HomeMy WebLinkAbout2026/09/24 - Street Closure Report1 Street Closure Report: Upcoming ClosuresSCR Sept 28th - Oct 4thStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1 Exported on September 24, 2026 10:56:58 AM CDT
2 Street Closure Report: Current ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Bonnie Brae StUniversity Dr (US 380)Carril Al Lago Dr07/13/2610/10/26Contractor is to demo existing southbound lanes of Bonnie BraeEngineeringJesus PerezLane Closure2Bonnie Brae StUniversity Dr (US 380)Elm St (US77)05/11/2610/10/26Contractor will continue to demolish and install infrastructure along thewhole length of the project. At times Contractor will need the use of anadditional lane.EngineeringJesus PerezRolling Closure3Bonnie Brae StRiney Rd / Bronco WayElm Street (US77)05/22/2610/10/26Contractor to construct the new concrete southbound lanes.EngineeringJesus PerezFull Closure4Carril Al Lago DrAurora LnBonnie Brae St05/25/2610/10/26Contractor will be demolishing the street intersection and median to thenew right of way line.EngineeringJesus PerezFull Closure5Carroll Blvd SPrairie St WHickory St08/24/2610/16/26Driver to perform gas work at the SE corner of intersection ofCarroll/Mulberry Street.Atmos Public WorksInspectionsZabdiel MotaLane Closure6Hickory Creek RdRiverpass DrCountry Club Rd (FM 1830)03/13/2312/31/26Bridge InstallationEngineeringTracy BeckFull Closure7Highland St WWelch StBernard St08/03/2610/05/26Reconstruct on W HighlandStreetsJesse RodriguezFull Closure8McKinney StLoop 288500' east of Loop 28809/07/2609/30/26Demo existing curb-gutter and install new D/W approachPublic Works InspectionsJacob O'BriantLane Closure9Micro Surfacing ProgramMultiple Streets and Dayshttps://www.cityofdenton.com/m/newsflash/home/detail/133809/09/2609/29/26A city contractor will be performing an annual preventative maintenancetreatment to various road surfaces throughout the city. Please visithttps://www.cityofdenton.com/m/newsflash/home/detail/1338 for moredetails.StreetsJesse RodriguezRolling Closure10Oak StCarroll BlvdFry St05/08/2610/16/26A&D completing restoration for gas workPublic Works InspectionsStephany TrammellRolling Closure11Oak StWelch StAve C05/08/2610/16/26A&D completing restoration for gas workPublic Works InspectionsStephany TrammellRolling Closure12Quail Creek DrStockbridge RdBerry Down Ln05/04/2610/23/26Replacing water linesPrivate Development PublicWorks InspectionsAlexander CervantesFull Closure13Redstone RdHercules LnNeptune Dr05/05/2510/31/26Utilities and Pavement replacementEngineeringDante HaleFull Closure14Robson Ranch RdI-35WGibbs Road/Ed Robson Blvd08/10/2602/06/27Roadway widening from Sagehawk Drive to I-35W and at the GibbsRoad/Ed Robson Blvd intersectionEngineeringMegan DavidsonLane Closure15Stockbridge DrHudsonwood DrQuail Creek Dr03/30/2610/23/26Contractor replacing water lines for Providence Place ProjectPrivate Development PublicWorks InspectionsAlexander Cervantes16Stuart RdSun Valley DrImperial Dr05/15/2610/23/26Utility WorkPublic Works InspectionsArmando BeltranLane Closure17Vintage Blvd (4301)Edge WayHidden Meadows Trail09/21/2609/25/26The right lane on vintage blvd will be closed due to a storm inlet demo.Traffic will be directed into the left lane, contractor on needs one week tofinish demo.Private DevelopmentMichael CollinsLane Closure18Windsor DrNorthwayParkside Dr04/22/2610/01/26The Contractor will be demolishing the asphalt roadway that form the (2)west bound lanes West of the Windsor/Bonnie Brae intersection.EngineeringJesus PerezLane Closure19Windsor DrNorthwayBonnie Brae St07/20/2610/01/26Contractor will be installing concrete pavement on the eastbound laneswest of the street intersection of Windsor & Bonnie BraeEngineeringJesus PerezLane Closure20Windsor DrBonnie Brae StWestgate Dr03/26/2610/23/26Water Tap and Tie in. Closure will be active from 9am-3pmPublic Works InspectionsArmando BeltranLane Closure21Yellowstone PlImperial DrSun Valley Dr05/15/2610/23/26Utility WorkPublic Works InspectionsArmando BeltranLane Closure Exported on September 24, 2026 10:57:53 AM CDT
3 Street Closure Report: Completed ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment ContactClosure Type1Carroll Blvd NPearl StPrairie St W07/27/2609/04/26Driver to use multiple TCP setup while relocating gas main.Public Works InspectionsChristopher YanezLane Closure2Chipping Campden RdCarlisle CtWinthrop Hill Rd08/24/2608/31/26BaseFailure WorkStreetsJesus RodriguezLane Closure3Fishtrap Rd5501 Fishtrap Rd (FishtrapBusiness Center)Greenleaf Cir06/22/2608/31/26Fink Construction extendingwaterline on Fishtrap for RivieraMobile Home Park.Public Works InspectionsEder TalamantesLane Closure4Frame St (722)Mingo RdFrame St (710)09/08/2609/10/26BaseFailureStreetsJesse RodriguezLane Closure5Jupiter DrRedstone RdSelene Dr02/02/2609/11/26Utilities and PavementreplacementEngineeringDante HaleFull Closure6Neptune DrRedstone RdSelene Dr11/24/2509/11/26Utilities and PavementreplacementEngineeringDante HaleFull Closure7Pershing DrAtlas DrStuart Rd09/01/2609/11/26Utilities and PavementreplacementEngineeringDante HaleFull Closure8Pershing DrAtlas DrStuart Rd05/08/2509/11/26Utilities and PavementreplacementEngineeringDante HaleFull Closure9Royal Acres DrHercules LnSherman Dr02/16/2609/11/26Utilities and PavementreplacementEngineeringDante HaleFull Closure10Snowshill CtArgle LnCul de Sac09/01/2609/08/26BaseFailureStreetsJesus RodriguezLane Closure11Stuart RdSelene DrJuno Ln09/08/2609/11/26Utilities and PavementreplacementEngineeringDante HaleFull Closure12Wisteria StWillowwood StLaurel St08/19/2608/25/26Basefailure RepairStreetsJesus RodriguezLane Closure Exported on September 24, 2026 10:58:01 AM CDT