HomeMy WebLinkAbout2026/07/30 - Street Closure Report1 Street Closure Report: Upcoming ClosuresSCR Aug 3rd - 9thStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1 Exported on July 30, 2026 1:48:26 PM CDT
2 Street Closure Report: Current ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Bernard StHickory StChestnut St02/06/2608/21/26Utility installations and pavement replacementEngineeringMegan DavidsonFull Closure2Bonnie Brae StRiney Rd / Bronco WayElm Street (US77)05/22/2608/10/26Contractor to construct the new concrete southbound lanes.EngineeringJesus PerezFull Closure3Bonnie Brae StUniversity Dr (US 380)Elm St (US77)05/11/2608/10/26Contractor will continue to demolish and install infrastructure along thewhole length of the project. At times Contractor will need the use of anadditional lane.EngineeringJesus PerezRolling Closure4Bonnie Brae StUniversity Dr (US 380)Carril Al Lago Dr07/13/2609/11/26Contractor is to demo existing southbound lanes of Bonnie BraeEngineeringJesus PerezLane Closure5Carril Al Lago DrAurora LnBonnie Brae St05/25/2608/10/26Contractor will be demolishing the street intersection and median to thenew right of way line.EngineeringJesus PerezFull Closure6Carroll Blvd NPearl StPrairie St W07/27/2609/04/26Driver to use multiple TCP set up while relocating gas main.Public Works InspectionsChristopher YanezLane Closure7Donna RdElm StEnd11/17/2507/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure8Eagle DrAve CAve A03/17/2507/31/26Using it for an entrance due to elevation changes in the jobsite it is theonly way to get into the sitePublic Works InspectionsStephany TrammellLane Closure9Eastpark BlvdHeritage TrlCrescent St06/16/2508/03/26lane will be closed for up to 2 week starting on the 3rd of JulyPublic Works InspectionsJohn Cantu10Fishtrap Rd5501 Fishtrap Rd (Fishtrap BusinessCenter)Greenleaf Cir06/22/2608/31/26Fink Construction extending waterline on Fishtrap for Riviera MobileHome Park.Public Works InspectionsEder TalamantesLane Closure11Hickory Creek RdRiverpass DrWaterside Pl04/27/2608/10/261) Intersection of Riverpass Drive and Hickory Creek Road will bereconstructed. 2) Hickory Creek Road from Riverpass Drive toWaterside Place will be reconstructedOtherTracy BeckFull Closure12Hickory Creek RdRiverpass DrCountry Club Rd (FM 1830)03/13/2312/31/26Bridge InstallationEngineeringTracy BeckFull Closure13Jupiter DrRedstone RdSelene Dr02/02/2609/11/26Utilities and Pavement replacementEngineeringDante HaleFull Closure14Mayhill Rd S600ft North of Edwards Rd400ft South of Edwards Rd10/20/2507/30/26Waterline tap being installed on Mayhill EasmentPublic Works InspectionsAlexander CervantesRolling Closure15Meadow StInman StI-35 Service Rd06/08/2607/31/26Road Repair / Base failure repairsStreetsRoy San MiguelLane Closure16Neptune DrRedstone RdSelene Dr11/24/2509/11/26Utilities and Pavement replacementEngineeringDante HaleFull Closure17Oak StCarroll BlvdFry St05/08/2608/28/26A&D completing restoration for gas workPublic Works InspectionsStephany TrammellRolling Closure18Oak StWelch StAve C05/08/2608/28/26A&D completing restoration for gas workPublic Works InspectionsStephany TrammellRolling Closure19Overlake DrRyan RdWildwood Ln08/04/2608/06/26Base failure repairs at intersection of overlake and ryan rdStreetsJesse RodriguezFull Closure20Pershing DrAtlas DrStuart Rd05/08/2509/11/26Utilities and Pavement replacementEngineeringDante HaleFull Closure21Quail Creek DrStockbridge RdBerry Down Ln05/04/2608/07/26Replacing water linesPrivate Development PublicWorks InspectionsAlexander CervantesFull Closure22Redstone RdHercules LnNeptune Dr05/05/2510/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure23Riney RdDiscovery BlvdElm St (US77)06/08/2608/10/26Contractor to install storm drain laterals needed to increase the width ofRiney Road. Contractor will also demolish the concrete street sectionadjacent to US77 in order to construct the street as per plan.EngineeringJesus PerezFull Closure24Riverpass DrHickory Creek RdRiverchase Trl04/27/2608/10/26Full Closure of