE DIRECT SUB'SWORK DESCRIPTION COMMENTS REQUIRED OFOWNER ANDfOR DESIGN TEAM 13.21 CONSTRUCTIONEQUIPMENT PERMITS X 14.o f INSURANCEANDBONDS 14.01 BUILDERS RISK INSURANCE 14.02 GENERAL LIABILITY,INCLUDINGAUTOMOBILE 14.03 1 POLLUTION INSURANCE 1 4 B o 4 [1rAE FLT?? I o N A L 14.05 1 PRODUCTLIABILITY 14.06 EXCESS LIABILITY COVERAGE 14.07 WORKERS COMPENSATION (FIELDOFFICE STAFF) 14.08 FICA INSURANCE (FIELD OFFICE STAFF) 14.09 FEDERAL UNEMPLOYMENT (FIELDOFFICE STAFF) 14.10 STATE UNEMPLOYMENT (FIELDOFFICE STAFF) 14.11 CONTRACTOR’SPAYMENT BOND (IFREQUIRED) 14.12 CONTRACTOR’SPERFORMANCE BOND (IF REQUIRED) 14.13 CONTRACTOR’SMAINTENANCE BOND (IF REQUIRED) X 14.14 * SUBCONTRACTORBONDS X 14.15 1 STATE/LOCAL BONDS X 14.16 * ONLY AS MUTUALLY AGREED UPON IN ADVANCE IN WRITING BETWEEN THE OWNER AND THE CONTRACTOR Page 16 of 18 o 2022 Peak Program Value, LLC All rights reserved DocuSign Envelope ID: 378163004E284FOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM PRE CONSTSERVICESFEE DIRECTCOST OF SUB'SWORK DESCRIPTION CONST 1 GC REIMB SERVICES I GEN COND COSTFEE REQUIRED OFOWNER ANDfOR DESIGN TEAM 15.O I OTHERCOSTS 1 5 s o 1 1 ::: : FpL\u£TT I o N 15.02 CONSTRUCTION SERVICES LABOR (GC) 15.03 CONSTRUCTIONSERVICES LABOR (SUBS) 15.04 CONSTRUCTIONMATERIALS 1 5.05 COST OF DESIGN ANDENGINEERING 1 5 p 0 6 1 (E:i ; i? ! T 1R:J\ C K C 0 S T 1507 1 PRELIMINARYSOILS'-'v' I INVESTIGATION 1 5 T o 8 1 :1; b :D E v E L o p M E N T 15.09 BUILDING OPERATIONAFTER MOVE-IN 15.10 BUILDINGMAINTENANCE AFrERMOVE-IN 15.11 MOVINGCOORDINATION 15.12 1 MOVINGCOSTS 1513 1 COSTS OF EMERGENCY'u-'u I WORK 15.14 GC’S GENERAL & HOMEOFFICE OVERHEAD X 15.15 1 GC’S PROFIT MARGIN X 1 5 n 1 6 : :spp: :e FIITh E s X 1 5 p 1 7 1 rE:ii ;iE g) !? ][\ H J X Page 17 of 18 a 2022 Peak Program Value, LLC All rights reserved DocuSign Envelope ID: 37816300'+E284FOA-93F6-EC349F096102 City of Denton's Fire Station #9 CMAR RFP - General Conditions & General Requirements Responsibility Matrix Updated on 05 MAY 2022 Printed on 5/5/2022 at 6:28 PM III F: E CONSTSERVICES FEE CONST GC REIMB SERVICES I GEN CONDCOSTFEE DIRECT COST OFSUB'S WORK DESCRIPTION COMMENTS REQUIRED OF OWNER AND/ORDESIGN TEAM ==W CONSTRUCTION PHASE: OFF61TE SERVICES 16.01 CORPORATE EXECUTIVES (ASREQUIRED) X X 16.02 PRINCIPAL IN CHARGE (AS REQUIRED)X X 16.03 PROJECT EXECUTIVE (AS REQUIRED)X X 16.04 LEGAL - BASIC SERVICES (ASREQUIRED)X X 16.05 ACCOUNTING (ASREQUIRED)X X 1 6 B o 6 :E : : rR2sJT G W s X 1 6 a o 7 : TuI Eo1 F 1 c E R ( A s X 16.08 EEO OFFICER (AS REQUIRED)X X 16.09 SECRETARIAL AND CLERK-TYPIST (AS REQUIRED) X X 16.10 BENEFITS, BONUSESAND VACATIONS FORABOVE X X Page 18 of 18 o 2022 Peak Program Value, LLC All rights reserved DocuSign Envelope ID: 37816300'+E28JIFOA-93F6-EC349F096102 Denton Fire Station #9 - GMP #2 Exhibit 'A.2.F’ Key Personnel Unchanged in this Amendment CPRE DocuSign Envelope ID: 378163004E284FOA-93F6-EC349F096102 CPREDenton Fire Station #9 - GMP #2 Exhibit 'A.2.H’ Customary and Usual Labor Rates Construction Manager will provide Labor Rates for billing of the cost of the Construction Manager's staff' as mutually agreed with the Owner not later than ten (10) business days prior to Notice to Proceed with construction, or 22 NOV 2022(whichever is earlier). The Construction Manager acknowledges the Owner's requirement to confirm in writing with all subcontractors performing Work they will be paying their labor at orabove the State of Texas Prevailing Wage Rates current as of the date of thisAmendment . The Owner likewise confirms certified payrolls are not a requirement on this project . DocuSign Envelope ID: 378163004E284FOA-93F6-EC349F096102 SAM.gov Exhibit 'A.2.H’ "General Decision Number: Tx2022e243 a8/65/2022 Superseded General Decision Number: TX20219243 State: Texas Construction Type: Building County: Denton County in Texas . BUILDING CONSTRUCTION PROIECTS (does not include single family homes or apartments up to and including 4 stories) . Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage raterequired under Executive Order 14026 or Executive Order 13658.Please note that these Executive Orders apply to coveredcontracts entered into by the federal government that aresubject to the Davis-Bacon Act itself, but do not apply tocontracts subject only to the Davis-Bacon Related Acts,including those set forth at 29 CFR 5.1(a) (2) - (60) . 1 if the contract is entered I. Executive Order 14026 1I into on or after lanuary 30, 1 generally applies to the I12022, or the contract is 1 contract. I I renewed or extended (e.g. , an I. The contractor must pay II option is exercised) on or 1 all covered workers at 11 after January 30, 2022: 1 least $15.00 per hour (or I 1 1 the applicable wage rate II I listed on this wage I 1 1 determination, if it is I I I higher) for all hours II I spent performing on the 1 1 1 contract in 2022. 1 I I I llf the contract was awarded on I. Executive Order 13658 1 1 or between January 1, 2015 and I generally applies to the 1 j3anuary 29, 2022, and the 1 contract. II contract is not renewed or I. The contractor must pay alllI extended on or after January 1 covered workers at least I130, 2022: 1 $11.25 per hour (or the 1 I applicable wage rate listed I 1 on this wage determination, I1 if it is higher) for all I 1 hours spent performing on 1 I I I I that contract in 2622. 