Loading...
2003-212ORDINANCE NO,- Q --0?f a. AN ORDINANCE AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO EXECUTE CHANGE ORDER 4 TO THE CONTRACT BETWEEN THE CITY OF DENTON AND TEXAS ELECTRIC UTILITY CONSTRUCTION, INC.; PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFORE; AND PROVIDING AN EFFECTIVE DATE (BID 2840- HWY 380 WATER AND SEWER RELOCATION CHANGE ORDER FOUR IN THE AMOUNT OF $103,422.13). WHEREAS, on July 16, 2002 by Ordinance No. 2002-214, the City awarded a public works contract to Texas Electric Utility Construction, Inc., in the amount of $1,313,483.95 for the Hwy 380 Water and Sewer Relocation project; WHEREAS, the Staff having recommended, and the City Manager having recommended to the Council that a change order be authorized to amend such contract agreement with respect to the scope of work and an increase in the payment amount, and said change order amount together with prior change orders do not exceed 25% of the original contract amount; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. The Change Order No. Four, increasing the amount of the contract between the City and Texas Electric Utility Construction, Inc., which is on file in the office of the Purchasing Agent, in the amount of One Hundred Three Thousand Four Hundred Twenty Two and 13/100 ($103,422.13) Dollars, is hereby approved and the expenditure of funds therefore is hereby authorized in accordance with said change order. The total purchase order amount increases to $1,448,542.77. SECTION 2. That this ordinance shall become effective immediately upon its passage and approval. c~- PASSED AND APPROVED this the day of 2003 EULINE BROCK, MAYOR ATTEST: JENNIFER WALTERS, CITY BY: APPROVED AS TO LEGAL FORM: HERBERT L. PRO TY, CITY ATTORNEY BY: 3-ORD-Bid 2840 Charge Order Four Attachment 1 CITY OF DENTON CHANGE ORDER ion (Frig n6efltg 2 Purchase OFdtx NO-106447 Change O rder No. W 4. Nerve Of Project HWY 380 6. Pralaet Aed No. Date Prepared e.1 1.03 ame a dress Of C ontractor Texas Qet3ttc Utility Con6buc6ori P.O. Box 2211 Shannon. TX 75092 lion orlc Ind ed in Contract Ut4' Re bon ProlwL 0, Umn n Ordered a rea6gl o e • Add' 10" PVC sewer - the PNU m an steam nt b rat B. Contract Charges aid item CROW oContract itevised Negotiated ti KWAQV No Estimated Unit Price Estimate C.O. Unit Es timated esgmated Codtradors ananties& Extra Clualift 5 Price 52600A0 Cost goat SZ Udders figs , ' in" PVC DR3 exrer Extra 0 0 1540 0.26 0 546,6110.40 LFT. Cor"ats saw ow E) 0 0 1650 57.04 0 31.711LOO LM Remove 00M Extra 0 0 404.22 $5,80 0 350M 32 lm ents 9Y , IdsteO Con 0 536.26 0 513 106:$$ Pavement Sy_ . Install Conwate Sidewalk Extra 0 60.6 SY. 532.6 0 pq 51 M 04 8 V ditch , , . Drop Manhole ExVa 0 1o 57.334. $1.334.19 Manhole 0 Tzc- $1,334.10 0 1, Remove d Replace Curb extra 135 LFT. 0 33 1 2 00 GtriOar , . Abandon Manhole Extra 10 c t .03 0 540&03 cavation Protection Extral 0 0 1540 51,16 0 51,7 IFT. Temp. Erosion Control extra 0 0 1S40 0 $1,594.0 LPT. ameades, warning Extra 1 0 54 650.00 Si s . a Landscape and Extra 0 1 L .00 0 535Ur- swim 1e" DMaWy Casing Open (1rt Extra 0 50 LFT 4100,W 0 59,000,00 24" ore And Casing extra 0. 1 LFT. 5332. =00 TOT 422.13 10. Original Contract Price $1,345.120.64 Increase in eontrad price $103,443.13 New Contract Price $1,446,542.77 Decrease in contract pries WA 11. Contract lime increased by 30 days. New 6ontredtkne_ 232 days.