Loading...
2002-267FILE REFERENCE FORM [ 2002-267 ] X Additional File Exists Additional File Contains Records Not Public, According to the Public Records Act Other FILE(S) Date Initials Amended by Ordinance No. 2002-331 10/18/02 JR Amended by Ordinance No. 2003-262 09/02/03 JR O ANCE NO. 2o02- AN ORDINANCE OF THE CITY OF DENTON, TEXAS AMENDING THE SCHEDULE OF RATES CONTAINED IN ORDINANCE NO. 2001-337 FOR ELECTRIC SERVICE; PROVIDING FOR A REPEALER; PROVIDING FOR A SEVERABILITY CLAUSE; AND PROVIDING FOR AN EFFECTIVE DATE. THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: RF, CTION 1, That the Schedule of Rates for electrical services as provided for in Chapter 26 of the City of Denton Code of Ordinances, is amended to read as follows: ELECTRIC RATE SCHEDULES PAGE R1 Residential Service Rate 2 R2 Residential Scavice Rate 4 TR Residential Time of Use Rate 6 GSL General Service Large 8 GSS General Service Small 11 TGS General Service Time of Use Rate 14 WK Weekend Rate 18 G1 Local Government Lighting & Power Service Rate 21 [City, County, Independent School District] LS Street Light'mg 23 LT Traffic Lighting 25 LO Other Lighting 26 DD Dusk-to-Dam Lighting [Security Light] 27 DDL Downtown Decorative Lighting 29 DGL Decorative Ground Lighting 30 T1 Temporary Service Schedule 32 P1 Intermptible Primary Service 34 ES Standby, Supplementary and Maintenance Service 36 AF Athletic Field 40 IDR Industrial Development Rate 42 EP EnergySave Program 43 MTR Premium-Efficiency Motor Rebate 49 UPS Uninterruptible Power Supply 51 ECA Energy Cost Adjustment 53 Special Facilities Rider 54 Discount Rider for State Universities and Colleges 55 SCHEDULE RI RF,.qlDRNTTAI. ~F~VI-C.'F(. R ATI~, (Effective 10/01/02) APPT.TC. ATION Applicable to all electric service used for residential purposes in a single family dwelling or an individually metered apartment; supplied at one point of delivery and measured through one meter where usage is not in excess of 700 KWH per 30-day month during the billing months of May through October. If usage in any such month exceeds 700 KWH, billing will be rendered that month under Rate Schedule R2 and thereafter for a per/od extending through the 12 billing months of the next year ending with the October billing. Annually, in November, the customer may again qualify for the R1 rate provided that consumption has not exceeded 700 KWH per 30-day month during the previous six summer months. Where individual dwelling units are being served through the same meter and the KWH in the billing months of May through October exceed 700 KWH times the number of dwelling units, the billing for that month and thereafter will be rendered under Rate Schedule R2. N~,T MthNTHI,Y R ATIR (1) Facility Charge $6.70 / 30 days (2) Energy Charge 3.85¢ / KWH (3) Energy Cost Adjustment Schedule ECA MINIMI IM Fill J .lNG Facility Charge The City will supply single-phase service at any standard voltages available from the City's distribution system through one standard transformation. PAY]VFFNT Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from date of issuance. .qPF..CIAI. FACII,ITIF~,,q All services which require special facilities in order to meet customer's service requirements shall be provided subject to the Special Facilities Rider. 2 PROR ATTON OF ! TTI~,TTY RTT ,T Billin~ £or the ~acflity charge shal! bo based o~ twelve 02) b~]]ha~s annually and prorated lo~§er oT sho~er bjllin~ periods usin~ the £o]]owin§ £ormula. Formula: Aehml day~ {n re.~din~ P~riod x Customer Facility Charge 30 days I~,N I:(,R G¥ CFTAR GF. Bil]it~g £or the elaergy charge shall be based on actual KWH consump~on dm-i~g Lh¢ bill~g period. Formula: KWH × KWH rate 1R, N!F, RG¥ CO.qT AD.TI T.qTM1RNT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. 3 SCHEDULE R2 Rg,~TIDF, NTTAT, ~F. RVTC. I~. R AT~ (Effective 10/01/02) APPT JC. ATTON Applicable to any customer for all electric service used for residential purposes in an individual private dwelling or an individually metered apartment, supplied at one point of delivery and measured through one meter. Also applicable to any customer heating with electric energy, resistance or heat pump. Not applicable to resale service in any event, nor to temporary, standby, or supplementary service except in conjunction with the applicable rider. NF, T MONTI-~ .¥ R ATF, (1) Facility Charge Single-Phase Three-Phase (2) Energy Charge First 1,000 KWH Additional KWH First 3,000 KWH Additional KWH (3) Energy Cost Adjustment MINIMI IM [III J,1NG Single-Phase Three-Phase WINTF, R RI IMMF. R Billing months of NOV. through APRIL $ 7.73 / 30 days $15.45 / 30 days 4.34¢ / KWH 3.94¢ / KWH Schedule ECA Facility Charge Facility Charge Billing months of MAY through OCT. $ 7.73 / 30 days $15.45 / 30 days 5.61¢ / KWH 6.21¢ / KWH Schedule ECA TYPP. r31~ RF~RVICF, The City will supply single-phase service (or three-phase service if available at the point of delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution system through one standard transformation. Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may be required in advance. PAYM'IRNT Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from date of issuance. 8PF, C, IAI, FA 12.11 JTIF, R All services which require special facilities in order to meet customer's service requirements shall be provided subject to the special facilities rider. pROR ATTON OF 1 ITII JTY Rll .I ,R Billing for the Facility charge shall be based on twelve (12) billings annually and prorated for longer or shorter billing periods using the following formula: Formula: Achml da?q in reading period 30 days x Customer Facility Charge Billing for the energy charge shall be based on actual KWH consumption during the billing period. Formula: KWH in rate block x Rate per KWH in rate block ENI~,RG¥ CCI~qT AD.II IRTM~.NT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. SCHEDULE TR R~TT')F~NTTAT ~ TTM~ OF T T~F~ ~ ATE 0~ffective 10/01/02) APPT J~ATTON Applicable to any customer for all electric service used for residential purposes in an individual private dwelling or an individually metered apartment, supplied at one point of delivery and measured through one meter. Customem applying for the TR rate must remain on this rate for twelve (12) continuous billing periods. Not applicable to resale service in any event, nor to temporary, standby, or supplementary service except in conjunction with the applicable Hder. NET MONTI-II,¥ r ATE (1) Facility Charge Single-Phase Three-Phase $15.45 / 30 days $20.60 / 30 days (2) Energy Charge On-Peak Hours Off-Peak Hours 25.55¢ / KWH 1.41¢ / KWH (3) Energy Cost Adjustment Schedule ECA Facility Charge Single-phase or three-phase at sixty (60) cycles at secondary distribution voltage. Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may first be required. DEFINITION OF ON-PEAK HOI IRS The City's on-peak hoars, for the purpose of this rate schedule, are designated as being fi:om 2:00 P.M. to 7:00 P.M. each Monday through Friday, starting on June 1 and continuing through September 30 each year. The City's on-peak hours may be changed fi:om time to time and the customer will be notified twelve (12) months before such changes become effective. 6 D~.~INTTIO~,I ~3]~ (~-P~AT( T-TOT ~e CiW's off-pe~ ho~s, for ~e p~ose of ~s rate schedule, sh~ be ~1 ho~s not desi~ated ~ on-pe~ ho~s. RP~TAT, ~A~ JT~R ~1 s~ices w~ch req~e sp~i~ f~ilifies ~ order to meet customets se~ice req~ents sh~l be prodded subj~t to ~e Special Facilities ~der. Bfl~g for ~e FaciH~ Ch~ge sh~l be b~ on ~elve (12) bil~gs ~u~ly ~d prorated for bnger or shoaer pefio~ us~g Acme] da? in reading x Cuaomer FaciliW Ch~ge 30 days Bill~g for ~e ener~ ch~ge sh~l be b~ed on ~m~ K~ consmpfion d~g ~e bill~g p~od. Fox.a: K~ ~ rate block x Rate p~ K~ ~ rate bbck A ch~ge per K~ of ~ t~en br ~el cost calculaed ~ accor~ce ~ Schedule ECA. pA~ Bills ~e due wh~ rendered, ~d b~ome p~t due if not p~d wi~ fifteen (15) cM~d~ days ~om ~te ofiss~ce. 7 SCHEDULE GSL GI~,NI~,R AT, ~qF, R~r[cI~. LARGE (Effective 10/01/02) APPT .TCATTON The GSL Rate is applicable to any commercial or industrial customer having a minimum actual demand of 250 KVA or 225 KW for all electric service supplied at one point of delivery and measured through one meter. Customers with an average actual demand equal to or greater than 200 KVA or 180 KW during the previous twelve month period may be allowed service under this rate, subject to the minimum billing provision. Customers other than commercial and industrial may be allowed service under this rate, subject to the minimum billing provision. Customers who elect to discontinue service under this rate are ineligible for service under this rate for twelve months. This rate is not applicable to resale service in any event, nor to temporary, standby, or supplementary service except in conjunction with the applicable rider. NI:~,T MCflqTlql,Y R ATR (1) Facility Charge (2) Demand Charge (3) Energy Charge (GL1) (4) $60.60 / 30 days $8.64 / KVA (Minimum of 250 KVA billed) 1.41¢ / KWH Energy Cost Adjustment: Schedule ECA M1NIMI IM ltlT ,I ,lNG An amount equal to the facility charge, plus a demand charge billed at the above KVA rate, where demand is determined by whichever of the following methods yields the greatest result numerically: (1) the actual monthly KVA demand; (2) 250 KVA; or (3) seventy percent (70%) of the maximum monthly KW/KVA actual demand for any month during the previous billing months of May through October in the twelve months ending with the current month. TYPF, OF gRRVIC. R Secondary or primary service available to commercial and industrial customers. Pmary service is rendered at one point on the customer's premises at a nominal voltage of 13,200 volts. 