1IIII The applicable Executive Order minimum wage rate wi11 beadjusted annually. If this contract is covered by one of theExecutive Orders and a classification considered necessary forperformance of work on the contract does not appear on thiswage determination, the contractor must still submit a conformance request . Additional information on contractor requirements and workerprotections under the Executive Orders is available athttps : //www . dol . gov/agencies/whd/government - contracts . Modification Number Publication Date Q 01/07/20221 01/21/2622 https://sam.gov/wage-determination/TX20220243/5 1/7 DocuSign Envelope ID: 378163004E28-4FOA-93F6-EC349F096102 SAM .gov 2 34 5 02/18/202202/25/202204/29/202208/05/2622 ASBEee21-611 08/61/2017 Rates Fringes ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe andMechanical System Insulation) . . . .$ 25.87 BOILg074-603 01/01/2021 7.23 Rates Fringes 24 . 10BOILERMAKER. . . . . . . . . . . . . . . . . . . . . .$ 29.47 CARP1421-002 10/01/2021 Rates Fringes 11.27MILLWRIGHT. . . . . . . . . . . . . . . . . . . . . . .$ 29.58 ELEV0921-066 01/61/2622 Rates Fringes 36 . 885+a+bELEVATOR MECHANIC. . . . . . . . . . . . . . . .$ 45 . 54 FOOTNOTES :A. 6% under 5 years based on regular hourly rate for a11hours worked . 8% over 5 years based on regular hourly ratefor a11 hours worked . B. New Year's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day,Christmas Day, and Veterans Day. ENGIg178-005 06/61/2020 Rates Fringes 13.10POWER EQUIPMENT OPERATOR(1) Tower Crane. . . . . . . . . . . . .$ 32.85(2) Cranes with PileDriving or CaissonAttachment and HydraulicCrane 60 tons and above . . . . .$ 28.75 (3) Hydraulic cranes 59Tons and under. . . . . . . . . . . . . .$ 32.35 + IRONe263-gas 06/01/2022 la . 60 13 . le Rates Fringes 7.68IRONWORKER (ORNAMENTAL ANDSTRUCTURAL) . . . . . . . . . . . . . . . . . . . . . .$ 27.14 PLUMOIgO-008 11/01/2021 Rates Fringes https://sam .gov/wage-determination/TX20220243/5 2/7 DocuSign Envelope ID: 378163002IE28dIFOA-93F6-EC349F096102 HVAC MECHANIC (HVAC UnitInstallation Only) . . . . . . . . . . . . . . .$ 34.48 + SUTX2014-019 07/21/2014 SAM.gov 13 . 07 Rates BRICKLAYER. . . . . . . . . . . . . . . . . . . . . . .$ 19.89 CARPENTER, Excludes DrywallHanging, Form Work, and MetalStud Installation . . . . . . . . . . . . . . . .$ 19.25 CAULKER. . . . . . . . . . . . . . . . . . . . . . . . . .$ 16.63 g.gO CEMENT MASON/CONCRETE FINISHER. . .$ 12.93 ++ DRYWALL HANGER AND METAL STUDINSTALLER. . . . . . . . . . . . . . . . . . . . . . . .$ 15.42 ELECTRICIAN (AlarmInstallation Only) . . . . . . . . . . . . . . .$ 18.83 ELECTRICIAN (CommunicationTechnician 0nly) . . . . . . . . . . . . . . . . .$ 19.98 ELECTRICIAN (Low Voltage Wiring Only) . . . . . . . . . . . . . . . . . . . . .$ 15.80 ELECTRICIAN, Excludes Low Voltage Wiring andInstallation of Alarms/Sound and Communication Systems . . . Fringes g . gO a . gO g . gO e . gO 0.00 3.32 3 . 64 2.18 .$ 18.82 FORM WORKER. . . . . . . . . . . . . . . . . . . . . .$ 12.13 ++ GLAZIER. . . . . . . . . . . . . . . . . . . . . . . . . .$ 16.55 HIGHWAY/PARKING LOT STRIPING:Operator (Striping Machine) . . . . .$ 10.a4 ** INSTALLER - SIDING (METAL/ALUMINUM/VINYL) . . . . . . . . . . .$ 14.74 ++ INSTALLER - SIGN. . . . . . . . . . . . . . . . .$ 15.61 BATT. . . . . . . . . . . . . . . . .$ 13.OO ++ IRONWORKER, REINFORCING. . . . . . . . . .$ 14.02 ++ LABORER: Common or General. . . . . .$ 11.76 ++ LABORER: Mason Tender - Brick. . .$ 10.54 *+ LABORER: Mason Tender - Cement/Concrete. . . . . . . . . . . . . . . . . .$ 10.75 ++ LABORER: Pipelayer. . . . . . . . . . . . . .$ 13 .eg ++ LABORER: Plaster Tender. . . . . . . . .$ 12.22 ++ LABORER : Roof Tearoff . . . . . . . . . . .$ 11.28 ++ LABORER: Landscape andIrrigation . . . . . . . . . . . . . . . . . . . . . . .$ 12.56 ** https://sam.gov/wage-determination/FX20220243/5 0.83 a . gO 3.13 2.31 a . gO 0.00 O . gO O . gO e . gO e . gO INSULATOR 0.00 0.35 a . gO e . gO 0.48 3/7 DocuSign Envelope ID: 378163004E28-4FOA-93F6-EC349F096102 SAM .gov e . egLATHER. . . . . . . . . . . . . . . . . . . . . . . . . . .$ OPERATOR :Backhoe/Excavator/Trackhoe. . . . . . .$ OPERATOR : Bobcat/SkidSteer/Skid Loader . . . . . . . . . . . . . . . . $ OPERATOR: Bulldozer . . . . . . . . . . . . .$ OPERATOR: Drill. . . . . . . . . . . . . . . . .$ OPERATOR: Forklift . . . . . . . . . . . . . .$ OPERATOR: Grader/Blade. . . . . . . . . .$ OPERATOR : Loader . . . . . . . . . . . . . . . .$ 0PERATOR: Mechanic . . . . . . . . . . . . . .$ OPERATOR: Paver (Asphalt,Aggregate, and Concrete) . . . . . . . . .$ 0PERATOR: Roller . . . . . . . . . . . . . . . .$ PAINTER (Brush, Roller andSpray) , Excludes DrywallFinishing/Taping. . . . . . . . . . . . . . . . .$ PAINTER: DrywallFinishing/Taping Only . . . . . . . . . . . .$ PIPEFITTER. Excludes HVAC Pipe Installation . . . . . . . . . . . . . . . .$ PLASTERER. . . . . . . . . . . . . . . . . . . . . . . .$ PLUMBER (HVAC PipeInstallation Only) . . . . . . . . . . . . . . .$ PLUMBER, Excludes HVAC PipeInsta11ation . . . . . . . . . . . . . . . . . . . . .$ ROOFER. . . . . . . . . . . . . . . . . . . . . . . . . . .$ SHEET METAL WORKER (HVAC DuctInstallation Only) . . . . . . . . . . . . . . .