23-1633ORDINANCE NO. 23- 1633
AN ORDINANCE OF THE CITY OF DENTON AMENDING THE SCHEDULE OF RATES FOR
ELECTRIC SERVICE; PROVIDING FOR A REPEALER; PROVIDING FOR A SEVERABILITY
CLAUSE; AND PROVIDING FOR AN EFFECTIVE DATE.
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS :
SECTION 1. The Schedule of Rates for electrical services as provided for in Chapter 26 of
the City of Denton Code of Ordinances, is amended to repeal the current schedules and replace them
as follows:
ELECTRIC RATE SCHEDULES
PAGE
RES
GS
GM
GL
TG
GOS
GON4
GOL
Tl
AF
LS
LT
UFL
USC
UWF
LO
DD
DSL
EGR
GP
ECA
RCA
TCRF
DGR
SFR
PAF
BIF
WNA
EVCR
Residential Service
General Service Small
General Service Medium
General Service Large
General Service Time Of Use
Local Government Service Small
Local Government Service Medium
Local Government Service Large
Temporary Service
Athletic Field
Street Lighting
Traffic Lighting
Unmetered School Zone/Crossing Flashers
Unmetered Security Camera
Unmetered Wi-FI Devices
Other Lighting
Security Lighting
Non-Standard Street Lighting
Economic Growth Rider
GreenSense Incentive Program
Energy Cost Adjustment
Renewable Cost Adjustment
Transmission Cost Recovery Factor
Distributed Generation From Renewable Sources Rider
Special Facilities Rider
Pole Attachment Fee
Banner Install Fee
Wireless Node Attachments
Electric Vehicle Charging Rate
2
4
6
8
10
12
14
16
18
20
22
23
24
25
26
27
28
30
32
34
35
36
37
38
40
41
43
44
46
1
RESIDENTIAL ELECTRIC SERVICE
(Effective 10/01/23)
APPLICATION
Applicable to any Customer for all electric service used for residential purposes in an individual
private dwelling or an individually metered apartment, supplied at one point of delivery and measured
through one meter. This Rate is not applicable to resale service in any event, or to temporary, standby,
or supplementary service.
MONTHLY RATE
(1)Facility Charge Per Bill
Single-Phase Service (R2)
Three-Phase Service (R2)
Prepaid Service (P2)
$ 8.67
$17.33
Sl 6.02
plus;
(2)Usage Charge Per kWh
Winter (Billing months of November through April):
Tier 1: First 600 kWh
Tier 2: Additional kWh
$0.0684
$0.0455
Summer (Billing months of May through October):
Tier 1: All kWh $0.0684
plus;
(3)Energy Cost Adjustment Charge See Schedule ECA
plus;
(4)Transmission Cost Recovery Factor See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the Facility Charge as a minimum,
regardless of actual energy usage.
2
USAGE CHARGE
Billing for the Usage Charge shall be based on actual kWh consumption during the billing period.
Winter (Billing months of November through April):
Usage Charge = kWh in Tier 1 x Tier 1 Rate per kWh
kWh in Tier 2 x Tier 2 Rate per kWh, if applicable
Summer (Billing months of May through October) :
Usage Charge = All kWh x Tier I Rate per kWh
SPECIAL FACILITIES
All services which require special facilities in order to meet Customer’s service requirements shall be
provided, subject to Special Facilities Rider.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
SCHEDULE GS
GENERAL SERVICE SMALL
(Effective 10/01/23)
APPLICATION
Applicable to any commercial customer having a maximum demand of less than 21 kW in each of
the previous twelve (12) months for all electric service supplied at one point of delivery and measured
through one meter. If the demand is equal to or exceeds 21 kW in two consecutive months, account
will be adjusted to bill under General Service Medium (GM) and the Customer must remain on the
GSM rate for a minimum of twelve (12) billing periods. This Rate is not applicable to resale service
in any event, or to temporary, standby, or supplementary service.
MONTHLY RATE
(1)Facility Charge Per Bill
$16.60
$22.17
Single-Phase
Three-Phase
plus;
(2)Usage Charge Per kWh
$0.0852
$0.0446
Tier 1 : First 2,500 kWh
Tier 2: Additional kWh
plus;
(3)
plus;
(4)
Energy Cost Adjustment Charge See Schedule ECA
Transmission Cost Recovery Factor See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the Facility Charge as a minimum,
regardless of actual energy usage.
USAGE CHARGE
Billing for the Usage Charge shall be based on actual kWh consumption during the billing period.
Usage Charge =kWh in Tier 1 x Tier 1 Rate per kWh
kWh in Tier 2 x Tier 2 Rate per kWh, if applicable
4
SPECLAL FACILITIES
All services which require special facilities in order to meet Customer’s service requirements shall be
provided, subject to Special Facilities Rider.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
SCHEDULE GM
GENERAL SERVICE MEDIUM
(Effective 10/01/23)
APPLICATION
Applicable to any commercial customer having a maximum demand that meets or exceeds 21 kW
but less than 240 kW in each of the previous twelve (12) months for all electric service supplied at
one point of delivery and measured through one meter. If the demand is equal to or exceeds 240 kW
in two consecutive months, account will be adjusted to bill under General Service Large (GSL), and
the Customer must remain on the GSL rate for a minimum of twelve (12) billing periods.
Applicable to GSM Customers utilizing City owned and operated facilities and transformation
equipment and who are metered at primary voltage. (GW)
Applicable to GSM Customers that own, operate, and maintain all facilities necessary to receive three-
phase primary voltage service and all transformation facilities required for conversion to utilization
voltage. (GM3)
This Rate is not applicable to resale service in any event, or to temporary, standby, or supplementary
service.
MONTHLY RATE
(1)Facility Charge Per Bill
$16.60
$22.17
Single-Phase
Three-Phase
plus;
(2)Demand Charge Per kW
$4.78All kW
plus;
(3)Usage Charge Per kWh
GM Tier 1: First 6,000 kWh
Tier 2: Additional kWh
$0.0523
$0.0432
GM2 Tier 1: First 6.000 kWh
Tier 2: Additional kWh
$0.0513
$0.0422
GM3 Tier 1 : First 6,000 kWh
Tier 2: Additional kWh
$0.0493
$0.0402
plus;
6
(4)
plus;
Energy Cost Adjustment Charge See Schedule ECA
(5)Transmission Cost Recovery Factor See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the Facility Charge plus the Demand
Charge, regardless of actual energy usage.
DETERMINATION OF DEMAND
The demand used in calculating the Demand Charge for the billing period shall be the greater of: (1)
the actual monthly kW demand as measured during the fifteen (15) minute period of maximum use
each month; or (2) 21 kW; or (3) seventy percent (70%) of the maximum monthly actual demand for
any month during the previous billing months of May through October in the twelve (12) months
ending with the current month.
USAGE CHARGE
Billing for the Usage Charge shall be based on actual kWh consumption during the billing period.
