022825 Friday Staff ReportCity Manager’s Office 215 E. McKinney St., Denton, TX 76201  (940) 349-8307 OUR CORE VALUES Inclusion  Collaboration  Quality Service  Strategic Focus  Fiscal Responsibility MEMORANDUM DATE: Feb. 28, 2025 TO: The Honorable Mayor Hudspeth and Council Members FROM: Sara Hensley, City Manager SUBJECT: Friday Staff Report Upcoming Meetings A.Historic Landmark Commission on Monday, March 3, 2025, at 5:30 p.m. at the Development Service Center. B.Parks, Recreation and Beautification Board on Monday, March 3, 2025, at 6:00 p.m. inthe Civic Center Community Room. C.Work Session of the City Council on Tuesday, March 4, 2025, at 2:00 p.m. in the City Council Work Session Room followed by a Regular Meeting at 6:30 p.m. in the Council Chambers. D.CANCELLED - Agenda Committee on Thursday, March 6, 2025, at 8:00 a.m. in theCity Council Work Session Room. Please check the City of Denton website for final meeting days and times as information is subject to change after the Friday Report is published. Public Meetings & Agendas | Denton, TX (civicplus.com) General Information & Status Updates A.Municipal Court – The Municipal Court will close at 1 p.m. on Friday, March 7 to complete a critical system update. Regular hours will resume on Monday, March 10. Requests and payments may be submitted online at www.cityofdenton.com/court. The automated pay byphone line (940) 349-7244 also remains available 24 hours daily. Staff Contact: JamieLindsay, Municipal Court B.Wildfire Deployment – Three members of the Denton Fire Department were deployed after a request was received from the Texas Intrastate Fire Mutual Aid System (TIFMAS)managed by the Texas Forest Service, on Wednesday, Feb. 26, 2025. These members areexpected to be deployed for up to two weeks. This strike team was deployed to Childressto address several active wildfires in the western portion of Texas. Staff contact: Kenneth Hedges, Fire C.City Auditor’s Office Fiscal Year 2024-25 First Quarter Report – The City's Auditor'sOffice released the first quarter performance report for Fiscal Year 2024-25. One new auditreport covering Development Planning: Application Processing was released during the first quarter. The City Auditor's Office also responded to four requests for advice and assistance. At the end of the first quarter, the Office had used almost 27 percent of the timebudgeted for audit projects. The entire First Quarter Report can be seen on the InternalAudit Website here. Staff contact: Madison Rorschach, City Auditor D.Denton Community Job Fair – The City is partnering with Denton Independent School District, Denton Chamber of Commerce, Goodwill North Central Texas, North CentralTexas College, Texas Veterans Commission, United Way of Denton County, andWorkforce Solutions for North Central Texas, to host a free community job fair onWednesday, April 9, 2025, from 10 a.m. to 2 p.m. at the Denton Civic Center located at 321 E. McKinney St, Denton, TX. Businesses in Denton County are actively accepting applications for current job openings.Those businesses interested in participating in the job fair can register atwww.DentonJobFair.com. Job seekers will have access to one-on-one counseling for job selection, guidance on completing an application, resume review and printing, interview coaching, and a free headshot. Additionally, for this year’s event, community serviceagencies will provide job-based resources to assist in overcoming employment barriers.Staff contact: Christina Davis, Economic Development E.DTV Video Highlights for February – DTV released several videos this month that raise awareness, educate, and inform our community. •UNT Women’s Basketball: Coach of the Day YouTubeDenton Mayor Gerard Hudspeth serves as the Honorary Coach of the Day, as the MeanGreen soared past a new record for Home Wins in a season! •A Valentine’s Dance to Remember YouTubeZoe Bernal and her father reminisce on when they'd attend the My Little ValentineFamily Dance. 2 •Smoke Alarms Save Lives YouTubeWhile you may not think about them too often, smoke alarms are crucial for your safety. •OUT THERE with the Mayor: North Central Texas College YouTube Mayor Gerard Hudspeth learns how North Central Texas College prepares students for college and career, as well as being a good neighbor with their facilities downtown.All videos air on DTV, are shared via social media channels, and are available on the City’s YouTube channel. Staff contact: Billy Matthews, Marketing and Communications F.Monthly Mobility Report – Innovative Transportation Solutions (ITS) provides a monthly report overview of Texas Department of Transportation regional projects. See the attachedITS Monthly Mobility Report for review. Staff contact: Trevor Crain, Capital Projects G.Winter Weather Homelessness Response – During the winter weather event last week City staff and their partners expanded operational capacity to ensure the unhoused population was aware of the dangerous temperatures and how they could safely avoid them. •Overnight shelters: Throughout the winter weather event, an average of 236 individuals received shelter from the Denton Community Shelter and the Salvation Army Shelter nightly. The Denton Community Shelter did not reach capacity at any point during the event. Our Daily Bread was prepared with additional cots, bedding, and staff support if there was a need to increase capacity. •Street outreach: Street outreach was conducted daily by Giving Grace and the Denton Police Department Outreach Team to alert unsheltered individuals of oncoming cold weather. •Warming stations: City facilities operated as warming stations for the duration of the event providing individuals with shelter from the cold during operational hours. DCTA passes were available for individuals who needed help getting from the warming station to emergency shelter. Warming stations were supplied with 220 DCTA passes ahead of, and throughout, the event to ensure transportation was available. Staff contact: Jesse Kent, City Manager’s Office H.Mayor’s Pet Spotlight – Tank is a lively four-year-old terrier/pit bull mix with a zest forlife. He has been in the shelter since Dec. 12, 2024, and we're eager to find him a loving foster/forever home as soon as possible. Tank is a high-energy dog who loves to jump and play, making him a great companion for active individuals or families. He is dominant but knows basic commands, making training and bonding with him a rewarding experience. Tank adores toys and can spend hours entertaining himself, which is perfect for keeping him mentally stimulated. His high energy levels mean he needs regular exercise and engagement to stay happy and healthy. While he can be kennel reactive, his mental state is stable, and he will thrive with the right environment and care. Due to his length of stay at the shelter, it's crucial to place Tank in a foster home where he can receive the attention and activity he craves. By fostering or adopting Tank, you'll be 3 allowing him to flourish in his forever home. Please contact Denton Animal Services by phone at (940) 349-7594 or at Animal.Services@cityofdenton.com. Staff contact: Bailey Coleson, Animal Services Responses to Council Member Requests for Information A.Traffic Safety Audits – On Jan. 29 and Feb. 14, Council Members Beck and Holland sharedresidents' requests for traffic safety audits. Kayewood Drive at Greenwood Drive – Staff conducted