Loading...
23-2405ORDINANCE NO. 23-2405 AN ORDINANCE OF THE CITY OF DENTON, TEXAS, A TEXAS HOME-RULE MUNICIPAL CORPORATION, AUTHORIZING THE APPROVAL OF A THIRD AMENDMENT TO A PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF DENTON AND RPS INFRASTRUCTURE, INC., AMENDING THE CONTRACT APPROVED BY CITY COUNCIL ON SEPTEMBER 18, 2018, IN THE NOT-TO-EXCEED AMOUNT OF $2,031,479.50, AMENDED BY AMENDMENTS 1 AND 2 APPROVED BY CITY COUNCIL; SAID THIRD AMENDMENT TO PROVIDE ENGINEERING AND DESIGN SERVICES RELATING TO THE BONNIE BRAE PHASE 6 - WEST UNIVERSITY DRIVE (US 380) TO NORTH ELM STREET (US 77) STREET IMPROVEMENT PROJECT FOR THE CAPITAL PROJECTS DEPARTMENT; PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFOR; AND PROVIDING AN EFFECTIVE DATE (RFQ 6590-032 – PROVIDING FOR AN ADDITIONAL THIRD AMENDMENT EXPENDITURE AMOUNT NOT-TO-EXCEED $368,038.20, WITH THE TOTAL CONTRACT AMOUNT NOT-TO-EXCEED $3,137,886.70). WHEREAS, on March 6, 2018 and June 5, 2018, the City Council approved a pre-qualified engineer list (Ordinance 2018-331) and the professional services provider (the “Provider”), mentioned in this ordinance is being selected as the most highly qualified on the basis of its demonstrated competence and qualifications to perform the proposed professional services; and WHEREAS, on September 1 8, 20 1 8, by Ordinance No. 18- 1429, the City awarded a contract to RPS Infrastructure, Inc. in the amount of $2,03 1 ,479.50, for design services relating to the Bonnie Brae Phase 6 - University (US 380) to Loop 288 street improvement project; and WHEREAS, on March 26, 2019, by Ordinance No. 19-602, the City awarded a first amendment to the contract between the City of Denton and RPS Infrastructure, Inc. in the amount of $397,760, to provide engineering and design services relating to the Bonnie Brae Phase 6 - University (US 380) to Loop 288 street improvement project; and WHEREAS, on October 13, 2020, by Ordinance No. 20-1994, the City awarded a second amendment to the contract between the City of Denton and RPS Infrastructure, Inc. in the amount of $340,609, to provide engineering and design services relating to the Bonnie Brae Phase 6 - University (US 380) to Loop 288 street improvement project; and WHEREAS, this procurement was undertaken as part of the City’s governmental function; and WHEREAS, the additional fees under the proposed Third Amendment are fair and reasonable and are consistent with, and not higher than, the recommended practices and fees applicable to the Provider’s profession, and such fees do not exceed the maximum provided by law; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS : SECTION 1. The Third Amendment, increasing the amount ofthe contract between the City and RPS Infrastructure, Inc., which is on file in the office of the Purchasing Agent, in the amount of Three Hundred Sixty-Eight Thousand Thirty-Eight and 20/100 ($368,038.20) Dollars, is hereby approved and the expenditure of funds therefor is hereby authorized in accordance with said amendment which shall be attached hereto. The total contract amount increases to $3,137,886.70. SECTION 2. This ordinance shall become effective immediately upon its passage and approval. s e c o n d erb: rr1 % : : : 3 : :p r odin= : o rd F: : ::: s r:iTs ::d hE : = : i as se VIi Bill :ed bye following vote [3 - L] : Aye Nay Abstain Absent Mayor Gerard Hudspeth:-L ,/ / / L/ IZ Vicki Byrd, District 1 : Brian Beck, District 2: Paul Meltzer, District 3 : Joe Holland, District 4: Brandon Chase McGee, At Large Place 5 : Chris Watts, At Large Place 6:L/ PASSED AND APPROVED this the 1 IIb day of Dec ew,bd 2023 #,##==OR ATTEST: JESUS SALAZAR, CITY SECRETARY qi\Q I+aP 11111111\\ APPROVED AS TO LEGAL FORM: MACK REINWAND, CITY ATTORNEY Digitally signed by Marcella Lunn DN: dc=com, dc=cityofdenton, dc=codad, ou=Department Users and Groups, ou=General –XXlhy\\\R\ \\lw BY cn=Marcella Lunn. email=Marcella.Lunn@cityofdent ort.corrt Date: 2023.1 2.05 1 1 :20:00 -06'00' DocuSign Envelope ID: 452959E9-1 1 DC-4562-81A8-BOFE7A744721 DE]qTON Docusign City Council Transmitta I Coversheet 6590–032 Bonnie Brae Ph 6 DesIgn Amendment #3 1 1 cab1 e PSA File Name Purchasing Contact C orl PQwer City Council Target Date DECEMBER 12’ 2023 Piggy Back Option Contract Expiration Ordinance Not APP N/A 23-2405 DocuSign Envelope ID: 452959E9-1 1 DC-4562-81A8-BOFE7A744721 THIRD AMENDMENT TO CONTRACT BY AND BETWEEN THE CITY OF DENTON, TEXAS AND RPS INFRASTRUCTURE, INC. FILE 6590-032 THE STATE OF TEXAS § §COUNTY OF DENTON THIS THIRD AMENDMENT TO CONTRACT 6590-032 (“Amendment”) by and between the City of Denton, Texas (“City”) and RPS Infrastructure, Inc. (“Consultant“); to that certain contract executed on September 18, 2018, in the original not-to-exceed amount of $2,031,479.50 (the “Original Agreement”); amended on March 26, 2019, in the additional amount of $397,760 aggregating a not-to-exceed amount of $2,429,239.50 (the “First Amendment”); amended on October 13, 2020, in the additional amount of $340,609 aggregating a not-to-exceed amount of $2,769,848.50 (the “Second Amendment”) (collectively, the Original Agreement, the First Amendment, and the Second Amendment are the “Agreement”) for services related to professional engineering services for the preparation of construction plans and construction phase services associated with Bonnie Brae Phase 6 Reconstruction from US 380 to Loop 288 in Denton County; WHEREAS, the City deems it necessary to further expand the services provided by Consultant to the City pursuant to the terms of the Agreement, and to provide an additional not-to-exceed amount of $368,038.20 with this Amendment for an aggregate