Loading...
HomeMy WebLinkAbout060520 Friday Staff Report City Manager’s Office 215 E. McKinney St., Denton, TX 76201  (940) 349-8307 OUR CORE VALUES Integrity  Fiscal Responsibility  Transparency  Outstanding Customer Service MEMORANDUM DATE: June 5, 2020 TO: The Honorable Mayor Watts and Council Members FROM: Todd Hileman, City Manager SUBJECT: Friday Staff Report I. Council Schedule A. Meetings 1. Public Utilities Board Meeting on Monday, June 8, 2020 at 9:00 a.m. via video/teleconference – City Council Work Session Room. 2. Historic Landmark Commission on Monday, June 8, 2020 at 3:00 p.m. via video/teleconference – City Council Work Session Room. 3. Work Session of the City Council on Tuesday, June 9, 2020 at 1:00 p.m. via video/teleconference – City Council Work Session Room. 4. Cancelled - Mobility Committee Meeting on Tuesday, June 9, 2020 at 9:00 a.m. in the City Council Work Session Room. 5. Cancelled - Agenda Committee Meeting Wednesday, June 10, 2020 at 2:30 p.m. in the City Manager’s Conference Room. 6. Hotel Occupancy Tax and Sponsorship Committee on Thursday, May 23, 2020 at 10:00 a.m. via video/teleconference – City Council Work Session Room. II. General Information & Status Update A. Pending Council Requests Work Session Topics – There are NO items scheduled for discussion during the June 9 City Council work session. Staff contact: Stuart Birdseye, City Manager’s Office B. COVID-19 Testing at Nursing Homes – The Denton Fire Department concluded testing in Denton on May 29. 746 total residents and staff were tested at four nursing facilities (both Good Samaritans, The Vintage, and Senior Care) last Thursday and Friday. Results from those tests should be received by the County Health Department and disseminated to the nursing facilities soon. Pilot Point Fire Department also requested the Denton Fire Department assist with testing the Pilot Point Care Center. This testing was completed on Tuesday, June 2 to 103 total residents and staff. In all, the Fire Department tested 849 persons in 3 days. Staff will submit the expenses that were incurred for reimbursement. Staff contact: Kenneth Hedges, Fire C. COVID-19 Expense Reimbursement – During the June 2 City Council Meeting, staff received a question regarding the Federal Emergency Management Agency (FEMA) reimbursement submittal timeframe. To be eligible for reimbursement, expenses must be submitted within 60 days of the end of the national disaster declaration, accord ing to the Texas Department of Emergency Management (TDEM). Staff Contact: David Gaines, Finance D. 8 Can’t Wait Initiative – On May 25, George Floyd, an unarmed person of color, died while in the custody of officers of the Minneapolis Police department. This death has stirred a national debate for the need to review and improve the equitable and proper use-of-force by public safety entities across the nation. Locally, residents have led and joined in demonstration and protests to express their outrage at the death of George Floyd, expressing their concern that the use-of-force by police on persons of color across the United St ates has been committed in a discriminatory and disproportionate manner that has resulted in injury or death, and the desire to have such policies and practices of the Denton Police department Reviewed. On June 4, Council Member Armintor forwarded an email from a resident and staff have received other articles regarding the “8 Can’t Wait” initiative by Campaign Zero. Campaign Zero examined the use of force policies of 91 of America’s 100 largest cities’ police departments to identify the policies that establish restrictions on how and when police use force against civilians. Out of that research, the initiative identifies 8 measures to be included in Department policy in the effort to reduce violent encounters between police and citizens. Currently, very few cities in the U.S. have reported adopting all eight measures. The Denton Police Department has very intentionally and deliberately continued to review and update all General Orders (policies) in place prior to 2018. Within these general orders, the Denton Police Department has adopted eight (8) of the measures (see attached) prescribed by Campaign Zero. The ongoing process to refine and improve the all General Orders continues today. To see an updated version of current Denton Police Department General Orders, go to https://www.cityofdenton.com/en-us/all-departments/public-safety/police and click on the link “General Orders (Updated Monthly)” under Documents and Forms. Staff contact: Frank Dixon, Police E. Loop 288 Property Virtual Neighborhood Meeting – On Thursday, June 4 at 6:30 p.m., the City hosted a virtual neighborhood meeting to discuss the proposed zoning change of 909 N Loop 288 from Suburban Corridor (SC) to Public Facilities (PF). Staff shared with the attendees an overview of the proposed zoning change and potential uses being considered for the proposed center. There was a total of 11 attendees that participated in the virtual meeting, some asked questions while other s just observed. Questions included: 1) What will the City do to prevent those visiting the center from traveling through my neighborhood?; 2) What are the plans for the area between the center and 2 my neighborhood?; 3) Was there other locations identified for the proposed center?; and 4) How will the City prevent individuals that are living unshe ltered from camping near the center in wooded areas or on other properties? Staff responded to all the questions and provided the attendees with a timeline of upcoming public hearings where they can provide their comments and ask additional questions. Staff Contact: Sarah Kuechler and Dani Shaw, Community Services F. Downtown Fence/Wall – Several Council Members have requested information about the temporary fence/wall at 108 N. Locust St. in downtown (former Mini-Mall). This site has remained undeveloped since the fire in December 2017, and the wood wall was put in place as a temporary solution. Since the time of the fire, staff has worked with the property owners to secure the fence when damaged/fallen as a result of severe weather. This week, staff provided several options to the property owners to provide a more permanent solution and re medy the wind damaged wall. Staff will continue to work with the property owners to mitigate the hazard. Staff contact: Scott McDonald, Development Services G. Weekly Unemployment & Business Update – Staff is working to assemble, review, and analyze unemployment and labor data each week. Staff will provide ongoing updates throughout the COVID-19 pandemic as data is made available. • U.S. Department of Labor (DOL) o DOL released its weekly unemployment report on Thursday, June 4. The full report is available here. • Bureau of Labor Statistics (BLS) i. The BLS released the May Employment Situation Summary on Friday, June 5. The full report is available here. • Texas Workforce Commission (TWC) o TWC has created a UI Claimant Dashboard to provide updated graphical representations of data and datasets for download. The dashboard is available here. o April local unemployment data was released on the Texas Labor Market Information (www.texasLMI.com) system on May 22. The next release is scheduled for June 19. o TWC also provides data on weekly unemployment claims filed and how the claim was received. The chart with data as of May 29 is below. • U.S. Census Bureau o The U.S. Census Bureau is conducting experimental Small Business Pulse Surveys to measure the changes in business conditions on small businesses throughout the country. o Data is now available for the week of May 24-30. o The results of the survey are available here. Staff contact: Jessica Rogers, Economic Development 3 H. Utilities Management Study – Denton Utilities are required by the Section 12.08(f) of the City Charter to conduct a management study in an interval not to exceed 10 years. The Charter specifies the study shall be conducted by a competent management consulting or industrial engineering firm and that the report and recommendations shall be made public. The purpose of conducting management studies is to provide a thorough examination of major elements of Utilities operations to ensure Utilities are adhering to processes required by the charter and organization, are being managed efficiently, and are cost effective. The last management studies were completed in 2008-2009. On July 24, 2018 the City Council adopted an Ordinance awarding a contract with NewGen Strategies and Solutions, LLC (NewGen) for a Utility Management Study for Electric, Water, and Wastewater. The study was conducted during 2018-2019, and the draft findings were presented to the Public Utility Board on Feb 24, 2020 and the City Council on March 2, 2020. The draft report was then comp leted, although some delays occurred due to the COVID-19 pandemic. The final report is attached. Staff continues to work on initiatives to address the findings and recommendations of the report. Staff contact: Kenneth Banks, Utilities Administration I. Library Internet Access – During the May 19 City Council Meeting, Council Member Armintor requested information about how citizens can access Denton Public Library wi-fi internet outside library facilities. Library staff added information about facility wi-fi range to the library’s website on the COVID-19 response page and shared the information on library social media channels on May 20. Denton Public Library also submitted a grant application with the Texas State Library and Archives Commission for the compet itive TSLAC CARES Act Grant. The library’s request is for funding to expand library wi-fi internet into the parking lots at all three library locations. If funded, community members would be able to access wi- 4 fi 24/7 while parked in library public parking lots. In addition, the library is requesting funding for additional mobile wi-fi hotspots for circulation. Additional mobile wi-fi hotspots would reduce wait times as the library’s existing 30 hotspots are so popular and have a continual wait list of 5-15 patrons waiting for hotspot access. If Denton Public Library’s application is approved for grant funding, the TSLAC CARES Grant funding would be available in July or August 2020. Library users also now can make appointments to access library computers or bring their own devices to access library wi-fi inside library facilities as part of the library’s Phase 2 reopening plan, which started Monday, June 1. The first appointments began Tuesday, June 2. Staff contact: Jennifer Bekker, Library J. Wildflower Patch Mowing – On June 1, Council Member Briggs forwarded a resident concern about a wildflower patch on Sherman Dr. that was mowed over recently. This wildflower area was inadvertently mowed by a new City contractor. Staff contacted the contractor to review t he map that was given to them showing the areas that should be mowed. Staff reached out to the resident to attempt to replant some seed now and will help again this fall to try to reinstitute some wildflowers in the future. Additionally, this contractor notified staff that they were not prepared for a workload of this nature and terminated their contract. These parcels will be going out to bid again and will be presented to the Council later this summer for consideration. Staff contact: Gary Packan, Parks and Recreation K. Update on Denton Women’s Interracial Fellowship Monument Project – At the January 28 City Council meeting, Council Member Meltzer presented a request for consideration of a monument to the Denton Women’s Interracial Fellowship (DWIF). The Council directed the item be reviewed and considered by the Public Art Committee (PAC). The PAC reviewed the item at their March 5 meeting and approved to place the project on their work plan so that they could consid er funding for the project later. In May 2020, the Texas Commission on the Arts (TCA) released their applications for the Arts Respond – Cultural District Project grant program. The PAC, as the primary board for the City’s cultural district, is e ligible to apply for the TCA grant program. Although there are multiple public art projects in the works, the monument to the DWIF was the only current project eligible for submission by the PAC to TCA, so staff worked with the PAC and the Greater Denton Arts Council to develop an application, project budget, and narrative for submission. At the June 4 PAC meeting, the committee recommended approval of the application and requested Council approve a letter of support. A resolution approving the application and the letter of support will be on the June 9 City Council agenda for consideration. Staff contact: Jessica Rogers, Economic Development L. Hinkle Drive Roundabout – On May 19, Council Member Briggs requested that staff assess the lighting at the new roundabout at Hinkle Dr. after a sign had been run over. Staff visited the sight last week and determined short- and long-term solutions to resolve the concern. First, reflective pavement markers have been installed on the inside and outside of the roundabout lanes which will allow a vehicle’s headlights to illuminate the roundabout edges when they shine on the reflectors. Long -term, Capital 5 Projects is developing a schedule with DME to install streetlights at this intersection. Staff contact: Brian Jahn, Capital Projects M. Signal Timing – On June 2, Mayor Pro Tem Hudspeth requested that staff assess the signal timing at the intersection of Locust St. and US 77/Elm St. and determine whether a flashing yellow (yield) light would be better suited for this site. Staff looked at the timing and detection of this signal and updated the timing to make it turn green sooner when opposing traffic is not present. Staff does not recommend a flashing yellow arrow for the southbound right -turning movement, as it would create an unsafe condition due to the lane geometry of the intersection. Staff contact: Brian Jahn, Capital Projects N. Upcycling Plastic Buckets – On May 29, Council Member Briggs forwarded a resident suggestion about upcycling plastic five-gallon buckets to be used for distributing DynoDirt or for use at the ReUse Store. Unfortunately, contractual and safety issues prevent the City from attempting to segregate this mat erial from the recycling stream once it is collected. The City contracts with a third party to manage and recycle materials collected from Denton residents and commercial entities. Pursuant to the contract, our process has the exclusive right to manage t he recyclable material collected. Because there is revenue involved, it is incumbent upon the City to deliver as much empty, clean, and dry programmatic material as possible. From a safety standpoint, scavenging (the search for and collection of anything usable from discarded waste) of material from within dumpsters or the working face of the landfill is extremely dangerous and contrary to industry best practices. All Landfills have an anti-scavenging policy. The solid waste industry is the fifth most dangerous profession as listed by the Department of Labor based on number of deaths. It is estimated that several people are killed each year at landfills and material recycling facilities due to the removal of objects from discarded material. The safest, and cleanest mechanism, to obtain materials for upcycling is from the generators directly. While some may have a policy that prohibits distribution, many businesses are happy and willing to segregate and distribute buckets and other items at the request of patrons. Upcycling is the reuse of discarded objects or materials in such a way as to create a product of higher quality or value than the original. Moving forward, upcycling will be a component examined as part of the upcoming Solid Waste Management Strate gy. Staff contact: Brian Boerner, Solid Waste and Recycling O. Orr Street Repairs – On May 26, Council Member Briggs forwarded a resident concern that Orr Street was sinking near the intersection with Locust. The next day, May 27, a crew from the Streets Department completed a patch on the street, and staff assessed the underground utilities to verify the cause of the pavement failure. Staff used their CCTV camera down the sewer line at the intersection, and found no issues with the pipe, leading staff to believe that the issue was soil settling over the pipe, which is not uncommon for a pipe nearing 20 feet. Staff will continue monitoring the area, but do not anticipate this being a continued issue. Staff contact: Daniel Kremer, Public Works 6 P. Proposed Park Property in Rayzor Ranch East – In April of 2019, Parks and Recreation presented City Council the proposed development of potential park property located in Rayzor Ranch. The 9.86-acre parcel of green space was to be developed and dedicated to the City with both land and improvements. The presented improvements consisted of the linear trail, trees, landscaping, mounding, signage, and lighting. At this time, per the City park land dedication and development ordinance, the development, as proposed, is required to dedicate a minimum of 6.14 acres of park land as well as $311,995 for park development. During the meeting, the City Council provided feedback with potential ideas for the new park. Some of the ideas were integrated, such as spacing for food trucks, wildflower areas, trees, and shaded areas. At this time, some of the suggestions provided by Council will not be in the initial plan due to budgetary restrictions. Suggested ideas from Council include an interactive fountain, elevated stage, and terraced seating. The development group did have several conversations regarding potential opportunities with the Denton Explorium Museum. On November 19, 2019, Allegiance Hillview received a developer agreement for review and feedback. Numerous communications have been sent to the developer requesting feedback on the agreement. Since this date, it has been the desire of Parks and Recreation staff to provide the developer agreement to City Council. Staff intends to present a proposed development agreement as soon as the agreement is finalized. The developer has been working on the construction of the park and has made significant progress. The developer has already installed the grading, drainage, irrigation, sod, landscaping, trees, and the trail. Per estimates provided by Allegiance Hillview, the cost of the park is estimated at over $1,000,000. These construction costs well exceed the amount of required park development fees that the residential projects with Rayzor Ranch East would generate. Any improvement made above this amount is not eligible for any such payment or reimbursement from the City. Additio nally, the developer continues to construct the parcel in good faith to provide enjoyable park space for the neighborhood and the City. Staff contact: Gary Packan, Parks and Recreation Q. Atlas Road Repairs – On May 27, Council Member Briggs requested information about the status of street repairs on Atlas Rd. Repairs on this road are anticipated to begin within the next eight months, as the construction on Hercules needs to be complete before beginning on Atlas. Atlas Rd. will be repaired by in-house crews (highlighted in red on the map below) and all other streets in the neighborhood are part of the 2019 Bond package (highlighted in blue). Staff contact: Daniel Kremer, Public Works In-House Construction Schedule • Currently Under Construction: Masch Branch, Kerely • Next on Schedule: Rockwood, Royal, Mistywood, Woodhaven • Awaiting Atmos Clearance: Edgewood Place, Northwood Terrace, Atlas 7 R. Virtual Yankee Doodle Parade – Parks and Recreation is reorganizing the annual event into an online parade video, which will premiere on Facebook on July 4. Anyone who would like to participate is asked to submit a picture or short video/animation (30 seconds or less with no music) o f their version of a float. Participants are asked to have fun and be creative. There will be awards for multiple categories, including Most Patriotic Baby, Pet, Vehicle, Yard, and more. All entries must be submitted by June 14. Visit www.dentonparks.com for more information and to register. Staff contact: Keanna Stallings, Parks and Recreation S. Virtual Liberty Run – The 22nd Annual Liberty Run 5K and 1-Mile Walk is becoming a virtual run this year. Registration is free, or $12 for a T -shirt. Participants should complete their run or walk by July 4. Runners and walkers can share pictures of themselves in festive out fits and be entered to win $25 gift cards. For more information and to register, visit www.cityofdenton.com/virtualreccenter. Staff contact: Jennifer Eusse, Parks and Recreation III. Upcoming Community Events and Meetings A. Events All City-sponsored events and programs are suspended until further notice. B. Community Meetings All City-sponsored meetings are also suspended until further notice. 8 IV. Attachments A. Denton PD 8 Can’t Wait Chart ......................................................................... 10 B. Denton Organizational Assessment ................................................................... 11 V. Informal Staff Reports A. 2020-055 Riney Road Water Site .................................................................... 275 B. 2020-056 Forestar-Rayzor and Drury Tract 4 .................................................. 279 C. 2020-057 2019 Water Loss Report.................................................................. 283 VI. Council Information A. Council Requests for Information .................................................................. 306 B. Council Calendar ........................................................................................... 307 C. Draft Agenda for June 16 ................................................................................ 310 D. Future Work Session Items ............................................................................ 318 E. Street Construction Report ............................................................................. 319 9 Denton Police Department " 8 Can't Wait Chart"NameGeneral Order #300Requires De‐EscalationHas Use of Force Continuum Bans ChokeholdsRequires Warning Before ShootingRestricts Shooting At Moving CarsRequires Exhaust All Means Prior to Duty to InterveneRequires Comphrehensive ReportingResponse to ResistanceYes (300.3.1) Yes* (300.4.2) Yes (300.4.4)Yes (300.5) Yes (300.5.1) Yes (300.4) Yes (300.2.1) Yes (300.6.1)10 REPORT | May 2020 Utility Management Study City of Denton, Texas 11 NEWGEN STRATEGIES AND SOLUTIONS, LLC Table of Contents TOPIC PAGE PROJECT OVERVIEW 4 EXECUTIVE SUMMARY 7 SURVEY RESULTS 13 UTILITY MANAGEMENT STUDY –KEY FINDINGS & RECOMMENDATIONS –Electric 23 –Water / Wastewater 37 –Shared Services 53 Communications 55 Finance 64 Infrastructure 93 People 107 Process 122 Strategy 126 FRANCHISE & PAYMENT IN LIEU OF TAXES –Electric 130 –Water / Wastewater 138 COMPARATIVE ANALYSIS (BENCHMARKING) 147 –Electric 167 –Water 215 –Wastewater 233 APPENDICES –Appendix A –Persons Interviewed 250 –Appendix B –Documents Reviewed 252 –Appendix C –Follow-up Survey 259 2 12 NEWGEN STRATEGIES AND SOLUTIONS, LLC Glossary of Terms 3 A&G Administrative & General ACM Assistant City Manager AE Austin Energy AMI Automated Metering Infrastructure APPA American Public Power Association AWWA American Water Works Association BPUB Brownsville Public Utilities Board BTU Bryan Texas Utilities CAFR Comprehensive Annual Financial Reports CAPEX Capital Expenditure CIP Capital Improvement Plan CMO City Manager's Office DEC Denton Energy Center DME Denton Municipal Electric DRRP Denton Renewable Resource Plan DSCR Debt Service Coverage Ratio EMO Energy Market Operations ERCOT Electric Reliability Council of Texas FCU Fort Collins Utilities FERC Federal Energy Regulatory Commission FTE Full-Time Employee GEUS Greenville Electric Utility Service GFOA Government Finance Officers Association GFT General Transfer Fund GP&L Garland Power & Light IOU Investor-Owned Utility KFA Key Focus Areas kWh kilowatt hour LUS Lafayette Utility Systems MAOP Maximum Allowable Operating Pressure MG millions of gallons NBU New Braunfels Utilities NERC North American Electric Reliability Corporation OPEX Operating Expenses PILOT Payment in Lieu of Taxes PMO Project Management Office PUB Public Utility Board PURA Public Utility Regulatory Act REU Redding Electric Utility ROI Return on Investment RPU Riverside Public Utilities SAIDI System Average Interruption Duration Index SAIFI System Average Interruption Frequency Index SCADA Supervisory Control and Data Acquisition SOC System Operations Center SPP Southwest Power Pool TCOS Transmission Cost of Service TMPA Texas Municipal Power Agency TRE Texas Reliability Entity W/WW Water/Wastewater 13 PROJECT OVERVIEW Scope & Project Objectives TOC 14 NEWGEN STRATEGIES AND SOLUTIONS, LLC PROJECT OVERVIEW •NewGen Strategies & Solutions (NewGen) was retained to perform a Management Study of the City of Denton Utilities (Electric, Water and Wastewater) per City requirements every ten years. •The project consisted of review of pertinent documents, interviews with Utility and City staff, CMO and PUB/Council Surveys. •NewGen performed an overall Organizational Assessment to review what is working and areas needing improvement in addition to specific review and analysis of the following areas defined in the Scope of Work. NOTE: This Study was conducted utilizing data from 2017 and interviews held in 2018. 5 15 NEWGEN STRATEGIES AND SOLUTIONS, LLC Scope of Work •Governance Review •Organizational Structure Review •Financial Practices Analysis •Development Policies Review •Support Services Review •Franchise & Payment in Lieu of Taxes Comparison and Impact Analysis •Communications Review •Public Relations Review •Planning Review •Budget Process Review –Operations & Capital Budgeting •Rate Development & Administration Review •Other Significant Issues Effecting Utility Management Identification and Review •Significant Operational Cost Components Comparative Analysis 6 16 EXECUTIVE SUMMARY TOC 17 NEWGEN STRATEGIES AND SOLUTIONS, LLC Executive Summary •General Findings –The Management Study is performed every ten years to meet a requirement of the City Charter to perform a general management review of the City’s utilities. –NewGen reviewed the last two reports from 1998 and 2008 and found that the reports, while apparently using the same scope of work tended to focus on certain topics more than provide a “general survey of the utilities” -a holistic view of the organization to identify what is working and what needs improvement. The 1998 report focused on electric utility deregulation and the 2008 report focused on the cost of shared services. –The ten year timeframe seems to be too long between studies as much change can take place between studies. –Each of the three utilities have had leadership changes. •NewGen Recommendations –Develop a Scope for future Management Studies that provides a general review of the utilities similar to the holistic organizational assessment approach NewGen performed for this Study. –Even if conducted internally, consider performing a Management Study Interim Review every five (5) years tracking progress on the implementation of actionable recommendations from the previous Management Study; this may also provide a fresh general review of the utilities again to identify what is working and what needs improvement. 8 18 NEWGEN STRATEGIES AND SOLUTIONS, LLC Scorecard – DME 9 Lack of formal strategic planning process Monitor rates for competitive position and deregulation pressure EMO Center needs better technology to more fully automate its process (in progress) GIS & Work Order systems work very well Substation & Distribution engineering & ops processes appear to be well documented High caliber & well- trained team Lack of a dedicated rates position(s) Several vacant senior positions Solid financial policies & procedures Extremely strong liquidity and reserves position Lack of an Integrated Resource Plan Evaluate DEC financial viability on on-going basis Finance reporting has shifted to the CFO Beneficial TCOS recovery Debt service ratio is below Fitch guidelines Formal corporate communication function Misunderstanding & miscommunications Community awareness of DME value is low Best in class facilities Consistent site design standards improve serviceability 19 NEWGEN STRATEGIES AND SOLUTIONS, LLC Actionable Priorities – DME 10 ACTION RECOMMENDATION CRITICAL SUCCESS FACTOR CLICK FOR MORE INFOCOMMUNICATIONFINANCEINFRASTRUCTUREPEOPLEPROCESSSTRATEGY1.Hire a General Manager a)Hire a GM / Assistant GM that exhibits the following qualities: Experience managing an electric utility Top tier leadership qualities INFO 2.A Utilities rates group is needed comprised of DME and Finance staff for the rates it charges a)Need long term rate plan that contemplates multiple scenarios with impacts from Council decisions such as rate decreases and major capital purchases b)Finalize the development of the 10-year financial forecast c)Review rates structure to ensure adequate fixed cost recovery INFO 3.Communicate with stakeholders regarding concern over viability of Denton Energy Center a)Review financials, supply contracts, opportunities to improve the financial viability of the DEC and develop a short-term and long- term mitigation plan b)Conduct or update an integrated resource planning study c)Improve communication with stakeholders regarding the DEC INFO INFO 4.Create a formal corporate communication function a)Begin a formal stakeholder engagement process that is ongoing and comprehensive b)Document “rules of engagement” that form the basis of governance interaction and authority limits INFO 5.Communicate with staff to build trust bi- directionally a)Utility leadership must model the trust inwardly and outwardly and communicate the why for changes being made in a way that is clear and consistent over time INFO INFO20 NEWGEN STRATEGIES AND SOLUTIONS, LLC Scorecard –Water & Wastewater 11 Lack of formal strategic planning process Identify need for and acquire source water to meet future demand Processes need to be inventoried and documented Lack of system or process automation limits efficiency / effectiveness Outsourcing / contractual options underutilized (mowing) Key positions to be filled Relatively new in certain Divisions Bench Strength Several vital positions lack needed backup Organizational structure needs to be more clearly defined Solid financial policies & procedures Extremely strong liquidity and reserves Strong record of communicating changes and ensuring financial stability Finance reporting has shifted to the CFO Capital project funding/accounting getting more focus Debt service ratio is below 2.1 median Fitch guidelines for Water Formal corporate communication function Misunderstanding & miscommunications Lack of community engagement to educate on rate pressures WATER Clean & well maintained Appears to be lacking some appropriate SCADA technology WASTEWATER Lack of integrated technology Issues with cleanliness One safety concern 21 NEWGEN STRATEGIES AND SOLUTIONS, LLC Actionable Priorities –Water & Wastewater ACTION RECOMMENDATION CRITICAL SUCCESS FACTOR CLICK FOR MORE INFOCOMMUNICATIONFINANCEINFRASTRUCTUREPEOPLEPROCESSSTRATEGY1.Create a formal corporate communication function a)Begin a formal stakeholder engagement process that is ongoing and comprehensive b)Document “rules of engagement” that form the basis of governance interaction and authority limits INFO 2.Communicate the execution of capital planning a)Communicate and coordinate system planning methodology and goals throughout the organization INFO 3.Communicate with staff to build trust bi-directionally a)Utility leadership must model the trust inwardly and outwardly and communicate the why for changes being made in a way that is clear and consistent over time INFO INFO 4.Develop standard operations procedures/technical specifications a)Develop procedures and specifications that define the "Denton Way" of operating, maintaining the utility infrastructure and technical specifications for any and all equipment to be installed INFO INFO 5.Develop succession plan a)Develop a formal utility wide succession plan working with City and Utility Human Resources staff INFO 6.A Utilities rates group is needed comprised of the Utilities and Finance staff a)Need long term rate plan that contemplates multiple scenarios with impacts from Council decisions such as rate decreases and major capital purchases b)Finalize the development of the 10-year financial forecast INFO INFO 12 22 SURVEY RESULTS City Council & Public Utilities Board TOC 23 NEWGEN STRATEGIES AND SOLUTIONS, LLC PUB and City Council Survey •In January 2019, NewGen surveyed the PUB and City Council. –The survey asked, “What is your view of how the Utility is operated? –Answer choices and the numeric value NewGen assigned to each are below: •Two primary observations emerged from these weighted responses. 1.All Measures Were Better than “Good” 2.The PUB consistently rated each area lower than City Council. •We recommend the City survey each group with the same questions annually or biennially for comparison purposes. 14 Scored Area City Council PUB Water Operations 4.33 3.33 Wastewater Operations 4.60 3.67 Electric Operations 4.00 3.67 Utilities Staff 4.00 3.5724 NEWGEN STRATEGIES AND SOLUTIONS, LLC City Council •Managing Growth •Environmental Issues •Homelessness •Affordable Housing •Mobility Public Utilities Board •Planning for Growth •Aging Infrastructure •Homelessness •Affordable Housing •Downtown parking/streets/traffic What do you believe are the top 3-5 issues facing the City of Denton? 15 25 NEWGEN STRATEGIES AND SOLUTIONS, LLC City Council •Competitive Rates •Environmental stewardship •Sufficient capacity for Growth •Replacement of aging Infrastructure •Better customer service Public Utilities Board •Affordability of services •Meeting green energy targets affordably •Growth putting strain on ability to serve •Age of infrastructure •ROI of DEC What do you believe are the top 3-5 issues facing the City of Denton Utilities? 16 26 NEWGEN STRATEGIES AND SOLUTIONS, LLC City Council •Good to Excellent* –Impressive, knowledgeable leadership –Ability to respond quickly to water leaks –Not many complaints. Effective customer service –Not enough focus on conservation –Costs seem higher for certain customer classes Public Utilities Board •Good* to Excellent –Water quality good, well monitored –Improvements to system staying ahead of growth –Improved communication on water quality achievements –Good balance on improvements needed vs. rate impacts –Better future planning needed What is your view of how the WATER utility is operated? 17 * Majority view 27 NEWGEN STRATEGIES AND SOLUTIONS, LLC City Council •Good to Excellent* –Impressive, knowledgeable leadership –Ability to respond quickly to leaks without much impact –Facilities appear well run –Concern over rate calculations Public Utilities Board •Good* to Excellent –Recognized as leader in wastewater industry –Improvements to system staying ahead of growth –Utility is perceived to have no known major issues –Few hiccups recently; being proactive with info to the public is beneficial –Better future planning needed What is your view of how the WASTEWATER utility is operated? 18 * Majority view 28 NEWGEN STRATEGIES AND SOLUTIONS, LLC City Council •Poor to Good to Excellent* –Gas Plant is a huge financial liability –Moving smartly toward 2020 100% renewable goal yet competitively priced –Deposit policy needs to be evaluated –New management has performed well, transparent vs. closed approach Public Utilities Board •Good* to Excellent –Plan for DEC could have been better planned and executed –Morale seems to be low –Recognized as one of the best electric utilities by APPA –Well managed, diversified energy sources providing low cost power; good planning for growth –Being managed with greater transparency and efficiency What is your view of how the ELECTRIC utility is operated? 