8 pRIMARY ~P/RMT~I~, DT~OT TNT Customers who own, operate, and maintain all facilities necessary to receive three phase prima~y voltage service and all transformation facilities required for conversion to utilization voltage shall receive a discount of 0.3C/KWH (GL3). Primary service customers utilizing City owned and operated facility and transformation equipment necessary to receive primary voltage service shall receive a discount of 0.1C/KWH (GL2). The City shall own, operate and maintain all metering facilities, either at primary or secondary voltage. PAYMRNT Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from date of issuance. DF, TRRMINATION O~ DPMAND The demand shall be determined by the KVA supplied during the fifteen (15)-minute period of maximum use during the current month as determined by City's demand meter, but shall not be less than 70% of the highest monthly KW/KVA actual demand determined during the billing months of May through October in the twelve (12) months immediately preceding the current month. If the current monthly demand is less than 250 KVA, and 70% of the actual demand determined during the previous months of May through October is less than either 250 KVA or 225 KW, a minimum of 250 KVA demand will be billed for the month. In all cases, 250 KVA is the minimum demand billable under rate GSL. SpF. CTAT. FACII JTIRR All services which require special facilities in order to meet customer's service requirements shall be provided subject to the Special Facilities Rider. PRORATION OF l ITII JTY RII ,I ,R (a) Billing for the Facility charge shall be based on twelve (12) billings annually and prorated for longer or shorter billing periods using the following formula: Formula: Actual dava in reading period ' x Customer Facility Charge 30 days 9 (b) Billing for demand shall be calculated on a thirty (30) day per month basis and prorated for longer or shorter billing periods using the following formula: Formula: Actual days in reading perlnd 30 days x KVA Demand x Rate ~,NF, R GY CJ-I AR GF, Billing for the energy charge shall be based on actual KWH consumption during the billing period. Formula: KWH x KWH Rate A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. 3_O SCHEDULE GSS GI~.NrI:~,R AT. ~q~RVI'CF. SMALL (Effective 10/01/02) APPT,TCATTON The GSS rote is applicable to any commercial or industrial customer having a maximum demand less than 225 KW for all electric service supplied at one point of dehvery and measured through one meter. Not applicable to resale service in any event, nor to temporary, standby, or supplementary service except in conjunction with the applicable rider. NET MONTI-II .¥ R ATF. (1) Facitity Charge (2) (3) Single Phase Three Phase $15.15 / 30 days $20.20 / 30 days Demand Charge $8.00 / KW (First 20 KW not Billed) Energy Charge (GS1) Customer with 20 KW or below: Block 1 - First 2,500 KWH Block 2 - All Additional KWH 6.75¢ / KWH 3.00¢ / KWH Customer above 20 KW: Block 1 - First 2,500 KWH Block 2 - Next 3,500 + B2T' KWH Block 3 - All Additional KWH 6.75¢ / KWH 3.00¢ / KWH 2.65¢ / KWH * The Block 2 Threshold (B2T) establishes the upper threshold for the Block 2 billing rote above 6,000 KWH as a function of demand, and is determined by the following formula: B2T KWH = [(^cmal KW Demand - 20) x 190] No customer shall be billed for KWH not actually consumed. Energy Cost Adjustment Current ECA Schedule 13. An amount equal to the facility charge plus the greater of: (1) the actual monthly KW demand charge, or (2) seventy percent (70%) of the maximum monthly actual demand charge for any month during the previous billing months of May through October in the twelve (12) months ending with the current month. TYPR (~F ,qF. RVICF. Secondary service available to commercial and industrial customers. The City will supply single-phase service (or three-phase service if available at the point of delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution system through one standard transformation. Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may first be required. PRIMARY .RI~,RV~C~R DT.ql2.OT Customers who own, operate, and maintain all facilities necessary to receive three-phase primary voltage service and all transformation facilities required for conversion to utilization voltage shall receive a discount of 0.3C/KWH (GS3). Primary service customers utilizing City owned and operated facility and transformation equipment necessary to receive primary voltage service shall receive a discount of 0.1C/KWH (GS2). The City shall own, operate and maintain all metering facilities, either at primary or secondapj voltage. Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days fi.om date of issuance. I)RTF. Rh,qINIATIONI OF DFMANT) The demand shall be detenuined by the KW supplied during the fifteen (15)-minute period of maximum use during the current month as determined by CityTs demand meter, but shall not be less than 70% of the highest monthly actual demand detenuined during the billing months of May through October in the twelve (12) months immediately preceding the current month. Billing demand shall be based on an adjusted KW demand which is the highest of the actual monthly demand, less 20 KW or 70% of the maximum monthly actual demand during the preceding months of May through October, less 20 KW. In no case, shall billed demand be less than 0 KW. In cases where the connected load is constant, the City may, at its option, estimate the KW demand. For neon signs, one volt ampere shall be considered the equivalent of 3/4 watt. 12 All services which require special facilities in order to meet customer's service requirements shall be provided subject to the Special Facilities Rider. PR OR ATIC}N OF T ltl]' ,TTY glll,T,,q (a) Billing for the Facility charge shall be based on twelve (12) billings annually and prorated for longer or shorter periods using the following formula: Formula: Actual day,q in reading, nerlod ~ ' x Customer Facility Charge 30 days Co) Billing for demand shall be calculated on a thirty (30) day per month basis and prorated for longer or shorter billing periods using the following formula: Formula: Aehml dayg in reading period x Adjusted KW Demand x Rate 30 days F, NI~R G¥ C,I-I AR GF~ Billing for the energy charge shall be based on actual KWH consumption during the billing period. Formula: KWH in rote block x Rate per KWH in rate block F, NF, RG¥ CO~qT AD.II I.RTM~,NT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. 3.3 SCHEDULE TGS gF. RVI(~. T1K4~ f~F TTg~ RAT~ Effective 10/01/02) APPl JC A TION Applicable to any customer having a minimum demand of 250 KVA for all electric service supplied at one point of delivery and measured through one meter, with the City providing all facilities necessary to receive primary voltage service. Supplementary service will be available subject to the applicable rider. Not applicable to resale or temporary service. Customers electing this rate must remain on this rate for a minimum of twelve (12) continuous billing months. NI~.T MONTHI ~¥ R ATI~. (1) Facility Charge $70.70 / 30 days (2) On-Peak Demand Charge $10.98 / KVA On-Peak Demand (3) Off-Peak (System) Demand $ 2.16 / KVA System Demand Charge (4) Energy Charge 0.51 ¢ / KWH (5) Energy Cost Adjustment: Per Schedule ECA M[NIMI ~,[ RTl' J,1NG The minimum monthly bill shall be the sum of the Customer Facility Charge, the Off-Peak Demand Charge, and the On-Peak Demand Charge. The October through May demand charge shall be the measured system demand, plus not less than 100% of the actual maximum monthly on- peak demand for any month during the months of June through September in the twelve (12) months mediately preceding the current month. T¥-Pl~, OF gI~RVIC~ Secondary or prima~ service available to commercial and industrial customers. Primary service is rendered at one point on the customer's premises at a nominal voltage of 13,200 volts. The City will supply single-phase service (or three-phase service if available at the point of delivery) at sixty (60) cycles and at any standard voltages available t~om the City's distribution system through one standard transformation. Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may be required. 3.4 PrtMAr¥ .