MEMORANDUM
DATE: Sept. 27, 2024
TO: The Honorable Mayor Hudspeth and Council Members
FROM: Sara Hensley, City Manager
SUBJECT: Friday Staff Report
Upcoming Meetings
A.Cancelled - Agenda Committee on Thursday, Oct. 3, 2024, at 8:00 a.m. in the City
Council Work Session Room.
B.Downtown Economic Development Committee on Thursday, Oct. 3, 2024, at 8:30a.m. at the Development Service Center.
C.Public Art Committee on Thursday, Oct. 3, 2024, at 4:00 p.m. at the Civic CenterCommunity Room.
D.Charter Review Committee on Thursday, Oct. 3, 2024, at 5:30 p.m. at theDevelopment Service Center.
Please check the City of Denton website for final meeting days and times as information is subject to change after the Friday Report is published. Public Meetings & Agendas | Denton, TX
(civicplus.com)
General Information & Status Updates
A.Texas Commission on Environmental Quality Compliance Rating – The City’s Solid
Waste & Recycling Department received the highest compliance rating and classification
from the Texas Commission Environmental Quality (TCEQ) for the last four years.Annually, the TCEQ calculates compliance history ratings and determines compliancehistory classifications for all organizations covered under Title 30, Texas AdministrativeCode, Chapter 60. Staff contact: Ami Reeder, Environmental Services & Sustainability
B.Monthly Mobility Report – Innovative Transportation Solutions (ITS) provided a monthlyreport that included an overview of several major regional Texas Department ofTransportation (TxDOT) projects. See the attached ITS Monthly Mobility Report forreview. Staff contact: Trevor Crain, Capital Projects
C.Dog Park Temporary Closures – Lake Forest Park’s Wiggly Field and North Lakes Parks’Fetch Park will have intermittent closures for regularly scheduled maintenance fromMonday, Sept. 30 through Sunday, Oct. 27. Full reopening is scheduled for Monday, Oct.28.Scheduled closures will be available on the City’s social media outlets. Staff contact:
Russell Koch, Parks and Recreation
D.Mutual Aid for Hurricane Helene Response – On Sept. 25, Denton Municipal Electric(DME) dispatched 14 staff to assist Ft. Valley, Georgia, but were then reassigned to Adel,Georgia, based on restoration needs. The duration of the restoration effort has not been
determined at this time. Staff contact: Chris Lutrick, DME
E.DTV Videos for September - The DTV team released videos this month that raisedawareness, educated, and informed the community. Below are a few of the highlightedvideos for the Council to share. We will highlight a few in the Friday Report each month
and encourage the Council to share.
•TWU Pioneers Take to the Skies YouTubeTexas Woman’s University has launched its first aviation program in Denton, wherestudents are already taking flight. Learn more about the program here.
•Denton’s 31 Days of Halloween: YouTubeCome check out our exciting activities for all 31 days of October, grab some themedfood and drinks, or just stroll around and take in the spooky vibes.
•Fire Department: Field Readiness Fitness Test YouTube
Our Fire Department is always working hard to be prepared for any emergencies.They conduct yearly fitness tests to make sure everyone is fit for duty!All videos air on DTV, are shared via social media channels and are available on the City’s YouTube channel. Staff contact: Billy Matthews, Marketing and Communications
Responses to Council Member Requests for Information
A.Council Voting History – On Sept. 20, Mayor Pro Tem Meltzer shared an inquiry from aresident regarding viewing Council Voting History online. The restored website shows the
2
vote history up to April 2023. Based on the Council direction received on May 7, 2024, the website will be updated to reflect Council history from May 2023 to present in November 2024. The existing council vote history can be found here. Staff contact: Lauren Thoden,
City Secretary’s Office
B.Water Restrictions – On Sept. 22, Mayor Pro Tem Meltzer, shared an inquiry regardingwatering restrictions. Watering restrictions are expected to be lifted in mid-October whenthe filter replacement project is complete at the Lake Lewisville Water Treatment Plant.
Staff contact: Stephen Gay, Water Utilities
C.Tax Credit for Affordable Apartments – On Sept. 23, Mayor Pro Tem Meltzer inquiredabout tax credits for affordable apartments. The rent for affordable apartments depends onthe geographic location and the Area Median Income (AMI) formula, including income
amount, household size, and number of bedrooms.
Since AMI changes annually these limits change accordingly. In Denton, the calculation isbased on Dallas, Texas HUD Metro Area. The Area Median Income for a household offour is $110,300, as of 2024. Rent limits based on Area Median Family Income (AMFI)
are shown below:
If a property is supported by Housing Tax Credits, rents will vary based on the specific Land Use Restriction Agreements (LURA) for each property. The Texas Department of
Housing and Community Affairs (TDHCA) oversees these properties and compliance. Staff contact: Dani Shaw, Community Services
3
Upcoming Community Events and Public Meetings
Please visit the City of Denton website for upcoming community events and details.
Attachments
A.ITS Report ...........................................................................................................................5
Information
A.Council Requests for Information .....................................................................................24
B.Public Meetings Calendar .................................................................................................27 C.Future Work Session Items ...............................................................................................31 D.Street Closure Report ........................................................................................................32
4
City of Denton Transportation Update Prepared by:
September 2024 1
City of Denton Transportation/Mobility
Project Status Report
Prepared by ITS
September 2024
PROJECTS
•Project Summary ............................................ page 2
•I-35 North ....................................................... page 3
•I-35/35E/35W Merge...................................... page 5
•I-35E/Mayhill ................................................. page 7
•I-35W Frontage Roads Middle ....................... page 8
•Loop 288 West Frontage Roads ..................... page 9
•Loop 288 East-US 380 Connector ................ page 10
•Bonnie Brae Segment 7 ................................ page 11
•FM 1515 ....................................................... page 12
•FM 1173 ....................................................... page 13
•Outer Loop.................................................... page 14
•Elm and Locust ............................................. page 15
•Glossary of Acronyms .................................. page 17
•TxDOT Funding Categories ......................... page 18
•Denton City Limits ....................................... page 19
5
City of Denton Transportation Update Prepared by:
September 2024 2
PROJECT SUMMARY
PROJECT LET DATE CONTRACTOR/
ENGINEER
CONSTRUCTION COST
I-35 North Various Stantec $897,796,423
I-35/35E/35W Merge 04-2024 Sema Construction $588,780,841
I-35E/Mayhill 06-2025 LTRA $139,130,349
I-35W Frontage Roads Middle 09-2028 WSP $446,891,327
Loop 288 West Frontage Roads 09-2028 CP&Y $227,423,354
Loop 288 East-US 380 Connector * Westwood $922,000,000
Bonnie Brae Segment 7 * Westwood *
FM 1515 * LTRA $69,484,709
FM 1173 * Halff $125,852,145
Outer Loop * LJA $1,547,212,128
Elm and Locust 02-02-2024 Jagoe Public $3,803,760
TOTAL $4,968,375,036
6
City of Denton Transportation Update Prepared by:
September 2024 3
Current Activity:
•PS&E: Work on the 100% PS&E plan set for the -074 CSJ is underway with updates to 2024TxDOT Specifications. Work on the 100% PS&E plan set for the -081 CSJ is underway withupdates to 2024 TxDOT Specifications; TxDOT is revising scope to ensure that the project scope
fits within the available funds. Work on the 100% PS&E plan set for -084 CSJ is underway withupdates to the 2024 TxDOT Specifications; some scope being shifted to -081 CSJ.