Usage Charge =kWh in Tier 1 x Tier I Rate per kWh
kWh in Tier 2 x Tier 2 Rate per kWh, if applicable
SPECLAL FACILITIES
All services which require special facilities in order to meet Customer’s service requirements shall be
provided, subject to Special Facilities Rider.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
SCHEDULE GL
GENERAL SERVICE LARGE
(Effective 10/01/23)
APPLICATION
Applicable to any commercial customer having a minimum demand of 240 kW for all electric
service supplied at one point of delivery and measured through one meter. Customers who elect
to discontinue service under this Rate are ineligible for service under this Rate for twelve (12)
months.
Applicable to GSL Customers utilizing City owned and operated facilities and transformation
equipment and who are metered at primary voltage. (GL2)
Applicable to GSL Customers that own, operate, and maintain all facilities necessary to receive three-
phase primary voltage service and all transformation facilities required for conversion to utilization
voltage. (GL3)
This Rate is not applicable to resale service in any event, or to temporary, standby, or
supplementary service.
MONTHLY RATE
(1)Facility Charge Per Bill
$69.06Three-Phase
plus;
(2)Demand Charge
All kVA
Per kVA
$10.80
plus;
(3)Usage Charge Per kWh
GL Tier 1 : First 200,000 kWh
Tier 2: Additional kWh
$0.0245
$0.0140
GL2 Tier 1: First 200,000 kWh
Tier 2: Additional kWh
$0.0235
$0.0130
$0.0215
$0.0110
GL3 Tier 1: First 200,000 kWh
Tier 2: Additional kWh
plus;
8
(4)
plus;
Energy Cost Adjustment Charge See Schedule ECA
(5)Transmission Cost Recovery Factor See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the Facility Charge plus the Demand
Charge, regardless of actual energy usage.
DETERMINATION OF DEMAND
The demand used in calculating the Demand Charge for the billing period shall be the greater of: (1 )
the actual monthly kV A demand as measured during the fifteen (15) minute period of maximum use
each month; or (2) 250 kVA; or (3) seventy percent (70%) of the maximum monthly kVA actual
demand for any month during the previous billing months of May through October in the twelve (12)
month period ending with the current month.
USAGE CHARGE
Billing for the Usage Charge shall be based on actual kWh consumption during the billing period.
Usage Charge =kWh in Tier 1 x Tier 1 Rate per kWh
kWh in Tier 2 x Tier 2 Rate per kWh, if applicable
SPECLAL FACILITIES
All services which require special facilities in order to meet Customer’s service requirements shall be
provided, subject to Special Facilities Rider.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
SCHEDULE TG
GENERAL SERVICE TIME OF USE
(Effective 10/01/23)
APPLICATION
Applicable to any Customer having a minimum demand of 240 kW for all electric service supplied
at one point of delivery and measured through one meter. Customers electing this Rate must remain
on this Rate for a minimum of twelve (12) continuous billing months. If the Customer is new or does
not have a history of on-peak use for June through September, and elects to accept service on the TGS
Rate, the Customer’s demand shall be billed at the GSL Demand Rate until the Customer establishes
a separate on-peak and ofF-peak demand during an on-peak month.
Applicable to TGS Customers utilizing City owned and operated facilities and transformation
equipment and who are metered at primary voltage. (TG2)
Applicable to TGS Customers that own, operate, and maintain all facilities necessary to receive three-
phase primary voltage service and all transformation facilities required for conversion to utilization
voltage. (TG3)
This Rate is not applicable to resale service in any event, or to temporary, standby, or
supplementary service.
MONTHLY RATE
(1)Facility Charge Per Bill
$80.54Three-Phase
plus;
(2)Demand Charge Per kVA
$13.76
$ 2.72
On-Peak
Off-Peak
plus;
(3)Usage Charge Per kWh
TG AllkWh $0.0082
TG2 AllkWh $0.0072
$0.0052TG3 AllkWh
plus;
10
(5)
plus;
(6)
Energy Cost Adjustment Charge See Schedule ECA
Transmission Cost Recovery Factor See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the Facility Charge plus the On-Peak
and Off-Peak Demand Charges, regardless of actual energy usage.
DEFINITION OF TIME OF USE HOURS
The City’s on-peak hours, for the purpose of this rate schedule, are designated as being from 2:00
P.M. to 7:00 P.M. each Monday through Friday, for the months of June through September excluding
Independence Day and Labor Day. The City’s on-peak hours may be changed from time to time.
The City's ofF.peak hours, for the purpose of this rate schedule, shall be all hours not designated as
on-peak hours.
DETERMINATION OF DEMAND
On-Peak Demand Charge for the billing period shall be the greater of (1) the kVA actual demand
supplied during the fifteen (15) minute period of maximum use each month during on-peak hours as
recorded by the City's demand meter; or (2) 250 kVA; or (3) one hundred percent (100%) of the actual
maximum on-peak demand similarly determined during the billing months of June through
September in the twelve (12) months immediately preceding the current month. The On-Peak
Demand Charge will be applied to each billing period.
Off-Peak Demand Charge for the billing period shall be the greater of: (1) the kVA actual demand
supplied during the fifteen (15) minute period of maximum use each month during on-peak hours as
recorded by the City’s demand meter; or (2) 250 kVA. The Off-Peak Demand Charge will be applied
to each billing period.
USAGE CHARGE
Billing for the Usage Charge shall be based on actual kWh consumption during the billing period.
Usage Charge = All kWh x Rate per kWh
SPECLAL FACILITIES
All services which require special facilities in order to meet Customer’s service requirements shall be
provided, subject to Special Facilities Rider.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
11
SCHEDULE (,OS
LOCAL GOVERNMENT SERVICE SMALL
(Effective 10/01/23)
APPLICATION
Applicable to any local City, County or School District customer having a maximum demand of less
than 21 kW in each of the previous twelve (12) months for all electric service supplied at one point
of delivery and measured through one meter. If the demand equals or exceeds 21 kW in two
consecutive months, account will be adjusted to bill under Local Government Service Medium
(GOM), and the Customer must remain on the GOMI Rate for a minimum of twelve (12) billing
periods. This Rate is not applicable to resale service in any event, or to temporary, standby or
supplementary service.
NET MONTHLY RATE
(1)Facility Charge Per Bill
$16.60
$22.17
Single-Phase
Three-Phase
plus;
(2)Usage Charge Per kWh
$0.0852
$0.0446
Tier 1: First 2,500 kWh
Tier 2: Additional kWh
plus;
(3)
plus;
(4)
Energy Cost Adjustment Charge See Schedule ECA
Transmission Cost Recovery Factor See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the Facility Charge as a minimum,
regardless of actual energy usage.
USAGE CHARGE
Billing for the Usage Charge shall be based on actual kWh consumption during the billing period.
