Loading...
HomeMy WebLinkAbout2026/08/27 - Street Closure Report1 Street Closure Report: Upcoming ClosuresSCR Aug 31st – Sept 6thStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Stuart RdSelene DrJuno Ln09/08/2609/08/26Utilities and Pavement replacementEngineeringDante HaleFull Closure Exported on August 27, 2026 2:47:31 PM CDT 2 Street Closure Report: Current ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Bonnie Brae StUniversity Dr (US 380)Carril Al Lago Dr07/13/2609/11/26Contractor is to demo existing southbound lanes of Bonnie BraeEngineeringJesus PerezLane Closure2Bonnie Brae StUniversity Dr (US 380)Elm St (US77)05/11/2610/01/26Contractor will continue to demolish and install infrastructure along thewhole length of the project. At times Contractor will need the use of anadditional lane.EngineeringJesus PerezRolling Closure3Bonnie Brae StRiney Rd / Bronco WayElm Street (US77)05/22/2610/01/26Contractor to construct the new concrete southbound lanes.EngineeringJesus PerezFull Closure4Carril Al Lago DrAurora LnBonnie Brae St05/25/2609/17/26Contractor will be demolishing the street intersection and median to thenew right of way line.EngineeringJesus PerezFull Closure5Carroll Blvd NPearl StPrairie St W07/27/2609/04/26Driver to use multiple TCP set up while relocating gas main.Public Works InspectionsChristopher YanezLane Closure6Carroll Blvd SPrairie St WHickory St08/24/2609/25/26Driver to perform gas work at the SE corner of intersection ofCarroll/Mulberry Street.Atmos Public WorksInspectionsZabdiel MotaLane Closure7Chipping Campden RdCarlisle CtWinthrop Hill Rd08/24/2608/31/26BaseFailure WorkStreetsJesus RodriguezLane Closure8Fishtrap Rd5501 Fishtrap Rd (Fishtrap BusinessCenter)Greenleaf Cir06/22/2608/31/26Fink Construction extending waterline on Fishtrap for Riviera MobileHome Park.Public Works InspectionsEder TalamantesLane Closure9Hickory Creek RdRiverpass DrCountry Club Rd (FM 1830)03/13/2312/31/26Bridge InstallationEngineeringTracy BeckFull Closure10Highland St WWelch StBernard St08/03/2610/05/26Reconstruct on W HighlandStreetsJesse RodriguezFull Closure11Jupiter DrRedstone RdSelene Dr02/02/2609/11/26Utilities and Pavement replacementEngineeringDante HaleFull Closure12Neptune DrRedstone RdSelene Dr11/24/2509/11/26Utilities and Pavement replacementEngineeringDante HaleFull Closure13Oak StCarroll BlvdFry St05/08/2609/11/26A&D completing restoration for gas workPublic Works InspectionsStephany TrammellRolling Closure14Oak StWelch StAve C05/08/2609/11/26A&D completing restoration for gas workPublic Works InspectionsStephany TrammellRolling Closure15Pershing DrAtlas DrStuart Rd09/01/2609/09/26Utilities and Pavement replacementEngineeringDante HaleFull Closure16Pershing DrAtlas DrStuart Rd05/08/2509/11/26Utilities and Pavement replacementEngineeringDante HaleFull Closure17Quail Creek DrStockbridge RdBerry Down Ln05/04/2609/14/26Replacing water linesPrivate Development PublicWorks InspectionsAlexander CervantesFull Closure18Redstone RdHercules LnNeptune Dr05/05/2510/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure19Robson Ranch RdI-35WGibbs Road/Ed Robson Blvd08/10/2602/06/27Roadway widening from Sagehawk Drive to I-35W and at the GibbsRoad/Ed Robson Blvd intersectionEngineeringMegan DavidsonLane Closure20Royal Acres DrHercules LnSherman Dr02/16/2609/11/26Utilities and Pavement replacementEngineeringDante HaleFull Closure21Snowshill CtArgle LnCul de Sac09/01/2609/08/26BaseFailureStreetsJesus RodriguezLane Closure22Stockbridge DrHudsonwood DrQuail Creek Dr03/30/2609/11/26Contractor replacing water lines for