I-35 North
CSJ: 0195-02-074; 0195-02-076; 0195-02-081; 0195-01-116; 0195-02-084 Schematic Approval: January 31, 2019
Limits: From US 77 to FM 3002 (Cooke County line) Environmental Approval: October 7, 2019 Length: 12.4 miles
Description: Reconstruct and widen 4- to 6-lane rural freeway with ramp modifications and
reconstruct 4- to 4/6-lane frontage roads
ROW Acquisition Complete: July 2023
Est. Construction Cost:
$897,796,423 -074: $495,359,007
-081: $175,274,676-116: $110,895,970-084: $116,266,771
Utility Relocations Complete:
-074: May 2025
-081: December 2024-116: October 2025
-084: October 2025
Funding:
$801,507,230 CAT 4: $220,966,122 CAT 11: $2,574,631 CAT 12: $577,966,477
100% Plans:
-074: October 2024-081: September 2024-116: November 2024-084: November 2024
Firm & Key Contact: Stantec Ready to Let Date:
-074: May 2025-081: December 2024-116: October 2025-084: October 2025
TxDOT PM: Dawit Abraham Let Date:
-074: July 2026-081: April 2025-116: December 2029
-084: December 2029
7
City of Denton Transportation Update Prepared by:
September 2024 4
•Utilities: Status of utilities in conflict is listed below by CSJ/Segment.IH-35 from US 77 to South of FM 455; CSJ: 0195-02-074oUtilities that are clear of construction: City of Denton, OneOK.o Atmos Distribution: Relocations underway. Anticipate clearance in October 2024.
o AT&T: Design approved. Pending utility agreement. Anticipate start of construction in November2024.
o Bolivar Water: Anticipate start of construction in September 2024. Anticipate clearance in December
2024.o Brazos Electric: Construction underway. Anticipate clearance in November 2024.o CenturyLink/Brightspeed: Design approved. Utility agreement pending. Construction start pendingCoServ overhead electric.o CoServ Electric: Construction underway. Anticipate clearance in November 2024.o Frontier: Construction underway. Anticipate clearance in October 2024.o Lumen/Level 3: Design approved. Utility agreement pending. Anticipate start of construction inOctober 2024. Anticipate clearance in December 2024.o MCI/Verizon: Design pending. Utility agreement pending. Anticipate start of construction in October2024.o Nortex: Construction complete, pending splicing.
o OneOK: Clear
o Sanger Electric: Relocations underway. Demolition of parcel 59 is hindering completion. Anticipate
clearance in September 2024.o Sanger Water/Wastewater: Relocations underway. Anticipate clearance in March 2025.
o Suddenlink/Altice: Design and utility agreement pending.o UTRWD: Design and utility agreement finalized. Pending UTRWD contractor. Anticipate clearancein May 2025.o Zayo: Design pending. Utility agreement pending. Anticipate start of construction at the end ofSeptember 2024 and clearance in January 2025.IH-35 from North of FM 455 to View Road; CSJ: 0195-02-081 o AT&T: Design approved. Utility agreement finalized. Construction underway. Anticipate clearance inSeptember 2024.
o Bolivar Water: Design approved. Utility agreement finalized. Anticipate start of construction inSeptember 2024 and completion in December 2024.
o Brightspeed/Centurylink: Design and utility agreement finalized. Construction underway. Anticipateclearance in October 2024.o Lumen/Level 3: Construction underway. Anticipate clearance in October 2024.o MCI/Verizon: Design approved. Utility agreement pending. Anticipate clearance in December 2024.o Nortex: Construction underway. Anticipate clearance in October 2024.o Sanger Electric: Install complete; wreck-out pending.o Sanger Water/Wastewater: Relocations underway. Anticipate clearance in October 2024.o Zayo: Design finalized. Utility agreement finalized. Anticipate start of construction in November2024.IH-35 from View Road to Cooke County Line (FM 3002); CSJ: 0195-02-084
o AT&T: Install complete; pending splicing.
o Bolivar WSC: Anticipate start of construction in August 2024 and completion in December 2024.
o CoServ Electric: Construction underway. Anticipate clearance in October 2024.o Level 3/Lumen: Construction underway. Anticipate clearance in November 2024.o MCI/Verizon: Design and utility agreement pending.o Nortex: Install complete; pending splicing.o Oncor: Design pending. Utility agreement pending. Anticipate start of construction in October 2024Anticipate clearance in January 2025.o Zayo: Design pending. Utility agreements pending. Anticipate start of construction in September 2024.Anticipate clearance in December 2024.
8
City of Denton Transportation Update Prepared by:
September 2024 5
Current Activity:
•Construction: The project let for construction on April 4, 2024. Low bidder is SemaConstruction with a low bid of $588,780,840.70, at 18% above engineer’s estimate. There are1,356 working days and 56 months of barricades. Project has been awarded. Work
authorization received from Dallas District. Pre-construction meeting scheduled for October 2,
2024. Anticipate start of construction in January 2025.
•Utilities: Utilities that are clear of construction: AT&T, Atmos Distribution, AtmosTransmission, Brazos Valley Electric, CoServ Electric, DME Transmission, and UPN.
I-35/35E/35W Merge
CSJ: 0195-03-099 (N Texas Blvd to I-35E/W) 0195-03-090 (I-35E/W to US 380) 0195-03-087 (US 380 to US 77) Schematic Approval: -090: August 2011-087: January 31, 2019
Limits: From North Texas Blvd to US 77 north of Denton Environmental Approval: -090: June 2017-087: October 7, 2019
Length: 5.073 miles ROW Acquisition Completed: May 2022
Description:
Reconstruct interchange and existing frontage roads; reconstruct and widen to
6/8-lane rural freeway with ramp modifications
Utility Relocations Complete: December 2024
Est. Construction Cost: $588,780,841 City of Denton Utility Relocations Complete: September 2024
Funding:
$588,780,841 CAT 2: $65,978,054 CAT 3: $1,452,495 CAT 4: $75,042,004 CAT 11: $106,973,305 CAT 12 (Strategic Priority): $219,334,983 CAT 12 (Texas Clear Lanes): $120,000,000
100% Plans: January 2024
Firm & Key Contact: AECOM (-090); Stantec (-087) Let Date: April 4, 2024
TxDOT PM: John Rich Construction Start: January 2025
9
City of Denton Transportation Update Prepared by:
September 2024 6
•Status of utilities in conflict is listed below.o AT&T: ClearoCharter-Spectrum: Relocations underway.
o City of Denton Water/Wastewater: Relocations are underway. Anticipate completion
in September 2024.
o DME Distribution: Relocations underway. Anticipate completion in December 2024.o Fiberlight (Joint Duct): Install complete; anticipate splicing in September 2024.o Frontier: Construction underway.o Level 3/Lumen (Joint Duct Bank): Construction underway from US 380 to US 77.