Usage Charge =All kWh x Rate per kWh
12
SPECLAL FACILITIES
All services which require special facilities in order to meet Customer’s service requirements shall be
provided, subject to Special Facilities Rider.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
13
SCHEDULE GOM
LOCAL GOVERNMENT SERVICE MEDIUM
(Effective 10/01/23)
APPLICATION
Applicable to any local City, County, or School District customer having a maximum demand that
meets or exceeds 21 kW but less than 240 kW in each of the previous twelve (12) months for all
electric service supplied at one point of delivery and measured through one meter. If the demand is
equal to or exceeds 240 kW in two consecutive months, account will be adjusted to bill under Local
Government Service Large (GOL), and the customer must remain on the GOL rate for a minimum of
twelve (12) billing periods. This Rate is not applicable to resale service in any event, or to temporary,
standby, or supplementary service.
NET MONTHLY RATE
(1)Facility Charge Per Bill
$16.60
$22.17
Single-Phase
Three-Phase
plus;
(2)Demand Charge Per kW
$4.78All kW
plus;
(3)Usage Charge Per kWh
$0.0523
$0.0432
Tier 1: First 6,000 kWh
Tier 2: Additional kWh
plus;
(4)
plus;
Energy Cost Adjustment Charge See Schedule ECA
(5)Transmission Cost Recovery Factor See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the Facility Charge plus the Demand
Charge, regardless of actual energy usage.
14
DETERMINATION OF DEMAND
The demand used in calculating the Demand Charge for the billing period shall be the greater of:
(1) The actual kW demand supplied during the fifteen (15) minute period of maximum use each
month; or (2) fifty percent (50%) of the maximum monthly actual demand for any month during
the previous billing months of May through October in the twelve (12) months ending with the
current month.
USAGE CHARGE
Billing for the Usage Charge shall be based on actual kWh consumption during the billing period.
Usage Charge =kWh in Tier 1 kWh x Rate per kWh
kWh in Tier 2 kWh x Rate per kWh, if applicable
SPECLAL FACILITIES
All services which require special facilities in order to meet Customer’s service requirements shall be
provided, subject to Special Facilities Rider.
PAYMENT
The due date for the payment of the bill for utility services shall not be less than ten ( 10)
business days after issuance.
15
SCHEDULE GOL
LOCAL GOVERNMENT SERVICE LARGE
(Effective 10/01/23)
APPLICATION
Applicable to any local City, County, or School District customer having a minimum demand of
240 kW for all electric service supplied at one point of delivery and measured through one meter.
Customers who elect to discontinue service under this Rate are ineligible for service under this
Rate for twelve (12) months.
Applicable to GOL Customers utilizing City owned and operated facilities and transformation
equipment and who are metered at primary voltage. (G02)
Applicable to GOL Customers that own, operate, and maintain all facilities necessary to receive three-
phase primary voltage service and all transformation facilities required for conversion to utilization
voltage. (G03)
This Rate is not applicable to resale service in any event, or to temporary, standby, or
supplementary service.
MONTHLY RATE
(1)Facility Charge Per Bill
$69.06Three-Phase
plus;
(2)Demand Charge
All kVA
Per kVA
$10.80
plus;
(3)Usage Charge Per kWh
GOL Tier 1: First 200,000 kWh
Tier 2: Additional kWh
$0.0245
$0.0140
G02 Tier 1: First 200,000 kWh
Tier 2: Additional kWh
$0.0235
$0.0130
$0.0215
$0.0110
G03 Tier 1 : First 200,000 kWh
Tier 2: Additional kWh
plus;
16
(4)
plus;
Energy Cost Adjustment Charge See Schedule ECA
(5)Transmission Cost Recovery Factor See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the Facility Charge plus the Demand
Charge, regardless of actual energy usage.
DETERMINATION OF DEMAND
The demand used in calculating the Demand Charge for the billing period shall be the greater of: (1)
the actual monthly kVA demand as measured during the fifteen (15) minute period of maximum use
each month; or (2) fifty percent (50%) of the maximum monthly kVA actual demand for any month
during the previous billing months of May through October in the twelve (12) month period ending
with the current month.
USAGE CHARGE
Billing for the Usage Charge shall be based on actual kWh consumption during the billing period.
Usage Charge =kWh in Tier 1 x Tier 1 Rate per kWh
kWh in Tier 2 x Tier 2 Rate per kWh, if applicable
SPECIAL FACILITIES
All services which require special facilities in order to meet Customer’s service requirements shall be
provided, subject to Special Facilities Rider.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
17
SCHEDULE Tl
TEMPORARY SERVICE
(Effective 10/01/23)
APPLICATION
Applicable to short term or temporary electric service where a Customer has received a permit. This
Rate is not applicable after the certificate of occupancy or building fInal inspection has been issued.
NET MONTHLY RATE
(1)Facility Charge Per Bill
$16.61
$22. 19
Single-Phase
Three-Phase
plus;
(2)Usage Charge Per kWh
$0.0854All kWh
plus;
(3)
plus;
(4)
Energy Cost Adjustment Charge See Schedule ECA
Transmission Cost Recovery Factor See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the Facility Charge regardless of actual
energy usage.
USAGE CHARGE
Billing for the Usage Charge shall be based on actual kWh consumption during the billing period.
Usage Charge = All kWh x Rate per kWh
18
ADDITIONAL TEMPORARY SERVICE CHARGES
Labor Regular time or overtime labor hourly rates in effect at the time the
work is performed for all personnel performing the work. Labor
charges shall be based on a one (1) hour minimum with all additional
time above the minimum to be measured to the nearest one-quarter
hour
Transportation To be billed by hours or miles, as applicable, according to the estimated
cost of operating the required equipment.
Material Material that cannot be salvaged shall be billed at the City’s Warehouse
cost plus twenty five percent (25%), plus applicable sales tax. At the
time a temporary service is removed or converted, any loss of the
installed material due to negligence or willful action by the Customer
will be billed separately to the Customer at replacement cost plus
twenty five percent (25%), plus applicable sales tax.
Administrative Fee Ten percent (10%) of the total labor, transportation, and material costs.
SPECLAL FACILITIES
All services which require special facilities in order to meet Customer’s service requirements shall be
provided, subject to Special Facilities Rider.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
19
SCImDULE AF
ATHLETIC FIELD
(Effective 10/01/23)
APPLICATION
Applicable to all electric service metered at one point for use to light specified areas for athletic events.
This Rate is not applicable to resale service in any event, or to temporary, standby, or supplementary
service except in conjunction with applicable rider.
NET MONTHLY RATE
(1)Facility Charge Per Bill
$22.75
$34.11
Single-Phase
Three-Phase
plus;
(2)Demand Charge Per kW
$6.06
$ 1.44
On-Peak
Off-Peak
plus:
(3)Usage Charge Per kWh
$0.0977
$0.0489
On-Peak
Off-Peak
plus;
(4)
plus;
(5)
Energy Cost Adjustment Charge See Schedule ECA
Transmission Cost Recovery Factor See Schedule TCRF
MINIMUM BILLING
For each billing period, the Customer shall be obligated to pay the Facility Charge, regardless of
actual energy usage.