not-to-exceed of $3,137,886.70. FURTHERMORE, the City deems it necessary to further expand the goods/services provided by Consultant to the City; NOW THEREFORE, the City and Consultant (hereafter collectively referred to as the “Parties”), in consideration of their mutual promises and covenants, as well as for other good and valuable considerations, do hereby AGREE to the following Amendment, which amends the following terms and conditions of the said Agreement, to wit: 1.The additional services described in Exhibit “A“ of this Amendment, attached hereto and incorporated herein for all purposes, for professional services related to the Bonnie Brae Phase 6 Reconstruction from US 380 to Loop 288 in Denton County, are hereby authorized to be performed by Consultant. For and in consideration of the additional services to be performed by Consultant, the Owner agrees to pay, based on the cost estimate detail attached as Exhibit “A“ to this Amendment, a total fee, including reimbursement for non-labor expenses an amount not to exceed $368,038.20. 6590-032 PSA – Amendment #3 Page 1 of 2 DocuSign Envelope ID: 452959E9-1 1 DC-+562-81A8-BOFE7A744721 2. This Amendment modifies the Agreement amount to provide an additional $368,038.20 for the additional services with a revised aggregate not to exceed total of $3,137,886.70. The Parties hereto agree, that except as specifically provided for by this Amendment, that all of the terms, covenants, conditions, agreements, rights, responsibilities, and obligations of the Parties, set forth in the Agreement remain in full force and effect. IN WITNESS WHEREOF, the City and the Consultant, have each executed this Amendment electronically, by and through their respective duly authorized representatives and officers on this date 12/12/2023 “CONSULTANT” RPS INFRASTRUCTURE, INC. “CITY” CITY OF DENTON, TEXAS A Texas Municipal Corporation tXnuSlgrnd br Byua (bi+M Executlve D1 rector -R12PB-SIGNATURE. TITLE DocuSlgned by: Byl SMA Hu.,Iq TIIS,CITY MANAGER APPROVED AS TO LEGAL FORM: MACK RErNWAND, CITY ATTORNEY ATTEST: JESUS SALAZAR, CITY SECRETARY DocuSigned bF By: I M4ruIIAtW ,4B070831 B4AA438 DocuSlgned by:By: 2437C77B897541 D... THIS AGREEMENT HAS BEEN BOTH REVIEWED AND APPROVED as to financial and operational obligations and business terms. ++?? Trevor Crain PMP PRINTED NAME Director of Capita1 Projects TITLE Caplta1 Projects DEPARTMENT 6590-032 PSA – Amendment #3 Page 2 of 2 DocuSign Envelope ID: 452959E9- 11 DC-4562-81A8-BOFE7A744721 Exhibit A 581 0 Tennyson Parkway, Suite 280, PIano, Texas 75024 T 972 202 4242 D 972 202 4248 w rpsgroup.com November 2, 2023 Mr. Jesus Perez Project Manager – Capital Projects 40 1 N. Elm Street Denton, Texas 76201 Re: Bonnie Brae Street Phase 6 Reconstruction - Amendment 3 Dear Mr. Perez, Thank you for the opportunity to submit RPS Infrastructure’s proposal for Amendment 3 to contract 6590- 032: professional engineering services for the proposed Bonnie Brae Phase 6 project in Denton County. The proposal includes a scope of work and detailed estimate including labor and direct expenses. The fee estimate is based on the following information: Project Understanding The project is generally described as professional engineering services during the bidding and construction of Bonnie Brae Street between US 380 (University Drive) and US 77 (Elm Street). The scope also includes ROW / Easement Exhibits, Utilities Coordination, and ROW Acquisition Support during the Bid and Construction Phases The project will be based on standard industry practice following procedures in accordance with City of Denton Transportation Criteria Manual, City of Denton Drainage Criteria Manual, TxDOT Roadway Design Manual, TxDOT Hydraulic Design Manual, Texas Manual on Uniform Traffic Control Devices, and Federal, State, and Local laws that apply. Project Team • Senior Project Manager – Kevin Howlett, P.E. • QA / QC Manager – Lynn Pipkin, P.E. • Senior Project Engineer – Ronald Thomas, P.E. • Project Engineer - Berenice Salaices, P.E. • Construction Inspector – Conrad Gonzales, E.I.T. • Design Engineer - Nicole Roeglin, E.I.T. • Utility Coordinator – Cole Preston, P.E. • ROW Support - Joseph Khammash Scope of Services A complete scope of services is included as Attachment A. The services provided by the Engineer are divided into the following Tasks: Base Services: Task 13 – ROW Acquisition Exhibits Task 18 – ROW Acquisition Support Task 14 – Utilities Coordination Task 1 9 – Bid Phase Services DocuSign Envelope ID: 452959E9-1 IDC4562-81A8-BOFE7A7++721 Task 20 - Construction Phase Services Basis of Estimate The fee estimate for this proposal is based on the base services identified above. Modifications to the base services after confirmation will be deemed additional services and will require subsequent authorization from the City of Denton. Additional services and will be performed on an hourly fee basis in accordance with the rates shown in the Work Breakdown Structure (Attachment C). Total fees for the project are based on the schedule provided. Exclusions This scope of services does not include the following: • Design services beyond those specifically stated in this scope. • Direct expenses associated with additional services, if required. • Additional services not provided herein. • Exclusions listed in the Scope of Services (Attachment A). These services, if required, and upon agreement from the City of Denton, will be performed as an additional service. Project Schedule A Project Schedule has been provided in Attachment B. Summary of Cost The summary of cost for each base service is shown in the table below. The total for providing base services