Anticipate splicing in September 2024. Construction from Bonnie Brae to US 380underway. Anticipate splicing in October 2024.o MCI/Verizon: Stand-alone construction and Zayo joint duct ongoing. Lumen joint ductongoing.o Zayo: Install complete. Splicing expected in October 2024.
10
City of Denton Transportation Update Prepared by:
September 2024 7
Current Activity:
•PS&E: LTRA is updating the plan set to the 2024 TxDOT Specifications.
•Utilities: Utilities currently clear of construction: CoServ Gas, City of Denton, City of DentonWastewater, NGG, Oncor, and United Private Networks.
o Astound (formerly Grande): Construction underway. Anticipate splicing in September 2024.
o Atmos Gas (Distribution): Install complete; pending wreck-out. Anticipate completion in October2024.o AT&T: Construction and splicing complete. Wreck out underway.
o CenturyLink/Brightspeed: Construction underway. Completion dependent on southbound frontageroad joint duct.o Charter/Spectrum: Utility agreement pending. Anticipate start of construction in October 2024.Anticipate clearance in November 2024.o DME: Relocations underway. Anticipate clearance in November 2024.o DISD: Utility agreement pending. Anticipate start of construction in October 2024.
o Frontier: Northbound frontage road clear. Anticipate completion for southbound frontage road inNovember 2024.
o Level 3/Lumen: Construction underway. Completion dependent on southbound frontage road jointduct.o Zayo: Construction underway. Completion dependent on southbound frontage road joint duct.
I-35E/Mayhill
CSJ: 0196-01-109 Schematic Approval: February 2011
Limits: I-35E intersection with Mayhill from
Pockrus Page Rd to Loop 288 Environmental Clearance: January 31, 2012
Length: 1.912 miles ROW Acquisition Completed: November 2022
Description: Reconstruct interchange at Mayhill and I-35E and existing 4-lane frontage roads Utility Relocations Complete: November 2024
Est. Construction Cost: $139,130,349 City of Denton Utility Relocations Completed: February 2024
Funding: $139,130,349
CAT 2: $129,130,349 CAT 4: $10,000,000 100% Plans: September 2024
Firm & Key Contact: LTRA, Tyler Martin Ready to Let Date: November 2024
TxDOT Project Manager: Don Vo Let Date: June 2025
11
City of Denton Transportation Update Prepared by:
September 2024 8
Current Activity:
•PS&E: WSP continues addressing TxDOT comments to 95% plan set and is working toward
completion of final plan set.
•ROW: There are 58 parcels to acquire. There are: 9 parcels in ED and 49 parcels acquired.
•Utilities: Status of utilities in conflict is listed below.o Astound (Grande): Design pending. Utility agreement pending. Construction schedule pending CoServdesign.o Atmos: Design pending. Utility agreement pending. Construction schedule pending temporary workeasements.
o Charter/Spectrum: Design pending. Utility agreement pending. Construction schedule pending CoServdesign.
o CoServ Electric: Design pending. Utility agreement pending.
o DME Transmission: Joint use agreement pending. Facility to stay in place; not in conflict.o DME Distribution: Design pending. Utility agreement pending.o Fiberlight: Agreement pending. Anticipate start of relocations in October 2024 and clearance inNovember 2024.o Lumen/Level 3: Preliminary design pending. Utility agreement pending.o Trinity River Authority: Projected to be clear pending changes to TxDOT plans.o Zayo: Design pending. Utility agreement pending. Anticipate start of relocations in October 2024.
I-35W Frontage Roads Middle
CSJ: 0081-13-071 Schematic Approval: March 20, 2020
Limits: From 0.7 miles south of FM 407 to FM 2449 Environmental Clearance: June 30, 2020 Length: 6.76 miles
Project Description: Construct frontage roads ROW Acquisition Complete: January 2025
Est. Construction Cost: $446,891,327 Utility Relocations Complete: March 2026
Funding: $213,024,000 CAT 2: $24,537,247 CAT 12: $188,486,753 100% Plans: March 2025
Firm: WSP Ready to Let Date: March 2026
TxDOT Contact: Gutema Gebriel Let Date: *
12
City of Denton Transportation Update Prepared by:
September 2024 9
Current Status:
•ROW: For RCSJ 2250-02-023, there are
19 parcels to acquire. There are: 2 parcelsin ED and 17 parcels in possession. ForRCSJ 2250-02-024, there are 20 parcels toacquire. There are: 5 parcels innegotiations and 15 parcels in possession.
•ROW acquisition efforts are on hold due
to District budgetary constraints.
•PS&E: CP&Y updated PBLR for finalsubmittal.
•CP&Y updated Exhibit A for finalsubmittal.
•CP&Y coordinated with Dallas District
and Environmental regarding USACEapplication.
•CP&Y met with TxDOT on July 22, 2024,to discuss US 380 phasing.
•CP&Y submitted pavement report onAugust 9, 2024.
•CP&Y continued drainage efforts, SW3P
design, bridge design, SUE efforts, andupdating pavement and signing design.
•CP&Y continued efforts toward completion of 95% PS&E plan set. The 95% PS&E plan setsubmittal was made on August 30, 2024.
•CP&Y coordinated with property owners for upcoming SUE field work.
•Bi-weekly coordination meetings underway.
Loop 288 West Frontage Roads
CSJ: 2250-00-013 (from I-35 to US 380) 2250-00-032 (from US 380 to I-35W) Schematic Approval: March 20, 2020
Limits: From I-35 to I-35W Environmental Clearance: September 28, 2020 Length: 9.0 miles
Description: Construct frontage roads ROW Acquisition Complete: December 2024
Estimated Construction Cost:
$227,423,354 -013: $95,315,990-032: $132,107,364 Utility Relocations Complete: April 2026
Funding: $3,000,000 CAT 3
$1,000,000 CAT 7 100% Plans: December 2024
Firm & Key Contact: CP&Y, Tom Cochill & Jacob Roberts Ready to Let Date: April 2026
TxDOT Project Manager: Gutema Gebriel Let Date: *
13
City of Denton Transportation Update Prepared by:
September 2024 10
Current Activity:
•PS&E: Westwood continues efforts toward completion of schematic. Westwood continuesaddressing TxDOT comments from the 60% schematic and from the Value Engineering study,modifying schematic to include ramp changes in traffic turning/volumes diagram, and finalizingalignments in the compressed sections between Locust and Sherman and Sherman and Kings Row.