~,r vtc~, DT~OT ~ Customers who own, operate and maintain all facilities necessary to receive three-phase primary voltage service and all transformation facilities required for conversion to utilization voltage shall receive a discount of 0.3C/KWH (TG5 and TG6). If primary service is provided and the City owns and operates all facilities and transformation equipment necessary to receive primary voltage service, a discount of 0.1C/KWH will be applied to the customer's bill (TG3 and TG4). The City shall own, operate and maintain all metering facilities, either at primary or secondary voltage, at the City's option. DF. FTNITION OF ON-PEAT( HOT lR.q The City's on-peak hours, for the purpose of this rate schedule, are designated as being from 2:00 P.M. to 7:00 P.M. each Monday through Friday, for the months of June through September. The City's on-peak hours may be changed from time to time and the customer will be notified twelve (12) months before such changes become effective. DI~.FINITION C)F C)I~F-PIq. AK l-lOT )R,q The City's system (off-peak) hours, for the purpose of this rate schedule, shall be all hours not designated as on-peak hours. DF, Tt:~.RMINATION OF ON-PF. AK DFMANrD The on-peak demand shall be determined by the KVA actual demand supplied during the fifteen (15) minute period of maximum use each month during on-peak hours as recorded by the City's demand meter, but not less than one hundred percent (100%) of the actual maximin on-peak demand similarly determined during the billing months of June through September in the twelve (12) months immediately preceding the current month. Dla, TF. RK4TNATTONT OF OFF-PRAT( (,qYRTF,]M) DF. hA'AND The off-peak demand shall be determined by the maximum KVA actual demand supplied during the fifteen (15) minute period of maximum use during off-peak hours each month as recorded by the City's demand meter. The off-peak demand will be billed every month. DF, TF. RMINIATION OF DFMANT) RTTJ.ING FOR CTI,qTOMFR,q WITH NO PF. AK DPMAND HISTORY DI IRING OFF-PF. AK MONrrlq,q If the customer is new or does not have a history of on-peak use for June through September, and elects to come on the TGS rate, the customer's billed demand shall be the off-peak demand billed at the GSL demand rate. The off-peak demand will be billed every month at the GSL rate until the customer establishes a separate on-peak and off-peak demand during an on-peak month. At this time, both on-peak and off-peak demand will then begin billing at the TGS rate. 3.5 ~T ~pT,I~JVIF;NTAT, PO'gv~,R RTDF, R Customers requesting standby or supplementary power shall be allowed service under this rate schedule; however, the determination of off-peak demand shall be adjusted to read: The off-peak demand shall be the sum of the maximum KVA demand supplied during the fifteen (15) minute period of maximum use as recorded by the City's demand meter plus the KVA nameplate rating(s) of the customer's generator(s). In the event the customer's generator(s) is/are off-line at the time of the establishment of the maximum off-peak demand, the KVA nameplate rating of the generator(s) unavailable for service shall be removed from the determination of the off-peak demand. .RPF. CIAT. FACIT .TTl~.g All services which require special facilities in order to meet the customer's service requirements shall be provided subject to the Special Facilities Rider. PROR ATTON OF I ITII .TT¥ RD-,T,g (a) Billing for the Facility Charge shall be based on twelve (12) billings annually and prorated for longer or shorter periods using the following formula: Actnal days in reading perind 30 days x Customer Facility Charge Billing for demand shall be calculated on a thirty (30)-day-per-month basis and prorated for longer or shorter billing periods using the following formula: Achml davg in readin~ nerlnd ' - ' x KVA Billed Demand x Rate 30 days F~NF~R G¥ CHARGE Billing for the energy charge shall be based on actual KWH consumption during the billing period. Formula: KWH x KWH Rate ~,?~,R~,¥ Cf)ET AT~ITTETMW, NT A charge per KWH of energy taken for fuel cost calculated in accord~mce with Schedule BCA. PAYMENT Bills are due wh~ rendered, and become past due if not paid within fiiteen (15) calendar days from date of issuance. l? SCHEDULE WI( ~K]~ R AT~ (EFFECTIVE 10/01/02) APPI JCATION Applicable to any commercial and industrial user whose maximum demand load occurs during the period from Thursday at 12 midnight through Sunday at 12 midnight and does not experience a demand load during the period from Sunday 12 midnight through Thursday 12 midnight that exceeds 80% of the maximum demand load. Customers who violate the 80% requirement more than four (4) ftmes during the month, or more than twice on the same day of the week, during the months of June through September, are ineligible for service under this rate for twelve (12) months. Not applicable to resale service in any event, nor to temporary, standby or supplementary service except in conjunction with applicable rider. N~.T MONTRI.Y R ATI~. (1) Facility Charge (2) (3) Singie-Phase Three-Phase $20.00 / 30 days $25.00 / 30 days Demand Charge $ 6.40 / KW (First 20 KW not Billed) Energy Charge (GS 1 ) Customer with 20 KW or below: Block 1 - First 2,500 KWH Block 2 - All Additional KWH 6.75¢ / KWH 3.00¢ / KWH Customer above 20 KW: Block 1 - First 2,500 KWH Block 2 - Next 3,500 + B2T' KWH Block 3 - All Additional KWH 6.75¢ / KWH 3.00¢ / KWH 2.65¢ / KWH * The Block 2 Threshold (B2T) establishes the upper threshold for the Block 2 billing rate above 6,000 KWH as a function of demand, and is determined by the following formula: B2T KWH = [(Actual KW Demand - 20) x 190] No customer shall be billed for KWH not actually consumed. (4) Energy Cost Adjustment P~S~e~leECA 3.8 An amotmt equal to the demand charge as calculated below plus $20.00/month for single - phase service or $25.00/month for three-phase service, per thirty (30) day bilYmg. The City will supply single-phase service (or three-phase service if available at the point of delivery) at sixty (60) cycles and at any standard voltages available fi:om the City's distribution system through one standard transformation. Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may be required. PAYMF, NT Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from date of issuance. DFYFFJtMINATION Ol~ D~'MANT} The demand shall be determined by the KW supplied during the fifteen (15) minute period of maximum use during the current month as determined by the City's demand meter. Billing shall be based on an adjusted KW demand, which is the actual demand less 20 KW. The adjusted KW demand will subsequently be used for billing the demand portion of the utility bill. In no case, shall billed demand be less than 0 KW. ,qPF, C,I A 1, FACII JTIlq, R All services which require special facilities in order to meet customer's service requirements shall be provided subject to the Special Facilities Rider. PR OR ATIONI OF I ITII ,ITY RII J,R Billing for customer facility charge and demand shall be calculated on a thirty (30) day basis and prorated for longer or shorter billing per/ods using the following formula: (a) Billing - Customer Facility Charge shall be based on twelve (12) bill'mgs annually. Formula: Actual da?q in readin~ period 30 days x Customer Facility Charge 3_9 Formula: Ac~ml day~ in readinE period 30 days Billing - Demand Charge shall be based on twelve (12) billings annually. x Adjusted KW Demand x Rate Bill'mg for the energy charge shah be based on actual KWH consumption during the billing period. Formula: KWH in rate block x Rate per KWH in rate block ECA. ENF. R~Y ~fIRT AD.[[ IRT1MI~.NIT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule 20 SCHEDLTLE G1 I,OCAT, Cd"}VF~NMF;.NT T.TCtHTTNCt & PC}V~I~,R ~F~VTC. I~, R ATI~, [CTTY: COT TNT¥; ANI~ INDF,~FNDF, NT ~C. HOC}T, DISTRICT] (Effective 10/01/02) APPI JC, A TIC)N Applicable to any local City, County or School District for all electric service supplied at one point of delivery and measured through one meter. Not applicable to resale service in any event, nor to temporary, standby or supplementary service except in conjunction with applicable rider. N~T MC}NTHI ,¥ R ATE (1) Facility Charge Single-Phase Three-Phase (2) Demand Charge (3) Energy Charge (4) Energy Cost Adjustment $15.15 / 30 days $20.20 / 30 days $6.31 / KW 3.03¢ / KWH Current ECA Schedule An amount equal to the demand charge as calculated below, but not less than fifty percent (50%) of the maximum monthly demand charge for any month during the previous billing months of May through October in the twelve (12) months ending with the current month, plus the applicable facility charge per thirty (30) day billing period. TYPE OF ,ql~,RVICF, The City will supply single-phase service (or three-phase service if available at the point of delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution system through one standard transformation. Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may be required. p^YM~.NT Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from date of issuance. 21 ¥)ETER'MIMATION ~)r Y)F~ANW) The demand shall be determined by the KW supplied during the fifteen (15)-minute period of maximum use during the current month as determined by City's demand meter, but not less than 50% of the highest monthly actual demand determined during the billing months of May through October in the twelve (12) months immediately preceding the current month. SpRCTAT. FACII JTIF~K All services which require special facilities in order to meet customer's service requirements shall be provided subject to the Special Facilities Rider. PROR A TTONT OF T ]TH.ITs?. PITI .I .~q (a) Billing for the Facility charge shall be based on twelve (12) billings annually and prorated for longer or shorter billing periods using the following formula: Formula: Actual daym in reading period x Customer Facility Charge 30 days (b) Billing for demand shall be calculated on a thirty (30) day per month basis and prorated for longer or sho~ter billing periods using the following formula: Formula: Acl~ml daya in reading period x KW Billed Demand x Rate 30 days ENIR. R G¥ CHARGE Billing for the energy charge shall be based on actual KWH consumption during the billing period. Formula: KWH x KWH Rate EN.~,RG¥ CORT ADJI IRTMF, N]T A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. 