$ SHEET METAL WORKER, ExcludesHVAC Duct Installation . . . . . . . . . . .$ SPRINKLER FITTER (FireSprinklers) . . . . . . . . . . . . . . . . . . . . . .$ TILE FINISHER. . . . . . . . . . . . . . . . . . . .$ TILE SETTER. . . . . . . . . . . . . . . . . . . . . .$ TRUCK DRIVER: 1/Single AxleTruck. . . . . . . . . . . . . . . . . . . . . . . . . . . .$ TRUCK DRIVER : Dump Truck. . . . . . . .$ TRUCK DRIVER : Flatbed Truck. . . . .$ https://sam.gov/wage-determination/TX20220243/5 16.00 12.83 ++g . gO 13.93 ++ 18.29 15.69 13.21 ++ 12.48 ++ 13.46 ++ 17.52 a . gO 1.31 0.50 0.81 g . gO 0.85 3.33 18 . 44 15 . 04 O . gO g . gO 13.21 ++2.33 13.76 ++2.84 6.35 g . gO 22 . 98 15.75 22.16 5.46 20 . 84 17 . 19 4.74 g . gO 20.88 5.19 24.88 5.97 22 . 94 11.22 ++ 14.25 ++ e . eg 0.60 0.00 16 . 40 12.39 ++ 19 . 65 0.81 1.18 8.57 4/7 DocuSign Envelope ID: 378163004E28zIFOA-93F6-EC349F096102 SAM.gov TRUCK DRIVER: Semi-Trailer Truck. . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 12.50 ++e . eg 4.11TRUCK DRIVER:Water Truck. . . . . . .$ 12.00 ++ = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = WELDERS - Receive rate prescribed for craft performingoperation to which welding is incidental. ** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14626 ($15.00) or 13658($11.25) . Please see the Note at the top of the wagedetermination for more information . Note: Executive Order (EO) 13706, Establishing Paid Sick Leavefor Federal Contractors applies to all contracts subject to theDavis-Bacon Act for which the contract is awarded (and anysolicitation was issued) on or after lanuary 1, 2017. If thiscontract is covered by the EO, the contractor must provideemployees with T hour of paid sick leave for every 30 hoursthey work, up to 56 hours of paid sick leave each year.Employees must be permitted to use paid sick leave for theirown illness, injury or other health-related needs, includingpreventive care; to assist a family member (or person who islike family to the employee) who is ill, injured, or has otherhealth-related needs, including preventive care; or for reasonsresulting from, or to assist a family member (or person who islike family to the employee) who is a victim of, domesticviolence, sexual assault, or stalking. Additional informationon contractor requirements and worker protections under the EOis available at https : //www . dol.gov/agencies/whd/government - contracts . Unlisted classifications needed for work not included withinthe scope of the classifications listed may be added afteraward only as provided in the labor standards contract clauses(29CFR 5.5 (a) (1) (ii) ) . The body of each wage determination lists the classificationand wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wagedetermination. The classifications are listed in alphabeticalorder of ""identifiers"" that indicate whether the particularrate is a union rate (current union negotiated rate for local),a survey rate (weighted average rate) or a union average rate(weighted union average rate) . Union Rate Identifiers A four letter classification abbreviation identifier enclosedin dotted lines beginning with characters other than ""SU"" or""UAVG" " denotes that the union classification and rate were prevailing for that classification in the survey. Example:PLUMg198-005 07/01/2014. PLUM is an abbreviation identifier ofthe union which prevailed in the survey for thisclassification, which in this example would be Plumbers . 0198indicates the local union number or district council number where applicable, i . e. , Plumbers Local 0198. The next number, https://sam.gov/wage-determination/TX20220243/5 5/7 Do?1I?#!Enjel Pte. ID: 378163004E284FOA-93F6-EC349F0961 02 SAM.gov gas in the example, is an internal number used in processingthe wage determination . 07/01/2014 is the effective date of themost current negotiated rate, which in this example is ]uly I,2014 . Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governingthis classification and rate . Survey Rate Identifiers Classifications listed under the ""SU"’' identifier indicate that no one rate prevailed for this classification in the survey andthe published rate is derived by computing a weighted averagerate based on all the rates reported in the survey for thatclassification . As this weighted average rate includes all rates reported in the survey, it may include both union andnon-union rates . Example: SULA2912-007 5/13/2014. SU indicates the rates are survey rates based on a weighted averagecalculation of rates and are not majority rates . LA indicatesthe State of Louisiana . 2012 is the year of survey on whichthese classifications and rates are based . The next number, 607in the example, is an internal number used in producing thewage determination. 5/13/2014 indicates the survey completiondate for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until anew survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicatethat no single majority rate prevailed for thoseclassifications; however, lee% of the data reported for theclassifications was union data . EXAMPLE : UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted unionaverage rate . 0H indicates the state. The next number, 0010 in the example, is an internal number used in producing the wagedetermination . 