19 * Majority view 29 NEWGEN STRATEGIES AND SOLUTIONS, LLC City Council •Good to Excellent –City Council had an even split of their view of the Utilities’ Staff –Some customer service complaints on being friendly but mostly good –Lineman are very knowledgeable, conduct themselves well and have won awards –Control room staff very good –Deposit policy needs to be evaluated Public Utilities Board •Good* to Excellent –Good people concerned about losing them –Staff gives good presentations and has been responsive to Board requests –New DME General Manager has strong financial and operational background; good at conveying complex topics in simple terms –Despite all the changes over last few years overall experience, knowledgeable and organized –Energy Services group good at managing risk for the utility –Hard working with intent to serve citizens of Denton but get caught in politics What is your view of the UTILITIES’ STAFF? 20 * Majority view 30 NEWGEN STRATEGIES AND SOLUTIONS, LLC City Council •Continue road reconstruction and resurfacing •Develop downtown Denton, Parks, mobility and open space master plan •Continue strong management of fiscal resources •Up to date status on capital projects i.e. streets for citizens •Address homeless issue Public Utilities Board •Improve roads, congestion •Attract businesses to bring better paying jobs to Denton •Improve coordination of projects to complete in a more timely manner •Streamline/eliminate bureaucracy, empower staff •Address homeless issue What are the top 3-5 items that can be implemented to improve the City? 21 31 NEWGEN STRATEGIES AND SOLUTIONS, LLC City Council •Plan for long-term water system needs; wastewater system needs •Communication plan for day to day capital repair projects •Continue to educate public on financial commitments and budgets •Evaluate rates and deposits •Encourage conservation Public Utilities Board •Improve the planning and execution of water and wastewater projects •Improve employees morale •Ensure proper planning for future capacity needs •Achieve 100% renewable goal affordably •Better communication with residents on projects •Address the ROI of DEC What are the top 3-5 items that can be implemented to improve the City’s Utilities? 22 32 UTILITY MANAGEMENT STUDY Denton Municipal Electric TOC 33 NEWGEN STRATEGIES AND SOLUTIONS, LLC Study of DME •Denton Municipal Electric (DME) Utility has undergone significant change in the last several years specifically related to: –Personnel and process changes –The addition of its own generation facilities with the construction of the Denton Electric Center (DEC); and –Some trust and credibility concerns. •NewGen’s scope did not include an evaluation of the changes themselves, but the Management Study does evaluate the effect of these changes and the state of the Utility overall. •The Utility has experienced changes in governance and senior leadership. DME continues to work through a “re-setting” stage. •With clear direction from City Council and CMO, DME is redefining the “Denton Way” with its own new leadership, processes and sharing of services with the City. 24 34 NEWGEN STRATEGIES AND SOLUTIONS, LLC Study of DME (cont’d) •Overall, based on the documents reviewed, interviews conducted with DME and City staff, CMO, Council/PUB surveys, NewGen believes DME is operationally very well run and we did not find any “red flags” requiring immediate attention. •NewGen has several findings and recommendations concerning the ongoing operation of DME which are summarized in the Executive Summary and detailed throughout the report. 25 35 NEWGEN STRATEGIES AND SOLUTIONS, LLC What’s Working at DME CITY •Good training programs available for employees FINANCIAL •Cost savings after ERCOT settlement setup INFRASTRUCTURE •DEC is running well and operated by a good team •Robust ability to handle load growth ORGANIZATION •One of the better organizations to work for-good people concerned about the customers PEOPLE •Good people/team capable of doing excellent work •Apprenticeship Program PROCESS / CITY •Working with Finance to setup ERCOT settlement process/ accounts RELIABILITY / COMPLIANCE •Electricity Reliability and Compliance is Good (NERC certified). DME has experienced very high levels of reliability and even sustained significant 20 MW peak jump in the last year. •The 2018 SAIDI/SAIFI ratings were good to excellent. TECHNOLOGY •Best-in-class tools and technology provide protection for the system and building blocks for design and construction 26 36 Key Findings & Recommendations Denton Municipal Electric TOC 37 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations Key Issue Description Recommendation Click for More Info COMMUNICATIONCommunication Need to improve communication with other City departments. a)Recommend monthly meetings with each City department the Utilities interface with to discuss the list of outstanding items and action items for each until the next meeting. Once better communication is established may be able to move to bi-monthly or quarterly meetings. INFO Formal corporate communication function Communication to external stakeholders has led to misunderstandings. a)Begin a formal stakeholder engagement process that is ongoing and comprehensive. b)Document “rules of engagement” that form the basis of governance interaction and authority limits. INFO Silos/Need for Improved Coordination Silos exist between parts of DME internally. a)Suggest internal departmental head/ manager meetings bi-weekly or monthly to increase collaboration and coordination across all levels of DME. INFO INFO Issues between Engineering and Operations There seems to be a disconnect between Engineering and Operations overall which is affecting the efficiency and coordination of these two groups of DME. a)Some of the issues may be simply personality differences but suggest engineers spend more time in a formalized field training program and operations staff work with engineering on completing O&M procedures; look at potential team building activities as well to improve relations. INFO INFO 28 38 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations Key Issue Description Recommendation Click for More Info COMMUNICATIONLack of formal corporate communication function Communication to external stakeholders has led to misunderstanding and miscommunication regarding DME strategies and objectives negatively impacting DME’s reputation within the community and its relationship with the City. a)Begin a formal stakeholder engagement process that is ongoing and comprehensive. b)Document “rules of engagement” that form the basis of governance interaction and authority limits. INFO Governance Issues Concerns about council members either contacting staff members directly for information or work to be performed. a)All requests from Council to utility or city staff needs to go through the City Manager's office.INFO 29 39 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info FINANCEConcern over viability of Denton Energy Center There continues to be stakeholder concern regarding long term financial viability of the DEC. a)Review financials, supply contracts, opportunities to improve the financial viability of the DEC and develop a short-term and long-term mitigation plan. b)Conduct or update a supply optimization study. c)Communicate the results of the supply optimization study to stakeholders. INFO INFO Form Utilities rates group A Utilities rates group is needed comprised of DME and Finance staff. It is our understanding from staff that this is in progress. The Energy Cost Adjustment (ECA) is not currently being used as a true tracker of fuel/energy costs. a)Finalize the development of the 10-year financial forecast including capability to run multiple scenarios and analyze rate impact b)Review rates structure to ensure adequate fixed cost recovery c)Decide as a body what the policy regarding ECA will be going forward. INFO Long-term forecasting The Utilities Financial Strategies document reviewed suggest an annual 20-year pro forma be completed, but NewGen was unable to identify or review any 20-year financial plans. a)Although we understand the Utilities Financial Strategies document suggests a 20-year pro forma to be completed, at this time of market volatility we see no benefit of forecasting beyond 10 years. INFO Working capital for Enterprise Funds While DME meets GFOA guidelines, reserve targets may need to be increased to allow for larger shifts in energy pricing, especially if hedging strategies will involve any long positions. a)Evaluate the need to increase target reserves. b)Consider updating policies to address the DEC debt payments similar to its TMPA debt reduction strategy. INFO Capital planning DME has adequately planned for load growth and has focused intently on planning for reliability in recent years. a)Communicate and coordinate system planning methodology and goals throughout the organization INFO 30 40 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info FINANCECapital planning DME has adequately planned for load growth and has focused intently on planning for reliability in recent years. a)Communicate and coordinate system planning methodology and goals throughout the organization INFO Concern over viability of Denton Energy Center There continues to be stakeholder concern regarding long term financial viability of the DEC. a)Review financials, supply contracts, opportunities to improve the financial viability of the DEC and develop a short-term and long-term mitigation plan. b)Conduct or update an integrated resource planning study. c)Communicate the results of the integrated resource planning study to stakeholders. INFO INFO Debt service coverage is below Fitch median of 2.1 Fitch uses guidelines to assign debt ratings in order for the Utilities to improve debt ratings they will need to improve debt service coverage. a)Consider changing policy to match Fitch guidelines INFO INFO INFO INFO 31 41 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info PEOPLEMorale At the time of the survey, staff morale was low presumably due to changes and negative perception of DME. However, recent conversations with staff indicate that morale has improved. a)Utility leadership must help the organization continue to move to a better future by establishing clear goals and objectives. b)Increase communication from DME Senior Management to all levels of the organization. Small groups or one-on-one communication in effort to qualm the uncertainty and repudiate the notion that everyone is on probation. INFO Succession Planning Succession Planning is not formalized at the utility level and largely left up to each manager to figure out and keep up with. a)Develop a formal utility wide succession plan working with City and Utility Human Resources staff. INFO Turnover/ resource allocation/ acquisition At the time of the survey, a number of positions were open in the organization. a)Evaluate need for open positions and set timetable to eliminate or fill if needed. Suggest an overall FTE analysis of the organization (in progress). INFO Resistance to change At the time of the survey the organization was struggling with change. a)Leadership should meet one-on-one and with departments to explain the overall strategic plan once developed and routinely to help staff understand changes facing the organization. INFO 32 42 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info PEOPLELack of trust The lack of trust is bi-directional and is outward looking in (other city departments, Council, CMO) and inward looking out from DME towards the same groups. a)Utility leadership must model the trust inwardly and outwardly and communicate the why for changes being made in a way that is clear and consistent over time. INFO Morale Morale is low amongst staff due to changes and negative perception of DME in last few years. a)Utility leadership must help the organization "right itself" and move on to a better future by establishing clear goals and objectives. INFO Issues between Engineering and Operations There seems to be a disconnect between Engineering and Operations overall which is affecting the efficiency and coordination of these two groups of DME. a)Some of the issues may be simply personality differences but suggest engineers spend more time in a formalized field training program and operations staff work with engineering on completing O&M procedures; look at potential team building activities as well to improve relations. INFO INFO Silos/Need for Improved Coordination Silos exist between parts of DME internally. a)Suggest internal departmental head/ manager meetings bi-weekly or monthly to increase collaboration and coordination across all levels of DME. INFO INFO 33 43 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info PEOPLE (cont’d)Lack of communication Need for better communication with other City departments especially with the advent of more services being moved from the utility to City departments i.e. IT, Procurement, Transportation, etc. a)Recommend monthly meetings with each City department the Utilities interface with to discuss the list of outstanding items and action items for each until the next meeting. Once better communication is established may be able to move to bi-monthly or quarterly meetings. INFO Lack of Succession Planning Succession Planning is not formalized at the utility level and largely left up to each manager to figure out and keep up with. a)Develop a formal utility wide succession plan working with City and Utility Human Resources staff.INFO Turnover/ resource allocation/ acquisition Turnover is up and a number of positions are open in the organization that have not been filled. a)Evaluate need for open positions and set timetable to eliminate or fill if needed. Suggest an overall FTE analysis of the organization. INFO Resistance to change Overall the organization is struggling with change and not accepting either changes that have occurred or are to come. a)Leadership should meet one-on-one and with departments to explain the overall strategic plan once developed and routinely to help staff understand changes facing the organization. INFO 34 44 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info PROCESSProcedures and Technical Specifications need to be completed, staff trained and published to all parts of DME Procedures and technical specifications exist in various degrees of completeness focused on new construction primarily and are not found in one comprehensive manual. a)Review existing procedures and technical specifications and assign owners to complete for operations and maintenance as well as new construction at direction of General Manager; once complete train employees and ensure accessibility to procedures by all staff. INFO STRATEGYLack of Strategic Planning/ Overall Planning Continual need for strong leadership, better communication and utility level strategic and operational planning. a)Recommend DME go through an externally facilitated strategic planning process to develop a roadmap for utility operations for the next 3-5 years followed by monthly meetings to ensure the plan is being implemented across the organization. b)Recommend performing formal Strategic Planning process at least every 5 years. INFO 35 45 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info PROCESSProcedures and Technical Specifications need to be completed, staff trained and published to all parts of DME Procedures and technical specifications exist in various degrees of completeness focused on new construction primarily and are not found in one comprehensive manual. a)Review existing procedures and technical specifications and assign owners to complete for operations and maintenance as well as new construction at direction of General Manager; once complete train employees and ensure accessibility to procedures by all staff. INFO STRATEGYLack of Strategic Planning/Overall Planning Overall need for strong leadership, better communication and utility level strategic and operational planning so staff knows the plan before taking action. a)Recommend DME go through an externally facilitated strategic planning process to develop a roadmap for utility operations for the next 3-5 years followed by monthly meetings to ensure the plan is being implemented across the organization. b)Recommend performing formal Strategic Planning process at least every 5 years. INFO 36 46 UTILITY MANAGEMENT STUDY Denton Water and Wastewater Utilities TOC 47 NEWGEN STRATEGIES AND SOLUTIONS, LLC Study of Water & Wastewater Utilities •Denton Water and Wastewater utilities have undergone significant change in the last several years specifically related to: –Personnel, organizational structure and process changes –Lack of execution with respect to capital planning –Large amounts of capital set aside for projects that have not been started or completed has created trust and credibility concerns •NewGen’s scope did not include an evaluation of the changes themselves, but the Management Study does evaluate the effect of these changes and the state of the Utilities overall. •The Utilities have experienced changes in governance and senior leadership. The Utilities working through a “re-setting” stage. •With clear direction from City Council and CMO leadership, the Utilities are redefining the “Denton Way” with its own new leadership, processes and sharing of services with the City. 38 48 NEWGEN STRATEGIES AND SOLUTIONS, LLC Study of Water & Wastewater Utilities (cont’d) •Overall, based on the documents reviewed, interviews conducted with the utilities and City staff, CMO, Council/PUB surveys, NewGen believes the water and wastewater utilities are operationally sound and we did not find any “red flags” requiring immediate attention to address. •NewGen has several findings and recommendations concerning the ongoing operation of the utilities which are summarized in the Executive Summary and detailed throughout the body of the report. 39 49 NEWGEN STRATEGIES AND SOLUTIONS, LLC What’s Working at Water & Wastewater ORGANIZATION •Good place to work •Loyal staff PEOPLE •Good people who enjoy working here PROCESS •Development of Project Management Office (PMO) •More data driven focus INFRASTRUCTURE •Limited wastewater spills •Award-winning drinking water quality 40 50 Key Findings & Recommendations Denton Water and Wastewater Utilities TOC 51 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations Key Issue Description Recommendation Click for More Info COMMUNICATIONFormal corporate communication function Improve communication to external stakeholders a)Begin a formal stakeholder engagement process that is ongoing and comprehensive b)Document “rules of engagement” that form the basis of governance interaction and authority limits INFO Communication Improve communication with other City departments. a)Recommend monthly meetings with each City department the Utilities interface with to discuss the list of outstanding items and action items for each until the next meeting. Once better communication is established may be able to move to bi-monthly or quarterly meetings. INFO Execution of capital planning The Utilities have adequately planned for growth and has focused intently on planning for reliability in recent years. a)Communicate and coordinate system planning methodology and goals throughout the organization INFO 42 52 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations Key Issue Description Recommendation Click for More Info COMMUNICATIONLack of formal corporate communication function Communication to external stakeholders has led to misunderstanding and miscommunication regarding the Utilities’ strategies and objectives negatively impacting the Utilities’ reputation within the community and its relationship with the City. a)Begin a formal stakeholder engagement process that is ongoing and comprehensive.INFO Governance Issues Several complaints of council members either contacting staff members directly for information or work to be performed. a)All requests from Council to utility or city staff needs to go through the City Manager's office.INFO Public Relations Web Site –Water needs to tell the story better. Could not easily locate the miles of water system or source water on City’s page Capital Project Education a)Create a “Trophy Room” for achievements b)Add easily understood facts for utilities c)Improve capital project education using information, system metrics, and measures that demonstrate the need for capital projects and how these projects are improving the system INFO 43 53 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info FINANCENot spending capital set aside for projects Better project definition and project management needed to ensure only capital is set aside as needed for needed infrastructure projects. a)Outcome of a formalized capital planning process is a list of projects needed for the next 3-5 years with spend by year (in process). INFO Long-term forecasting The Utilities Financial Strategies document reviewed suggest an annual 20-year pro forma be completed. NewGen was unable to identify or review any 20-year financial plans. a)Consider creating a 20-year forecast to comply with the City’s policy and consider long-term rate strategies. b)Update financial forecast tools and long-term rate strategies. INFO Working capital targets for Enterprise Funds While the Utilities meet GFOA guidelines, given its substantial capital cash funding for capital repair and replacements, restricted and unrestricted working capital should be clearly delineated. a)Consider reviewing how restricted and unrestricted working capital are allocated to ensure balances are not improperly committed to future capital spending. INFO 44 54 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info FINANCEExecution of capital planning The Utilities have adequately planned for growth and has focused intently on planning for reliability in recent years. a)Communicate and coordinate system planning methodology and goals throughout the organization INFO INFO INFO Improve timeliness of capital spending Improve project definition and project management to ensure capital requirements reflect needed infrastructure projects within planning horizon. a)Outcome of a formalized capital planning process is a list of projects needed for the next 3-5 years with spend by year. INFO Lack of long-term planning The long-term financial forecast tool available to the Utilities is not utilized. a)Training should be provided on the use of the financial forecast modeling tools. b)Update financial forecast tools and long-term rate strategies. INFO Debt service coverage below Fitch median of 2.1 Fitch uses guidelines to assign debt ratings in order for the Utilities to improve debt ratings they will need to improve debt service coverage. a)Consider changing policy to match Fitch guidelines INFO INFO INFO INFO 45 55 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info FINANCE (cont’d)Working capital targets for Enterprise Funds While the Utilities meet GFOA guidelines, given its substantial capital cash funding for capital repair and replacements, restricted and unrestricted working capital should be clearly delineated to ensure no balances used to meet targets are committed for future capital spending. a)Consider reviewing how restricted and unrestricted working capital are allocated to ensure balances are not improperly committed to future capital spending. INFO Long-term forecasting The Utilities Financial Strategies document reviewed suggest an annual 20-year pro forma be completed, but NewGen was unable to identify or review any 20-year financial plans. a)Consider creating a 20-year forecast to comply with the City’s policy and consider long-term rate strategies. b)Update financial tools and long-term rate strategies. INFO Service delivery backlog The Utilities made efforts to save money through use of internal crews for capital projects. When project scheduling and internal staff capacity allows, this has benefited City rate payers. However, project timelines have suffered and/or projects are not completed. a)Consider further supplementation of internal crews to complete projects.INFO Utilities rates group Form a Utilities rates group comprised of Utilities and Finance staff. a)Need long-term rate plan that contemplates multiple scenarios with impacts from Council decisions such as rate decreases and major capital purchases. b)Finalize the development of the 10-year financial forecast INFO 46 56 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info PEOPLESuccession Planning Succession Planning is not formalized at the utility level a)Develop a formal utility wide succession plan working with City and Utility Human Resources staff.INFO Silos/Need for Improved Coordination Silos exist between water and wastewater and internally in each utility. Departments need to work together better to ensure better operations and reliability of services. Open communication is needed between the water and wastewater utilities and internally within each utility i.e. plant personnel and distribution system personnel a)Re-instate departmental head manager meetings bi- weekly or monthly to increase collaboration and coordination. b)Institute cross training sessions "lunch and learn" to educate departments on what each other does. INFO Need training program geared towards Water and Wastewater Utility operations and management With senior staff leaving, more formal training is needed to ensure there is no drop-off in staff's ability to operate, maintain and manage utilities. a)Review any existing training activities and develop formal training program for all water and wastewater staff pertinent to their job and the W/WW operations, maintenance and management principles overall. Fulfillment maybe through associations including AWWA or local Texas water/wastewater associations. INFO INFO Resource allocation/ acquisition At the time of the survey, a number of positions were open in the organization. a)Evaluate need for open positions and set timetable to eliminate or fill if needed. Suggest an FTE analysis of the organization be performed. INFO Resistance to change At the time of the survey, the organization was struggling with change. a)Leadership should meet one-on-one and with departments to explain the overall strategic plan once developed and routinely to help staff understand changes facing the organization (in process). INFO 47 57 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info PEOPLELack of trust The lack of trust is bi-directional and is outward looking in (other city departments, Council, CMO) and inward looking out from the Utilities towards the same groups. a)Utility leadership must model the trust inwardly and outwardly and communicate the why for changes being made in a way that is clear and consistent over time. INFO Silos/Need for Improved Coordination Silos exist between water and wastewater and internally in each utility. Departments need to work together better to ensure better operations and reliability of services. Open communication is needed between the water and wastewater utilities and internally within each utility i.e. plant personnel and distribution system personnel a)Re-instate departmental head manager meetings bi- weekly or monthly to increase collaboration and coordination. b)Institute cross training sessions "lunch and learn" to educate departments on what each other does. INFO Lack of communication Need for better communication with other City departments especially with the advent of more services being moved from the utility to City departments i.e. IT, Procurement, Transportation, etc. a)Recommend monthly meetings with each City department the Utilities interface with to discuss the list of outstanding items and action items for each until the next meeting. Once better communication is established may be able to move to bi-monthly or quarterly meetings. INFO 48 58 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info PEOPLE (cont’d)Resource allocation/ acquisition A number of positions are open in the organization that have not been filled. a)Evaluate need for open positions and set timetable to eliminate or fill if needed. Suggest an FTE analysis of the organization be performed. INFO Resistance to change Overall the organization is struggling with change and not accepting either changes that have occurred or are to come. a)Leadership should meet one-on-one and with departments to explain the overall strategic plan once developed and routinely to help staff understand changes facing the organization. INFO INFO Need training program geared towards Water and Wastewater Utility operations and management With changeover in senior staff leaving, more formal training is needed to ensure there is no drop-off in staff's ability to operate, maintain and manage utilities. a)Review any existing training activities and develop formal training program for all water and wastewater staff pertinent to their job and the W/WW operations, maintenance and management principles overall. Fulfillment maybe through associations including AWWA or local Texas water/wastewater associations. INFO 49 59 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info PROCESSStandard operations procedures / technical specifications The Utilities need more formalized operations procedures and technical specifications for infrastructure to reduce reliance on the knowledge of key individuals for such information. a)Develop procedures and specifications that define the "Denton Way" of operating, maintaining the utility infrastructure and technical specifications for any and all equipment to be installed. INFO Unnecessary emergency work due to improper system operations. Pressure management decisions may cause undue stress on pipes. Pay system is not setup appropriately for crews working days on end to fix leaks. a)Need overall system SCADA map at each water plant and in main office which shows water plants and T&D system network with system pressures and maintenance identified. Need to consider and resolve call in pay issues for emergency work through policy revision or review for staff understanding. INFO Lacking long term system planning Largely system planning is performed by the directors and outside engineering firms and while there are some notable items that have been developed i.e. Wastewater asset management, fundamental day to day system planning and modeling needs should have a more critical role in planning to ensure reliability, efficient operations, and improved capital planning. a)We understand Denton has hired one individual to lead up system planning and asset management group and is developing a team to perform system planning and modeling. Denton should also bring in experienced consultants different from the same ones involved with the Directors now to advise on critical issues in the next 1-3 years. INFO 50 60 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info PROCESSLack of standard operations procedures/technic al specifications The Utilities did not appear to have formalized operations procedures nor technical specifications for items being installed in the infrastructure but rely on knowledge of key individuals for such information. a)Develop procedures and specifications that define the "Denton Way" of operating, maintaining the utility infrastructure and technical specifications for any and all equipment to be installed. INFO Unnecessary emergency work due to improper system operations. Water leaks due to mismanagement of system putting too much stress on pipes which are cracking. Pay system is not setup appropriately for crews working days on end to fix leaks. a)Need one overall system map at each water plant and in main office which shows water plants and distribution system network with MAOP system pressures identified. Need to resolve pay issue for emergency work. INFO Lacking long term system planning Largely system planning is performed by the general managers and outside engineering firms and while there are some notable items that have been developed i.e. Wastewater asset management, fundamental day to day system planning and modeling needs to have a more critical role to ensure reliability of the system, correct operations of the system and proper capital planning. a)We understand Denton has hired one individual to lead up system planning and asset management group and is developing a team to perform system planning and modeling removing these duties from the general managers. Denton should also bring in experienced consultants different from the same ones involved with the GMs now to advise on the best path practically forward to mitigate critical issues in the next 1-3 years. INFO 51 61 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations (cont’d) Key Issue Description Recommendation Click for More Info STRATEGYStrategic Planning/ Overall Planning Overall need for strong leadership, better communication and utility level strategic and operational planning so staff is fully informed of the plan before taking action. a)Recommend the Utilities go through an externally facilitated strategic planning process to develop a roadmap for utility operations for the next 3-5 years followed by monthly meetings to ensure the plan is being implemented across the organization. b)Recommend performing formal Strategic Planning process at least every 5 years. INFO TECHNOLOGYTechnology could play a bigger role in the operations of the Utilities. The Utilities are operated very manually. There are numerous areas where technology could improve efficiency, data storage and access, and operations overall. No Technology Roadmap currently exists and items to be evaluated include: One System Control Room Map linked to SCADA systems, AMR/AMI, Automation Meter shop automation and more comprehensive GIS/Asset Management Data to support system operations, planning and modeling, etc. a)Develop a Technology Roadmap for each Utility including key stakeholders and IT staff to identify technology needs, priorities, timeframes and costs for the next 3-5 years as a starting place; execute Technology projects by priority once Roadmap is complete and agreed upon. INFO 52 62 Key Findings & Recommendations Shared Services TOC 63 NEWGEN STRATEGIES AND SOLUTIONS, LLC Key Issues & Recommendations Key Issue Description Recommendation Click for More Info PROCESSDelays in Purchasing Goods and Services New purchasing procedures, some resistance to change, overworked Purchasing staff are causing some delays in purchasing goods and services. a)Evaluate new Purchasing procedures for efficiencies and improvements, whether additional training is needed for users and need for short-term purchasing staff augmentation to get tasks completed to shave delays in purchasing processes. INFO Fixed Asset Accounting Fixed asset accounting problems stem from general project management deficiencies in planning and closing projects, and improper record-keeping can significantly affect rate options. a)Review new capital projects and project management procedures instituted by the PMO office to see if they address these issues. INFO INFO INFO INFO INFO FINANCEConcern over the impact of rate changes to long- term viability of the Utilities. Rate changes have been made recently by the City without reviewing the long-term financial forecast of the Utilities, which may affect the financial sustainability of the organization. a)Review and model the CAPEX and OPEX needs of the Utilities over the next 5-10 years to evaluate financial needs and impact to rates. INFO INFO INFO INFO INFO INFO INFO STRATEGYA Utilities rates group is needed comprised of the Utilities and Finance staff for the rates it charges Need long term rate plan that contemplates multiple scenarios with impacts from Council decisions such as rate decreases and major capital purchases a)Finalize the development of the 10-year financial forecast. b)Review rates structure to ensure adequate fixed cost recovery. INFO INFO INFO 54 64 COMMUNICATIONS TOC 65 NEWGEN STRATEGIES AND SOLUTIONS, LLC Common Thread •While the Utilities are well run operationally, the areas that need improvement have one common thread. •There is a lack of a formal corporate communication function which has led to misunderstanding and miscommunication regarding the Utilities’ strategies and objectives that have negatively impacted the Utilities’ reputation within the community and its relationship with the City. –The perceived lack of transparency regarding the DEC created a lack of trust and credibility of DME with the Council and the CMO’s office. –The public’s negative perception of the Utilities has impacted morale. 