20
DEFnviTiON OF ON-PEAK AND OFF-PEAK HOURS
The City’s on-peak hours, for the purpose of this rate schedule, are designated as being from 2:00
P.M. to 7:00 P.M., for the months of June through September. The City’s on-peak hours may be
changed from time to time.
The City’s off-peak hours, for the purpose of this rate schedule, shall be all hours not designated as
on-peak hours.
DETERMINATION OF DEMAND
The demand used in calculating the Demand Charge for the billing period shall be the actual kW
demand supplied during the fifteen (15) minute period of maximum use during the current billing
period as determined by the City’s demand meter.
USAGE CHARGE
Billing for the Usage Charge shall be based on actual kWh consumption during the billing period.
Usage Charge =On-Peak kWh x Rate per kWh
Off Peak kWh x Rate per kWh
SPECLAL FACILITIES
All services which require special facilities in order to meet Customer’s service requirements shall be
provided, subject to Special Facilities Rider.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance
SCHEDULE LS
STREET LIGHTING
(Effective 10/01/23)
21
APPLICATION
Applicable to all street lighting owned and maintained by the City.
NET MONTHLY RATE
(1)Facility Charge Per Bill
Luminaire Style Type
100 W Sodium Cobra (LSA)
250 W Sodium Cobra (LSB)
400 W Sodium Cobra (LSC)
100 W LED Cobra (LSD)
250 W LED Cobra (LSE)
400 W LED Cobra (LSF)
85 W LED Post (LSG)
$6.08
$8.62
$10.86
$6.08
$8.62
$10.86
$10.86
plus;
(2)Energy Cost Adjustment Charge See Schedule ECA
ENERGY COST ADJUSTMENT CHARGE
Current ECA multiplied by respective kWh based on the following Bulb Wattage Factors:
Luminaire Type
100 W Sodium(LSA)
250 W Sodium (LSB)
400 W Sodium (LSC)
IOOWLED (LSD)
250WLED (LSE)
400 WLED (LSF)
85 WLED (LSG)
Bulb WattaRe Factor
48 kWh
105 kWh
159 kWh
25 kWh
96 kWh
148 kWh
23 kWh
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
TRAFFIC LIGHTING
(Effective 10/01/23)
APPLICATION
22
Applicable to State and Local Government agencies that operate anc
signals.
METERED TRAFFIC LIGHTING NET MONTHLY RATE (LT)
maintain their own traffic
( 1) Usage Charge $0.06 M per kWh
plus;
(2) Energy Cost Adjustment Charge See Schedule ECA
plus;
(3) Transmission Cost Recovery Factor
USAGE CHARGE
Billing for the Metered Traffic Lighting Usage Charge shall be based on actual kWh consumption
during the billing period. Usage Charge = All kWh x Rate per kWh
UNMETERED TRAFFIC LIGHTING NET ANNUAL RATE (ULT)
( 1) Usage Charge $0.0664 per kWh
plus;
(2) Energy Cost Adjustment Charge See Schedule ECA
plus;
(3) Transmission Cost Recovery Factor
USAGE CHARGE
Billing for the Unmetered Traffic Lighting Usage Charge shall be based on historical recorded annual
kWh consumption. Usage Charge = All kWh x Rate per kWh
Annual Usage = 904 kWh per account
See Schedule TCRF
See Schedule TCRF
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
23
SCHEDULE UFL
UNMETERED SCHOOL ZONE/CROSSING FLASHERS
(Effective 10/01/23)
APPLICATION
Applicable to local government agencies that operate and maintain their own unmetered school
zone/crossing flashers.
NET ANNUAL RATE
(1)
plus;
Usage Charge $0.0664 per kWh
(2)
plus;
Energy Cost Adjustment Charge See Schedule ECA
(3)Transmission Cost Recovery Factor See Schedule TCRF
USAGE CHARGE
Billing for the Usage Charge shall be based on historical recorded annual kWh consumption. The
total billed usage divided by number of school zone/crossing flashers will determine the average kWh
usage. This average consumption will be billed for each school zone/crossing flasher once every
twelve (12) months at the end of the fiscal year. Any accounts that are added during the year will be
billed on prorated consumption.
Usage Charge =All kWh x Rate per kWh
Annual Usage =48 kWh per account
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
24
SCHEDULE USC
UNMETERED SECURITY CAMERA
(Effective 10/01/23)
APPLICATION
Applicable to Local Government agencies that operate and maintain their own unmetered security
cameras.
NET ANNUAL RATE
(1)
plus;
Facility Charge $17.82 per bill
(2)
plus;
Usage Charge $0.066+ per kWh
(3)
plus;
Energy Cost Adjustment Charge See Schedule ECA
(1)Transmission Cost Recovery Factor See Schedule TCRF
USAGE CHARGE
Billing for the Usage Charge shall be based on technical information of installed equipment. This
calculated consumption will be billed for each camera once every twelve (12) months at the end of
the fiscal year. Any accounts that are added during the year will be billed on prorated consumption.
Usage Charge =annual kWh per camera x kWh Rate
Annual Usage =300 kWh per camera per account
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance
25
SCHEDULE UWF
UNMETERED WI-FI DEVICES
(Effective 10/01/23)
APPLICATION
Applicable to local government agencies that operate and maintain their own unmetered Wi-FI
devices.
NET ANNUAL RATE
(1)
plus;
Facility Charge $17.82 per bill
(2)
plus;
Usage Charge $0.0664 per kWh
(3)
plus;
Energy Cost Adjustment Charge See Schedule ECA
(4)Transmission Cost Recovery Factor See Schedule TCRF
USAGE CHARGE
Billing for the Usage Charge shall be based on technical information of installed equipment. This
calculated consumption will be billed for each device once every twelve (12) months at the end of the
fiscal year. Any accounts that are added during the year will be billed on prorated consumption.
Usage Charge =annual kWh per device x kWh Rate
Annual Usage =300 kWh per device per account
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
26
SCHEDULE LO
OTHER LIGHTING
(Effective 10/01/23)
APPLICATION
Applicable to Texas Department of Transportation unmetered and metered safety lighting systems
and continuous lighting systems as those terms are defined in Texas Administrative Code, Title 43,
Part 1, Chapter 25, Subchapter A, Rule §25.11.
METERED LIGHTING NET MONTHLY RATE (LOB)
(1)
plus;
(2)
Usage Charge $0.066+ per kWh
Energy Cost Adjustment Charge See Schedule ECA
METERED LIGHTING USAGE CHARGE (LOB)
Billing for the Usage Charge shall be based on actual kWh consumption during the billing period.
Usage Charge = All kWh x Rate per kWh
UNMETERED LIGHTING NET MONTHLY RATE (LOA)
(1)
plus;
Usage Charge $0.0664 per kWh
(2) Energy Cost Adjustment Charge See Schedule ECA
UNMETERED LIGHTING USAGE CHARGE (LOA)
Billing for the Usage Charge shall be based on estimated kWh consumption during the billing period.