08/29/2014 indicates the survey completion datefor the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in ]anuary ofeach year, to reflect a weighted average of the currentnegotiated/CBA rate of the union locals from which the rate isbased . WAGE DETERMINATION APPEALS PROCESS 1. ) Has there been an initial decision in the matter? This canbe + # # + an existing published wage determinationa survey underlying a wage determinationa Wage and Hour Division letter setting forth a position ona wage determination mattera conformance (additional classification and rate) ruling On survey related matters, initial contact, including requestsfor summaries of surveys, should be with the Wage and HourNational Office because National Office has responsibility forthe Davis-Bacon survey program. If the response from this https://sam.gov/wage-determination/TX20220243/5 6/7 DocuSign Envelope ID: 378163004E28zIFOA-93F6-EC349F096102 SAM.gov initial contact is not satisfactory, then the process describedin 2. ) and 3. ) should be followed . With regard to any other matter not yet ripe for the formalprocess described here, initial contact should be with theBranch of Construction Wage Determinations . Write to: Branch of Construction Wage DeterminationsWage and Hour DivisionU.S. Department of Labor 260 Constitution Avenue, N. W. Washington, DC 20210 2. ) if the answer to the question in 1. ) is yes, then aninterested party (those affected by the action) can requestreview and reconsideration from the Wage and Hour Administrator(See 29 CFR Part 1.8 and 29 CFR Part 7) . Write to: Wage and Hour AdministratorU.S. Department of Labor200 Constitution Avenue, N. W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wagepayment data, project description, area practice material,etc. ) that the requestor considers relevant to the issue. 3. ) if the decision of the Administrator is not favorable, aninterested party may appeal directly to the AdministrativeReview Board (formerly the Wage Appeals Board) . Write to: Administrative Review Board U.S. Department of Labor200 Constitution Avenue, N. W. Washington, DC 20210 4. ) All decisions by the Administrative Review Board are final. = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = ===============•=::•== END OF GENERAL DECISIO" https://sam.gov/wage-determination/TX20220243/5 7/7 DocuSign Envelope ID: 378163004E28-4FOA-93F6-EC349F096102 Denton Fire Station #9 - GMP #2 Exhibit 'A.2.1’ Rental Rates CPRE DocuSign Envelope ID: 378163004E28dtFOA-93F6-EC349F096102 Exhibit G Rental Rates for CORE owned Equipment Equipment Air Compressor Air Compressor Coring Machine Equipment AttachmentGenerator Generator Skid Steer Skid Steer Sweeper Welder Drop Deck Trailer Drop Deck Trailer Drop Deck Trailer Dump Trailer Equipment Trailer Hydraulic Ground Level Equip Trailer Hydraulic Ground Level Equip Trailer Mobile Restoration Trailer Mobile Restoration Trailer Permanent Fuel Tank for Trailer Tilt Trailer Tilt Trailer Tilt Trailer Trailer Hitch Utility Trailer Utility Trailer Vacuum Trailer Walk-behind Trencher Trailer Water Trailer Track Loader Track Loader Track Loader Track Loader Track Loader Walk-behind Track Loader Skid Steer Loader Skid Steer Loader Skid Steer Loader Skid Steer Loader Skid Steer Loader 2-seat UTV 2-seat UTV 2-seat UTV 2-seat UTV 2-seat UTV Pressure Washer Pressure Washer Pressure Washer Pressuer Washer Pressuer Washer Sandblast Pot 4-set UTV 4-seat UTV 4-seat UTV Golf Cart Industrial Electric Cart UTV Pressure Washer Pressure Washer Pressure Washer Pressure Washer Pressure Washer Pressure Washer Equipment Specs Portable diesel air compressor Sullair Compressor Coring Machine and Accessories Jack Hammer 3500W or 3,800W Honda Generator Honda Generator 5000 Watt Multi Terrain Loader Auger AttachmentRide on Broom 6' 3-wheel Miller Bobcat 225 Welder 14 ft. - 16 ft.. Tandem Axle 16 ft. - 18 ft., Tandem Axle 18 ft. - 20 ft., Tandem Axle 10 ft. x 12 ft., Tandem Axle Double Axle 6 ft. x 14 ft„ Single Axle 6 ft. x 14 ft., Tandem Axle UR Rate/Daily $81 $81 $50 $50 $50 $50 $250 $30 $250 $50 $125 $61 $ 146 $261 $67 $47 $63 N/A N/A N/A $55 $70 $58 $11 $75 $66 $431 $33 $ 149 $709 $499 $524 $531 $647 $285 $413 $434 $435 $436 $416 $85 $164 $ 169 $ 163 $ 160 $12 $11 $16 $12 $41 $207 $113 $173 $ 170 $89 $90 $186$98 $206 $95 $324 $112 $ 189 UR Rate/Weekly $195 $195 $150 $ 140 $150 $ 180 $ 1 ,000 $225 $ 1 ,000 $150 $339 $182 $394 $749 $135 $327 $258 N/A N/A N/A $158 $303 $ 189 $32 $281 $193 $1.699 $66 $492 $1.683 $1,319 $1 ,385 $ 1 ,489 $1 ,674 $757 $1.105 $1,160 $1,161 $1 ,233 $1,175 $267 $322 $332 $320 $314 $35 $35 $35 $24 $112 $628 $285 $342 $334 $281 $282 $436 $257 $904 $369 $1,155 $404 $520 UR Rate/Monthly $650 $650 $450 $390 $380 $395 $4,200 $675 $4.200 $450 $879 $559 $1,020 $2,045 $404 $572 $551 N/A N/A N/A $402 $649 $515 $86 $571 $424 $3,736 $ 147 $946 $3,337 $2,725 $2.861 $3,247 $3,336 $2,430 $2,900 $3,045 $3,309 $3,509 $3,969 $681 $718 $746 $716 $709 $69 $77 $68 $69 $231 $ 1 ,098 $729 $969 $751 $615 $728 $1,692 $690 $1,962 $751 $2,414 $789 $ 1 ,435 14 ft. 12 ft., Single Axle14 ft. - 16 ft., Tandem Axle 14 ft. - 16 ft., Tandem Axle Slide-in Pintle BaII Combination 10 ft. - 14 ft., Tandem Axle 8 ft. to 10 ft„ Single Axle 512-575 CFM, Diesel Powered 500 Gallons Large, 2,800-4, 107 lbs. Small, 1,300-1,699 lbs. Small, 1,700 lbs. Small, 2,000-2,399 lbs. Small, 2,400-2,999 lbs. 1,351-1,699 lbs. 1,700-1,899 lbs. 1,900-1.999 lbs 2,001-2,799 lbs. 2,600-3,499 lbs 2WD, Electric Powered 2WD, Gas Powered 4WD, Diesel Powered 4WD, Diesel Powered, Rollover Protection 4WD, Gas Powered Chemical Injector AttachmentHose Hose, 50 ft Spray Wand Surface Cleaner, 4,000 PSI, Hydro Scrubber XL350 2WD, Gas or Electric Powered 4WD, Diesel Powered, Rollover Protection 4WD, Gas Powered, Rollover Protection Gas Powered 2WD 4WD, Diese 3,000 PSI, Gas Powered 3,000-3,500 PSI, Towable, Gas Powered 3,500 PSI, Gas Powered 3,500 PSI, Towable, Gas Powered 4,000 PSI, Gas Powered Hot Water. 