Riverpass between RIverchase Trail and Hickory CreekRoad and Hickory Creek Road at Riverpass.OtherTracy BeckFull Closure25Royal Acres DrHercules LnSherman Dr02/16/2609/11/26Utilities and Pavement replacementEngineeringDante HaleFull Closure26Stockbridge DrHudsonwood DrQuail Creek Dr03/30/2608/07/26Contractor replacing water lines for Providence Place ProjectPrivate Development PublicWorks InspectionsAlexander Cervantes27Stuart RdHercules LnLoop 288 N05/11/2608/07/26SPS to use TCP on Stuard Road for their relocation of their gas main.Public Works InspectionsZabdiel MotaLane Closure28Stuart RdSun Valley DrImperial Dr05/15/2608/21/26Utility WorkPublic Works InspectionsArmando BeltranLane Closure29Teasley Ln & Shady Oaks DrI-35 Frontage RoadColorado Blvd07/13/2607/31/263" Mill & OverlayEngineeringTaylor HoltRolling Closure30Windsor DrNorthwayParkside Dr04/22/2608/10/26The Contractor will be demolishing the asphalt roadway that form the (2)west bound lanes West of the Windsor/Bonnie Brae intersection.EngineeringJesus PerezLane Closure31Windsor DrNorthwayBonnie Brae St07/20/2608/10/26Contractor will be installing concrete pavement on the eastbound laneswest of the street intersection of Windsor & Bonnie BraeEngineeringJesus PerezLane Closure32Windsor DrBonnie Brae StWestgate Dr03/26/2608/21/26Water Tap and Tie in. Closure will be active from 9am-3pmPublic Works InspectionsArmando BeltranLane Closure33Yellowstone PlImperial DrSun Valley Dr05/15/2608/21/26Utility WorkPublic Works InspectionsArmando BeltranLane Closure Exported on July 30, 2026 1:48:43 PM CDT
3 Street Closure Report: Completed ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Audra LnAudra/NottinghamMockingbird Ln07/13/2607/24/26Lacy to fix panels on AudraLane for the Audra Lane Project(PCM22-0057)Public Works InspectionsStephany TrammellFull Closure2Bolivar St3rdWestway07/06/2607/13/262in Mill and Overlay on Bolivarfrom 3rd to WestwayStreetsKronenbergerRolling Closure3Bonnie Brae StUniversity Dr (US 380)South of Panhandle St06/29/2607/13/263" Millling of the street with newsurface placed.EngineeringTaylor HoltRolling Closure4Buckingham DrHercules LnSherman Dr11/17/2507/03/26Utilities and PavementreplacementEngineeringDante HaleFull Closure5Carroll BlvdOak StMulberry St07/06/2607/17/26Driver Pipeline to use TCP onS. Carroll to pothole locatingexcavation operations.Public Works InspectionsZabdiel MotaLane Closure6Coit StPanhandle StCrescent St07/13/2607/20/262 in Mill and overlay on Coitfrom Panhandle to Crescent,road will be closed from 7am to5pmStreetsKevin KronenbergerFull Closure7Dawnlight DrWaterside PlNightfall Dr06/22/2607/10/26Mill and overlayStreetsJesus RodriguezRolling Closure8Hobson LnFort Worth DrSanta Monica Dr06/22/2607/10/26Paving repairs/replacements forStorage 365Public Works InspectionsStephany TrammellFull Closure9McKinney St800ft West of Spring Tree StSpring Tree St06/29/2607/10/26Adding a new asphalt turn lanePublic Works InspectionsEder Talamantes JrLane Closure10Paisley StPace DrOak Valley01/05/2607/17/26awaiting asphalt restorationsPublic Works InspectionsRyan DonaldsonLane Closure11Riverchase TrlCreekdale DrWaterside Pl06/22/2607/10/26Mill and overlayStreetsJesus RodriguezRolling Closure12Russell Newman BlvdLoop 288 NMayhill Rd N07/08/2607/17/263" Mill and OverlayEngineeringTaylor HoltRolling Closure13Scripture StJagoe StPonder St03/04/2507/03/26Utility installations andpavement replacement.EngineeringScott FettigFull Closure14Sunset St ECarroll BlvdBolivar St07/07/2506/30/26Utility installations andpavement replacement.EngineeringScott FettigFull Closure15Swisher RdEdwards RdSwisher Rd (4312)06/23/2607/09/26Small base failure starting atEdwards and ending at 4312SwisherStreetsMarlon HarrisonLane Closure16Vintage BlvdIH 35w service RdProvence Dr04/20/2606/30/26To install Deacceleration Laneand Modifying the medianPublic Works InspectionsJDLane Closure17Waterside PlRiverchase TrlHickory Creek Rd06/22/2607/10/26Mill and overlayStreetsJesus RodriguezRolling Closure Exported on July 30, 2026 1:48:55 PM CDT