Loading...
2000-167 ORDINANCE NO ~7~000-/~ '7 AN ORDINANCE PROVIDING FOR THE EXPENDITURE OF FUNDS FOR EMERGENCY PURCHASE OF REPAIRS REQUIRED DUE TO FIRE DAMAGE TO THE SPENCER STATION, #3 COOLING TOWER IN ACCORDANCE WITH PROVISION OF STATE LAW EXEMPTING SUCH PURCHASES FROM REQUIREMENTS OF COMPETITIVE BIDDING, AND PROVIDING AN EFFECTIVE DATE (PURCHASE ORDER 05460 TO MIDWEST TOWERS, INC IN THE AMOUNT OF $316,538) WHEREAS, state law and ordinance reqmre that certmn contracts requmng an expenditure or payment by the C~ty m an amount exceeding $15,000 be by competmve b~ds, except ~n the case of pubhc calamity where ~t becomes necessary to act at once to appropriate money to reheve the necessity of the c~tlzens of the c~ty, or ~n case of unforeseen damage to pubhc property, machinery or equipment, and, WHEREAS, the C~ty Manager has recommended to the C~ty Council that ~t ~s necessary to purchase goods or semces due to the following emergency conditions outhned m the memorandum attached hereto, mcorporated hereto by reference, NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS ~ That the City Council hereby determines that there ~s a pubhc calamity that makes it necessary to act at once to appropriate money to reheve the necessity of the cmzens of the city, or to prowde for unforeseen damage to pubhc property, machinery or eqmpment, and by reason thereof, the following emergency purchases of materials, equipment, supphes or serwces, as described m the "Purchase Orders" referenced here~n and on file ~n the office of the Purchasing Agent, are hereby approved PURCHASE ~ 'vENDOR ~dOUNT 05460 MIDWEST TOWERS, INC $316,538 ~ That because of such emergency, the C~ty Manager or designated employee ~s hereby authorized to purchase the materials, eqmpment, supphes or sermces as described ~n the attached Purchase Orders and to make payment therefore ~n the amounts therein stated, such emergency purchases being m accordance w~th the provls~ons of state law exempting such purchases by the C~ty from the reqmrements of competmve b~ds ~ Thru ordinance shall become effective ~mmedmtely upon ~ts passage and approval EULINE BROCK, MAYOR ATTEST JENNIFER WALTERS, CITY SECRETARY 0~ 4~0 ~MERo'-Z~ o ~,~- o ~ANO~ 2°°° ATTACHMENT o_ ~. ~ ATTACHMENT ° 0. ~ o o O ATTACHMENT 1 o o o o PAGE 1 OF 5 ATTACHMENT 2 Midwest Towers, Inc. "Quality and Serwce wtth Integnty" Denton Municipal Electric Denton, Texas Subject' Denton Mumclpal Generating Stabon Unit 3 Coohng Tower Repair M~dwest Towers' Pror;osal No MT-R-2'I01 SCOPE OF WORK BASE BID Remove and replace as required fire damaged drift ehm~nators ard support Install Brentwood CDX-150 PVC drift ehm~nators Ne,v drift ehm~nators will be supported on custom manufactured PV3 drain boards/shelf supports 2 HOT WATER BASINS--EAST SIDE Remove a mlmmum of 2 basins decks 100% and apprommatey 10% of the third cell for inspect~on and replacement Replace f,e damaged hot water bas~ns, curbs, d~strtbubon boxes, nozzles, 2" x 6" basin joists, 2" x 6" m~dbay nailers, 2" x 4" jo~st supports and 4" x 4" stub post full length for outboard handrails Install new 2" x longitudinal lo,st supports, 2" x 6" transverse jo~sts and 2" x m~dbay nailers The new 2" x 6" transverse joists will be spliced ,~t the original splice block location Install new 3/4" CCX pressure treated plywood decking and 2" x 10" longitudinal and transverse basin curbs Each basin w~ll be sealed around the perimeter wllh chamfered 2" x 2" and caulked with Vulkem Mastic to preve~t leakage New custom manufactured d~strlbut~on boxes w~ll I:e installed at each emstmg valve location Also ~ncluded w~ll be neN polypropylene target nozzles New walkways w~ll be Installed tl'e full length of damaged area New hand and knee ra~ls w~ll I:e installed on the new 4" x 4" stub post ~ _ ~,~to~ Tel (405) 224-4622 · Fax (405) 224-4625 PAGE 2 OF 5 ATTACHMENT 2 Denton Mumc~pal Electric Scope of Work Page 2 3 SPLASH FILL Remove fire damaged fill as required and install new fill The exa~,t quantity will have to be determined after the header p~pe and basra decking is removed for inspection For now, 20% replacement (~f the top 6' of 2 cells is estimated and considered hberal The fill w Il be Opts-Bar (emst~ng) ~n kind replacement New slotted 2" x L" members w~ll be installed to support the emstmg w~re hangers 4 HOT WATER BASIN COVERS Install hot water basra enclosures as required to replace f~re damaged area Included will be new bolted 2" x 6" transverse jo~,,t supports and nailed 2" x 4" longitudinal jo~sts Enclosures w~ll be B oz, 5 33" corrugated fiberglass Area between fandeck and handrails will remain open for vent[labon Included w~ll be ~11 necessary attaching hardware New access ladders w~ll b~ ~nstalled from the fandeck down to the hot water basra walkway', The enclosure roof w~ll be framed for ladder access to walkways 5 PLENUM PARTITION WALLS New ~,'~" plywood plenum parht~on walls