3.500 PSI. Gas Powered DocuSign Envelope ID: 378163004E28-+FOA-93F6-EC349F096102 Denton Fire Station #9 - GMP #2 Exhibit 'A.2.J’ Alternates with Costs and Expiration Alternate #1 – Terminal Work: $88,432 This alternate expires 30 days after Notice to Proceed. CPRE Dates DocuSign Envelope ID: 378163004E28-4FOA-93F6-EC349F096102 Denton Fire Station #9 - GMP #2 Exhibit 'A.2.K’ Unit Costs Unchanged in this Amendment: a. Piers - PIer Units CPRE Pier Diama©r DocuSign Envelope ID: 37816300-4E28-4FOA-93F6-EC349F096102 CPREDenton Fire Station #9 - GMP #2 Exhibit 'A.2.L’ Allowances GMP #1 Allowances (Already Approved): Allowance #1 - Permit Review Comments: $50,000 Allowance #2 - Fiber Line Conduit: $50,000 Allowance #3 - Franchise Utility: $50,000 Allowance #4 - Temporary Generator: $50,000 Allowance #5 - Pier Casing: $75,000 GMP#2 Allowances: Allowance #1 - Alerting System Equipment: $75,000 Allowance #2 - Alerting System Installation: $25,000 Allowance #3 - Cascade SCBA Compressor: $71,000 Allowance #4 - Appliances: $12,400 cpRIGMP #2 Exhibit 'A.2 M’ Schedule of Values for GMP #2 To be issued after the GMP Amendment #2 has been fully executed as mutually agreed Denton Fire Station #9 by Owner and Contractor. DocuSign Envelope ID: 378163004E284FOA-93F6-EC349F0961 02 Denton Fire Station #9 - GMP #2 Exhibit 'A.2.N’ Itemized Statement of GMP and CPRE Clarifications DocuSign Envelope ID: 378163004E2WFOA-93F6-EC349F096102 October 21 't, 2022 VIA ELECTRONIC MAIL Sara Hensley City Manager City of Denton 215 East McKinney StreetDenton, Texas, 76201 RE: GUARANTEED MAXIMUM PRICE PROPOSAL I Denton Fire Station #9 1 GMP #2 of 2 Dear Sara, On behalf of CORE Construction, I am pleased to submit our Guaranteed Maximum Price (GMP #2) proposal forthe Denton Fire Station #9. GMP Summary: Guaranteed Maximum Price #1 Guaranteed Maximum Price #2 Total of Guaranteed Maximum Price #1 & #2 $4,550.786 $7.503, 562 $12,054,348 We look forward to a successful and enjoyable project together. Thank you for this opportunity, please do not hesitate to contact me directly with any questions or comments. Respectfully submitted, 3ye@##? Steven Normand Director of Preconstruction CORE Construction www.coreconstruct lon.com DocuSign Envelope ID: 37816300JtE2WFOA-93F6-EC:P+9F096102 BASIS OF ESTIMATE Denton Fire Station #9 1 Denton, TX October 21 st, 2022 ASSUMPTIONS, CLARIFICATIONS, & EXCLUSIONS Schedule Project Construction Duration and Substantial Completion shall remain dependent upon the Building Permit Approval and the following criteria: •The following milestones are to be met. The dates listed below are the latest possible dates to meet these milestones and any delays will impact the Substantial Completion Date. o GMP approval by City Council to be received no later than 11/1 5/2022 o NTP received by 11/22/2022 o if NTP is received prior to the date listed above, the Substantial Completion date will not adjust to an earlier date, due to material lead times o if the above criteria are unachievable Substantial Completion will need to be adjusted oracceleration costs further discussed. Substantial Completion: March 5th, 2024 This schedule assumes that masonry will arrive within 4 months of GMP, and that electrical switchgear will arrive within 7 months of NTP. Both items are critical path items to achieving the substantial completion date. CORE reserves the right to delay construction start and adjust the date of substantial completion without the penalty of liquidated damages if these lead times are extended. • • Owner Items •The City of Denton and CORE each acknowledge that national and international markets, have been and will continue to be, affected by COVID-19 and other factors, impacting the availability of materials as well as pricing. In the event labor and/or materials or pricing are affected by COVID-19 or other factors, the parties shall negotiate an equitable adjustment to the Contract Price and Schedule as needed due to negative impacts to the Project arising from market conditions. Additionally, substitutions or materials, equipment, systems, etc. may be necessary or partially necessary if specified items are not available. • • e • • • Material Testing, Assembly Testing, as well as and Special Inspections, are by Owner, and are not included. Third-party Commissioning is by Owner and is not included. CORE will provide coordination as required. Platting and/or re-platting, licensing agreements, land-use permitting, and site development permits as well as any cost related thereto, is not included. General Condition