a traffic safety audit anddetermined that the following improvements could be implemented: All-Way Stop signsand tightening the intersection with markings. Improvements are expected to be completeby March 27. Thistle Ridge at Andrew Avenue – Staff conducted a traffic safety audit and determined that a stop sign is appropriate for this roadway. The stop sign will be installed on Thistle Ridge and is expected to be implemented by March 12. Staff contact: Farhan Butt, Transportation Services B.Inclement Weather Policy – On Feb. 18, Council Member Jester requested informationregarding the City’s evaluation of the Inclement Weather Policy. The Policy was lastupdated in 2021 and is currently under review. The April 15 Council Work Session willinclude the policy review and recommendations. Staff contact: Christine Taylor, City Manager’s Office C.Downtown Public Improvement District – On Feb. 21, Council Member McGee requestedinformation regarding the proposed Downtown Public Improvement District (PID). Citystaff met on Jan. 17 with downtown property owners to discuss the potential creation of a PID, a recommendation from the recently adopted Downtown Master Plan, and previousCouncil direction for staff to explore sustainable funding for the Downtown Ambassadorpilot program. The initial meeting focused on providing education on the creation processand assessing the level of interest among property owners. Staff will continue to meet withthe property and business owners over the next few months and provide updates to Council. Staff contact: Christine Taylor, City Manager’s Office D.Cottage-Style Home Development – On Feb. 25, Council Member Byrd inquired about thecapability of cottage-type neighborhoods. Generally, “cottage neighborhoods” refer toresidential uses designed around a central open space. The residential uses within cottage neighborhoods vary from tiny homes and accessory dwelling units to single-family homes,townhomes, and multifamily developments. The Denton Development Code does notinclude a formal “cottage neighborhood” as a development type. If a property owner soughtto construct a cottage neighborhood to sell to individual owners, the path towarddevelopment would depend on the project layout and proposed residential use, as it may 4 align with an existing standard zoning district or require specialized development standards. Staff contact: Julie Wyatt, Development Services E.Encampment Cleanup – On Feb. 26, Mayor Hudspeth inquired about an encampment located on public property near Loop 288. Staff is working with Giving Grace to connectindividuals at the encampment site with resources while coordination for cleanup isunderway. The site cleanup is expected to be completed by March 14. Staff contact: JoshuaEllison, Community Services Attachments A.ITS Monthly Mobility Report ............................................................................................6 Upcoming Community Events and Public Meetings Please visit the City of Denton website for upcoming community events and details. Information A.Council Requests for Information ....................................................................................24 B.Public Meetings Calendar ................................................................................................26 C.Future Work Session Items ..............................................................................................30 D.Street Closure Report .......................................................................................................31 5 City of Denton Transportation Update Prepared by: February 2025 1 City of Denton Transportation/Mobility Project Status Report Prepared by ITS February 2025 PROJECTS •Project Summary ............................................ page 2 •I-35 North ....................................................... page 3 •I-35/35E/35W Merge...................................... page 5 •I-35E/Mayhill ................................................. page 8 •I-35W Frontage Roads Middle ....................... page 9 •Loop 288 West Frontage Roads ................... page 10 •Loop 288 East-US 380 Connector ................ page 11 •Bonnie Brae Segment 7 ................................ page 12 •FM 1515 ....................................................... page 13 •FM 1173 ....................................................... page 14 •Outer Loop.................................................... page 15 •Glossary of Acronyms .................................. page 16 •TxDOT Funding Categories ......................... page 17 •Denton City Limits ....................................... page 18 6 City of Denton Transportation Update Prepared by: February 2025 2 PROJECT SUMMARY PROJECT LET DATE CONTRACTOR/ ENGINEER CONSTRUCTION COST I-35 North Various Stantec $897,796,423 I-35/35E/35W Merge 04-2024 Sema Construction $588,780,841 I-35E/Mayhill 06-2025 LTRA $139,130,349 I-35W Frontage Roads Middle 09-2028 WSP $446,891,327 Loop 288 West Frontage Roads 09-2028 CP&Y $227,423,354 Loop 288 East-US 380 Connector * Westwood $922,000,000 Bonnie Brae Segment 7 * Westwood * FM 1515 * LTRA $69,484,709 FM 1173 * Halff $125,852,145 Outer Loop * LJA $1,547,212,128 TOTAL $4,964,571,276 7 City of Denton Transportation Update Prepared by: February 2025 3 Current Activity: •PS&E: Work on the 100% PS&E plan set for the -074 CSJ is underway with updates to 2024TxDOT Specifications. Additionally, TxDOT plans to split -074 CSJ into three separate CSJs forletting. Update to project schedule to accommodate for project split is forthcoming. I-35 North CSJ: 0195-02-074; 0195-02-076; 0195-02-081; 0195- 01-116; 0195-02-084 Schematic Approval: January 31, 2019 Limits: From US 77 to FM 3002 (Cooke County line) Environmental Approval: October 7, 2019 Length: 12.4 miles Description: Reconstruct and widen 4- to 6-lane rural freeway with ramp modifications and reconstruct 4- to 4/6-lane frontage roads ROW Acquisition Complete: July 2023 Est. Construction Cost: $897,796,423 -074: $495,359,007 -081: $175,274,676-116: $110,895,970 -084: $116,266,771 Utility Relocations Complete: -074: January 2026 -081: April 2025 -116: October 2025 -084: October 2025 Funding: $801,507,230 CAT 4: $220,966,122 CAT 11: $2,574,631 CAT 12: $577,966,477 100% Plans: -074: * -081: February 2025 -116: June 2025 -084: June 2025 Firm: Stantec Ready to Let Date: -074: January 2026 -081: April 2025 -116: October 2025 -084: October 2025 TxDOT PM: Dawit Abraham Let Date: -074: July 2026 -081: April 2025 -116: December 2029 -084: December 2029 8 City of Denton Transportation Update Prepared by: February 2025 4 •Work on the 100% PS&E plan set for the -081 CSJ is underway with updates to 2024 TxDOT Specifications; TxDOT is revising scope to ensure that the project scope fits within the availablefunds. •Work on the 100% PS&E plan set for -084 CSJ is underway with updates to the 2024 TxDOT Specifications; some scope being shifted to -081 CSJ. •Utilities: Status of utilities in conflict is listed below by CSJ/Segment.IH-35 from US 77 to South of FM 455; CSJ: 0195-02-074Utilities that are clear of construction: AT&T, Atmos Distribution, City of Denton, Frontier, Nortex, OneOK, and Sanger Electric. o Bolivar Water: Anticipate clearance in early 2026.o Brazos Electric: Construction complete. Wreck-out and transfer pending. Anticipateclearance in April 2025. o CenturyLink/Brightspeed: Construction