HomeMy WebLinkAbout2026/03/19 - Street Closure Report1 Street Closure Report: Upcoming ClosuresSCR Mar. 23rd – 29thStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Mulberry StCarroll BlvdLocust St04/08/2606/10/26Contractor extending waterline on Mulberry.Public Works InspectionsStephany TrammellFull Closure2Stockbridge DrHudsonwood DrQuail Creek Dr03/30/2605/29/26Contractor replacing water lines for ProvidencePlace ProjectPrivate Development PublicWorks InspectionsAlexander Cervantes Exported on March 19, 2026 12:52:42 PM CDT
2 Street Closure Report: Current ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Alice StPanhandle StCrescent St05/02/2506/15/26Utility installations and pavement replacement.EngineeringMegan DavidsonFull Closure2Apollo DrRedstone RdSelene Dr09/29/2503/28/26Utilities and Pavement replacementEngineeringDante HaleFull Closure3Apollo DrRedstone RdSelene Dr07/24/2505/29/26Utility installations and pavement replacement.EngineeringScott FettigFull Closure4Audra LnNottingham Dr/Audra LnOak Valley01/19/2603/27/26TCP to be used to install drainage pipe and make street repairs.Private DevelopmentStephany TrammellFull Closure5Audra LnLattimore StMack Pl01/19/2603/27/26TCP to be used during sidewalk construction.Private DevelopmentStephany TrammellLane Closure6Audra Ln (EB)Audra LnOak Valley10/01/2503/27/26Utility Contractor to install drainage pipe across Audra Lane.Private DevelopmentStephany TrammellLane Closure7Audra Ln (WB)Audra LnOak Valley10/01/2503/27/26Utility Contractor to install drainage pipe across Audra Lane.Private DevelopmentStephany TrammellLane Closure8Bernard St NHickory StChestnut St02/06/2607/24/26Utility installations and pavement replacementEngineeringMegan DavidsonFull Closure9Bonnie Brae StConquest DrElm St N (US 77)02/16/2603/23/26Contractor will be installing storm drain lines, laterals, and curb inletsalong Bonnie Brae.EngineeringJesus PerezFull Closure10Bonnie Brae StUniversity Dr (US 380)Carril-Al-Lago Dr03/05/2604/06/26Contractor to install storm drain line, laterals and curb inlets. Contractorto lower existing water line.EngineeringJesus PerezLane Closure11Buckingham DrHercules LnSherman Dr11/17/2507/03/26Utilities and Pavement replacementEngineeringDante HaleFull Closure12Denton StHickory StCongress St06/02/2505/01/26Atmos gas line installationEngineeringMegan DavidsonFull Closure13Donna RdElm StEnd11/17/2503/27/26Utilities and Pavement replacementEngineeringDante HaleFull Closure14Eagle DrAve CAve A03/17/2504/01/26Using it or an entrance due to elevation changes in the jobsite it is theonly way to get into the sitePublic Works InspectionsStephany TrammellLane Closure15Emery StDead EndAlice St09/29/2504/10/26Full Road ReconstructionEngineeringMegan DavidsonFull Closure16Fulton St NCordell StEmery St09/29/2504/10/26Full Road ReconstructionEngineeringMegan DavidsonFull Closure17Hickory Creek RdRiverpass DrCountry Club Rd (FM 1830)03/13/2312/31/26Bridge InstallationEngineeringTracy BeckFull Closure18Huntington DrSun Valley DrHercules Ln10/20/2503/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure19Jupiter DrRedstone RdSelene Dr02/02/2607/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure20Lattimore StMozingo StAudra Ln01/19/2603/27/26TCP to be used for street paving.Private DevelopmentStephany TrammellFull Closure21Mayhill Rd S600ft North of Edwards Rd400ft South of Edwards Rd10/20/2507/30/26Waterline tap being installed on Mayhill EasmentPublic Works InspectionsAlexander CervantesRolling Closure22Meadowedge LnFall Meadow StChapel Hill Ln03/09/2604/24/26Concrete Panel and Sidewalk RepairStreetsRoy San MiguelLane Closure23Mulberry StAve CAve D12/03/2504/03/26Tri Dal working on water lines/ Water VaultPublic Works InspectionsRyan DonaldsonLane Closure24Neptune DrRedstone RdSelene Dr11/24/2505/08/26Utilities and Pavement replacementEngineeringDante HaleFull Closure25Northridge StHinkle DrBolivar St04/16/2504/20/26Utilities and Pavement replacementEngineeringDante HaleRolling Closure26Oak StCarroll BlvdFry St02/13/2603/31/26SPS relocating gas linesPublic Works InspectionsStephany TrammellRolling Closure27Oak StWelch StAve C02/13/2603/31/26SPS relocating gas linesPublic Works InspectionsStephany TrammellRolling Closure28Paisley StPace DrOak Valley01/05/2603/27/26TCP lane closure to be used for water tap performed by COD WaterDepartment.Public Works InspectionsRyan DonaldsonLane Closure29Panhandle StFulton StDenton St01/07/2604/10/26Pavement