expenses included through date of Final Completion. Contractor Fee shall be considered a Lump Sum and remain in the amount as stated in Exhibit 1-A. Building permit costs, plan expediter fees, plan check fees, impact fees and their associated permits, site development permits/fees, gas and electrical service charges, utility recovery or tap fees, and/or water meter fees shall be paid for by Owner and are not included. www.coreconstruct lon.comQ Page 2 of 6 DocuSign Envelope ID: 378163004E2W+FOA-93F6-EC349F096102 BASIS OF ESTIMATE Denton Fire Station #9 1 Denton, TX October 21 st, 2022 Contingency and Allowances • PreConstruction Contingency of 1% ($75,036 direct cost) is included in this proposal • Additional Marketplace Risk of 1% ($75,036 direct cost) - is included in this proposal • Construction Phase Contingency of ($57,816 direct cost) - is included in this proposal • Owner Construction Phase Contingency ($979,532 direct cost) - is included in this proposal a. This allowance shall account for an increase in price of materials equipment or products between the date of this proposal and the time when the job is ready for the installation of the affected material. The allowance shall be used to reflect the additional cost to obtain the materials, pending approval by the Owner and provided that the Contractor gives the Owner written notice and documentation of the increased costs. Allowance #1 - Alerting System Equipment: $75,000 Allowance #2 - Alerting System Installation: $25,000 Allowance #3 - Cascade SCBA Compressor: $71,000 Allowance #4 - Residential Appliances: $12,400 • • • • General Assumptions 1. Price is based on documents issued by Parkhill as enumerated in the List of Documents. 2. We assume normal working hours. However, to maintain the schedule we may perform work outside of normal working hours. We will request permission from the City, as required by local ordinances, when we plan to work outside of normal work hours. Alternates: Alternate #1- Terminal Improvements: $88,415 This alternate is good for 30 days. Specific Exclusions to GMP a. Fee is excluded from the contingency and allowance section. Fee to be incorporated into the cost upon authorization of usage. www.coreconstructlon.comQ Page 3 of 6 DocuSign Envelope ID: 378163004E2WFOA-93F6-EC:H9F096102 BASIS OF ESTIMATE Denton Fire Station #9 1 Denton, TX October 21 st, 2022 Other Scope Specific Assumptions and Clarifications: LINE ITEM 2 1 Public Utility Infrastructure 1.Excluded: a. b. Relocation or removal of public utilities not shown on the contract drawings. Relocation of the fiber lines and telephone lines (by owner). Relocating these lines is critical to the contract schedule. Any delay in the relocation of these lines will adjust the substantial completion date LINE ITEM 15 1 Landscaping & Irrigation 1. Excluded: a. Any sod, or landscaping required due to city relocation of fiber lines LINE ITEM 18 1 Fencing & Gates 1. Included: a. Fencing and gates per plan, no spec provided. 2. Excluded: a. Any fencing & gates on west side of fire station, none shown. LINE ITEM 21 1 Flagpole 1. Included: a. (1) 35' Internal halyard with winch clear anodized finish, no spec provided. LINE ITEM 30 1 Steel 1. Included: a. Changes to structural steel to date. Remainder of steel was bought in GMP#2. LINE ITEM 40 1 Glass & Glazing 1. Excluded: a. Decorative window films, they are not shown on the plans. www.coreconstruct lon.com+ Page 4 of 6 BASIS OF ESTIMATE Denton Fire Station #9 1 Denton. TX October 21st, 2022 LINE ITEM 41 1 Metal Wall Panels 1. Included: a. Pricing for improvements for one side of the terminal building as shown in the drawings. LINE ITEM 42 1 Masonry 1. Included: a. Masonry veneer with 4-month lead time is included. 2. Excluded: a. Specified brick is not included due to the 12-month lead time. LINE ITEM 56 1 HM Frames, Doors, & Hardware1. Included: a. Standard PLAM doors, spec not provided. LINE ITEM 57 1 Overhead Coiling Doors 1. Included: a. Door engineering FF30 assumed, no spec provided. LINE ITEM 61 1 Painting 1. Included: a. Pricing for improvements for one side of the terminal building as shown in the drawings. LINE ITEM 86 1 Residential Appliances 1. Included: a. Extractor, Gas burners 2. Excluded: a. Any other residential appliance, no specifications provided. LINE ITEM 98 1 Plumbing Systems 1. Included: a. Fixture and trench drains as scheduled or equal. 2. Excluded: a. Anti-buoyancy slabs. Detail D4 on P501 dated 9/9/22. Eliminated in most recent set of documents. LINE ITEM 99 1 HVAC Systems 1. Included: a. Kitchen hood www.coreconstruct lon.comq DocuSlgn Envelope ID: 378163004E2&4FOA-93F6-EC349FQ961 Q2 BASIS OF ESTIMATE Denton Fire Station #9 1 Denton, TX October 21st, 2022 b. Building Automation Syste LINE ITEM 102 1 Electrical Systems 1. Included: a. Lightning Protection b. Generator Installation2. Excluded: a. Generator (in GMP#1) rn LINE ITEM 110 1 Security / Access Control Systems 1. Included: a. Conduit as shown in contract drawings. 2. Excluded: a. By Owner, no spec provided LINE ITEM 111 ! Audio Visual Systems 1. Included: a. Conduit as shown in contract drawings. 