•Westwood is working to align west segment with the connector alignment to accommodate newramps to improve access from and to the connector, Sherman Drive, and west to I-35.
•The third round of right-of-entry letters to be sent out in September 2024.
•Westwood met with City of Denton on September 5, 2024.
•Westwood to meet with DME to discuss shared ROW with shared-used paths in compressed areas.
•Westwood coordinated with TxDOT on revised Kings Row/Windsor Drive configuration.
•Westwood working to set final right-of-way footprint.
•SUE efforts expected in early October 2024 pending latest right-of-entry notices.
Loop 288 East-US 380 Connector
CSJ: 2250-02-025; 0135-10-066 Schematic Approval: January 2025
Limits: from I-35 to US 380 east of Geesling Road Environmental Clearance: July 2025 Length: 8 miles
Project Description: Construct Loop 288 frontage roads and grade separations and an improved connector to US
380
ROW Acquisition Completion: *
Estimated Const. Cost: $922M Utility Relocations Completion: *
Funding: * 100% Plans: *
Firm & Key Contact: Westwood, Mark Schluter, Mark Zoellner Ready to Let Date: *
TxDOT PM: Nelson Underwood Let Date: *
14
City of Denton Transportation Update Prepared by:
September 2024 11
Current Activity:
•PS&E: The segment between US 77 and Loop 288 has been added to Loop 288 East contractwith Westwood.
Bonnie Brae Segment 7
CSJ: * Schematic Approval: January 2025
Limits: From US 77 to Loop 288 Environmental Clearance: July 2025
Length: 0.2 miles ROW Acquisition Complete: *
Description: Extension of Bonnie Brae north of US 77 Utility Relocations Complete: *
Est. Construction Cost: * 100% Plans: *
Funding: * Ready to Let Date: *
Firm & Key Contact: Westwood, Mark Schluter, Mark Zoellner Let Date: *
TxDOT Project Manager: Nelson Underwood Construction Start: *
15
City of Denton Transportation Update Prepared by:
September 2024 12
Current Activity:
•PS&E: LTRA updated plans to the 2024 TxDOT Specifications and submitted the final plan set
on June 28, 2024.
•Exhibit A: LTRA submitted new Exhibit A for CPKC approval.
•Utilities: Status of utilities in conflict:o Atmos: Final design pending TxDOT review. Construction schedule pending.
o Brightspeed/CenturyLink: Design pending Oncor final design.o Charter/Spectrum: Design dependent on Oncor design.o City of Denton Water/Wastewater: Design reviewed. Construction schedule pending.
o Denton Municipal Electric: Preliminary design pending. Utility agreement pending.o Frontier: Design pending.o MCI/Verizon: Design pending.
o Oncor: Design pending, expected in September 2024.o Unite Private Networks: Design pending.
FM 1515
CSJ: 1951-01-011 Schematic Re-approval: October 13, 2021
Limits: From Bonnie Brae to Masch Branch Road Environmental Approval: August 4, 2020
Length: 2.096 miles Environmental Re-eval: March 15, 2022
Description: Widen existing 2-lane rural section to a six-lane divided urban roadway ROW Acquisition Complete: July 2023
Est. Construction Cost: $69,484,709 Utility Relocations Complete: June 2025
Funding: $500,000 CAT 7 100% Plans: June 2024
Firm & Key Contact: LTRA, Tyler Martin Ready to Let Date: June 2025
TxDOT Project Manager: Bryan Esmaili-Doki Let Date: *
16
City of Denton Transportation Update Prepared by:
September 2024 13
Current Activity:
•PS&E: Halff submitted the 95% plan set for review on July 29, 2024. Anticipate receipt of TxDOTcomments in September 2024.
•Utilities: Final SUE test hole surveyed. Status of utilities in conflict:o Altice-Suddenlink: Prioritizing I-35 designs.o AT&T: Design to be revised; dependent on Oncor and CoServ.
o Atmos Gas: Preliminary design underway.o Brightspeed/CenturyLink: Initial design review completed; awaited Oncor design for overhead.
o City of Denton: Design under review.
o CoServ: Initial design review completed. Final design to be completed upon completion of 95%PS&E.
o Fiberlight: Design dependent upon Oncor and CoServ.o City of Krum: Preliminary design underway. Current long lead relocate.o Oncor: Partial preliminary design complete; awaiting revisions.
o Zayo: Design revisions pending.
FM 1173
CSJ: 1059-01-047; 1059-02-002 Schematic Approval: March 20, 2020
Limits: From I-35E to FM 156 Environmental Clearance: August 26, 2021 Length: 3.613 miles
Description: Widen and realign to 4/6-lane divided urban road ROW Acquisition Completed: September 2023
Est. Construction Cost: $125,852,145 -047: $62,892,803-002: $62,959,342 Utility Relocations Complete: August 2025
Funding: * 100% Plans: November 2024
Firm & Key Contact: Halff Associates, Aimee Jones Ready to Let Date: August 2025
TxDOT PM: Kwan Lam Let Date: *
17
City of Denton Transportation Update Prepared by:
September 2024 14
Current Activity:
•Design: LJA submitted draft feasibility report and submitted schematic concept for blue alignmentand addressing preliminary comments.
•LJA continues coordination with NCTCOG, TxDOT, USACE, and other agencies.
•LJA continues identifying developments adjacent to proposed Outer Loop alignment.
•LJA distributed right-of-entry letters in May 2024. Beginning field work in areas where right-of-entryhas been obtained.
•LJA continues efforts toward IAJR M&A (Methodology & Assumptions) memo.
•Environmental: Ongoing field work in areas where right-of-entry has been obtained.
•Utilities: LJA continues evaluating transmission level utilities within study area and gatheringinformation near refined alignments and coordinating with entities. LJA is developing Level D map.
•Other: Project website is available: www.DentonCountyOuterLoop.com.
•An agency scoping meeting was held on September 4, 2024, to kick off the Environmental ImpactStatement (EIS) process with local, state, and federal agencies. The next public meetings will follow
on October 29, and October 30, 2024, in Aubrey/Pilot Point and Denton respectively and will be publicscoping meetings. Both meetings will provide an overview of the EIS scope, establish the two-buildalignments that will proceed through the EIS process, along with the no-build alternative, and detail thecriteria upon which the alternatives will be evaluated. Denton County, along with TxDOT, will be
represented as the agencies sponsoring the EIS.
Outer Loop
CSJ: 0918-46-341 Schematic Approval: December 2025
Limits: From I-35 to the DNT at the Denton
County Line Environmental Clearance: Summer 2026
Length: 23 miles ROW Acquisition Complete: *
Description: Construct a six-lane controlled access freeway with continuous frontage roads Utility Relocations Complete: *
Est. Construction Cost: $1,547,212,128 100% Plans: *
Funding: * Ready to Let Date: *
Firm & Key Contact: LJA, Tony Kimmey Let Date: *
TxDOT Project Manager: Liang Ding Construction Start: *
18
City of Denton Transportation Update Prepared by:
September 2024 15
Current Activity:
•Construction: Project let for construction on February 2, 2024. Project was awarded to Jagoe
Public, with a low bid of $3,803,760.40, at 7.91% above engineer’s estimate. There are 118
working days and 8 months of barricades. Construction began on May 6, 2024. See attachedTxDOT construction report.