22 SCHEDULE LS ~TR T~T T~TGI4TIN~ (Effective 10/01/02) APPI Applicable to all street lighting owned and maintained by the City of Denton. NET MONTI-II,¥ RATE (1) See table Current ECA x Monthly Bulb Wattage Factor LS LSA 100 W Sodium Vapor LSB 250 W Sodium Vapor LSC 400 W Sodium Vapor I.M LMA 175 W Mercury Vapor LMB 250 W Mercury Vapor LMC 400 W Mercury Vapor Facility, Charge ~ulh Wattage l~actor $ 4.90 / 30 Days 48 KWH $ 6.95 / 30 Days 105 KWH $ 8.75 / 30 Days 159 KWH $5.65 / 30 Days 70 KWH $6.70 / 30 Days 98 KWH $8.50 / 30 Days 153 KWH LMD 1,000 W Mercury Vapor $15.45 / 30 Days/380 KWH TYPE OF ,ql~,RVIC, F, The City will supply single-phase service (or three-phase service if available at the point of delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution system through one standard transformation. Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may first be required. pA'YMI~.NT Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from date of issuance. 23 PRORATION OF 1 ~TI[ .ITY RH',l,g a) Billing for the Facility Charge shall be based on twelve (12) billings annually and prorated for longer or shorter periods using the following formula: Actual day~ in re~ain~ periad x # of lights per type x 30 days Customer Facilities Charge ECA. F, NI~.RG¥ C, ORT AD.I[ IgTMRNT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule 24 SCHEDULE LT TR AFFTC T .TGHTTNTC~ (Effective 10/01/02) APPT .TC ATION Applicable to State and Local Government agencies that operate and maintain their own traffic signals. NI~,T IMONITHI ,Y R ATF, All KWH 5.30¢ / KWH TYPF, OF SI~,RVICR At the City's available secondary voltage and phase. pAVMRNIT Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from date of issuance. MAINTRNANCR CHAR C,R Maintenance expenses billed at cost. SPRCIAT, FACII .ITIRS All services which require special facilities in order to meet customer's service requirements shall be provided subject to the Special Facilities Rider. RNIF. R GY CHARCtE Billing for the energy charge shall be based on actaal KWH consumption during the billing period. Formula: KWH x KWH Rate F, N1F, RG¥ COST AD.[[ ISTMRNT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. 25 SCHEDULE LO OTHER l JC~HTING (Effective 10/01/02) 1 APPI JCATION Applicable to State and Local Government agencies that install and maintain their own street lights, other than the City of Denton. BULB WATTAGE lqET MONTIqI.¥ R ATP. FACTOR LS1 250 W Sodium Vapor 5.30¢ / KWH 105 KWH LS2 400 W Sodium Vapor 5.30¢ / KWH 159 KWH LM1 400 W Memury Vapor 5.30¢ / KWH 153 KWH LM2 1,000 W Mercury Vapor 5.30¢ / KWH 380 KWH APPI.IC ATION Applicable to other unmetered lighting services. NET MONTHI,¥ RATE Tntal Watts x Hours used per Month x KWH Rate 1,000 TYPE. OF ,qF. RVICE At the City's available secondary voltage and phase. Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from date of issuance. MAINITF. NANICE CHARGE Maintenance expenses billed at cost. .qPECIAI, FACI~ All services which require special facilities in order to meet customer's service requirements shall be provided subject to the Special Facilities Rider. F, NI:~,RG¥ CO,qT ADII [qTMENIT A charge per KWH of energy taken for fuel cost calculated in accord with Schedule ECA. 26 SCHEDULE DD DT T~qK T~ DA~NT T,T~T-TTTNCt [SECURITY LIGHT] (Effective 10/01/02) AppI,TCATTONT Applicable to any customer within the area served by the City's electric distribution system for outdoor area lighting when such lighting facilities are operated as an extension of the City's distribution system. NF, T MONITI-tl .¥ R ATI~, (1) FaeiliW Charge See table (2) Baer 2aarA jasamm DSA 100 W Sodium Vapor DSB 250 W Sodium Vapor DSC 400 W Sodium Vapor DHA 250 W Metal Halide DHB 400 W Metal Halide Restricted 10/1/97: DMA 175 W Mercury Vapor DMB 250 W Mercury Vapor DMC 400 W Mercury Vapor Current ECA x Monthly Bulb Wattage Factor $7.75 / 30 Days $10.05 / 30 Days $12.35 / 30 Days $12.05 / 30 Days $14.35 / 30 Days 48 KWH 105 KWH 159 KWH 105 KWH 159 KWH $6.45 / 30 Days $7.50 / 30 Days $8.35 / 30 Days 70 KWH 98 KWH 153 KWH The City shall furnish, install, maintain and deliver electric service to automatically controlled, mercury or sodium vapor lighting fixtures conforming to the City's standards and subject to its published roles and regulations. Where necessary for proper illumination or where existing poles are inadequate, the City will install or cause to be installed, one (1) pole for each installed light, at a distance not to exceed eighty (80') feet from said existing lines, at no charge to the customer. Each additional pole span shall not exceed a span spacing of one hundred (100') feet. Additional poles required to install a light in a customer's specifically desired location, and not having a light installed on same, shall bear the cost. 27 PAYMRNT Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from date of issuance. A two (2) year contract shall be agreed to and signed by each customer desiring Dusk-to- Dawn Lighting Service authorizing fixed monthly charges, which may be reviewed annually, and to be applied to the monthly municipal utilities bill. In the event that a customer desired the removal of the unit or discontinuance of the service prior to completion of two (2) years, the remainder of the contract period shall become due and payable. After the end of the initial two (2) year contract, service shall continue on a month- to-month basis and may be canceled by either party upon thirty (30) days notice. SpPI~,TAI, [*ACH JTl~,~q All service which requires special facilities in order to meet the customer's service requirements shall be provided subject to the Special Facilities Rider. PROR ATTONI Ol~ t n'n,trY rn,t Billing for the Facility charge shall be based on twelve (12) billings annually and prorated for longer or shorter billing periods using the following formula: Formula: Ach,al da? in reading perlnd 30 days x Customer Facility Charge A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. 28 SCHEDULE DDL Df3WNTOWN DD',COR A TIVF, I,I~HT~ ~ffecfive 10/01/02) APPT JC A~ON Applicable to ~y cmtomer on ~e p~eter of ~e squ~e s~cd by ~c CiW's el~ffic · sffibufion syst~ for outdoor ~ea li~g when such ~g f~ihties ~e opiated ~ m extension of ~e CiW's &sffibution system. ~ MO~Y RAT~ (1) Faci~ Ch~ge (2) En~ Cost Adjus~mt $3.85 / 30 Days Current ECA x Monthly Bulb Wattage Factor, based on 415 KWH per Customer TYPF. OF RF. RVICF, The City shall fumish, install, maintain and deliver electric service to automatically controlled lighting fixtures conforming to the City's standards and subject to its published roles and regulations. The service is provided between dusk and midnight. PAYMF. NT Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from date of issuance. RP~,,C].IAT. FACII JTIF. R All service which requires special facilities in order to meet the customer's service requirements shall be provided subject to Special Facilities Rider. PRORATION OF I ITIT JTY RTT J.R Billing for the Facility Charge shall be based on twelve (12) billings annually and prorated for longer or shorter billing periods using the following formula: Formula: Ach]al day~ in reading period x Facility Charge 30 days F, NF, R GY C/')RT AD.II I,qTMF. NT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. 29 SCHEDULE DGL DF,,COR ATTMR GROT ~ T ,TOtFTTTNOt (Effective 10/01/02) APPI ,ICATION Applicable to any customer using ground lighting served by the City's electric distribution system for outdoor area lighting. The customer owns, operates, and maintains the decorative ground lighting upon installation by the City of Denton. NRT MONTRI,¥ R ATF, (1) Facility Charge (Meter) $6.70 / 30 Days Facility Charge (Per Light) 50 W Sodium Vapor Beacon 50 W Spot 70 W Sodium Vapor Ballard 100 W Sodium Vapor Ballard (2) Energy Charge $2.15 / 30 Days $1.70 / 30 Days $4.50 / 30 Days $4.50 / 30 Days 3.79 cents / KWH TYPF. OF ~RRVTCF. The City shall furnish and install light fixtures, and deliver electric service to automatically controlled lighting fixtures confonning to the City of Denton's standards and subject to its published roles and regulations. The service is provided between dusk and dawn. At the end often (10) years, the facility charges per light will be discontinued. PAYM~.NT Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days fi:om date of issuance. IN~qTAT J ,ATION CO,qT~q The installation costs will be calculated by the City. The customer is responsible for installation costs at the City's discretion. 