56 BACK 66 NEWGEN STRATEGIES AND SOLUTIONS, LLC Common Thread (cont’d) •Silos exist –Within DME (namely operations and engineering) due, in large part, to the lack of communication and coordination affecting overall efficiency of these functional areas. –Between and within the Water and Wastewater Utilities due, in large part, to the lack of communication and coordination creating redundancies between the Utilities. •Need for better communication with other City departments, especially with more services moving to the City, such as IT and Procurement. •Overall need for strong leadership throughout the organization, better communication and utility level strategic and operational planning so staff knows the plan before needing to take action. 57 BACK 67 NEWGEN STRATEGIES AND SOLUTIONS, LLC Governance •Several complaints of council members either contacting staff members directly for information or work to be performed. •Governance policies are not separate but listed under the roles and powers of each entity involved i.e. City Council, Public Utilities Board, City Manager etc. •Governance policies do not specifically spell out rules of engagement and/or communications or directives allowed between parts of City government i.e. Council, PUB, CMO’s office, City staff. •Recommend documenting “rules of engagement” that form the basis of governance interaction and authority limits i.e. Council, PUB cannot direct staff but must funnel all request through the CMO. 58 BACK 68 NEWGEN STRATEGIES AND SOLUTIONS, LLC Governance (cont’d) •City Manager has instituted rules of engagement to funnel all requests from Council, PUB through one City staff person (chief of staff) vs. Council, PUB members going to staff directly. •Large amount of data requests by Council and PUB taking City staff time and attention away from daily priorities. •Governance policies and rules of engagement should focus on keeping entities in their respective “swim lanes” i.e. Council, PUB-setting policy and review expenditures and CMO and staff executing those policies with sustainable strategic and tactical plans that survive regardless of changeover in Council and PUB membership. 59 69 Public Relations TOC 70 NEWGEN STRATEGIES AND SOLUTIONS, LLC Public Education and Advertorials •Web Site –Water needs to tell the story better •Could not locate miles of water system or source water easily on City’s page •Capital Project Education –2019 Construction Guide Looks Great, but focuses primarily on road-driven CIP –Video of Project Types, with timing and customer impacts 61 71 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Create “Trophy Room” for Achievements –Superior Drinking Water –Best Tasting Water at Texas Water •National if ranked –Wastewater Collection System Asset Management Program •Water Environment Association of Texas Sidney L. Allison Award Public Relations Recommendations 62 BACK 72 NEWGEN STRATEGIES AND SOLUTIONS, LLC Trophy Cabinet 63This Photo by Unknown Author is licensed under CC BY-NC-ND Water and Wastewater 3-Time Best Tasting Water Superior Public Water System Wastewater Sidney L Allison Award LEED Certified City APPA Excellence in Reliability 73 FINANCE TOC 74 Financial Practices Denton Municipal Electric TOC 75 NEWGEN STRATEGIES AND SOLUTIONS, LLC Financial Practices – Electric •DME needs to review the financial viability of the DEC with a view on the potential revenues needed to offset the increasing debt burden in 2019. –The DEC has been a lightning rod for public discussion and consternation in the community –It is a state of the art power plant but appears to be overbuilt and therefore more expensive for DME and Denton power needs •Concern of the impact of rate changes to long-term viability of the Utility •Suggest need for a Utility Rates group comprised of DME and Finance staff working together to assess financial needs of the organization and impact to rates •Transmission Cost of Service has a very healthy return at 28% 66 BACK 76 NEWGEN STRATEGIES AND SOLUTIONS, LLC Financial Policy Review •Annual Financial Strategies Review and Documented Path Forward –Denton has done a good job reviewing financial policies annually for DME as well as Water and Wastewater Funds •The utilities’ Financial Strategies and Practices were compared to the best practices promulgated by the Government Finance Officers Association (GFOA) •NOTES: –Key policies in this section are identified in “quotes” –Adherence to these policies is noted in BLACK font –Comments and recommendations are annotated in RED font 67 77 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison Area: Working Capital Targets for Enterprise Funds (Policy date February 2011) •“GFOA recommends that local governments adopt a target amount of working capital to maintain in each of their enterprise funds. Ideally, targets would be formally described in a financial policy and/or financial plan.” –DME meets this guidance. •DME may need to consider increasing the reserve targets to allow for larger shifts in energy pricing, especially if hedging strategies will involve any long positions. •DME may need to consider updating its policies to address the DEC debt payments similar to its TMPA debt reduction strategy 68 Reserve Type Target Working Capital 8% Operating Reserves 8-12% Operating Days 60-75 Days BACK 78 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison (cont’d) Area: Establishing Government Charges and Fees (Policy date February 2014) •DME uses a 1.25 debt service coverage ratio in setting rates –This is a good policy and helps ensure bond payments adequately covered. –Per policy, this may be supplemented by operating reserve funds to meet 1.25 •While City policy allows for this use of reserves, DME should be cautious in its application as some bond pledges may specifically prohibit use of reserves. •DME meets this best practice guidance, with only the one exception below: –“Utilize long-term forecasting… If the charges will recover costs associated with other long-term plans, such as a multi-year capital plan, a longer-term service fee plan should be consistent, recognizing the plan may be amended to reflect changing conditions in the future.” •The Utilities Financial Strategies document reviewed by NewGen suggested an annual 20-year pro forma be completed, but NewGen was unable to identify or review any 20- year financial plans for DME. If not already created, this should be done to comply with the City’s policy and to consider long-term rate strategies. 69 BACK 79 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison (cont’d) Area: Capital Planning Policies (Policy date September 2013) •DME meets this guidance, with the few exceptions below: –“To create a sustainable capital plan, the finance officer and other participants in the capital planning process need to consider all capital needs as a whole, assess fiscal capacity, plan for debt issuance, and understand impact on reserves and operating budgets, all within a given planning timeframe.” •Until recently, the Denton Finance Department has had limited involvement and project accounting for capital planning has been challenging. •While this is being corrected, NewGen believes this historical disconnect between City finance and DME financial planning created several challenges that DME is still facing today. –“Provisions for monitoring and oversight of the CIP program, including reporting requirements and how to handle changes and amendments to the plan.” •Uncertainty about project funding, project viability and project prioritization has damaged confidence in PUB and DME decision making. •Multiple efforts have recently been made to remedy this, but the systems and practices to ensure clarity in capital project monitoring are still a work in progress. 70 BACK 80 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison (cont’d) Area: Communicating Capital Improvement Strategies (Policy date February 2014) •DME has suffered significant loss in public trust by not following this practice. •Examples are below –“Capital programs gain from the support of the community both to ensure that capital projects will deliver expected and desired outcomes as well as to ensure there is adequate support for the investment.” •The Renewable Resource Plan calls for the Power Purchase Agreements needed to reach the 100% renewable goal to be completed by 2020. However, the costs and risks in delivering on the 100% plan may not have been clearly communicated and rate increases (if any) related to 100% renewable sources may or may not be well-received by DME customers. –“…recommends that organizations develop a communications plan for public participation focused on explaining capital needs, options, and strategies and facilitating feedback in advance of any major capital program. ” •The Denton Energy Center became a very sensitive community issue, but only after the decision was made. 71 BACK 81 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison (cont’d) Area: Capital Project Monitoring and Reporting (Policy date October 2017) •DME has a strong history of capital project management and seeing projects through has assisted in its FERC accounting and TCOS filings. •DME meets this guidance, which is generally described below. –“1. Identify and incorporate legal and fiduciary requirements into capital monitoring and reporting processes.” –“2. Identify relevant data for external and internal stakeholder information needs.” –“3. Plan and design systems to collect, store, and analyze project data and to report results.” –“4. Regularly monitor capital projects’ financial and project activity information.” –“5. Reporting on project status and activities.” –“6. Project close-out.” –“7. Evaluate monitoring and reporting activities.” 72 BACK 82 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison (cont’d) Area: Creating a Comprehensive Risk Management Program (Policy date March 2009) •DME has contracted with Deloitte to evaluate and set in place plans to mitigate risk throughout DME –NewGen generally concurs with Deloitte recommendations •DME has already started change efforts or implementation of several recommended strategies including: Reviewing and updating the Enterprise Risk Management Policy Evaluating and planning to implement Energy Trading Risk Management system Improving clarity in boundaries in Delegation of Authority for transactions Clarifying hedge strategies, limits and quantifiable objectives Improved training for PUB members 73 83 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison (cont’d) Area: Evaluating Service Delivery Alternatives (Policy date September 2018) •DME meets this guidance, with the few exceptions below: –“Consideration must be given to how service delivery is affected by demographics, the economy, geography, citizen sensitivity and the local political environment.” •Service delivery alternatives for DME include the DEC. While has been mentioned previously, alternatives to DEC may not have been given enough consideration to gain continued public buy-in. –“The government should establish clear expectations and standards in analyzing service delivery options. ” •Both DEC and EMO functions have been questioned recently. DME needs to spell out its expected financial outcomes and analyze the cost and benefits of each. •NewGen recommends benchmarking each against similar market or comparator utilities to show the relative benefit of each. This analysis should be shared with the PUB, Council and the public at large. 74 84 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison (cont’d) Area: Key Issues in Succession Planning (Policy date February 2011) •DME needs to update its succession planning –“Many governments face the challenge of ensuring continuity and consistency of service delivery due to employee turnover. ” •DME has undergone significant change in senior leadership. •Filling key roles has been challenging and succession plans are unclear. •DME needs to solidify management and support function roles –“Develop written policies and procedures to facilitate knowledge transfer.” •DME’s multiple reorganizations has also changed the nature and responsibilities for a number of roles •Documenting expectations for each position is a key first step •Knowledge management practices and cross training may help DME cope with any future turnover 75 BACK 85 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison (cont’d) Area: Technology in Capital Planning and Management (Policy date October 2011) •This best practice calls for “Capital Planning for multi-year capital forecasting that identifies needs of new items, replacement items, and major renovations.” –Denton clearly meets this guidance 76 •DME has a very solid approach to technology in capital planning –Tech Services, in coordination with DME, maintains 5-Year Roadmap •This list of major initiatives, confirming funding status and planned timelines ... … … … … … … 86 Financial Practices Denton Water and Wastewater Utilities TOC 87 NEWGEN STRATEGIES AND SOLUTIONS, LLC Financial Policy Review •Annual Financial Strategies Review and Documented Path Forward –Denton has done a good job reviewing financial policies annually for DME as well as Water and Wastewater Funds •Favorable AA-Bond Rating from S&P –Report from March 14, 2019 –Related to Denton Utility System Revenue Debt –Per S&P’s Report •“We consider the utility’s financial management policies and practices very strong…” •“Extremely strong liquidity and reserves” •“Very strong fixed-charge coverage and…plans to cash fund more than half of its capital improvements plan (CIP).’ •The utilities’ Financial Strategies and Practices were compared to the best practices promulgated by the GFOA 78 88 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison Area: Working Capital Targets for Enterprise Funds (Policy date February 2011) •“GFOA recommends that local governments adopt a target amount of working capital to maintain in each of their enterprise funds. Ideally, targets would be formally described in a financial policy and/or financial plan.” –Denton Water and Wastewater meets this guidance. •Given its substantial cash funding for capital repair and replacements, restricted and any unrestricted working capital should be clearly delineated to make sure no balances used to meet targets are committed for future capital spending. •Appropriable balances reported in the Budget exclude Impact Fees, but do not appear to exclude the $1M Development Plan Line Reserve called for in the financial policies. 79 Reserve Type Water Target Wastewater Target Working Capital 8%8% Operating Reserves 25-42%20-31% Operating Days 120-180 Days 100-140 Days BACK 89 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison (cont’d) Area: Establishing Government Charges and Fees (February 2014) •Denton W/WW meets this guidance, with the few exceptions below: –“Utilize long-term forecasting… If the charges will recover costs associated with other long-term plans, such as a multi-year capital plan, a longer-term service fee plan should be consistent, recognizing the plan may be amended to reflect changing conditions in the future.” •The Utilities Financial Strategies document reviewed by NewGen suggested an annual 20-year pro forma be completed, but NewGen was unable to identify or review any 20- year financial plans for Denton W/WW. If not already created, this should be done to comply with the City’s policy and to consider long-term rate strategies. –“State whether the jurisdiction intends to recover the full cost of providing goods and services. Set forth under what circumstances the jurisdiction might set a charge or fee at more or less than 100 percent of full cost. If the full cost of a good or service is not recovered, then an explanation of the government's rationale for this deviation should be provided.” •Recent rate reductions signal that the budgeting practices or strategy for cash-funding a portion of CIP has changed or may not have been consistent with the longer term financial plan. 80 BACK 90 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison (cont’d) Area: Establishing Government Charges and Fees (cont’d) (Policy date February 2014) •Denton W/WW uses a 1.25 debt service coverage ratio in setting rates –This is a good policy and helps ensure bond payments are adequately covered. –Per policy, this may be supplemented by operating reserve funds to meet 1.25 •While City policy allows for this use of reserves, Denton W/WW should be cautious in its application as some bond pledges may specifically prohibit use of reserves. 81 BACK 91 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison (cont’d) Area: Capital Planning Policies (Policy date September 2013) •Denton W/WW meets this guidance, with the few exceptions below: –“To create a sustainable capital plan, the finance officer and other participants in the capital planning process need to consider all capital needs as a whole, assess fiscal capacity, plan for debt issuance, and understand impact on reserves and operating budgets, all within a given planning timeframe.” •Until recently, the Denton Finance Department has had limited involvement and project accounting for capital planning has been challenging. •While this is being corrected, NewGen believes this historical disconnect between City finance and W/WW financial planning created several challenges that Denton W/WW is still facing today. –“Provisions for monitoring and oversight of the CIP program, including reporting requirements and how to handle changes and amendments to the plan.” •Project funding and significant excess transfers without a clear plan have damaged confidence in cash funding needs within rate revenue requirements for W/WW. •Multiple efforts have recently been made to remedy this, but the systems and practices to ensure clarity in capital project monitoring are still a work in progress. 82 BACK 92 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison (cont’d) Area: Communicating Capital Improvement Strategies (Policy date February 2014) •Examples for areas of improvement are below –“Capital programs gain from the support of the community both to ensure that capital projects will deliver expected and desired outcomes as well as to ensure there is adequate support for the investment.” •Cash capital has been consistently set aside, which has been seen as very favorable when reviewed by bond rating agencies. Denton W/WW has not been effective in consistently delivering on planned capital project implementation and have accumulated significant cash funding as a result. This build up of cash, following years of rate increase without clear understanding, has eroded confidence in the practice. –“…recommends that organizations develop a communications plan for public participation focused on explaining capital needs, options, and strategies and facilitating feedback in advance of any major capital program. ” •Denton W/WW and City leadership are instituting a Project Management Office, which will aid in successfully meeting this best practice. 83 BACK 93 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison (cont’d) Area: Evaluating Service Delivery Alternatives (Policy date September 2018) •Denton W/WW meets this guidance, with the few exceptions below: –“Consideration must be given to how service delivery is affected by demographics, the economy, geography, citizen sensitivity and the local political environment.” •Denton W/WW has made efforts to save money through the use of internal crews for capital projects. When project scheduling and internal staff capacity allows, this practice has been to the benefit of Denton rate payers. •City staff may create cost savings from internal crews, but savings and quality of service may be overstated if project timelines suffer or the project are not being completed. •Denton should consider further supplementing internal crews given the volume of projects that are backlogged. –“The government should establish clear expectations and standards in analyzing service delivery options. ” •For example, if a standard was set that employees would consistently provide the highest value possible, certain activities (such as mowing around water facilities) may be considered for outsourcing or best completed by other departments with routine outdoor maintenance duties. 84 BACK 94 NEWGEN STRATEGIES AND SOLUTIONS, LLC GFOA Best Practice Comparison (cont’d) Area: Technology in Capital Planning and Management (Policy date October 2011) •Denton W/WW meets much of this guidance, but could improve as outlined below. –“Alignment with other organization-wide planning efforts will avoid redundant systems and will provide a greater opportunity for systems to efficiently support end-to-end business processes.” •Denton W/WW has limited strategic coordination with the Tech Services function. One example that merits review is the use various fiber backbones to support SCADA and possible, while limited, information sharing for non-sensitive operations data. –“…analyze the projected benefits, costs, and risks in moving to a new system to determine if there is a suitable business case for moving forward.” •Denton W/WW should reconsider Advanced Metering Infrastructure (AMI). The meter reading requirements for water is substantially more time consuming than getting electricity usage from smart meters throughout the City. Neither DME nor Denton W/WW are getting the full benefit of smart meters since the meter reading function is still required on a monthly basis. If AMI is not deployed for Denton W/WW, a review of the meter reading function may result in additional cost assignment to W/WW. 85 BACK 95 NEWGEN STRATEGIES AND SOLUTIONS, LLC Capital Planning •Money has been set aside for capital projects for several years with no real plan to spend the money causing CMO and Council to question the need for the capital money, planning abilities of the utilities and ability to get projects done in a timely fashion especially in relation to public works and development projects. •Both the Water and Wastewater Utilities need to develop a program to execute the Capital Plan. 86 BACK 96 NEWGEN STRATEGIES AND SOLUTIONS, LLC Water Capital Project Transfers 87 6.8 8.0 11.6 11.7 5.3 5.0 5.6 5.2 $- $2 $4 $6 $8 $10 $12 $14 $16 $18 FY15 FY16 FY17 FY18MillionsWater Transfers to Projects Versus Capital Spending Transfer Actual Actual Expense 1.5 4.5 10.5 17.0 $- $2 $4 $6 $8 $10 $12 $14 $16 $18 FY15 FY16 FY17 FY18MillionsWater Transfers in Excess of Capital Spending Cumulative Excess After Expense Project funding in water is building up but expenses are not keeping pace. Large projects and a total 5-year CIP of over $111 Million can create backlogs, but it was not apparent during our interviews why this level of transfers were accumulating in the most recent years. 97 NEWGEN STRATEGIES AND SOLUTIONS, LLC Wastewater Capital Project Transfers 88 4.1 5.5 10.3 8.6 1.6 3.0 4.4 2.9 $- $2 $4 $6 $8 $10 $12 $14 $16 $18 FY15 FY16 FY17 FY18MillionsWastewater Transfers to Projects Versus Capital Spending Transfer Actual Actual Expense 2.4 5.0 10.8 16.6 $- $2 $4 $6 $8 $10 $12 $14 $16 $18 FY15 FY16 FY17 FY18MillionsWastewater Transfers in Excess of Capital Spending Cumulative Excess After Expense Project funding in wastewater is also building; expenses are much less than transfers. With projects scheduled for the next 5-year CIP totaling almost $50 Million, the $16 Million may be fully assigned. Regardless, it would seem the project spending would catch up to the transfers as more construction is completed on time. 98 Budget Process TOC 99 NEWGEN STRATEGIES AND SOLUTIONS, LLC Budget Process •From interviews, we understand the budget process was not previously handled the same as other City departments –This is likely related to both the role of PUB and decentralized Finance functions •As of FY 2020 budget setting, DME, Water and Wastewater are now submitting budget packets similar to other departments –NewGen sees this change as a very positive step in getting PUB-directed departments in sync with City-wide budgeting practices –This, like most change, may create some discomfort in the first few years –Similar budget review will help build confidence in budgeted expenses –The typical calendar for the new budget process is detailed on the following page •Better budgets will produce more accurate revenue requirements that the PUB and Council can rely on to forecast costs and set rates appropriately 90 BACK 100 NEWGEN STRATEGIES AND SOLUTIONS, LLC 2020 Budget Process April CIP submissions due to Finance City Manager /ACM Review of Utilities Budgets May Utilities Budgets Due to Finance Public Utilities Board Reviews Utility Budgets and CIP June Public Utilities Board reviews changes/updates to Utilities Budgets PUB approves Utilities Budgets and CIP Provide proposed rate increases July PUB reviews any proposed Utilities Rate Changes Proposed Utility Budgets and CIPs submitted to City Council and filed with City Secretary August Council Budget Workshop (First) Utilities contacts Public Communications Office to begin work on Rate Brochure Council Meeting: Budget Workshop (Second) 91 101 NEWGEN STRATEGIES AND SOLUTIONS, LLC Cost Allocation in Budgeting •Denton has fully allocated costs from General Fund, IT and Other Internal Service Funds •Given the level of costs these represent, these allocation amounts should be reviewed and updated annually 92 102 INFRASTRUCTURE TOC 103 Infrastructure Condition Assessment Denton Municipal Electric TOC 104 NEWGEN STRATEGIES AND SOLUTIONS, LLC System Condition •Electric system site visits: –Arco Substation –Hickory Substation –Locust Substation –McKinney Substation –Denton Energy Center (DEC) –System Operations Center (SOC) •Reviewed inspection and maintenance practices •Reviewed system planning studies and capital improvement plans –Included comprehensive 5-year Roadmap •List of major initiatives, confirming funding status and planned timelines 95 105 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Substation facilities are relatively new; records show in-service date of June 2016 •Design and construction follows best utility practice •Relay and protection schemes and SCADA systems are considered to be best in class •Inspection, testing, and maintenance practices are well above average •Overall facility condition is excellent Arco Substation 96 106 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Hickory Substation facilities are among the oldest on DME’s system; records show some equipment with initial in-service date of April 1968 •Some of the Hickory Substation facilities have been upgraded •Older substation facilities have been well maintained, but are due for upgrade/replacement Hickory Substation 97 107 NEWGEN STRATEGIES AND SOLUTIONS, LLC •New Locust Substation is under construction •New substation design, construction, and configuration is similar to Arco and McKinney •Old Locust Substation is relatively dated; records show in-service date of major equipment to be May 1980 •Facilities have been well maintained, but are due for upgrade/replacement Locust Substation 98 108 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Substation facilities are relatively new; records show in-service date to be June 2015 •Design and construction follows utility best practice •Relay and protection schemes and SCADA systems are considered to be best in class •Inspection, testing, and maintenance practices are well above average •Overall facility condition is excellent McKinney Substation 99 109 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Denton Energy Center (DEC) is a 225MW generating plant including 12 Wartsila gas- fired engines •DEC became operational in July 2018 and provides capacity and price hedging for DME’s renewable energy program •DEC facilities are well maintained and are in excellent condition Denton Energy Center 100 110 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Denton System Operations Center (SOC) is the focal point for daily management, dispatch service, emergency response and restoration for Denton’s utility systems •One half of the SOC deals with the City of Denton’s water, wastewater, and solid waste systems •One half of the SOC deals with DME’s electric transmission and distribution system •The SOC became operational in 2012 and has undergone periodic technology upgrades •SOC facilities are ranked to be best utility practice System Operations Center 101 111 NEWGEN STRATEGIES AND SOLUTIONS, LLC Review of Periodic Inspection & Maintenance Practices •Review included: –Checkout summary for new construction –Weekly substation inspections / reports –Infrared inspection of substations and transformers –Breaker testing and maintenance (15kV, 69kV, and 138kV) –SF6 breaker gas analysis –Substation transformer oil and dissolved gas testing –Relay testing –Substation battery/charger inspection and maintenance –Pole inspection program –Tree trimming program •DME’s inspection and maintenance practices ranked good to excellent 102 112 Infrastructure Condition Assessment Denton Water and Wastewater Utilities TOC 113 NEWGEN STRATEGIES AND SOLUTIONS, LLC NewGen reviewed water infrastructure in the field including the Lake Lewisville water plant and several water tanks. •In general, water plant was clean and appeared well-maintained. Good housekeeping practices exist and staff interviewed seemed to understand the necessity of their jobs to produce safe, clean drinking water. •Only issue was with the lack of coordination with the water distribution staff which may have caused over pressurization of water distribution system and one or more water line breaks. •There needs to a shared SCADA system showing the water plants and the distribution system at the plants and in the distribution offices as well with current system data available. •Tanks were recently painted and did not exhibit any discoloration of the metal structures nor rust. Water System 104 114 NEWGEN STRATEGIES AND SOLUTIONS, LLC NewGen reviewed wastewater infrastructure in the field including the wastewater plant and one lift station at the wastewater plant. •In general, wastewater plant was not clean but appeared to be operating in good condition. Good housekeeping practices are not being followed, unnecessary items were left around offices and parts of the plant vs. being stored in proper places or trash being thrown away. In general, most areas were trashy and not well kept. •A “temporary” area with blue sheeting covered one of the sand filters which are not in use and apparently have not nor will be for some time causing a safety hazard. •Staff interviewed seemed to understand the necessity of their jobs to produce safe, reclaimed wastewater not overflowing or spills from facilities. Wastewater System 105 115 NEWGEN STRATEGIES AND SOLUTIONS, LLC •One issue was with the lack of technology, manual process and only one operator trained on how to operate the digester solids belt press to the drying beds which makes it challenging to keep the solids from overflowing especially on weekend and holidays. Operator has to manually check the belt press even on weekends and holidays due to the lack of cross-training and technology improvements. •Wastewater Plant Not Integrating on City Network •While we understand it is a wastewater plant and inherently is dealing with a nastier product than the water plant, we have served as supervisors and operators in other plants as well have assessed many plants and have seen pride in the staff keeping the quarters clean and tidy. Wastewater System (cont’d) 106 116 PEOPLE TOC 117 NEWGEN STRATEGIES AND SOLUTIONS, LLC Succession Planning •NewGen was not provided a written Succession Plan for the Utilities. Verbal discussion was held on some succession planning initiatives. •Succession planning and employee development is largely left up to individual supervisors and managers. •The Utilities are working with Human Resources to develop a Utility wide Succession Plan and accompanying Employee Development Plan for all employees. 108 BACK 118 NEWGEN STRATEGIES AND SOLUTIONS, LLC Human Resources •NewGen did not conduct HR interviews or an independent review of specific HR practices. Observations here were gathered from interviews and are for thoughtful consideration only. NewGen does not make a recommendation to change policies or practices outside of further review. •Finding, hiring and retaining qualified staff has been difficult. –Could benefit from a Utilities Career website and video, similar to Fire and Police Careers links •Sick leave may be too generous. Accruing 10 hours each month up to a maximum 720 hours creates substantial liabilities and may create sense of entitlement. Perceived inequity by those who are not out sick may create moral hazard to abuse sick days. –Combination of more guilt-free, general paid time off bank of hours, with backstops in catastrophic leave policy and short-term disability coverage (already offered) may improve benefit plan offering and work scheduling 109 119 NEWGEN STRATEGIES AND SOLUTIONS, LLC Organizational Assessment - Overview •NewGen performed an overall Organizational Assessment of the Utilities which reviewed all parts of the Utilities including People, Process, Data, Financial, Technology, Infrastructure to identify what is working and what needs improvement. 110 120 NEWGEN STRATEGIES AND SOLUTIONS, LLC Consider moving under common Assistant or Deputy City Manager Recommended Organizational Changes 111 121 Organizational Structure Denton Municipal Electric TOC 122 NEWGEN STRATEGIES AND SOLUTIONS, LLC Organizational Structure •Overall the structure is “chunky” –Numerous departments and layers of management that would not seem to be needed for a utility of DME’s size •Structure lends to silos at the managerial level •Seems to work at the “operational level” where the field work takes place •NewGen recommends a deeper analysis before making any organizational changes including: –Full FTE analysis –Evaluation of need for open positions –Management layer and span of control analysis –Integration with formalized Succession Plan 113 BACK 123 Organizational Structure TOC Denton Water and Wastewater Utilities 124 NEWGEN STRATEGIES AND SOLUTIONS, LLC Organizational Structure •Organizational changes recently made to separate duties of General Managers into 2 parts 1) Transmission & Distribution System 2) Plants and Meter shop –No one person responsible for water utility and wastewater utility –Role confusion and disorganization due to new organizational chart, roles not documented nor defined clearly –Staff below management level has adapted and continues to bring stability to utility operations despite changes 115 BACK 125 NEWGEN STRATEGIES AND SOLUTIONS, LLC Organizational Structure •Changes recently made to separate functions from each utility that can/should reside at the City level including parts or all of finance, engineering, capital projects, procurement, information systems, transportation and warehousing –New procedures need to continue to be written and training provided to staff to avoid confusion going forward to develop the “Denton Way” –Needed to modernize and formalize manual and historical processes that need updating and streamlining –Clear communication needed to ensure smooth change management of operations and areas affected –Some system planning and modeling staff needed at utility level for sustainability of operations and to assist with capital planning functions 116 BACK 126 NEWGEN STRATEGIES AND SOLUTIONS, LLC Organizational Structure •New organizational structure and key hires are needed for clarity, give new direction with experienced leadership –Suggest organizational structure with either experienced overall General Manager for both utilities or separate GMs –Move one existing position to system planning function to bring all system modeling and planning functions in house for both water and wastewater –Other suggested organizational changes are shown in the following pages with key themes of consolidation and streamlining of management layers and positions and improving span of control 117 127 NEWGEN STRATEGIES AND SOLUTIONS, LLC Move under System Planning & Modeling organization System Planning & Modeling WATER ADMINISTRATION 118 128 NEWGEN STRATEGIES AND SOLUTIONS, LLC System Planning & Modeling WATER UTILITIES 119 WATER & WASTEWATER SUPERINTENDENT 129 NEWGEN STRATEGIES AND SOLUTIONS, LLC Consider moving Pretreatment Operations to Wastewater organization System Planning & Modeling Move under System Planning & Modeling organization 120 WASTEWATER UTILITIES 130 NEWGEN STRATEGIES AND SOLUTIONS, LLC Organizational Structure •NewGen recommends a deeper analysis before making any organizational changes including: –Full FTE analysis –Evaluation of need for open positions –Management layer and span of control analysis –Integration with formalized Succession Plan (being recommended in this report) 121 131 PROCESS TOC 132 NEWGEN STRATEGIES AND SOLUTIONS, LLC Support Services •Need for better communication with other City departments especially with more services moving to City departments i.e. IT, Procurement, Transportation, etc. •Process changes instituted in the Procurement area by the City to develop and establish standard policies and procedures are good to see. The City should recognize the impact on DME and all parts of the City which were not accustomed to standard ways of centralized procurement. –Previously, DME procured supplies/equipment themselves as needed. –Implementation of new policies was disruptive and needs to be more efficiently planned for in the future. 