Elm and Locust
CSJ: 0196-01-117 100% Plans: December 2023
Limits: from Eagle Drive to McKinney Street ROW Acquisition Complete: NA
Description: Rehabilitate and repair pavement Utility Relocations Complete: Included with construction
Est. Construction Cost: $3,803,760 Let Date: February 2, 2024
Funding: CAT 1: $3,803,760 Construction Start: May 2024
TxDOT Project Manager: Branden Barnett Construction Completion: October 2024
19
City of Denton Transportation Update Prepared by:
September 2024 16
TxDOT Monthly Project Report
Date of Report: September 16, 2024
Report Prepared by: Branden Barnett
Project: C 196-1-117 Control: 0196-01-117 Highway: US 77 Limits: From: Eagle Dr
To: McKinney St
Contractor: Jagoe Public
TxDOT Project manager: Branden Barnett Phone: (214) 392-1791 Contractor’s Project Manager: Mark Seidcheck
Contractor’s Superintendent: Ramiro Rangel
Date Work Began: May 6, 2024 Anticipated Completion Date: October 2024
Current Activities:
Current activities include: Placing asphalt on Elm Street and Locust Street. Project was substantially
completed on September 13, 2024.
Narrative description of last month’s activities: Placing cement in subgrade along Elm Street and Locust Street.
Narrative description of activities planned for next month: Punch-list items.
Traffic issues: None
Plans for changes in traffic patterns: None
Item(s) of work currently controlling project completion: Punch list.
Other items of significance: None
20
City of Denton Transportation Update Prepared by:
September 2024 17
•AADT – Annual Average Daily Traffic
•AFA – Advanced Funding Agreement
•ARPA – Archeological Resources Protection Act
•CE – Categorical Exclusion (environmental clearance process for projects that do not involve significantenvironmental impacts)
•CLOMR – (FEMA’s) Conditional Letter of Map Revision
•Conformity – Federal requirement in nonattainment areas to conduct air quality analysis on projects,programs, and policies identified in transportation plans, transportation improvement programs,federally funded projects, or projects requiring federal approval
•CSJ – (TxDOT’s) Control Section Job Number
•DCC – Design Concept Conference
•EA – Environmental Assessment
•ED – Eminent Domain
•EIS – Environmental Impact Statement
•EPIC – Environmental Permits, Issues, and Commitments
•ESAL – Equivalent Single Axle Load (TxDOT design calculation)
•FONSI – Finding of No Significant Impact
•IAJR – Interstate Access Justification Request
•ICA – Interlocal Cooperative Agreement
•IFP – Initial Financial Plan
•Let – Official date of receipt and opening of bids
•MAPO – Meeting with Affected Property Owners
•MPO – Metropolitan Planning Organization
•MTP – Metropolitan Transportation Plan
•NCTCOG – North Central Texas Council of Governments
•NEPA – National Environmental Policy Act
•NOPC – Notice of Proposed Construction
•NTTA – North Texas Toll Authority
•PBLR – Preliminary Bridge Layout Review
•PS&E – Plans Specifications and Estimate
•PUA – Possession and Use Agreement
•ROW – Right-of-Way
•RTC – Regional Transportation Council
•RTL – Ready to Let (date project is clear for construction but lacks funding for actual let)
•RTR – Regional Toll Revenue (funds resulting from certain toll/managed lane projects in DFW region)
•RULIS – Right-of-Way, Utilities, Leasing, and Information System
•STBG – Surface Transportation Block Grant
•STIP – Statewide Transportation Improvement Program
•SUE – Subsurface Utility Engineering
•SW3P – Storm Water Pollution Prevention Plan
•TCP – Traffic Control Plan
•TIA – Time Impact Analysis
•TPP – Transportation Planning and Programming
•TPWD – Texas Parks & Wildlife Department
•TTC – Texas Transportation Commission
•TxDOT – Texas Department of Transportation
•UTP – Unified Transportation Program
•VE – Value Engineering
Glossary of Acronyms
21
City of Denton Transportation Update Prepared by:
September 2024 18
•CAT 1: Preventive Maintenance and Rehabilitation
•CAT 2: Metro and Urban Area Corridor Projects / NCTCOG
•CAT 3: Non-Traditionally Funded Transportation Projects
•CAT 4: Statewide Connectivity Corridor Projects
•CAT 5: Congestion Mitigation and Air Quality Improvement / NCTCOG
•CAT 6: Structures Replacement and Rehabilitation (Bridge)
•CAT 7: Metropolitan Mobility and Rehabilitation / NCTCOG
•CAT 8: Safety Projects
•CAT 9: Transportation Alternatives
•CAT 10: Supplemental Transportation Projects
•CAT 11: District Discretionary
•CAT 12: Strategic Priority
TxDOT Funding Categories
22
City of Denton Transportation Update Prepared by:
September 2024 19
Denton City Limits
23
24
Friday Report - Council RequestsSummary of RequestCouncil Member Requestor Date Received Staff AssignedDepartmentCommentsStatus1Kingsway DevelopmentCouncil Member Beck09/27/24Trevor CrainCapital Projects/Engineering/Public Works Referred to staff.2VandalismCouncil Member McGee09/24/24Jessica RobledoPoliceReferred to staff.3Status Updates on Development Projects Mayor Hudspeth09/23/24Tina FirgensDevelopment ServicesReferred to staff4Additional Signage for Paid Parking Mayor Hudspeth09/19/24Scott McDonaldDevelopment ServicesStaff working with paidparking lot owner forimproved signage.5Weekday after hours activity at Fred MooreParkCouncil Member Byrd09/27/24Jessica RobledoPoliceDirected patrol.6Tax Credit for Affordable Apartments Mayor Pro Tem Meltzer09/23/24Danielle ShawCommunity ServicesStaff provided MPT detailsregarding tax credits.7Voting Record on Evers FarmMayor Pro Tem Meltzer09/23/24Tina FirgensDevelopment ServicesStaff updated MPT thatthe Evers Farm item hasnot been considered atCity Council.8Short Term RentalCouncil Member McGee09/23/24Frank DixonCMOStaff provided CM with anupdate regarding theprocedure and process ofbringing the item beforeCouncil.9Inquiry Regarding State LobbyistCouncil