is $368,038.20. Base and Special Services: Task Task 13 – ROW Acquisition Support - GAI Task 14 – Utilities Coordination - KCI Task 18 – ROW Acquisition Support - HDR Task 1 9 – Bid Phase Services - RPS Task 20 – Construction Phase Services - RPS Direct Expenses Method of Compensation Hourly / Unit Cost Hourly / Unit Cost Hourly / Unit Cost Hourlym Cost Amount $28,750.00 $64,662.20 $50,600.00 $26,540.00 $ 1 80, 1 70.00 $ 1 7,3 1 6.00 A detailed cost breakdown per base service is provided in the Work Breakdown Structure (Attachment C). DocuSign Envelope ID: 452959E9-1 1 DC-4562-81A8-BOFE7A74472 1 fPS:* The hourly rates for labor classifications used to perform engineering services on a time and material basis as well as any additional services are shown in Attachment C. Except as noted on the attached, all invoices will be prepared monthly and are due and payable within 30 days of receipt. Once the final deliverables are submitted for final review, the project will be considered complete and invoiced accordingly. In closing, we appreciate the opportunity to provide this proposal. Please feel free to call our Project Manager, Kevin Howlett, P.E., at 972-202-4248 if you have any questions. Sincerely, Brent Christian, P.E Executive Director, Infrastructure DocuSign Envelope ID: 452959E9-1 IDC4562-81A8-BOFE7A744721 ATTACHMENT “A“ Amendment 3 Scope of Services for Bonnie Brae Phase 6 reconstruction bid and construction phase services The scope set forth defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. Under this scope, “ENGINEER” is expanded to include sub-consultants, including surveyor, employed or contracted by the ENGINEER. GENERAL OVERVIEW RPS Infrastructure, Inc,, (ENGINEER) has been contracted by the City of Denton (CITY) to provide the bid phase and construction phase services for Bonnie Brae Phase 6. This scope includes additional ROW exhibits, Utility Coordination, and ROW acquisition support. For this amendment, the ENGINEER shall provide bid phase services and construction phase services for Bonnie Brae Phase 6 reconstruction from US 380 to US 77. WORK TO BE PERFORMED Task 13 Task 14 Task 18 Task 19 Task 20. ROW Acquisition Exhibits Utilities Coordination ROW Acquisition Support Bid Phase Services Construction Phase Services Page 1 of 6 DocuSign Envelope ID: 452959E9-1 1 DC-4562-81A8-BOFE7A744721 TASK 13. ROW Acquisition Exhibits. ENGINEER will support and perform activities related to ROW and easements as outlined below, per scoping direction and guidance from the CITY’s Project Manager •Prepare a metes and bounds description of the proposed ROW take. A “drawing” exhibit with the focus being on the proposed ROW take will accompany the metes and bounds descriptions. The metes and bounds descriptions along with the drawing exhibits will be signed and sealed. No platting or re-platting is scoped for any properties for ROW takes. TASK 14. Utilities Coordination. See attached proposal from KCI TASK 18. ROW Acquisition Support. • ENGINEER shall provide engineering professional services as described below: As a sub consultant: •HDR will coordinate with City Real Estate Staff to determine each condemnation case’s ability to be closed and resume sending monthly reports to all City and TxDOT staff regarding the status of each open condemnation case. • When a condemnation case closes, HDR will follow up with the City’s real estate department to request copies of final judgements and coordinate with the title company to issue the title insurance policies to the city for each parcel. • Upon the issuance of a title policy, HDR will gather all relevant documentation required by TxDOT and fill out the LPA Tabulation of costs sheet for each parcel eligible for reimbursement under the AFA • HDR will complete a QC check of the Tabulation form and provide to City for review and execution. • HDR will enter all relevant information into the TxDOTConnect System and forward allreimbursement items to the TxDOT Dallas District •HDR will generate and monitor each reimbursement payment in the TxDOTConnect System to ensure that the proper amount is reimbursed and processed in a timely manner to expedite funds back to the City •HDR will provide links to City staff for file turnover for all relevant documentation associated with the real property purchase and the TxDOT reimbursement. • HDR will make its personnel available for any relocation appeals or city meetings to discuss any real property questions or discussions associated with the project Any additional work for HDR authorized by the City outside of the original scope would be billed at the following rates, with an approved estimated hours for each defined role below: Role Accountant Project Principal Proposed Hourly Rate $135.00 $350.00 Page 2 of 6 DocuSign Envelope ID: 452959E9-1 1 DCa+562-81A8-BOFE7A744721 Project Manager Real Estate Agent $250.00 $200.00 TASK 19. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows. • • The ENGINEER will assemble the bid Package in accordance with CITY requirements. The ENGINEER will provide technical assistance with questions from contractors and plan revisions as needed. Addenda shall be prepared and issued for the contract documents if necessary. • • • Attend one pre-bid conference in support of the CITY. The ENGINEER will prepare a comparison of bid tabs submitted by contractors (up to 6 bids) ENGINEER will check contractor references and prepare letter of recommendation of award . ASSUMPTIONS • The project will be bid only once and awarded to one contractor. • Cost for publications and Notice To Bidders shall be paid for by the CITY. DELIVERABLES A. Plan Revisions (if required) B. Letter of Recommendation TASK 20. CONSTRUCTION PHASE SERVICES. ENGINEER will support the construction phase of the project as follows. 