123 BACK 133 NEWGEN STRATEGIES AND SOLUTIONS, LLC System Planning & Modeling – DME •DME has a fairly robust system planning and modeling function that is used to develop its capital plans. •Engineers work with operations to identify areas of the system needing hardening in advance of actual need for the improvements. •Focus has been on large improvements to the transmission backbone, substations and some parts of the distribution system. –NewGen understands there are few areas of the distribution system that need hardening to avoid local reliability issues. •Overall system reliability is good for DME with few outages of any duration. 124 134 NEWGEN STRATEGIES AND SOLUTIONS, LLC System Planning & Modeling – Water/Wastewater •NewGen was not provided current written Master Plans based on hydraulic modeling for the water system that is tied to a capital plan. •The wastewater utility has an asset management plan which is very detailed in procedures and technologies used to risk rank the wastewater collection system. A high level 5 year capital plan is included in this annual report as well as historical info for the year provided initiatives but a list of capital projects was not seen. •System Planning has largely been performed by the former managers of each utility using outside consultants to perform the actual modeling and planning studies, if done. •Both the Water and Wastewater Utilities need to develop in-house expertise of utility staff working with engineering to perform system modeling and planning on an on-going basis to formally produce an annual master plan that is tied to a capital plan for the each budget year, next 3 years and a 10 year horizons. If outside consultants are used at some point, the work should be bid with other consultants who currently do not work for the City and their role should be as an extension of staff with staff owning the process. 125 BACK 135 STRATEGY 126 TOC 136 NEWGEN STRATEGIES AND SOLUTIONS, LLC •NewGen was not provided a written Strategic Plan for DME. Verbal discussion was held on some strategic initiatives. •NewGen suggests that DME go through a Strategic Planning process reviewing the existing state, issues to be addressed and future state needed and desired to produce a roadmap to guide utility decision making, priorities and capital expenditures. –DME’s roadmap should also include a plan to recognize the competitive nature of DME’s multi-certified areas Strategic Planning – DME 127 BACK 137 NEWGEN STRATEGIES AND SOLUTIONS, LLC Strategic Planning –Water/Wastewater •NewGen was not provided a written Strategic Plan for the utilities. Verbal discussion was held on some strategic initiatives. •Both the Water and Wastewater Utility need to go through a Strategic Planning process reviewing the existing state, issues to be addressed and future state needed and desired to produce a roadmap to guide utility decision making, priorities and capital expenditures. 128 BACK 138 FRANCHISE & PAYMENT IN LIEU OF TAXES TOC 139 Franchise & Payment in Lieu of Taxes Denton Municipal Electric TOC 140 NEWGEN STRATEGIES AND SOLUTIONS, LLC Current Computation of Franchise Fees and Return on Investment (ROI) Computation of Franchise Fees –5% of Gross Revenue excluding: •ECA Revenue •Denton Energy Center Revenue •TMPA Coverage Revenue •Interest •Other Non-Utility Revenue –ECA Franchise Fees limited to $.03/kWh sold •Computation of ROI –Essentially treated as a Payment in Lieu of Taxes (PILOT) –Current computation is 3.5% of Gross Revenue with no exclusions •Effective Rate on Total DME Operating Revenue –Franchise Fees effective rate from 2013 through 2017 –4.30% –ROI effective rate from 2013 through 2017 –3.01% •Use of Franchise Fees and ROI –Based on the FY 2018-19 Budget, approximately 24.4% of total franchise fees will be transferred to the General Fund and the remaining 75.6% of the franchise fees will be transferred to the Street Improvement Fund –All ROI related fees are transferred to the General Fund. 131 141 NEWGEN STRATEGIES AND SOLUTIONS, LLC Comparison to Other Texas Municipal Electric Power Providers Typical Computation Based on Percentage of Revenue •Majority Compute Based on a Percentage of Gross Revenue –Specific Computations –AE computes a general fund transfer (GFT) •GFT includes both franchise fees and PILOT (ROI) •Set at no more than 12% of non-fuel revenue •Set a floor of annual recovery of $105 million •DME effective total of Franchise Fees and ROI for non-fuel revenue is 11.17% from 2013-2017 •Lubbock computes a franchise fee based on 5% of gross revenue –Lubbock PILOT is 1% of gross revenue •BTU computes a per kWh charge for franchise fees –PILOT is computed based on a percentage of the approved rate of return used in the TCOS –However, a percentage of 7% of gross revenue has been set as a cap on these two computations –Currently BTU is at approximately 6.5% of gross revenue for the combination of franchise fee and PILOT •CPS computes a combined GFT similar to AE with a 14% of gross revenue –Revenue related to schools and hospitals is excluded 132 142 NEWGEN STRATEGIES AND SOLUTIONS, LLC Comparison to Other Texas Municipal Electric Power Providers (cont’d) Typical Computation Based on Percentage of Revenue (cont’d) •GEUS is similar to Lubbock –Franchise Fee are 5% of Gross Revenue, as adjusted for: •Fuel for off-system sales –PILOT is 1% of Gross Revenue, as adjusted •Goes to Greenville Board of Development •Garland Power & Light only charges an ROI –Approximately set at $19.5 million per year –Equates to an approximately 7% of total operating revenue in 2017 •San Marcos Water and Power charges a franchise fee of 8% •Georgetown Utilities charges a 3% franchise fee and a 7% ROI in its electric rates 133 143 NEWGEN STRATEGIES AND SOLUTIONS, LLC National Municipal General Fund Transfer for Franchise Fees and/or PILOTs Based on a 2016 survey conducted by the American Public Power Association that included 171 respondents: •Over 79% (136 respondents) have some form of PILOT •Approximately 26% compute the payment based on a percentage of electric operating revenues, with a notable percentage (13%) based on a flat annual amount •Only 10% reported use of a charge per kWh sold •Based on the regional variations, the West South Central respondents, which includes public power operations in Texas, Arkansas, Louisiana and Oklahoma, remitted the highest median percentage of electric operating revenues (12.6%) based on 36 responding utilities •Based on all respondents, payments made to state and local governments by public power operations produced a median percentage of 5.6%, with utilities over $100 million in revenue at 6.2% 134 144 NEWGEN STRATEGIES AND SOLUTIONS, LLC Comparison to Municipal Charges to IOUs Electric IOUs in Texas are charged franchise fees and property taxes separately •The majority of electric IOUs are charged franchise fees based on a $/kWh as prescribed by the Public Utility Regulatory Act (PURA) §33.008. •Municipal property taxes vary by location 135 145 NEWGEN STRATEGIES AND SOLUTIONS, LLC Comparison to Municipal Charges to IOUs (cont’d) •Non-ERCOT IOUs remit franchise fees based on the following paradigms: –Entergy – Based on negotiated $kWh charges with each municipality charges rangings from $.00053/kWh to $.0015908/kWh.`` –El Paso Electric – Current rates have a 4% franchise fee embedded in the tariff and an additional 1% payment (5% total) to the City of El Paso. This is an additional 0.75% (4.75% and 5.75%) charged for revenue received by El Paso Electric for broadband services over powerlines. –SWEPCO –Current rates have franchise fees embedded in the rates at $.0005528/kWh plus riders to collect the amounts over by municipality. The latter comprise approximately 55% of the total franchise fees. The total amount is approximately 1.78% of total revenue, both from incorporated and unincorporated service areas. –SPS (Xcel Energy) –Current rates have an embedded amount of 2% in the customer service rates with any additional percentage by municipality included as a line item on the bill. For example, the City of Amarillo has an additional 2% above the embedded 2% included in rates. The City of Post has an additional 3% of gross receipts charged on customers’ bills based on a 2017 franchise agreement. 136 146 NEWGEN STRATEGIES AND SOLUTIONS, LLC Texas Utilities Comparisons •DME’s fees based on a % of gross revenue is similar to other municipal electrics computations and non- ERCOT Texas IOUs •DME has a capped franchise fee on commodity revenue where other have excluded this revenue in the computation of franchise fees •A 5% franchise fee is within the range of fees charged by other Texas municipal electrics •A 5% for franchise fees is equal to or slightly higher than fees charged by non-ERCOT Texas IOUS. •A 3.5% ROI is within the range of ROIs charged by Texas municipal electrics •A 3.5% ROI appears low in light of returns approved for TCOS filings •Texas municipal electrics vary in whether the fees are termed as franchise fees, PILOTs or ROI and ranges from 6% to 14% when added together National Comparisons •The vast majority of electric utilities are charged franchise fees by the franchising authority •The median national percentage franchise fee charged to public power is approximately 5.6% of gross revenue •Public power with revenue over $100 million reported an average percentage of 6.2% •Public power operations in Texas, Arkansas , Louisiana, and Oklahoma reported higher percentages than other areas within the US •DME is slightly lower than national median •The vast majority of public power utilities also has a PILOT charged by the franchising authority •On a national basis, IOU electrics are charge a franchise fee varying in percentage, but generally noted to be between 3% and 6%. Conclusions – DME Franchise Fees and PILOT (ROI) 137 147 Franchise & Payment in Lieu of Taxes Denton Water and Wastewater Utilities TOC 148 NEWGEN STRATEGIES AND SOLUTIONS, LLC Current Computation of Franchise Fees & Return on Investment (ROI) •Franchise Fees Computation •Water Services –5% of Gross Revenue Excluding: •Interest Income •Water for Resale •Water Impact Fees •Wastewater Services –5% of Gross Revenue Excluding: •Interest Income •Wholesale Wastewater Services •Wastewater Impact Fees •Drainage Fees •ROI Computation •Water and Wastewater Services –Essentially treated as a Payment in Lieu of Taxes (PILOT) –Current Computation is 3.5% of Gross Revenue with Same Exclusions as Franchise Fees 139 149 NEWGEN STRATEGIES AND SOLUTIONS, LLC Current Computation of ROI & Return on Investment (ROI)(cont’d) Historical Effective Rates Based •Franchise Fees Effective Rate from 2013-2017 –Water Services – 4.79% •Based on CAFR Operating Revenue –Wastewater Services – 4.72% •Based on Adjusted Gross Revenue Use of Franchise Fees & ROI for Water and Wastewater •Based on the FY 2018-19 Budget: –Approximately 24.4% of Total Franchise Fees will be Transferred to the General Fund –Remaining 75.6% of the Franchise Fees will be Transferred to the Street Improvement Fund •All ROI Related Fees are Transferred to the General Fund 140 150 NEWGEN STRATEGIES AND SOLUTIONS, LLC Comparison to Other Texas Municipal Water & Wastewater Service Providers Typical Computation Based on Percentage of Revenue •Majority Compute Based on a Percentage of Gross Revenue –Specific Computations •AE Computes a General Fund Transfer (GFT) –GFT includes bother Franchise Fees and PILOT (ROI) –GFT Reflects Approximately 8.2% of Water/Wastewater Fund Revenue –Services Effective Total of Franchise Fees & ROI •Denton Water is 8.13% of Operating Revenue from 2013-2017 •Denton Wastewater is 8.03% of Adjusted Operating Revenue •Lubbock Compute a Franchise Fee Based on 5% of Gross Revenue for its Water & Wastewater Utility Services –PILOT is 1% of Gross Revenue 141 151 NEWGEN STRATEGIES AND SOLUTIONS, LLC Comparison to Other Texas Municipal Water & Wastewater Service Providers (cont’d) Typical Computation Based on Percentage of Revenue •City of Bryan Computes a Right of Way Payment Fee –5% of Total Water Operating Revenue, Exclusive of: •Interest Income •Water Tap Fees •Transfer in from Other Funds •Non-operating Revenue •Gain on Sale of Assets –5% of Total Wastewater Operating Revenue, Exclusive of: •Interest Income •Sewer Tap Fees •Transfer in from Other Funds •Non-operating Revenue •Gain on Sale of Assets •City of Greenville is Similar to Lubbock –Based on 2019 Budget: •Franchise Fees are ~4.45% of Total Water/ Wastewater Operating Revenue •PILOT is ~4.45% of Total Water/ Wastewater Fund Revenue 142 152 NEWGEN STRATEGIES AND SOLUTIONS, LLC Comparison to Other Texas Municipal Water & Wastewater Service Providers (cont’d) Typical Computation Based on Percentage of Revenue •City of Garland Charges Franchise Fee & PILOT –Franchise Fee is Based on 5% of Operating Revenue –PILOT is Computed Based on Applying the Property Tax Rate to the Value of the Water/Wastewater Assets •Water PILOT = ~2.67% of Operating Revenue •Wastewater PILOT = ~7.33% of Operating Revenue •San Marcos Water and Power Charges a Franchise Fee of 8% •Georgetown Utilities Charges –3% Franchise Fee –7% ROI in its Water/ Wastewater Rates 143 153 NEWGEN STRATEGIES AND SOLUTIONS, LLC National Municipal General Fund Transfer for Franchise Fees and/or PILOTS •Research shows a franchise fee charge by municipal water and wastewater utilities appears reasonably common and identified separately on a customer’s bill •Where included, the franchise fees are primarily based on a percentage of the gross revenue •Noted ranges for the computation based on a percentage of water and wastewater revenue was 2% to 6% with separately identified franchise fees •Several instances were noted where franchise fees were collected based on a fixed charge for each meter size. –These appeared to be based on a certain required revenue stream established by the municipality –Such computations do provide for more certainty in franchise fee collection when compared to the percentage of a customer’s usage of water and sewer services •PILOT computations vary nationally, but are primarily based on two methodologies –A percentage of water and wastewater revenue; or –An application of the local tax rate times the value of the water and wastewater investment •Use of this methodology will produce widely varying results among utilities based on the reported asset balances in each operation. 144 154 NEWGEN STRATEGIES AND SOLUTIONS, LLC Texas Water Utilities Comparisons •Denton Water fees based on a % of gross revenue are similar to other municipal water computations and Texas water IOUs •A 5% franchise fee is within the range of fees charged by other Texas municipal water operations •A 3.5% ROI is within the range of ROIs charged by Texas municipal electrics •Some Texas water operations charge a single percentage which is comparable to the combination of Denton Water franchise fee and ROI •There is less variability in the total fees charged by Texas municipal water operations than Texas municipal electric operations National Comparisons •Water rates reported for operations outside of Texas showed that franchise fees are a typical component of the charges to customers •Fees are general based on a percentage of gross revenue like Denton Water •Denton is within the noted range of 2-6% for water related franchise fees •PILOT (ROI) computations showed wide variations among water operations with some based on a percentage of revenue and other based on property tax rates times value of assets. Conclusions – Water Franchise Fees and PILOT (ROI) 145 155 NEWGEN STRATEGIES AND SOLUTIONS, LLC Texas Wastewater Utilities Comparisons •Denton Wastewater fees based on a % of gross revenue, but exclude wholesale wastewater services and drainage fees •A 5% franchise fee is within the range of fees charged by other Texas municipal WW operations •A 3.5% ROI is within the range of ROIs charged by Texas municipalities •Some Texas wastewater operations charge a single percentage which is comparable to the combination of Denton Wastewater franchise fee and ROI •There is less variability in the total fees charged by Texas municipal wastewater operations than Texas municipal electric operations National Comparisons •Wastewater rates reported for operations outside of Texas showed that franchise fees are a typical component of the charges to customers •Fees are general based on a percentage of gross revenue like Denton WW •Denton is within the noted range of 2-6% for WW related franchise fees •PILOT (ROI) computations showed wide variations among wastewater operations with some based on a percentage of revenue and other based on property tax rates times value of assets. Conclusions – WW Franchise Fees and PILOT (ROI) 146 156 COMPARATIVE ANALYSIS (BENCHMARKING) PURPOSE & METHODOLOGY TOC 157 NEWGEN STRATEGIES AND SOLUTIONS, LLC Benchmarking Introduction City of Denton (Denton) sought to gain insight from benchmarking the operations of its electric, water and wastewater systems with other comparable utilities and industry statistics. NewGen was retained by Denton to conduct the Benchmarking Study (Study) as part of an Organizational Assessment Study. NewGen is providing analysis of data gathered from publicly available sources for selected benchmark comparison utilities. Utilities were selected for this analysis based on factors such as number of customers, annual electric revenue, or distribution system similarities. This Study collected information from municipal electric utilities and business units of combined utilities related to operational and financial measures. Data sources included publicly owned utilities’ annual reports, their respective city’s Comprehensive Annual Financial Reports (CAFR), utility financial reports, budgets, websites, the American Public Power Association (APPA) Selected Financial and Operating Ratios of Public Power Systems, 2015 Data and American Water Works Association’s 2017 AWWA Utility Benchmarking. The APPA “Southwest” Region included in this report includes 19 participating APPA members in the Southwest Power Pool (SPP) and Texas Reliability Entity (TRE), which in 2015 included the states of Kansas and Texas and parts of Arkansas, Louisiana, Missouri and New Mexico. This report presents results and findings from an analysis performed by NewGen using publicly available information, as well as information provided by Denton related to its operations. 148 158 NEWGEN STRATEGIES AND SOLUTIONS, LLC Benchmarking Introduction (cont’d) Attempts were made to collect data across all measures from publicly available sources for the following electric utilities: –Brownsville Public Utilities Board, Texas (BPUB) –Bryan Texas Utilities, Texas (BTU) –Fort Collins Utilities, Colorado (FCU) –Garland Power & Light, Texas (GP&L) –Greenville Electric Utility Service, Texas (GEUS) –Lafayette Utility Systems, Louisiana (LUS) –New Braunfels Utilities, Texas (NBU) –Redding Electric Utility, California (REU) –Riverside Public Utilities, California (RPU) 149 159 NEWGEN STRATEGIES AND SOLUTIONS, LLC Benchmarking Introduction (cont’d) Attempts were made to collect data across all measures from publicly available sources for the following water and/or wastewater utilities: –Brownsville Public Utility Board, Texas (BPUB) –City of Bryan, Texas (BTU) –City of Garland, Texas (Garland) –New Braunfels Utilities, Texas (NBU) –Frisco, Texas (Frisco) –Round Rock, Texas (Round Rock) –McKinney, Texas (McKinney) –Grand Prairie, Texas (Grand Prairie) –Greenville, Texas (Greenville) 150 160 NEWGEN STRATEGIES AND SOLUTIONS, LLC Benchmarking Purpose and Methodology The purpose of the Benchmarking Study was to compare strategic and tactical performance measures observed at the operations of Denton with the same parameters at other municipal electric, water and wastewater utilities or departments as well as tracking Denton’s performance over time. Although there will never be perfectly equitable utility-to-utility comparisons, benchmarking can be a useful tool for system improvement. Each of the utilities used in the comparisons have their own mix of cost factors that determine the nuances of a given utility’s performance indicators. Differences such as the ownership and operation of assets need to be kept in mind while reviewing results. Strategic-level parameters addressed include: –Revenue per unit of commodity –Liquidity –Operating income Tactical parameters addressed include: –Operations and Maintenance expense ratios –Administrative and General (A&G) expense ratios –Uncollectible accounts –Usage per customer –Accounts per Employee 151 161 NEWGEN STRATEGIES AND SOLUTIONS, LLC Profile of Benchmark Electric Utilities 152 Utility/City No. of Electric Customers Retail MWh Sales Total Electric Revenue No. of Full-time Equivalent Employees (Electric) Denton 51,915 1,449,585 $ 172,027,080 191 Brownsville PUB, TX 48,726 1,320,697 $ 170,631,405 280.5 Bryan, TX 57,940 2,072,312 $ 234,288,951 189 Fort Collins Utilities, CO 72,523 1,499,036 $ 130,655,363 131 Garland, TX 69,929 1,887,188 $ 280,452,721 251 Greenville, TX 16,434 506,087 $ 62,371,543 128.5 Lafayette Utility System, LA 66,860 1,980,653 $ 174,888,543 215 New Braunfels Utilities, TX 38,867 1,512,675 $ 100,006,812 95 Redding, CA 44,233 744,607 $ 165,123,848 180 Riverside Public Utilities, CA 109,274 2,198,000 $ 366,100,000 472 162 NEWGEN STRATEGIES AND SOLUTIONS, LLC Profile of Benchmark Water & Wastewater Utilities 153 Utility/City No. of Water Customers No. of Wastewater Customers Total Water/ Wastewater Revenue No. of Full-time Equivalent Employees (Water / Wastewater) Denton 34,714 32,618 $67,283,583 151.5 / 111.25 Brownsville PUB 50,153 50,329 $50,246,097 323.5 (combined W/WW ) Bryan 23,223 22,907 $26,540,053 32 / 37 Garland 69,929 Not available $108,305,941 65 / 102 New Braunfels Utilities 36,140 26,294 $27,528,212 44 / 39.5 Round Rock 34,179 33,186 $51,980,615 93 / 35 Frisco 54,261 50,212 $84,647,008 97 (combined W/WW ) McKinney 56,512 Not available $78,491,464 103.1 (combined W/WW ) Grand Prairie 66,075 Not available $72,668,796 120.5 (combined W/WW ) 163 Benchmarking SUMMARY OF FINDINGS & RECOMMENDATIONS TOC 164 Electric Benchmarking SUMMARY OF FINDINGS & RECOMMENDATIONS 165 NEWGEN STRATEGIES AND SOLUTIONS, LLC Electric Benchmarking –Key Takeaways •EFFECTIVE RATE –In terms of effective rate (revenue per kWh) across all retail customers as well as for each customer class, DME should strive for a balance between reasonable rates for customers and sufficient revenue for the utility to sustain itself financially. In addition to monitoring this measure, DME should review its rates structure to ensure adequate fixed cost recovery given the nationwide trend in the growth of customer-sited distributed energy resources. •EXPENSES –For Administrative & General expenses, DME exhibits higher cost ratios, especially on a per mile of distribution basis. •LIQUIDITY –DME appears to be operating the utility in such a manner as to have the reserves necessary to pay its short and long-term obligations. To support future Revenue Bond financings, DME should continue to monitor measures such as Days Cash On Hand and Debt Service Coverage Ratio that rating agencies rely on. •UNCOLLECTIBLE ACCOUNTS –DME showed a substantial drop in uncollectibles per revenue dollar from about 7 cents in 2016 to approximately 3 cents in 2017. If DME instituted a new policy to reduce bad debt in 2017, it appears to be working effectively. If not, DME should investigate what procedures have caused the decline so that it can continue this downward trend. •LOAD GROWTH TRENDS –DME has experienced a decline in kilowatt hours sales over the period covered in this Benchmarking Study (2015 –2017). Across the industry, the trend also appears to be in load decline due to a drop in energy intensity. Real estate development in the DME service territory has the potential to overcome decline in energy intensity. 156 166 NEWGEN STRATEGIES AND SOLUTIONS, LLC Financial Performance 157 Measurement How DME Compares Notes & Other Information RevenueRevenue per kWh Middle of Comparators Lower ratio typically means more affordable rates Customer mix, load factor, and commodities contribute to differences in ratio Effective Rate Higher than most Comparators and APPA Southwest Region statistics Customer mix, load factor, and commodities contribute to differences in ratio LiquidityCurrent Ratio Lower than Comparator average and slightly lower than APPA data DME’s 2.4-3.7 3-year ratio suggest ability to meet short-term obligations Debt Service Coverage Ratio (DSCR) Lower than 7 Comparators and APPA averages Higher than DME’s required coverage level DME’s DSCR is 1.71 DCSR > 1.0 generally means the utility has sufficient funds to pay its current debt obligations Debt to Total Assets Lower than Comparators average Higher than APPA statistics for similar sized utilities Longer term measurement of liquidity Days Cash on Hand Above Comparator median and average In 2017, DME has enough cash to cover 119 days of operating expenses Uncollectable Accounts per Revenue Dollar Higher than APPA statistics and Comparator median, but lower than the average Suggests DME may want to review its account receivables and deposit policies Operating MarginOperating Income to Total Revenue In alignment with Comparator median Higher number indicates a smaller portion of revenue is going to pay operating expenses DME is earning ~$0.08 for every dollar of sales revenue167 NEWGEN STRATEGIES AND SOLUTIONS, LLC Operational Performance •Administrative & General (A&G) and Customer Expenses –A&G expenses are those costs not allocable to power costs, distribution, or customer accounting. Items typically include compensation for executives, office supplies, professional fees, property insurance and claims, and pensions and benefits. DME’s ratio of A&G expense per circuit mile is higher than the comparator’s average and median. DME’s A&G expenses per customer are higher than the average and median, but in line with NBU and APPA statistics for similarly sized utilities. These ratios are subject to each utility’s accounting practices and utilities that share A&G expenses across several utility services may exhibit lower cost allocations to its electric operations. –The Customer Accounting, Service, and Sales ratio measures the utility's customer-related expenses incurred relative to each customer served. Customer expenses typically include customer service center, meter reading, billing, key accounts, credit and collections, and uncollectable accounts. This ratio is subject to each utility’s accounting practices and if services are shared across multiple utility services. DME’s ratio is below that of three of the four comparator for which data was available as well as in line with APPA data. 158 168 NEWGEN STRATEGIES AND SOLUTIONS, LLC Operational Performance (cont’d) •Kilowatt-hours per Customer –The kWh per customer ratio reflects the average annual usage for all customer classes served by the utility; it is impacted by the distribution of the types of customers served, as well as factors such as energy efficiency measures and the level of customer-owned distributed generation. DME’s ratio is slightly above the comparator’s average and median. The downward trend in DME’s ratio of kWh per customer is not surprising, as it reflects a trend in lower usage seen across the country. •Productivity Measures –DME’s ratios for Customers per Employee and Megawatt hours per Employee are in alignment with the comparators and industry averages, an indication that it is efficiently operating the electric utility. •Electric Reliability –In 2018, DME’s measures for System Average Interruption Duration Index (SAIDI) is substantially better than that of APPA Region 4 utilities and similarly sized utilities. –In 2018, DME’s measures for System Average Interruption Frequency Index (SAIFI) is similar to APPA Region 4 utilities. •Energy Losses –The Energy Loss percentage is a measure of how much energy is lost in the utility’s electrical system and indicates the efficiency of the system. The losses include physical losses occurring in the distribution system, as well as metering and billing losses. DME’s ratio is slightly higher than most comparators and APPA averages. 159 169 Water & Wastewater Benchmarking SUMMARY OF FINDINGS & RECOMMENDATIONS 170 NEWGEN STRATEGIES AND SOLUTIONS, LLC Water & Wastewater Benchmarking – Key Takeaways •EFFECTIVE RATE –In terms of effective rate (revenue per MG) across all retail customers for both Water and Wastewater operations, Denton should continue to work toward attaining a balance between reasonable rates for customers and sufficient revenue to achieve financial sustainability. •LIQUIDITY –Denton appears to be operating the Water and Wastewater utilities in such a manner as to have the reserves necessary to pay its short and long-term obligations. •PRODUCTIVITY –Several of Denton’s efficiency measures have indicated lower than average productivity. While climate and water conservation measures have an impact on the water delivered per employee ratio, the seemingly lower levels of productivity should be investigated further. However, this measure is impacted by how services are shared across a municipal organization. For some water and/or watewater operations, activies such as customer service and billing are staffed outside the utility, which would lead to higher productivity indices. 161 171 NEWGEN STRATEGIES AND SOLUTIONS, LLC Financial Performance 162 Measurement How DME Compares Notes & Other Information RevenueRevenue per MG Water delivered Higher than Comparator average for Water, except Garland Customer mix and commodity costs contribute to differences in ratio Revenue per MG Water collected Higher than Comparator average Higher than all Comparators operating wastewater systems in Texas Customer mix and commodity costs contribute to differences in ratio LiquidityCurrent Ratio Lower than Comparator average Water’s 2.6-5.0 and Wastewater’s 3.5-6.1 3-year ratios indicates the ability to meet short-term obligations is more than adequate Debt Service Coverage Ratio (DSCR) Lower than Comparator median for Water Above Denton’s required coverage level Water’s ratio ranged from 1.6 to 2.3 between 2015 and 2017 DSCR > 1.0 generally means the utility has sufficient income to pay its current debt obligations Debt Ratio At Comparator median but slightly lower than AWWA statistics for Water Substantially lower than Comparator and AWWA statistics for Wastewater Water’s debt ratio is 32% and Wastewater’s is 21% May indicate that Water and Wastewater are not highly leveraged Operating MarginOperating Income to Total Revenue Just below Comparator median for Water Denton is earning ~$0.09 for every dollar of Water revenue and $.018 for every dollar of Wastewater revenue 172 NEWGEN STRATEGIES AND SOLUTIONS, LLC Financial Performance -Revenue (cont’d) Water/Wastewater Revenue •Retail revenue per retail million gallons of water delivered for Water operations and per millions of gallons (MG) of water collected or treated for wastewater operations generally demonstrates the magnitude of water/wastewater rates charged. Customer mix and commodity costs contribute to differences in this ratio. •Denton’s revenue per MG of water delivered for all retail customers is higher the comparators’ average as well as higher than all comparators except for Garland. •Denton’s revenue per MG of water collected or processed for all retail customers is higher the comparators’ average as well as higher than all comparators operating wastewater systems in Texas. 163 173 NEWGEN STRATEGIES AND SOLUTIONS, LLC Financial Performance -Liquidity (cont’d) Water/Wastewater Liquidity •The Current Ratio (current assets compared to current liabilities) is a measure of short-term liquidity. While Denton’s results are lower than the benchmark group average, its ratio in the 2.6 to 5.0 range for Water operations and between 3.5 and 6.1 for Wastewater operations over the three years of this Benchmark Study indicates that its ability to meet its short-term obligations is more than adequate. •Another short-term liquidity measure is Debt Service Coverage. The Debt Service Coverage Ratio (DSCR) is a measure of cash flow available to pay current debt obligations. This ratio is typically influenced by the utility’s financial policies. A ratio greater than 1.0 generally means that the utility has sufficient income to pay its current debt obligations. Debt obligations such as bond covenants often require specific levels of this ratio, with a DSCR of 1.0 typically a requirement. For Water operations, Denton’s DSCR ranged from 1.6 to 2.3 from 2015 through 2017 and was lower than the comparator group median. However, it is well above Denton’s required coverage level of 1.25. •Debt Ratio is a longer term measure of liquidity; it is the ratio of long-term debt plus current and accrued liabilities to total assets. The target level of this ratio is also generally influenced by the utility’s financial policies. For Water, at 32%, Denton’s debt ratio is at the comparators’ median, but slightly lower than the AWWA statistics. For Wastewater, Denton’s debt ratio is 21%, which is substantially lower (better) than the comparator 75th percentile and AWWA statistics. This indicates that for both its Water and Wastewater operations, Denton is not highly leveraged. 164 BACK 174 NEWGEN STRATEGIES AND SOLUTIONS, LLC Financial Performance –Operating Margin •Water/ Wastewater Operating Margin –Denton’s ratio of operating income to total Water revenue is just below the comparator ’s median. A higher number is more favorable as it indicates that a smaller portion of revenue is going to pay operating expenses. Its operating margin indicates that Denton is earning approximately 9 cents for every dollar of Water revenue and 18 cents for every dollar of Wastewater revenue (before debt service and in lieu of franchise fee and return on investment payments). 165 175 NEWGEN STRATEGIES AND SOLUTIONS, LLC Operational Performance •Million Gallons per Customer –The MG per water customer ratio reflects the average annual usage for all customer classes served by the utility; it is impacted by the distribution of the types of customers served, as well as factors such as water conservation measures. Denton’s ratio is slightly below the comparator’s median, but is among the highest usage among the Texas Water utilities. Denton’s ratio of MG collected or processed per Wastewater customer is on par with comparator utilities and varied little over the past three years. •Productivity Measures –Customers per Employee –For both Water and Wastewater operations, Denton’s level of productivity as measured by the number of customers serve per employee is well below that of both comparators and AWWA statistics. –Million Gallons per Employee –For both Water and Wastewater operations, Denton’s level of efficiency as measured by the number of gallons delivered, collected, or processed per employee is well below that of both comparators and AWWA statistics. 