Member McGee09/23/24Kristi FogleCMOStaff provided CM with theresponse.10Fair Chance Hiring Follow-UpCouncil Member Byrd09/22/24Kristi FogleCMOStaff responded to CMfollowing up with Chamberof Commerce11Night time activity at Fred Moore Park Council Member Byrd09/22/24Gary Packan, JessicaRobledoPolice ParksStaff confirmed signage ofpark hours at Fred MoorePark. Police will startdoing directed patrol in thearea.12Inquiry: Water Filter RepairsMayor Pro Tem Meltzer09/22/24Stephen GayWaterStaff provided a responseto MPT including thecurrent status of filterrepairs with expectedcompletion date of midOctober.13Conduct issues at the ShelterMayor Hudspeth09/20/24Danielle ShawCommunity ServicesStaff resolved the issueand the individual wasremoved from thepremises.14Council Voting HistoryMayor Pro Tem Meltzer09/20/24Lauren ThodenCity Secretary's OfficeStaff provided MPT withan update on the timelinefor the Council VoteHistory.15Fair Chance Hiring Follow-UpCouncil Member McGee09/20/24Kristi FogleCMOStaff communicated withCM on the follow-up.16Individual(s) under bridge on W. UniversityDrive.Mayor Hudspeth09/20/24Danielle Shaw, JessicaRobledoCommunity Services PoliceStaff dispatched to thearea and did not discoverindividual(s) residingunder the bridge.17Condos in alignment with City DevelopmentCodeMayor Pro Tem Meltzer09/20/24Tina FirgensDevelopment ServicesStaff responded to MPTthat condos are permittedin the City.18Reclassification of UnderwoodMayor Pro Tem Meltzer09/20/24Tina FirgensDevelopment Servicesstaff advised MPT that thereclassification will occurwhere new development isunderway.Page 1 of 2Exported on September 27, 2024 9:27:24 AM PDT25
Summary of RequestCouncil Member Requestor Date Received Staff AssignedDepartmentCommentsStatus19Request for Sponsorship Proposal Mayor Hudspeth09/19/24Terrance JonesFinanceStaff sent information tothe agency.20Inquiry regarding estimated city populationstatistics, percentage of rental units incomparison to owned homes, limitation ofrental properties developedCouncil Member Byrd09/16/24Danielle Shaw, ScottMcDonaldCommunity Services DevelopmentServicesStaff conferring onstrategy.Page 2 of 2Exported on September 27, 2024 9:27:24 AM PDT26
Meeting Calendar
City of Denton City Hall
215 E. McKinney St.
Denton, Texas 76201
www.cityofdenton.com
Criteria : Begin Date: 9/1/2024, End Date: 11/30/2024
Date Time Meeting LocationMeeting Body
September 2024
9/5/2024 8:00 AM Cancelled
9/5/2024 8:30 AM Development Service Center
9/5/2024 5:30 PM Development Services Center
9/6/2024 1:00 PM Development Service Center
9/9/2024 9:00 AM Council Work Session Room
9/9/2024 5:30 PM Development Service Center
9/9/2024 5:30 PM North Branch Library
9/9/2024 6:00 PM Civic Center Community Room
9/10/2024 3:00 PM Council Work Session Room
&
Council Chambers
9/11/2024 10:00 AM Cancelled
9/11/2024 11:00 AM Development Service Center
9/11/2024 3:00 PM Airport Terminal Meeting Room
9/11/2024 3:00 PM Council Work Session Room
9/11/2024 5:00 PM Council Work Session Room
&
Council Chambers
9/12/2024 3:00 PM Development Service Center
9/12/2024 4:30 PM Development Service Center
9/17/2024 2:00 PM Council Work Session Room.
&
Council Chambers
9/19/2024 3:00 PM Development Service Center
9/19/2024 5:30 PM Development Services Center
9/23/2024 9:00 AM
Agenda Committee
Downtown Economic Development
Committee
Charter Review Committee
Bond Oversight Committee
Public Utilities Board
Historic Landmark Commission
Library Board
Parks, Recreation and Beautification
Board
City Council
Animal Shelter Advisory Committee
Economic Development Partnership
Board
Airport Advisory Board
Board of Ethics
Planning and Zoning Commission
Health & Building Standards
Commission
Community Services Advisory
Committee
City Council
Committee on Persons with Disabilities
Charter Review Committee
Public Utilities Board Council Work Session Room
Page 1City of Denton Printed on 9/27/2024
27
Date Time Meeting LocationMeeting Body
Meeting Calendar continued...
9/23/2024 5:30 PM CANCELLED
9/24/2024 2:00 PM Council Work Session Room
&
Council Chambers
9/24/2024 2:00 PM Council Work Session Room
&
Council Chambers
9/25/2024 10:00 AM Council Work Session Room
9/25/2024 12:00 PM Development Service Center
9/25/2024 1:00 PM City Hall East
Human Resources Training Room
9/25/2024 5:30 PM Council Work Session Room
&
Council Chambers
9/26/2024 2:00 PM Council Work Session Room
&
Council Chambers
9/26/2024 2:00 PM Council Work Session Room
&
Council Chambers
9/27/2024 1:00 PM Cancelled
October 2024
10/3/2024 8:00 AM Cancelled
10/3/2024 8:30 AM Development Service Center
10/3/2024 4:00 PM Civic Center Community Room
10/3/2024 5:30 PM Development Services Center
10/7/2024 5:30 PM Council Work Session Room
10/9/2024 11:00 AM Development Service Center
10/9/2024 3:00 PM Airport Terminal Meeting Room
10/9/2024 5:00 PM Council Work Session Room
&
Council Chambers
10/10/2024 3:00 PM Development Service Center
10/10/2024 4:30 PM Development Service Center
10/14/2024 9:00 AM Council Work Session Room
10/14/2024 5:30 PM
Zoning Board of Adjustment
City Council
City Council
Mobility Committee
Tax Increment Reinvestment Zone
Number One Board
Civil Service Commission
Planning and Zoning Commission
City Council
City Council
Sustainability Framework Advisory
Committee
Agenda Committee
Downtown Economic Development
Committee
Public Art Committee
Charter Review Committee
Board of Ethics
Economic Development
Partnership Board
Airport Advisory Board
Planning and Zoning Commission
Health & Building Standards
Commission
Community Services Advisory
Committee
Public Utilities Board
Historic Landmark Commission Development Service Center
Page 2City of Denton Printed on 9/27/202428
Date Time Meeting LocationMeeting Body
Meeting Calendar continued...