to begin in February 2025. Anticipate clearance in May 2025.o CoServ Electric: Construction underway. Anticipate clearance in June 2025.o Lumen/Level 3: Relocations underway. Anticipate clearance in June 2025. o MCI/Verizon: Design pending. Utility agreement pending. Anticipate start of construction in early 2025. Anticipate clearance in March 2025.o Sanger Water/Wastewater: Relocations underway. Anticipate clearance in March 2025.o Suddenlink/Altice: Design and utility agreement pending. Anticipate start of relocations inFebruary 2025. Dependent upon CoServ. o UTRWD: Design and utility agreement finalized. Pending UTRWD contractor. Anticipate clearance in August 2025.o Zayo: Pending mobilization. Anticipate clearance in April 2025.IH-35 from North of FM 455 to View Road; CSJ: 0195-02-081 Utilities that are clear of construction: AT&T, Nortex, Sanger Electric and Sanger Water/Wastewater. o Bolivar Water: Construction underway. Anticipate clearance in March 2025.o Brightspeed/Centurylink: Construction complete. Awaiting wreck-out and transfer to newfacilities. Anticipate clearance in February 2025.o Lumen/Level 3: Construction underway. Anticipate clearance in March 2025. o MCI/Verizon: Anticipate start of construction in February 2025. Anticipate clearance in April2025.o Zayo: Construction underway. Anticipate completion in February 2025.IH-35 from View Road to Cooke County Line (FM 3002); CSJ: 0195-02-084 Utilities that are clear of construction: AT&T, CoServ Electric, and Nortex o Bolivar WSC: Construction start pending. Anticipate clearance in August 2025.o Level 3/Lumen: Relocations complete. Splicing ongoing. Anticipate clearance in April 2025.o MCI/Verizon: Design and utility agreement pending. Construction start pending.o Oncor: Design pending. Utility agreement pending. Anticipate start of construction inFebruary 2025. Anticipate clearance in May 2025. o Zayo: Design pending. Construction underway. Anticipate clearance in April 2025. 9 City of Denton Transportation Update Prepared by: February 2025 5 Current Activity: •Construction: The project let for construction on April 4, 2024. The project was awarded to Sema Construction with a low bid of $588,780,840.70, at 18% above engineer’s estimate. There are 1,356 working days and 56 months of barricades. Construction began on January 13,2025. See attached TxDOT construction report. •Utilities: Utilities that are clear of construction: AT&T, Atmos Distribution, Atmos Transmission, Brazos Valley Electric, City of Denton Water/Wastewater, CoServ Electric, DME Transmission, Fiberlight, and UPN. •Status of utilities in conflict is listed below. I-35/35E/35W Merge CSJ: 0195-03-099 (N Texas Blvd to I-35E/W) 0195-03-090 (I-35E/W to US 380) 0195-03-087 (US 380 to US 77) Schematic Approval: -090: August 2011 -087: January 31, 2019 Limits: From North Texas Blvd to US 77 north of Denton Environmental Approval: -090: June 2017 -087: October 7, 2019 Length: 5.073 miles ROW Acquisition Completed: May 2022 Description: Reconstruct interchange and existing frontage roads; reconstruct and widen to 6/8- lane rural freeway with ramp modifications Utility Relocations Complete: February 2025 Est. Construction Cost: $588,780,841 City of Denton Utility Relocations Completed: December 2024 Funding: $588,780,841 CAT 2: $65,978,054 CAT 3: $1,452,495 CAT 4: $75,042,004 CAT 11: $106,973,305 CAT 12 (Strategic Priority): $219,334,983 CAT 12 (Texas Clear Lanes): $120,000,000 100% Plans: January 2024 Firm & Key Contact: AECOM (-090); Stantec (-087) Let Date: April 4, 2024 TxDOT PM: John Rich Construction Completion: November 2029 10 City of Denton Transportation Update Prepared by: February 2025 6 o Charter-Spectrum: Standalone construction complete. Joint duct construction ongoing.Anticipate clearance in February 2025.o DME Distribution: Relocations underway. Previously unidentified conflict beingdesigned. Anticipate completion in February 2025. o Frontier: One unidentified conflict being resolved. Anticipate clearance in February 2025. o Level 3/Lumen (Joint Duct Bank): Construction underway from US 380 to US 77.Anticipate splicing in February 2025. Construction from Bonnie Brae to US 380underway. Anticipate splicing in February 2025. o MCI/Verizon: Conduit install complete. Anticipate splicing in February 2025. o Zayo: Install complete. Repairs to new duct caused delay. Splicing remains.Anticipate clearance in February 2025. 11 City of Denton Transportation Update Prepared by: February 2025 7 TxDOT Monthly Project Report for Precinct 1 Task Force Date of report: January 29, 2025 Report prepared by: Jonathan Rich Project: 0195-03-087, ETC Control: 0195-03-087, ETCA Highway: IH 35 Limits: IH35E at North Texas Blvd to North of US 77 on IH35 Contractor: Sema TxDOT Project Manager: Jonathan Rich Phone: (945) 290-0731 Contractor’s Project Manager: Shea Hurley Phone: (720) 215-8056 Date Work Began: January 13, 2025 Anticipated Completion Date: November 2029 Current Activities: Current activities: Clearing ROW. Placing temporary striping on I-35E main lanes and northbound and southbound frontage roads along with barrier. Performing earthwork fill and excavation at I-35W future off-ramp. Narrative description of last month’s activities: None Narrative description of activities planned for next month: Start detour work north and southbound. Close northbound frontage road on-ramp north of North Texas Boulevard on February 5, 2025. Perform bridge and frontage road work from Scripture to US 380. Traffic issues: Nightly lane closures. Plans for changes in traffic patterns: Close northbound frontage road on-ramp north of North Texas Boulevard on February 5, 2025. Item(s) of work currently controlling project completion: None Other items of significance: None 12 City of Denton Transportation Update Prepared by: February 2025 8 Current Activity: • PS&E: LTRA updated the plan set to the 2024 TxDOT Specifications and included additional sheets and quantities requested by TxDOT. LTRA submitted final plan set to TxDOT. • Utilities: Utilities currently clear of construction are: Atmos Gas (Distribution), AT&T, CenturyLink/Brightspeed, CoServ Gas, City of Denton, City of Denton Wastewater, NGG, Oncor, and United Private Networks. • Status of utilities in conflict is listed below. o Astound (formerly Grande): Construction underway. Anticipate clearance in February 2025. o Charter/Spectrum: Construction underway. Anticipate clearance in March 2025. o DME: Relocations underway. Anticipate clearance in August 2025. o DISD: Utility agreement pending. Anticipate start of construction in February 2025. Anticipate clearance in March 2025. o Frontier: Northbound frontage road clear. Pending Denton Electric pole relocation. Anticipate completion for southbound frontage road in March 2025. o Level 3/Lumen: Construction underway. Anticipate clearance in February 2025. o Zayo: Conduit install complete. Splicing ongoing. Anticipate completion in February 2025. I-35E/Mayhill CSJ: 0196-01-109 Schematic Approval: February 2011 Limits: I-35E intersection with Mayhill from Pockrus Page Rd to Loop 288 Environmental Clearance: January 31, 2012 Length: 1.912 miles ROW Acquisition Completed: November 2022 Description: Reconstruct interchange at Mayhill and I-35E and existing 4-lane frontage roads Utility Relocations Complete: August 2025 Est. Construction Cost: $139,130,349 City of Denton Utility Relocations Completed: February 2024 Funding: $139,130,349 CAT 2: $129,130,349 CAT 4: $10,000,000 100% Plans: November 2024 Firm & Key Contact: LTRA, Tyler Martin Ready to Let Date: August 2025 TxDOT Project Manager: Chaikou Bah Let Date: June 2025 13 City of Denton Transportation Update Prepared by: February 2025 9 Current Activity: • PS&E: WSP continues addressing TxDOT comments to 95% plan set and is working toward completion of final plan set. • ROW: There are 58 parcels to acquire. There are: 3 parcels in ED and 55 parcels acquired. ROW acquisition has been placed on hold due to District budgetary constraints. • Utilities: Status of utilities in conflict is listed below. o Astound (Grande): Design pending. Utility agreement pending. Construction schedule pending CoServ design. o Atmos: Design pending. Utility agreement pending. Anticipate clearance in December 2025. o Charter/Spectrum: Design pending. Utility agreement pending. Construction schedule pending CoServ design. o CoServ Electric: Design pending. Utility agreement pending. o DME Transmission: Joint use agreement pending. Facility to stay in place; not in conflict. o DME Distribution: Design pending. Utility agreement pending. o Fiberlight: Preliminary design approved. Agreement pending. Anticipate clearance in February 2025. o Lumen/Level 3: Preliminary design pending. Utility agreement pending. o Trinity River Authority: Anticipate TRA to be clear pending revisions to TxDOT plans. o Zayo: Design pending. Utility agreement pending. Anticipate start of construction in February 2025. I-35W Frontage Roads Middle CSJ: 0081-13-071 Schematic Approval: March 20, 2020 Limits: From 0.7 miles south of FM 407 to FM 2449 Environmental Clearance: June 30, 2020 Length: 6.76 miles Project Description: Construct frontage roads ROW Acquisition Complete: January 2026 Est. Construction Cost: $446,891,327 Utility Relocations Complete: March 2026 Funding: $213,024,000 CAT 2: $24,537,247 CAT 12: $188,486,753 100% Plans: December 2025 Firm: WSP Ready to Let Date: March 2026 TxDOT Contact: Gutema Gebriel Let Date: * 14 City of Denton Transportation Update Prepared by: February 2025 10 Current Status: •ROW: For RCSJ 2250-02-023, there are 19 parcels to acquire. There are: 2 parcels in ED and 17 parcels in possession. For RCSJ 2250-02-024,there are 20 parcels to acquire. Thereare: 5 parcels in negotiations and 15parcels in possession. •ROW acquisition efforts are on hold dueto District budgetary constraints. •PS&E: CP&Y updated PBLR for final submittal. •CP&Y updated Exhibit A and madefinal submittal on September 30, 2024. •The 95% PS&E plan set submittal was made on September 3, 2024. The comment resolution meeting was heldon January 28, 2025. CP&Y isaddressing comments and workingtoward final submittal. •Bi-weekly coordination meetingsunderway. •Utilities: SUE Level submittal was made on October 11, 2024. Loop 288 West Frontage Roads CSJ: 2250-00-013 (from I-35 to US 380) 2250-00-032 (from US 380 to I-35W) Schematic Approval: March 20, 2020 Limits: From I-35 to I-35W Environmental Clearance: September 28, 2020 Length: 9.0 miles Description: Construct frontage roads ROW Acquisition Complete: December 2025 Estimated Construction Cost: $227,423,354 -013: $95,315,990 -032: $132,107,364 Utility Relocations Complete: April 2026 Funding: $3,000,000 CAT 3 $1,000,000 CAT 7 100% Plans: March 2025 Firm & Key Contact: CP&Y, Tom Cochill & Jacob Roberts Ready to Let Date: April 2026 TxDOT Project Manager: Gutema Gebriel Let Date: * 15 City of Denton Transportation Update Prepared by: February 2025 11 Current Activity: •PS&E: The revised 60% schematic was submitted to TxDOT for review on November 26, 2024.Schematic review comments provided to Westwood. Westwood responding to TxDOT schematic comments and anticipates submittal of final schematic to TxDOT for review at the end of March2025. Westwood and ITS met on February 18, 2025, to discuss TxDOT schematic comments. •Westwood continues efforts on drainage report and bridge layouts. •Survey from US 380 to Kings Row has been staked to identify alignment for property owners. •SUE provider finalizing utility survey in the connector section; preparing final SUE plan sheets. •Westwood is revising drainage report. •Westwood met with the City of Denton on February 6, 2025. •Westwood met with DME to conduct utility coordination on January 15, 2025. •Environmental: Tentative public hearing date is April 24, 2024. TxDOT approved project for anEnvironmental Assessment (EA). Westwood is working on Environmental Assessment and Technical Reports. Loop 288 East-US 380 Connector CSJ: 2250-02-025; 0135-10-066 Schematic Approval: June 2025 Limits: from I-35 to US 380 east of Geesling Road Environmental Clearance: December 2025 Length: 8 miles Project Description: Construct Loop 288 frontage roads and grade separations and an improved connector to US 380 ROW Acquisition Completion: * Estimated Const. Cost: $922M Utility Relocations Completion: * Funding: * 100% Plans: * Firm & Key Contact: Westwood, Mark Schluter, Mark Zoellner Ready to Let Date: * TxDOT PM: Stephen Endres Let Date: * 16 City of Denton Transportation Update Prepared by: February 2025 12 Current Activity: • PS&E: The segment between US 77 and Loop 288 has been added to Loop 288 East contract with Westwood. Bonnie Brae Segment 7 CSJ: * Schematic Approval: June 2025 Limits: From US 77 to Loop 288 Environmental Clearance: December 2025 Length: 0.2 miles ROW Acquisition Complete: * Description: Extension of Bonnie Brae north of US 77 Utility Relocations Complete: * Est. Construction Cost: * 100% Plans: * Funding: * Ready to Let Date: * Firm & Key Contact: Westwood, Mark Schluter, Mark Zoellner Let Date: * TxDOT Project Manager: Stephen Endres Construction Start: * 17 City of Denton Transportation Update Prepared by: February 2025 13 Current Activity: •PS&E: LTRA updated plans to the 2024 TxDOT Specifications and submitted the final plan set on June 28, 2024. Plans have been shelved until letting. •Exhibit A: LTRA submitted new Exhibit A for CPKC approval. •Utilities: Status of utilities in conflict:o Atmos: Final design approved. Permit pending. Construction schedule pending. o Brightspeed/CenturyLink: Design pending Oncor final design.o Charter/Spectrum: Design dependent on Oncor design.o City of Denton Water/Wastewater: Final design pending. Anticipate start of construction inMarch 2025. Anticipate clearance in December 2025.o Denton Municipal Electric: Preliminary design pending. Utility agreement pending.o Frontier: Design pending. o MCI/Verizon: Design pending.o Oncor: Design pending. Construction schedule pending. o Unite Private Networks: Design pending. FM 1515 CSJ: 1951-01-011 Schematic Re-approval: October 13, 2021 Limits: From Bonnie Brae to Masch Branch Road Environmental Approval: August 4, 2020 Length: 2.096 miles Environmental Re-eval: March 15, 2022 Description: Widen existing 2-lane rural section to a six- lane divided urban roadway ROW Acquisition Complete: July 2023 Est. Construction Cost: $69,484,709 Utility Relocations Complete: December 2025 Funding: $500,000 CAT 7 100% Plans: June 2024 Firm & Key Contact: LTRA, Tyler Martin Ready to Let Date: December 2025 TxDOT Project Manager: Bryan Esmaili-Doki Let Date: * 18 City of Denton Transportation Update Prepared by: February 2025 14 Current Activity: •PS&E: Halff and TxDOT to meet for a 100% page turn on February 25, 2025. Anticipate submittal