Usage Charge = (kWh Rate x Bulb Wattage/1000) x (Hours of Operation per Billing Period)
Hours of Operation per Billing Period = 333 hours
Bulb Wattage is the rated wattage of the luminaire bulb
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance
27
SCHEDULE DD
SECURITY LIGHTING
(Effective 10/01/23)
APPLICATION
Applicable to all outdoor area lighting when such lighting facilities are operated as an extension of the
City's distribution system.
NET MONTHLY RATE
(1)Facility Charge Per Bill
Luminaire Type
100 W Sodium Vapor (DSA)
250 W Sodium Vapor (DSB)
400 W Sodium Vapor (DSC)
250 W Metal Halide (DHA)
400 W Metal Halide (DHB)
100 W Equivalent LED (DSD)
250 W Equivalent LED (DSE)
400 W Equivalent LED (DSF)
$ 9.61
$12.71
815.32
$14.95
$17.82
$ 9.61
812.71
$15.32
plus;
(2)Energy Cost Adjustment Charge See Schedule ECA
ENERGY COST ADJUSTMENT CHARGE
Current ECA multiplied by respective kWh based on the following Bulb Wattage Factors:
Luminaire Type
100 W Sodium Vapor (DSA)
250 W Sodium Vapor (DSB)
400 W Sodium Vapor (DSC)
250 W Metal Halide (DHA)
400 W Metal Halide (DHB)
100 W Equivalent LED (DSD)
250 W Equivalent LED (DSE)
400 W Equivalent LED (DSF)
Bulb Wattage Factor
48 kWh
105 kWh
159 kWh
105 kWh
159 kWh
25 kWh
96 kWh
148 kWh
28
TYPE OF SERVICE
The City shall furnish, install, maintain and deliver electric service to automatically controlled lighting
fixtures conforming to the City's standards and subject to its published rules and regulations.
Where necessary for proper illumination or where existing poles are inadequate, the City will install
or cause to be installed, one (1) wood pole with the necessary lighting hardware and overhead
conductor for each installed light, at a distance not to exceed eighty (80’) feet from existing lines, at no
charge to the Customer. Additional contractual arrangements between the City and the Customer are
subject to the Special Facilities Rider.
TERM OF CONTRACT
A two (2) year contract shall be agreed to and signed by each Customer desiring security lighting
service authorizing fixed monthly charges, which may be reviewed annually, and to be applied to the
Customer’s monthly municipal utilities bill. In the event that a Customer requests the removal of the
unit or discontinuance of the service prior to completion of two (2) years, the remainder of the contract
period shall become due and payable. After the end of the initial two (2) year contract, service shall
continue on a month-to-month basis and may be canceled by either party upon thirty (30) days’ notice.
SPECLAL FACILITIES
All services which require special facilities in order to meet Customer’s service requirements shall be
provided, subject to Special Facilities Rider.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days
from date of issuance
29
SCHEDULE DSL
NON-STANDARD STREET LIGHTING
(Effective 10/01/23)
APPLICATION
Applicable to street lighting owned and maintained by the Customer. Availability of this service is
contingent on the existence of an executed Special Facilities Rider between the legally responsible
party and the City under which the legally responsible party accepts all responsibilities, both legal and
financial, related to operation and maintenance of the subject lights, including but not limited to
payment of all applicable energy charges.
NET MONTHLY RATE
(1)
plus;
Facility Charge $9.18 per bill
(2)Usage Charge $0.0664 per kWh
plus;
(3)Energy Cost Adjustment Charge See Schedule ECA
USAGE CHARGE
Current usage charge and ECA rates are multiplied by respective kWh based on the following Bulb
Wattage Factors:
Luminaire Type
100 W Sodium Vapor (DLSA)
250 W Sodium Vapor (DLSB)
400 W Sodium Vapor (DLSC)
250 W Metal Halide (DLHA)
400 W Metal Halide (DLHB)
Bulb Wattage Factor
48 kWh
105 kWh
159 kWh
105 kWh
159 kWh
ADDITIONAL SERVICE CHARGES
If the City is required to maintain the privately owned lights to ensure public safety, the owner of the
lights may be subject to additional service charges. The additional service charges shall be the actual
cost of performing any work required to perform the necessary maintenance including but not limited
to
30
Labor Regular time or overtime labor hourly rates in effect at the time the work is
performed for all personnel performing the work. Labor charges shall be
based on a one (1) hour minimum with all additional time above the minimum
to be measured to the nearest one-quarter hour.
Transportation To be billed by hours or miles, as applicable, according to the estimated cost
of operating the required equipment.
Material Any material needed to repair and/or maintain facilities will be billed at City
Warehouse cost plus twenty five percent (25%).
Administrative Fee Ten percent (10%) of the total labor, transportation, and material costs.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
31
SCImDULE EGR
ECONOMIC GROWTH RIDER
(Effective 10/01/23)
PURPOSE
The purpose of this Rider is to facilitate local economic growth and expand the ad valorem tax base
of the City.
AVAILABILITY
This Rider is available to the Customers who:
(1)
(2)
(3)
Receive service from Rate Schedules GSL or TGS; and
Pay City ad valorem tax; and
Receive no electric service discounts other than those specifically defined in the GSL
or TGS Rate Schedules.
APPLICATION
This Rider is available to electric service supplied at any one location. It is for firm electric service
applicable to new and existing customers as described below, over a five (5) year period. This Rider
is available to the following classes of customers:
(1)New Customers whose electric service represents demand not previously served by
the City at any location in the City’s service area in the last twelve (12) months, where
such metered demand will be in excess of 1 ,000 kVA and customer load factor must
be greater than the City’s electric system load factor, as estimated and mutually agreed
upon by the General Manager of the City’s electric utility and the Customer.
(2)Existing Customers served under Rate Schedules GSL or TGS who increase their
prior existing metered demand by 1 ,000 kVA and customer load factor must be greater
than the City’s electric system load factor. This increase shall be verified by sub-
metering (at the Customer’s expense) the additional load. If sub-metering is not
possible, at the discretion of the General Manager of the City’s electric utility, the
increase may be verified by comparing a three-month rolling average of the new level
of demand to the prior demand averaged for corresponding months. During periods
in which this verification method cannot be applied, the General Manager and the
Customer may develop a mutually agreed-upon formula to estimate the base and
additional demand levels.
32
In light of additional costs associated with the Economic Growth Rider and to mitigate potential
risk to ratepayers, any participant in the Economic Growth Rider must be, at the time this Rider is
applied for and continuing while such Rider is in effect, a Customer in good standing of all City
utilities, including solid waste services. Unless legal review procedures have been invoked in good
faith regarding the obligation, a Customer in good standing for the purpose of this Rider is defined
as a Customer not owing any unpaid utility or solid waste debt obligation that is over forty-five (45)
days past due to the City during the previous twelve (12) months.
NET MONTHLY RATE
The Customer shall be charged under the appropriate applicable rate schedules with the exception
that the monthly billing demand (for the GSL Rate) or system demand and on-peak demand (for the
TGS Rate) will be adjusted in accordance with the following table:
Time Period Reduction to Billing Demand
First Year
Second Year
Third Year
Fourth Year
Fifth year
50%
40%
30%
20%
10%
CONTRACT PERIOD
The term of the contract will be for five (5) years.