30 ~P~'.C~TAT. FA~TT,TTT~,,~ AJ] service which ~equires special £acilitics in order to meet the custom~'s service requirements shall be provided subject to the Special Facilities Rider. TERM IDg CONTRACT A ten (10) year contract shall be agreed to and signed by the customer desiring Decorative Ground Lighting Service authorizing fixed monthly meter charges, which may be reviewed annually, and to be applied to the monthly municipal utilities bill. The monthly per light facility charge will not change during the ten (10) year contract period. In the event that a customer desired the removal of the unit or discontinuance of the service prior to completion of ten (10) years, the remainder of the contract period shall become due and payable. After the end of the initial ten (10) year contract, service shall continue on a month- to-month basis and may be canceled by either pray upon thirty (30) days notice. pRORATION OF I ITII JTY glll,T,S Billing for the Facility charge shall be based on twelve (12) billings annually and prorated for longer or shorter billing periods using the following formula: Formula: Achml day~ in reading period x Customer Facility Charge 30 days 31 SCHEDULE T1 T~MPOR AR¥ ,qEI~VTCE ,qCHEDI R-,E ~ec~w ~0/01/02) APPT .TCATTON App~cablc wh~ a custom~ r~uests elec~c so,icc on a sho~ t~ or t~po~ b~is where a c~tomer h~ received a pc~t ~om ~e Ci~ of Denton's B~l~g ~pecfio~ D~cnt. ~s rate is not applicable ~er ~c ce~ificate ofoccup~cy h~ bccn issued. NET MONTT-IT ,Y R ATE ( 1 ) Facility Charge Single-Phase Three-Phase (2) Energy Charge (3) Energy Cost Adjustment $15.15 / 30 days $20.20 / 30 days 6.77¢ / KWH Current ECA Schedule MINIMI IM gilt .1 ,lNG Facility Charge. TYPE OF ~ERVICE At the City's available secondary supply. ADDITIONAL rI~MPOR ARY SERVICE CHARGES Labor (Regular Time) $60.00 minimum up to 1 hour. $60.00 for each additional hour (to be measured to the nearest one-quarter hour). Labor (Overtime) $75.00 minimum up to 1 hour. $75.00 for each additional hour (to be measured to the nearest one-quarter hour). Premium time to be added where applicable. Transportation To be billed by hours or miles, as applicable, according to the estimated cost of' operating the equipment. 32 Material that cannot be salvaged to be billed at Stores cost plus 25% and applicable sales tax. At the time a temporary service is removed or converted, any loss in the material installed due to negligence or willful action by the customer will be billed separately to the customer at replacement cost plus 25% and sales tax. RPECIAT. FACII,ITTI~.S All services which require special facilities in order to meet the customer's service requirements shall be provided subject to the Special Facilities Rider. See Section 25-23(e) for the standard requirements. FI.AT r ATE TEMPORARY ,qERVICE Applicable to new construction of underground residential electric service only. Rate: A flat fee of $195 per lot payable when the customer applies for temporaTy service. PR OR ATTONT cYF I ITT] JTY Billing for the Facility charge shall be based on twelve (12) billings annually and prorated for longer or shorter periods using the following formula: Formula: Aenml day.q in reading period x Customer Facility Charge 30 days ENF, R GY CHARGE Billing for the energy charge shall be based on actual KWH consumption during the billing period. Formula: KWH x KWH Rate EN'E, RG¥ CO.qT ADJI I~qT1VIENT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. 33 SCHEDULE P1 ]NTI~.RRI ]PTI~I ,F, PRIMARY ~RERVI~T~, (Effective 10/01/02) APPT JC A TIC)N Applicable to all customers taking primary service at a firm power load exceeding 1,000 KVA during the months of June, July, August and September and is, by contract, provided service subject to load interruptions. The City retains the right to limit the number of customers on this rate if the City's load reduction goals are met. NII~,T MONTI-II.Y CI4ARGF. (Estimated Transmission Finn) (1) Facility Charge (2) Energy Charge (3) Demand Charge (4) Energy Cost Adjustment $70.70 / 30 days 0.20¢ / KWH $3.78 / KVA Current ECA Schedule Mr~ r~ nH .T ,r~c~ An amount equal to the demand charge as calculated below but not less than one hundred percent (100%) of the maximum monthly KVA similarly determined during the previous billing months of May through October in the twelve months ending with the current month, nor less than 1,000 KVA. TYPF OF .qFRVIC~ lntermptible primary voltage service (transformation equipment owned by customer) is available to any customer with a twelve (12)-month minimum monthly demand of 1,000 KVA or greater. Intermptible primary service rendered at one point on the customer's premises at a nominal voltage of 13,200 volts or 69,000 volts three-phase at the option of the utility. The primary voltage service customer shall own, operate, and maintain all facilities necessary to receive three-phase pmary voltage service and all transformation facilities required for conversion to utilization voltage. The City shall own, operate and maintain all metering facilities, either at primary or secondary voltage, at the City's option. Where the City elects to meter at secondaxy voltage, two percent shall be added to the demand charge, the energy charge, and the energy cost adjustment charge to account for transformer losses. 34 r)ET~I~N'ATION Of r)FMAND The demand shall be determined by the KVA supplied during the fifteen (15) minute per/od of maximum use during the current month as detemained by City's demand meter, but not less than 100% of the maximum monthly KVA similarly determined during the billing months of May through October in the twelve months immediately preceding the current month, nor less than 1,000 KVA. .qPRCTAT, I~A (211.ITIF.,R All service which requires special facilities in order to meet the customer's service requirements shall be provided subject to the Special Facilities Rider. PRO1? ATION O~' T TT~I' ,TTM RTT ,T ,~ (a) Billing for the Facility charge shall be based on twelve (12) billings annually and prorated for longer or shorter billing periods using the following formula: Formula: Actual day~ in reading period 30 days x Customer Facility Charge Billing for demand shall be calculated on a thirty (30) day per month basis and prorated for longer or shorter billing periods using the following formula: Formula: Actual dayg in reading period 30 days F. NFR G¥ C~J-i'AR GF. x KVA Demand x KVA Rate Billing for the energy charge shall be based on actual KWH consumption during the billing period. Formula: KWH x KWH Rate F, NF, RG¥ CO,qT AD.R' I.qTIV~NT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. 35 STANT)RY: SCHEDULE ES gI rPPT,F. MY~NTAR ¥ ANT) MAINTI~NIANC. F. (Effective 10/01/02) APPI JCATION Applicable in all areas served by the City to customers who: (1) Own and/or operate an electric power generation facility mainly used for non- emergency uses and which has a total nameplate or effective capacity (whichever is lesser) of fifty (50) KVA or more in parallel with the City's electric system for the purpose of generating power for the customer's own consumption, and (2) Employ equipment which is compatible with the City's electric system at the customer's delive~ point and which will cause no damage to the City's electric system or equipment or present undue hazards to City personnel, and O) Own and/or operate an electrical generating facility which has been certified annually by a registered professional engineer practicing in the utility or Independent Power Production Industry to be a functioning and reliable generating facility. (4) Operate an electrical power generating system at least 6,500 hours annually. (5) Execute an agreement for interconnection and parallel operation with the City. INTF. R CONN~.CTION CO~qT~q The customer shall reimburse the City for any equipment or facilities required as a result of the installation by the customer of generation in parallel with the City's electric system. The customer shall pay all costs of the City to extend its facilities or modify them at the time of interconnection, or at some future time in order to permit parallel operation of the customer's facility. TYPR OF .qF, RVICE The City shall supply altemating current at sixty (60) cycles and at the voltage and phase of the City's electric system most available to the location of the customer. The primary voltage customer shall own, operate and maintain all facilities necessary to receive three-phase primary voltage service and all transformation facilities required for conversion to utilization voltage. The City shall own, operate and maintain all metering facilities, either at primary or secondary voltage, at the City's option. Where the City elects to meter at secondary voltage, the secondary energy and on-peak demand charges shall apply. 36 ]xTWT' MO~F~TI'.¥ RA~ Primary Secondary Sevvice ~erv~ee (1) Facility Charge $60.60 / 30 days $25.25 / 30 days Demand Charges: On-Peak Demand Off-Peak Demand $10.30 / KVA $3.80 / KVA $10.30 / KVA $3.80 / KVA (3) Energy Charges: Non-Emergency Energy 0.20¢ / KWH Emergency Energy 5.25¢ / KWH 0.51¢/KWH 5.35¢ / KWH (5) Energy Cost Adjustment Current ECA Current ECA If the sum of the Customer Facility Charge, the On-Peak Demand Charge, and the Off-Peak Demand Charge is less than $1.00 per KVA of installed transformer capacity, $1.00 per KVA of installed transformer capacity will be the monthly charge. Mnqr~ ~ Rn.t.nqC~ The minimum monthly billing shall be the higher of the following: (1) The sum of the Customer Facility Charge, the On-Peak Demand Charge, and the Off- Peak Demand Charge; or (2) A charge of $1.00 per KVA of installed transformer capacity. DRTRRMINATIONI OF ON-PF, AK DFZ, MANID The on-peak demand shall be determined by the KW demand supplied by the City during the fifteen (15) minute period of maximum use during the on-peak hours as recorded by the City's demand meter, but not less than one hundred percent (100%) of the maximum on-peak demand which occurred during the billing months of June through September in the twelve (12) months immediately preceding the current month. DRTRRMIN'ATION OF ON-PRAK DEMAND - C, OGRNRRATION IINITR NOT OPRRATING AND CIISTOIVYRR',q PRAK DID NOT CONTRIRIITR TO CITYLq ANNT IAI, gY.RTF. M PEAK If a customer's cogeneration unit(s) is/are off during peak hours, and the customer's peak did not contribute to the City's annual off-peak demand, and the cogeneration unit is one (1) MW or larger, then the nameplate rating of the customer's mt(s) shall be deducted from the peak demand. 