2. Excluded: a. Any AV besides supporting components by various trades, AV is by owner. www.coreconstructlon.comq Page 6 of 6 DocuSign Envelope ID: 378163004E284FOA-93F&EC349F096102 Denton Fire Station #9GMP 2 Estimate LOCATION: Denton. TXARCHITECT: Martinez a Parkhill WARRANTY(yrs): 1SITE ACREAGE: 4.0 SQUARE FOOTAG£ 14.42 #Description Base Price ;TF ab,1,580 181 44 a$2.85 $0.71Em2=b a5fTTBPier 8.48%E 6.19%E +1.33 3e8mo 027%=7.06%&g#W;5118,13 ==ma 0.03%To=0.35%E $0.53 a 75%E IM 0 a,76%$0.55EBF ,,87 m4 Ime7.93% 70.96%L„,.,,,„„„75.59% 0.80% !543.qB a@ME tr*ud€i;dh :P;ha§4 'C6 -ntl:era art tvIUI„mI-"""Idl•=7 Tj .. MMI By Omv $208,750 11 14 15 18 71 24 30 32 3740 4142 :§3iITM BBqI g-I===c FercFnq & Gate;T;apimiF;;in BlI1 $41,115 liMo $3.000 MMmml roent r BMI 510,816 Damproofinq / Waterproofing / Air BaGlass & :I==irc Metal V/all 3aneFs Masonl 5122,100m7 –]5435,256 S317,472 55 56 5759 61 64 65 66 I @I &mr mI 3verhead Coiling DoorsBaRmIBJaII Packa'Paintincem==k;iConcrete Finishin< BMs&Id 5109.458 $416.875 $433.650 587,387 $63,950 513.680 $54.546 7273 75TI78 79 80 wiMM© I Signage Pack.TJlaTaTi;i=== Wall Protection & Corner Guards Fire Extinguishers & CabInet:Lockers Esm7 576.910 SS,220 SI 542m EsIaIMI!!I=TI 86 87 Rest;en:al ;::Tiles '' Furnishi TaI Co,,ntertops R §M3 1$8.000 97 9899 lal 102I03 [@ 110 111 e e PIL=nq S\rstemsmfs,,fstemsITs & Balance Electrical Systemsils 561,682 sao m6$562,398 $8.150 5799,997 $40.837 Stb lm5temsc ms Audio Visual Systems s4Ml By OwnerM TnT:=;;;ruc: on–;hase Cont r len n E©5lgRa Sub'total (WIth General ’ReqyirenlenB) In and Perforrnlrl:a Bondr M [BBl m Subtota1 (WIth <;R's. Prof. ServIces. & Insurance) Su!>total (GR's, Prof Services. Irt5urance. Tax. & Feet InstallationAllowance #2 Allowance #3 Cascade SCBA Allowance #4 Residential Subtotal {with Contingency and Allow3nc Doc"S'gn E""eIQpe ID: 378163C>O-4E284FOA-93F6-Ee#;Oer:l2?v„,vn's Fire Station No. 9 Updated 17 OCT 2022 GMP Amendment #01 - Site and Long Lead Items P''"t'd '- 10/17/2022 ’t 1 :48 PMExhibit "A.2.Z" - Schedule of Exhibits Description Prepared By ExhIbits to A133 Exhibit A.1 - Guaranteed Maximum Price Amendment #01 Exhibit "A.2" – Guaranteed Maximum Price Amendment Exhibit "A.2.B" – Insurance and Bonds - GMP Amendment #02 Exhibit "A.2.C" – Scope of Work - GMP Amendment #02 Exhibit "A.2.D" – Construction Manager’s Project Schedule Exhibit "A.2.E" – Construction Manager’s Soft Costs and Fee Exhibit "A.2.F" – Key Personnel Exhibit "A.2.G" – Confidentiality of the Project Exhibit "A.2.H" – Customary and Usual Labor Rates Exhibit "A.2.1" – Rental Rates Exhibit "A.2.J" – Alternates with Costs and Expiration Dates Exhibit "A.2.K'’ – Unit Costs Exhibit "A.2.L" – Allowances Exhibit ’'A.2.M" – Schedule of Values - GMP Amendment #02 Exhibit “A.2.N" – Itemized Statement of GMP and Clarifications Exhibit "A.2.Z" – Schedule of Exhibits for Exhibit A.1 Owner Construction Manager Construction Manager Construction Manager Construction Manager Construction Manager Owner Construction Manager Construction Manager Construction Manager Construction Manager Construction Manager Construction Manager Construction Manager Construction Manager Attached After GMP Amdmt #02 is Signed Attached Unchanged in thisAmendment Attached Unchanged in thisAmendment TBD Attached Unchanged in thisAmendment Not Applicable Unchanged in thisAmendment Attached After GMP Amdmt #02 is Signed Attached This Document Copy of 220822 DFS9 A133 Exhibit A. 1.z - sch,d„I, ,t E,hibits (GMP) REV Q1.oo t, T,,m Page 1 of 1 © 2022 Peak Program Value, LLC All Rights Reserved DocuSign Certificate Of Completion Envelope Id: 378163004E284FOA93F6EC349F096102 Subject: Please DocuSign: City Council Contract 7967 - FS 9, GMP Amendment 2 Source Envelope: Document Pages: 65 Status: Completed Certificate Pages: 6 Signatures: 6 Initials: 1 Envelope Originator: Christa Christian AutoNav: Enabled Envelopeld Stamping: Enabled Time Zone: (UTC-06:00) Central Time (US & Canada) 901B Texas Street Denton, TX 76209 Christa.Christian@cityofdenton.com IP Address: 198.49.140.10 Record Tracking Status: Original10/26/2022 10:06:28 AM Holder Christa Christian Christa.Christian@cityofdenton.com Location: DocuSign Signer Events Christa Christian christa.christian@cityofdenton.com Senior Buyer City of Denton Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure:Not Offered via DocuSign Signature Timestamp Sent: 10/26/2022 10:12:39 AM Viewed: 10/26/2022 10:13:00 AM Signed: 10/26/2022 10:13:14 AM Completed Using IP Address: 198.49.140.10 Lori Hewell lori.hewell@cityofdenton.com Purchasing Manager City of Denton Security Level: Email, Account Authentication(None) Sent: 10/26/2022 10:13:19 AM Viewed: 10/26/2022 10:39:32 AM Signed: 10/26/2022 10:40:40 AM Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Electronic Record and Signature Disclosure: Not Offered via DocuSign Marcella Lunn marcella.lunn@cityofdenton.com Deputy City Attorney City of Denton Security Level: Email, Account Authentication (None) Sent: 10/26/2022 10:40:45 AM Viewed: 10/26/2022 10:52:09 AM Signed: 10/26/2022 10:54:47 AM Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Electronic Record and Signature Disclosure: Not Offered via DocuSign Gary Aanenson garyaanenson@coreconstruction.com Vice President CORE Construction Security Level: Email, Account Authentication(None) Sent: 10/26/2022 10:54:50 AM Resent: 10/31/2022 9:03:04 AM Resent: 10/31/2022 9:03:23 AM Viewed: 10/31/2022 9:08:19 AM Signed: 10/31/2022 9:08:47 AMSignature Adoption: Pre-selected Style Using IP Address: 162.247.135.154 Electronic Record and Signature Disclosure:Accepted: 6/1 3/2022 4:01 :32 PMID: 96bdaf1 3-b4a549f0-ae76-ac4851 1280c5 Signer Events Chris Squadra csquadra@peakprogramvalue.com Chris Squadra, Peak Program Value, LLC Security Level: Email, Account Authentication (None) Signature Timestamp Sent: 10/31/2022 9:08:51 AM Viewed: 10/31/2022 10:54:47 AM Signed: 10/31/2022 10:55:03 AM 'Do€uSigned by: Uk\.