166 176 Benchmarking –Detailed Findings Denton Municipal Electric TOC 177 NEWGEN STRATEGIES AND SOLUTIONS, LLC Financial Performance •The following graphs illustrate financial ratios and comparisons, including: –Revenue –Liquidity –Operating margin 168 178 NEWGEN STRATEGIES AND SOLUTIONS, LLC •On a revenue per kWh basis across all customer classes, DME’s ratio of 11.3 cents is slightly lower than the average and median for the comparators. •APPA statistics show values well below DME and the comparison group average. •While revenue per kWh is a reflection of the magnitude of electricity rates (the effective rate paid by customers), the customer mix, load factor, and commodity costs contribute to differences in this ratio. •For this ratio, DME should strive for a balance between reasonable rates for customers and sufficient revenue for the utility to sustain itself financially. Revenue per kWh – All Retail Customers 2017 169 179 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Across all customer classes, DME’s ratio of revenue per kWh shows a moderate increase over the previous three years. Several of the comparators (BTU, RPU, and FCU) exhibit a similar trend. •Since variations in revenue per customer can be attributed to several factors, including the load factor and commodity costs, slight variations over time are not a major concern. DME’s rates have risen slightly over the past three years, which has impacted this measure. •Future increases may require further analysis to ensure that rates charged to customers are tracking with power costs. Revenue per kWh – All Retail Customers 3-Year Trend 170 180 NEWGEN STRATEGIES AND SOLUTIONS, LLC •At approximately 11 cents, DME’s revenue from residential customers per kWh sold to this class is similar to many comparators (with the exception of the California utilities –RPU and REU), the median value of the comparator group, and the APPA data. Revenue per kWh – Residential 2017 171 181 NEWGEN STRATEGIES AND SOLUTIONS, LLC •As with the slight increase in revenue per kWh across all customer classes, DME’s revenue from Residential customers per kWh sold exhibits a small rise over the past three years. •All the comparators have only slight changes in this ratio over the last three years. •Among the comparators, only Garland Power & Light shows a decline in revenue per kWh over the time period. Revenue per kWh – Residential 3-year Trend 172 182 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s measure of revenue from commercial customers per kWh sold is 9.9 cents and is lower than the comparators group average, but slightly higher than the median. •As with this measure for residential customers, DME’s effective rate for commercial customers is similar to the APPA data for similarly sized utilities and is much lower than for the two California utilities included in this benchmarking. Revenue per kWh – Commercial 2017 173 183 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s revenue from Commercial customers per kWh sold exhibits a relatively flat trend over the past 3 years. •While number of kWh hours sold to DME’s commercial customers decreased by approximately 7% from 2015 to 2017, on a per customer basis, the revenue exhibits little change over that time period. •GP&L, GEUS and NBU show slight declines in commercial revenue per kWh sold over the three years reviewed. Revenue per kWh – Commercial 3-year Trend 174 184 NEWGEN STRATEGIES AND SOLUTIONS, LLC •At 7.8 cents, DME’s revenue per kWh sold to industrial customers is above the comparator median as well as slightly higher than the effective rate reported by APPA across the U.S. and for similarly sized utilities. •Several of the comparator utilities do not serve industrial customers or do not report sales to industrial customers separately from commercial, hence data was not available for this graphic. Revenue per kWh – Industrial 2017 175 185 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s revenue per kWh sold to industrial customers shows a very small downward trend over the past three years. •DME’s kWh sales to industrial customers rose by approximately 3% from 2015 to 2017. However, on a per kilowatt hour (kWh) basis its revenue from this customer class decreased in 2017 compared to the previous 2 years. •Several comparators (GP&L, and NBU) exhibit a similar downward trend in effective rate for Industrial customers; which is frequently an indication of declining commodity costs. Revenue per kWh – Industrial 3-year Trend 176 186 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Average monthly usage and resultant bills based on current electricity rates are shown for Denton and the Texas comparators. •DME’s average residential monthly bill based on average monthly usage among DME customers is similar to bill amounts for the other Texas utilities. •Although average monthly residential usage varies substantially, from a low of 848 kWh (GEUS) to a high of 1,156 kWh (NBU), with the exception of NBU, the average bill is within 15% range. Average Residential Monthly Electricity Bill & Usage Comparison -2017 177 187 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Current Ratio is defined as current assets ÷ current liabilities and measures the utility’s short-term liquidity. Current assets typically include cash, marketable securities, accounts receivables, and inventories. Current liabilities usually include accounts payable, short-term notes, and accrued expenses. A ratio below 1.0 may be indicative of cash flow issues, while a ratio of ~2.0 or higher suggests efficient management of working capital. •DME’s Current Ratio of 2.4 is similar to APPA averages and lower than the comparators group median and average. It indicates that the utility has sufficient funds to cover short- term indebtedness. •In order to accommodate paying for expenses with cash (or other reasons for holding significant balances in short-term reserves), some utilities will have higher than average Current Ratios. •Risk management policies may dictate analyzing the level of this measure to ensure liquidity if access to debt financing is limited. ELECTRIC Current Ratio –2017 178 188 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Current Ratio for DME declined slightly in 2017 compared to the previous two years. •The Current Ratio for the majority of comparator utilities varies only slightly year-to-year over the past three years. This is an indication that each utility is adhering to its risk management or other financial policies regarding desired levels of liquidity. ELECTRIC Current Ratio – 3-Year Trend 179 189 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Debt Service Coverage Ratio (DSCR) is the ratio of net income to total long-term debt service for the year; it measures the utility’s ability to meet its long-term debt obligations. •At 1.7, DME’s DSCR is lower than for seven of the eight comparators and the APPA averages. However, it is higher than its 1.00 DSCR requirement. •This ratio is typically influenced by the utility’s financial policies with a ratio greater than 1 meaning that the utility has sufficient income to pay its current debt obligations. Debt obligations frequently require specific levels of this ratio, with bond covenants often requiring a DSCR between 1.0 and 2.0. These ratio is also greatly influenced by the structure of the utility with wires-only electric utilities frequently exhibiting higher DSCRs than those utilities with generation assets. ELECTRIC Debt Service Coverage –2017 180 BACK 190 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Since DSCRs may be dictated by bond covenant's and/or fiscal policies, it is not surprising that they do not vary significantly over time. •Large increases typically would occur in years when new debt is issued; conversely refund or retiring debt could lead to substantial decreases in this measure ELECTRIC Debt Service Coverage – 3-Year Trend 181 BACK 191 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Debt to Total Assets is the ratio of long-term debt plus current and accrued liabilities to total assets. It is normally influenced by a utility’s financial policies. •At 0.24, DME’s ratio is lower than the comparator’s average, and the APPA average for utilities in the southwest U.S., and across the country, but is similar to the ratio for NBU. •While low or no debt offers certain advantages, debt financing is often used as a financial management tool to amortize large, long-lived infrastructure costs over the long- term (e.g., 20 to 30 years). This aligns the cost of the assets to their useful lives. Limiting or foregoing debt financing may result in less predictable rates for customers due to changes in supply costs or high capital costs for major infrastructure projects. ELECTRIC Debt to Total Assets –2017 182 192 NEWGEN STRATEGIES AND SOLUTIONS, LLC •For most utilities, Debt to Total Assets is a relatively stable number; although substantial changes may occur when new debt is issued or debt is retired. •From a risk perspective, lower ratios are considered better debt ratios (<0.4), while higher debt ratios (0.6+) may make it more difficult to borrow money. •For 2016 to 2017, DME’s ratio doubled from 0.12 to 0.24 due to the issuance of $$214.9 million of utility revenue bonds in May 2017. ELECTRIC Debt to Total Assets – 3-Year Trend 183 2015 data not available for NBU 193 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Days Cash on Hand is another measure of liquidity that rating agencies are typically interested in. It is a measure of how much cash the utility has in relation to its operating expenses. •DME has enough cash to cover 119 days of operating expenses, which is higher than both the comparator group median and average. •Days Cash on Hand is typically influenced by the utility’s financial policies and should promote a balance between maintaining adequate reserves while also prudently operating the utility. ELECTRIC Days Cash on Hand –2017 184 194 NEWGEN STRATEGIES AND SOLUTIONS, LLC •As with other financial metrics, Days Cash on Hand for municipal utilities generally does not vary significantly year-to-year. DME’s number of Days of Cash on Hand ranges from a low of 119 to a high of 175 over this three year period. •In 2017, GEUS experienced a negative unrestricted cash net position related to impairment of prepaid electric costs associated with TMPA , which results in a negative measure for Days Cash on Hand. ELECTRIC Days Cash on Hand – 3-Year Trend 185 195 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Operating margin is a measure of the proportion of a utility’s revenue remaining after paying operating expenses. •DME’s ratio is similar to the comparator’s median, as well as higher than five of the nine comparators. Its operating margin of 7.7% indicates that DME is earning almost 8 cents for every dollar of sales revenue before debt service, capital projects, and transfers to the City for return on investment and franchise taxes. ELECTRIC Operating Margin –2017 186 196 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s Operating Margin has declined from 2016 levels, with a similar trend for BTU. •Other Texas utilities have seen a declining over the past three years, including GP&L, GUES, NBU and BPUB. •Modest annual changes in this measure are not typically a concern; however, trends such as continued declines or substantial drops in the margin over time may highlight rising costs that are not being adequately recovered by rates and might warrant rate increases or conducting a cost of service study. ELECTRIC Operating Margin – 3-Year Trend 187 197 NEWGEN STRATEGIES AND SOLUTIONS, LLC Operational Performance •The following graphs illustrate operational ratios and comparisons, including: –Expenses –Kilowatt-hours per customer –Reliability 188 198 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Uncollectable Accounts per Revenue Dollar measures the portion of each revenue dollar that will not be collected by the utility. •DME’s ratio is similar to the average for comparators and slightly higher than the APPA statistics. ELECTRIC Uncollectible Accounts per Revenue Dollar –2017 189 199 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s ratio of Uncollectible Accounts per Revenue Dollar shows a decline over the three years of 2015 through 2017. ELECTRIC Uncollectible Accounts per Revenue Dollar – 3-Yr Trend 190 200 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Administrative & General (A&G) expense per circuit mile of distribution ratio measures the utility’s A&G expense incurred relative to each mile of distribution. A&G expenses are those costs not allocable to power costs, distribution, or customer accounting. Items typically include compensation for executives, office supplies, professional fees, property insurance and claims, and pensions and benefits. •DME’s ratio is higher than comparator’s average, as well as higher than all other comparators. •This ratio is subject to each utility’s accounting practices and for multi-service utilities such as BTU, BPUB, RPU, FCU and LUS, A&G expenses may be lower as the costs are shared across electric and water operations. ELECTRIC A&G Expense per Distribution Mile –2017 191 201 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s ratio of A&G expense per mile of distribution is trending upward over the time period of 2015 through 2017. ELECTRIC A&G Expense per Distribution Mile – 3-Year Trend 192 202 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The A&G expense per customer ratio measures the utility’s A&G expense incurred relative to each customer. A&G expenses are those costs not allocable to power costs, distribution, or customer accounting. Items typically include compensation for executives, office supplies, professional fees, property insurance and claims, and pensions and benefits. •DME’s ratio is above the group average and the APPA averages. •This ratio is subject to each utility’s accounting practices and for utilities such as BTU, RPU and MID, A&G expenses may be lower as the costs are shared across electric and water operations. ELECTRIC A&G Expense per Customer –2017 193 203 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s ratio of A&G expense per customer is also trending upward over the past 3 years. •Further increases in A&G expense ratios may warrant additional analysis. ELECTRIC A&G Expense per Customer – 3-Year Trend 194 204 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Customer Accounting, Service, and Sales ratio measures the utility's customer- related expenses incurred relative to each customer served. Customer expenses typically include customer service center, meter reading, billing, key accounts, credit and collections, and uncollectable accounts. This ratio is subject to each utility’s accounting practices and if services are shared across multiple utility services. Additionally, larger utilities may be able to achieve economies of scale. •At $52, DME’s ratio is well below the comparator’s average and median, but similar to the APPA statistics for like-sized utilities and the U.S. overall. •Being below average in this expense can be a false economy if customer-facing services are rated low by customers. •Many of the comparator utilities do not report their Customer service expenses. ELECTRIC Customer Accounting/Service/Sales Expense per Customer–2017 195 205 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s ratio of Customer Accounting, Service, and Sales expense per customer is exhibiting an downward trend from 2015 through 2017. ELECTRIC Customer Accounting/Service/Sales Expense per Customer – 3-Year Trend 196 206 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The kilowatt hour (kWh) per customer ratio demonstrates average annual usage for all customer classes served by the utility. This is typically a reflection of the distribution of the types of customers served. •At almost 28,000, DME’s ratio is slightly above the comparator’s average and median. ELECTRIC Kilowatt Hours per Customer –2017 197 207 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s ratio of kWh per customer is trending downward over the time period of 2015 through 2017. •Most other utilities (with the exception of BPUB and RPU) also show a downward trend in electric usage per customer. •Across the U.S., the trend is toward declining load growth even in the face of expanding customer base. •From 2015 to 2017, DME saw a 3.7% growth in the number of accounts served, but only a 3.0% growth in kWh sold. ELECTRIC Kilowatt Hours per Customer – 3-Year Trend 198 208 NEWGEN STRATEGIES AND SOLUTIONS, LLC •At approximately 12,000 kWh sold in 2017, DME’s ratio of kWh sold per residential customer is slightly above the comparator’s average, but below the median. •The average amount of electricity sold per residential customer is typically impacted by the housing mix (single family vs. multi-family), size of homes, number of members per household, as well as solar installations and energy efficiency measures enacted. ELECTRIC Residential KWH per Residential Customer -2017 199 209 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s ratio of kWh sold per residential customer is declining slightly over the time period of 2015 through 2017. •Annual variations can occur based on extreme weather conditions (such as an unusually hot or cold summer) or changing housing trends such as increased energy efficiency measures or roof-top solar. ELECTRIC Residential KWH per Residential Customer – 3-Year Trend 200 210 NEWGEN STRATEGIES AND SOLUTIONS, LLC •At approximately 53,000 kWh sold in 2017, DME’s ratio of kWh sold per Commercial customer is below the comparator’s average and median. •However, several utilities report combined commercial and industrial customer numbers and usage (GEUS, BPUB and LUS). The average usage without those 3 utilities is displayed on the graph (~64,000). •Usage by customer class is impacted by how each utility defines its classes. ELECTRIC Commercial KWH per Commercial Customer -2017 201 211 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s ratio of kWh sold per Commercial customer, as well as the ratio for most comparators is little changed over the time period of 2015 through 2017. ELECTRIC Commercial KWH per Commercial Customer – 3-Year Trend 202 212 NEWGEN STRATEGIES AND SOLUTIONS, LLC •At over 4 million kWh sold in 2017, DME’s ratio of kWh sold per Industrial customer is well below the comparator’s average and median. •As previously noted, how each utility classifies customers impacts these customer class ratios. Several of the comparators that show high levels of usage on a per customer basis only classify a few (<20) customers as “Industrial.” ELECTRIC Industrial KWH per Industrial Customer –2017 203 213 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s ratio of kWh sold per Industrial customer, as well as the ratio for most comparators is little changed over the time period of 2015 through 2017. •Large changes to this ratio typically occur if large industrial customer with high load factors either enters or leaves a serve territory. ELECTRIC Industrial KWH per Industrial Customer – 3-Year Trend 204 214 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s ratio of number of customers served per employee is lower than the comparator average and median, but higher than the APPA averages. This ratio is a measure of workforce productivity. •This ratio is influenced by the mix of customer types and population density. It is also influenced by the extent that employees are shared with other (non-electric) departments or operations. ELECTRIC Customers Served per Employee 205 215 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Another measure of productivity is amount of electricity sold per employee. •DME’s ratio of number of megawatt hours of electricity sold per employee is in line with the comparator average and median. •This ratio is influenced by customer mix and load factors. For example, less than 1% of NBU’s customers are industrial (13 customers), but their usage is over 40% of megawatt hours NBU sells. ELECTRIC Retail Megawatts Hours Sold per Employee 206 216 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Energy Loss percentage is the ratio of total energy losses to total sources of energy; it measures how much energy is lost in the utility’s electrical system and indicates the efficiency of the system. The losses include physical losses occurring in the distribution system as well as metering and billing losses. •At approximately 5% DME’s ratio is above the comparator’s median and average, as well as higher than the APPA statistics. •This level of losses warrants a loss study to determine the source(s) of these losses. ELECTRIC Energy Loss –2017 207 217 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s ratio did not vary significantly over the prior 3 years. •Of the utilities included in the study, only BPUB shows a significant difference year-to- year. ELECTRIC Energy Loss –Trend 208 218 NEWGEN STRATEGIES AND SOLUTIONS, LLC System Reliability •The following graphs illustrate reliability indices, including: –SAIDI (System Average Interruption Duration Index) –SAIFI (System Average Interruption Frequency Index) 209 219 NEWGEN STRATEGIES AND SOLUTIONS, LLC •For 2018, DME’s SAIDI index is substantially better than that of APPA Region 4 utilities and similarly sized utilities comparators; while its SAIFI index is similar to APPA comparators. SAIDI & SAIFI –Calendar Year 2018 210 SAIDI SAIFI Note: The 2018 comparators differ from those in previous years220 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s SAIDI measure (number of minutes of system average interruption duration index) for 2017 is higher than its comparators. SAIDI –Calendar Year 2017 211 221 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Age of infrastructure, the utility’s level of emphasis on regular maintenance and vegetation policy as well as percentage of underground distribution lines typically impacts these reliability indices. •For example, FCU’s distribution system is over 90% underground which maybe reflected in its low SAIDI results. SAIDI –3 Year Trend 212 222 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s SAIFI measure (number of times of system average interruptions) is considerably higher than the comparators. SAIFI –Calendar Year 2017 213 223 NEWGEN STRATEGIES AND SOLUTIONS, LLC •DME’s SAIFI measure (number of times of system average interruptions) is considerably higher than the comparators. SAIFI – 3-Year Trend 214 224 Benchmarking –Detailed Findings Denton Water Utility TOC 225 NEWGEN STRATEGIES AND SOLUTIONS, LLC Financial Performance –Water •The following graphs illustrate financial ratios and comparisons, including: –Revenue –Liquidity –Operating margin 216 226 NEWGEN STRATEGIES AND SOLUTIONS, LLC •On a revenue per million gallons (MG) basis across all customer classes, Denton’s ratio of $5,705 is higher than the 75th percentile of the comparators. •While revenue per MG is a reflection of the magnitude of water rates (the effective rate paid by customers), the customer mix and commodity costs contribute to differences in this ratio. •Greenville’s revenue value is for combined water and wastewater operations. •For this ratio, Denton should look to achieve a balance between reasonable rates for customers and sufficient revenue for financial sustainability. WATER Revenue per Million Gallons of Water Sold -2017 217 227 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Across all customer classes, Denton’s ratio of revenue per MG shows a moderate increase over the previous three years. Several of the comparators (Greenville, Frisco, and McKinney) exhibit a similar trend. •Since variations in revenue per customer can be attributed to several factors, including commodity costs, slight variations over time are not a major concern. •Future increases may require further analysis to ensure that rates charged to customers are tracking with water supply costs. WATER Revenue per Million Gallons Sold -Trend 218 228 NEWGEN STRATEGIES AND SOLUTIONS, LLC •For residential customers served by a ¾-inch service connection, Denton’s water bill for 7,500 gallons of usage is higher than for six of the Texas-based comparators as well as above the AWWA Region IV average. However, city of Garland residential bill for usage of 7,500 gallons is over 25% higher than Denton’s. •All the Texas water utilities in this study offer incline block tiered rates for at least part of year, but the size of the blocks and associated rates vary widely. WATER: Average Residential Bill for 7,500 Gallons Usage 219 Lowest Tier Rate Highest Tier Rate Denton 4.15$ 10.90$ Garland 4.77$ 9.22$ BTU 2.76$ 3.50$ Greenville 3.45$ 4.37$ NBU 1.55$ 5.43$ BPUB 1.98$ 4.08$ Round Rock 2.56 5.77 Frisco 3.92$ 6.78$ McKinney 4.40$ 6.60$ Grand Prairie 4.04$ 7.24$ 229 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Current Ratio is defined as current assets ÷ current liabilities and measures the water utility’s short-term liquidity. Current assets typically include cash, marketable securities, accounts receivables, and inventories. Current liabilities usually include accounts payable, short-term notes, and accrued expenses. A ratio below 1.0, may be indicative of cash flow issues, while a ratio of ~2.0 or higher suggests efficient management of working capital. •Denton’s Current Ratio of 4.2 is slightly higher than the median, and it indicates that the water utility has sufficient funds to cover short-term indebtedness. WATER Current Ratio -2017 220 230 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Current Ratio for Denton declined slightly in 2017 compared to the previous year. •The Current Ratio for the majority of comparator water utilities varies only slightly year-to-year over the past three years. This is an indication that each utility is adhering to its risk management or other financial policies regarding desired levels of liquidity. However, McKinney saw a significant decrease in its Current Liabilities from 2015 to 2016, leading to a substantial increase in its Current Ratio. •In order to accommodate paying for expenses with cash (or other reasons for holding significant balances in short-term reserves), some utilities will have higher than average Current Ratio. WATER Current Ratio -Trend 221 231 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Debt Service Coverage Ratio (DSCR) is the ratio of net income to total long- term debt service for the year; it measures the utility’s ability to meet its long-term debt obligations. •At 1.99, Denton’s DSCR is lower than the 25th percentile of comparators, but above the AWWA overall average (mean). Additionally, it is higher than the water operations’ 1.25 DSCR requirement. WATER Debt Service Coverage Ratio –2017 222 BACK 232 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Since DSCRs may be dictated by bond covenant's and/or fiscal policies, it is not surprising that they do not vary significantly over time. •This ratio is typically influenced by the utility’s financial policies with a ratio greater than 1 meaning that the utility has sufficient income to pay its current debt obligations. Debt obligations frequently require specific levels of this ratio, with bond covenants often requiring a DSCR between 1.0 and 2.0. WATER Debt Service Coverage Ratio – 3-Year Trend 223 BACK 233 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Debt Ratio is defined as total liabilities ÷ total assets and measures the utility’s level of indebtedness. The higher the debt ratio, the more dependent the water utility is on debt financing. •Denton’s Debt Ratio of 32% is close to the benchmark median, not as low as the 75th percentile of comparators. It is also lower than the AWWA averages (mean). This indicates that the Denton water utility is not overly leveraged. •Additionally, according to the 2018 AWWA study, Denton’s debt ratio is slightly better than the median based on 50 water utilities who participated as shown in the table. WATER Debt Ratio -2017 224 Denton 75th Percentile Median 25th Percentile Count 32%20%33%53%50 234 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Debt Ratio for Denton declined in 2017 compared to the previous years. •The Debt Ratio for the majority of comparator utilities varies only slightly year-to-year over the past three years; which is typical except in years in which new debt is issued or debt is refunded. •Due to its stable cash flows, utilities frequently operate with a debt level of approximately 40%. However, some municipal utilities elect to either forgo issuing debt or use limited debt financing, which results in very low debt ratios. WATER Debt Ratio -Trend 225 235 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Operating Margin is a measure of the proportion of the water utility’s revenue remaining after paying operating expenses. •Denton’s ratio is higher than the comparator ’s median. Its operating margin of 9.1% indicates that Denton is earning just over 9 cents for every dollar of sales revenue before debt service, capital projects, and transfers to the City for return on investment and franchise taxes. •Operating margin for Greenville (shown as blue bar) is based on combined water and wastewater operation financials. •The Frisco water utility shows a negative operating margin as it had negative operating income (loss) that appears to be due to non-cash transactions. WATER Operating Margin –2017 226 236 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Denton’s Operating Margin has declined from 2015 levels, with a similar trend for Frisco and Grand Prairie. •Modest annual changes in this measure are not typically a concern; however, trends such as continued declines or substantial drops in the margin over time may highlight rising costs that are not being adequately recovered by rates and might warrant rate increases or conducting a cost of service study. •The Frisco water utility shows a negative operating margin in 2017 as it had negative operating income (loss) in that year. WATER Operating Margin – 3-Year Trend 227 237 NEWGEN STRATEGIES AND SOLUTIONS, LLC Operational Performance –Water •The following graphs illustrate operational ratios and comparisons, including: –Customers per employee –Million gallons delivered per employee 228 238 NEWGEN STRATEGIES AND SOLUTIONS, LLC •At approximately 156,000 gallons sold in 2017, Denton’s ratio of million gallons sold per customer is slightly higher than the comparator’s median and below the 75th percentile. •The average amount of water sold per customer is typically impacted by the mix of customer classes, as well as water conservation measures enacted. WATER Million Gallons per Customer -2017 229 239 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Denton’s ratio of MG per customer has remained relatively consistent over the time period of 2015 through 2017. •Several other Texas water utilities have exhibited an increase in per customer usage (Garland, BTU, BPUB, Round Rock and Grand Prairie), while others (Greenville and Frisco) show a downward trend in water usage per customer. WATER Million Gallons per Customer – 3-Year Trend 230 240 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The customer per employee ratio demonstrates productivity, with higher numbers of customers per employee indicating more efficient operations. However, this measure is also a reflection of how services are shared across a municipal organization. For some water utilities, activities such as customer service and billing are staffed outside the utility which would lead to higher productivity indices. •Denton’s ratio using the adjusted number of employees (to remove shared services staff counts, FTE = 97) is to just under the 25th percentile and the AWWA averages (mean). •For the utilities shown as blue bars, this ratio is based on to the total number of FTEs in both Water and Wastewater operations. WATER Retail Customer Accounts Served per Employee -2017 231 241 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The ratio of system throughput to number of employees is a common high- level measure of productivity. However, this measure is also a reflection of how services are shared across a municipal organization. For some water utilities, activities such as customer service and billing are staffed outside the utility which would lead to higher productivity indices. •Denton’s water utility productivity of 150,000 gallons per day delivered per the adjusted number of employees (FTE = 97 – after removing shared services staff) is slightly below the comparator 25th percentile and lower than the below AWWA averages (mean). •This measure may also be impacted by climate and water conservation measures implemented. WATER Million Gallons per Day Delivered per Employee -2017 232 242 Benchmarking –Detailed Findings Denton Wastewater Utility TOC 243 NEWGEN STRATEGIES AND SOLUTIONS, LLC Financial Performance –Wastewater •The following graphs illustrate financial ratios and comparisons, including: –Revenue –Liquidity –Operating margin 234 244 NEWGEN STRATEGIES AND SOLUTIONS, LLC •On a revenue per million gallons (MG) of wastewater collected or processed basis across all customer classes, Denton’s ratio of $5,653 per million gallons is higher than the 75th percentile of comparators. •Revenue per MG is the effective rate paid by customers; however, it is impacted by the customer mix and commodity costs. •For this ratio, Denton should balance reasonable rates for customers with achieving sufficient revenue for the utility to sustain itself financially. WASTEWATER Revenue per Million Gallons -2017 235 245 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Across all customer classes, Denton’s ratio of revenue per MG shows a slight increase over the past three years. •Variations in revenue per customer can be attributed to several factors, hence small changes over time are not a major concern. Denton adjusted its wastewater rates in October 2017, which likely accounts for the increase. •Future increases may require additional review to confirm that rates charged to customers are aligned with wastewater costs. WASTEWATER Revenue per Million Gallons Processed - 3-Year Trend 236 246 NEWGEN STRATEGIES AND SOLUTIONS, LLC •For residential customers, Denton’s average monthly wastewater bill for 7,500 gallons of usage is $39.50 which is slightly higher than the 25th percentile and lower than the median among comparators. It is also similar to the AWWA average bill for Region IV. •The fixed cost recovery component of the wastewater rates varies from a low of $6.55 for Garland, to a high of $25.44 for Frisco. As with the overall bill, Denton is again in the middle of the range with a customer service charge of $11. WASTEWATER Average Monthly Residential Bill for 7,500 Gallons Usage -2017 237 247 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Current Ratio is defined as current assets ÷ current liabilities and measures the water utility’s short-term liquidity. Current assets typically include cash, marketable securities, accounts receivables, and inventories. Current liabilities usually include accounts payable, short-term notes, and accrued expenses. A ratio below 1.0, may be indicative of cash flow issues, while a ratio of ~2.0 suggests efficient management of working capital. •Denton’s Current Ratio of 6.1 is higher than the comparator median and close to the 75th percentile; it indicates the water utility has sufficient funds to cover short-term indebtedness. •Ratios for NBU and BPUB are for the entire utility operations (electric, water, wastewater), ratios for Round Rock, Frisco, McKinney and Grand Prairie are for the combined water and wastewater operations. WASTEWATER Current Ratio -2017 238 248 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Current Ratio for