of final plans on March 11, 2025. •Halff submitted BNSF Exhibit A on September 24, 2024. •Utilities: Status of utilities in conflict: o Altice-Suddenlink: Completing I-35 North relocations prior to FM 1173 relocations. o AT&T: Design revisions pending. Construction dependent upon Oncor and CoServ.o Atmos Gas: Design pending.o Brightspeed/CenturyLink: Design review completed; awaiting revisions. Awaiting Oncor designfor overhead portions.o City of Denton: Design under review with I-35 project.o CoServ: Initial design review completed; awaiting revisions.o Fiberlight: Design dependent upon Oncor and CoServ.o City of Krum: Design changes from Hopkins and NightHawk to be shown. Current long leadrelocate.o Oncor: Partial preliminary design complete; awaiting revisions for phase 2 design. o Zayo: Design revisions pending. Dependent on CoServ design. FM 1173 CSJ: 1059-01-047; 1059-02-002 Schematic Approval: March 20, 2020 Limits: From I-35E to FM 156 Environmental Clearance: August 26, 2021 Length: 3.613 miles Description: Widen and realign to 4/6-lane divided urban road ROW Acquisition Completed: September 2023 Est. Construction Cost: $125,852,145 -047: $62,892,803 -002: $62,959,342 Utility Relocations Complete: August 2026 Funding: * 100% Plans: March 2025 Firm & Key Contact: Halff Associates, Adam Bazar Ready to Let Date: August 2026 TxDOT PM: Kwan Lam Let Date: * 19 City of Denton Transportation Update Prepared by: February 2025 15 Current Activity: •Design: LJA continues preparing 30% schematic. LJA is performing microstudies to evaluatealignments utilizing new field work data; reviewing and making updates on schematic layouts. •LJA continues coordination with NCTCOG, TxDOT, USACE, and other agencies. •LJA continues identifying developments adjacent to proposed Outer Loop alignment. •Utilities: LJA continues evaluating transmission level utilities within study area and gathering information near refined alignments and coordinating with entities. LJA continues developing Level Dmap. •Environmental: Evaluating easements and TxDOT property near USACE property. Reviewingadditional constraints and areas of concern. Tracking right-of-entry responses. Ongoing field work inareas where right-of-entry has been obtained. •Other: Project website is available: www.DentonCountyOuterLoop.com. •Public Involvement: Public Scoping Meetings were held on October 29, 2024, at Midway Church in Pilot Point, and on October 30, 2024, at Denton Convention Center. Comment period closed onNovember 29, 2024. LJA drafted public scoping meeting documentation and submitted in January2025. Outer Loop CSJ: 0918-46-341 Schematic Approval: March 2026 Limits: From I-35 to the DNT at the Denton County Line Environmental Clearance: September 2026 Length: 23 miles ROW Acquisition Complete: * Description: Construct a six-lane controlled access freeway with continuous frontage roads Utility Relocations Complete: * Est. Construction Cost: $1,547,212,128 100% Plans: * Funding: * Ready to Let Date: * Firm & Key Contact: LJA, Tony Kimmey Let Date: * TxDOT Project Manager: Liang Ding Construction Start: * 20 City of Denton Transportation Update Prepared by: February 2025 16 • AADT – Annual Average Daily Traffic • AFA – Advanced Funding Agreement • ARPA – Archeological Resources Protection Act • CE – Categorical Exclusion (environmental clearance process for projects that do not involve significant environmental impacts) • CLOMR – (FEMA’s) Conditional Letter of Map Revision • Conformity – Federal requirement in nonattainment areas to conduct air quality analysis on projects, programs, and policies identified in transportation plans, transportation improvement programs, federally funded projects, or projects requiring federal approval • CSJ – (TxDOT’s) Control Section Job Number • DCC – Design Concept Conference • EA – Environmental Assessment • ED – Eminent Domain • EIS – Environmental Impact Statement • EPIC – Environmental Permits, Issues, and Commitments • ESAL – Equivalent Single Axle Load (TxDOT design calculation) • FONSI – Finding of No Significant Impact • IAJR – Interstate Access Justification Request • ICA – Interlocal Cooperative Agreement • IFP – Initial Financial Plan • Let – Official date of receipt and opening of bids • MAPO – Meeting with Affected Property Owners • MPO – Metropolitan Planning Organization • MTP – Metropolitan Transportation Plan • NCTCOG – North Central Texas Council of Governments • NEPA – National Environmental Policy Act • NOPC – Notice of Proposed Construction • NTTA – North Texas Toll Authority • PBLR – Preliminary Bridge Layout Review • PS&E – Plans Specifications and Estimate • PUA – Possession and Use Agreement • ROW – Right-of-Way • RTC – Regional Transportation Council • RTL – Ready to Let (date project is clear for construction but lacks funding for actual let) • RTR – Regional Toll Revenue (funds resulting from certain toll/managed lane projects in DFW region) • RULIS – Right-of-Way, Utilities, Leasing, and Information System • STBG – Surface Transportation Block Grant • STIP – Statewide Transportation Improvement Program • SUE – Subsurface Utility Engineering • SW3P – Storm Water Pollution Prevention Plan • TCP – Traffic Control Plan • TIA – Time Impact Analysis • TPP – Transportation Planning and Programming • TPWD – Texas Parks & Wildlife Department • TTC – Texas Transportation Commission • TxDOT – Texas Department of Transportation • UTP – Unified Transportation Program • VE – Value Engineering Glossary of Acronyms 21 City of Denton Transportation Update Prepared by: February 2025 17 • CAT 1: Preventive Maintenance and Rehabilitation • CAT 2: Metro and Urban Area Corridor Projects / NCTCOG • CAT 3: Non-Traditionally Funded Transportation Projects • CAT 4: Statewide Connectivity Corridor Projects • CAT 5: Congestion Mitigation and Air Quality Improvement / NCTCOG • CAT 6: Structures Replacement and Rehabilitation (Bridge) • CAT 7: Metropolitan Mobility and Rehabilitation / NCTCOG • CAT 8: Safety Projects • CAT 9: Transportation Alternatives • CAT 10: Supplemental Transportation Projects • CAT 11: District Discretionary • CAT 12: Strategic Priority TxDOT Funding Categories 22 City of Denton Transportation Update Prepared by: February 2025 18 Denton City Limits 23 24 Friday Report - Council RequestsSummary of RequestCouncil Member Requestor Date Received Staff AssignedDepartmentCommentsStatus1Request for Road Safety Audit forUniversity Drive and Malone StreetCouncil Member Beck CouncilMember Byrd Mayor HudspethCouncil Member McGee CouncilMember Holland Mayor Pro TemMeltzer Council Member JesterUpFarhan ButtPublic Works-TrafficData collection iscomplete. Analysis isunderway, anticipateddate of completion if3/13/25.2Traffic Study Prairie @ ElmCouncil Member Beck02/18/25Farhan Butt, JessicaRobledoPolice Public Works-TrafficStaff anticipate the trafficaudit report to be completeby 3/19/25.3Road Safety Hickory Creek RanchNeighborhoodCouncil Member Holland02/09/25Farhan Butt, JessicaRobledoPolice Public Works-TrafficStaff updated CM. Dataanalysis should becomplete week of 3/3 withimprovementrecommendations.4Water Infrastructure Finance andInnovation Act (WIFIA) talking pointsCouncil Member Beck02/27/25Dustin Sternbeck, StephenGayMarketing and Communication Water Staff updated CM.5Old Denton High School Stadium LightingScheduleMayor Pro Tem Meltzer02/27/25Cassey OgdenCMOReferred to Denton ISD.6Municipal Bond Housing