20.1 Construction Support shall include: •The ENGINEER shall register the project with Texas Department of Licensing and Regulation (TDLFR). The ENGINEER shall provide a 3rd party review of the Plans and inspection of constructed facilities from a Registered Accessibility Specialist for all the pedestrian elements and their compliance with 2012 Texas Accessibility Standards (TAS). •The ENGINEER shall make revisions to final plans to address TDLR review comments. • The ENGINEER shall attend the preconstruction conference in support of the CITY. • The ENGINEER shall provide a Roadway Construction Inspector on an as-needed basis as determined by the CITY. Page 3 of 6 DocuSign Envelope ID: 452959E9-1 IDC4562-81A8-BOFE7A74472 1 •The ENGINEER shall visit the project site twice (2) per month as construction proceeds to observe and report on progress. ENGINEER shall create meeting agenda and record meeting minutes for each meeting. •The ENGINEER shall review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. Such review shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. The ENGINEER shall log and track all shop drawings, samples and other submittals. •As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents(RFI’s), review change orders, and make recommendations as to the acceptability of the work. • • • The ENGINEER shall make investigations into contractor requests for deviation from plans or specifications as approved by CITY. The ENGINEER shall provide a 3rd party inspection of all the pedestrian facilities constructed on the project by a Registered Accessibility Specialist. The ENGINEER shall attend the “Final” project walk through and assist with preparation of final punch list. • The ENGINEER shall assist the City in Meeting with Affected Property Owners during construction on an as-needed basis. 20.2 Record Drawings The ENGINEER shall prepare record drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. The following information shall be provided by the CITY: o As-Built Survey o Red-Line Markups from the Contractor o Red-Line Markups from City Inspector o Copies of Approved Change Orders o Approved Substitutions The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed per the redline markups from the contractor and the inspector. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. This work does not include modifications made to traffic control during construction. ASSUMPTIONS •2 site visits by ENGINEER per month are assumed. Page 4 of 6 DocuSign Envelope ID: 452959E9-1 1 DC4562-81A8-BOFE7A744721 • Construction schedule is assumed at 18 months. • 10 submittal reviews by ENGINEER are assumed. • 10 RFI Reviews by ENGINEER are assumed. • 5 Change Order Reviews by ENGINEER are assumed. • Assume 10 meetings with Affected Property Owners. • Record Drawings do not include changes to traffic control sheets. DELIVERABLES A. Response to Contractor’s Request for Information B. Review of Change Orders C. Review of shop drawings D. Final Punch List items E. Record Drawing Page 5 of 6 DocuSign Envelope ID: 452959E9-11 DC-4562-81A8-BOFE7A744721 EXCLUSIONS: ADDITIONAL SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY’s written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • • • • • • • • Any noise / sound wall design. Direct expenses associated with any additional services provided. Stormwater Pollution Prevention Plan (SWPPP) permitting Preparation of Environmental Information Document or an Environmental Impact Statement. Presence/absence suIveys for federally listed threatened/endangered species. Preparation of a mitigation plan to compensate for impacts to waters of the U.S Phase 1 or Phase II Environmental Site Assessment Any Asbestos investigations / mitigations, lead level in paint investigations / mitigations, or other hazardous material investigations or mitigations. •The preparation of a Section 4(D Evaluation (required for taking parkland, recreation land, historic sites), Biological Assessment/Biological Evaluation (associated with endangered species/habitat impacts), Section 7 Consultation with the U.S. Fish and Wildlife Service, U.S. Coast Guard Section 9 permit, any USACE Section 10 or Section 404 permit. •Performing analysis or investigations proposed by contractor to correct defective construction work. • • Construction Staking, Materials Testing, or a full time Roadway Construction Inspector. Tree survey and/or mitigation plan to comply with the City of Denton TreeProtection Ordinance. •Design, contract modifications, analysis that is required to comply with local, State, or Federal guidelines that become effective after the date of this agreement. •Services required to resolve bid protests or re-bid the project for any reason unless protest or re-bid is caused by actions or negligence of the engineering professional. • • Providing services or modifications to contract documents made necessary due to site conditions being different then what they are at time of this agreement. Providing services beyond an 30 month construction time. Page 6 of 6 DocuSign Envelope ID: 452959E9-1 IDC4562-81A8-BOFE7A744721 Professional Services Agreementa October 26, 2023 RPS Group 5180 Tennyson Parkway STE 280 PIano. TX 75024 Client's Authorized Representative(s): Kevin Howlett, PE, Senior Project Manager Subject :. Bonnie Brae Phase 6 Supplemental OLA and UC Services KCI Project Number: 802 ... KCI Technologies, Inc. (KCI) is pleased to submit this professional services agreement (the "Proposal") to RPS Group ("Client") for the