Loading...
HomeMy WebLinkAbout2026/07/09 - Street Closure Report1 Street Closure Report: Upcoming ClosuresSCR Jul 13th - 19thStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1 Exported on July 9, 2026 1:36:07 PM CDT 2 Street Closure Report: Current ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Audra LnAudra/NottinghamMockingbird Ln07/13/2607/24/26Lacy to fix panels on Audra Lane for the Audra Lane Project (PCM22-0057)Public Works InspectionsStephany TrammellFull Closure2Bernard StHickory StChestnut St02/06/2607/24/26Utility installations and pavement replacementEngineeringMegan DavidsonFull Closure3Bolivar St3rdWestway07/06/2607/13/262in Mill and Overlay on Bolivar from 3rd to WestwayStreetsKronenbergerRolling Closure4Bonnie Brae StUniversity Dr (US 380)South of Panhandle St06/29/2607/13/263" Millling of the street with new surface placed.EngineeringTaylor HoltRolling Closure5Bonnie Brae StRiney Rd / Bronco WayElm Street (US77)05/22/2607/31/26Contractor to construct the new concrete southbound lanes.EngineeringJesus PerezFull Closure6Bonnie Brae StUniversity Dr (US 380)Elm St (US77)05/11/2608/03/26Contractor will continue to demolish and install infrastructure along thewhole length of the project. At times Contractor will need the use of anadditional lane.EngineeringJesus PerezRolling Closure7Carril Al Lago DrAurora LnBonnie Brae St05/25/2608/03/26Contractor will be demolishing the street intersection and median to thenew right of way line.EngineeringJesus PerezFull Closure8Carroll BlvdOak StMulberry St07/06/2607/17/26Driver Pipeline to use TCP on S. Carroll to pothole locating excavationoperations.Public Works InspectionsZabdiel MotaLane Closure9Coit StPanhandle StCrescent St07/13/2607/20/262 in Mill and overlay on Coit from Panhandle to Crescent, road will beclosed from 7am to 5pmStreetsKevin KronenbergerFull Closure10Dawnlight DrWaterside PlNightfall Dr06/22/2607/10/26Mill and overlayStreetsJesus RodriguezRolling Closure11Donna RdElm StEnd11/17/2507/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure12Eagle DrAve CAve A03/17/2507/31/26Using it for an entrance due to elevation changes in the jobsite it is theonly way to get into the sitePublic Works InspectionsStephany TrammellLane Closure13Fishtrap Rd5501 Fishtrap Rd (Fishtrap BusinessCenter)Greenleaf Cir06/22/2607/24/26Fink Construction extending waterline on Fishtrap for Riviera MobileHome Park.Public Works InspectionsEder TalamantesLane Closure14Hickory Creek RdRiverpass DrWaterside Pl04/27/2607/31/261) Intersection of Riverpass Drive and Hickory Creek Road will bereconstructed. 2) Hickory Creek Road from Riverpass Drive toWaterside Place will be reconstructedOtherTracy BeckFull Closure15Hickory Creek RdRiverpass DrCountry Club Rd (FM 1830)03/13/2312/31/26Bridge InstallationEngineeringTracy BeckFull Closure16Hobson LnFort Worth DrSanta Monica Dr06/22/2607/10/26Paving repairs/replacements for Storage 365Public Works InspectionsStephany TrammellFull Closure17Jupiter DrRedstone RdSelene Dr02/02/2607/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure18Mayhill Rd S600ft North of Edwards Rd400ft South of Edwards Rd10/20/2507/30/26Waterline tap being installed on Mayhill EasmentPublic Works InspectionsAlexander CervantesRolling Closure19McKinney St800ft West of Spring Tree StSpring Tree St06/29/2607/10/26Adding a new asphalt turn lanePublic Works InspectionsEder Talamantes JrLane Closure20Meadow StInman StI-35 Service Rd06/08/2607/17/26Road Repair / Base failure repairsStreetsRoy San MiguelLane Closure21Neptune DrRedstone RdSelene Dr11/24/2507/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure22Oak StCarroll BlvdFry St05/08/2607/31/26A&D completing restoration for gas workPublic Works InspectionsStephany TrammellRolling Closure23Oak StWelch StAve C05/08/2607/31/26A&D completing restoration for gas workPublic Works InspectionsStephany TrammellRolling Closure24Paisley StPace DrOak Valley01/05/2607/17/26awaiting asphalt restorationsPublic Works InspectionsRyan DonaldsonLane Closure25Pershing DrAtlas DrStuart Rd05/08/2507/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure26Quail Creek DrStockbridge RdBerry Down Ln05/04/2607/20/26Replacing water linesPrivate Development PublicWorks InspectionsAlexander CervantesFull Closure27Redstone RdHercules