37 The customer shall be charged the appropriate on-peak demand charges for the KW supplied by the City for the succeeding twelve (12) months. DFTI:~,RMINATION OF OFF-PFAK (RYRTFM) DEMAND The off-peak demand shall be determined by the sum of the KW demand supplied during the fifteen (15) minute period of maximum use as recorded by the City's demand meter, plus the KW nameplate rating(s) of the customers generator(s). In no event shall the off-peak demand be less than seventy percent (70%) of the maximin on-peak demand similarly determined during the billing months of June through September in the twelve (12) months immediately preceding the current month. DF. TFRMINATION O1~ NON-FMI~,RGFNCY ENERGY All energy supplied to customers whose generating units are less than one (1) MW capacity. DFTFRMINIATION OF lqMIq, RGFNC¥ FNFRGY Emergency energy is all energy supplied by the City during peak hours of operation to displace energy normally supplied by the customer's one (1) MW or larger mt. DFFINITION OR ONI-PFAI( 14OT 1R,q The City's on-peak hours, for the purpose of this rate schedule, are designated as being from 2:00 P.M. to 7:00 P.M. each Monday through Friday. DFFINITION OF OFF-PFA~ HOIIR.q The City's off-peak hours, for the purpose of this rate schedule, shall be all hours not designated as on-peak hours. SpFC. IAT. FACH JTIF.q All services which require special facilities in order to meet customer's service requirements shall be provided subject to the Special Facilities Rider. PR OR A TIONI O1~ 1 ITU JTY gill J,g (a) Billing for demand shall be calculated on a 30 day per month basis and prorated for longer or shorter billing periods using the following formula: Actual day~ in reading period 30 days x Customer Facility Charge 38 (b) Billing for demand shall be calculated on a thirty (30) day per month basis and prorated for longer or shorter bill'mg periods using the following formula: Achml day~ in reading period 30 days EN~R G¥ CI-IAR GR x KW Billing Demand x Rate Billing for energy shall be based on actual KWH consumption during the billing period. Formula: KWH in rate block x Rate per KWH in rate block CREDIT FOR F. NIF. RCtY DFJJV~.RF.D INTO CITY'S SYSTEM DIIRINTG OM=PEAK 1-101 IR S If Customer-produced energy is fed back into the City's system during on-peak hours, an amount equal to fuel cost calculated in accordance with Schedule ECA, as applicable to such energy is credited monthly, provided that Customer has paid the City for necessary added metering, protective and other equipment as determined by the City. CRF. DIT FOR F. NII~RGY DFJJVFRFJ') INTO CITY'S S¥STFM DIIRINIG OFF-PF. AK 1-101 IR S If Customer-produced energy is fed back into the City's system during off-peak hours, an amount equal to 70% of the billed ECA charge per KWH (for each KWH delivered hack into the City's system) will be credited monthly, provided that Customer has paid the City for necessary added metering, protective and other equipment as determined by the City. F. Ni~.RG¥ COST AFIJI LqT1V~.NIT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. SCHEDULE AF A TT-TT ~F~TTC~ ~T~J D (Effective 10/01/02) APpI .TC ATTONI Applicable to all electric service metered at one point for use to light specified areas for athletic events where such electrical use will not occur between the hours of 2:00 P.M. and 7:00 P.M. for the months of June through September. NII~,T MONTI41 .Y R ATI~. (1) Facility Char§e Single-Phase $20.20 / 30 days Three-Phase $30.30 / 30 days (2) Energy Charge ttilllng mnnth~ nfhme thrnugh ge?ember: 2:00 PM to 7:00 PM (Peak) 7.58¢ / KWH All Other Hours (OffPeak) 3.79¢ /KWH Billing mnnth.q nf Oetnher Ihrnugh May: All hours 3.79¢ / KWH (3) Demand Charge Billing mnnth.q of.h]ne through ,qep/emher: Peak (2:00 PM - 7:00 PM) $4.70 / KW All Other Hours (OffPeak) $1.11 / KW 1Flilling mnnth~ nf Oetnher/hrnugh May: All hours $1.11 / KW 40 (4) Energy Cost Adjustment Current ECA Schedule MINIMI IM 1~11 J,ING Facility Charge TYPE O1~ gRRVICR At the City's available secondary voltage and available phase. For use only between the hours of 7:00 P.M. and 2:00 P.M. fi:om June through September and all hours fi:om October through May. gPR~TAI, FAC. IT,ITII~.~ All services which require special facilities in order to meet customer's service requirements shall be provided subject to the Special Facilities Rider. PR or ATTON OF T TT1T,TTY l~TT J (a) Billing for the Facility charge shall be based on twelve (12) billings annually and prorated for longer or shorter periods using the following formula: Formula: Actual dav~ in readlnc* nerlnd - - - x Customer Facility Charge 30 days (b) Billing for demand shall be calculated on a thirty (30) day per month basis and prorated for longer or shorter billing periods using the following formula: Formula: Actnal da?q in reading perind x KW Demand x Rate 30 days ENERGY C~IqARG~ Billing for the energy charge shall be based on actual KWH consumption during the billing period. Formula: KWH in rate block x Rate per KWH in rate block RN~.~Ct¥ CO.qT AD.IT T,~TMRNT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. 41 SCHEDULE IDR TNTF)~ T~TrTAT, D F,,VFJ (Effective 10/01/02) AVAIl.Al:IH JTY This rider is available to the customers who receive service fTom Rate Schedules GSS, GSL, or TGS. APPT JCATTON This rider is available to electric service supplied at any one location. It is for firm electric service applicable to new and existing customers as described below, over a five-(5) year period. This rider is available to the following classes of customers: O) New customers whose electric service represents demand not previously served by the City at any location in the City's service area in the last twelve (12) months, where such metered demand will be in excess of 225 KVA or 200 KW, as estimated and mutually agreed upon by the Director of Electric Utilities and the customer. (2) Existing customers served under Rate Schedules GSS, GSL or TGS who increase their prior existing metered demand by 225 KVA or 200 KW. This increase shall be verified by comparing a three-month rolling average of the new level of demand to the prior demand averaged for corresponding months. During periods in which this verification method cannot be applied, the Director of Electric Utilities and the customer may develop a mutually agreed-upon formula to estimate the base and additional demand levels. NI~.T MONrl'fll.Y RAT~ The customer shall be charged under the appropriate applicable rate schedules with the exception that the monthly billing demand (For GSS and GSL) or system demand and on-peak demand (for TGS) will be adjusted in accordance with the following table: Time Parind Reduction to Billing Demand or gystem Demand CONTRA CT PF, R TOD The term of the contract will be for five (5) years. 42 First Year 50% Second Year 40% Th/rd Year 30% Fourth Year 20% Fifth Year 10% SCHEDULE EP (Effective 10/01/02) Application/Program ,qummary Denton Municipal Electric (DME) through this program, called "EnergySave", is offering cash payments as incentives in the form of rebates to customers who purchase and install high-efficiency air conditioners or heat pumps for new residential, existing residential or commercial facilities. This program will provide structure incentives in the form of rebates, in the mount of $500.00 per qualifying structure, to residential builders of single-family residences for meeting specific DME structure requirements. Satisfying these construction reqmr' ements will improve a residential structure's heating and cooling systems' operating efficiency. Apartments and multiple trait residential structures will qualify for the air conditioner rebates, but will not qualify for the structure incentive, if they meet the applicable EnergySave Program Guidelines. The EnergySave Program's objectives are primarily to reduce energy demand and consumption, thereby allowing the customers of Denton Municipal Electric to save dollars on their utility bills, reducing the peak load of the City of Denton's electric system, and promoting energy efficient heating and cooling. I. Qualification Guidelines for Equipment All installations must be for accounts served by the Denton Municipal Electric and must meet all applicable national, local, and manufacturers' codes and specifications. B. To qualify for equipment incentive, equipment must be new when installed. All equipment must be purchased. No leased or lease/purchased equipment will qualify for a cash rebate. D. Installations must be made by licensed contractors and/or dealers. go No rebate will be paid on a partial replacement of an air conditioner. The compressor, condenser and the evaporator coil must be replaced to qualify for a rebate. Payments for residential central cooling systems, which include apartments and mobile homes, will be limited to a capacity based on a minimum of 600 conditioned square feet per ton. The conditioned area in square feet is required on each residential central system request for payment. Any variance must be authorized on an individual basis and approved by the Denton Municipal Electric Marketing Division. 