work (the "Work") described in detail in the Scope of Services section of this Proposal. The Work will be performed for the following: Location: Bonnie Brae St from US380 to US77 in Denton, TX PROJECT DESCRIPTION Client is Requesting Scope and Fee for SUE (Sub-Surface Utility Engineering services) and UC (Utility Coordination Services), for a proposed roadway improvements along BonnIe Brae St from US38CI to US77 in Denton, TX KCI is providing this proposed scope of work to obtain the desired quality levels, upgrade the existing utility mapping information and perform utility coordination services. SCOPE OF SERVICES This Proposal is limited exclusively to the Work as described in this Scope of Services section and anything not expressly described shall be considered expressly excluded from the Work. KCI proposes to perform the Work in accordance with ASCE Standards 38-22 Quality Level (QL) Standard Guidelines for the Collection and Depiction of Existing Subsurface Utility Data, which is described as follows: aL-A - Utility Locating (Test Holes) – KCI will utilize its in-house crews and equipment to perform 8 Test Holes on existing utilities, exact Test Hole locations will be provided by the Client. Test Holes will be performed using vacuum excavation equipment and will determine the depth of the utilities from existing grade and their estimated size and material type. Excavation will include the removal of existing pavement, base paving and soil extraction, backfill of excavated material with compaction and paving repair with High Performance Permanent Pavement Repair QPR. KCI will not “hot patch” the holes. If the property owner/Jurisdiction requires hot patch, this will need to be added as EWO. While ground water, large rock and other irregularities inhibit this process, KCI will make every effort with our standard equipment to gain a visual confirmation of the existing utility to document its horizontal and vertical position. A survey marker will be installed directly over each Test Hole with a minimum of three swing ties to existing features. A Test Hole sketch will be prepared summarizing the above information. Upon completion of the Test Hole process, a KCI Survey Crew will survey the Test Hole locations. It is assumed that all applicable permits, if required, will be obtained by client. Complex Traffic Control (lane closures) is not included as a part of this submission. October 26, 2023 Page 1 DocuSign Envelope ID: 452959E9-11DC4562-81A8-BOFE7A744721 Professional Services Agreement OL-B – Mapping ofToneable Utilities– KCI will use Geophysical Electromagnetic equipment to interpret the presence of the existing metallic subsurface utilities within the proposed project area. First: When an access point is available Direct Connection method will be applied to mark utilities crossing through the Project Areas. Second: When no access point is present or are not close to the Project Area, Induction methods will be applied. Placing an EM transmitter box over the desired utility. These signals will be interpreted to mark the approximate horizontal location of the existing utility. Third: By placing an EM transmitter box on the ground in a 50’ grid pattern around the Boring Locations in an attempt to broadcast signals to conductive utilities within the pattern will be performed. These signals will be interpreted to mark the approximate horizontal location of the existing metallic toneable utility. • The ground surface will be marked with the approximate horizontal location of the existing utilities in accordance with APWA/ULCC Uniform Marking Standards. KCI will attempt to designate any sanitary sewer, or non-metallic utility lines not having tracer wire placed with them by utilizing a toneable rodder as part of the designation effort. KCI will attempt to verify storm, showing general directions at their surface or employ the use of a rodder as necessary. Utility Coordination with EagleRidge Energy - Provide utility accommodation coordination including utility coordination meetings with EagleRidge Energy (ERE), communication and coordination with ERE, and preparation of utility agreement assemblies including, but not limited to utility agreements, joint use agreements, notice of proposed installation, and advanced funding agreements for ERE. The UC shall: • Perform utility coordination and liaison activities with involved utility owners, consultants, and City of Denton to achieve timely project notifications, formal coordination meetings, conflict analysis and resolution. • Act as the "Responsible Party" as indicated in Chapter 2 Utility Cooperative Management Process and Sub-process of TXDOT's ROW Utility Manual. • Coordinate all activities with City of Denton, or the designee, to facilitate the orderly progress and timely completion of City of Denton’s design phase. • Coordinate a work plan to include, but not be limited to a list of the proposed meetings, coordination activities, and related tasks to be performed, a schedule and an estimate for completion of the related tasks. The work plan shall meet the requirements of the project and shall be submitted to City of Denton for approval, prior to commencing work. •Prepare and present, in collaboration with City of Denton staff, instruction and orientation sessions, as required by City of Denton. The instruction shall facilitate the preparation of work October 26, 2023 Page 2 DocuSign Envelope ID: 452959E9-1 1 DC4562-81A8-BOFE7A744721 Hln•lu4&•Hula=• HIHU•+qIH•HIHllll•B==n+l=== nIHlllll•lln+=lIHIBKCI TECI INOLOGIES orders, invoices, and other related documentation. Professional Services Agreement • Attend an initial project