LnNeptune Dr05/05/2510/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure28Riney RdDiscovery BlvdElm St (US77)06/08/2608/03/26Contractor to install storm drain laterals needed to increase the width ofRiney Road. Contractor will also demolish the concrete street sectionadjacent to US77 in order to construct the street as per plan.EngineeringJesus PerezFull Closure29Riverchase TrlCreekdale DrWaterside Pl06/22/2607/10/26Mill and overlayStreetsJesus RodriguezRolling Closure30Riverpass DrHickory Creek RdRiverchase Trl04/27/2607/31/26Full Closure of Riverpass between RIverchase Trail and Hickory CreekRoad and Hickory Creek Road at Riverpass.OtherTracy BeckFull Closure31Royal Acres DrHercules LnSherman Dr02/16/2607/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure32Russell Newman BlvdLoop 288 NMayhill Rd N07/08/2607/17/263" Mill and OverlayEngineeringTaylor HoltRolling Closure33Stockbridge DrHudsonwood DrQuail Creek Dr03/30/2607/24/26Contractor replacing water lines for Providence Place ProjectPrivate Development PublicWorks InspectionsAlexander Cervantes34Stuart RdSun Valley DrImperial Dr05/15/2607/17/26Utility WorkPublic Works InspectionsArmando BeltranLane Closure35Stuart RdHercules LnNorth Loop 28805/11/2607/24/26SPS to use TCP on Stuard Road for their relocation of their gas main.Public Works InspectionsZabdiel MotaLane Closure36Swisher RdEdwards RdSwisher Rd (4312)06/23/2607/09/26Small base failure starting at Edwards and ending at 4312 SwisherStreetsMarlon HarrisonLane Closure37Teasley Ln & Shady Oaks DrI-35 Frontage RoadColorado Blvd07/13/2607/31/263" Mill & OverlayEngineeringTaylor HoltRolling Closure38Waterside PlRiverchase TrlHickory Creek Rd06/22/2607/10/26Mill and overlayStreetsJesus RodriguezRolling Closure39Windsor DrBonnie Brae StWestgate Dr03/26/2607/17/26Water Tap and Tie in. Closure will be active from 9am-3pmPublic Works InspectionsArmando BeltranLane Closure40Windsor DrNorthwayParkside Dr04/22/2608/03/26The Contractor will be demolishing the asphalt roadway that form the (2)west bound lanes West of the Windsor/Bonnie Brae intersection.EngineeringJesus PerezLane Closure41Yellowstone PlImperial DrSun Valley Dr05/15/2607/17/26Utility WorkPublic Works InspectionsArmando BeltranLane Closure Exported on July 9, 2026 1:36:20 PM CDT 3 Street Closure Report: Completed ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Apollo DrRedstone RdSelene Dr07/24/2506/12/26Utility installations andpavement replacement.EngineeringScott FettigFull Closure2Buckingham DrHercules LnSherman Dr11/17/2507/03/26Utilities and PavementreplacementEngineeringDante HaleFull Closure3Hickory StLocust StAustin St06/08/2606/09/26Repair work on Wells FargoSignPublic Works InspectionsOtherRyan DromgooleFull Closure4Malone StCongress StEgan St06/01/2606/12/26Road Repair / Mill and overlayStreetsMarlon HarrisonLane Closure5McKinney StNorth Cedar StOakland St05/21/2606/22/26Water to replace valve at theintersection of North Locust andMcKinney Street.Public Works InspectionsZabdiel MotaLane Closure6Montecito DrSwan Park DrSettlement Dr04/27/2606/12/26Concrete panel replacementStreetsJordan PorterLane Closure7Mulberry StCarroll BlvdLocust St04/08/2606/19/26Contractor extending waterlineon Mulberry.Public Works InspectionsStephany TrammellFull Closure8Scripture StJagoe StPonder St03/04/2507/03/26Utility installations andpavement replacement.EngineeringScott FettigFull Closure9Sunset St ECarroll BlvdBolivar St07/07/2506/30/26Utility installations andpavement replacement.EngineeringScott FettigFull Closure10Vintage BlvdIH 35w service RdProvence Dr04/20/2606/30/26To install Deacceleration Laneand Modifying the medianPublic Works InspectionsJDLane Closure11Wainwright StHighland StBell Ave06/15/2606/19/26Mill and OverlayStreetsJesus RodriguezFull Closure12Wellington DrSherman DrHercules Ln02/16/2606/26/26Utilities and PavementreplacementEngineeringDante HaleFull Closure13Willowwood StHighland Park RdWisteria St06/01/2606/12/26Road street repairStreetsMarlon HarrisonFull Closure14Willowwood StHighland Park RdWisteria St06/22/2606/22/26Road street repairStreetsMarlon HarrisonLane Closure15Windsor Dr WWindsor Dr W (721)Windsor Dr W (709)06/02/2606/19/26Roadway base failure repairStreetsJesus RodriguezLane Closure Exported on July 9, 2026 1:36:32 PM CDT