HomeMy WebLinkAbout2026/04/02 - Street Closure Report1 Street Closure Report: Upcoming ClosuresSCR Apr. 6th - 12thStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Audra LnMockingbird LnMockingbird Ln05/04/2605/22/26concrete curb and gutter and sidewalk repairStreetsJordan PorterLane Closure2Clubhouse Dr (2804)Mustang DrSombrero Dr04/13/2605/08/26Concrete panel repairStreetsJordan porterLane Closure3Georgetown DrUniversity DrAmherst Dr04/20/2605/22/26concrete & base failure on roadwayStreetsJordanLane Closure4Mulberry StAvenue CAvenue D04/13/2605/08/26Wastewater Collections to replace and installnew sanitary sewer main line.Public Works InspectionsWastewaterAnthony MorrisFull Closure5Stuart RdImperial DrSun Valley Dr04/20/2605/22/26Utility ConnectionsPublic Works InspectionsArmando BeltranLane Closure6Yellowstone PlImperial DrSun Valley Dr04/20/2605/22/26Utility ConnectionsPublic Works InspectionsArmando BeltranLane Closure Exported on April 2, 2026 4:10:03 PM CDT 2 Street Closure Report: Current ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Alice StPanhandle StCrescent St05/02/2506/15/26Utility installations and pavement replacement.EngineeringMegan DavidsonFull Closure2Apollo DrRedstone RdSelene Dr07/24/2505/29/26Utility installations and pavement replacement.EngineeringScott FettigFull Closure3Audra LnNottingham Dr/Audra LnOak Valley01/19/2604/10/26TCP to be used to install drainage pipe and make street repairs.Private DevelopmentStephany TrammellFull Closure4Bernard StHickory StChestnut St02/06/2607/24/26Utility installations and pavement replacementEngineeringMegan DavidsonFull Closure5Bonnie Brae StUniversity Dr (US 380)Carril-Al-Lago Dr03/05/2604/06/26Contractor to install storm drain line, laterals and curb inlets. Contractorto lower existing water line.EngineeringJesus PerezLane Closure6Buckingham DrHercules LnSherman Dr11/17/2507/03/26Utilities and Pavement replacementEngineeringDante HaleFull Closure7Cordell StAileen StMalone St04/06/2604/17/26Street surface repair. Mill and Overlay of asphaltStreetsKevin KronenbergerFull Closure8Denton StHickory StCongress St06/02/2505/01/26Atmos gas line installationEngineeringMegan DavidsonFull Closure9Donna RdElm StEnd11/17/2505/15/26Utilities and Pavement replacementEngineeringDante HaleFull Closure10Eagle DrAve CAve A03/17/2504/24/26Using it or an entrance due to elevation changes in the jobsite it is theonly way to get into the sitePublic Works InspectionsStephany TrammellLane Closure11Emery StDead EndAlice St09/29/2504/10/26Full Road ReconstructionEngineeringMegan DavidsonFull Closure12Fulton StCordell StEmery St09/29/2504/10/26Full Road ReconstructionEngineeringMegan DavidsonFull Closure13Hickory Creek RdRiverpass DrCountry Club Rd (FM 1830)03/13/2312/31/26Bridge InstallationEngineeringTracy BeckFull Closure14Jupiter DrRedstone RdSelene Dr02/02/2607/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure15Mayhill Rd S600ft North of Edwards Rd400ft South of Edwards Rd10/20/2507/30/26Waterline tap being installed on Mayhill EasmentPublic Works InspectionsAlexander CervantesRolling Closure16Meadowedge LnFall Meadow StChapel Hill Ln03/09/2604/24/26Concrete Panel and Sidewalk RepairStreetsRoy San MiguelLane Closure17Mulberry StAve CAve D12/03/2504/17/26Tri Dal working on water lines/ Water VaultPublic Works InspectionsRyan DonaldsonLane Closure18Mulberry StCarroll BlvdLocust St04/08/2606/10/26Contractor extending waterline on Mulberry.Public Works InspectionsStephany TrammellFull Closure19Neptune DrRedstone RdSelene Dr11/24/2505/08/26Utilities and Pavement replacementEngineeringDante HaleFull Closure20Northridge StHinkle DrBolivar St04/16/2504/20/26Utilities and Pavement replacementEngineeringDante HaleRolling Closure21Oak StCarroll BlvdFry St02/13/2604/24/26SPS relocating gas linesPublic Works InspectionsStephany TrammellRolling Closure22Oak StWelch StAve