Denton increased each year from 2015 to 2017. •The Current Ratio for the majority of comparator wastewater utilities varies only slightly year-to-year over the past three years. This is an indication that each utility is adhering to its risk management or other financial policies regarding desired levels of liquidity. •In order to accommodate paying for expenses with cash (or other reasons for holding significant balances in short- term reserves), some utilities will have higher than average Current Ratio. WASTEWATER Current Ratio - 3-Year Trend 239 249 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Debt Ratio is defined as total liabilities ÷ total assets and measures the wastewater utility’s level of indebtedness. The higher the debt ratio, the more dependent the wastewater utility is on debt financing. •Denton’s Debt Ratio of 21% is better than the 75th percentile as well as below the AWWA averages (mean). This indicates that the wastewater utility is not overly leveraged. WASTEWATER Debt Ratio -2017 240 250 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The Debt Ratio for Denton’s wastewater system declined in 2017 compared to the previous years. •The Debt Ratio for the majority of comparator water utilities varies only slightly year-to-year over the past three years; which is typical except in years in which new debt is issued or debt is refunded. •Due to its stable cash flows, utilities frequently operate with a debt level of 40%. However, some municipal utilities elect to either forgo issuing debt or use limited debt financing, which results in very low debt ratios. WASTEWATER Debt Ratio - 3-Year Trend 241 251 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Operating Margin is a measure of the proportion of the wastewater utility’s revenue remaining after paying operating expenses. •Denton’s ratio of 18.2% is above the 75th percentile. Its operating margin indicates that Denton is earning just over 18 cents for every dollar of sales revenue before debt service, capital projects, and transfers to the City for return on investment and franchise taxes. •The Frisco wastewater utility shows a negative operating margin as it had negative operating income (loss) that appears to be related to non-cash transactions. WASTEWATER Operating Margin -2017 242 252 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Denton’s Operating Margin has exhibited only slight variations over the past three years. •Modest annual changes in this measure are not typically a concern; however, trends such as continued declines or substantial drops in the margin over time may highlight rising costs that are not being adequately recovered by rates and might warrant rate increases or conducting a cost of service study. •The Frisco wastewater utility shows a negative operating margin in 2017 as it had negative operating income (loss) in that year. WASTEWATER Operating Margin - 3-Year Trend 243 253 NEWGEN STRATEGIES AND SOLUTIONS, LLC Operational Performance -Wastewater •The following graphs illustrate operational ratios and comparisons, including: –Customers per employee –Million gallons delivered per employee 244 254 NEWGEN STRATEGIES AND SOLUTIONS, LLC •At approximately 168,000 gallons in 2017, Denton’s ratio of MG per wastewater customer is slightly higher than comparators’ 75th percentile. •The average amount of wastewater collected or processed per customer is typically impacted by the mix of customer classes as well as weather events such as heavy levels of rainfall. WASTEWATER Million Gallons per Customer -2017 245 255 NEWGEN STRATEGIES AND SOLUTIONS, LLC •Denton’s ratio of MG per wastewater customer has remained relatively consistent over the time period of 2015 through 2017. WASTEWATER Million Gallons per Customer – 3-Year Trend 246 256 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The customer per employee ratio demonstrates operational efficiency. Higher numbers of customers per employee indicate higher levels of productivity. However, this measure is also a reflection of how services are shared across a municipal organization. For some wastewater utilities, activities such as customer service and billing are staffed outside the utility which would lead to higher productivity indices. •At 366, Denton’s ratio using an adjusted number of employees to remove staff providing shared services (FTE = 89) is below the comparator’s 25th percentile as well as lower than the AWWA averages (mean). •This measure may be impacted by how the wastewater operation allocates for shared services as well as whether or not maintenance crews maintain lower-lateral sections of the sewer line (from the customer cleanout to the collector). WASTEWATER Retail Customer Accounts Service per Employees -2017 247 257 NEWGEN STRATEGIES AND SOLUTIONS, LLC •The million gallons processed per employee ratio demonstrates average annual usage for all customer classes served by the wastewater utility. However, this measure is also a reflection of how services are shared across a municipal organization. For some wastewater utilities, activities such as customer service and billing are staffed outside the utility which would lead to higher productivity indices. •The ratio of system throughput to number of employees is a common high-level measure of productivity or efficiency. Denton’s wastewater utility productivity of 160,000 gallons processed per adjusted number of employee (to remove shared services staff numbers, FTE = 89) is higher than the 25th percentile of gallons processed, but slightly below the AWWA averages. WASTEWATER Million Gallons Processed per Employee -2017 248 258 APPENDICES TOC 259 NEWGEN STRATEGIES AND SOLUTIONS, LLC Name Title Name Title Kenneth Banks General Manager of Utilities Smith Day Regulatory & Risk Division Manager George Morrow General Manager of Denton Municipal Electric Stephen Johnson Market Operations Manager Brent Heath Executive Manager of Energy Delivery Mary Dickinson Business Manager Toni Puente Finance Director Kathy Brooks Electric Budget Manager Rusty White Electric Safety & Training Supervisor David Gaines Assistant Finance Director Jason Brown Power Plant Manager Jose Gaytan Energy Analytics Manager Brad Watts Operations Line Superintendent Kyle Thompson Power Plant Maintenance Supervisor Jerry Fielder Engineering Div Manager -Distribution Mike Wilson ERCOT Settlement & Rate Administrator JR Richardson Metering Superintendent Elizabeth Ruiz Energy Programs & Key Accounts Admin Fara Emadi Engineering Services Manager Kevin Griffin Power Plant Operations Supervisor Jerry Looper System Operations Manager Minh Tran Compliance Officer Sam Bridges Substation /Transmission Superintendent Michael Looper Electric Distribution Foreman Chuck Sears Engineering Div Manager -Transmission Bobby King Electric Distribution Senior Lineman Rowdy Patterson Distribution Line Superintendent Appendix A –Persons Interviewed 250 TOC 260 NEWGEN STRATEGIES AND SOLUTIONS, LLC Name Title Name Title David Clark Water Production Superintendent David Brown Wastewater Collections Manager Kirt Behrens Water Meter/Cross Connect Control Manager P. S. Arora Wastewater Director Susan Croff Process Control/QC Auditor Brian Smith Water Plant Manager Daniel Parish Water Utilities Coordinator Kent Conkle Superintendent Water/Wastewater Alberto Lopez Construction Projects Mgr Todd Estes Capital Projects Casey Bowles Water Distribution System Mgr Tony Puente Utilities Finance Administrator Tim Fisher Water Director Cassandra Ogden Director of Procurement and Compliance Tyler Dawson Field Service Technical Manager Frank Pugsley Deputy Director Water/Wastewater Frank Pugsley Deputy Director Water/Wastewater Melissa Kraft IT Director Rusty Willard Wastewater Reclamation /Beneficial Reuse Mario Canizares Assistant City Manager Nick Vincent Utility Business Manager Todd Hileman City Manager Tiffany Sherrane Wastewater Utility Coordinator Bryan Langley Deputy City Manager Appendix A –Persons Interviewed (cont’d) 251 261 NEWGEN STRATEGIES AND SOLUTIONS, LLC Appendix B –Documents Reviewed 252 2015-GEUS-Audited-Financial- Statement.pdf 2016-2017 Approved Budget GreenvilleTX 2016-2017 CAFR -City of Greenville 2016-GEUS-Audited-Financial- Statement.pdf 2018-19-Utility-Rate-Denton.pdf 2018-2019 PROPOSED BUDGETGreenvilleTX.pdf BPUB_FY2017_2018Budget.pdf BPUB2017_CAFR_FINAL.pdf BrownsvillePublicUtilitesCAFR_20 16.pdf Bryan_TX_FY_15_CAFR.pdf Bryan_TX_FY_16_CAFR.pdf Bryan_TX_FY_17_CAFRv2 City of Garland 2016-17 Adopted Budget.pdf City of Garland 2017-18 Annual Operating Budget.pdf CityofReddingCAFRFYE2016.pdf CityofReddingCAFRFYE2017.pdf Denton 2014-15-CAFR.pdf Denton 2015-16-CAFR.pdf Denton FY17-18 3rd-Quarter- Financial-Report.pdf Denton_2015-16-CAFR.pdf Denton_2017-CAFR.pdf FY15 City Of Garland CAFR.pdf FY16 City of Garland CAFR.pdf FY17 City of Garland CAFR.pdf Garland FY 2018-19 Proposed Budget.pdf Garland Texas -Water Rates.pdf Garland Texas -Water Utilities.pdf GEUS 2017 Annual Rpt.pdf GPL2015AnnualReport.pdf GPL2016AnnualReport.pdf GPL2017AnnualReport.pdf Greenville 2015 CAFR.pdf Greenville 2016 CAFR.pdf LCG_2017_CAFR.pdf NBU CAFR 2017 FINAL.pdf NBU_2018-Consumer-Confidence- Report Water.pdf Redding_CAFR_FYE 2015.pdf Riverside_2017_Financial Report.pdf Attachment 2 Electric Water WW Funds.pdf Copy of DME Vehicle Data 12.19.18.xlsx Copy of Historical Actuals 12 to present 08-01-18.xls 2017 Safety Awards of Excellence Annual Report Form (002).pdf DME SAFETY INCIDENT RATES.xlsx Electric Denton Benchmark data 20181120.xlsx Q17 DME long rept091308. ppt.ppt 2018 DME Historical Peak Loads Since 1960.PNG 2018-19 CIP Listing.xlsx 2019 CIP Feeder Imp 20180412.pdf Construction Report 20180830.pdf Copy of System Studies & Analysis.xlsx Final 2019 CIP RCA Map.pdf 16 Exhibit 3 -FY 2017-18 Electric Revised CIP.pdf 16 FY 17-18 Budget & CIP.pdf 2012-13-Budget.pdf 2012-13-CAFR.pdf 2013-14-Budget.pdf 2013-14-CAFR.pdf 2014-15-Budget.pdf 2014-15-CAFR.pdf 2015-16-Budget.pdf 2015-16-CAFR.pdf 2016-17-Budget.pdf 2016-17-CAFR.pdf 2017-City-of-Denton-CAFR.pdf Adopted-Cover-Page-and- expenditures.pdf AIS FINANCIAL STRATEGIES 2017 FINAL 012417.docx Attachment 1 Solid Waste Fund.pdf Attachment 2 Electric, Water, WW Funds.pdf Budget Instructions FY 18-19 12- 11-17.doc City-of-Denton-2018-19-Proposed- Budget.pdf City-of-Denton-Annual-Program- of-Services-FY-2017-18.pdf City-of-Denton-APoS-FY-2016- 17.pdf Debt-Report-09-30-13.pdf Debt-Report-09-30-14.pdf Debt-Report-09-30-15.pdf Debt-Summary-Report-17-46- 022117.pdf Debt-Summary-Report-18-47- FINAL.pdf DME 2014 Rates (2).pdf DME-Financial-Overview.pdf Exhibit 3 -Contract.pdf Expenditure Actuals for Five Years 2013-2017.xlsx FF and ROI Actuals -FY 2013- 17.xlsx Franchise Fee Memo 091318.docx FY 13-17 CIP Budget & Actuals.xlsx FY15-16 4th-Qtr-Report- electronic-copy.pdf FY16-17 2nd-Quarter-Financial- Report.pdf FY16-17 4th-Quarter-Financial- Report.pdf FY16-17 Website-3rd-Quarter- Report-Aug-24.pdf FY17-18 1st-Quarter-Financial- Report.pdf FY17-18 2nd-Quarter-Financial- Report_1.pdf FY17-18 3rd-Quarter-Financial- Report.pdf FY-2012-13-1st-Quarter-Financial- Report.pdf FY-2012-13-2nd-Quarter-Financial- Report.pdf FY-2012-13-3rd-Quarter-Financial- Report.pdf FY-2012-13-4th-Quarter-Financial- Report.pdf FY-2013-14-1st-Quarter-Financial- Report.pdf FY-2013-14-2nd-Quarter-Financial- Report.pdf FY-2013-14-3rd-Quarter-Financial- Report.pdf FY-2013-14-4th-Quarter-Financial- Report.pdf FY-2014-15-1st-Quarter-Financial- Report.pdf FY-2014-15-2nd-Quarter-Financial- Report.pdf FY-2014-15-3rd-Quarter-Financial- Report.pdf FY-2014-15-4th-Quarter-Financial- Report.pdf FY-2015-16-1st-Quarter-Financial- Report.pdf FY-2015-16-2nd-Quarter-Financial- Report.pdf FY-2015-16-3rd-Quarter-Financial- Report.pdf FY-2015-16-4th-Quarter-Financial- Report.pdf FY-2016-17-1st-Quarter-Financial- Report.pdf FY-2016-17-2nd-Quarter-Financial- Report.pdf FY-2016-17-3rd-Quarter-Financial- Report.pdf FY-2016-17-4th-Quarter-Financial- Report.pdf Revenue Actuals for Five Years 2013-2017.xlsx Exhibit 1. FY2016-17 UTILITIES FINANCIAL STRATEGIES, FINAL, 060316.docx Exhibit 2. FY2017-18 revised UTILITIES FINANCIAL STRATEGIES, 012417.docx Exhibit 3 Financial Strategies PRESENTATION Final 020117.pptx 01 FY 18-19 Organizational Chart 071818.ppt 01 FY 18-19 Organizational Chart 071818.pptx TOC 262 NEWGEN STRATEGIES AND SOLUTIONS, LLC Appendix B –Documents Reviewed (cont’d) 253 01 FY 18-19 Organizational Chart 0718181.pptx 01 FY 18-19 Organizational Chart 0718182.pptx 01 FY 18-19 Organizational Chart 0718183.pptx 11-14-06 DME Salaries TO T Edgar.xls Comments -Distribution Engineering.docx Copy of Distribution Project Tracker -MasterNewest.xlsx Denton DME.doc DME draft ppt report 072708.ppt DME draft ppt report 072708.pptx DME Executive Summary (V3) - with previously surveyed organizations.pdf DME Executive Summary (V4a) - without Austin and CPS.pdf DMECAM.doc FY 18-19 Organizational Chart 071818.pdf Summary Sept 29 2017 with Historical Market Delta (Incld. AE and CPS).pdf Summary Sept 29 2017 with Historical Market Delta (WITHOUT AE and CPS).pdf bv-18-denton.tx-start#2-E7-TCEQ- Report.pdf 09-11-17 DME Savings Model Review -Final.pdf 12-11-17 DME Report -FInal.pdf 2016 Distribution System Reliability Study.pdf 2016 EOY Reliability Report.pdf 2017 and 2018 DME Area TM CB Operation Summary.pdf 2017 Outages.xlsx 2017 Reliability [FINAL V2_3].pptx 2017.12.05 final Denton Renewable Resource Plan v1.4.docx 2018 Outages (1st Qtr -Clean).xlsx 7-19-18 369MW peak.pdf Comments –Transmission Engineering.docx Council Presentation_September 19, 2017.pdf DME system outage report 2017.doc EIA Reliability_2015.xlsx EIA Reliability_2016.xlsx Exhibit 1 -Agenda Information Sheet.pdf Exhibit 2 -Resource Planning and Power Supply Strategy Report 10- 24-17.pdf Exhibit 3 -Presentation.pdf Feeder loading data on Peak 2018.xls FY17-18 ESTIMATE DEC Monthly Proforma.pdf Outages 2016 V3.xlsx Peak Loading Analysis 2018.docx Transformer loading data on Peak 2018.xls 04_050115.doc 16SSWG_2018_SUM1_U1_Final_1 0152016_DME_FERC715.raw 16SSWG_2018_SUM1_U1_Final_1 0152016_DME_FERC715.sav 16SSWG_2018_SUM1_U1_Final_1 0152016_DME_FERC715_DEC.raw 16SSWG_2018_SUM1_U1_Final_1 0152016_DME_FERC715_DEC.sav 16SSWG_2018_SUM1_U1_Final_1 0152016_DME_FERC715_DEC_SP N.raw 16SSWG_2018_SUM1_U1_Final_1 0152016_DME_FERC715_DEC_SP N.sav 16SSWG_2018_SUM1_U1_Final_1 0152016_DME_FERC715_Load_SE N.raw 16SSWG_2018_SUM1_U1_Final_1 0152016_DME_FERC715_Load_SE N.sav 16SSWG_2020_MIN_U1_Final_10 152016_DME_FERC715.raw 16SSWG_2020_MIN_U1_Final_10 152016_DME_FERC715.sav 16SSWG_2020_MIN_U1_Final_10 152016_DME_FERC715_Load_SEN .raw 16SSWG_2020_MIN_U1_Final_10 152016_DME_FERC715_Load_SEN .sav 16SSWG_2022_SUM1_U1_Final_1 0152016_DME_FERC715.raw 16SSWG_2022_SUM1_U1_Final_1 0152016_DME_FERC715.sav 16SSWG_2022_SUM1_U1_Final_1 0152016_DME_FERC715_DEC.raw 16SSWG_2022_SUM1_U1_Final_1 0152016_DME_FERC715_DEC.sav 16SSWG_2022_SUM1_U1_Final_1 0152016_DME_FERC715_DEC- SPN.raw 16SSWG_2022_SUM1_U1_Final_1 0152016_DME_FERC715_DEC- SPN.sav 16SSWG_2022_SUM1_U1_Final_1 0152016_DME_FERC715_Load_SE N.raw 16SSWG_2022_SUM1_U1_Final_1 0152016_DME_FERC715_Load_SE N.sav 16SSWG_2023_SUM1_U1_Final_1 0152016_DME_FERC715_2027.sav 16SSWG_2023_SUM1_U1_Final_1 0152016_DME_FERC715_2027O.r aw 17SSWG_2019_SUM1 - DEC_OFF.raw 17SSWG_2019_SUM1 - DEC_OFF.sav 17SSWG_2019_SUM1 - DEC_OFF_LOAD_SEN.raw 17SSWG_2019_SUM1 - DEC_OFF_LOAD_SEN.sav 17SSWG_2019_SUM1.raw 17SSWG_2019_SUM1.sav 17SSWG_2019_SUM1_Load_Sen.r aw 17SSWG_2019_SUM1_Load_Sen.s av 17SSWG_2021_MIN.raw 17SSWG_2021_MIN.sav 17SSWG_2021_MINLoad_SEN.raw 17SSWG_2021_MINLoad_SEN.sav 17SSWG_2023_SUM1 - DEC_OFF.raw 17SSWG_2023_SUM1 - DEC_OFF.sav 17SSWG_2023_SUM1 - DEC_OFF_LOAD_SEN.raw 17SSWG_2023_SUM1 - DEC_OFF_LOAD_SEN.sav 17SSWG_2023_SUM1.raw 17SSWG_2023_SUM1.sav 17SSWG_2023_SUM1_Load_SEN.r aw 17SSWG_2023_SUM1_Load_SEN.s av 17SSWG_2024_SUM1_28SUM - DEC_OFF.raw 17SSWG_2024_SUM1_28SUM - DEC_OFF.sav 17SSWG_2024_SUM1_28SUM.raw 17SSWG_2024_SUM1_28SUM.sav 1-FERC Form 715 Report Transmittal Letter.pdf 2017 DentonOneLine.pdf 2017_DME_FERC-715_Breaker Rating Adequacy Assessment_Final_03302017.docx 2017_DME_FERC-715_Breaker Rating Adequacy Assessment_Final_03302017.pdf 2017_DME_FERC715_Report_wor king_Final_03302017.docx 2017_DME_FERC715_Report_wor king_Final_03302017.pdf 2017_July-System Topology.pdf 2018 DentonOneLine.pdf 2018 FERC Onelines -DME.pdf 2018 FORM 715 Submission.pdf 2018 July OneLine.pdf 2018 July Topology.pdf 2018 July Topology-DETAIL A.pdf 2018 July Transmission System Topology.pdf 2018 July Transmission System Topology-Detail A.pdf 2018_DME_FERC715_Report_328 2018.pdf 2020 Jan.DentonOneLine.pdf263 NEWGEN STRATEGIES AND SOLUTIONS, LLC Appendix B –Documents Reviewed (cont’d) 254 2021 DentonOneLine.pdf 2021_July-System Topology.pdf 2022 DentonOneLine.pdf 2022 July OneLine.pdf 2022 July Topology.pdf 2022 July Topology-Spencer Area.pdf 2027 DentonOneLine.pdf 2-FERC Form 715 Introduction- Cityof Denton.pdf 3- 2018_DME_FERC715_Report_328 2018.docx 3- 2018_DME_FERC715_Report_328 2018.pdf 4- 2017_DME_FERC715_Stability_Re port_Final.pdf 4- 2018_DME_FERC715_Stability_Re port.pdf 5-2018_DME_FERC-715_Breaker Rating Adequacy Assessment.docx Aaron Woods -Commercial Load Analysis.xlsx Appendix A - DWG_Procedure_Manual_Revisio n_10.doc Appendix A - DWG_Procedure_Manual_Revisio n_10.pdf APPENDIX B - MaxDeviationsv33_2019SP.pdf APPENDIX B - MaxDeviationsv33_2020HWLL.pdf APPENDIX B - MaxDeviationsv33_2024SP.pdf Appendix B -Maximum Deviations -Flatstart Run.pdf Appendix C -ERCOT Planning Guide.doc Appendix C -TPL-001-4.pdf Appendix D - 2018HWLL -Dynamic Events.xlsx Appendix D - 2018SUM -Dynamic Events.xlsx Appendix D - 2018SUM_GENSEN1 -Dynamic Events.xlsx Appendix D - 2018SUM_GENSEN2 -Dynamic Events.xlsx Appendix D - 2022SUM -Dynamic Events.xlsx APPENDIX D - Events_2019SP.xls APPENDIX D - Events_2020HWLL.xls APPENDIX D - Events_2024SP.xls Appendix E - 2018HWLL.pdf Appendix E - 2018SUM.pdf APPENDIX E - PLOTS_2019SP_BASECASE.pdf APPENDIX E - PLOTS_2020HWLL_BASECASE.pdf APPENDIX E - PLOTS_MITIGATION_2019SP_BAS ECASE_CCT.pdf APPENDIX E - PLOTS_MITIGATION_2019SP_BAS ECASE_OOS.pdf Appendix F - 2018HWLL - LOADSEN.pdf Appendix F - 2018SUM - LOADSEN.pdf APPENDIX F - PLOTS_2019SP_LOAD SENSITIVITY.pdf APPENDIX F - PLOTS_2020HWLL_LOAD SENSITIVITY.pdf APPENDIX F - PLOTS_MITIGATION_2019SP_LOA D SENS_CCT.pdf APPENDIX F - PLOTS_MITIGATION_2019SUM_L OAD SENS_OOS.pdf Appendix G - 2018SUM -GEN SENSITIVITY CASE- 1_3Ph_P4+P5_CCT.pdf Appendix G - 2018SUM -GEN SENSITIVITY CASE- 1_P4+P5_SLG.pdf Appendix G - 2018SUM -GEN SENSITIVITY CASE- 1_P4+P5_SLG_CCT.pdf Appendix G - 2018SUM -GEN SENSITVITIY CASE-1-1.pdf Appendix G - 2018SUM -GEN SENSITVITIY CASE-1-2.pdf APPENDIX G - PLOTS_2019SP_GEN SESITIVITY.pdf Appendix H - 2018SUM -GEN SENSITIVITY CASE - 2-1.pdf Appendix H - 2018SUM -GEN SENSITIVITY CASE - 2-2.pdf Appendix H - 2018SUM -GEN SENSITIVITY CASE- 2_3Ph_P4+P5_CCT.pdf Appendix H - 2018SUM -GEN SENSITIVITY CASE- 2_P4+P5_SLG.pdf Appendix H - 2018SUM -GEN SENSITIVITY CASE- 2_P4+P5_SLG_CCT.pdf APPENDIX H - PLOTS_2024SP_BASECASE.pdf APPENDIX H - PLOTS_MITIGATION_2024SP_BAS ECASE_CCT.pdf APPENDIX H - PLOTS_MITIGATION_2024SP_BAS ECASE_OOS.pdf Appendix I - 2023SUM.pdf Arturo Guardado -Load Analysis (VALUES).xlsx CEII P18SP.raw CEII P18SP.sav CEII P19SP.raw CEII P19SP.sav CEII P20MN.raw CEII P20MN.sav CEII P20SP.raw CEII P20SP.sav CEII P21MN.raw CEII P21MN.sav CEII P21SP.raw CEII P21SP.sav CEII P22SP.raw CEII P22SP.sav CEII P23SP.raw CEII P23SP.sav CEII P24SP.raw CEII P24SP.sav CIP Map 2019-2023 Landscape (1).pdf CIP Schedule Summary.xlsx CityofDentonStrategicPlan.pdf Cody Tenorio -Load Analysis.xlsx Copy of Transmission and Fiber Inventory List.xlsx Denton Area Circuit Breaker Nameplate Data.pdf Denton Area Substation Relays.pdf Denton Area System OneLine - 7- 6-2018.pdf DME -Phase I Report_Final Draft Rev 3.pdf DME E&OT Strategic Plan V2-4 (final).pdf DME_Surround_15DSB_2018SUM _P2-P4.con DME_Surround_15DSB_2020MIN_ P2-P4.con DME_Surround_16SSWG_2018_P 1-ERCOT_1-P7.con DME_Surround_16SSWG_2018SU M_Extreme_Events.CON DME_Surround_16SSWG_2022_P 1-ERCOT_1-P7.con DME_Surround_16SSWG_2022SU M_P2-P4.con DME_Surround_17SSWG_19_P1 - N-1-1_First.con DME_Surround_17SSWG_19_P1 - N-1-1_Second.con DME_Surround_17SSWG_2019_P 1-ERCOT_1-P7.con DME_Surround_17SSWG_2019SU M_Extreme_Events.CON DME_Surround_17SSWG_2019SU M_P2-P4.con DME_Surround_17SSWG_2021MI N_Extreme_Events.CON DME_Surround_17SSWG_2021MI N_P1 - N-1-1_First.con DME_Surround_17SSWG_2021MI N_P1-ERCOT_1-P7.con DME_Surround_17SSWG_2021MI N_P2-P4.con264 NEWGEN STRATEGIES AND SOLUTIONS, LLC Appendix B –Documents Reviewed (cont’d) 255 DME_Surround_Single_Transform er_20168UM_A-1+N-1.con DME_Surround_Single_Transform er_2019UM_A-1+N-1.con DRAFT_2018 FORM 715 of ERCOT.docx Entire GIS Assets Inventory 20180829.xlsx ERCOT Planning Guide- 04_050115.doc ERCOTDD.xls Final_2017 FORM 715 of ERCOT cover letter.pdf Final-Substation and Transmission CIP 2019-2023 RevAHE.xlsx Future 2022 July Transmission System Topology.pdf Future 2022 July Transmission System Topology-Detail A.pdf Load Analysis.xlsx Oak Area StudyDoc1.docx OAK GATEWAY AREA PLAN - 36x36.pdf plots_bind_BF_2018HWLL+DEC.pd f plots_bind_BF_2018SUM+DEC.pdf plots_bind_N11_2018HWLL+DEC. pdf plots_bind_N11_2018SUM+DEC.p df plots_bind_NC_2018HWLL+DEC.p df plots_bind_NC_2018SUM+DEC.pd f plots_bind_remedial_BF#9_2018H WLL+DEC.pdf plots_bind_remedial_BF#9_2018S UM+DEC.pdf Short Circuit Report_18INR0013_Final_010420 17.pdf Small Area Study 2017 -For Jerry (VALUES ONLY).xlsx Stability_Report_18INR0013_1216 2016_Final.pdf Stability_Report_18INR0013_1216 2016_Final_Updated.pdf Steady_State_Study_Report_18IN R0013_11232016_Final.pdf Substation Transformer Data 8-27- 2018.pdf Substations Operated by DME 8- 27-2018.pdf System Map.pdf Transmission Lines 8-27-2018.pdf 138kV TM Line Vegetation Mgmt Inspection Woodrow to McKinney.pdf 2014 CONTROLLER IDENTIFICATION-1.pdf 2014 CONTROLLER IDENTIFICATION-2.pdf 2014 CONTROLLER IDENTIFICATION-3.pdf 2014 CONTROLLER IDENTIFICATION-4.pdf 2014 CONTROLLER IDENTIFICATION-5.pdf 2014 CONTROLLER IDENTIFICATION-6.pdf 2017 COD TAX EXEMPT FORM.DOC A Weekly Substation Inspection Sheet Samples.pdf ADMIS Customer Account Application.pdf ADMIS Owner ID Supplement.pdf ADMS Confidentiality Agreement.pdf Arbitration.pdf Authority to Transact - CONFIDENTIAL.pdf B Cooper Creek Substation Checkout Summary G2ETC.doc Bluebell II PPA.pdf Bluebell Power Purchase Agreement.pdf Broker Agmt DME Amerex FINAL.pdf Broker Agmt DME Atlas FINAL.pdf Broker Agmt DME BGC Financial FINAL.pdf Broker Agmt DME Bosworth FINAL.pdf Broker Agmt DME BTU FINAL.pdf Broker Agmt DME ICAP FINAL.pdf Broker Agmt DME TFS FINAL.pdf Bryan EEI Master.pdf Bryan Langley Photo ID.pdf C McKinney Substation Building 1 Batteries Testing.xls CC McKinney Substation Building 3 Batteries Testing.xls Centrica Guarantee Agreement.pdf Citigroup Energy Collateral Annex.pdf Citigroup Energy EEI.pdf Citigroup Energy Guarantee Agreement.pdf City of Denton SENA and STRM Certificates.pdf City of Denton SENA Guaranty Final 12-6-17.docx.pdf City of Denton TX OB GTY (EEI) (06.19.14) XD (06.19.16).pdf City Secretary Certificate - CONFIDENTIAL.pdf Clevest Trouble WorkOrder tickets from distr PM patrols r.pdf COD W9.pdf Collateral Annex.pdf ConocoPhillips.pdf Controller Identification Supplement.pdf Cover Letter to James Lierman 6 3 2016.doc Cover Letter to Linda Cole 1 18 2018.doc Credit Support Annex.pdf Customer Account Application.pdf Customer Agreement.pdf D Woodrow Substation Building 2 Battery Charger Testing.pdf DENTONFINAL4.20.09.pdf Designation of Signature.pdf Distribution ATO monthly logsheet inspection r.pdf DME EEI Collateral_para 10 v2.0.docx DME EEI Master v2.0.docx DME Enforceability Legal Opinion.pdf DME MSCG Collateral Annex.pdf DME MSCG EEI Master.pdf DME_TrailStone Group CA (Revised TrailStone Comments 6.16.17).docx DTE Final Contract.pdf E Woodrow Substation Building 2 Batteries Testing.pdf EDF Collateral Annex.pdf EDF EEI.pdf EDF Guarantee.pdf EEI Master.pdf Electronic Trading Disclosure.pdf F Arco Substation InfraRed Inspection.pdf First Amendment FINAL 06152010 Signed .pdf FW ADM Clearing Account Paperwork.msg FW First Amendment To Guaranty -Nextera.msg FW_ Denton -NewGen Request.pdf G Arco 15kV 220 and 221 Breaker Testing and Maint.pdf Garland EEI Master.pdf GIS Distr Device Inspections 7-23- 12.xls Hedge Account Representation.pdf Howard Martin Photo ID.pdf I SF6 Substation Breaker Gas Testing r.pdf ICE OTC Participant Agreements - ORIGINAL AGREEMENTS.msg IFUS Participant Agreement 8.12.16 (DME 3.10.17).pdf III Substation Transformer Oil and Dissolved Gas Testing r.pdf InfraRed Transformer and 600A TBody Inspection r.pdf Inspector Tabular Screenshots.doc ISDA Master Agreement.pdf J Relay Testing.pdf Janet Granger Letter 3-20-18.doc K RDW Building 3 Battery Discharge Testing.pdf265 NEWGEN STRATEGIES AND SOLUTIONS, LLC Appendix B –Documents Reviewed (cont’d) 256 Keira Kazmerski Cover Letter 8-12- 2016.doc LCRA EEI Master.pdf LCRA-W9-Form.pdf List of Items DME Routinely Inspects in Substations.pdf NAESB Contract with Enterprise - FINAL.pdf NAGP EEI 7-14-14.pdf NAGP EEI Master Signed 7-14- 14.pdf NextEra Second Amendment to PPA FINAL EXECUTED.pdf Noble Credit Risk Position 1-8- 16.xlsx Noble Guarantee Agreement.pdf Northern States Power Company Collateral Annex.pdf Northern States Power Company EEI.pdf Online Account Access Application.pdf Ordinance 2014-060 Authorizing the Energy Risk Management Policy FINAL.pdf Ordinance 2018-017.pdf Pole Assembly Trans Inspections 4-26-12.xlsx PSE Collateral Annex.pdf PSE Master Cover Sheet.pdf R2013-036 Investment Policy.pdf RD Wells to Hickory.pdf RE Denton Municipal Electric - ACTION REQUIRED FOR UNINTERRUPTED ACCESS TO IFUS (IFUS PA).msg Risk Disclosure Statement.pdf Sales and Use Tax Certificante.pdf Santa Rita Executed Contract.pdf SCOA Guaranty_City of Denton dba Denton Muni Elec_102915.pdf SENA Collateral Annex.pdf SENA Master Agreement.pdf Shell Trading Risk Management W9 2018.pdf Special Entity Schedule.pdf Tenaska Confidentiality Agreement.pdf Tenaska EEI CS + Collateral Annex 07 01 2015.pdf Tenaska Guarantee.pdf Tony Puente Photo ID.pdf Trading Disclosure -2.pdf Tree Trimming Circuit Feeder Yearly Progress.xls Updated Transacting Authority Memo.docx.pdf Utility Special Representation Letter.pdf 01 Purchasing -Project Execution Process Substation -Rev 2.pdf 02 Site & Route Selection -Project Execution Process -Rev 9.pdf 03 AIS -Site Selection -Project Execution Process Substation -Rev 1.pdf 04 Land Acquisition -Substation Project Execution Process -Rev 10.pdf 05 Land Acquisition -Transmission Line Project Execution Process Rev 7.pdf 06 AIS -Land & Easement Acquisition -Project Execution Process -Rev 2.pdf 07 Condemnation -Project Execution Process Part I_II -Rev 3.pdf 08 Closing -Project Execution Process -Rev 1.pdf 09 Relocation -Project Execution Process.pdf 10 Planning -SUP -Project Execution Process Substation -Rev 2.pdf 10027065-HOU-R-01-0 Report Final.pdf 11 Planning -SWPPP, Clearing & Grading Permit -Project Execution Process Substation -Rev 3.pdf 12 Planning -Fence Permit - Project Execution Process Substation -Rev 3.pdf 13 Planning -Building Permit - Project Execution Process Substation -Rev 4.pdf 14 Planning -Preliminary Plat - Project Execution Process Substation -Rev 2.pdf 15 Planning -Minor Plat -Project Execution Process Substation -Rev 3.pdf 16 Planning -Final Plat -Project Execution Process Substation -Rev 3.pdf 17 Planning -Conveyance Plat - Project Execution Process Substation -Rev 1.pdf 18 Design Electrical & Structural - Substation Project Execution Process -Rev 2.pdf 19 Design Relay -Substation Project Execution Process -Rev 2.pdf 20 Construction -Substation Project Execution Process -Rev 1.pdf 2018 DME Black Start Plan Version 1.doc 2018 Emergency Operations Plan (5).docx Control Center Backup Plan 2018.docx Copy of DME DG PV Unit Listing.xlsx CP1-Contingency Plan 2018.docx DME AssetLife Workflow.pdf DME Load Shed Plan Report - 2018 Final.docx DME Processes List.pdf DME Switching Procedure 2016V3.pdf DME System Operations Process .docx DME System Peak by Substation Transformer 2018.tif DME_WorkflowInterfacesDiscover y_v1.pdf EMO Procedure 01 Position Balancing Methodology.pdf EMO Procedure 02 Load Forecast Methodology.pdf EMO Procedure 03 Estimate Available Resources Methodology.pdf EMO Procedure 04 Review Position and Perform Deals Methodology.pdf ERM Procedure CR-01 Master Agreement Negotiations.pdf ERM Procedure CR-02 Counterparty Evaluations.pdf ERM Procedure CR-03 Credit Risk Calculations.pdf ERM Procedure CR-04 Credit Portfolio Administration.pdf ERM Procedure GC-01 Approved Transaction Types.pdf ERM Procedure GC-02 Transaction Approval Process.docx ERM Procedure GC-02 Transaction Approval Process.pdf ERM Procedure GC-03 Model Validation Change Control.pdf ERM Procedure MR-01 Market Risk Exposure Methodology.pdf ERM Procedure MR-02 Forward Price Curves.pdf ERM Procedure MR-03 Portfolio Risk Exposure Limits.pdf ERM Procedure MR-04 Risk Models and Metrics.pdf ERM Procedure MR-05 Non- Standard Product Valuation.pdf ERM Procedure MR-06 Transaction Risk Limit.pdf ERM Procedure SE-01 ERCOT Settlement Process.pdf ERM Procedure SE-02 Bilateral Settlement Process.pdf Executive Dashboard Packet 7-31- 18.pdf FY2019 GS Manual.pdf MeterPingLogic.pdf RPT.2018 ERCOT Black Start Plan.pdf Santa Rita Operating Procedures.docx Substation Loading at 2018 Peak.tif266 NEWGEN STRATEGIES AND SOLUTIONS, LLC Appendix B –Documents Reviewed (cont’d) 257 Tailboard-Job Briefing Procedure.pdf Visio-Joint Use Process.pdf DME public communicaiton paths.docx DME Tree Trimming Program.pdf door hanger .bmp Electric Outage Communication Plan_jr.docx GreenSense Energy Rebate Flier 1017.pdf Learn to Conserve Workshop Thermostat 0216.pdf 2016 Innovation Plan.pdf DME TS 5-Year Roadmap v2018.6.docx 2018-125 CO Bond Sale and Rating Reports.pdf Appropriable Fund Balance used for the 2018 beginning budget 6_12_17 TP 120517.pdf Complete 2017-007 Informal Staff Report on 2017 Utility System Revenue Bond Sale.pdf 1997 Management Study - Governance.pdf 3 Turnover.pdf City Charter and Ordinance Excerpts.docx Copy of Terms 8.1.15 to 8.24.18 - for Electric Water and WW.xlsx Navigant water cs report draft 100308.ppt Navigant water cs report draft 100308.pptx Navigant water cs report draft 1003081.pptx Studies-DMU Management Study.pdf UMGHR final report -Aug 1 2016.pdf Denton_Plan_2030.pdf Purch Flowchart_Change Orders.pdf Purch Flowchart_Greater $50K_CoOp_Revised2.pdf Purch Flowchart_Greater $50K_Revised2.pdf Purch Flowchart_Greater $50K_SS_Revised2.pdf Purch Flowchart_OR to PO_Greater Than $50K.PDF Purch Flowchart_OR to PO_Under $50K.PDF 14 Public Relations.pdf 2017 Citizen Update_Final2.pdf 2017-18 Utility Rate Brochure.pdf Annual Report 1617_final.pdf Citizen Connection APRIL 2017.pdf Citizen Connection APRIL 2018.pdf Citizen Connection AUG 2017.pdf Citizen Connection AUG 2018.pdf Citizen Connection DEC 2017.pdf Citizen Connection FEB 2017.pdf Citizen Connection FEB 2018.pdf Citizen Connection JAN 2017.pdf Citizen Connection JAN 2018.pdf Citizen Connection JULY 2017.pdf Citizen Connection JULY 2018.pdf Citizen Connection JUNE 2017.pdf Citizen Connection JUNE 2018.pdf Citizen Connection MARCH 2017.pdf Citizen Connection MARCH 2018.pdf Citizen Connection NOV 2017.pdf Citizen Connection SEPT 2017.pdf Citizen Connection SEPT 2018.pdf DWW 2014 poster.pdf Dyno Decal.pdf Dyno Dirt brochure_Rev0118.pdf Dyno Dirt_2018 Campaign.docx Energy Conservation Tips Flier.pdf FW_ Management Study -Public Relations.msg FW_Management Study -Public Relations.pdf Grease Interceptor Maintenance Brochure.pdf Grit Traps Brochure.pdf Grow Zone Sign_2018_print.pdf Learn To Conserve Multi Family Handout 0316.pdf Learn To Conserve Multi Family Handout_Spanish.pdf Learn to Conserve Workshop Sprinkler Use 0116 print.pdf Learn to Conserve Workshop_DIY Drip Irrigation_0416.pdf Maintain Your Drain Can Lids.pdf Maintain Your Drain_Truck Wrap.pdf Maintain Your Draun-Web Banner 160x600.pdf Maintain Your Draun-Web Banner 300x250.pdf Maintain Your Draun-Web Banner 728x90.pdf Resident Update_April May 2018_final.pdf Resident Update_Aug Sept 2018.pdf Resident Update_Dec Jan 2018_Final.pdf Resident Update_Feb March 2018_final.pdf Resident Update_June July 18_final.pdf Resident Update_Oct Nov 2017_Final.pdf Reverse Litter Banner 2x4.pdf Water Conservation_handout.pdf Auto and Property claims EK.xlsx Copy of Utilities -Workers Comp claim summary 10-01-2014 to 09- 30-2015.xlsx Copy of Utilities -Workers' Compensation claim summary 10- 01-2015 to 09-30-2016.xlsx Copy of Utilities Workers' Compensation Claims 10-1-16_9- 30-17.xlsx Copy of Denton requested Benchmark data.xlsx nv.xlsx 16 FY17-18 Final Budget Binder.pdf B&A 2015 Denton Water Utilities Cost of Service & Rate Design Study Revised Report.pdf Budget Process.xlsx 01 FY17-18 Final Budget Binder.pdf Wastewater dashboard, 020217.pdf FY14-15 WW Mini Budget Book.pdf FY15-16 WW Mini Budget Book.pdf FY16-17 WW Mini Budget Book.pdf FY17-18 WW Mini Budget Book.pdf FY18-19 WW Mini Budget Book 09-21-18.pdf Wastewater 5 Year Exp.Rev.xlsx Wastewater 5 Year History CIP.xls Wastewater 5 Year Rates.xlsx Wastewater 5 Year ROI and Franchise Fees.xlsx Denton, city of_001 EPA permit.pdf Denton WWCS AMP FY17_180205.pdf Equipment Criticality List (final).xlsm Wastewater Collections Performance Metrics.docx WW Collections Risk Rating.pdf WW Plant Critical Equipment.docx WW Plant Process and Equipment Criticality List (final).xlsx MasterplanExisting.pdf MasterplanLongTerm.pdf MasterplanShortTerm.pdf Denton SCADA MP Scope of Work_FINAL.docx 2017 Award Notification Letter - Ronald B Sieger Biosolids Management.pdf Award Notification Letter -Sidney Allison -PS Arora.pdf Award Notification Letter-Munc WWTP of the Year-Cat 3.pdf Award Notification Letter-Sidney Allison-City of Denton Collection System.pdf PSArora Papers Presented.docx267 NEWGEN STRATEGIES AND SOLUTIONS, LLC Appendix B –Documents Reviewed (cont’d) 258 Texas WET Article Denton AMP.pdf Texas WET Article PCWRP.docx Texas Wet Issue 1.2018 Phosphorus Real Time Control.pdf Wastewater Org Charts 20190312.pdf Infrastructure Leakage Index Comparison -Region C.PNG Non Revenue Water Comparison - NTX.PNG 5 Year Exp.Rev.xlsx FY14-15 Water Mini Budget Book.pdf FY15-16 Water Mini Budget Book.pdf FY16-17 Water Mini Budget Book.pdf FY17-18 Water Mini Budget Book.pdf FY18-19 Water Mini Budget Book 09-21-18.pdf Internal Service Payments -Debt Service and Transfers.xlsx Wastewater Org Charts.pdf Water 5 Year Exp.Rev.xlsx Water 5 Year History CIP.xls Water 5 Year Rates.xlsx Water 5 Year ROI and Franchise Fees.xlsx Water Org Charts.pdf Water, Wastewater Accounts.xlsx Denton Water Utilities Cost of Service & Rate Design Study Revised Report 6_3_2015_FINAL.pdf Water Org Charts 20190312.pdf Water.WW.Drainage.Bonds.xlsx 5 Year Break History.xlsx Water Loss Audit.xlsx Q6 Denton SCADA Master Plan- FINAL.PDF Tx Water Development Board- 2017 State Water Plan.pdf Water GIS Assets List.xlsx Water System Map.pdf WM SOP METERING.doc 2017 Water Quality Report Denton_final.pdf 2017 Water Quality Report Denton_Spanish.pdf 0. Denton LLWTP -Backup Disinfection Plan EOM_Final.pdf 0. Denton LLWTP -Biologically Active GAC Filters OM_Final.pdf 0. Denton LLWTP -Chemical Systems EOM_Final.pdf 0. Denton LLWTP -Filter Air Scour and Backwash O&M_Final.pdf 0. Denton LLWTP -Low Lift Pump Station O&M_Final.pdf 0. Denton LLWTP -Raw Water By Pass EOM_Final.pdf 0. Denton LLWTP -Variable Speed Flocculators EOM_Final.pdf 0. Denton LLWTP -Ozone System O&M_Final.pdf 0. Sodium Hypochlorite and LAS Feed and Storage Facilities OM_Final.pdf 1 Introduction -revised.doc 2 Major Treatment Components and Processes -Revised.doc 3 Chemical Feed Systems - revised.doc 4 Laboratory Equipment and Procedures -revised.doc 5 Maintenance -revised.doc 6 Spill and Emergency Response - revised.doc 7 Operator Education and Training -revised.doc 8 Records -revised.doc FW_ Question about major claims involving utilities.pdf FW_ Question about major claims involving utilities2.pdf FW_ Retirement Info -Sensitive Data.pdf LRRWTP SOP.doc OM TOC-revised.doc Retirement Eligiblity 12-31-2017 - for Utility study.xlsx Exit Interviews for 80 Individuals 268 Appendix C –Follow-up Survey 269 NEWGEN STRATEGIES AND SOLUTIONS, LLC Scorecard – DME 260 Surveys of remaining original participants were conducted in October 2019 to assess how each area has changed. Each area was evaluated from 1-5 with 1 being Worse, 3 as No Change and 5 Better. Most scores were near 4 which ranked as Somewhat Better. The average relative change score for each is shown below the original study light indicator. Survey Results 4.34.34.1 3.7 3.9 4.2 Starting Scores 270 NEWGEN STRATEGIES AND SOLUTIONS, LLC Utilities Management Survey –Electric 261 Surveys of remaining original participants were conducted in October 2019 to assess how each area has changed. Each area was evaluated from 1-5 with 1 being Worse, 3 as No Change and 5 Better. Most scores were near 4 which ranked as Somewhat Better. 