Letter - Signature Mayor Hudspeth02/26/25Cassey OgdenCMOStaff updated Mayor.7Request from Charter school to meet withCity CouncilCouncil Member Beck CouncilMember Byrd Mayor HudspethCouncil Member McGee CouncilMember Holland Mayor Pro TemMeltzer Council Member Jester02/26/25Stephen GayWaterStaff provided an updateto the parent organization.Staff updated Council.8Cottage Style Home Development Council Member Byrd02/25/25Scott McDonaldDevelopment ServicesStaff updated CM.9Animal ServicesCouncil Member Beck CouncilMember Byrd Mayor HudspethCouncil Member McGee CouncilMember Holland Mayor Pro TemMeltzer Council Member Jester02/24/25Cassey OgdenCMOStaff updated Council andare in communication withresident.10Request for updates to North LakesRecreation CenterMayor Hudspeth02/22/25Gary PackanParksStaff updated resident andMayor.11Ector Street Neighborhood Meeting - March5Mayor Pro Tem Meltzer02/21/25Seth GarciaCapital Projects/Engineering/Public Works Staff prepared materialsand updated MPT.12PID Downtown InquiryCouncil Member McGee02/21/25Brittany Sotelo, ChristineTaylorCMO Economic DevelopmentStaff updated CM.13Evaluation of Inclement Weather Policy Council Member Jester02/18/25Christine TaylorCMOStaff updated CM.14Traffic concerns - evaluate for stop signThistle Ridge @ Andrew AvenueCouncil Member Holland02/14/25Farhan ButtPublic Works-TrafficRoad safety auditcompleted by staff. Metwith resident. UpdatedCM. Anticipate installationof stop sign by 3/12/25.15Traffic Safety Audit at Circle at Kayewoodand GreenwoodCouncil Member Beck01/29/25Farhan ButtPublic Works-TrafficStaff updated CM and willimplement the trafficcontrols by March 27.Page 1 of 1Exported on February 28, 2025 8:37:43 AM PST25 Meeting Calendar City of Denton City Hall 215 E. McKinney St. Denton, Texas 76201 www.cityofdenton.com Criteria : Begin Date: 3/3/2025, End Date: 5/30/2025 Date Time Meeting LocationMeeting Body March 2025 3/3/2025 3:00 PM Development Code Review Committee Development Services Center 3/3/2025 5:30 PM Historic Landmark Commission Development Service Center 3/3/2025 6:00 PM Parks, Recreation and Beautification Board Civic Center Community Room 3/4/2025 2:00 PM City Council Council Work Session Room & Council Chambers 3/6/2025 8:00 AM Agenda Committee Cancelled 3/10/2025 9:00 AM Public Utilities Board Council Work Session Room 3/10/2025 3:00 PM Development Code Review Committee Cancelled 3/10/2025 5:30 PM Board of Ethics Council Work Session Room 3/10/2025 5:30 PM Library Board North Branch Library 3/12/2025 10:00 AM Animal Shelter Advisory Committee Animal Services Training Room 3/12/2025 11:00 AM Economic Development Partnership Board Development Service Center 3/12/2025 3:00 PM Airport Advisory Board CANCELLED 3/13/2025 3:00 PM Health & Building Standards Commission CANCELLED 3/14/2025 12:00 PM Community Services Advisory Committee Development Service Center 3/19/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers 3/24/2025 9:00 AM Public Utilities Board Council Work Session Room 3/24/2025 3:00 PM Development Code Review Committee Development Services Center 3/24/2025 5:30 PM Zoning Board of Adjustment Development Service Center 3/25/2025 2:00 PM City Council Council Work Session Room & Council Chambers 3/26/2025 10:00 AM Mobility Committee Council Work Session Room Page 1City of Denton Printed on 2/28/202526 Date Time Meeting LocationMeeting Body Meeting Calendar continued... 3/26/2025 12:00 PM Tax Increment Reinvestment Zone Number One Board Development Service Center 3/26/2025 1:00 PM Civil Service Commission City Hall East Human Resources Training Room 3/28/2025 1:00 PM Sustainability Framework Advisory Committee City Council Work Session Room April 2025 4/1/2025 11:00 AM City Council Council Work Session Room & Council Chambers 4/1/2025 2:00 PM City Council Council Work Session Room & Council Chambers 4/3/2025 8:00 AM Agenda Committee Council Work Session Room 4/3/2025 8:30 AM Downtown Economic Development Committee Development Service Center 4/3/2025 4:00 PM Public Art Committee Civic Center Community Room 4/7/2025 6:00 PM Parks, Recreation and Beautification Board Civic Center Community Room 4/9/2025 11:00 AM Economic Development Partnership Board Development Service Center 4/9/2025 3:00 PM Airport Advisory Board Airport Terminal Meeting Room 4/9/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers 4/10/2025 3:00 PM Health & Building Standards Commission Development Service Center 4/11/2025 12:00 PM Community Services Advisory Committee Development Service Center 4/14/2025 9:00 AM Public Utilities Board Council Work Session Room 4/14/2025 3:00 PM Development Code Review Committee Development Services Center 4/14/2025 5:30 PM Board of Ethics Council Work Session Room 4/14/2025 5:30 PM Historic Landmark Commission Development Service Center 4/14/2025 5:30 PM Library Board South Branch Library 4/15/2025 2:00 PM City Council Council Work Session Room & Council Chambers 4/23/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers 4/25/2025 1:00 PM Sustainability Framework Advisory Committee City Council Work Session Room Page 2City of Denton Printed on 2/28/2025 27 Date Time Meeting LocationMeeting Body Meeting Calendar continued... 4/28/2025 9:00 AM Public Utilities Board Council Work Session Room 4/28/2025 3:00 PM Development Code Review Committee Development Services Center 4/28/2025 5:30 PM Zoning Board of Adjustment Development Service Center 4/30/2025 10:00 AM Mobility Committee Council Work Session Room May 2025 5/1/2025 8:00 AM Agenda Committee Council Work Session Room 5/1/2025 4:00 PM Public Art Committee Council Work Session Room 5/5/2025 9:00 AM Public Utilities Board Council Work Session Room 5/5/2025 6:00 PM Parks, Recreation and Beautification Board Civic Center Community Room 5/6/2025 2:00 PM City Council Council Work Session Room & Council Chambers 5/8/2025 3:00 PM Health & Building Standards Commission Development Service Center 5/9/2025 12:00 PM Community Services Advisory Committee Development Service Center 5/12/2025 3:00 PM Development Code Review Committee Development Services Center 5/12/2025 5:30 PM Board of Ethics Council Work Session Room 5/12/2025 5:30 PM Historic Landmark Commission Development Service Center 5/12/2025 5:30 PM Library Board Emily Fowler Central Library 5/13/2025 12:00 PM City Council Council Work Session Room & Council Chambers 5/14/2025 10:00 AM Animal Shelter Advisory Committee Animal Services Training Room 5/14/2025 11:00 AM Economic Development Partnership Board Development Service Center Training Rooms 5/14/2025 3:00 PM Airport Advisory Board Airport Terminal Meeting Room 5/14/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers 5/16/2025 1:00 PM Bond Oversight Committee Development Service Center 5/19/2025 9:00 AM Public Utilities Board Council Work Session Room 5/19/2025 5:30 PM Zoning Board of Adjustment Development Service Center 5/20/2025 2:00 PM City Council Council Work Session Room & Council Chambers Page 3City of Denton Printed on 2/28/2025 28 Date Time Meeting LocationMeeting Body Meeting Calendar continued... 