2009-321 ORDINANCE NO. SOD AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NUMBER ONE TO THE CONTRACT BETWEEN THE CITY OF DENTON AND LANDS CONSTRUCTION FOR ADDITIONAL SIDEWALK INSTALLATION AND PATHWAY IMPROVEMENTS ASSOCIATED WITH THE TEASLEY LANE/FM 2181 PEDESTRIAN WAY PROJECT; PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFOR; AND PROVIDING AN EFFECTIVE DATE (BID 3966-CHANGE ORDER NUMBER ONE IN THE AMOUNT OF $4102.74). WHEREAS, on December 9, 2008 by Ordinance No. 2008-311, the City awarded a public works contract to Lands Construction in the amount of $226,988 for the Teasley Lane/FM2181 Pedestrian Way project; and WHEREAS, the Staff having recommended, and the City Manager having recommended to the Council that a change order be authorized to amend such contract agreement with respect to the scope of work and an increase in the payment amount, and said change order fees under the proposed contract are fair and reasonable and are consistent with and not higher than the recommended practices and fees published by the professional associations applicable to the Provider's profession and such fees do not exceed the maximum provided by law; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. The Change Order No. One, increasing the amount of the contract between the City and Lands Construction, which is on file in the office of the Purchasing Agent, in the amount of Forty One Thousand Eighty Two and 74/100 ($41,082.74) Dollars, is hereby approved and the expenditure of funds therefor is hereby authorized in accordance with said change order. The total purchase order amount increases to $268,070.74. SECTION 2. This ordinance shall become effective immediately upon its passage and approval. PASSED AND APPROVED this the -5 day of , 2009. 4MRK 4~Bk~OUIK, FMAYOR - ATTEST: JENNIFER WALTERS, CITY SECRETARY C BY: J1~ - APPROVED AS TO LEGAL FORM: ANITA BURGESS, CITY ATTORNEY r BY: .4 - ;2 3-0I~D'-Bid 3966 Change O rderOlOne r CITY OF DENTON CHANGE ORDER 1. Division (Department) 2. Purchase Order No. 3. Change Order No. Engineering 142620 1 4. Name of Project 5. Project Acct No. 6. Date Prepared Teasley Ln./Fm2181 Pedestrian Pathway to: 350250457.1360.40100 12/1/2009 7. Name and Address of Contractor Lands Construction 9085 Teasley Ln,. Denton, TX 76205 8. Description of Work Included in Contract Construction of pathway along Teasley Ln. 9. Changes ordered and reason ordered Additional flex base & unclassified excavation to complete project with additional sidewalk at locations where pathway has erosion problems because of rain runoff 10. Contract Bid Item No Original Estimated Contract Unit Revised Negotiated C.O. Original Revised Estimated Changes Quantity Price Estimate Unit Price Estimated Cost Cost Contractor's Warranties and 1 1.00 $ 4,800.00 5,930.00 N/A $4,800.00 $5,930.00 Understanding Project Signs 2 2.00 $ 900.00 N/A N/A $1,800.00 $1,800.00 Temp Erosion Control, Sediment & Water Pollution 3 1.00 $ 6,000.00 N/A N/A $6,000.00 $ 6,000.00 Prevention Hydro mulch 4 100.00 $ 7.00 - N/A $700.00 $0.00 Sodding 5 9,556.00 $ 3.00 3,000.00 N/A $28,668.00 $9,000.00 Removal of Trees & Bushes 6A 1.00 $ 5,500.00 N/A N/A $5,500.00 $ 5,500.00 General Site 6B 1.00 $ 12,500.00 N/A N/A $12,500.00 Preparation $ 12,500.00 Concrete Curb & Gutter Excavation 7A 20.00 $ 4.00 - N/A $80.00 $0.00 Unclassified Excavation, other 7B 1,200.00 $ 13.00 1,772.00 N/A $15,600.00 $23,036.00 Embankment 8 50.00 $74.00 268.06 N/A $3,700.00 $19,836.44 (compacted fill) Flex Base Pedestrian 9 2,600.00 $35.30 3,611.00 N/A $91,780.00 $127,468.30 Pathway flinch fiber reinforced concrete sidewalk over 1 1/2 10A 770.00 $29.00 965.00 N/A $22,330.00 $27,985.00 crushed rock or select fill 6 inch steel reinforced concrete sidewalk over concrete inch 10B 20.00 $53.00 20.00 N/A $1,060.00 $1,060.00 4-6 crushed rock Page 1 of 3 4 inch concrete sidewalk curb return ramp- 10C 2.00 $900.00 - N/A $1,800.00 $0.00 TxDOT ramp type 7 Fence 11 200.00 $15.00 - N/A $3,000.00 $0.00 Gabion Structures 3ft/2ft 12 15.00 $40.00 - N/A $600.00 $0.00 Rip Rap 13 10.00 $80.00 20.00 N/A $800.00 $1,600.00 Reinforced Concrete Pipe for 14 42.00 $100.00 80.00 N/A $4,200.00 $8,000.00 storm water class III, 18inch Concrete Safety 15 126.00 $105.00 99.00 N/A $13,230.00 Ends $10,395.00 Mobilization 16 1.00 $1,500.00 1.00 N/A $1,500.00 $1,500.00 Barricades, Detours & 17 1.00 $2,500.00 1.00 N/A $2,500.00 $2,500.00 warning signs Small Roadside Signs 18 22.00 $100.00 18.00 N/A $2,200.00 $1,800.00 Small Roadside Sign Supports & 19 22.00 $120.00 18.00 N/A $2,640.00 $2,160.00 Assemblies TOTAL $226,988.00 $268,070.74 11. Original Contract Price $226,988.00 Increase in contract price $41,082.74 New Contract Price $268,070.74 Decrease in contract price 12. Contract time increased/decreased by _0_days. New contract time days. Page 2 of 3 THE AFOREMENTIONED CHANGE, AND WORK AFFECTED THEREBY, IS SUBJE L CONTRACT STIPULATIONS AND COVENANTS. 13. SUBMITTED BY: / i V P ec nager Date 14. ACCEPTED BY CITY ENGINEER: igna are Date 15. ACCEPTED BY CONTRACTOR: T Title Signature /Dafe 16. ASSISTANT CITY MANAGER: Signature Date 17. DIRECTOR OF UTILITIES: Signature Date CONDITIONS OF APPROVAL: 18. PURCHASING/FINANCE: Sig a Date 19. COUNCIL APPROVAL 2 IJ Dy Signature Date Page 3 of 3