43 G. Incentives for new and retrofit equipment will be contributed to a purchaser or authorized homebuilder for qualifying equipment. Incentives will be paid upon verification of compliance with program guidelines. H. Requests for payment must be received by the Director of Electric Utilities within sixty (60) days of installation. I. Equipment and installation are subject to inspection by the City's Building Inspection Department before final approval for payment is issued. J. The EnergySave Program guidelines and payments are subject to change by Denton Municipal Electric without prior notice. K. Denton Municipal Electric may, at any time, discontinue the EnergySave Program without prior notice. II. Qualification Guidelines for Structure Incentive A. A residential structure incentive, in the amount of $500.00 per qualifying structure, is offered to a builder, developer or authorized agent after the following qualifications are met: I. Builder, developer or authorized agent must be enrolled in the Denton Municipal Electric EnergySave Program (EnergySave). 2. Builder must install a 1.5 ton or above central air conditioner or heat pmnp having a minimum efficiency rating of 12 SEER. 3. Install minimum of R13 wall insulation 4. Install minimum of R30 ceiling insulation 5. Ninety-percent (90%)of the total square footage of exterior glass must be double-glazed (double pane). 6. Seal and weather-strip exterior doors and windows. Includes caulking exterior toe plates and wiring/plumbing penetrations through the structure's exterior walls and ceiling. B. Structure Incentive for new homebuilders must also comply with the respective restrictions set forth in Guideline~ for g.a?iprnent Qnalifie. atlnnn, I. GENERAL PROCEDURES A. Application 1. Equipment- An application for equipment incentive must be completed and sent to 44 the Director of Electric Utilities within sixty (60) days of installation of new or replacement equipment. Participating dealers have application forms and will complete these forms for the purchaser. It is the purchaser's responsibility to see that the dealer completes the form and submits it to the Director of Electric Utilities. 2. Structure Incentive- To qualify for residential structure incentives, a builder/developer or authorized agent must be registered as an authorized Denton Municipal Electric EnergySave Authorized Builder. To become a recognized EnergySave builder, applicant must complete and submit a Denton Municipal Electric EnergySave Builder Application form to the Director of Electric Utilities. Applicant must also meet the requirements listed in the EnergySave Final Audit form listing the described construction requirements. Inspe~ons Installations of central air-conditioning systems will be inspected by the City's Building Inspection Department and must be approved before rebates will be processed. New structures will be randomly audited to insure adherence to the required energy efficient construction specifications. Payments to Participants 1. Equipment Retrofit (Existing residences) Cash payments will be made to the purchaser of the qualifying replacement equipment. Participating retail equipment dealers will receive a cash payment of $20 per unit for the sale of window units, central air conditioning systems, or heat pumps to offset their cost for properly filling out the applications for purchasers of retrofit equipment. 2. New equipment and stmcture incentive Program participants are responsible for submitting the correct informa- tion. The Utility Department will not issue any additional payment unless the payment was incorrect due to a mistake in processing by a City employee. The twenty dollar ($20.00) payments to dealers will be made only if they supply the qualifying equipment to the customer or builder who is paying for the installation of the equipment. Dealers and purchasers may be denied payment for failure to follow program guidelines such as: failing to supply correct square footage or SEER/EER figures; installing equipment which is not new; replacing part of a split system; or failure to fill out rebate forms properly. Payments will be made to customers who purchase and install new qualifying equipment. If a tenant purchases and installs qualifying equipment, the payment is made to the tenant. If the owner of rental property purchases and installs qualifying equipment, the payment is made to the owner. If the purchaser ora mobile or custom home selects and pays for a qualifying unit, the purchaser will receive the rebate. CENTRAL ELECTRIC AIR CONDITIONERS AND HEAT PUMPS Ao A new condensing unit with an inside evaporator coil will qualify if matched, as specified, in the current issue of the ARI Directory of Certified Air Conditioners and Air Source Heat Pumps and the unit meets the mi~irmlm ratings as specified in the 1998 EnergySave Program. If the unit is not in the current ARI Directory, the manufacturer's latest data approved for publication will be accepted. If the unit is not in the current ARI Directory or data approved for publication, the average of the high and low SEER/EER coil only, not including blower coil, will be accepted as listed in the current ARI Directory. Computer simulations may be used if ratings are not listed in the current AR[ Directory, provided the following criteria are met: Systems using mix-matched coils must meet all established program guidelines to qualify for a rebate. The computer simulations must be signed, certified, and dated by a registered professional engineer and an officer of the company making the subnfittal. The engineer who certifies a simulation must attest to the accuracy of the input data, the validity of the calculation procedure used, and that the results are in accordance with Department of Energy approved methodology. A complete set of the input data and an indication of the source of the data must accompany the simulated ratings. The simulated ratings must be based on the condensing unit's te.~ted combination as listed in the current ARI Directory or latest data approved for publication and identified by the correct model numbers of both the condensing unit and coil as listed in the current ARI Directory. Simulated ratings must not exceed 105% of the SEER rating of the tested system used as a base. An open file of computer simulations will be maintained at the Energy Management Office. Supplying erroneous ratings or data can lead to disqualification of those involved fi:om further program participation. C. Program Capacity and Payment Formula The maximum allowable BTU per hour capacity el/gible for a residential rebate is determined by dividing the square footage of the air-conditioned area by 600 and multiplying by 12,000. Example: The Program Capacity for an 1,800 square foot house is: 1:800 = 3.0 x 12,000 = 36,000 BTUH 600 The City will pay a rebate on a unit that meets program efficiency standards and is sized at 36,000 BTUH or less. Actual payment will be determined by dividing the BTUH of the installed unit (up to, and including the Program Capacity) by 12,000 and multiplying by the incentive. The incentive amounts and SEER ratings are referenced of the "1998 EnergySave Program: Methods Used in Det,mdning Equipment Efficiency and Eligibility," and are incorporated herein as if fully set forth at length: Example A: A person in a 2,100 square foot house installs a 42,000 BTUH central air conditioner with an SEER rating of 12.0. 2:100_ 3.5 x 12,000 = 42,000 Program Capacity 600 ~ = 3.5 x $100/ton = $350.00 Incentive 12,000 Example B:A person in a 2,400 square foot house installs a 60,000 BTUH central air conditioner with a SEER rating of 12.0. 2,t0fl = 4 x 12,000 = 48,000 Program Capacity 600 48.ooo = 4 x $100/ton = $400 Incentive 12,000 Example C: A person in a 2,400 square foot house installs a 60,000 BTUH central heat pump with a SEER rating of 12.0. 9.;400 _- 4 x 12,000 = 48,000 Program Capacity 600 48~000 = 4 x 12,000 Central Air Conclitioning Single-Phase (SEER) 12.0 Three-Phase (EER) 12.0 Single-Phase (SEER) 14.0 Three-Phase (EER) 14.0 Central Heat Pnm? Single-Phase (SEER) 12.0 Three-Phase (EER) 12.0 Single-Phase (SEER) 14.0 Three-Phase (EER) 14.0 Room Air Conclitionem 10.0 Room Heat lh~mp.q 10.0 Geothermal Heat P,,mp 12.0 (Waste heat reclamation device) $150/ton = $600 Incentive Minimum SEER/EER Rating $100 / ton*'~ $100 / ton $125 / ton $125 / ton $150 / ton $150/ton $175 / ton $175 / ton $50 / unit $50 / trait $500 / unit $150 / unit Refer to "1998 EnergySave Program: Methods Used in Determining Equipment Efficiency and Eligibility" For calculation purposes, one ton equals 12,000 BTUH 48 SCHEDULE MTR PRF, Mll ]]V[-~,FFII~IFJq(~¥ MOTOR RI~.~I ATR (Effective 10/01/02) APPT JCATTON/PROGR AM gT TMMARY The City of Denton Utility Department is offering cash payments to customers who purchase and install premium-efficiency motors and adjustable speed drives in facilities serviced by Denton Electric Utility. The program's objective is to reduce energy demand and consumption, thereby saving customers dollars on their utility bills and reducing the peak load of the City of Denton's electric system, thereby conserving energy and improving the power factor. PROGR AM GI IlDRI All installations must be for accounts served by the City of Denton Electric Utility and must meet all applicable national, local, and manufacturers' codes and specifications. o To qualify for a rebate, equipment must be new when installed. All equipment must be purchased. No leased or lease/purchased equipment will qualify for a cash rebate. Removed motors must be properly disposed of after inspection and not re-used with the Denton Electric Utility system. Method of disposal must be stated. The City will pay the rebate to the purchaser of the qualifying equipment upon verification of compliance with program guidelines. Equipment and installation are subject to inspection by the City's Electric Utility before final approval for payment is issued. Replacement motors must be the same horsepower or lower than the original motor. Exceptions must be approved in writing by the City's Eleclric Utility. Only motors 20 horsepower and above are eligible for the program. All information must be complete on the Motor Rebate Application in order for a rebate to be issued (see Motor Rebate Application). The Premium-Efficiency Motor Rebate program guidelines and payments are subject to change without notice. This program may be discontinued with prior notice, at any time by the City of Denton Electric Utility. 