5/23/2025 1:00 PM Sustainability Framework Advisory Committee City Council Work Session Room 5/28/2025 10:00 AM Mobility Committee Council Work Session Room 5/28/2025 12:00 PM Tax Increment Reinvestment Zone Number One Board Development Service Center 5/28/2025 5:00 PM Planning and Zoning Commission Council Work Session Room & Council Chambers Page 4City of Denton Printed on 2/28/202529 Meeting Date Item Legistar ID Departments Involved Type Estimated Time A. Ethics Proposed Amendments 25-300 Internal Audit City Business 1:00 B. State Legislative Session Update 25-299 City Manager's Office City Business 0:30 C. Use of Evers Property 25-357 Parks and Recreation City Business 0:30 D. Two Minute Pitch:25-021 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Council Appointed Position Mid-Year Performance Reviews: City Auditor and City Attorney; Legal (if any)City Business 1:30 Total Est. Time: 4:00 Other Major Items for Meeting: A. Overview and Updates - Solid Waste and Recycling Department 24-2603 Solid Waste City Business 0:45 B. Annual Comprehensive Financial Report 24-2537 City Manager's Office City Business 0:30 C. Two Minute Pitch:25-022 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 2:15 Other Major Items for Meeting: A. Construction projects surrounding DISD campuses 25-244 City Manager's Office City Business 0:30 B. Denton ISD's legislative priorties and funding 25-245 City Manager's Office City Business 0:30 C. City of Denton Legislative Priorties TBD City Manager's Office City Business TBD Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 1:30 Other Major Items for Meeting: A. Audit of Recreation Facility Operations 25-339 Internal Audit City Business 0:15 B. Food Trucks TBD City Manager's Office City Business 1:00 C. Denton Police Department Annual Update and 2024 Annual Report 25-151 Police Department City Business 0:45 D. Water & Wastewater Resource Planning 25-149 Water/City Manager's Office City Business 1:00 E. Two Minute Pitch:25-023 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 4:00 Other Major Items for Meeting: A. Remote Participation for P&Z TBD Marketing and Communications Council Request 0:30 B. Homelessness Response Audit 25-337 Internal Audit City Business 0:30 C. Homelessness Initiative Update Part 2 24-2043 City Manager's Office City Business 1:00 D. Community Shelter Update TBD City Manager's Office City Business 1:00 E. Two Minute Pitch:25-024 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 4:00 Other Major Items for Meeting: A. Financial Policy Discussion 25-241 Finance City Business 1:00 B. Expiring Incentives TBD Economic Development Council Request 0:30 C. State Legislative Session Update TBD City Manager's Office City Business 0:30 D. Two Minute Pitch:25-025 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 3:00 Other Major Items for Meeting: Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 0:30 Other Major Items for Meeting: A. Animal Services Euthanasia Policy and Schedule of Fees TBD Animal Services City Business 1:00 B. Audit of Public Works Maintenance 25-338 Internal Audit City Business 0:30 C. Audit of Parks Management and Planning 25-340 Internal Audit City Business 0:30 D. Denton Renewable Resource Plan 24-1910 Denton Municipal Electric City Business 0:45 E. Two Minute Pitch:25-026 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 3:45 Other Major Items for Meeting: A. City Council Committee Assignments TBD City Secretary's Office City Business 0:30 B. Climate Action Plan Update 25-421 Environmental Services City Business 0:45 C. Fire Pension Audit TBD Finance City Business 0:30 D. Two Minute Pitch:25-027 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 2:45 Other Major Items for Meeting: A. Countywide Vote Centers TBD City Secretary's Office Council Request 0:30 B. Mission, Vision, and Rebranding Initiative TBD Marketing City Business 0:45 C. Boards and Commissions Citizen Nominations TBD City Secretary's Office City Business 0:30 D. Two Minute Pitch:25-028 City Manager's Office Council Request 0:30 Closed Meeting Item(s): Legal (if any)City Business 0:30 Total Est. Time: 2:45 Other Major Items for Meeting: Work Session To Be Determined Leak Adjustment Ordinance 24-1632 Water Utilities City Business TBD Item Dates Departments Type Estimated Work Item Date Approved Department Next Step Requestor Board of Ethics develop guidance for interactions with external partners 6/18/2024 Internal Audit Work Session CM Beck Amending master plans to renovate Civic Center Pool 10/15/2024 Parks & Recreation Informal Staff Report CM Beck Changes to the building code to make new homes EV and solar ready 11/19/2024 Development Services Informal Staff Report CM McGee Rooftop and wall gardens and solar panels on City buildings 12/3/2024 Facilities Management Informal Staff Report CM Beck Remote attendance for Planning and Zoning Commissioners 1/7/2025 Marketing and Communications Work Session Mayor Pro Tem Meltzer Fair Chance Hiring 2/4/2025 City Manager's Office Informal Staff Report CM McGee April 1 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) May 6 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) June 3 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) Approved Council Pitches to be Scheduled May 13 Special Called Meeting - Canvassing (@12:00 p.m.) May 20 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) March 25 Work Session (@2:00 p.m.) Special Called Meeting (Upon conclusion of the Work Session) Council Priorities and Significant Work Plan Items to be Scheduled June 17 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) March 4 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) Tentative Work Session Topics and Meeting Information Updated: February 28, 2025 April 1 Joint Meeting with Denton ISD (@11:00 a.m.) April 15 Work Session (@2:00 p.m.) Regular Called Meeting (@6:30 p.m.) *This is for planning purposes only. Dates are subject to change.30 1 Street Closure Report: Upcoming ClosuresSCR Mar 3rd - Mar 9thStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type1Ave GPrairie StLousie St03/13/25 05/23/25 Utility installations and pavement replacement EngineeringMegan DavidsonFull Closure2Bonnie Brae StUniversity Dr (Hwy 380)Elm St N03/10/25 03/24/25 Contractor will be preparing the right-of-way bycutting down the trees that will be removed towiden Bonnie BraeEngineeringJesus PerezRolling Closure3Mounts AveCongress St WHaynes St03/21/25 06/27/25 Utility installations and pavement replacement EngineeringMegan DavidsonFull Closure4Prairie StWelch StBernard St03/13/25 05/23/25 Utility installationsEngineeringMegan DavidsonFull Closure5Precision DrAirport RdUNT Library Annex04/01/25 07/31/25 ReconstructionEngineering OtherGio PineiroFull Closure6Welch StEagle DrHighland St03/13/25 05/30/25 Utility installations and pavement replacement EngineeringMegan DavidsonFull ClosureExported on February 28, 2025 11:47:30 AM CST31 2 Street Closure Report: Current ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type1Aileen StPanhandle StBroadway St09/27/24 04/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure2Audra LnStockton StMockingbird Ln02/24/25 03/21/25 Paving new addition street laneon Audra Lane and replacingstreet panel on existingroadway where 8-inch water tapwas performed.Private Development PublicWorks InspectionsZabdiel MotaLane Closure3Audra LnStockton StMockingbird Ln07/29/24 05/09/25 Connection new storm drainageto existing City of Dentondrainage.Private DevelopmentZabdiel MotaLane Closure4Ave ACollins StEagle Dr10/08/24 04/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure5Ave AEagle DrHighland St02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigRolling Closure6Ave BFannin StMargie St11/22/24 04/30/25 Pavement replacement