33
SCHEDULE GIP
GREENSENSE INCENTIVE PROGRAM
(Effective 10/01/23)
PROGRAM SUMMARY
The objective of the GreenSense Incentive Program (“Program”) is to reduce energy demand and
consumption by promoting energy conservation, thereby reducing the utility bills of City Customers,
reducing the peak load of the City’s electric system, reducing emissions in the state, and promoting
energy conservation. The Program offers incentives, that may be distributed in the form of credits on
the electric service bills or cash incentive to City retail customers.
Any participant in the GreenSense Incentive Program must be, at the time this program is applied
for and continuing while such program is in effect, a Customer in good standing of all City utilities,
including solid waste services. Unless legal review procedures have been invoked in good faith
regarding the obligation, a Customer in good standing for the purpose of this Program is defIned as a
Customer not owing any unpaid utility or solid waste debt obligation that is over forty-five (45) days
past due to the City during the previous twelve (12) months.
Program applicants will be able to qualify for multiple incentives simultaneously, unless specified in
the individual guidelines. A separate application may be necessary for each incentive. The Probram
will be in effect each fiscal year beginning on October 1, until the allotted funding is depleted or until
cancellation of the program by the City. At the time the funds are depleted, no additional applications
for participation will be accepted until the next fiscal year.
Qualifying applicants must receive electric service from the City. The program guidelines and
payment provisions are subject to change by the City without prior notice. The City may, at any
time, discontinue the Program without prior notice. The current program guidelines may be found
in the GreenSense Incentive Program Manual located at www.cityofdenton.com.
34
SCHEDULE ECA
ENERGY COST ADJUSTMENT
(Effective 10/01/23)
The Energy Cost Adjustment (ECA) Rate shall be set by the Public Utilities Board (“PUB”). The ECA
Rate shall be reviewed on a quarterly basis and adjusted as defined below to recover the net cost of
energy delivered to Customers and to maintain the City’s electric utility in a financially sound position.
NET MONTHLY RATE
( 1) Energy Cost Adjustment Charge $0.0341 per kWh
ENERGY COST ADIUSTMENT BALANCING ACCOUNT CALCULATION
The ECA Balancing Account shall be calculated using the following formula:
ECA Balancing Account = (Beginning ECA Account Balance) – (Projected Net Energy Cost)
Where:
Projected Net Energy Cost = For the next fiscal quarter, the electric utility’s projected cost of
electric load purchases from ERCOT BIW all projected electric utility power/energy related costs
for that same period including, but not limited to, power production (including the Denton Energy
Center debt and all other costs); purchased power; applicable transmission services, losses and
congestion; other ERCOT charges; renewable energy credits; and financial and/or physical
power/energy trades; less all projected revenue to be received by the electric utility for
power/energy related sales and/or trades.
The General Manager of the City’s electric utility or his/her designee shall calculate the ECA Balancing
Account monthly. In the event that the ECA Balancing Account calculated during the last month of
each fiscal quarter (December, March, June, and September) is projected to be over/under collected by
$5,000,000 or more during the next quarter, the General Manager or his/her designee may recommend
to the PUB and City Council a revision to the ECA to maintain the City’s electric utility in a financially
sound position.
ENERGY COST ADJUSTMENT CALCULATION
ECA = [projected Net Energy Cost) + (ECA Balancing Account)] / (Projected kWh sales)
ENERGY COST ADJUSTMENT CnARGE
The Energy Cost Adjustment Charge shall be based on actual kWh consumption during the billing
period. Energy Cost Adjustment Charge = kWh x ECA Rate
35
SCHEDULE RCA
RENEWABLE COST ADJUSTMENT
(Effective 10/01/23)
Applicable to any Customer receiving City electric service that owns an on-site distributed
generation powered by a renewable resource which is interconnected with the City’s electric
system.
The Renewable Cost Adjustment (RCA) Rate shall be set by the Public Utilities Board (“PUB”). The
RCA Rate shall be reviewed on a quarterly basis and adjusted as defined below to reflect an
economically neutral value of distributed generation energy.
NET MONTHLY RATE
( 1 ) Renewable Cost Adjustment $0.0381 per kWh
RENEWABLE COST ADJUSTMENT CALCULATION
The RCA shall be calculated using the nodal market price and renewable hourly output factor:
RCA = (Nodal Market Price) x (Renewables Hourly Output) / (Total Annual Renewables Production)
RENEWABLE COST ADJUSTMENT CREDIT
The Renewable Cost Adjustment Charge shall be based on actual kWh delivered from Customer to
the City’s electric system during the billing period.
Renewable Cost Adjustment Credit = kWh x RCA Rate
36
SCHEDULE TCRF
TRANSMISSION COST RECOVERY FACTOR
(Effective 10/01/23)
The Transmission Cost Recovery Factor (TCRF) Rate shall be set by the Public Utilities Board
(“PUB”). The TCRF Rate shall be reviewed on a quarterly basis and adjusted as defined below to
recover the costs of transmission service within the boundaries of the Electric Reliability Council
of Texas (“ERCOT”) region which are billed and charged to the City.
NET MONTHLY RATE
Residential
General Service Small
Local Government Service Small
Temporary Service
Athletic Field
Traffic Lighting
Unmetered Traffic Lighting
Unmetered School Zone/Crossing
Unmetered Security Camera
Unmetered Wi-FI Devices
Per kWh
$0.00
$0.00
$0.OO
$0.00
$0.OO
$0.00
$0.00
$0.00
$0.OO
$0.00
NET MONTHLY RATE
General Service Medium
Local Government Service Medium
Per kW
$0.00
$0.00
NET MONTHLY RATE
General Service Large
Local Government Service Large
General Service Time Of Use
Per kVA
$0.00
$0.00
$0.00
TRANSMISSION COST RECOVERY FACTOR BALANCING ACCOUNT CALCULATION
The TCRF shall be calculated using the following formula:
TCRF Annual Billing = (Actual monthly net TCOS billing amounts charged by ERCOT
transmission service providers to the City) + (Projected increases or decreases PUCT-
approved TCOS billing amount charges to ERCOT utilities)
During the last month of each fiscal year quarter (December, March, June, and September), the
General Manager of the City’s electric utility or his/her designee shall calculate the TCRF
Balancing Account. The TCRF charge will be developed by the City for each applicable customer
billing schedule herein, based on projected kWh sales for billing schedules without a demand
component and on monthly peak kW for billing schedules with a demand component.
TCRF rate class allocation amount = [(TCRF annual billing) x (Projected rate class kWh
usage)] / (Total projected usage for all rate classes).