w~ll be ~nstalted as necessary to replace fire damaged walls 6 STRUCTURAL REPAIRS Our first concern ~s to safely remove all fire damaged mechamc,~l equipment as they pose the greatest r~sk due to their extreme weight Professionals should accomplish th~s as soon as possible to prevent their falling and causing further damage Replace as necessary all Redwood structural members damaged by fire Again, th~s w~ll be a precarious endeavor g~ven the conditions for scaffolding and safely replacing certain member', Although we have completed numerous projects s~rn~lar to th~s each ~n ~t's own way ~s unique and requires our safety people ATTACHMENT 2 PAGE 3 OF 5 Denton Munm~pal Electric Scope of Work Page 3 (Structure cont ) working closely w~th our construchon superwsors m staging a project such as this All members that have been compromised by burmng or charring w~ll be replaced All vertical 4x4 columns w~ll be replaced down to their original splice point All diagonal braces will be replaced ~n whole, full length All horizontal structural members w~ll be replaced ~n their entirety, to original manufacturers sphcmg point,, Sphcmg of any other structural member w~ll be completed to ongmal points, includ~ng those that enter longitudinally through a partition wall Included will be #1 Structural Redwood, pressure treated, and new 304 SST attaching hardware 7 FAN DECK Replace ~n kind as required, Redwood 2 x 6 tongue & groow decking A mm~mum of 2 complete cells w~ll be replaced ~n their entirety, and apprommately 25% of the third cell Included w~th decking is all new jo~sts, jo~st supports, bridging for fan stack', quake blocks for stacks, and all necessary 304 SST attachln;I hardware Th~s would be a very convenient opportumty to replace the balanc9 of a very poor fan deck We can d~scuss th~s further ~f desired 8 DISTRIBUTION PIPING Supply and install 30" O FRP distribution p~p~ng from riser flang(,, into the forth bay of third cell At that juncture p~pmg w~ll be cut an:i new p~pe glassed to emstlng p~pe Included will be new p~pe, fiel:l fiberglass wrap k~t, valve stub flanges, rebuilding of emstmg valve,,, new wood d~stnbut~on boxes, d~stnbutlon saddle supports, and all necessary gaskets and hardware Also ~ncluded will be new FR ~ grating for access walkway between valve d~str~button boxes PAGE 4 OF 5 ATTACHMENT 2 Denton Mumc~pal Electric Scope of Work Page 4 g Remove endwall casing only as required to access and replace burnt structure Thru w~ll be apprommately 8 feet downward from fan deck, or to first full sheet below damage New casing will ~'e installed after structure is replaced New casing w~ll be 12 ounce PSF, 4 2" corrugated FRP Each vertical seam will be caulked lo prevent leakage and attached to new structure w~ll SST Each na~l w~th neoprene SST bonded washers Included ~n tbs item ~s cost of manhft TOTAL NOT TO EXCEED BASE BID I $194,410 00 ] ADDITIVES TO BASE BID J 0 FAN STACKS In two -(2) cells, remove fire damaged fanstacks and supply hen r~gld fiberglass fanstacks manufactured by M~dwest Towers The throat diameter w~ll be 22' and the ~nlet d~ameter will be 25' Tl~e height will be 14' Also Included w~ll be access door, removab e wewport, external motor couphng shaft guard and stainless ste,)l attaching hardware Segments from ex~st~ng stack w~ll be salvaged for repair of third cells damaged panel Also ~ncluded ~s FRP k~t lo repmr small hole in bottom of one panel Labor for ~nstallabon s ~ncluded ~n base bid est[mate Total Cost Per Fan Stack I $ 9,894 00 Each ATTACHMENT 2 PAGE 5 OF 5 Denton Mumclpal Electric Scope of Work Page 5 11 FANS In two -(2) calls, remove fire damaged fans and install new Hudscn model APT-22H-6 blade fan assembhes New assembhes ~ncluce 6 each FRP fan blades, galvamzed hubs bored for Marley gear~, FRP center seal d~sc, and all necessary attaching hardware Labor for ~nstallat~on ~s ~ncluded m base b~d estimate Total Cost Per Fan Assembly I $ 6,885 00 Each 12 DRIVE SHAFTS In two -(2) cells, remove fire-damaged drive shafts Supply Addsx composite fiber shafts, model LRH400270SS Labor f(~r ~nstallat~on ~s ~ncluded ~n base b~d estimate Total Cost Per Shaft I $1,854 O0 Each 13 GEAR REPAIRS Inspect for heat damage and routine repair emstmg senes 32 gear reducers as follows Routine repair ~ncludes new beanngs, o~1 seats sh~ms, and bolts Sandblast exterior cases, and apply 3 coats epoxy paint Reassemble gear perform operational check and test run Labor for ~nstallabon ~s ~ncluded ~n base b~d estimate New series 32 gears would cost apprommately $14,000 each ant are 4 weeks ARO [ Total Routine Repmrs I Per Gear I $ 8,970 00 Each 14 MOTOR & GEAR SUPPORT FRAMES Remove frames from South two cells Inspect for heat d~storhcn and rehab~hty Provide new frames ~f required Included w~ll be ~11 necessary 304 SST attaching hardware Labor for ~nstallat[on s included m base btd estimate I"Total Cost Per New Frame ] $ 2,950 O0 Each