10/14/2024 5:30 PM South Branch Library
10/15/2024 2:00 PM Council Work Session Room
&
Council Chambers
10/17/2024 5:30 PM Development Services Center
10/22/2024 2:00 PM Council Work Session Room
&
Council Chambers
10/23/2024 5:00 PM Council Work Session Room
&
Council Chambers
10/25/2024 9:00 AM City Hall Conference Room
10/25/2024 1:00 PM Council Work Session Room
10/28/2024 9:00 AM Council Work Session Room
10/28/2024 5:30 PM Development Service Center
10/30/2024 10:00 AM Council Work Session Room
November 2024
11/1/2024 1:00 PM Development Service Center
11/4/2024 5:30 PM Council Work Session Room
11/7/2024 8:00 AM Council Work Session Room
11/7/2024 8:30 AM Development Service Center
11/8/2024 12:00 PM Development Service Center
11/11/2024 5:30 PM CANCELED
11/13/2024 10:00 AM Animal Services Training Room
11/13/2024 11:00 AM Development Service Center
11/13/2024 3:00 PM Airport Terminal Meeting Room
11/13/2024 5:00 PM Council Work Session Room
&
Council Chambers
11/14/2024 3:00 PM Development Service Center
11/14/2024 5:30 PM Development Services Center
11/18/2024 9:00 AM Council Work Session Room
11/18/2024 5:30 PM
Library Board
City Council
Charter Review Committee
City Council
Planning and Zoning Commission
Community Partnership Committee
Sustainability Framework Advisory
Committee
Public Utilities Board
Zoning Board of Adjustment
Mobility Committee
Bond Oversight Committee
Board of Ethics
Agenda Committee
Downtown Economic Development
Committee
Community Services Advisory
Committee
Library Board
Animal Shelter Advisory Committee
Economic Development Partnership
Board
Airport Advisory Board
Planning and Zoning Commission
Health & Building Standards
Commission
Charter Review Committee
Public Utilities Board
Historic Landmark Commission Development Service Center
Page 3City of Denton Printed on 9/27/2024
29
Date Time Meeting LocationMeeting Body
Meeting Calendar continued...
11/18/2024 5:30 PM Zoning Board of Adjustment Development Service Center
11/19/2024 2:00 PM City Council Council Work Session Room
&
Council Chambers
11/21/2024 3:00 PM Committee on Persons with Disabilities Development Service Center
11/22/2024 1:00 PM Sustainability Framework Advisory
Committee
Council Work Session Room
11/27/2024 10:00 AM Mobility Committee Council Work Session Room
Page 4City of Denton Printed on 9/27/2024
30
Meeting Date Item Legistar ID Departments Involved Type Estimated Time
A. Board of Ethics Pitch 24-1832 Internal Audit Council Request 0:45
B. Towing Ordinance 24-1538 Police Department City Business 0:30
C. TIRZ Downtown Boundary 24-1929 Economic Development City Business 0:30
D. Community Housing Initiatives Audit 23-2458 Internal Audit City Business 0:30
E. Short Term Rental 24-1920 City Manager's Office City Business 0:45
F. Two Minute Pitch:24-1494 City Manager's Office Council Request 0:30
Closed Meeting Item(s): Legal (if any)City Business 0:30
Total Est. Time: 4:00
A. Proposed State Legislative Agenda TBD City Manager's Office City Business 0:45
B. Business Inclusion Program TBD Procurement Council Priority 0:30
C. Council Appointed Position Complaint Review, Investigation, and Corrective Action
Process 24-1432 Human Resources City Business 0:30
D. Two Minute Pitch:24-1495 City Manager's Office Council Request 0:30
Closed Meeting Item(s): Legal (if any)City Business 0:30
Total Est. Time: 2:45
A. Federal Legislative Briefing TBD City Manager's Office City Business 0:45
B. Homelessness Initiative Update TBD City Manager's Office City Business 1:00
C. Denton Renewable Resource Plan TBD Denton Municipal Electric City Business 0:45
D. Charter Review Committee Recommendations TBD City Manager's Office Council Request 1:00
E. Two Minute Pitch:24-1557 City Manager's Office Council Request 0:30
Closed Meeting Item(s): Legal (if any)City Business 0:30
Total Est. Time: 4:30
Other Major Items for Meeting:
A. Charter Review Committee Recommendations TBD City Manager's Office Council Request 1:00
B. Community Village/FLUM Discussion TBD Development Services City Business TBD
C. Two Minute Pitch:24-1557 City Manager's Office Council Request 0:30
Closed Meeting Item(s): Legal (if any)City Business 0:30
Total Est. Time: 2:00
Other Major Items for Meeting:
A. Charter Review Committee Recommendations TBD City Manager's Office Council Request 1:00
B. Two Minute Pitch:24-1559 City Manager's Office Council Request 0:30
Closed Meeting Item(s): Legal (if any)City Business 0:30
Total Est. Time: 2:00
Other Major Items for Meeting:
Item Legistar ID Departments Type Estimated Work
Session Date
Parking Minimum TBD Development Services Council Request TBD
Audit of Park Management & Planning (30 min.)24-255 Internal Audit City Business TBD
Leak Adjustment Ordinance 24-1632 Water Utilities City Business TBD
Item Dates Departments Type Estimated Work
Item Date Approved Department Estimated Hours to Complete Requestor
Vote Centers Resolution 10/17/2023 City Manager's Office TBD CM McGee
Election Day Holiday 6/18/2024 Human Resources TBD CM McGee
NO MEETING - NOVEMBER 5 - ELECTION DAY
October 15
Work Session (@2:00 p.m.)
Regular Called Meeting (@6:30 p.m.)
Other Major Items for Meeting:
Work Session To Be Determined
Tentative Work Session Topics and Meeting Information
Updated: September 27, 2024
Council Priorities and Significant Work Plan Items
to be Scheduled
Other Major Items for Meeting:
December 3
Work Session (@2:00 p.m.)
Regular Called Meeting (@6:30 p.m.)
December 17
Work Session (@2:00 p.m.)
Regular Called Meeting (@6:30 p.m.)
October 22
Work Session (@2:00 p.m.)
Special Called Meeting (Upon conclusion of the
Work Session)
November 19
Work Session (@2:00 p.m.)