37
SCHEDULE DGR
DISTRIBUTED GENERATION FROM RENEWABLE SOURCES RIDER
(Effective 10/01/23)
APPLICATION
This Rider is available to retail Customers receiving electric service under a City electric rate
schedule who owns and operates an on-site generating system powered by a renewable resource
capable of producing power, and which is interconnected with the City’s electric system. Systems
greater than 20 kW may be required to enter into a Purchase Power Agreement (PPA) applicable
to their specific situation in lieu of this rate schedule. Renewable energy technology is any
technology that exclusively relies on an energy source that is naturally regenerated over a short
time and derived directly or indirectly from the sun or wind. A renewable energy technology does
not rely on energy resources derived from fossil fuels, waste products from fossil fuels, or waste
products from inorganic sources.
This Rider applies to a Customer-owned generating system that primarily offsets all or part of the
Customer’s electric service provided by the City. If the Customer-owned generating system is
sized such that it produces energy in excess of a Customer’s electric consumption, special
arrangements and a contract may be necessary. The current interconnection guidelines may be
found in the Distributed Generation Manual located at www.cityofdenton.com.
In light of additional costs associated with the Distributed Generation From Renewable Sources
Rider and to mitigate potential risk to ratepayers, any participant in the Distributed Generation From
Renewable Sources Rider must be, at the time this Rider is applied for and continuing while such
Rider is in effect, a Customer in good standing of all City utilities, including solid waste
services. Unless legal review procedures have been invoked in good faith regarding the obligation, a
Customer in good standing for the purpose of this Rider is defined as a Customer not owing any
unpaid utility or solid waste debt obligation that is over forty-five (45) days past due to the City during
the previous twelve (12) months.
CONDITIONS OF SERVICE
All charges, character of service, and terms and conditions of the electric rate schedule under which
the Customer receives service shall apply except as expressly altered by this Rider.
The Customer shall comply with the City’s current technical requirements for distributed
generation interconnection. The Customer shall obtain approval from the City prior to the
installation of the on-site generating system. The Customer shall submit to the City a completed
interconnection application form and signed Agreement for Interconnection and Parallel Operation
of Distributed Generation before the system installation. The minimum term of an agreement
under this Rider is one year, extended automatically unless terminated by either party with sixty
(60) days advance written notice.
The Customer is responsible for the costs of interconnecting with the City’s electric system,
including transformers, service lines, or other equipment determined necessary by the City for safe
installation and operation of the Customer’s equipment with the City’s electric system. The
38
Customer is responsible for any costs associated with required inspections and permits.
METERING
Metering under this Rider shall be performed by a single meter capable of registering the flow of
electricity in two directions (delivered by the City’s electric system to the Customer and delivered
to the City’s electric system by the Customer’s system) to determine the Customer’s net energyflow
RATE
Beginning in the billing period after a Customer receives approval from the City, to interconnect
the Customer’s on--site generating system; all energy generated by the Customer’s system and
delivered to the City’s electric system will be considered renewable energy. The Customer shall
be billed for all energy delivered by the City to the Customer under the approved rates.
For any generation delivered by the Customer’s system to the City’s electric system up to the
amount of energy delivered by the City to the Customer. the City shall credit the Customer’s
account for the energy generated as follows :
Generation Credit = [(kWh delivered from the Customer’s approved system)
x (Customer’s base electric service rate)] + [(kWh delivered from the Customer’s approved
system) x (RCA Rate)]
For all energy delivered by the Customer’s system to the City’s electric system that exceeds
the amount of energy delivered by the City to the Customer, the City
shall credit the Customer’s account for the energy generated as
follows:
Excess Generation Credit = (kWh delivered from the Customer’s system) x RCA Rate
Any Billing Period Credit shall be applied to the utility charges due from the Customer to the City
for the billing period.
INDEMNIFICATION
THE CUSTOMER OPERATING THE RENEWABLE DISTRIBUTED GENERATION SYSTEM rNDEMNIFrES
THE CITY AND HOLDS THE CITY HARMLESS FOR ALL DAMAGES AND INJURIES TO THE CITY, THE
CUSTOMER, OR OTHERS ARISING OUT OF CUSTOMER’S USE, OWNERSHIP OR OPERATION OF
CUSTOMER’S DISTRIBUTED GENERATION FACILITIES IN PARALLEL WITH THE CITY’S SYSTEM.
CUSTOMER IS SOLELY RESPONSIBLE FOR PROVIDING ADEQUATE PROTECTION FOR OPERATING
IN PAkALLEL WITH THE CITY’S SySTEM IN SUCH A MANNER THAT FAULTS OR OTHER
DISTURBANCES ON THE CITY’S SYSTEM DO NOT CAUSE DAMAGE TO THE CUSTOMER’S
DISTRIBUTED GENERATION EQUIPMENT.
39
SCHEDULE SFR
SPECIAL FACILITIES RIDER
(Effective 10/01/23)
(1)All service shall be offered from available facilities. If a Customer’s service characteristics
require facilities and devices not normally and readily available at the location where the
Customer requests service, the total cost incurred by the City for all facilities installed, buried,
relocated and/or removed shall be the responsibility of the Customer and subject to a contract
entered into between the City and the Customer. This contract shall be signed by both parties
prior to the City providing service to the Customer.
(2)Any contract under this rider is subject to the following approvals:
(a) if the total value of the contract is less than $100,000, the contract may be approved by
the City Manager, or his designee. If a contract under this subsection is not approved by the
City Manager, or his designee, then it must be recommended for approval by the Public
Utilities Board and approved by the City Council.
(b) if the total value of the contract is equal to or greater than $100,000, the contract must
be recommended for approval by the Public Utilities Board and approved by the City
Council.
40
SCHEDULE PAF
POLE ATTACHMENT FEE
(Effective 10/01/23)
APPLICATION
This Rate is available to a licensee who desires to access designated poles or conduits owned by the
City for the purpose of installing and maintaining their facilities and associated equipment to provide
services to the public. An agreement between such entity and the City shall be executed separate
from, but will reference, the following rate schedule:
NET ANNUAL RATE
(1)
(2)
(3)
Annual Pole Attachment (“AP/V’)$ 15.57 per attachment
plus;
plus;
On-pole Conduit Rate $15.57 per linear foot
In-Ground Conduit Rate Rate specified pursuant to
Schedule SFR
plus;
(4)
plus;
(5)
Riser Rate $160 per riser
Miscellaneous Attachments $ 100 per miscellaneous
attachment
Note: Annual Rates (2) and (3) listed above are not available on all poles nor in all areas across the
City
APPLICATION PROCESSING COSTS
(1)
(2)
(3)
Application Filing Fee (per submittal)$ 100 per application
Per pole cost (review & inspection)$25.00 per pole
Per pole cost (mileage)$5.00 per pole
All application processing costs are non-refundable.
If an application being processed is identified as inaccurate or with errors, the licensee will need to
resubmit the application and pay the application filing fee again.
