2008-008ORDINANCE NO. ~Z0,e- t~bi AN ORDINANCE AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO EXECUTE CHANGE ORDER ONE TO THE CONTRACT BETWEEN THE CITY OF DENTON AND THE FAIN GROUP, INC.; PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFOR; AND PROVIDING AN EFFECTIVE DATE (BID 3770-CEDAR STREET IMPROVEMENTS CHANGE ORDER ONE IN THE AMOUNT OF $197,744.64). WHEREAS, on June l9, 2007 by Ordinance No. 2007-135, the City awarded apublic works contract to the Fain Group, Inc. in the amount of $1,170,263 for Cedar Street Improvements; WHEREAS, the Staff having recommended, and the City Manager having recommended to the Council that a change order be authorized to amend such contract agreement with respect to the scope of work and an increase in the payment amount, and said change order fees under the proposed contract are fair and reasonable and are consistent with and not higher than the recommended practices and fees published by the professional associations applicable to the Provider's profession and such fees do not exceed the maximum provided by law; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. Change Order No. One, increasing the amount of the contract between the City and The Fain Group, Inc., which is on file in the office of the Purchasing Agent, in the amount of One Hundred Ninety Seven Thousand Seven Hundred Forty Four and 64/100 ($197,744.64) Dollars, is hereby approved and the expenditure of funds therefor is hereby authorized in accordance with said change order. The total purchase order amount increases to $1,368,007.64. SECTION 2. This ordinance shall become effective immediately upon its passage and approval. PASSED AND APPROVED this the _ day of / 2008. ro/ PERR . McNEILL, MAYOR ATTEST: JENNIFER WALTERS, CITY SECRETARY BY: 1 3. 0, Liu- A~) APPROVED AS TO LEGAL FORM: EDWIN M. SNYDER, CITY ATTORNEY BY: 3-0R: - 77 Change Ord cone CHANGE ORDER / CONTRACT REVISION City of Denton, Texas Owner Distributed to: Owner /_X_/ Contractor /_X_/ Bid #3770 PO #134002 Project:Cedar Street Streetscape, Utility replacement Dated:12-17-07 Contractor: The Fain Group, Inc. Contract Date: June 19, 2007 P.O. Box 750 Fort Worth, TX 76101 This Change Order/Revision makes the following changes in this contract. Add: Replacement of Street Paving and associated expenses for Cedar Street from McKinney Street to Mulberry St. See attached detail $197,744.64 The Original (Contract Sum) $1,170,263.00 Net Change by previously authorized change orders 00 The (Contract Sum) prior to this change order 1,170,263.00 The (Contract Sum) will be (increased) by this change order $ 197,744.64 The New(Contract Sum) including this change order will be........ $ 1,368,007.64 The contract time will be (increased) by ................................30 working days The date of substantial completion as of the date of this change order therefore is May 2, 2008 The Fain Group, Inc Contractor (as above) City of Denton Owner P.O. Box 750 Address 12/17/07 Date 901-B Texas Street Address Denton, TX 76201 Signature Di l § I 1Aeog Date Change Order #1 G:4kfi k 6Word D .\Ced Streit Project M0 CR GE ORDER Fd Gmup Ceder Sww CM, 11J-07.doo FAIN Mr. Robert Ticl+aer ~ City of Denton CpLLM=ft F°hvBs 601 Hickory R0- eo750 Fort WoM, TX 76101 Denton, TX 76209 e17-m-4= 817-927-4389 Fax w .lhohdrKonvww.°°m RE: Asphalt Paving Change Order Request Robert, The cost to add 8" paving to Cedar Street based on the revised drawings from Schrickel, Rollins and Associates, Inc. received via email on December 10, 2007 is One Hundred Ninety-Seven Thousand Seven Hundred Forty- Four and 64/100 dollars ($197,744.64). The cost breakdown for this addition is as follows: CONCRETE DEPTH BASED ON COMMERCIAL MIXED USE COLLECTOR Mill As halt/Concrete Paving 00-8" must stop if rebar encountered 33308 SF $0.63 $20,984.04 Additional move- for milling based on doing one block at a time 2 ea $575.00 $1,150.00 Concrete 8" 7288 SF $6.58 $47,955.04 Asphalt 6" type B, 2" type C) 33308 SF $3.76 $125,238.08 Additional move-for asphalt (based on doing one block at a time 2 ea $1,331.00 $2,662.00 Concrete/Asphalt removal (at Intersections to receive concrete 810 SY $16.64 $13,478.40 6" Lime Treated Sub-grade 40596 SF $1.07 $43,437.72 Saw cutting up to 8" thick 1000 LF $2.21 $2,210.00 Additional Move4ns for Lime Stabilization 2 ea $575.00 $1,150.00 Surveying 1.5 wk $3,994.00 $5,991.00 Credit for Base Bid work 1 ea $79,793.00 -$79,793.00 Subtotal $184,463.28 Profit 10.00% $9,223.16 Bond 2.00% $4,058.19 Total $197,744.64 This price includes the cost of milling for asphalt areas, removal of concrete/asphalt for the areas with new concrete paving at the intersections of Oak, Hickory and McKinney, 6" of lime treatment on existing soil, an estimated quantity of 1000 LF for saw cutting paving up to 8" thick where required and additional mobilizations for asphalt paving, milling operation and lime treatment based on completing one block at a time. This price does not include the following: any utility adjustments for underground utilities that are in conflict with lime operation or within the new 8" depth of paving or any utility adjustment required if the final top of paving elevation has changed from the base bid top of paving elevation, any fill material required due to unsuitable soils or for revised elevations that will require fill material, lime treatment under curb and gutter, concrete removal due to encountering rebar in the milling process before reaching 8" in depth. In addition to the cost above this change will require Thirty (30) working days added to the contract time based on approval no later than January 11, 2008. Please feel to call me at 817-927-4388 with any questions or concerns. Thanks, Jasori Copes CC: File t_F ® yl ici F-F-- w .2 Z - ~ 5 i`~ F ~ i O ~ „ s~ : , ®~k~g. ~w ~ ' gal ~ c _ s t-~ ~o i"I ~a:a $ ~~~Ei Q~ ocfi I ~ i v+d iFeE ~ ~ ~ d r vc ~ i ai ~i#y `ICI ~ g k 1 ~ ~ ~.~o... I I ~ ry a.n~.. I. ~ i. I: O_ I ~ R i `.I i r__ 4 ~s 0 v I_ NV u~ G. M \J ~~Z~R - _1~ . _ ~ l I ~.Y iii i~_.l i ~a~' ~r rr ~ I ~ ~ v II= o` ~ O ~ I ~ 1 ~ ~ f