Providence Place ProjectPrivate Development PublicWorks InspectionsAlexander Cervantes23Stuart RdSun Valley DrImperial Dr05/15/2609/18/26Utility WorkPublic Works InspectionsArmando BeltranLane Closure24Windsor DrBonnie Brae StWestgate Dr03/26/2609/18/26Water Tap and Tie in. Closure will be active from 9am-3pmPublic Works InspectionsArmando BeltranLane Closure25Windsor DrNorthwayParkside Dr04/22/2610/01/26The Contractor will be demolishing the asphalt roadway that form the (2)west bound lanes West of the Windsor/Bonnie Brae intersection.EngineeringJesus PerezLane Closure26Windsor DrNorthwayBonnie Brae St07/20/2610/01/26Contractor will be installing concrete pavement on the eastbound laneswest of the street intersection of Windsor & Bonnie BraeEngineeringJesus PerezLane Closure27Yellowstone PlImperial DrSun Valley Dr05/15/2609/18/26Utility WorkPublic Works InspectionsArmando BeltranLane Closure Exported on August 27, 2026 2:47:38 PM CDT 3 Street Closure Report: Completed ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Bernard StHickory StChestnut St02/06/2608/21/26Utility installations andpavement replacementEngineeringMegan DavidsonFull Closure2Donna RdElm StEnd11/17/2507/31/26Utilities and PavementreplacementEngineeringDante HaleFull Closure3Eagle DrAve CAve A03/17/2507/31/26Using it for an entrance due toelevation changes in the jobsiteit is the only way to get into thesitePublic Works InspectionsStephany TrammellLane Closure4Eastpark BlvdHeritage TrlCrescent St06/16/2508/03/26lane will be closed for up to 2week starting on the 3rd of JulyPublic Works InspectionsJohn Cantu5Hickory Creek RdRiverpass DrWaterside Pl04/27/2608/10/261) Intersection of RiverpassDrive and Hickory Creek Roadwill be reconstructed. 2) HickoryCreek Road from RiverpassDrive to Waterside Place will bereconstructedOtherTracy BeckFull Closure6Mayhill Rd S600ft North of Edwards Rd400ft South of Edwards Rd10/20/2507/30/26Waterline tap being installed onMayhill EasmentPublic Works InspectionsAlexander CervantesRolling Closure7Meadow StInman StI-35 Service Rd06/08/2607/31/26Road Repair / Base failurerepairsStreetsRoy San MiguelLane Closure8Montecarlo LnMontecarlo Ln (3803)Deadend08/12/2608/19/26Localized roadway base failurerepairsStreetsJesus RodriguezFull Closure9Montevideo CtMontecristo LnCul de sac08/10/2608/17/26Localized roadway base failurerepairsStreetsJesus RodiguezLane Closure10Overlake DrRyan RdWildwood Ln08/04/2608/06/26Base failure repairs atintersection of overlake andryan rdStreetsJesse RodriguezFull Closure11Riney RdDiscovery BlvdElm St (US77)06/08/2608/14/26Contractor to install storm drainlaterals needed to increase thewidth of Riney Road.Contractor will also demolishthe concrete street sectionadjacent to US77 in order toconstruct the street as per plan.EngineeringJesus PerezFull Closure12Riverpass DrHickory Creek RdRiverchase Trl04/27/2608/10/26Full Closure of Riverpassbetween RIverchase Trail andHickory Creek Road andHickory Creek Road atRiverpass.OtherTracy BeckFull Closure13Stuart RdHercules LnLoop 288 N05/11/2608/21/26SPS to use TCP on StuardRoad for their relocation of theirgas main.Public Works InspectionsZabdiel MotaLane Closure14Teasley Ln & Shady Oaks DrI-35 Frontage RoadColorado Blvd07/13/2607/31/263" Mill & OverlayEngineeringTaylor HoltRolling Closure15Welch StOak StHickory St08/17/2608/24/26A&D to complete restoration forgas work for ATMOSPublic Works InspectionsStephany TrammellFull Closure16Wisteria StWillowwood StLaurel St08/19/2608/25/26Basefailure RepairStreetsJesus RodriguezLane Closure Exported on August 27, 2026 2:47:44 PM CDT