MISCELLANEOUS
(1)The City or City Contractor Performing Analysis
41
$225 per pole
(2)
(3)
Unauthorized Attachment Penalty $ 1,000 per attachment per pole
Undefined Work or Expense Rate pursuant to Schedule SFR
MAKE READY COSTS
Licensees will be required to pay for any work done or contracted by the City, including but not
limited to make ready work and any installed, used or maintained facilities in violation of the
Agreement that the licensee has not corrected. The City will invoice licensee, and licensee must pay,
for identified expenses as needed before any work will begin and shall include all reasonable fully
loaded material (including any applicable overhead), labor, engineering, transportation and
administrative costs.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
42
SCHEDULE BIF
BANNER INSTALL FEE
(Effective 10/01/23)
APPLICATION
Applicable to any person who has completed an application and received approval from the City to
have a banner installed on facilities owned by the City for the purpose of marketing and publicizing
community events shall be assessed a fee based on the following schedule:
NET ANNUAL RATE
Over the Street Banner Install $ 100.00 per banner
Pole One Time Banner Install $ 15.00 per banner
Pole Seasonal Banner Install $27.00 per banner
TERMS AND CONDITIONS OF SERVICE
Persons requesting the City install an Over the Street Banner must provide the City with a banner that
is no more than three (3) feet tall by thirty-five (35) feet in length with six (6) feet of rope. All Over
the Street Banners must be made out of mesh only (fish net type material). A sample of the banner
material is recommended for approval. The City’s Building Inspections Department requires an
application and permit fee of sixty (60) dollars for installation of an Over the Street Banner which needs
to be completed prior to contacting the City’s electric utility.
Persons requesting the City install a Pole Banner must provide the City’s electric utility with a banner
that is no more than thirty (30) inches tall by eighty (80) inches in length with openings of two (2)
inches. Pole Banners are required to be made of weather beater or vinyl material only. The appropriate
application for each type of banner must be completed prior to installation and returned to a
representative of the City’s Electric Operations and Maintenance Division along with applicable fees
listed above, a digital image of the banner, and location requests. The City’s electric utility will
determine install locations depending on availability. Any banners that promote sponsors or
advertisement are strictly prohibited.
PAYMENT
Payment is required to the City at the time the banners are given for installation. Permit fees, when
applicable, are due to Building Inspections in order to reserve specific dates.
43
SCHEDULE WNA
WIRELESS NODE ATrACHMENTS
(Effective 10/01/23)
APPLICATION
This Rate is available to a licensee who desires to install and maintain their wireless nodes and
associated equipment to provide services to the public. An agreement between such entity and the
City shall be executed separate from, but will reference, the following rate schedule:
NET ANNUAL RATE
(1)
(2)
(3)
(4)
Facility Charge $ 17.82 per node
plus;
plus;
plus;
Usage Charge $0.066+ per kWh
Energy Cost Adjustment Charge See Schedule ECA
Transmission Cost Recovery Factor See Schedule TCRF
METERED USAGE CHARGE
Billing for the Metered Usage Charge shall be based on actual kWh consumption for each device
once every twelve (12) months at the end of FC fiscal year.
Usage Charge =All kWh per device x Rate per kWh
UNb4ETERED USAGE CHARGE
BilIIng for the Unmetered Usage Charge shall be based on 1) kWh consumption from similarly
installed metered equipment; or 2) technical information of installed equipment provided by licensee,
if similar equipment is not already metered. This calculated consumption will be billed for each
device once every twelve (12) months at the end of the fiscal year.
Usage Charge =Annual kWh per device x Rate per kWh
Annual Usage =2,000 kWh per device per account (or calculated consumption based
on technical information provided by licensee)
MISCELLANEOUS
(1)Unauthorized Attachment Penalty $ 1,000 per attachment
44
(2) Undefined Work or Expense Rate pursuant to Schedule SFR
MAKE READY COSTS
Licensees will be required to pay for any work done or contracted by the City, including but not
limited to make ready work and any installed, used or maintained facilities in violation of the
Agreement that the licensee has not corrected. The City will invoice licensee, and licensee must pay,
for identified expenses as needed before any work will begin and shall include all reasonable fully
loaded material (including any applicable overhead), labor, engineering, transportation and
administrative costs.
PAYMENT
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
i t T.It
45
SCHEDULE EVCR
ELECTRIC VEHICLE CHARGING RATE
(Effective 10/01/23)
APPLICATION
Applicable to vehicles that utilize charging services from City of Denton owned and operated Level
2 EV chargers.
NET ANNUAL RATE
(1 ) Usage Charge $0.04 per minute
USAGE CHARGE
Billing for the Usage Charge shall be based on actual charging time incurred. The billing service will
be provided by a third-party vendor
Usage Charge = EV Charging duration x Rate per Minute
46
SECTION 2. The City Manager is hereby authorized to expend funds to authorize credits
to Customers on their electric service bills and further to authorize cash incentives in accordance
with the form and type set forth in Schedule GIP, as the installation of energy efficient upgrades
is in the best interest of the City, as such will reduce energy demand and consumption, reduce the
peak load of the City’s electric system, reduce emissions in the state, and promote energy
conservation, which are all public purposes of the City.
SECTION 3. All ordinances or parts of ordinances in force when the provisions of this
ordinance became effective which are inconsistent, or in conflict with the terms or provisions
contained in this ordinance are hereby repealed to the extent of any such conflict.
SECTION 4. If any section, subsection, paragraph, sentence, clause, phrase or word in this
ordinance, or application thereof to any person or circumstances is held invalid by any court of
competent jurisdiction, such holding shall not affect the validity of the remaining portions of this
ordinance, and the City Council of the City of Denton, Texas, hereby declares it would have enacted
such remaining portions despite any such invalidity.
SECTION 5. This ordinance and the rates herein adopted shall become effective, charged,
and applied to all electric services rendered by the City, and all energy usage by Customers of the City
effective with the first billing issued on and after October 1, 2023; and a copy of said rates shall be
maintained on file in the Office of the City Secretary of the City of Denton, Texas.
SECTION 6.This ordinance shall be effective immediately upon its passage and approval.
The motion to approve this ordinance was made by Br ,+a Tb q.ch ,
seconded by B,=Pb£>a\ (_)'.., 3L hc etc , and was passed and approved by the following
vote [ 7 - o 1:
Aye
,/
-L
Nay Abstain Absent
Mayor Gerard Hudspeth:
Vicki Byrd, District 1 :
Brian Beck, District 2:.,,/
Paul Meltzer, District 3 :,Z
,/Joe Holland, District 4:
Brandon Chase McGee, At Large Place 5 :L/
J
o161 L
Chris Watts, At Large Place 6:
PASSED AND APPROVED this the day of SO+,w,b./_, 2023.
mD7tfDN
47
ATTEST:
JESUS SALAZAR, CITY SECRETARY
b\\\t 1111111/
APPROVED AS TO LEGAL FORM:
MACK REINWAND, CITY ATTORNEY
Digitally signed by Marcella Lunn
DN: cn=Marcella Lunn, o, ou=City
cML
on.com. c=US
Date: 2023.09.21 11:15:23 -05'00'
of Denton.MJL\I LIfb emait=maketta lllnn@rhynfdent]
48