0%10%20%30%40%50%60%70%80%90%100% Communication Finance Infrastructure People Process Strategy Employee Morale Community Perception PUB Leadership City Council Leadership Worse Somewhat Worse Same Somewhat Better Better 271 NEWGEN STRATEGIES AND SOLUTIONS, LLC Scorecard –Water & Wastewater with Updated Change Values 262 Surveys of remaining original participants were conducted in October 2019 to assess how each area has changed. Each area was evaluated from 1-5 with 1 being Worse, 3 as No Change and 5 Better. Most scores were near 4 which ranked as Somewhat Better. The average relative change score for each is shown below the original study light indicator. Starting Scores Survey Results 4.1 3.7 4.14.04.23.8 272 NEWGEN STRATEGIES AND SOLUTIONS, LLC Utilities Management Survey –Water & Wastewater 263 Surveys of remaining original participants were conducted in October 2019 to assess how each area has changed. Each area was evaluated from 1-5 with 1 being Worse, 3 as No Change and 5 Better. Most scores were near 4 which ranked as Somewhat Better. 0%10%20%30%40%50%60%70%80%90%100% Communication Finance Infrastructure People Process Strategy Employee Morale Community Perception PUB Leadership City Council Leadership Worse Somewhat Worse Same Somewhat Better Better 273 NEWGEN STRATEGIES AND SOLUTIONS, LLC Utilities Management Survey –Shared Services 264 Surveys of remaining original participants were conducted in October 2019 to assess how each area has changed. Each area was evaluated from 1-5 with 1 being Worse, 3 as No Change and 5 Better. Most scores were near 4 which ranked as Somewhat Better. 0%10%20%30%40%50%60%70%80%90%100% Changes Communication Finance People Process Strategy Employee Morale Procurement Process PUB Leadership City Council Leadership Worse Somewhat Worse Same Somewhat Better Better 274 Date: June 5, 2020 Report No. 2020-055 INFORMAL STAFF REPORT TO MAYOR AND CITY COUNCIL SUBJECT: In late May, Council Member Briggs forwarded a request to city staff to host a community meeting for the Denton University Park HOA. A number of residents inquired as to the recent activities (flags, markings on the ground) around the vacant land next to the elevated storage tank between Santos Drive and Riney Road. DISCUSSION: The Water Utilities Department began the preliminary design and site layout phase of a Booster Pump Station project to be located on the southwest corner of the property. The flags and markings on the site are for the survey work that is required for the preliminary design phase. The tentative project schedule predicts construction to begin in September 2021, approximately 15 months from now. Detailed design of the architectural look of the building and required architectural security features (fencing/wall) have not begun. This facility is necessary to support the new Denton High School and development in the area by providing additional water supply to the elevated storage tank (water tower) at Loop 288 and IH35. This will improve the City’s water delivery and quality in that portion of our service area. Site access will be from Riney Road, as it is currently. The only access to Santos Drive will be one driveway required for emergency vehicles. Staff is preparing a letter with additional information to be mailed to the HOA and residents in the vicinity next week. In the Spring of 2021, staff will schedule a community meeting to receive feedback and involve residents regarding input on the appearance of the facility during the detailed design phase. 275 Date: June 5, 2020 Report No. 2020-055 Figure 1 – Aerial Photograph Project Limits 276 Date: June 5, 2020 Report No. 2020-055 Figure 2 – Preliminary Engineering Site Plan 277 Date: June 5, 2020 Report No. 2020-055 STAFF CONTACT: Frank Pugsley Director of Water Utilities 940-349-8086 REQUESTOR: Council Member Briggs PARTICIPATING DEPARTMENTS: Water Utilities STAFF TIME TO COMPLETE: 2 man-hours 278 Date: June 5, 2020 Report No.       INFORMAL STAFF REPORT TO MAYOR AND CITY COUNCIL SUBJECT: Provide a project status update regarding the Forestar/Rayzor and Drury Tract single-family residential developments located at the northwest corner of Roselawn Drive and Roselawn Drive. BACKGROUND: Forestar Group, Inc. is under contract to purchase approximately 236.8 acres of land located at the northwest corner of Roselawn Drive and Roselawn Drive for a proposed residential development consisting of 770 single-family detached lots, open space, amenity center, parkland, park trails, and connections to adjacent Borman Elementary and nearby Denia Park. In August 14, 2019 Development Services received a preliminary plat application (Project No. PP19-0019) from Forestar Group, Inc. for a 723-lot single-family subdivision. The preliminary plat was approved by the Planning & Zoning Commission (P&Z) February 5, 2020. Subsequent to this preliminary plat submittal, Forestar Group, Inc. conducted a pre-application meeting for an adjacent property to the west of Forestar/Rayzor known as the Drury Tract (outlined in pink in the Attachment) proposing an additional 64 single-family lots. An overall Traffic Impact Analysis (TIA) for both developments (Project No. TIA20-0001) was submitted March 31, 2020 and an Alternative Environmentally Sensitive Area (AESA) plan (Project No. AESA20-0003) are currently under review by staff. DISCUSSION: The subject property is zoned Residential 4 (R4) which permits the proposed use of single-family residential by right. The developer proposes 770 single-family detached lots, providing 70.4 acres of open space within common area lots and preserved Environmentally Sensitive Area (ESA) water-related habitat. An additional 15.1 acres of ESA designated upland habitat is proposed for preservation as well. No further applications have been received to-date although multiple meetings have been held between the development team and various city staff including: Planning, Engineering, Water and Wastewater Utilities, Parks, Water Administration/Watershed Protection, Traffic Engineering, and Capital Projects. The development will result in future roadway connections for Parvin Street and Highland Park Road, and the reconstruction (elevation) of Roselawn Drive. Some tree removal will be required for grading adjacent to but off-site from the Roselawn Elevated Water Storage Tank. All minimum tree preservation requirements will be met by the overall development and some minor encroachments into the designated ESA water-related habitats are anticipated for stormwater outfall locations. These encroachments will be addressed through the submitted and consideration by City Council of an AESA plan (Project No. AESA20-0003). Parks Department staff has 279 Date: June 5, 2020 Report No.       discussed possible parkland dedication to the city and trail connectivity to Borman Elementary and ultimately nearby Denia Park. The development’s next steps include preliminary plat approval for the Duruy Tract, and civil engineering plan (CEP) and final plat approval for each phase. It is staff’s understanding that the Parvin Street connection and reconstruction of Roselawn Drive adjacent to the project’s frontages will occur with the first phase of this overall development. CONCLUSION: This ISR has been provided for informational purposes. ATTACHMENTS: Forestar/Rayzor – Drury Tract Concept Plan STAFF CONTACT: Richard Cannone, AICP Director of Planning and Deputy Director of Development Services (940) 349 – 8507 Richard.Cannone@cityofdenton.com 280 Date: June 5, 2020 Report No.       ATTACHMENT 281 EXHIBIT A 25' WATERLINE EASEMENT DOC. NO. 2008-78560 O.R.D.C.T. EXHIBIT B VARIABLE WIDTH WATERLINE EASEMENT DOC. NO. 2008-78560 O.R.D.C.T. 20' SANITARY SEWER EASEMENT DOC. NO. 2007-128320 O.R.D.C.T. 10 SANITARY SEWER EASEMENT VOL. 504, PG. 456 D.R.D.C.T. 10 SANITARY SEWER EASEMENT VOL. 504, PG. 453 D.R.D.C.T. PUBLIC DRAINAGE EASEMENT DOC. NO. 2004-22992 O.R.D.C.T. DRAINAGE EASEMENT VOL. 2409, PG. 572 D.R.D.C.T. DRAINAGE AREA CAB. A, PG. 54 P.R.D.C.T. DRAINAGE EASEMENT CAB. A, PG. 54 P.R.D.C.T. DRAINAGE EASEMENT DOC. NO. 1996-088904 O.R.D.C.T. ±300' FROM P A D TAYLOR PARK SUBDIVISION CAB. A, PG. 54 P.R.D.C.T. LOT 1, BLOCK A ROSELAWN ELEVATED STORAGE TANK ADDITION CAB. Y, PG. 777 P.R.D.C.T. BALTAZAR MESTA DOC. NO. 2004-57002 O.R.D.C.T. LOT 1, SORRELLS- MCBRIDE ACRES CAB. X, PG. 749 P.R.D.C.T. LOT 2, SORRELLS- MCBRIDE ACRES LOT 3, SORRELLS- MCBRIDE ACRES ROSELAWN ACRES ADDITION CAB. U, PG. 126, P.R.D.C.T. LOT 1 LOT 2 WILLOWWOOD WEST CAB. B, PG. 13 P.R.D.C.T. MARGARET A. YOUNG DOC. NO. 2017-34293 O.R.D.C.T.THE BRADLEY FAMILY TRUST DOC. NO. 1997-60633 O.R.D.C.T. TAYLOR PARK CHURCH OF THE NAZARENE DOC. NO. 2005-35385 O.R.D.C.T. DENTON INDEPENDENT SCHOOL DISTRICT VOL. 518, PG. 89 D.R.D.C.T. CITY OF DENTON VOL. 514, PG. 579 D.R.D.C.T. MARC S. CULP DOC. NO. 2001-3928 O.R.D.C.T. TED C. MEADOR DOC. NO. 2001-5374 O.R.D.C.T. TRACT I PITNER FAMILY LIMITED PARTNERSHIP DOC. NO. 2013-70762 O.R.D.C.T.TONJIA KIM TAYLOR ROANDOC. NO. 2001-61729O.R.D.C.T.THOMAS A. GARBACIK AND MARY JOANN GARBACIK VOL. 566, PG. 151 D.R.D.C.T. LEE ANNE TODD DOC. NO. 1994-1091 O.R.D.C.T. VIRGIL DAN SMITH & SHARON SMITH DOC. NO. 1995-52411 O.R.D.C.T. PART OF SECTION 11. TRACT ONE RAYZOR INVESTMENTS, LTD. VOL. 1796, PG. 601 D.R.D.C.T.TRACT LINEWILLOWWOOD STREET HIGHLAND PARK RD.HIGHLAND PARK RD.KENDOLPH DRIVEKENDOLPH DRMcCORMICK ST.DUDLEY ST.WESTWOOD DR.MERCEDES RD.JACQUELINE DR.LESLIE ST.PARVIN ST. ROSELAWN DRIVE ROSELAWN DRIVELAUREL ST.WISTERIA ST.AZALEA ST.WILLOWCREST LOOP WILLOWCREST LOOP HIGHLAND PARK RD.HIGHLAND PARK RD.WISTERIA ST.McCORMICK ST.UPLAND HABITAT (SURVEYED) 100-YR FLOODPLAIN (STUDIED) OBSERVED STREAM BUFFER WATER RELATED HABITAT ESA FLOOD PLAIN FEMA ZONE AE ROAD STUB-OUT EXISTING "Y" INLET TREE PRESERVATION AREA EXISTING HIGHLAND PARK RENAME TO ALLEY OPEN SPACE OPEN SPACE AMENITY CENTER EXTEND ROAD AS 24' SECTION OPEN SPACE UPLAND HABITAT (SURVEYED) 100-YR FLOODPLAIN (STUDIED) OBSERVED STREAM BUFFER WATER RELATED HABITAT ESA FLOOD PLAIN FEMA ZONE AE ROAD STUB-OUT EXISTING "Y" INLET TREE PRESERVATION AREA EXISTING HIGHLAND PARK RENAME TO ALLEY OPEN SPACE OPEN SPACE AMENITY CENTER EXTEND ROAD AS 24' SECTION OPEN SPACE UPLAND HABITAT (SURVEYED) 100-YR FLOODPLAIN (STUDIED) OBSERVED STREAM BUFFER WATER RELATED HABITAT ESA FLOOD PLAIN FEMA ZONE AE ROAD STUB-OUT EXISTING "Y" INLET TREE PRESERVATION AREA EXISTING HIGHLAND PARK RENAME TO ALLEY OPEN SPACE OPEN SPACE AMENITY CENTER EXTEND ROAD AS 24' SECTION OPEN SPACE UPLAND HABITAT (SURVEYED) 100-YR FLOODPLAIN (STUDIED) OBSERVED STREAM BUFFER WATER RELATED HABITAT ESA FLOOD PLAIN FEMA ZONE AE ROAD STUB-OUT EXISTING "Y" INLET TREE PRESERVATION AREA EXISTING HIGHLAND PARK RENAME TO ALLEY OPEN SPACE OPEN SPACE AMENITY CENTER EXTEND ROAD AS 24' SECTION OPEN SPACE UPLAND HABITAT (SURVEYED) 100-YR FLOODPLAIN (STUDIED) OBSERVED STREAM BUFFER WATER RELATED HABITAT ESA FLOOD PLAIN FEMA ZONE AE ROAD STUB-OUT EXISTING "Y" INLET TREE PRESERVATION AREA EXISTING HIGHLAND PARK RENAME TO ALLEY OPEN SPACE OPEN SPACE AMENITY CENTER EXTEND ROAD AS 24' SECTION OPEN SPACE Forestar Denton, Texas June 2020 DWG NAME K:\DAL_CIVIL\069313607-FORESTAR RAYZOR\CAD\EXHIBITS\PLANSHEETS\CONCEPT PLAN-20200601.DWG LAST SAVED 6/2/2020 7:46 AM NOTE: THIS PLAN IS CONCEPTUAL IN NATURE AND HAS BEEN PRODUCED WITHOUT THE BENEFIT OF A SURVEY OR CONTACT WITH THE CITY, COUNTY, ETC. CONCEPT PLAN Land Use Acreage Summary Open Space (Including ESA Areas)70.4 Residential Lots /Residential Rights of Way 166.4 Total 236.8 Open Space Acreage Summary Open Space 70.4 Total Percent Open Space 29.7% Lot Type Summary 52' x 115' (Rayzor)706 Total 770 Density Summary (Units per Acre) Gross (Rayzor)3.3 Tree Preservation Area (ESA - Preserved Upland Habitat)15.1 55' x 130' (Drury)64 Gross (Drury)2.8 HIGHLAND PARK RDPARVIN STREET HIGHLAND PARK RD.GRAPHIC SCALE IN FEET 0 100 200 400 1"=200'@ 24x36 13455 Noel Rd., Two Galleria Office Tower Suite 700 Dallas, Texas 75240 972-770-1300 State of Texas Registration No. F-928 282 Date: June 5, 2020 Report No. 2020-057       INFORMAL STAFF REPORT TO MAYOR AND CITY COUNCIL SUBJECT: 2019 Water Loss Audit EXECUTIVE SUMMARY: Water Utilities staff completes a water loss audit annually in accordance with Texas Water Development Board (TWDB) regulations and industry best practices. This year’s audit identified water losses similar to recent years and identified opportunities to improve these metrics in the future. BACKGROUND: TWDB requires the completion of water loss audits annually by all water utilities serving more than 3,300 customers. Beyond State requirements, a water loss audit program presents opportunities for better resource conservation and improved fiscal responsibility. For many years, staff has executed water loss audits to standards over and above TWDB minimum requirements in pursuit of a healthier water utility. Water loss audit standards within the industry have continued to evolve, which provides ongoing opportunities for the improvement of individual audits and has led TWDB to refine their water loss audit framework. DISCUSSION: As a primary function, Denton’s water loss audit separates water use into three categories: (1) authorized consumption, (2) apparent loss, and (3) real loss. (1) Authorized consumption consists of all water that has been authorized for use by the utility and its customers. Authorized consumption includes, but is not limited to, water used for residential and commercial uses, firefighting, municipal landscape watering, pipe flushing, city offices, and water treatment facility use. Authorized consumption is all the water the utility gave permission to a business, individual, or itself to use. Staff previously identified an opportunity to improve water volume estimations for new pipe flushing and is implementing new methods accordingly. (2) Apparent loss represents water that was not accurately measured and/or not recorded at a customer meter and therefore not billed due to meter inaccuracy, theft, and billing waivers. This category represents a loss in revenue, and since customer meters hold customers accountable for their water use, it also represents a detriment to water conservation efforts. The water meter maintenance and replacement program works to offset this loss and maintain reasonable accuracy in customer meters. 283 Date: June 5, 2020 Report No. 2020-057       (3) Real loss represents water that left the water distribution system without serving a purpose. This is largely a result of leakage. Staff estimates water lost through known main breaks and leaks, and the remaining unaccounted-for volume is assumed to be undiscovered leakage. The city implemented programs to repair known leaks and search for undiscovered leaks. To the extent that this program is financially offset by the value of water saved, staff can continue to reduce real loss through leak detection and repair. The waterline replacement program in Water Distribution also plays a large part in this figure, as they aim to replace the pipes which are most likely to break. Staff identified an opportunity to improve water volume estimations on known water main leaks and breaks and is implementing new steps accordingly. In a benchmarking study of real and apparent loss, Denton sits near the middle of Region C utilities in both per connection and per capita measurements as shown below. 284 Date: June 5, 2020 Report No. 2020-057       The water loss audit framework also includes calculation of the Infrastructure Leakage Index (ILI), which is a measure of real loss adjusted for the size of each utility. This metric is useful for benchmarking due to its size considerations. ILI compares real loss to a theoretical unavoidable leakage unique to each utility based on their size. A value of 1 would suggest a utility has avoided all possible leakage. There is no upper limit to this metric. Denton’s ILI in 2019 was 2.13, which places us in the top 40% of Region C utilities as shown below. 285 Date: June 5, 2020 Report No. 2020-057       In the 2019 Water Loss Audit, staff verified existing concerns with the accuracy of large water meters at Denton’s water production plants. Such accuracy errors have inflated the total amount of water produced, causing losses to appear to rise over time. Out of the four affected meters, two have been replaced, and one of the remaining two will be replaced in 2020. Staff is implementing steps to validate the accuracy of these meters and improve water accounting within the water production plants. Improved accuracy of these meters will likely result in reduced estimations of water loss in future audits. CONCLUSION: Denton has continued to maintain a competitive water loss management program and has implemented new steps to continue to improve the program. ATTACHMENT(S): Water Audit Presentation 2019.pdf (pptx as pdf) STAFF CONTACT: Tyler Dawson, Manager of Asset Management 940-349-8944 Tyler.Dawson@CityofDenton.com 286 Water Loss Audit 2019 JUNE 8, 2020 1PUB20-103 287 Water Loss Audit Authorized Consumption + Apparent Losses + Real Losses Total Water Supplied 2PUB20-103 288 Water Produced Water Exported Water Supplied Authorized Consumption Fire Protection Unbilled Water Loss Apparent Loss Unauthorized Consumption Real Loss Systematic Data Error System Operations The Water Audit Tree –Categorizing Water Use 3 Main Breaks Unaccounted Billed Residential Commercial Meter Inaccuracy PUB20-103 289 Real Loss Real loss is water lost through distribution system leakage and excessive pressure •Main breaks and leaks •Undiscovered leakage •Background leakage •Other unidentified losses 4PUB20-103 290 Effects of Real Loss Real losses are indicators of system health ◦These losses should be minimized within economic reason ◦Real losses are priced at the marginal cost of water acquisition and treatment Denton FY 2019: 607.20 MG/ 9.40% 5PUB20-103 291 Apparent Loss Apparent loss is water that was not read accurately by a meter •Water meter inaccuracy •Unauthorized consumption •Systematic data errors 6PUB20-103 292 Effects of Apparent Loss Apparent losses are indicators of fiscal health ◦Inaccurate meters and theft reduce revenue ◦Apparent losses are priced at the retail volume cost of water Denton FY 2019: 197.42 MG/ 3.09% 7PUB20-103 293 Unbilled Authorized Fire Protection is provided as an unbilled service ◦Fire sprinkler systems ◦Fire engine use System operation often requires flushing water mains ◦Cleaning new pipes after installation ◦Removing old water from low flow pipes ◦Flow rate testing and water quality sampling 8PUB20-103 294 Water Produced 6,476 Water Exported 76 Water Supplied 6,398 Authorized Consumption 5,593 Fire Protection 1Unbilled 78 Water Loss 805 Apparent Loss 197 Unauthorized Consumption 16 Real Loss 607 Systematic Data Error 5 System Operations 77 The Water Audit Tree –Categorizing Water Use 9 Main Breaks 40 Unaccounted 567 Billed 5,515 Residential 2,628 Commercial 2,887 Meter Inaccuracy 176 volumes in MG PUB20-103 295 Cost of Water Loss Real Loss -$209,487 / 607.20 MG ◦Real loss is priced at the variable cost of treating 1,000 gallons of water: $0.35 ◦Cost of real loss will increase in the future when Denton acquires additions to the water supply Apparent loss -$947,621 / 197.42 MG ◦Apparent loss is priced at the average retail cost of 1,000 gallons of water: $4.80 ◦This amount is offset by our proactive meter replacement and calibration program 10PUB20-103 296 Benchmarking Data Points Real Loss ◦System Health Apparent Loss ◦Fiscal health Infrastructure Leakage Index (ILI) ◦Comparison to theoretical minimum leakage 11PUB20-103 297 Benchmarking Considerations System Size ◦Growth ◦Water Quality / topology Infrastructure Age Audit Validation 12PUB20-103 298 13 0 20 40 60 80 100 120 140 Gallons Per Connection Per DayReal and Apparent Loss per Connection Across Region C Real Loss Apparent Loss PUB20-103 299 14 0 5 10 15 20 25 30 35 40 45 Gallons Per Capita Per Day (GPCD)Total Loss per Capita Across Region C PUB20-103 300 Infrastructure Leakage Index (ILI) Calculated as total real losses over theoretical minimum leakage An indicator of a utility’s effectiveness in managing leaks Theoretical minimum of 1 ◦Denton FY 2019: = 2.13 15PUB20-103 301 16 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 AWWA Infrastructure Leakage Index (ILI) Across Region C Infrastructure Leakage Index -Technical Performance Indicator 1.0 –3.0 3.0 –5.0 5.0 –8.0 > 8 PUB20-103 302 17PUB20-103 303 Implementation Steps ✓Continue meter replacement program ✓Continue leak detection program with improved technology ✓Continue use of improved main break water loss estimates o Improve volume estimates for new line flushing o Create and implement Mass Balance Worksheet for plants 18PUB20-103 304 Questions / Comments Water Utilities 19PUB20-103 305 Council Requests for InformationCouncil Member Requestor DateSummary of RequestStaff AssignedDepartmentComments1Council Member Briggs02/03/20Would like to request council discuss a citywide public health study.http://www.austintexas.gov/sites/default/files/files/Health/Info_to_Post/HealthReport-linked.pdf Like thisBalthrop MendozaCity Manager's OfficeRequest will be presented during a future PendingRequest work session2Council Member Briggs05/17/20Can staff look at a light to brighten the traffic circle on HinkleEstesCapital ProjectsInformation will be provided in June 5 Friday Report3Council Member Davis05/19/20Disconnected fragments of streets that share the same name (i.e.Westgate, Riney, etc.) cause considerable confusion. I'd like to make avery surface level catalog of these streets and see if there aren't someeasy fixes we could make. For example, the East-West part of Westgateis an easy switch, while East Oak is not.Estes/McDonaldCapital Projects/DevelopmentServicesInformation will be provided in a future Friday Report4Council Member Briggs05/24/20Request for speed study, permanent reducing speed ideas on Hercules.Maybe a flashing digital sign to show speed? Is there a way we could putthis on PD enforcement list rotation for awhile?JahnCapital ProjectsInformation will be provided in a future Friday Report5Council Member Briggs05/26/20I would like to set up a staff meeting with the University Parkneighborhood. They are curious about what we are doing and havesome suggestions, comments.CoxPublic WorksInformation will be provided in the June 5 Friday Report6Council Member Briggs05/26/20Can staff check on the asphalt/road at Orr St. and North Locust?Constituent says it has sunk.EstesCapital ProjectsInformation will be provided in the June 5 Friday Report7Council Member Briggs05/27/20Can staff assess Atlas Dr. and update on any construction efforts?Resident says that construction began 2 years ago by utilities, and nowroad is in bad shapeEstesCapital ProjectsInformation will be provided in the June 5 Friday Report8Council Member Briggs05/29/20Would Solid Waste be able to upcycle five gallon buckets?BoernerSolid Waste and RecyclingInformation will be provided in the June 5 Friday Report9Council Member Briggs06/01/20Can someone check on who mowed the wildflower patch on privateproperty at 915 E Sherman Dr.?PackanParks and RecreationInformation will be provided in the June 5 Friday Report10Mayor Pro Tem Hudspeth06/02/20Can staff check on the signal timing at the corner of US77 and LocustJahnCapital ProjectsInformation will be provided in the June 5 Friday Report11Mayor Pro Tem Hudspeth06/02/20Have we contacted the property owner to address the fence downtown?Please let me know the plan.McDonaldDevelopment ServicesInformation will be provided in the June 5 Friday Report12Council Member Briggs06/03/20In the light of recent events and calls from the community , I would likeask for a Work session on police review/oversight boardDixonPoliceRequest will be presented during a future PendingRequest work session13Council Member Davis06/03/20I would like to see a summary of the improvements Chief Dixon (andChief Howell before him) have made in community relations and officertraining that are helping prevent police violence in Denton. This could bean ISR. But I would also like to see a work session where the Chief couldrespond to some of the things BLM and the protesters are asking for. Forexample, a police oversight board, a more granulated use of forcecontinuum, disallowing certain types of holds, etc. The average citizendoesn’t know a lot about these kinds of things, and hearing the Chief’sperspective could be very helpful.DixonPoliceInformation will be provided in a future Friday Report14Council Member Meltzer06/03/20When the smoke clears, I would like to see an informal staff report on theviability and desirability of the items in the attached agenda from theNAACP, excluding the item requiring State action, although an opinionon that would be welcome as well.DixonPoliceInformation will be provided in a future Friday Report15Council Member Meltzer06/04/20Can staff provide an evaluation of feasibility and desirability of the 10recommendations provided?DixonPoliceInformation will be provided in a future Friday Report16Council Member Briggs06/05/20There have been many task forces and groups convened by city over theyears where poc were asked to serve to address race and racial injustice(Ex. Diversifying the fire dept) can city research and create list of thesegroups and identify reports/recommendations?Information will be provided in a future Friday Report306 June 2020 Sunday Monday Tuesday Wednesday Thursday Friday Saturday  1 Cancelled - 11:30 am Council Luncheon Cancelled -COE 1:30 Cancelled -Traffic Safety Commission 5:30 pm 2 1:00 pm CC Work Session 6:30 pm CC Regular Session 3 Cancelled - 2:30pm Agenda Committee 5:00pm P&Z Work Session 6:30pm P&Z Regular Session 4 Cancelled - 8:30 DEDC 1:00 Public Art Committee 567 8 PUB 9am HLC 3:00pm  9 1:00 pm 2nd Tuesday Session Cancelled - Mobility Committee Meeting 9:00 am 10 Cancelled - 2:30pm Agenda Committee  11 HOT & S Committee 10am 121314 15 16 2:00 pm CC Work Session 6:30 pm CC Regular Session 17 5:00pm P&Z Work Session 6:30pm P&Z Regular Session  18 HOT & S 9:00 TBD 6:00pm Committee on Persons with Disabilities HABSCO 4pm 192021 22 PUB 9am 23 10am Council Airport Committee 2:00 pm 4th Tuesday Session  2425 HOT & S 9:00 TBD 5:30PM Board of Ethics 262728 29 ZBA 5:30pm 30 No Council Meeting            307 July 2020 Sunday Monday Tuesday Wednesday Thursday Friday Saturday    12 8:30 DEDC 4:00 Public Art Committee 3 4th of July Holiday 45 6 No Luncheon Meeting COE 1:30 Traffic Safety Commission 5:30 pm 7 No Council Meeting 8 11:00 EDPB 2:30pm Agenda Committee 5:00pm P&Z Work Session 5:30 Airport Advisory Board 6:30pm P&Z Regular Session 9 101112 13 PUB 9am 14 No Council Meeting Mobility Committee Meeting 9:00 am 15 2:30pm Agenda Committee 16 HOT & S 9-11 6:00pm Committee on Persons with Disabilities HABSCO 4pm 171819 20 21 2:00 pm CC Work Session 6:30 pm CC Regular Session 22 12:00 TIF Board (TIRZ) 2:30pm Agenda Committee 5:00pm P&Z Work Session 6:30pm P&Z Regular Session 23 242526 27 PUB 9am ZBA 5:30pm 28 10am Council Airport Committee 2:00 pm 4th Tuesday Session 29 2:30pm Agenda Committee 30 5:30PM Board of Ethics 31        308 August 2020 Sunday Monday Tuesday Wednesday Thursday Friday Saturday       12 3 11:30 am Council Luncheon COE 1:30 Traffic Safety Commission 5:30 pm 4 2:00 pm CC Work Session 6:30 pm CC Regular Session 5 2:30pm Agenda Committee 5:00pm P&Z Work Session 6:30pm P&Z Regular Session  6 8:30 am Council Budget Workshop 8:30 DEDC 4:00 Public Art Committee 789 10 PUB 9am 11 2:00 pm 2nd Tuesday Session Mobility Committee Meeting 9:00 am 12 11:00 EDPB 2:30pm Agenda Committee 5:30 Airport Advisory Board  13 141516 17 18 2:00 pm CC Work Session 6:30 pm CC Regular Session 19 2:30pm Agenda Committee 5:00pm P&Z Work Session 6:30pm P&Z Regular Session  20 6:00pm Committee on Persons with Disabilities HABSCO 4pm 212223 24 PUB 9am 25 10am Council Airport Committee 2:00 pm 4th Tuesday Session 2627 5:30PM Board of Ethics 282930 31 ZBA 5:30pm       309 City Council City of Denton Meeting Agenda City Hall 215 E. McKinney St. Denton, Texas 76201 www.cityofdenton.com Council Work Session Room2:00 PMTuesday, June 16, 2020 WORK SESSION BEGINS AT 2:00 P.M. IN THE WORK SESSION ROOM REGULAR MEETING BEGINS AT 6:30 P.M. IN THE COUNCIL WORK SESSION ROOM Note: Mayor Chris Watts, Mayor Pro Tem Gerard Hudspeth, and Council Members Keely Briggs, Jesse Davis, John Ryan, Deb Armintor and Paul Meltzer will be participating in the work session, closed meeting, and regular meeting via video/teleconference. REGISTRATION GUIDELINES FOR ADDRESSING THE CITY COUNCIL Due to COVID-19 precautions, members of the public will not be able to attend the June 16, 2020 City Council meeting in-person. To accommodate and receive input on agenda items, citizens will be able to participate in one of the following ways (NOTE: Other than public hearings, citizens are only able to comment one time per agenda item; citizens cannot use both methods to comment on a single agenda item. Public comments are not held for work session reports.): • Virtual White Card – On June 12, the agenda was posted online at www.cityofdenton.com/publicmeetings. Once the agenda is posted, a link to the Virtual White Card, an online form, will be made available under the main heading on the webpage. Within this form, citizens may indicate support or opposition and submit a brief comment about a specific agenda item. Comments may be submitted up until the start of the meeting, at which time, the Virtual White Card form will be closed. Similar to when a citizen submits a white card to indicate their position on the item, these comment forms will be sent directly to City Council members and recorded by the City Secretary. City Council Members review comments received in advance of the meeting and take that public input into consideration prior to voting on an agenda item. The Mayor will announce the number of Comment Cards submitted in support or opposition to an item during the public comment period. Comments will not be read during the meeting. The City Secretary will reflect the number of comments submitted in favor/opposition to an item, the registrant’s name, address, and (summary of) comments within the Minutes of the Meeting, as applicable. OR • By phone – Citizens wishing to speak over the phone during this Council meeting, may call (940) 349-7800 beginning 30 minutes prior to the meeting start time. Comments by phone will be accepted until the item is opened for discussion by the Council. When the call is initially received, a staff member will receive the caller’s information and either: 1) offer to call the citizen back when it is time for them to speak, or 2) record the caller’s information, support or opposition, and comment. If the caller chooses to record their support or opposition, rather than speaking during the meeting, the Mayor will announce the number of comments submitted in support or opposition to the item. If the caller wishes to receive a call back, the voice of each caller will be broadcast into the meeting during the public commenting time of their desired agenda item. Individuals will be able to comment once per agenda item, no matter the method. Page 1 Printed on 6/5/2020 310 June 16, 2020City Council Meeting Agenda • At regular meetings only, citizens can speak on any topic that is not on the agenda (Open Microphone). Alert the call taker if you wish to speak under the Open Microphone category. If you would like to give a public report, see the information below. After determining that a quorum is present, the City Council of the City of Denton, Texas will convene in a Work Session on Tuesday, June 16, 2020, at 2:00 p.m. in the Council Work Session Room at City Hall, 215 E. McKinney Street, Denton, Texas at which the following items will be considered: WORK SESSION 1. Citizen Comments on Consent Agenda Items This section of the agenda allows citizens to speak on any item listed on the Consent Agenda prior to its consideration. Each speaker will be given a total of three (3) minutes to address any item(s). Any person who wishes to address the City Council regarding these items may do so by utilizing the "By Phone" registration process as referenced under the REGISTRATION GUIDELINES FOR ADDRESSING THE CITY COUNCIL detailed at the beginning of this agenda. Registration is required prior to the time the City Council considers this item. Registrants may call in and remain on hold or receive a call back at the time the Work Session is called to Order and are encouraged to ensure they remain accessible to accept the call. 2. Requests for clarification of agenda items listed on this agenda. 3. Work Session Reports Receive a report, hold a discussion, and give staff direction on the Green Tree Estates.ID 20-965A. Receive a report, hold a discussion, and give staff direction regarding an update to the City of Denton’s COVID-19 response. ID 20-945B. Receive a report, hold a discussion, and give staff direction regarding the proposed prioritization and implementation of the City’s Capital Improvement Projects. ID 20-888C. Receive a report and hold a discussion regarding plugged gas well issues, including risks and public protections from plugged wells, current inspection practices, setback distances in Denton and other area cities, and zoning incentives such as density bonuses that could encourage plugging wells in areas of new development. ID 20-1067D. Receive a report, hold a discussion, and give staff direction on pending City Council requests for information. ID 20-673E. Following the completion of the Work Session, the City Council will convene in a Closed Meeting to consider specific items when these items are listed below under the Closed Meeting section of this agenda. The City Council reserves the right to adjourn into a Closed Meeting on any item on its Open Meeting agenda consistent with Chapter 551 of the Texas Government Code, as amended, or as otherwise allowed by law. 1. Closed Meeting: -- PLACEHOLDER IN THE EVENT A CLOSED MEETING IS NEEDED; OTHERWISE, WILL BE DELETED. -- Page 2 Printed on 6/5/2020 311 June 16, 2020City Council Meeting Agenda Any final action, decision, or vote on a matter deliberated in a Closed Meeting will only be taken in an Open Meeting that is held in compliance with Texas Government Code, Chapter 551, except to the extent such final decision, or vote is taken in the Closed Meeting in accordance with the provisions of Section 551.086 of the Texas Government Code (the ‘Public Power Exception’). The City Council reserves the right to adjourn into a Closed Meeting or Executive Session as authorized by Texas Government Code, Section 551.001, et seq. (The Texas Open Meetings Act) on any item on its open meeting agenda or to reconvene in a continuation of the Closed Meeting on the Closed Meeting items noted above, in accordance with the Texas Open Meetings Act, including, without limitation Sections 551.071-551.086 of the Texas Open Meetings Act. NOTE: Any item for which a formal action at the Regular Meeting has been taken by Council may be subject to a request for a motion for reconsideration at any time during the meeting, at the Concluding Items Section, or after the meeting. In order to comply with the Texas Open Meetings Act, a request for a motion for reconsideration made during, at the end of, or after a Council meeting will be placed on the agenda and considered at the next official meeting of the City Council. _________________________________________________________________________________ REGULAR MEETING OF THE CITY OF DENTON CITY COUNCIL AT 6:30 P.M. IN THE COUNCIL WORK SESSION ROOM AT CITY HALL, 215 E. MCKINNEY STREET, DENTON, TEXAS AT WHICH THE FOLLOWING ITEMS WILL BE CONSIDERED: 1. PLEDGE OF ALLEGIANCE A. U.S. Flag B. Texas Flag “Honor the Texas Flag – I pledge allegiance to thee, Texas, one state under God, one and indivisible.” 