2005-037 FILE REFERENCE FORM FILE(S) Chanl!e Order One - Ordinance No. 2007-052 2005-037 Date Initials 03/06/07 ) R Om)INANCE NO. AN ORDINANCE ACCEPTING COMPETITIVE BIDS AND AWARDING A CONTRACT FOR PURCHASE OF MEDIUM VOLTAGE SWITCHGEAR BUILDINGS FOR DENTON MUNICIPAL ELECTRIC; PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFORE; AND PROVIDING FOR AN EFFECTIVE DATE (BID 3282-TI-IREE YEAR AGREEMENT FOR PURCHASE OF MEDIUM VOLTAGE SWITCHGEAR BUILDINGS AWARDED TO ABB, INC. IN THE ESTIMATED AMOUNT OF $1,482,021). WHEREAS, the City has solicited, received and tabulated competitive bids for the purchase of necessary materials, equipment, supplies or services in accordance with the procedures of State law and City ordinances; and WHEREAS, the City Manager or a designated employee has reviewed and recommended that the herein described bids are the lowest responsible bids for the materials, equipment, supplies or services as shown in the "Bid Proposals" submitted therefore; and WHEREAS, the City Council has provided in the City Budget for the appropriation offimds to be used for the purchase of the materials, equipment, supplies or services approved and accepted herein; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. That the numbered items in the following numbered bids for materials, equipment, supplies, or services, shown in the "Bid Proposals" on file in the office of the City Purchasing Agent, are hereby accepted and approved as being the lowest responsible bids for such items: BID NUMBER VENDOR. AMOUNT 3282 ABB, Inc. Exhibit A SECTION 2. That by the acceptance and approval of the above numbered items of the submitted bids, the City accepts the offer of the persons submitting the bids for such items and agrees to purchase the materials, equipment, supplies or services in accordance with the terms, specifications, standards, quantities and for the specified sums contained in the Bid Invitations, Bid Proposals, and related documents. SECTION 3. That should the City and persons submitting approved and accepted items and of the submitted bids wish to enter into a formal written agreement as a result of the acceptance, approval, and awarding of the bids, the City Manager or his designated representative is hereby authorized to execute the written contract which shall be on file in the office of the Purchasing Agent; provided that the written contract is in accordance with the terms, conditions, specifications, standards, quantities and specified sums contained in the Bid Proposal and related documents herein approved and accepted. SECTION 4. That by the acceptance and approval of the above numbered items of the submitted bids, the City Council hereby authorizes the expenditure of fimds therefor in the amount and in accordance with the approved bids or pursuant to a written contract made pursuant thereto as authorized herein.' SECTION 5. That this ordinance shall become effective immediately upon its passage and approval. PASSED AND APPROVED this /~-~-dayof U~~2005. EULINE BROCK, MAYOR ATTEST: JENNIFER WALTERS, CITY SECRETARY APPROVED AS TO LEGAL FORM: HERBERT L. PROUTY, CITY ATTORNEY BY: 3-ORD-Bid 3282 Exhibit A Bid 3282 Three Year Agreement for Purchase of Medium Voltage Switehgear Buildings Unit Prices Bidder: ABB Manufacturer Information: manufacturer Metal Systems Switchgear manufacturer ABB from Houston Approval drawings (weeks ARO) I 4 Time allowed for owners review (Days) I 5 Shipment {weeks ARO) 20-22 Unit Prieine & Related Data: Base price (excluding freight) Estimated freight Maximum not-to-exceed amount for freight Base building length $392,628 $2,887 $4,125 43 Increase building length by 2' $3,025 Maximum building length 60' Spare breaker cost . 2000 amp (1 required each building) $8,006 1200 amp $6,217 Add one feeder breaker section $35,613 Credit to delete one feeder section -$35,613 Increase length of marshalling cabinet by 6" $275 Spare input power bushing $470 Estimated building weight 65,800 Porcelain bus insulator upgrade $6,256 Participate in intergovernmental agency purchases Yes Participation in price escalation/de-escalation (al~er I st year) Yes Warranty 24/30 Can meet specified first building delivery Yes I Unit Price Arc detection systems for three buildings $25,000 Additiona cost for 22 circuit breakers {all buildings) $1,100 Revised estimated total for ABB wRh options for three buildings $1,482,021 *** ABB proposed two options that were not required in the bid specification. The first is an are detection and high 5peed tripping system. The purpose of this system is to detect the presence of arcing faults inside the switchgnar at a very early stage before the fault magnitude is high enough ~o be sensed by the other types of bus protection. The syst is not a replacement for the standard types of bus protection. It is a complimentary enhancement to safety. The unit ¢ is $25,000 for including this in the switchgnar. The second item is to substitute ABB's low maintenance circuit break{ in place of their s~ndard breakers. The increase in unit cost per breaker would 1~1100. The lifetime ownership cost of these breakers will offset the higher initial cost. The low maintenance design has one moving part and is lighter >t both of these c