Loading...
2009-025ORDINANCE NO. ~D09 D~~ AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NUMBER ONE TO THE CONTRACT BETWEEN THE CITY OF DENTON AND J.R. STELZER COMPANY; PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFOR; AND PROVIDING AN EFFECTIVE DATE (BID 3945-HIGH SCHOOL ELEVATED STORAGE TANK CHANGE ORDER NUMBER ONE IN THE AMOUNT OF $73,400). WHEREAS, on May 6, 2008 by Ordinance No. 2008-095, the City awarded a public works contract to J.R. Stelzer Company in the amount of $949,467 for the High School Elevated Storage Tank Repaint project; WHEREAS, the Staff having recommended, and the City Manager having recommended to the Council that a change order be authorized to amend such contract agreement with respect to the scope of work and an increase in the payment amount, and said change order fees under the proposed contract are fair and reasonable and are consistent with and not higher than the recommended practices and fees published by the professional associations applicable to the Provider's profession and such fees do not exceed the maximum provided by law; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. The Change Order Number One, increasing the amount of the contract between the City and J.R. Stelzer Company, which is on file in the office of the Purchasing Agent, in the amount of Seventy Three Thousand Four Hundred and 0/100 ($73,400) Dollars, is hereby approved and the expenditure of funds therefor is hereby authorized in accordance with said change order. The total purchase order amount increases to $1,022,867. SECTION 2. approval. This ordinance shall become effective immediately upon its passage and PASSED AND APPROVED this the 3 - ATTEST: JENNIFER WALTERS, CITY SECRETARY BY: BY:day of ~ 009. APPROVED AS TO LEGAL FORM: ANITA BURGESS, CITY ATTORNEY MARK A. _ U GH AYOR 3-0RD~ 3945 CITY OF DENTON, TEXAS (OWNER) HIGH SCHOOL ELEVATED STORAGE TANK REPAIN (Bid Number 3945; Purchase Order Number 138905) CHANGE ORDER NO. 1 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into between the City of Denton, Texas and )eK. J. R. Stelzer Co., 5850 Russell Drive, Lincoln, Nebraska 68507, for construction of the High School Elevated Storage Tank Repaint project, dated May 6, 2008. B. DESCRIPTION OF CHANGE The City of Denton has requested the contractor perform extra work to re-paint the exterior of the 2.0 million gallon McKenna Park Stand Pipe. This change order covers the extra work as follows: a. Clean and recoat the entire exterior of the tank. It is anticipated that the tank will be left in service during this work. b. Pressure wash the entire stand pipe surface with 5000 psi machines using orbital tips. The City of Denton will provide water at no charge. It is expected this effort will remove all loosely adhering paint, chalk, and other contaminants. This effort will not remove all dimension created by partial removal but will assure only tightly adhered coating remains. This work specifically excludes any special ground protection or containment. c. The coating system shall be Tnemec Series 30 Acrylic Spra-saf. This coating is rust inhibitive and will serve as primer and/or finish and shall be applied in two coats @2.5 DMT each coat for a minimum total 5.0 DMT. d. The entire tank shall be painted one color (15131- White, or 11 WH White) as directed by the City. e. The Denton "Tank Logo"' will be placed on the North side Ina dimension that is suitable for this style tank. Logo coating shall be Tnemec 10740-color urethane. Logo colors to match the High School Elevated Tank logo colors. f Two (2) accent 18-inch wide color accent bands (color to match the tank logo "blue") may applied around the top and base of the tank on a unit price basis per each, if so directed by the City of Denton. 2. The contractor has requested additional contract time on the High School Elevated due to extended time necessary to evaluate and perform recommended approach on the highly corroded roof rafters and the repairs to the pits in the tank floor. C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change order will have the following effect on the cost of this project: Item Previous Quantity Revised Unit Amount No Descri !ion Quantity This C.O. Quantity Unit Price Tof Change Power Wash and Repaint the Exterior of the McKenna Park 2.0 MG Stand Pipe, 21 including one 1 Denton "Tank Logo" 0 1 1 L.S. $69,400.00 $ 69,400.00 22 18-inch wide color accent band 0 2 2 Ea $ 2,000.00 $ 4,000.00 Total: $ 73,400.00 j:~clericalldenton 2006-106 high school at rcpaint'specs`change orders'change order 1(drafi(.doc (/21/ 912008) Page / of 2 Original Contract Amount: Change Order No. I Revised Contract Amount: D EFFECT OF CHANGE ON CONTRACT TIME $ 949,467.00 $ 73,400.00 $ 1,022,867.00 The extra work required under this change order will add seventy-five (75) additional calendar days to this project. Original Contract Time 210 Calendar Da s Change Order No. 1 75 Calendar Days Revised Contract Time 285 Calendar Days E AGREEMENT By the signatures below of duly authorized agents, the City of Denton, Texas and J.R. Stelzer Co., do hereby agree to append this Change Order No. 1 to the original contract between themselves, dated May 6, 2008. City of Denton, Texas O By: (signature) Name: GC 0,126,C_ C • 0,q1 g R /f (please print) Title: le IALI Q62L (please print) Date: E Q 0 1? Attest. J.R. Stelzer Co.. Contractor By: (sign ure) Name• James R. Stelzer (please print) Title: President (please print) Date: December 23, 2008 Attest: , , L ' i 15 k: clmcal~denton0006-106 high school est repain0spc&change orders4hange order l(drafi).doc (1211912008) Page 2 of 2