2. PROCLAMATIONS/PRESENTATIONS 3. PRESENTATION FROM MEMBERS OF THE PUBLIC A. Review of procedures for addressing the City Council. B. Reports from members of the public shall be received through the following two (2) methods. A total of up to seven (7) speakers are permitted to provide public comment and may include any combination of prior registration and open microphone speakers. 1) Pre-registration. This section of the agenda permits any person who has registered in advance to make a citizen report regarding a public business item he or she wishes to be considered by the City Council. Each speaker is allowed a maximum of four (4) minutes to present their report. At the conclusion of each report, the City Council may pose questions to the speaker or may engage in discussion. If the City Council believes that a speaker's report requires a more detailed review, the City Council will give the City Manager or City Staff direction to place the item on a future work session or regular meeting agenda and advise staff as to the background materials to be desired at such meeting. 2) Open Microphone. This section of the agenda permits any person who has not registered in advance for a citizen report to make comments about public business items not listed on the agenda. Such person(s) shall have registered using the “Virtual White Card” or “By Phone” process outlined by the City on its website or meeting notice. Page 3 Printed on 6/5/2020 312 June 16, 2020City Council Meeting Agenda During open microphone reports under this section of the agenda, the Council may listen to citizens speak. However, because notice of the subject of the open microphone report has not been provided to the public in advance, the Texas Open Meetings Act limits any deliberation or decision by the Council to: a proposal to place the item on a future agenda; a statement of factual information; or a recitation of existing policy. Council Members may not ask the open microphone speakers questions or discuss the items presented during open microphone reports. NOTE: If audio/visual aids during presentations to Council are needed, they must be submitted to the City Secretary 24 hours prior to the meeting. 4. CONSENT AGENDA Each of these items is recommended by Staff and approval thereof will be strictly on the basis of the Staff recommendations. Approval of the Consent Agenda authorizes the City Manager or his designee to implement each item in accordance with the Staff recommendations. The City Council has received background information and has had an opportunity to raise questions regarding these items prior to consideration. Listed below are bids, purchase orders, contracts, and other items to be approved under the Consent Agenda (Agenda Items A – N). This listing is provided on the Consent Agenda to allow Council Members to discuss or withdraw an item prior to approval of the Consent Agenda. If no items are pulled, the Consent Agenda Items will be approved with one motion. If items are pulled for separate discussion, they may be considered as the first items following approval of the Consent Agenda. Consider approval of a resolution of the City of Denton supporting the Michaels Development Company I, LP’s 4% housing tax credit application to the Texas Department of Housing and Community Affairs for proposed new construction of Mayhill Road Apartments in Denton to provide affordable rental housing; and providing an effective date. ID 20-866A. Consider adoption of an ordinance of the City of Denton authorizing a memorandum of understanding between the City of Denton, Texas, the Emily Fowler Library Foundation, and the Rotary Club of Denton, Texas #1779, for improvements to Quakertown Park; accepting donations of $40,000 from the Rotary Club of Denton and its members via the Emily Fowler Library Foundation and $15,000 from the Emily Fowler Library Foundation for improvements to the Quakertown Park; approving a plan for improvement of Quakertown Park and authorizing expenditures in furtherance of the plan; providing for an effective date. ID 20-974B. Consider approval of the minutes of June 2, 2020 (Regular and Emergency).ID 20-1037C. Consider adoption of an ordinance of the City of Denton, a Texas home-rule municipal corporation, authorizing the City Manager to execute a contract with FCx Performance Inc. dba Instrumentation Services, for predictive maintenance testing services for the Water Reclamation Department’s treatment plant and lift stations; providing for the expenditure of funds therefor; and providing an effective date (RFP 7300 - awarded to FCx Performance Inc. dba Instrumentation Services, for three (3) years, with the option for two (2) additional one (1) year extensions, in the total five (5) year not-to-exceed amount of $118,200). The Public Utilities Board recommends approval ( - ). ID 20-1058D. Page 4 Printed on 6/5/2020 313 June 16, 2020City Council Meeting Agenda Consider adoption of an ordinance of the City of Denton, a Texas home-rule municipal corporation, authorizing the City Manager, or his designee, to execute a contract with Holt Caterpillar Inc. through the Sourcewell Cooperative Purchasing Contract Number 032119, for the acquisition of one (1) New Caterpillar model D6XE Track Type Dozer for the Solid Waste/Landfill Department; authorizing the expenditure of funds therefor; and declaring an effective date (File 7376 - awarded to Holt Caterpillar Inc., in the not-to-exceed amount of $469,401.38). The Public Utilities Board recommends approval ( - ). ID 20-1059E. Consider adoption of an ordinance of the City of Denton, a Texas home-rule municipal corporation, authorizing the City Manager to execute a contract with JDK Associates, Inc., for the installation of a gravity retaining wall in the Brinker Substation; providing for the expenditure of funds therefor; and providing an effective date (RFP 7316 - awarded to JDK Associates, Inc., in the not-to-exceed amount of $755,296.68). The Public Utilities Board recommends approval ( - ). ID 20-1061F. Consider adoption of an ordinance of the City of Denton, a Texas home-rule municipal corporation, authorizing the City Manager, or his designee, to execute a contract with Tymco Inc., through the Houston-Galveston Area Council of Governments (H-GAC) Cooperative Purchasing Program Contract Number SW04-20, for the acquisition of one (1) Tymco model 600 Regenerative Air Sweeper for the Drainage Department; authorizing the expenditure of funds therefor; and declaring an effective date (File 7294 - awarded to Tymco Inc. in the not-to-exceed amount of $239,185). The Public Utilities Board recommends approval ( - ). ID 20-1062G. Consider adoption of an ordinance of the City of Denton, a Texas home-rule municipal corporation, authorizing the City Manager, or his designee, to execute a contract with Rush Truck Centers of Texas LP through the BuyBoard Cooperative Purchasing Network Contract number 601-19, for the acquisition of one (1) 2020 Peterbilt model 348 truck chassis with hoist and two (2) emergency generators for the Water Reclamation Department; authorizing the expenditure of funds therefor; and declaring an effective date (File 7367 - awarded to Rush Truck Centers of Texas LP, in the not to exceed amount of $634,703.94). The Public Utilities Board recommends approval ( - ). ID 20-1063H. Consider adoption of an ordinance of the City of Denton, a Texas home-rule municipal corporation, authorizing the City Manager to execute a contract with Centricity GIS, for the continuation of the services for utility line locates for the Water Distribution Department, Wastewater Collections, Water Metering, and Denton Municipal Electric Department provided by Texas 811, which is the sole provider of these commodities and services, in accordance with Texas Local Government Code 252.022, which provides that procurement of commodities and services that are available from one source are exempt from competitive bidding, and if over $50,000 shall be awarded by the governing body; and providing an effective date (File 7336 - awarded to Centricity GIS, in the five (5) year not-to-exceed amount of $300,000). The Public Utilities Board recommends approval ( - ). ID 20-1064I. Consider adoption of an ordinance of the City of Denton, a Texas home-rule municipal ID 20-1065J. Page 5 Printed on 6/5/2020 314 June 16, 2020City Council Meeting Agenda corporation, authorizing the City Manager to execute a Professional Services Agreement with Teague Nall and Perkins, Inc., for consulting services and to develop a master plan for Southwest Park for City of Denton as set forth in the contract; providing for the expenditure of funds therefor; and providing an effective date (RFQ 7170 - Professional Services Agreement for consulting services awarded to Teague Nall and Perkins, Inc., in the not-to-exceed amount of $198,800). Consider adoption of an ordinance of the City of Denton, a Texas home-rule municipal corporation, authorizing the City Manager to execute a contract with DFW Printing Services, LLC, for printing services for resident updates and construction guide printing and mailing for the City of Denton; providing for the expenditure of funds therefor; and providing an effective date (RFP 7317 - awarded to DFW Printing Services, LLC, for three (3) years, with the option for two (2) additional one (1) year extensions, in the total five (5) year not-to-exceed amount of $325,000). ID 20-1066K. Consider adoption of an ordinance of the City of Denton, approving an agreement with the Denton Independent School District and the City of Denton, Texas to work collaboratively to enable students in DISD to have greater access to Denton Public Library resources through a DISD Student Account at the Denton Public Library; authorizing the City Manager or his designee to execute the Agreement; and providing an effective date. ID 20-1068L. Consider approval of a resolution of the City of Denton adopting an integrated pest management plan as policy for City-owned property; and declaring an effective date. ID 20-1105M. 5. ITEMS FOR INDIVIDUAL CONSIDERATION Consider adoption of an ordinance directing the publication of Notice of Intention to issue $27,250,000 in principal amount of Certificates of Obligation of the City of Denton for General Government projects; and providing for an effective date. ID 20-916A. Consider adoption of an ordinance directing the publication of Notice of Intention to issue $37,120,000 in principal amount of Certificates of Obligation of the City of Denton for Electric, and Wastewater System projects; and providing for an effective date. ID 20-917B. 6. PUBLIC HEARINGS Hold a public hearing inviting citizens to comment on the 2020-2022 Consolidate Plan for Housing and Community Development and 2020 Action Plan. ID 20-994A. Hold a public hearing and consider adoption of an ordinance of the City of Denton, Texas, regarding an initial zoning of Planned Development (PD) District on approximately 131.94 acres and for a change from Residential 6 (R-6) to a PD District on approximately 14.19 acres, for a total of approximately 146.14 acres of land generally located south of Allred Road and west of South Bonnie Brae Street and Fort Worth Drive in the City of Denton, Denton County, Texas; adopting an amendment to the City’s official zoning map; providing for a penalty in the maximum amount of $2,000.00 for violations thereof; providing a severability clause and an effective date. (PD20-0001c, Sagebrook, Hayley Zagurski). STAFF IS REQUESTING THAT THIS ITEM BE PD20-0001cB. Page 6 Printed on 6/5/2020 315 June 16, 2020City Council Meeting Agenda POSTPONED TO A DATE CERTAIN OF JULY 21, 2020. Hold a public hearing and consider adoption of an ordinance of the city of Denton regarding a change in the zoning district and use classification of 10.49-acres from Planned Development-MR (PD-MR) zoning district and use classification and 1.523-acres from Mixed Use Neighborhood (MN) zoning district and use classification to a Planned Development (PD) zoning district on approximately 12.02-acres of land generally located on the southwest side of the intersection of the southbound I-35E service road and Buc-ee’s Boulevard, in the City of Denton, Denton County, Texas; adopting an amendment to the city’s official zoning map; providing for a penalty in the maximum amount of $2,000.00 for violations thereof; providing a severability clause and an effective date. The Planning and Zoning Commission recommended approval (6-1) (PD19-0005, Buc-ee’s Outparcels, Cindy Jackson) PD19-0005dC. Hold a public hearing and consider adoption of an ordinance of the City of Denton, Texas, regarding a Comprehensive Plan Amendment from Business Innovation Future Land Use designation to Regional Mixed Use Future Land use designation. The site includes 3 tracts for a total of approximately 98 acres: Tract 1 includes one acre generally located at the northwest intersection of South Loop 288 and Shady Oaks Drive; Tract 2 includes 72.76 acres located at the southwest corner of South Loop 288 and Shady Oaks drive; Tract 3 includes 24.14 acres located on the south side of Shady Oaks Drive, approximately 1900 feet west of South Loop 288, in the City of Denton, Denton County, Texas; adopting an amendment to the City’s Comprehensive Plan; providing for a penalty in the maximum amount of $2,000.00 for violations thereof; providing a severability clause and an effective date The Planning and Zoning Commission voted (6-1) to approve the request. (CA19-0001b, Canopy Trails, Julie Wyatt). CA19-0001bD. Hold a public hearing and consider adoption of an ordinance of the City of Denton, Texas, regarding a change in the zoning district and use classification on approximately 98 acres from Light Industrial (LI) and General Office (GO) to Mixed-Use Regional (MR). The site includes 3 tracts: Tract 1 includes one acre generally located at the northwest intersection of South Loop 288 and Shady Oaks Drive; Tract 2 includes 72.76 acres located at the southwest corner of South Loop 288 and Shady Oaks drive; Tract 3 includes 24.14 acres located on the south side of Shady Oaks Drive, approximately 1900 feet west of South Loop 288, in the City of Denton, Denton County, Texas; adopting an amendment to the City’s official zoning map; providing for a penalty in the maximum amount of $2,000.00 for violations thereof; providing a severability clause and an effective date The Planning and Zoning Commission voted (6-1) to approve the request. (Z20-0002b, Canopy Trails, Julie Wyatt). Z20-0002bE. 7. CONCLUDING ITEMS Page 7 Printed on 6/5/2020 316 June 16, 2020City Council Meeting Agenda A. Under Section 551.042 of the Texas Open Meetings Act, respond to inquiries from the City Council or the public with specific factual information or recitation of policy, or accept a proposal to place the matter on the agenda for an upcoming meeting AND Under Section 551.0415 of the Texas Open Meetings Act, provide reports about items of community interest regarding which no action will be taken, to include: expressions of thanks, congratulations, or condolence; information regarding holiday schedules; an honorary or salutary recognition of a public official, public employee, or other citizen; a reminder about an upcoming event organized or sponsored by the governing body; information regarding a social, ceremonial, or community event organized or sponsored by an entity other than the governing body that was attended or is scheduled to be attended by a member of the governing body or an official or employee of the municipality; or an announcement involving an imminent threat to the public health and safety of people in the municipality that has arisen after the posting of the agenda. B. Possible Continuation of Closed Meeting topics, above posted. C E R T I F I C A T E I certify that the above notice of meeting was posted on the bulletin board at the City Hall of the City of Denton, Texas, on the 12th day of June, 2020 at ___________________ __________________________________________ CITY SECRETARY NOTE: THE CITY OF DENTON'S DESIGNATED PUBLIC MEETING FACILITIES ARE ACCESSIBLE IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT. THE CITY WILL PROVIDE ACCOMMODATION, SUCH AS SIGN LANGUAGE INTERPRETERS FOR THE HEARING IMPAIRED, IF REQUESTED AT LEAST 48 HOURS IN ADVANCE OF THE SCHEDULED MEETING. PLEASE CALL THE CITY SECRETARY'S OFFICE AT 940-349-8309 OR USE TELECOMMUNICATIONS DEVICES FOR THE DEAF (TDD) BY CALLING 1-800-RELAY-TX SO THAT REASONABLE ACCOMMODATION CAN BE ARRANGED. Page 8 Printed on 6/5/2020 317 Meeting Date 6/9/2020 Start @ 1 p.m. COVID-19 Update 20-944 EV Charger Upgrade 20-732 Sustainable Denton Plan 20-521 Urban Forset Master Plan 20-426 Protest and Demonstration Update 20-111__ 16-Jun COVID-19 Update 20-945 Green Tree Estates 20-965 Business Utilization of Parking Spaces /ROW to Extend Outdoor Seatin 20-1102 Gas Wells 20-1067 CIP Update 20-888 Council Requests 20-673 23-Jun Eagle Substation (+ Closed Meeting) Solar Rebate Program 20-996 Audit - Water Loss 20-1009 Audit - Grants Management 20-1078 Audit - Customer Service 20-1079 Denton Development Code Amendments 20-1024 Council Requests 20-674 Special - Budget Workshop @ 1 p.m. 6/30/2020 FYs 19-20 and 20-21 Budget Updates 20-806 6, 7 & 14-Jul 19-2914 21-Jul COVID-19 Update 20-1046 Green Tree Estates 20-966 Drop-Off Recycling Centers 20-768 Denton Development Code Amendments Council Requests July 21 20-847 28-Jul COVID-19 Update 20-1047 Green Tree Estates 20-967 Council Requests July 28 20-848 23-Jul (Thursday) Budget Workshop Accessory Dwelling Units, and Screening DCA19-0011 Construction Code Review (TBD)Delegated Authority Group Home Code Amendment Library Master Plan 20-526 Aug 3 - Luncheon Municipal Broadband 20-556 Plugged Gas Wells Public Art Right of Way Ordinance Follow-up Stormwater Master Plan Council Requests Aug. 4 20-1048 TIF Grants for Accessibility 2020 Mobility Plan Update7 20-245 Aug 6 - Budget Workshop Council Requests Aug. 11 20-1049 -------------------------- Council Requests Aug 18 20-1050 Council Requests Aug 25 20-1051 Work Session Requests Determined by Council - Date TBD Community Public Art and Community Tree Grants Ethics Ordinance Revision Small Cell Lawsuit Participation Tree Ordinance Review Veteran Source of Income Housing Discrimination OrdinanceWork Sessions Planned - Date TBDFUTURE WORK SESSION ITEMS MATRIX As of June 5, 2020 Currently Slated Work Session Items No meetings - Council Break 318 Street/Intersection From To Closure Start Date Closure End Date Description Department Upcoming Info/Notes Public Meeting Other Communication Department Contact Bonnie Brae IH 35E Scripture 06/15/20 03/01/21 North South Water Main Phase 3 Engineering, Water Direct business contact (940) 349-8938 Cherrywood Ln Woodland St Roberts St 06/15/20 07/29/20 Water Distribution will be installing a new water main and water services. Water N/A (940) 349-7278 I35E northbound service road located 500 ft west of Bonnie Brae TBD TBD Wastewater Improvements (Temporary Lane Closures)Wastewater (940) 349-8909 Robson East Side of RR 35W TBD TBD Wastewater Main Install (Temporary Lane Closure)Wastewater (940) 349-8909 Rockwood Ln.Royal Mistywood TBD TBD bundle Engineering this will be part of bundle Door Hangers Roselawn Dr.Bonnie Brae Kansas City Southern RR TBD TBD Drainage and Roadway Construction Bonnie Brae Phase 1 (One Lane traffic control) Engineering Part of Bonnie Brae Ph. I Capital Project (940) 349-8910 Royal Ln.Royal Rockwood TBD TBD bundle Engineering this will be part of bundle Thomas St.Panhandle Oak TBD TBD Streets Construction Capital Projects Part of 2019 Street Bundle (940) 349-7104 Windsor E. Sherman Nottingham 06/15/20 08/01/20 This closure is to install underground utilities in this area Engineering NextDoor (940) 349-7426 Woodland St Frame St Cherrywood Ln 06/15/20 07/29/20 Water Distribution will be installing a new water main and water services. Water N/A (940) 349-7278 Total 8 Street Closure Report Upcoming Closures Week of June 8, 2020 - June 14, 2020 Upcoming Closures 319 Street/Intersection From To Closure Start Date Closure End Date Description Department Upcoming Info/Notes Public Meeting Other Communication Department Contact Broken Arrow Dunes Old Orchard 05/11/20 06/12/20 Concrete Sidewalk Repair. The process starts with Barricading the failed sections of concrete sidewalk, remove , and install new concrete. Streets N/A (940) 349-7146 Broken Arrow Dunes Burning Tree 06/03/20 06/26/20 Curb and Concrete Repair. The process starts with Barricading the failed sections of, Curb remove and install back. Streets N/A (940) 349-7146 Brown Dr Roberts St Woodland St 02/10/20 07/10/20 Wastewater collections will be installing a new wastewater main line and services Wastewater N/A (940) 349-8909 Chaucer Hemingway Hickory Creek 05/11/20 06/12/20 Concrete Sidewalk Repair. The process starts with Barricading the failed sections of concrete Sidewalk, remove, and install new concrete Streets N/A (940) 349-7146 Cherrywood Ln Woodland St Northwood Tr 02/10/20 07/10/20 Wastewater collections will be installing a new wastewater main line and services Wastewater N/A (940) 349-8909 Colorado Blvd Brinker Rd 3201 Colorado Blvd 02/17/20 06/12/20 Private Development: Drainage, Water, Sanitary Sewer, and Pavement for Fire Station #8 Public Works Inspections, Private Development NextDoor, Direct business contact (940) 205-9230 Colorado Blvd Loop 288 450 Feet north of Loop 288 05/18/20 06/26/20 This project will be removing the left turn lane on the northbound side of Colorado Blvd into the Mall. Floyd Smith Concrete The project sent out a mailout and door hangers when the first phase started in April. (940) 349-7104 Dunes Broken Arrow Windsor 06/03/20 06/26/20 Concrete Sidewalk Repair. The process starts with Barricading the failed sections of concrete Sidewalk, remove, and install new concrete Streets N/A (940) 349-7146 Elm Hickory Prairie 05/11/20 06/19/20 PEC 4 Utility Project Engineering Direct business contact (940) 349-8938 FM 2181 City of Denton/Cori nth City Lillian Miller 11/18/19 TBD Street Widening TxDOT Watch TXDOT message boards for local street closure updates. (940) 349-8425 FM 2499 Pine Hills Hickory Creek Rd 03/27/20 07/01/20 Ana Site Construction: Water and Sewer Bore FM2499 Public Works Inspections, Private Development NextDoor (940) 205-9230 Street Closure Report Week of June 8, 2020 - June 14, 2020 Current Closures Current Closures 320 Street/Intersection From To Closure Start Date Closure End Date Description Department Upcoming Info/Notes Public Meeting Other Communication Department Contact Foxcroft Cir Emerson Ln Emerson Ln 01/30/20 07/17/20 Wastewater main replacement. Projects extents, Emerson from Emerson Circle to Foxcroft. Emerson Circle from Emerson to End Foxcroft from Emerson to Northcrest Foxcroft from Old North to Emerson Wastewater N/A (940) 349-8909 Foxcroft Cir Emerson Ln Emerson Ln 03/09/20 09/17/20 Water Distribution will be replacing the water main and water services. Water N/A (940) 349-7278 Ft. Worth Dr. (US 377)IH 35E Mission St 10/17/19 11/27/20 Infrastructure Safety Upgrades (temporary closures)TxDOT (940) 349-8938 Ft. Worth Dr. (US 377)IH 35E 0.26 mi south of FM 1830 12/03/18 12/12/20 Street Widening (Temporary Lane Closures during non-peak traffic) TxDOT 10/08/19 (940) 387-1414 Greenwood Kaywood Crestwood 06/15/20 07/03/20 Installing Valley Gutter across Greenwood at the intersection of Kayewood. The process starts with barricading then remove pavement and subgrade and install new concrete Valley Gutter. Streets N/A (940) 349-7146 Hercules Lane E. Sherman Dr. Huntington Dr.06/04/20 07/31/20 Completed removal and replace of Hercules Lane in conjunction of the added turn lanes for the Sherman Crossing project. Public Works Inspections Email Notification, Door hangers (940) 391-6299 Hickory Exposition Bradshaw 06/08/20 06/26/20 Concrete Sidewalk Repair. The process starts with Barricading the failed sections of concrete Sidewalk, remove, and install new concrete Streets N/A (940) 349-7146 Hidden Meadows Trail Intersection with Vintage Blvd back of Vintage blvd right of way 03/16/20 07/03/20 Intermittent closures of this intersection for construction activities Engineering NextDoor, Email Notification (940) 349-8938 Hollyhill Ln Longridge Dr Tennyson Trl 03/06/20 06/12/20 Water Distribution will be replacing the water main and water services. Water N/A (940) 349-7278 Current Closures 321 Street/Intersection From To Closure Start Date Closure End Date Description Department Upcoming Info/Notes Public Meeting Other Communication Department Contact John Paine Road Southwest Pump Station Johnson Road 01/06/20 07/31/20 Install approximately 14,000 linear feet of 24-inch and 30- inch water main along Old John Paine and Allred between the Southwest Pump Station and South Bonnie Brae. Water Construction is continuing thru COVID- 19. Please respect workers efforts in the field and always maintain social distancing. 6/3/20 - New work near Bonnie Brae and US 377/Fort Worth Drive is underway. Work will be in the ROW but may impact shoulder and occasional travel lanes for equipment/material deliveries. 5/12/20 Update - Partial Opening Goal: John Paine from Johnson north to Allred/John Paine near IH 35W may be ready to re-open End of May. John Paine Road from Johnson Road south will remain closed but is still scheduled to re-open July 31. NextDoor (940) 349-8925 Johnson St.Smith St.Daugherty St.05/18/20 07/02/20 Install new storm drain from the intersection of Smith and Johnson to the intersection of Johnson and Daugherty. Drainage NextDoor (940) 349-7197 Kerley Street Duncan Street Shady Oaks Drive 02/05/20 07/31/20 Street Reconstruction Streets (940) 349-7146 Locust St.Oak McKinney 04/13/20 06/13/20 Sidewalk Improvements Engineering 5/28/20 - Contractor delayed due to weather and COVID related work slowdowns. (940) 349-8910 Locust St.Warren Ct.Maple 03/09/20 06/19/20 Storm drain improvements as part of Pec-4 Ph 1&amp;2 Project. West side lane closure until May 12th Changing to Eastside lane closure until May 29th. Engineering Direct business contact (940) 349-8938 Mantan Calvert La Fonda 05/11/20 06/12/20 Concrete Sidewalk Repair. The process starts with Barricading the failed sections of concrete Sidewalk, remove , and install new concrete Streets N/A (940) 349-7176 Masch Branch U S 380 Jim Crystal 02/17/20 07/17/20 We will be reconstructing Masch Branch from 380 to Jim Crystal. Streets Direct business contact, Door hangers (940) 349-7146 Current Closures 322 Street/Intersection From To Closure Start Date Closure End Date Description Department Upcoming Info/Notes Public Meeting Other Communication Department Contact Mockernut Rd. Intersection with Vintage Blvd. back of Vintage Blvd. right of way 03/16/20 07/03/20 Intermittent closures of this intersection for construction activities. Engineering NextDoor, Email Notification (940) 349-8938 Moss Creek Ft. Worth Dr.Bent Creek 05/11/20 06/12/20 Concrete Street Panel and Sidewalk Repair. The process starts with Barricading the failed sections of concrete pavement, remove the pavement, and install new concrete. Streets N/A (940) 349-7146 N. Bell Ave Texas College 02/28/20 07/01/20 Building out west side of building Public Works Inspections, Private Development NextDoor (940) 205-9230 N. Carroll W.Oak McKinney St.06/08/20 08/28/20 Concrete Street Panel and Sidewalk Repair. The process starts with Barricading the failed sections of concrete pavement, remove the pavement, and install new concrete. Streets N/A (940) 349-7146 Prairie Elm Pierce 06/01/20 06/19/20 PEC 4 Utilities Engineering NextDoor, Direct business contact (940) 349-8938 Prairie Locust Wainwright 06/01/20 06/19/20 PEC 4 Utilities Engineering NextDoor, Direct business contact (940) 349-8938 Prairie St.Locust St.Elm St.03/23/20 08/28/20 Storm drain improvements, as part of Pec-4 Ph 1&amp;2 Project. Street closed to thru traffic. Engineering Direct business contact (940) 349-8938 Roberts St Bell Ave Cherrywood Ln 02/10/20 07/10/20 Wastewater collections will be installing a new wastewater main line and services. Wastewater N/A (940) 349-8909 Roselawn Bonnie Brae Bernard 05/12/20 06/12/20 Bonnie Brae Phase 1 Engineering NextDoor (940) 349-8938 Scripture Street Thomas Street Malone 03/16/20 06/30/20 The 2019 Street Reconstruction project consists of the reconstruction of roadways listed above. This reconstruction shall include new curb and gutter, ADA compliant ramps in sidewalks, asphalt or concrete roadways as well as upgraded drainage, water and wastewater facilities Engineering NextDoor, Email Notification (940) 349-7426 Shagbark Dr intersection with Vintage Blvd back of Vintage Blvd right of way 03/16/20 07/03/20 Intermittent closure of the intersection for construction activities. Engineering NextDoor, Email Notification (940) 349-8938 Current Closures 323 Street/Intersection From To Closure Start Date Closure End Date Description Department Upcoming Info/Notes Public Meeting Other Communication Department Contact South Bonnie Brae FM 1515 Walt Parker 06/05/20 06/10/20 North South Water Phase 2 - Installation of 42" Water Main: Bonnie Brae is closed for pavement restoration efforts between FM1515 and Willowwood Street. Part of ongoing closures as street restoration is performed. Engineering Email Notification (940) 349-7713 Vista Verde Montecito Intersection 06/08/20 06/26/20 Concrete Sidewalk Repair. The process starts with Barricading the failed sections of concrete Sidewalk, remove, and install new concrete Also installing Valley Gutters across Vista Verde at the intersections Streets N/A (940) 349-7146 Warren Ct.Wainwright St.Locust St.12/16/19 07/31/20 Drainage Improvements as part of Pec-4 Ph 1&2 Project Engineering Closed to thru traffic Direct business contact, door hangers (940) 349-8938 Windsor Drive North Locust Stuart 05/11/20 07/01/20 Installation of sewer and water facilities. Windsor Drive - Closed EB - Open one Way WB Engineering NextDoor (940) 349-7426 Woodland St Brown Dr Cherrywood Ln 02/10/20 07/10/20 Wastewater collections will be installing a new wastewater main line and services Wastewater N/A (940) 349-8909 Total 43 Current Closures 324 Street/Intersection From To Closure Start Date Closure End Date Description Department Upcoming Info/Notes Public Meeting Other Communication Department Contact 941 Precision Airport Rd W. Oak St.04/20/20 05/12/20 Concrete Street Repair. The process starts with Barricading the failed sections of pavement, remove the pavement and subgrade, and install new concrete pavement. Streets N/A (940) 349-7146 Ave. C I-35 Eagle 04/28/20 05/29/20 Garage completion and tear down of crane on private Public Works Inspections, Private Development NextDoor (940) 205-9230 Bent Creek Kappwood Spring Creek 01/06/20 04/24/20 Concrete Street panel and Sidewalk repair. The process starts with barricading the failed sections of concrete pavement, remove the pavement and subgrade, and install new concrete pavement. Streets N/A (940) 349-7146 Eagle Elm Locust 03/30/20 05/29/20 PEC 4 1&amp;2 Drainage and Utility Improvements Engineering West bound Traffic being detoured down Locust to Maple to Elm. NextDoor, N/A (940) 349-8938 Hickory Creek Rd.Teasley Riverpass TBD TBD Street Widening (Temporary Lane Closures)Engineering From 1/13/20 to 3/8/20, City's Contractor will be clearing trees and vegetation along the south side of Hickory Creek Rd., from the west property line of McNair Elementary School to the Riverpass Dr. intersection. This will not involve any lane closures, but construction zone signage will be put up to warn motorists. Atmos still needs to relocate their facilities east of the Montecito intersection before our Contractor can fully deploy to the project. Phone call to McNair Elementary Principal (940) 349-7112 Street Closure Report Week of June 8, 2020 - June 14, 2020 Completed Closures Completed Closures 325 Street/Intersection From To Closure Start Date Closure End Date Description Department Upcoming Info/Notes Public Meeting Other Communication Department Contact Johnson Lane John Paine Road Just west of first driveway 01/06/20 05/31/20 5/20/20 Update - Project is still on schedule to re-open Johnson Road on May 31, 2020, Ideally sooner if weather/work permits. 3/25/20 Construction is continuing thru COVID-19. Please respect workers efforts in the field and always maintain social distancing. Road closure is for the installation of new water main along Old John Paine Rd. and Allred Rd. between the Southwest Pump Station on John Paine Rd. near Parkplace Dr. and South Bonnie Brae St. Water NextDoor (940) 349-8925 Johnson Street; Smith Street Dallas Drive Daughtery Street, at S Locust Street 04/06/20 07/31/20 Atmos Energy is relocating/ replacing existing gas mains and services for upcoming reconstruction of Smith Street; including gas main crossing Johnson Street at Smith Street. Atmos Direct business contact, Atmos Energy to distribute door hangers, place sign boards, and notify residents in person (940) 268-7285 Locust St.Highland St Eagle Dr 03/09/20 05/29/20 Sewer main improvements, as part of Pec-4 Ph 1&amp;2 Project. West side lane closure. Engineering Direct business contact (940) 349-8938 Longridge Woodbrock St.Hollyhill Ln.04/20/20 05/08/20 Emergency repair of drainage system Drainage N/A (940) 349-7197 Loop 288 Colorado 225 west of Colorado blvd 03/16/20 05/15/20 This project is to install a drive approach at the Golden Triangle Mall as part of the Colorado Blvd and Loop 288 intersection improvements. Engineering, Floyd Smith Concrete Floyd Smith concrete will resume work on this project April 6th 2020. Direct business contact (940) 349-7104 Maple St.Elm St.Myrtle St.02/24/20 03/06/20 Water Line improvements, as part of Pec-4 Ph 1&amp;2 Project. Alternating lane closures. Engineering Direct business contact (940) 349-7112 Montecito Dr.Hickory Creek Rd. Buena Vista Dr.TBD TBD Installation of new storm drainage line. Full street closure. Engineering City PM will contact McNair Elementary Principal again on 2/7/20. (940) 349-7112 Old North Rd Chebi Ln Emerson Ln 05/18/20 06/05/20 Water Distribution will be replacing the water main and water services on Foxcroft. Water N/A (940) 349-7125 Completed Closures 326 Street/Intersection From To Closure Start Date Closure End Date Description Department Upcoming Info/Notes Public Meeting Other Communication Department Contact Pembrooke Chasewood Long Ridge 04/20/20 05/29/20 Curb and Gutter Repair. The process starts with Barricading the failed sections of, Curb and Gutter remove and install Curbs. Also Mill and Overlay section of Street that was impacted with the curb repair. Streets N/A (940) 349-7146 Rushing Springs Dr.Hickory Creek Rd. Marble Cove Ln.TBD TBD Installation of new storm drainage line. Intersection closure. Traffic will be detoured to Serenity Way. Engineering N/A (940) 349-7112 S. Elm St.Prairie St.Eagle 03/16/20 05/29/20 Water main improvements along Elm St. as part of the Pec- 4 Ph 1&2 Project. Engineering Alternating East and West side lane closures Direct business contact, Door hangers (940) 349-8938 S. Locust St.Warren Ct.Maple 12/16/19 05/08/20 Drainage Improvements as part of the Pec-4 Ph 1&2 Project.Engineering West side lane closure Direct business contact, Door hangers (940) 349-8938 Thomas Street W. Oak Panhandle 03/16/20 06/15/20 The 2019 Street Reconstruction project consists of the reconstruction of roadways listed above. This reconstruction shall include new curb and gutter, ADA compliant ramps in sidewalks, asphalt or concrete roadways as well as upgraded drainage, water and wastewater facilities Engineering NextDoor, Email Notification, Direct business contact (940) 349-7426 Wainwright Highland ct Warren ct 04/27/20 05/29/20 PEC 4 Drainage project. Road Reconstruction Engineering Eastside Lane closure for pavement repair only.N/A (940) 349-8938 Total 19 Completed Closures 327