meeting and an on-site inspection, when requested by City of Denton, to ensure familiarity with existing conditions, project requirements and prepare and submit a written report of the meeting to City of Denton. • Coordinate all activities with City of Denton and consultants, other vendors or representatives, as authorized by City of Denton. • Provide City of Denton copies of diaries, correspondence and other documentation of work related communications between the UC, utility owners and other outside entities, when requested by City of Denton. •Implement a schedule of periodic meetings with each utility owner's representatives for coordination purposes. Meetings shall commence as early as possible in the design process and shall continue until completion of the project. Notify City of Denton a minimum of two business days in advance of each meeting to allow City of Denton the opportunity to participate in the meeting. Provide meeting minutes of all meetings with utility owners' representatives to City of Denton within seven business days after completion of each meeting. Meetings shall be held as frequently as required to manage the matters under discussion with each utility owner. • As required, coordinate with local utilities committees (if applicable) to present a footprint of City ofDenton's projects with represented utility owners. • Coordinate with any other utility committees, which may include county, city or other officials, if needed. •Provide City of Denton and all affected utility owners a Utility Contact List for each project with all information, to include, but may not be limited to owner's name, contact person, telephone numbers, emergency contact number, e-mail addresses, and all pertinent information concerning the respective affected utility facilities, including but not limited to; size, number of poles, material, and other information which readily identifies the utilities owners' facilities. • Advise utility owners of the general characteristics of the project and provide an illustration of the project footprint for mark-up of the utility facility locations that occupy the project area. •Coordinate which utilities conflict with highway construction in accordance with Texas Administrative Code, Title 43, Part 1, Chapter 21, Subchapter C and UAR and make the utility owner aware of the conflict by written notice. The notice shall include, but not be limited to sufficient plans and specifications to enable the utility to reasonably determine the future location, including depth of cover and required clearances, and survey datum. • Assist the utility owners in the preparation of required agreements associated with the funding of adjustments and the occupation of City/State right of way. October 26, 2023 Page 3 DocuSign Envelope ID: 452959E9-1 1 DC-4562-81A8-BOFE7A74472 1 [ A C 1 TECI INOLO(;IES K Professional Services Agreement • Assist the utility companies in the preparation of utility agreement assembly packages. All documents shall be complete and acceptable for execution by City of Denton. NOTE: Engineering of relocation plans relative to a particular utility agreement is not required for this solicitation. Determine whether or not a compensable interest exists and the utility owner's degree of eligibility. •Assist the utility owner with adjustment plans and a cost estimate for these adjustments. Plans shall include the design, proposed location vertical elevations, and horizontal alignments of the utility facility based on City ofDenton's survey data, the relationship to existing highway facilities and the right of way line, location of existing utility facilities that may be affected by the proposed utility facility, and as directed in the UAR and TXDOT’s ROW Utility Manual NOTE: Engineering of relocation plans relative to a particular utility agreement is not required for this solicitation • Review the relocation plans to ensure compliance with UAR and to ensure that the proposal does not conflict with highway construction. •Submit all non-reimbursable utility adjustments through the City of Denton •Assist the utility owner with the submission of the permit request. • Notify City ofDenton's PM, for approval, upon determination that the utility needs to be adjusted as part of the highway contract. • Submit two originals, two copies, and an electronic PDF file of the Utility Agreement Assembly Package. Each original, copy, or PDF file shall include the checklist agreement, all attachments, and supporting documentation for submission to City of Denton with a transmittal letter recommending approval. • NOTE: The utility should be reimbursed eligible costs incurred within the easement limits for replacement in kind. • Be solely responsible for determining which utilities shall be installed by “Permit', or by "Agreement' . • Assist in the preparation, compilation, gathering, and collection of all required and supporting documents to be included with the utility agreements. • Have the UC maintain a complete set of records for all Utility Adjustment Costs, for each utility until all final payments to the utility owners have been completed. October 26, 2023 Page 4 DocuSign Envelope ID: 452959E9-1 1 DC4562-81A8-BOFE7A744721 ====H LA JCl TECI INOLO(;IES K Professional Services Agreement Deliverables 1) 2) 3) 4) 5) SUE QL-A Test Hole Data Sheets in PDF format DGN and CSV file of surveyed Test Hole locations Monthly Progress Reports Utility Adjustment Status Reports Updated Utility Conflict Matrix SPECIAL PROVISIONS 1) KCI will not be responsible for damage to utilities caused by others. 