49 Rebates for the Premium-Efficiency Motor Rebate Program will be based on the following methodology: REPLACEMENT MOTORS: 1. The Denton Electric Utility staff will visit the site to determine the existing motor's efficiency. If the existing motor is non-operational, an estimate will be made. 2. The customer must provide all information on the rebate application concerning the proposed motor purchase. 3. A new motor must not exceed the horsepower of the existing motor without express written consent by the Denton Electric Utility, which consent shall be given only if the utility finds an increased efficiency. 4. The information concerning the existing and the proposed motors will be entered into the Motor Master software program to calculate the kilowatt (KW) or kilovolt amperes (KVA) savings yield. The calculation is based on horsepower, efficiency, RPM, and load information. 5. The KW or KVA yield will be multiplied times the rebate incentive amount of $100/KW or $90/KVA: KW yield x $100 / KW or KVA yield x $ 90/KVA 6. The Denton Electric Utility will to the site to verify installation, and following successful installation, a rebate check will be mailed to the customer. NEW MOTORS: New motors will follow the procedure outlined above for replacement motors but the efficiency comparison will be mede against a standard new motor, to be determined by the Motor Master software program used by the City, Department of Energy standards, or the Denton Electric Utility. ADJUSTABLE SPEED DRIVES: The Denton Electric Utility will visit the customer site to determine KW/KVA savings fi'om the proposed Adjustable/Variable Speed Drive. Those savings will be awarded on a $100/KW or $90/KVA basis. A watt-meter will be used before and atter installation. KW / KVA SAVINGS: Rebates in excess of $1,000.00 require advance approval of the Director of Electric Utilities. 5o SCHEDULE UPS T TNTNTF, RRTTpTTRT,F, pOWlqr ~TTpPT,¥ (Effective 10/01/02) AppT .ICATION Applicable to any customer who, by written agreement, receives service for an uninterruptible power supply for a computer or other electrical equipment. Uninterruptible Power Supplies provided by the City of Denton are of the standby type. NF, T MONTT-TT ,V' R ATF, (1) Facility Charge: 0 - 300 Watts Uninterruptible Power Supply 301 - 700 Watts Uninterruptible Power Supply 701 - 1,200 Watts Uninterruptible Power Supply (2) Installation Charge $7.80 / 30 days $14.90 / 30 days $31.85 / 30 days $25.75 For any Uninterruptible Power Supply other than above, the monthly customer charge will be based on the following formula: ( 1 ) Monthly Charge: 5% nf Annual lMnlnt~nnneo. C~nat 12 months PLUS 6% Anmml Reh~m nflnve,qtment 12 months PLUS 8% Interest on a 5 Year Life TYPE Og ~qFRvIcR The City shall furnish, install, maintain an automatically controlled alternating current power backup unit conforming to the City's standards and subject to its published rules and regulations. PAYM~,NT Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from date of issuance. 51 ~pFC]'AL FACTT All services which require special facilities in order to meet customer's service rcqukemonts shall be provided subject to the Special Facilities Rider. pR(3R ATT(3NT OF l TTTT,TTY RTT,T,~ (a) Billin§s for the Facility charge shah be based on twelve (12) billings annually and prorated for longer or sho~ter billing periods using the following formula: Formula: Ach]alday,q in reading perind x Customer Facility Charge 30 days 52 SCHEDULE ECA I~.NF, RGY CO,qT ADH I,~TMI:~.NT (Effective 10/01/02) F, NF, RO~¥ ~ORT AI"}II IR'TM~,NT All monthly KWH charges shall be increased or decreased by an amount equal to "X" cents per KWH, to be known as the energy cost adjustment (ECA). The ECA shall be computed during the last month of each fiscal year quarter (December, March, June and September) to be applied to the quarter mediately following. The City shall in no case change the energy cost adjustment more than once in any three (3) month period. The ECA shall be calculated using the following formula: ECA = Pro, et. ted energy en~qt for next quarter Projected KWH sales for next quarter In the event that actual plus estimated cumulative costs of fuel, variable costs of Texas Municipal Power Agency (TMPA) energy and purchased energy (excluding TMPA's fixed charges) are greater than or less than the actual and projected ECA revenues by $500,000 or more during the next quarter, the Director of Electric Utilities or her designate shall recompute the Energy Cost Adjustment and, with Public Utilities Board approval, may establish an ECA that collects or returns such difference over the next three month period. Such change in ECA shall be applied evenly to each month during the three-month period. 53 (I) (2) ~PtelAl, FAC~II JTll~,~ RmtR (Effective 10/01/02) All service shall be offered from available facilities. If a customer service characteristic requires facilities and devices which are not normally and readily available at the location which the customer requests service, then the City shall provide the service subject to paragraph (2) of this rider. The total cost of all facilities reburied to meet the customer's load characteristics which are incurred by the City shall be subject to a special contract entered into between the Utility and the customer. This contract shall be signed by both parties prior to the City providing service to the customer. 54 (Effective 10/01/02) (1) APPLICATION Service provided herein is applicable to electric service billed under the other, vise applicable tariffed rate for service supplied to a facility of a "four year state university upper level institution, the University of North Texas, Texas Woman's University or college" as provided in Section 2.2141, under Subtitle E, Title II, Public Utility Regulatory Act of 1995. CREDIT TO MONTHLY BILL OR MONTHLY RATE Customer's monthly bill and/or monthly rate shall be in accordance with the applicable rate schedule(s) in effect on July 1, 1997, shall be reduced by 20%. '`Base Rates" are defined as the sum of the following charges: the Facility Charge, the Demand Charge, the Energy Charge and/or the adjustment for short/extended read cycles of the applicable rate schedules. Base rates do not include recovery of fuel and purchased energy costs, including, without limitation, energy cost adjustments (the ECA mte or its successors). All other charges and calculations in the rote schedule are unchanged. The rates initially established on July 1, 1997 by this Discount Rider shall be the maximum or ceiling rate charged to the University of North Texas ("UNT") and Texas Woman's University ("TWU") during the term of the seven (7) year power supply a~eement. If during the term of the power supply agreement any applicable tariffed "Base Rates" are reduced by more than 10%, the discounted rates for UNT and TWU will be reduced such that the discounted "Base Rates" are always at least 10% below any tariffs that will otherwise be applicable to the universifies. At no time shall tariffed base rate decrease cause the rate discount to the two (2) universities to decrease by more than 50% over the term of the power supply agreement. 55 SF_C_2_IO_12~ That the Assistant City Manager for Utilities is hereby authorized to expend funds to issue rebates to electric utility customers in the form and type set forth in Schedules EP and MTR, as the use of more efficient air conditioning compressors, heat pumps, motors, and thermal storage is in the best interest of the City of Denton, as such will reduce the peak-load and conserve energy, which are public purposes of the City. SECTION 3. That all ordinances or parts of ord'mances in force when the provisions of this ordinance became effective which are inconsistent, or in conflict with the terms or provisions contained in this ordinance are hereby repealed to the extent of any such conflict. .qF. CTION 4_ That if any section, subsection, paragraph, sentence, clause, phrase or word in this ordinance, or application thereof to any person or circumstances is held invalid by any court of competent jurisdiction, such holding shall not affect the validity of the remaining portions of this ordinance, and the City Council of the City of Denton, Texas, hereby declares it would have enacted such remaining portions despite any such invalidity. gF. CTION 5. That this ordinance and the rates herein adopted shall become effective, charged, and applied to all electric services rendered by Denton Municipal Electric, and all energy usage by customers of Denton Mtmicipal Electric on and after October 1, 2002; and a copy of said rates shall be maintained on file in the Office of the City Secretary. 3¢ dayo &CC' er ,:00:. EULINE BROCK, MAYOR ATTEST: JENNIFER WALTERS, CITY SECRETARY APPROVED AS TO LEGAL FORM: HERBERT L. PROUTY, CITY ATTORNEY 56