Special Called Meeting (Upon conclusion of the
Work Session)
Approved Council Pitches to be Scheduled
NO MEETING - OCTOBER 1 - NATIONAL NIGHT OUT
*This is for planning purposes only. Dates are subject to change.31
1 Street Closure Report: Upcoming ClosuresSCR Sep 30th - Oct 6thStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type1Bonnie Brae St SWillowwood StWalt Parker Dr10/07/24 10/11/24 Sanitary Sewer service line installationscrossing under Bonnie BraeEngineeringRobin DavisFull ClosureExported on September 27, 2024 11:07:17 AM CDT32
2 Street Closure Report: Current ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type1Aileen StPanhandle StBroadway St09/27/24 02/28/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure2Allred RdOakleaf TrlJohn Paine Rd04/26/24 10/30/24 New road for Allred forSagebrook PH llPublic Works Inspections Kent Bull RiversFull Closure3Audra LnStockton StMockingbird Ln07/29/24 10/04/24 Connection new storm drainageto existing City of Dentondrainage.Private DevelopmentZabdiel MotaLane Closure4Ave CEagle DrHighland St08/26/24 12/31/24 Pavement replacement. EngineeringScott FettigFull Closure5Bernard StLindsey StFannin St08/26/24 12/31/24 Utility installations andpavement replacement.EngineeringScott FettigRolling Closure6Bonnie Brae StWillowwood StRailroad tracks09/30/24 10/04/24 Sanitary Sewer service lineinstallations crossing underBonnie BraeEngineeringRobin DavisFull Closure7Central AveMaple StHighland St06/03/24 10/31/24 Utility installations andpavement replacement.EngineeringScott FettigFull Closure8Collins StAve ABernard St08/26/24 11/30/24 Utility installations andpavement replacement.EngineeringScott FettigFull Closure9Crescent StEctor StHillcrest St12/27/23 10/31/24 Utility installations andpavement replacement.EngineeringScott FettigFull Closure10Hickory Creek RdRiverpass DrFM 183003/13/23 12/31/25 Bridge InstallationEngineeringTracy BeckFull Closure11Hillcrest StPanhandle StCrescent St12/27/23 10/30/24 Utility installations andpavement replacement.EngineeringScott FettigFull Closure12Houston PlThomas StBradley St09/27/24 12/31/24 Utility installations andpavement replacement.EngineeringScott FettigFull Closure13Loop 288University - US 380McKinney St09/23/24 10/21/24 Sidewalk InstallationEngineeringRobin DavisRolling Closure14Marietta StOak St WScripture St09/27/24 12/31/24 Utility installations andpavement replacement.EngineeringScott FettigFull Closure15Mayhill RdColorado BlvdEdwards Rd01/31/24 10/15/24 Various traffic lanes will remainclosed for final constructionactivities.EngineeringTracy BeckLane Closure16Montecito DrHickory Creek RdPalo Verde Dr05/28/24 10/11/24 Street ReconstructionStreetsRoy San MiguelFull Closure17Ocean DrAtlantic DrNautical Ln10/02/24 10/23/24 Sanitary Sewer installPrivate DevelopmentGavin PetnerFull Closure18Panhandle StEctor StAileen St09/27/24 10/31/24 Utility installations andpavement replacement.EngineeringScott FettigFull Closure19Ryan Rd WLauren's Pl RdLeisure Ln09/20/24 10/28/24 Work zone closure andflaggers, both lanes are openduring 9AM-3PM (utility lines &poles)OtherDelilah GarciaRolling Closure20Sycamore StExposition StRailroad Tracks on Sycamore 08/17/23 10/04/24 Paving improvements fromExposition to RailroadPublic Works Inspections Stephany TrammellFull Closure21Welch StHighland StHickory St08/26/24 12/31/24 Utility installations andpavement replacement.EngineeringScott FettigRolling Closure22Welch St SEagle DrHighland St06/03/24 11/30/24 Utility installations andpavement replacement.EngineeringScott FettigFull Closure23Willowood StLeslie StWestwood Dr09/30/24 10/30/24 Sanitary Sewer, water taps andstorm sewerPrivate DevelopmentGavin PetnerLane ClosureExported on September 27, 2024 11:07:30 AM CDT33
3 Street Closure Report: Completed ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type1Bernard StAcme StRoselawn Dr05/30/23 09/15/24 Utility installations andpavement replacement.EngineeringScott FettigFull Closure2Bonnie Brae St SN I-35 E Service rdHickory St08/21/24 08/30/24 Water Dept. replacing valve Public Works InspectionsWaterAlexander CervantesLane Closure3Brandywine StCopper Ridge StBriarwood St08/26/24 09/20/24 Curb and Asphalt Repair StreetsRoy San MiguelLane Closure4Countess LnThoroughbred TrlCul-de-Sac09/02/24 09/27/24 Sidewalk RepairStreetsRoy San MiguelLane Closure5Edwards Rd@ Colorado Blvd@ Edwards/DCTA Railroad 06/07/24 09/13/24 NEW TRAFFIC PATTERNMayhill Road fromEdwards/DCTA RailroadCrossing to Colorado Blvd willbe permanently closed Tuesday9/3/24. Access to/from EdwardsRoad will take the newMayhill/Edwards Intersectionnorth of Colorado Blvd.EngineeringTracy L. Beck, PE, PMP Lane Closure6Edwards Rd (FKA MayhillRd)Leafy LnMayhill Rd (New Road) 06/07/24 09/13/24 NEW TRAFFIC PATTERNEdwards (formerly Mayhill) willopen to traffic from Leafy(Pecan Creek ManufacturedHome Community) north to thenew Mayhill Road. Traffic Signalwill be fully operationalThursday 9/5/24 pending noissues. Various traffic lanes ineach direction will remainclosed for final constructionactivities.Engineering OtherTracy L. Beck, PE, PMP Lane Closure7Elm StHickory StMcKinney St08/26/24 09/13/24 TxDOT Roadway reconstruction TXDoTSeth GarciaFull Closure8Farris RdKingsrowOak Bend Cir08/22/24 09/09/24 Street repairsStreetsJesse RodriguezFull Closure9Hickory St EBell AveLocust St09/25/24 09/25/24 5:30AM- 8:30AMOtherColt MorrisFull Closure10Hill Alley StJackson StMartin St08/26/24 08/30/24 Asphalt milling & resurfacing EngineeringSeth GarciaRolling Closure11Industrial StMill StDead end08/26/24 08/30/24 Asphalt milling and resurface EngineeringSeth GarciaLane Closure12Jamestown LnMistywood LnLocksley Ln07/29/24 08/30/24 Trench Repair forNeighborhood 4EngineeringSheldon GatewoodRolling Closure13Locust StHickory StMcKinney St08/26/24 09/13/24 TxDOT Roadway reconstruction TXDoTSeth GarciaFull Closure14Maid Marion PlLocksley LnJamestown Ln07/29/24 08/30/24 Trench Repair forNeighborhood 4EngineeringSheldon GatewoodRolling Closure15Mayhill Rd (SB)University Dr (US 380)Prominence Pkwy04/15/24 09/06/24 Installation of new drivewayapproachesPrivate Development PublicWorks InspectionsZabdiel MotaLane Closure16Mill Pond RdEmerson LnOld North Rd07/29/24 08/30/24 Trench Repair forNeighborhood 4EngineeringSheldon GatewoodRolling Closure17Oak / Hickory StBonnie Brae StN Texas Blvd08/15/24 09/20/24 DME Conduit and Caved inTrench RepairPublic Works Inspections Ethan KeithFull Closure18Ocean DrAtlantic DrNautical Lane08/26/24 09/05/24 Sanitary Sewer installPrivate DevelopmentGavin PetnerFull Closure19Panhandle StHeritage TrlStanley St07/15/24 09/20/24 Drive ApproachPublic Works Inspections Collin ColeFull Closure20Potomac PkwyShenandoah TrailStone Mountain Dr08/19/24 09/13/24 Concrete Panel repairStreetsRoy San MiguelLane Closure21Robertson StCook StSkinner St08/26/24 08/30/24 Asphalt milling and resurfacing EngineeringSeth GarciaRolling ClosureExported on September 27, 2024 11:07:52 AM CDT34