2) Complex traffic control not included in this scope of services. SERVICES TO BE PROVIDED BY THE CLIENT • All permitting as required. FEES AND PAYMENTS The Schedule of fees for work defined in the scope of services is attached as exhibit A. Actual cost of test holes will be billed by the incremental depth noted in Exhibit A. For example, if all holes are 0’ to 5’ from ground surface to top of utility, the applicable rate will be billed. October 26, 2023 Page 5 V) 10+1ab Q0dqr 00dr\I 00 r\iHI 00 (XiHI 006al 81 8 O I O01 0 00 r\1fr) 00 adfn 00\l' 00nJ ~dR00d0q-I atHI adaIn aTenV} \D a) bO caa.dI niall nI dI niall st g 1II aBUBI gb8 SI \D eg aFiNHIV} bRFIqr\I qF0N THIbt/} !! Ln0 F( FUpIV} 0HI 0pI ber\1 Ln fr) LnsrdNnIPiVF 8 : 8 gea80 00 nJN0pIVF r\1b \l'N LnfbiV} 10 q-I qrr\I be Lnqr ad 010 fribaor\i RMIV} 1- El 00al F(0pIV} 10pI to 1 toq-II pI to 1 nIq=1 1 m 0r\1 T-I bRLnn\1 alqr +aa)aa) i: aD< ona) C)Hind aa)\A nunni eGa0==1 aaal cgI :n, }} 00fr) aFi10HIV} 000 nj10HIdpIV} qI q qI q qr qI q oo1 oo oo1 oo 0 10 befr)x-I .1r\I IbnbaIoa)i foI1/IC LU b 10 o6 r\1alt/} qr qrT-I bRfr)on\i gOfr) ,10 r\1friV} + V)a)aa a)ac + gbla3 an {}1RE aa0\rLneg{/} qrfbI qF 00r\I be1000 aFi qr r\1\i T=1 T-1 FCtr}Fa a\Ibi <b UJLL0 on !IP 00 dI COK)T C)a r d) LUa)K)a)alK)q IS V) Ea) Ea)ala3 -E !Hal<a 00 LndbV} r\1anfri an10,iVb (\1pI {\1pI qFr\I bR Lnqr ad LU ! ! Hg g g g s.g .g 3 a 1: 1:g j ;iii;}{ q- 1+ 1 a: I .g. I :Q lg 1 gj ! ! !! V) G) RDalD X RE UBC0U > 1 B3 i:g gg g)gg% E atI ' Egia<1. 10 6ala) QC C/)V)a) ED0a > JC E0 E V) a)CB0 > 3 a) ai EbC a E C .Q == BC/) ont/l>aHocI(lg BrGO8%UCag g B C/) Ea) E ala) ED < > C a 5 bO ala) & a)a Dela a) a : C) a)at/) Ifal•Ja3a) in 8 al + (BFf laa) iEC)a)aC/) Z0 be 1/) E re C)t/)LUa '(}- al3 +a)V) aa)'Saaa <(C) 2/30][ >on C a)C) aa Cr)(\I0al \dbI b, a)a0+)CJ0 <b Fa =XLU inC CD U•= L) r\ 0 a t/l 30 = (ai Ina) rDac gg: : i;; i g : i N a)an eu oh, IF IIT[HTrn H[T–[= 1I iI i IC) caLU i } iI i BF gI iabE 1- giC)i ii:g g :+)aa) Ea) a)hI bO< a)a)O•H >hIa)\A cBa0 thVI Ge0hInI =n•Hlnl U•ll•l a TD'ii 1 1 EiI IE } {al 1 'Sgl 1 ggl 1 ) {}}}}iii}{ CO (\Ibq'+b g LULL0 on Qb < 00 (iI COinIC)a d) LUa)ina) a\1LAV sI ! gg:gIgI ::8 lol "8 la la1III !g 131 a gl 81g 3a) G >a)a3a) CQ t)a tXaU '=a N)hIQ(\I \6hI hIa)a0 ! iC)0 +P&naC)+ Ca Fa 6 dE =V) ul ul ul3l3l3v) IV) 1 cn N 00 a)aD (B Q&i i i V}10VIV}V}V}V}tf}V) +)ea) E q)a) q: hO< a)a) C) aa)\A aa0 aa\A Ge0f:a, ==1 HI HI = ; gI ;g LA Elalal a a\1N ! <b LULL0 on e 00 dI CO LOIC)a d) LUa)K)a)(\IK)q IE={:i: i .,{}{!1IiI,Ig iII an• ! hI A)hI0 (\1 \661 hI a).n0+)CJ0 DocuSign Envelope ID: 452959E9-1 1 DC-+562-81A8-BOFE7A7#721 – T Professional Services AgreementKCI TTCIINOLO(;IES GENERAT I PROVISIONS The attached General Provisions are specifically made a part of this Proposal. If this Proposal is accepted by Client, then the General Provisions along with the Proposal shall constitute a complete and binding contract between KCI and Client (the " Agreement"). Any other understandings, agreements, promises, inducements or representations are hereby void. Any modifications to the terms and conditions of this Agreement must be made in writing and signed by both parties hereto in order to be valid. The person executing this Agreement on behalf of the Client does hereby warrant that he/she has full authority to do so. If this Proposal and the General Provisions attached hereto are satisfactory and acceptable, and fully set forth the terms of our understanding, please sign the Acceptance and return a copy to KCI’s office. This Proposal and the General Provisions will then constitute our entire Agreement. KCI reserves the right to terminate this contract in the event the Client, in the sole judgment of KCI, fails to establish sufficient credit to warrant proceeding with the work. In such event, Client shall be obligated to pay for all services rendered to date of termination, including any direct expenses, and no work will proceed thereafter unless Client provides a retainer which KCI, in its sole discretion, shall determine to be satisfactory for the continuation of the work. KCI welcomes the opportunity to serve RPS Group and looks forward to working with RPS Group on this project. The Project Principal to be assigned to the Work A Kyle Jones, P.E., and his_telephone number is 214-808-6114. Very truly yours, /y Jag""", A g. Kyje Jones, P.E. Senior Associate KCI Technologies October 26, 2023 Page 9 = =: S : S R R R letgEl P;i:;;::;;;:;;;:::;:;;;:;::::;!::;;;;:;;:;;:;;;{:;j;;;;:;};:; j:;;{{:j:ii iIi EL 8i Q b 8a 8 LU a A a f) : LU lad 8 g ;i i !!!!!!!i?!!iii!!!!!!!!i a i! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! i ! ! ! g E = E ! I dF fFF Fr fliP Pf FFF Fi [ F p FFF FFF FEE FFf FFf FFF Fff Fri rF [ Fff Eff fFF IFF fFF rf rf rf FFF oja,jg Fi !a lie ix !XIi be SiR gIf, i, !, i,gjg: : sis :oF CBi BEtB :BIG ;Bjg a ! ! ;!!!IB= ! !i =gLU 8i :g 8 : lii r:hi i B ,li{ &LUSU gg gIglig dE =LJi g g)n < 11iB; a< 11 : I Certificate Of Completion Envelope Id: 452959E911DC45628 IA8BOFE7A74472 1 Subject: Please DocuSign: City Council Contract 6590-032 Bonnie Brae Ph 6 Design Amendment #3 Source Envelope: Status: Completed Document Pages: 23 Certificate Pages: 6 Signatures: 5 Envelope Originator: Cori Power 901 B Texas Street Denton, TX 76209 cori .power@cityofdenton .com IP Address: 198.49.140. 