C02/13/2604/24/26SPS relocating gas linesPublic Works InspectionsStephany TrammellRolling Closure23Paisley StPace DrOak Valley01/05/2604/17/26TCP lane closure to be used for water tap performed by COD WaterDepartment.Public Works InspectionsRyan DonaldsonLane Closure24Panhandle StFulton StDenton St01/07/2604/10/26Pavement replacementEngineeringMegan DavidsonFull Closure25Parkway StDenton StCarroll Blvd10/20/2504/21/26Utility installations and pavement replacement.EngineeringScott FettigFull Closure26Pershing DrAtlas DrStuart Rd05/08/2505/15/26Utilities and Pavement replacementEngineeringDante HaleFull Closure27Photinia Ave (6001)Cattail LnHeron Pond Ln03/02/2604/17/26Concrete Panel and Sidewalk repairStreetsRoy san MiguelLane Closure28Ponder StOak St WPanhandle St06/02/2504/10/26Utility installations and pavement replacement.EngineeringMegan DavidsonFull Closure29Quail Creek DrBerry Down LnStockbridge Rd10/20/2504/20/26Waterline Tap being installed/Road patchPublic Works InspectionsAlexander CervantesLane Closure30Redstone RdHercules LnNeptune Dr05/05/2506/12/26Utilities and Pavement replacementEngineeringDante HaleFull Closure31Roselawn DrBernard StRoselawn Cir02/16/2608/31/26Demo Roselawn to rebuild and add sidewalks, for Roselawn VillageApartments.Private DevelopmentKent Bull RiversRolling Closure32Royal Acres DrHercules LnSherman Dr02/16/2607/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure33Scripture StJagoe StPonder St03/04/2505/01/26Utility installations and pavement replacement.EngineeringScott FettigFull Closure34Stockbridge DrHudsonwood DrQuail Creek Dr03/30/2605/29/26Contractor replacing water lines for Providence Place ProjectPrivate Development PublicWorks InspectionsAlexander Cervantes35Sunset St ECarroll BlvdBolivar St07/07/2504/24/26Utility installations and pavement replacement.EngineeringScott FettigFull Closure36Wellington DrSherman DrHercules Ln02/16/2606/26/26Utilities and Pavement replacementEngineeringDante HaleFull Closure37Windsor DrBonnie Brae StWestgate Dr03/26/2604/17/26Water Tap and Tie in. Closure will be active from 9am-3pmPublic Works InspectionsArmando BeltranLane Closure38Windsor DrNorthwayParkside Dr04/01/2605/15/26The Contractor will be demolishing the asphalt roadway that form the (2)west bound lanes West of the Windsor/Bonnie Brae intersection.EngineeringJesus PerezLane Closure Exported on April 2, 2026 4:09:41 PM CDT 3 Street Closure Report: Completed ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Audra LnLattimore StMack Pl01/19/2603/27/26TCP to be used during sidewalkconstruction.Private DevelopmentStephany TrammellLane Closure2Bonnie Brae StConquest DrElm St N (US 77)02/16/2603/23/26Contractor will be installingstorm drain lines, laterals, andcurb inlets along Bonnie Brae.EngineeringJesus PerezFull Closure3Cordell StFulton StCoit St09/15/2503/06/26Utility installations andpavement replacement.EngineeringScott FettigFull Closure4Huntington DrSun Valley DrHercules Ln10/20/2503/31/26Utilities and PavementreplacementEngineeringDante HaleFull Closure5Lattimore StMozingo StAudra Ln01/19/2603/27/26TCP to be used for streetpaving.Private DevelopmentStephany TrammellFull Closure6Margie StAve AMcCormick St11/17/2503/20/26Installing sewerPublic Works InspectionsStephany TrammellFull Closure7Mckinney St EMayhill RdGlenngary Way03/02/2603/13/26Removing existing pavementand pouring new drivewayapproach.Private Development PublicWorks InspectionsAlexander CervantesLane Closure8Oak StLocust StCarroll Blvd03/09/2603/20/26Repair to be made to the gasmain line.Public Works InspectionsZabdiel MotaFull Closure9Sheraton RdImperial DrSun Valley Dr08/11/2503/27/26Utilities and PavementreplacementEngineeringDante HaleFull Closure10Waterside PlHickory Creek RdRiver Chase Trl02/02/2603/27/26ADA / Sidewalk/ Asphalt StreetRepairStreetsRoy San MiguelLane Closure Exported on April 2, 2026 4:10:14 PM CDT