replacementEngineeringMegan DavidsonFull Closure30Parkway StDenton StCarroll Blvd10/20/2504/21/26Utility installations and pavement replacement.EngineeringScott FettigFull Closure31Pershing DrAtlas DrStuart Rd05/08/2503/27/26Utilities and Pavement replacementEngineeringDante HaleFull Closure32Photinia Ave (6001)Cattail LnHeron Pond Ln03/02/2603/27/26Concrete Panel and Sidewalk repairStreetsRoy san MiguelLane Closure33Ponder StOak St WPanhandle St06/02/2504/10/26Utility installations and pavement replacement.EngineeringMegan DavidsonFull Closure34Quail Creek DrBerry Down LnStockbridge Rd10/20/2504/20/26Waterline Tap being installed/Road patchPublic Works InspectionsAlexander CervantesLane Closure35Redstone RdHercules LnNeptune Dr05/05/2506/12/26Utilities and Pavement replacementEngineeringDante HaleFull Closure36Roselawn DrBernard StRoselawn Cir02/16/2608/31/26Demo Roselawn to rebuild and add sidewalks, for Roselawn VillageApartments.Private DevelopmentKent Bull RiversRolling Closure37Roselawn DrBernard StRoselawn Cir02/16/2608/31/26Demo Roselawn to rebuild and add sidewalks, for Roselawn VillageApartments.Private DevelopmentKent Bull Rivers38Royal AcresHercules LnSherman Dr12/01/2506/26/26Utilities and Pavement replacementEngineeringDante HaleFull Closure39Royal Acres DrHercules LnSherman Dr02/16/2607/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure40Scripture StJagoe StPonder St03/04/2505/01/26Utility installations and pavement replacement.EngineeringScott FettigFull Closure41Sheraton RdImperial DrSun Valley Dr08/11/2503/27/26Utilities and Pavement replacementEngineeringDante HaleFull Closure42Stockbridge DrHudsonwood DrQuail Creek Dr10/20/2504/20/26Utilities being upsizedPublic Works InspectionsAlexander CervantesLane Closure43Sunset St ECarroll BlvdBolivar St07/07/2504/24/26Utility installations and pavement replacement.EngineeringScott FettigFull Closure44Waterside PlHickory Creek RdRiver Chase Trl02/02/2603/27/26ADA / Sidewalk/ Asphalt Street RepairStreetsRoy San MiguelLane Closure45Wellington DrSherman DrHercules Ln02/16/2606/26/26Utilities and Pavement replacementEngineeringDante HaleFull Closure46Windsor DrBonnie Brae StWestgate Dr03/16/2603/23/26Water Tap and Tie inPublic Works InspectionsArmando BeltranLane Closure47Windsor DrNorthwayParkside Dr03/23/2605/11/26The Contractor will be demolishing the asphalt roadway that form the (2)west bound lanes West of the Windsor/Bonnie Brae intersection.EngineeringJesus PerezLane Closure Exported on March 19, 2026 12:52:54 PM CDT
3 Street Closure Report: Completed ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Bell St N (1912)University Dr / US380Sherman Dr02/02/2602/27/26ADA / Sidewalk RepairStreetsRoy San MiguelLane Closure2Bonnie Brae StBronco Way / Riney RdElm St N (US 77)01/14/2602/20/26Contractor will be installingstorm drain lines, laterals, andcurb inlets along Bonnie Brae.OtherJesus PerezFull Closure3Cordell StFulton StCoit St09/15/2503/06/26Utility installations andpavement replacement.EngineeringScott FettigFull Closure4Dakota LnFM 1515Shelby Ln02/16/2602/19/26Waterline Tie-inEngineeringShawn MessickFull Closure5I-35E NB Off-RampBonnie Brae Off RampBonnie Brae St02/20/2602/21/26TxDOT I-35E/I-35W MergeProjectTXDoTTila Grant6I-35W NB All LanesI-35E/I-35W interchangeOak St02/19/2602/20/26TxDOT I-35E/I-35W MergeProjectTXDoTTila Grant7Margie StAve AMcCormick St11/17/2503/20/26Installing sewerPublic Works InspectionsStephany TrammellFull Closure8Mckinney St EMayhill RdGlenngary Way03/02/2603/13/26Removing existing pavementand pouring new drivewayapproach.Private Development PublicWorks InspectionsAlexander CervantesLane Closure9Normal StScripture StOak St08/18/2502/20/26Utility installations andpavement replacement.EngineeringMegan DavidsonFull Closure10Oak StLocust StCarroll Blvd03/09/2603/20/26Repair to be made to the gasmain line.Public Works InspectionsZabdiel MotaFull Closure11Prairie StWelch StBernard St11/05/2502/20/26Pavement replacementEngineeringScott FettigFull Closure12Stuart Rd and PershingIntersectionSelene DrJuno Ln12/15/2502/20/26Utilities and PavementreplacementEngineeringDante HaleFull Closure13Sundown BlvdMustang DrSpur Ct01/08/2602/27/26Sign into existing utility linePublic Works InspectionsJohn CantuLane Closure14Western Blvd NB (1450)Jim Christal RdUniversity Dr / US 38002/02/2602/19/26North bound outside laneclosurePrivate DevelopmentKirk WinterLane Closure Exported on March 19, 2026 12:53:08 PM CDT