104 AutoNav: Enabled Envelopeld Stamping: Enabled Time Zone: (UTC-06:00) Central Time (US & Canada) Initials: 1 Record Tracking Status: Original 11/27/2023 12:34:12 PM Holder: Cori Power cori .power@cityofdenton . com Location: DocuSign Signer Events con Power cori .power@cityofdenton.com Purchasing Supervisor City of Denton Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Signature Timestamp Sent: 11/27/2023 12:37:55 PM Viewed: 11/27/2023 12:38:07 PM Signed: 11/27/2023 12:38:16 PM Completed Using IP Address: 198.49.140.104 Lori Hewell lori .hewell@cityofdenton.com Sent: 11/27/2023 12:38:18 PM Viewed: 11/27/2023 1 :40:10 PM Signed: 11/27/2023 1 :42:14 PMPurchasing Manager City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Electronic Record and Signature Disclosure: Not Offered via DocuSign Marcella Lunn ma rcella.lunn@cityofdenton.com Mack Reinwand City Attorney City of Denton Security Level: Email, Account Authentication (None) Sent: 11/27/2023 1 :42:16 PM Viewed: 11/27/2023 5:54:09 PM Signed: 11/27/2023 5:54:30 PM Signature Adoption: Pre-selected Style Using IP Address: 47.24.80.197 Electronic Record and Signature Disclosure: Not Offered via DocuSign Brent Christian Brent,christian@tetratech.com Executive Director Security Level: Email, Account Authentication (None) 'Dwu81gned by: I bud CI'ri+i- ,B23FF5F33596482 Sent: 11/27/2023 5:54:32 PM Resent: 11/30/2023 11:16:38 AM Viewed: 11/30/2023 11 :39:04 AM Signed: 11/30/2023 12:08:14 PM Signature Adoption: Pre-selected Style Using IP Address: 209.215.195.213 Electronic Record and Signature Disclosure: Accepted: 11/30/2023 11 :39:04 AM ID: 2b9af8e1 -6638-4489-bb69-b2cd00227fe9 Signer Events Trevor Crain, PMP Trevor.Crain@cityofdenton.com Director of Capital Projects City of Denton Security Level: Email, Account Authentication (None) Signature Timestamp Sent: 11/30/2023 12:08:16 PM Viewed: 11/30/2023 12:13:23 PM Signed: 11/30/2023 12:13:49 PM Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Electronic Record and Signature Disclosure: Accepted: 11/30/2023 12:13:23 PM ID: 67caf701 -45194949-a71 7-eccb7876ed43 Cheyenne Defee cheyenne.defee@cityofdenton.com Procurement Administration Supervisor City of Denton Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Completed Sent: 11/30/2023 12:13:52 PM Viewed: 12/1 3/2023 8:09:02 AM Signed: 12/1 3/2023 8:09:17 AM Using IP Address: 198.49.140.10 Sara Hensley sara.hensley@cityofdenton.com City Manager City of Denton Security Level: Email, Account Authentication (None) Sent: 12/1 3/2023 8:09:20 AM Viewed: 12/1 3/2023 8:24:25 AM Signed: 12/1 3/2023 8:24:29 AM Signature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Electronic Record and Signature Disclosure: Not Offered via DocuSign Jesus Salazar jesus.salazar@cityofdenton.com Security Level: Email, Account Authentication (None) Sent: 12/1 3/2023 8:24:31 AM Resent: 12/14/2023 9:22:06 AM Viewed : 12/1 5/2023 8:29:08 AM Signed: 12/1 5/2023 8:30:06 AMSignature Adoption: Pre-selected Style Using IP Address: 198.49.140.10 Electronic Record and Signature Disclosure: Accepted: 12/15/2023 8:29:08 AM ID: 365fa9db-a11a-4834-beOc-37bd6c50e817 In Person Signer Events Signature Status Timestamp Editor Delivery Events Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Status Timestamp Certified Delivery Events Timestamp Carbon Copy Events Cheyenne Defee cheyenne.defee@cityofdenton.com Procurement Administration Supervisor City of Denton Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Status Timestamp Sent: 11/27/2023 12:38:17 PM Carbon Copy Events Gretna Jones gretna.jones@cityofdenton,com Legal Secretary City of Denton Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Status Timestamp Sent: 11/30/2023 12:13:51 PM Viewed: 12/1/2023 8:47:58 AM City Secretary Office citysecretary@cityofdenton.com Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Sent: 12/1 5/2023 8:30:09 AM Jesus Perez Jesus.Perez@cityofdenton,com Security Level: Email, Account AuthenticatIon (None) Electronic Record and Signature Disclosure: Accepted: 9/14/2023 1 :37:37 PM ID: ada6eb6d-9a6a-4074-92d3-5fd85195f04b Sent: 12/15/2023 8:30:10 AM Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Envelope Sent Envelope Updated Envelope Updated Envelope Updated Certified Delivered Signing Complete Completed Status Timestamps 11/27/2023 12:37:55 PM 11/30/2023 1 1:16:37 AM 11/30/2023 1 1 :16:37 AM 11/30/2023 11:16:37 AM 12/15/2023 8:29:08 AM 12/1 5/2023 8:30:06 AM 12/1 5/2023 8:30:10 AM Hashed/Encrypted Security Checked Security Checked Security Checked Security Checked Security Checked Security Checked Payment Events Status Timestamps Electronic Record and Signature Disclosure Electronic Record and Signature Disclosure created on: 7/21/2017 3:59:03 PM Parties agreed to: Brent Christian, Trevor Crain, PMP, Jesus Salazar, Jesus Perez ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Denton (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent’ form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact City of Denton: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: purchasing@cityofdenton.com To advise City of Denton of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at melissa.kraft@cityofdenton.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address. . In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from City of Denton To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Denton To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to purchasing@cityofdenton.com and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process. . uired hardware and software 01 ing Systems Browsers (for SENDERS Browsers (for SIGNERS): r r r NetScape 7.2 (or above c x Email Screen Resolution Enabled Security Settings • Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via roxy connectron ## These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the ’I agree’ button below. By checking the ’I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify City of Denton as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by City of Denton during the course of my relationship with you.