EngineeringScott FettigFull Closure7Ave CEagle DrHighland St08/26/24 04/30/25 Pavement replacement. EngineeringScott FettigFull Closure8Bell Ave N (3317)Locust St NHolly Creek Rd03/03/25 04/11/25 Curb Gutter / Sidewalk Repair StreetsRoy San MiguelLane Closure9Bernard StLindsey StFannin St08/26/24 04/30/25 Utility installations andpavement replacement.EngineeringScott FettigRolling Closure10Bonnie Brae StStella StOak St W03/03/25 03/21/25 DME Sub Station work alongBonnie BraePublic Works Inspections Collin ColeLane Closure11Bonnie Brae StFM1515Walt Parker Dr01/06/25 06/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure12Clover LnRobinwood LnGlenwood Ln11/12/24 05/18/25 Full Road Reconstruction EngineeringSheldon GatewoodFull Closure13Collins StAve ABernard St08/26/24 04/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure14Congress StPonder AveCoit St02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure15Crescent StCarroll BlvdBolivar St01/24/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure16Duncan StSmith StKerley St02/21/25 03/07/25 Water Utility Line Repairs Public Works Inspections Kirk WinterLane Closure17Emery StAlice StDead End (West of Fulton)02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure18Evening Wind RdBishop Pine RdDessert Willow01/13/25 03/14/25 Concrete Panels and SideWalkRepairStreetsRoy San MiguelLane Closure19Fannin StAve AAve B12/09/24 03/28/25 Storm Drain being installed Public Works Inspections Collin ColeLane Closure20Fulton StCordell StEmery St02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure21Hickory Creek RdRiverpass DrFM 183003/13/23 12/31/25 Bridge InstallationEngineeringTracy BeckFull Closure22Hidden Path Ln (7808)White Dove LnMontecito Dr01/27/25 03/07/25 Concrete Panel and SidewalkRepairStreetsRoy San MiguelLane Closure23Hill StSmith StMill St02/21/25 03/14/25 Water Utility tie-inPublic Works Inspections Kirk WinterLane Closure24Hillcrest StPanhandle StCrescent St12/27/23 04/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure25Houston PlThomas StBradley St09/27/24 03/31/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure26Kenwood StWilderness StFox Hollow11/18/24 03/28/25 Reconstruction of the road curband gutter mill subgradestabilizationStreetsJesus RodriguezFull Closure27Lake Side CtLake Country DrCul v Sac03/03/25 04/11/25 Sidewalk RepairStreetsRoy San MiguelLane Closure28Margie StAve AAve B11/01/24 03/31/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure29Marietta StOak St WScripture St09/27/24 03/31/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure30Morse StLoop 288Mayhill Rd12/02/24 06/27/25 Water Line Replacement andRoad ReconstructionPublic Works InspectionsStreets WaterKristine StewartLane Closure31Mulberry StWelch StBernard St11/29/24 03/31/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure32Nautical LnHickory Creek RdOcean Dr01/02/25 03/28/25 Water and Storm line tie ins Private DevelopmentGavin PetnerLane Closure33Ocean DrAtlantic DrNautical Ln03/14/25 04/15/25 Sanitary Sewer installPrivate DevelopmentGavin PetnerFull Closure34Panhandle StEctor StAileen St09/27/24 03/31/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure Exported on February 28, 2025 11:47:51 AM CST32 Street/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type35Pinto Dr (2820)Paint Drat Intersection02/24/25 03/28/25 Street Panels and SidewalkRepairStreetsRoy San MiguelLane Closure36Riney RdBonnie Brae StHardaway Rd03/08/25 04/19/25 Contractor to install 12-inchwaterline to provide water to thenew DISD elementary schoolEngineeringJesus PerezFull Closure37Robinwood LnEmerson LnLive Oak St11/12/24 05/16/25 Full Road Reconstruction EngineeringSheldon GatewoodFull Closure38Robinwood LnLive OakKayewood Dr01/27/25 06/30/25 Road reconstruction (Millingand C/G Removal, Stabilization)EngineeringSheldon GatewoodFull Closure39Scripture StJagoe StPonder St03/04/25 10/17/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure40Spur CtLake Country DrCul v Sac03/03/25 04/11/25 Sidewalk RepairStreetsRoy San MiguelLane Closure41Sunset StUniversity Dr WAnna St01/20/25 04/30/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure42Thomas StPanhandle StEmery St10/11/24 03/31/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure43Unicorn Lake BlvdState School RdWind River Ln12/17/24 03/31/25 Water and Sanitary Sewer tieinsPrivate DevelopmentGavin PetnerLane Closure44Welch StHighland StHickory St08/26/24 04/30/25 Utility installations andpavement replacement.EngineeringScott FettigRolling Closure45Welch StChestnut StMulberry St02/03/25 07/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure46Welch St SEagle DrHickory St06/03/24 05/31/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure47Westway StAnna StBolivar St01/24/25 05/01/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure48Willowwood StWestwood DrLeslie St03/10/25 04/14/25 Sanitary sewer, water andstorm sewer installPrivate DevelopmentGavin PetnerLane Closure49Withers StVine StBell Ave02/28/25 03/03/25 Valley Gutter repairOtherAlexander CervantesFull Closure Exported on February 28, 2025 11:47:51 AM CST33 3 Street Closure Report: Completed ClosuresStreet/ IntersectionFromToClosure StartDateClosure EndDateDescriptionDepartmentDepartment Contact Closure Type1Bonnie Brae StBirch Grove BendVintage Blvd01/24/25 02/21/25 pavement removal andinfrastructure installationPublic Works Inspections Kirk WinterLane Closure2Bonnie Brae St NOak StHickory St02/10/25 02/21/25 Concrete poles install on thatcorner for DMEPublic Works Inspections John CantuLane Closure3Bonnie Brae St SNational Wholesale (south ofRR Tracks)Parvin Rd02/12/25 02/15/25 Installation of Sanitary Sewerline crossing under Bonnie Brae- Access to Natl Wholesale fromthe north end only.EngineeringRobin DavisFull Closure4Desert Willow DrSilktree Ct@ Intersection01/13/25 02/06/25 Sidewalk and ADA Repair StreetsRoy San MiguelLane Closure5Dunes StDunes Ct@ Intersection01/27/25 02/14/25 Removing asphalt and placingvalley gutter in the easternportion of the intersection onDunes StEngineeringTaylor HoltFull Closure6Eagle DrBeatty StCentral Ave11/25/24 02/14/25 Utility installations andpavement replacement.EngineeringScott FettigRolling Closure7Eagle DrCentral AveAve A02/17/25 02/28/25 Utility installations andpavement replacement.EngineeringScott FettigFull Closure8Emerald Trace DrShagbank DrRidgehurst Ln01/24/25 02/21/25 pavement removal andinfrastructure installationPublic Works Inspections Kirk WinterFull Closure9Mockingbird LnHoward CtLance Ln01/06/25 02/07/25 Sidewalk and ADA repair StreetsRoy San MiguelLane Closure10Pickwick LnOxford Lane@ Intersection01/27/25 01/31/25 Removing asphalt and placingvalley gutter in the easternportion of the intersection onPickwick Ln.EngineeringTaylor HoltFull Closure11Ridgehurst LnBonnie Brae StEmerald Trace Dr01/24/25 02/21/25 pavement removal andinfrastructure installationPublic Works Inspections Kirk WinterFull Closure12Shagbank DrHomebeam StEmerald Trace Dr01/24/25 02/21/25 pavement removal andinfrastructure installationPublic Works Inspections Kirk WinterFull Closure13Texas stBell AveOakland St02/08/25 02/17/25 Driver pipeline replacing valleygutterPublic Works Inspections Alexander CervantesFull Closure14Walnut St ELocust St SAustin St S02/25/25 02/25/25 Crane replacing HVAC on WellsFargo buildingOtherPatrick NunleyFull Closure Exported on February 28, 2025 11:48:05 AM CST34