}W/r& Signature Adoption: Pre-selected Style Using IP Address: 71.229.204.176 Electronic Record and Signature Disclosure:Accepted : 10/31/2022 10:54:47 AMID: de6e93c2-95ae4a21-ab23-1 2d90cOecbbf Trevor Crain trevor.crain@cityofdenton.com Interim Director of Facilities Security Level: Email, Account Authentication(None) Sent: 10/31/2022 10:55:09 AM Viewed: 10/31/2022 10:58:22 AM Signed: 10/31/2022 10:58:41 AM Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Electronic Record and Signature Disclosure:Accepted: 10/31/2022 10:58:22 AMID: 31 ce20cd-cb3721948-a4fb45ela083c1 59 Cheyenne Defee cheyenne.defee@cityofdenton.com Procurement Administration Supervisor City of Denton Security Level: Email, Account Authentication(None) Electronic Record and Signature Disclosure:Not Offered via DocuSign Completed Sent: 10/31/2022 10:58:47 AM Viewed: 11/16/2022 9:37:24 AM Signed: 11/16/2022 9:37:35 AMUsing IP Address: 198.49.140.10 Sara Hensley sara.hensley@cityofdenton.com City Manager City of Denton Security Level: Email, Account Authentication(None) Sent: 11/16/2022 9:37:39 AM Viewed: 11/16/2022 9:38:31 AM Signed: 11/16/2022 9:38:31 AM Signature Adoption: Pre-selected Style Using IP Address: 107.77.198.132 Signed using mobile Electronic Record and Signature Disclosure:Not Offered via DocuSign Rosa Rios rosa.rios@cityofdenton.com City Secretary Security Level: Email, Account Authentication(None) 'DocuSigned by:I RauRal ' 1 C5CA8C5E 1 75493. Sent: 11/1 6/2022 9:38:35 AM Viewed: 11/1 6/2022 4:30:29 PM Signed: 11/1 6/2022 4:30:57 PM Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Electronic Record and Signature Disclosure:Accepted: 11/1 6/2022 4:30:29 PMID: 28464347-525d4b8a-82de-7f24cf3eddf3 In Person Signer Events Signature Status Timestamp Editor Delivery Events Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Status Timestamp Certified Delivery Events Timestamp Carbon Copy Events Cheyenne Defee cheyenne.defee@cityofdenton.com Procurement Administration Supervisor City of Denton Security Level: Email, Account Authentication(None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Status Timestamp Sent: 10/26/2022 10:13:18 AM Gretna Jones gretna.jones@cityofdenton.com Legal Secretary City of Denton Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure:Not Offered via DocuSign Sent: 10/31/2022 10:58:44 AM Viewed: 10/31/2022 11:16:18 AM City Secretary Office citysecretary@cityofdenton.com Security Level: Email, Account Authentication(None) Electronic Record and Signature Disclosure:Not Offered via DocuSign Sent: 11/1 6/2022 4:31 :03 PM Viewed: 11/1 7/2022 9:18:38 AM Hailey Payne hailey.payne@cityofdenton.com Administration Manager City of Denton Security Level: Email, Account Authentication(None) Electronic Record and Signature Disclosure:Not Offered via DocuSign Sent: 11/1 6/2022 4:31 :06 PM Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Envelope Sent Certified Delivered Signing Complete Completed Status Timestamps 10/26/2022 10:12:39 AM 11/16/2022 4:30:29 PM 11/1 6/2022 4:30:57 PM 11/1 6/2022 4:31 :06 PM Hashed/Encrypted Security Checked Security Checked Security Checked Payment Events Status Timestamps Electronic Record and Signature Disclosure Electronic Record and Signature Disclosure created on: 7/21/2017 3:59:03 PM Parties agreed to: Gary Aanenson, Chris Squadra, Trevor Crain, Rosa Rios ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Denton (we, us or Company) may be required by law to provide toyou certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree’ button at the bottom ofthis document Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided ormade available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact City of Denton: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: purchasing@ cityofdenton.com To advise City of Denton of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at melissa.kraft@cityofdenton.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from City of Denton To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to purchasing @ cityofdenton.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Denton To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software rating Systems0 Browsers (for SENDERS Browsers (for SIGNERS) r Internet Explorer 6.0? or above mlet Explorer 6.0?, Mozilla FireFox 1.0 NetScape 7.2 (or above) c 800 x 600 minimum Email Screen Resolution Enabled Security Settings •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable Hmp 1.1 settings viaroxy connection # # These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify City of Denton as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by City of Denton during the course of my relationship with you. n + I •P +