Loading...
HomeMy WebLinkAbout2026/09/11 - Street Closure Report1 Street Closure Report: Upcoming ClosuresSCR Sept 14th - 20thStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1 Exported on September 11, 2026 8:54:24 AM CDT 2 Street Closure Report: Current ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Bonnie Brae StUniversity Dr (US 380)Carril Al Lago Dr07/13/2609/25/26Contractor is to demo existing southbound lanes of Bonnie BraeEngineeringJesus PerezLane Closure2Bonnie Brae StUniversity Dr (US 380)Elm St (US77)05/11/2610/01/26Contractor will continue to demolish and install infrastructure along thewhole length of the project. At times Contractor will need the use of anadditional lane.EngineeringJesus PerezRolling Closure3Bonnie Brae StRiney Rd / Bronco WayElm Street (US77)05/22/2610/01/26Contractor to construct the new concrete southbound lanes.EngineeringJesus PerezFull Closure4Carril Al Lago DrAurora LnBonnie Brae St05/25/2609/17/26Contractor will be demolishing the street intersection and median to thenew right of way line.EngineeringJesus PerezFull Closure5Carroll Blvd SPrairie St WHickory St08/24/2609/25/26Driver to perform gas work at the SE corner of intersection ofCarroll/Mulberry Street.Atmos Public WorksInspectionsZabdiel MotaLane Closure6Hickory Creek RdRiverpass DrCountry Club Rd (FM 1830)03/13/2312/31/26Bridge InstallationEngineeringTracy BeckFull Closure7Highland St WWelch StBernard St08/03/2610/05/26Reconstruct on W HighlandStreetsJesse RodriguezFull Closure8Jupiter DrRedstone RdSelene Dr02/02/2609/11/26Utilities and Pavement replacementEngineeringDante HaleFull Closure9McKinney StLoop 288500' east of Loop 28809/07/2609/30/26Demo existing curb-gutter and install new D/W approachPublic Works InspectionsJacob O'BriantLane Closure10Micro Surfacing ProgramMultiple Streets and Dayshttps://www.cityofdenton.com/m/newsflash/home/detail/133809/09/2609/29/26A city contractor will be performing an annual preventative maintenancetreatment to various road surfaces throughout the city. Please visithttps://www.cityofdenton.com/m/newsflash/home/detail/1338 for moredetails.StreetsJesse RodriguezRolling Closure11Neptune DrRedstone RdSelene Dr11/24/2509/11/26Utilities and Pavement replacementEngineeringDante HaleFull Closure12Oak StCarroll BlvdFry St05/08/2609/25/26A&D completing restoration for gas workPublic Works InspectionsStephany TrammellRolling Closure13Oak StWelch StAve C05/08/2609/25/26A&D completing restoration for gas workPublic Works InspectionsStephany TrammellRolling Closure14Pershing DrAtlas DrStuart Rd09/01/2609/11/26Utilities and Pavement replacementEngineeringDante HaleFull Closure15Pershing DrAtlas DrStuart Rd05/08/2509/11/26Utilities and Pavement replacementEngineeringDante HaleFull Closure16Quail Creek DrStockbridge RdBerry Down Ln05/04/2610/01/26Replacing water linesPrivate Development PublicWorks InspectionsAlexander CervantesFull Closure17Redstone RdHercules LnNeptune Dr05/05/2510/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure18Robson Ranch RdI-35WGibbs Road/Ed Robson Blvd08/10/2602/06/27Roadway widening from Sagehawk Drive to I-35W and at the GibbsRoad/Ed Robson Blvd intersectionEngineeringMegan DavidsonLane Closure19Royal Acres DrHercules LnSherman Dr02/16/2609/11/26Utilities and Pavement replacementEngineeringDante HaleFull Closure20Stockbridge DrHudsonwood DrQuail Creek Dr03/30/2610/01/26Contractor replacing water lines for Providence Place ProjectPrivate Development PublicWorks InspectionsAlexander Cervantes21Stuart RdSelene DrJuno Ln09/08/2609/11/26Utilities and Pavement replacementEngineeringDante HaleFull Closure22Stuart RdSun Valley DrImperial Dr05/15/2609/18/26Utility WorkPublic Works InspectionsArmando BeltranLane Closure23Windsor DrBonnie Brae StWestgate Dr03/26/2609/18/26Water Tap and Tie in. Closure will be active from 9am-3pmPublic Works InspectionsArmando BeltranLane Closure24Windsor DrNorthwayParkside Dr04/22/2610/01/26The Contractor will be demolishing the asphalt roadway that form the (2)west bound lanes West of the Windsor/Bonnie Brae intersection.EngineeringJesus PerezLane Closure25Windsor DrNorthwayBonnie Brae St07/20/2610/01/26Contractor will be installing concrete pavement on the eastbound laneswest of the street intersection of Windsor & Bonnie BraeEngineeringJesus PerezLane Closure26Yellowstone PlImperial DrSun Valley Dr05/15/2609/18/26Utility WorkPublic Works InspectionsArmando BeltranLane Closure Exported on September 11, 2026 8:54:33 AM CDT 3 Street Closure Report: Completed ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Bernard StHickory StChestnut St02/06/2608/21/26Utility installations andpavement replacementEngineeringMegan DavidsonFull Closure2Carroll Blvd NPearl StPrairie St W07/27/2609/04/26Driver to use multiple TCP setup while relocating gas main.Public Works InspectionsChristopher YanezLane Closure3Chipping Campden RdCarlisle CtWinthrop Hill Rd08/24/2608/31/26BaseFailure WorkStreetsJesus RodriguezLane Closure4Fishtrap Rd5501 Fishtrap Rd (FishtrapBusiness Center)Greenleaf Cir06/22/2608/31/26Fink Construction extendingwaterline on Fishtrap for RivieraMobile Home Park.Public Works InspectionsEder TalamantesLane Closure5Frame St (722)Mingo RdFrame St (710)09/08/2609/10/26BaseFailureStreetsJesse RodriguezLane Closure6Montecarlo LnMontecarlo Ln (3803)Deadend08/12/2608/19/26Localized roadway base failurerepairsStreetsJesus RodriguezFull Closure7Montevideo CtMontecristo LnCul de sac08/10/2608/17/26Localized roadway base failurerepairsStreetsJesus RodiguezLane Closure8Riney RdDiscovery BlvdElm St (US77)06/08/2608/14/26Contractor to install storm drainlaterals needed to increase thewidth of Riney Road.Contractor will also demolishthe concrete street sectionadjacent to US77 in order toconstruct the street as per plan.EngineeringJesus PerezFull Closure9Snowshill CtArgle LnCul de Sac09/01/2609/08/26BaseFailureStreetsJesus RodriguezLane Closure10Stuart RdHercules LnLoop 288 N05/11/2608/21/26SPS to use TCP on StuardRoad for their relocation of theirgas main.Public Works InspectionsZabdiel MotaLane Closure11Welch StOak StHickory St08/17/2608/24/26A&D to complete restoration forgas work for ATMOSPublic Works InspectionsStephany TrammellFull Closure12Wisteria StWillowwood StLaurel St08/19/2608/25/26Basefailure RepairStreetsJesus RodriguezLane Closure Exported on September 11, 2026 8:54:39 AM CDT